HARGA UPAH HARGA
SNI KODE SATUAN PEKERJA BAHAN
(Rp.) (Rp.) (Rp.) (Rp.)
A. PEKERJAAN TANAH
1 03-2835-2008 6.1 1 M3 Galian tanah biasa sedalam 1 m
0.7500 oh Pekerja
0.0250 oh Mandor
Jml Total
2 03-2835-2008 6.2 1 M3 Galian tanah biasa sedalam 2 m
0.9000 oh Pekerja
0.0450 oh Mandor
Jml Total
3 03-2835-2008 6.9 1 M3 Mengurug tanah kembali ( 1/3 dari indek pek galian )
0.3000 oh Pekerja
0.0150 oh Mandor
Jml Total
4 03-2835-2008 6.11 1 M3 Urugan pasir
1.2000 m3 Pasir urug
0.3000 oh Pekerja
0.0100 oh Mandor
Jml Total
5 03-2835-2008 6.15 1 M3 Urugan tanah + pemadatan
0.2500 oh Pekerja
0.0250 oh Mandor
1.0000 ls Pemadatan
Jml Total
6 03-2835-2008 6.15 1 M3 Urugan fill + pemadatan
0.2500 oh Pekerja
0.0250 oh Mandor
1.0000 ls Pemadatan
Jml Total
7 03-2835-2008 6.15 1 M3 Pembuangan tanah sejauh 150 m
0.5160 oh Pekerja
0.0500 oh Mandor
Jml Total
B. PEKERJAAN PONDASI
1 03-2836-2008 6.9 1 M3 Pasang batu kosong / anstamping
1.2000 m3 Batu belah
0.4330 m3 Pasir urug
0.7800 oh Pekerja
0.3900 oh Tukang batu
0.0390 oh Kepala tukang
0.0390 oh Mandor
2 03-2836-2008 6.3 1 M3 Pasang batu belah 1 Pc : 5 Ps
1.2000 m3 Batu belah
136.0000 kg Portland Cemen ( PC )
0.5440 m3 Pasir pasang
1.5000 oh Pekerja
0.6000 oh Tukang batu
0.0600 oh Kepala tukang
0.0750 oh Mandor
C. PEKERJAAN DINDING & PLESTERAN
1 03-6897-2008 6,10 1 M2 Pasang batu bata merah (5x11x22) cm tbl 1/2 bata camp 1 Pc : 5 Ps
70.0000 m3 Batu bata
9.6800 kg Portland Cemen ( PC )
0.0450 m3 Pasir pasang
0.3000 oh Pekerja
0.1000 oh Tukang batu
0.0100 oh Kepala tukang
0.0150 oh Mandor
ANALISA HARGA SATUAN PEKERJAAN
NO JUMLAHANALISA PEKERJAAN
2 03-2837-2008 6.16 1 M2 Plesteran 1 Pc : 5 Ps- tbl 20 mm
6.9120 kg Portland Cemen ( PC )
0.0350 m3 Pasir pasang
0.2600 oh Pekerja
0.2000 oh Tukang batu
0.0200 oh Kepala tukang
0.0130 oh Mandor
3 03-2837-2008 6.15 1 M2 Plesteran 1 Pc : 4 Ps- tbl 20 mm
8.3200 kg Portland Cemen ( PC )
0.0320 m3 Pasir pasang
0.2600 oh Pekerja
0.2000 oh Tukang batu
0.0200 oh Kepala tukang
0.0130 oh Mandor
4 03-2837-2008 6.19 1 M2 Plesteran braben 1 Pc : 5 Ps- tbl 15 mm
5.1840 kg Portland Cemen ( PC )
0.0260 m3 Pasir pasang
0.1500 oh Pekerja
0.0700 oh Tukang batu
0.0070 oh Kepala tukang
0.0080 oh Mandor
5 03-2837-2008 6,20 1 M' Plesteran skoning 1 : 2 lebar 10 mm
0.5000 kg Portland Cemen ( PC )
0.0130 m3 Pasir pasang
0.0570 oh Pekerja
0.0380 oh Tukang batu
0.0380 oh Kepala tukang
0.0030 oh Mandor
6 03-2837-2008 6,26 1 M' Memasang finishing siar batu kali 1Pc : 2Ps
6.3400 kg Portland Cemen ( PC )
0.1200 m3 Pasir pasang
0.3000 oh Pekerja
0.1400 oh Tukang batu
0.0140 oh Kepala tukang
0.0150 oh Mandor
7 03-2837-2008 6,27 1 M2 Memasang acian
3.2500 kg Portland Cemen ( PC )
0.1500 oh Pekerja
0.1000 oh Tukang batu
0.0100 oh Kepala tukang
0.0080 oh Mandor
D. PEKERJAAN LANTAI
1 03-7395-2008 6.9 1 M2 Lantai keramik polish 60/60 ( Aula ) :
3.0000 bh keramik polish 60x60
14.7000 kg Portland Cemen ( PC )
1.9500 kg PC warna
0.0675 m3 Pasir pasang
0.3750 oh Pekerja
0.1800 oh Tukang batu
0.0180 oh Kepala tukang
0.0195 oh Mandor
2 03-7395-2008 6.9 1 M2 Lantai keramik unpolish 60/60 ( Aula ) :
3.0000 bh keramik polish 60x60
14.7000 kg Portland Cemen ( PC )
1.9500 kg PC warna
0.0675 m3 Pasir pasang
0.3750 oh Pekerja
0.1800 oh Tukang batu
0.0180 oh Kepala tukang
0.0195 oh Mandor
3 03-7395-2008 6.9 1 M2 Lantai granito 60/60 ( Aula ) :
3.0000 bh granito 60x60
14.7000 kg Portland Cemen ( PC )
1.9500 kg PC warna
0.0675 m3 Pasir pasang
0.3750 oh Pekerja
0.1800 oh Tukang batu
0.0180 oh Kepala tukang
0.0195 oh Mandor
4 03-7395-2008 6.9 1 M2 Lantai keramik 40/40 (Polish) :
6.6300 bh keramik 40x40
9.8000 kg Portland Cemen ( PC )
1.3000 kg PC warna
0.0450 m3 Pasir pasang
0.2500 oh Pekerja
0.1200 oh Tukang batu
0.0120 oh Kepala tukang
0.0130 oh Mandor
5 03-7395-2008 6.9 1 M2 Lantai keramik 40/40 (Un polish) :
6.6300 bh keramik 40x40
9.8000 kg Portland Cemen ( PC )
1.3000 kg PC warna
0.0450 m3 Pasir pasang
0.2500 oh Pekerja
0.1200 oh Tukang batu
0.0120 oh Kepala tukang
0.0130 oh Mandor
6 03-7395-2008 6.35 1 M2 Lantai keramik unpolish 30/30 :
11.8700 bh Keramik 30x30
10.0000 kg Portland Cemen ( PC )
1.5000 kg PC warna
0.0450 m3 Pasir pasang
0.6200 oh Pekerja
0.3500 oh Tukang batu
0.0350 oh Kepala tukang
0.0300 oh Mandor
7 03-7395-2008 6.35 1 M2 Lantai keramik 30/30 :
11.8700 bh Keramik 30x30
10.0000 kg Portland Cemen ( PC )
1.5000 kg PC warna
0.0450 m3 Pasir pasang
0.6200 oh Pekerja
0.3500 oh Tukang batu
0.0350 oh Kepala tukang
0.0300 oh Mandor
8 03-7395-2008 6.54 1 M2 Pasang keramik dinding 20x25 :
21.5000 bh Keramik 20x25
10.4000 kg Portland Cemen ( PC )
1.6200 kg PC warna
0.0450 m3 Pasir pasang
0.6200 oh Pekerja
0.3500 oh Tukang batu
0.0350 oh Kepala tukang
0.0300 oh Mandor
9 03-7395-2008 6.36 1 M2 Pasang keramik lantai 20x20 :
26.5000 bh Keramik 20x20
10.4000 kg Portland Cemen ( PC )
1.6200 kg PC warna
0.0450 m3 Pasir pasang
0.6200 oh Pekerja
0.3500 oh Tukang batu
0.0350 oh Kepala tukang
0.0300 oh Mandor
10 03-7395-2008 1 M' Pasang nozing tangga 5x20 :
5.000 bh Nozing 5x20
2.600 kg Portland Cemen ( PC )
0.405 kg PC warna
0.011 m3 Pasir pasang
0.088 oh Tukang
0.009 oh Kepala tukang
0.155 oh Pekerja
0.008 oh Mandor
11 03-7395-2008 1 M' Pasang keramik border dinidng km/wc 5x30 :
4.000 bh Keramik border 5x30
1.140 kg Portland Cemen ( PC )
0.025 kg PC warna
0.003 m3 Pasir pasang
0.090 oh Tukang
0.009 oh Kepala tukang
0.090 oh Pekerja
0.005 oh Mandor
12 1 M' Pasang plint kaca rayband 5 mm L = 10 cm
0.1000 m2 Plint kaca rayband 5 mm L = 10 cm
1.1400 kg Portland Cemen ( PC )
0.090 oh Pekerja
0.090 oh Tukang
0.009 oh Kepala tukang
0.005 oh Mandor
13 03-7395-2008 1 M' Pasang kuku macan 2,5x10 :
10.000 bh Kuku macan 2,5x10
0.945 kg Portland Cemen ( PC )
0.147 kg PC warna
0.004 m3 Pasir pasang
0.032 oh Tukang
0.003 oh Kepala tukang
0.056 oh Pekerja
0.003 oh Mandor
14 03-7395-2008 6.57 1 M2 Pasang batu serit / mortar
1.1000 m2 Batu serit
11.7500 kg Portland Cemen ( PC )
0.0350 m3 Pasir pasang
0.6200 oh Pekerja
0.3500 oh Tukang batu
0.0350 oh Kepala tukang
0.0300 oh Mandor
E. PEKERJAAN BETON
1 03-7394-2008 6.4 1 M3 Beton lantai kerja mutu fc = 7,4 Mpa ( K100) slum (3-6) cm w/c = 0,87
230.0000 kg Portland Cemen ( PC )
893.0000 kg Pasir beton
1,024.0000 kg Kerikil (maksimum 30 mm)
200.0000 ltr air
1.2000 oh Pekerja
0.2000 oh Tukang batu
0.0200 oh Kepala tukang
0.0060 oh Mandor
2 03-7394-2008 6.5 1 M3 Beton mutu fc = 9,8 Mpa ( K175) slum (12±2) cm w/c = 0,66
326.0000 kg Portland Cemen ( PC )
760.0000 kg Pasir beton
1,029.0000 kg Kerikil (maksimum 30 mm)
215.0000 ltr air
1.6500 oh Pekerja
0.2500 oh Tukang batu
0.0250 oh Kepala tukang
0.0800 oh Mandor
3 03-7394-2008 6.7 1 M3 Beton mutu fc = 19,3 Mpa ( K225) slum (12±2) cm w/c = 0,58
371.0000 kg Portland Cemen ( PC )
698.0000 kg Pasir beton
1,047.0000 kg Kerikil (maksimum 30 mm)
215.0000 ltr air
1.6500 oh Pekerja
0.2500 oh Tukang batu
0.0250 oh Kepala tukang
0.0800 oh Mandor
4 03-7394-2008 6.9 1 M3 Beton mutu fc = 24 Mpa ( K275) slum (12±2) cm w/c = 0,53
406.0000 kg Portland Cemen ( PC )
684.0000 kg Pasir beton
1,026.0000 kg Kerikil (maksimum 30 mm)
215.0000 ltr air
1.6500 oh Pekerja
0.2500 oh Tukang batu
0.0250 oh Kepala tukang
0.0800 oh Mandor
5 03-7394-2008 6.9 1 M3 Beton mutu fc = 26.4 Mpa ( K300) slum (12±2) cm w/c = 0,52
413.0000 kg Portland Cemen ( PC )
681.0000 kg Pasir beton
1,021.0000 kg Kerikil (maksimum 30 mm)
215.0000 ltr air
1.6500 oh Pekerja
0.2750 oh Tukang batu
0.0280 oh Kepala tukang
0.0830 oh Mandor
6 03-7394-2008 6.17 10 kg Pembesian dengan besi polos / ulir
10.5000 kg Besi polos / ulir
0.1500 kg Kawat beton
0.0700 oh Pekerja
0.0700 oh Tukang batu
0.0070 oh Kepala tukang
0.0040 oh Mandor
1 kg Pembesian dengan besi polos / ulir
7 03-7394-2008 6.21 1 M2 Memasang Bekisting untuk sloof
0.0450 m3 Kayu kelas III (terentang)
0.3000 kg Paku biasa 2"-5"
0.1000 ltr Minyak bekisting
0.5200 oh Pekerja
0.2600 oh Tukang batu
0.0260 oh Kepala tukang
0.0260 oh Mandor
8 03-7394-2008 6.22 1 M2 Memasang Bekisting untuk kolom
0.0400 m3 Kayu kelas III (terentang)
0.4000 kg Paku biasa 2"-5"
0.2000 ltr Minyak bekisting
0.0150 m3 Balok kayu kelas II
0.3500 lbr Multiplex 6 mm
2.0000 btg Dolken kayu dia 8-10 cm / 4 m
0.6600 oh Pekerja
0.3300 oh Tukang batu
0.0330 oh Kepala tukang
0.0330 oh Mandor
9 03-7394-2008 6.23 1 M2 Memasang Bekisting untuk balok
0.0400 m3 Kayu kelas III (terentang)
0.4000 kg Paku biasa 2"-5"
0.2000 ltr Minyak bekisting
0.0180 m3 Balok kayu kelas II
0.3500 lbr Multiplex 6 mm
2.0000 btg Dolken kayu dia 8-10 cm / 4 m
0.6600 oh Pekerja
0.3300 oh Tukang batu
0.0330 oh Kepala tukang
0.0330 oh Mandor
10 03-7394-2008 6.24 1 M2 Memasang Bekisting untuk lantai
0.0400 m3 Kayu kelas III (terentang)
0.4000 kg Paku biasa 2"-5"
0.2000 ltr Minyak bekisting
0.0150 m3 Balok kayu kelas II
0.3500 lbr Multiplex 6 mm
2.0000 btg Dolken kayu dia 8-10 cm / 4 m
0.6600 oh Pekerja
0.3300 oh Tukang batu
0.0330 oh Kepala tukang
0.0330 oh Mandor
11 03-7394-2008 6.26 1 M2 Memasang Bekisting untuk tangga
0.0300 m3 Kayu kelas III (terentang)
0.4000 kg Paku biasa 2"-5"
0.1500 ltr Minyak bekisting
0.0150 m3 Balok kayu kelas II
0.3500 lbr Multiplex 6 mm
2.0000 btg Dolken kayu dia 8-10 cm / 4 m
0.6600 oh Pekerja
0.3300 oh Tukang batu
0.0330 oh Kepala tukang
0.0330 oh Mandor
12 Dihitung 1 M3 Beton bertulang praktis 15 x 15 :
1.0000 m3 Beton K 225
149.5207 kg Besi
13.3332 m2 Bekisting
Jml Total
13 Dihitung 1 M3 Beton bertulang sloof 15 x 20 :
1.0000 m3 Beton K 225
173.2849 kg Besi
13.3320 m2 Bekisting
Jml Total
14 Dihitung 1 M3 Beton bertulang sloof 15 x 25 ( Asrama ) :
1.0000 m3 Beton K 225
144.9191 kg Besi
13.3335 m2 Bekisting
Jml Total
15 Dihitung 1 M3 Beton bertulang sloof 20 x 40 ( Asrama ) :
1.0000 m3 Beton K 225
153.8700 kg Besi
10.0000 m2 Bekisting
Jml Total
16 Dihitung 1 M3 Beton bertulang sloof 20 x 30 ( Aula ) :
1.0000 m3 Beton K 225
197.3039 kg Besi
10.0002 m2 Bekisting
Jml Total
17 Dihitung 1 M3 Beton bertulang balok 20 x 40 B1 ( Aula ) :
1.0000 m3 Beton K 225
144.1000 kg Besi
12.5000 m2 Bekisting
Jml Total
18 Dihitung 1 M3 Beton bertulang balok 20 x 30 B2 ( Aula ) :
1.0000 m3 Beton K 225
177.6702 kg Besi
13.3336 m2 Bekisting
Jml Total
19 Dihitung 1 M3 Beton bertulang balok 15 x 25 B3 ( Aula ) :
1.0000 m3 Beton K 225
187.2023 kg Besi
17.3336 m2 Bekisting
Jml Total
20 Dihitung 1 M3 Beton bertulang balok 15 x 20 B4 ( Aula ) :
1.0000 m3 Beton K 225
219.5311 kg Besi
18.3332 m2 Bekisting
Jml Total
21 Dihitung 1 M3 Beton bertulang balok 30 x 70 B1 (Asrama ) :
1.0000 m3 Beton K 225
153.5364 kg Besi
5.2382 m2 Bekisting
Jml Total
21 Dihitung 1 M3 Beton bertulang balok 25 x 50 B2 ( Asrama ) :
1.0000 m3 Beton K 225
198.1280 kg Besi
10.0000 m2 Bekisting
Jml Total
22 Dihitung 1 M3 Beton bertulang balok 20 x 30 B3 ( Asrama ) :
1.0000 m3 Beton K 225
184.0703 kg Besi
13.3336 m2 Bekisting
Jml Total
23 Dihitung 1 M3 Beton bertulang balok 15 x 25 B3 (Asrama) :
1.0000 m3 Beton K 225
153.3032 kg Besi
17.3336 m2 Bekisting
Jml Total
24 Dihitung 1 M3 Beton bertulang balok 15 x 25 B4 (Asrama) :
1.0000 m3 Beton K 225
156.4393 kg Besi
17.3336 m2 Bekisting
Jml Total
25 Dihitung 1 M3 Beton bertulang plat konsol penyangga talang t = 15 cm :
1.0000 m3 Beton K 225
21.068 kg Besi
6.667 m2 Bekisting
Jml Total
26 Dihitung 1 M3 Beton bertulang ring balok 15 x 25 RB1 ( Asrama / Aula ) :
1.0000 m3 Beton K 225
144.9191 kg Besi
13.3335 m2 Bekisting
Jml Total
27 Dihitung 1 M3 Beton bertulang ring balok 15 x 20 RB 2 ( Asrma ) :
1.0000 m3 Beton K 225
173.2849 kg Besi
13.3332 m2 Bekisting
Jml Total
28 Dihitung 1 M3 Beton bertulang ring balok 15 x 25 RB3 ( Aula ) :
1.0000 m3 Beton K 225
144.9191 kg Besi
13.3335 m2 Bekisting
Jml Total
29 Dihitung 1 M3 Beton bertulang kolom 30 x 50 K1 ( Asrama ) :
1.0000 m3 Beton K 225
149.3515 kg Besi
10.6672 m2 Bekisting
Jml Total
30 Dihitung 1 M3 Beton bertulang kolom 30 x 30 K2 ( Asrama ) :
1.0000 m3 Beton K 225
106.9012 kg Besi
13.3332 m2 Bekisting
Jml Total
31 Dihitung 1 M3 Beton bertulang kolom 20 x 20 ( Asrama / Aula ) :
1.0000 m3 Beton K 225
135.8600 kg Besi
20.0000 m2 Bekisting
Jml Total
32 Dihitung 1 M3 Beton bertulang kolom atas talang 15 x 30 ( Asrama ) :
1.0000 m3 Beton K 225
126.0032 kg Besi
19.9998 m2 Bekisting
Jml Total
33 Dihitung 1 M3 Beton bertulang kolom 15 x 50 ( Asrama ) :
1.0000 m3 Beton K 225
79.2687 kg Besi
17.3329 m2 Bekisting
Jml Total
33 Dihitung 1 M3 Beton bertulang kolom 30 x 70 K1 ( Aula ) :
1.0000 m3 Beton K 225
169.9082 kg Besi
9.5240 m2 Bekisting
Jml Total
34 Dihitung 1 M3 Beton bertulang kolom 30 x 30 K2 ( Aula ) :
1.0000 m3 Beton K 225
157.8651 kg Besi
13.3332 m2 Bekisting
Jml Total
35 Dihitung 1 M3 Beton bertulang balok tangga 15 x 25 ( Asrama ) :
1.0000 m3 Beton K 225
192.2264 kg Besi
17.3336 m2 Bekisting
Jml Total
36 Dihitung 1 M3 Beton bertulang kolom 15 x 20 (Pos jaga ) :
1.0000 m3 Beton K 225
169.3550 kg Besi
23.3331 m2 Bekisting
Jml Total
37 Dihitung 1 M3 Beton bertulang kuda-kuda 15 x 25 B3 ( Mushola ) :
1.0000 m3 Beton K 225
187.2023 kg Besi
17.3336 m2 Bekisting
Jml Total
38 Dihitung 1 M3 Beton bertulang kolom 30 x 30 (Doorlupe ) :
1.0000 m3 Beton K 225
70.8615 kg Besi
13.3332 m2 Bekisting
Jml Total
39 Dihitung 1 M3 Beton bertulang pedestal 30x40 ( Aula ) :
1.0000 m3 Beton K 225
52.4896 kg Besi
5.8331 m2 Bekisting
Jml Total
40 Dihitung 1 M3 Beton bertulang pedestal 25x30 ( Asrama ) :
1.0000 m3 Beton K 225
76.1248 kg Besi
7.3332 m2 Bekisting
Jml Total
41 Dihitung 1 Bh Pondasi foot plat 175x175 F1 ( Asrama ) :
4.5938 m3 Galian tanah
1.8375 m3 Urugan kembali
0.3063 m3 Urugan pasir
0.1531 m3 Beton K 100
0.7656 m3 Beton K 225
81.7020 kg Besi
1.4000 m2 Bekisting
Jml Total
42 Dihitung 1 Bh Pondasi foot plat 100x100 F2 ( Asrama ) :
1.0000 m3 Galian tanah
0.4000 m3 Urugan kembali
0.1000 m3 Urugan pasir
0.0500 m3 Beton K 100
0.2500 m3 Beton K 225
32.7972 kg Besi
0.8000 m2 Bekisting
Jml Total
43 Dihitung 1 Bh Pondasi foot plat 80x80 F2 ( Asrama ) :
0.6400 m3 Galian tanah
0.2560 m3 Urugan kembali
0.0640 m3 Urugan pasir
0.0320 m3 Beton K 100
0.1600 m3 Beton K 225
21.5100 kg Besi
0.6400 m2 Bekisting
Jml Total
44 Dihitung 1 Bh Pondasi foot plat 120x120 F1 ( Aula ) :
1.5840 m3 Galian tanah
0.6336 m3 Urugan kembali
0.0720 m3 Urugan pasir
0.0720 m3 Beton K 100
0.3600 m3 Beton K 225
50.2048 kg Besi
0.9600 m2 Bekisting
Jml Total
45 Dihitung 1 Bh Pondasi foot plat tangga 60x150 F3 ( Asrama ) :
0.9750 m3 Galian tanah
0.3900 m3 Urugan kembali
0.0488 m3 Urugan pasir
0.0488 m3 Beton K 100
0.2438 m3 Beton K 225
26.1280 kg Besi
0.8600 m2 Bekisting
Jml Total
46 Dihitung 1 M3 Beton bertulang plat T = 10 cm
1.0000 m3 Beton K 225
62.000 kg Besi
10.000 m2 Bekisting
Jml Total
47 Dihitung 1 M3 Beton bertulang plat lantai T = 12 cm
1.0000 m3 Beton K 225
92.996 kg Besi
8.333 m2 Bekisting
Jml Total
48 Dihitung 1 M3 Beton bertulang plat tangga T = 12 cm
1.000 m3 Beton K 225
189.137 kg Besi
8.333 m2 Bekisting
Jml Total
49 Dihitung 1 M3 Beton bertulang plat T = 8 cm
1.0000 m3 Beton K 225
49.1250 kg Besi
12.500 m2 Bekisting
Jml Total
50 Dihitung 1 M3 Beton bertulang plat T = 6 cm
1.0000 m3 Beton K 225
65.2380 kg Besi
16.667 m2 Bekisting
Jml Total
51 Dihitung 1 Bh Beton bertulang poor mini pail 60x120 t= 40 cm (Aula)
0.288 m3 Beton K 300
48.980 kg Besi
1.440 m2 Bekisting
Jml Total
F. PEKERJAAN KAYU ATAP
1 03-3434-2008 6.15 1 M3 Memasang konstruksi gording kayu kelas II
1.1000 m3 Kayu kruing balok
15.0000 kg Besi strip
3.0000 kg Paku biasa 2"-5"
2.4000 oh Pekerja
7.2000 oh Tukang kayu
0.7200 oh Kepala tukang
0.1200 oh Mandor
2 03-3434-2008 6,15a 1 M3 Memasang konstruksi nok / jurai kayu kelas II
1.1000 m3 Kayu kruing balok
15.0000 kg Besi strip
3.0000 kg Paku biasa 2"-5"
2.4000 oh Pekerja
7.2000 oh Tukang kayu
0.7200 oh Kepala tukang
0.1200 oh Mandor
3 03-3434-2008 6.16 1 M2 Memasang rangka atap genteng glazur, kayu kelas II
0.0140 m3 Kayu kelas II kruing (5x7) cm
0.0080 m3 Reng bengkirai (3x5) cm
0.2500 kg Paku biasa 2"-5"
0.1000 oh Pekerja
0.1000 oh Tukang kayu
0.0100 oh Kepala tukang
0.0050 oh Mandor
4 03-3434-2008 6.22 1 M' Memasang listplank Uk ( 3x30 ) cm kayu kelas II
0.0110 m3 Kayu kelas II bengkirai papan
0.0500 kg Paku biasa 2"-5"
0.1000 oh Pekerja
0.2000 oh Tukang kayu
0.0200 oh Kepala tukang
0.0050 oh Mandor
5 3434-2008 1 M' Memasang reiter kayu kruing ( 2x20 ) cm
0.004 m3 Kayu kruing
0.040 kg Paku biasa 2"-5"
0.175 oh Pekerja
0.175 oh Tukang kayu
0.010 oh Kepala tukang
0.004 oh Mandor
G. PEKERJAAN PENUTUP ATAP
1 03-3436-2002 6.3 1 M2 Pasang atap genteng glazur
18.0000 bh Genteng glazur
0.1500 oh Pekerja
0.0600 oh Tukang kayu
0.0060 oh Kepala tukang
0.0080 oh Mandor
2 03-3436-2002 6.5 1 M' Pasang bubungan genteng glazur
4.0000 bh Bubungan genteng glazur
8.0000 kg Portland Cemen ( PC )
0.0320 m3 Pasir pasang
0.4000 oh Pekerja
0.2000 oh Tukang kayu
0.0200 oh Kepala tukang
0.0020 oh Mandor
3 03-3436-2002 6.42 1 M2 Pasang alluminium foil / sisalation
1.0500 m2 Alluminium foil
0.1500 oh Pekerja
0.0500 oh Tukang kayu
0.0050 oh Kepala tukang
0.1200 oh Mandor
4 03-7393-2008 6.18 1 M' Pasang talang jurai seng BJLS 28 lebat 90 cm
1.0500 lbr Seng plat
0.0150 kg Paku biasa 1"-2,5"
0.0190 m3 Papan kelas II
0.2000 oh Pekerja
0.4000 oh Tukang kayu
0.0250 oh Kepala tukang
0.0100 oh Mandor
H. PEKERJAAN LANGIT-LANGIT
1 03-2839-2008 6.7 1 M2 Plafond gypsum board (120x240) tebal 9 mm:
0.3640 lbr Gypsum Board 9 mm
1.0250 btg Rangka hollow 2x4 cm t = 0,35 mm
3.0000 bh Stifenner
0.1100 kg Paku keling/sekrup
4.0000 bh Penggantung dan Ramzet
0.1000 oh Pekerja
0.0500 oh Tukang kayu
0.0050 oh Kepala tukang
0.0050 oh Mandor
2 03-2839-2008 6.7 1 M2 Plafond kalsiboard (120x240) tebal 4 mm:
0.3640 lbr Kalsiboar 4 mm
1.0250 btg Rangka hollow 2x4 cm
3.0000 bh Stifenner
0.1100 kg Paku keling/sekrup
4.0000 bh Penggantung dan Ramzet
0.1000 oh Pekerja
0.0500 oh Tukang kayu
0.0050 oh Kepala tukang
0.0050 oh Mandor
3 Hitung 1 M2 Kompon plat
0.0784 zak Semen gypsum
0.1500 lbr Amplas
0.1600 oh Pekerja
0.0800 oh Tukang batu
0.0080 oh Kepala tukang
0.0080 oh Mandor
4 03-2839-2008 6.9 1m' Pasang list plafond gypsum
1.0000 m' m' List Profil Gypsum
0.6500 kg kg Compon
1.0000 ls Upah
I. PEKERJAAN KAYU KUSEN
1 03-3434-2008 6.8 1 M2 Daun pintu dobel teakwood 9mm lapis HPL rangka ky bengkirai :
0.0250 m3 Kayu bengkirai
0.0300 kg kg paku
0.5000 kg Lem kayu
2.0000 m2 HPL
2.0000 m2 Teakwood 9 mm
0.6000 oh Pekerja
2.0000 oh Tukang kayu
0.2000 oh Kepala tukang
0.0400 oh Mandor
J. PEKERJAAN BESI
1 03-7393-2008 6.2 1 Kg Pasang rangka kuda-kuda baja IWF :
1.1500 kg Besi IWF
0.0600 oh Pekerja
0.0600 oh Tukang besi
0.0060 oh Kepala tukang
0.0030 oh Mandor
2 03-7393-2008 6.2 1 m2 Pasang mainan listplank hollow 4x4 ( Aula ) :
9.1000 m' pipa hollow kotak 4x4 t = 2 mm
12.0000 tk las
0.0300 oh Pekerja
0.0300 oh Tukang besi
0.0030 oh Kepala tukang
0.0015 oh Mandor
K. PEKERJAAN KUSEN ALLUMINIUM
1 03-7393-2008 6.11 1 Unit Kusen alumunium Type J1 ( Asrama )
125.880 m' Rangka kusen alumunium 4" (brown)
64.200 m' Frame daun jendela / BV
131.640 m' Tube sealant
65.820 m' Silicon gel
180.000 bh Sekrup fixer
1.000 unit Upah
2 03-7393-2008 6.11 1 Unit Kusen alluminium Type J2 ( Asrama )
83.920 m' Rangka kusen alumunium 4" (brown)
42.800 m' Frame daun bv
87.760 m' Tube sealant
43.880 m' Silicon gel
120.000 bh Sekrup fixer
1.000 unit Upah
3 03-7393-2008 6.11 1 Unit Kusen alluminium Type J3 ( Asrama )
48.320 m' Rangka kusen alumunium 4" (brown)
25.120 m' Frame daun jendela
17.120 m' Frame daun bv
37.120 m' Tube sealant
18.560 m' Silicon gel
112.000 bh Sekrup fixer
1.000 unit Upah
4 03-7393-2008 6.11 1 Unit Kusen alluminium Type J4 ( Asrama )
12.480 m' Rangka kusen alumunium 4" (brown)
6.480 m' Frame daun jendela
4.480 m' Frame daun bv
9.680 m' Tube sealant
4.840 m' Silicon gel
28.000 bh Sekrup fixer
1.000 unit Upah
5 03-7393-2008 6.11 1 Unit Kusen alluminium Type J5 tampak depan ( Asrama )
79.400 m' Rangka kusen allumunium 4" (brown)
184.600 m' Tube sealant
92.300 m' Silicon gel
76.000 bh Sekrup fixer
1.000 unit Upah
6 03-7393-2008 6.11 1 Unit Kusen alluminium Type BV ( Asrama )
4.080 m' Rangka kusen allumunium 4" (brown)
4.000 m' Frame daun bv
4.280 m' Tube sealant
2.140 m' Silicon gel
12.000 bh Sekrup fixer
1.000 unit Upah
7 03-7393-2008 6.11 1 Unit Kusen alluminium Type P2 ( Asrama )
10.600 m' Rangka kusen alumunium 4" (brown)
12.800 m' Rangka daun pintu
4.800 m' Frame daun jendela / bv
15.920 m' Tube sealant
7.960 m' Silicon gel
21.000 bh Sekrup fixer
1.000 unit Upah
8 03-7393-2008 6.11 1 Unit Kusen alluminium Type P3 ( Asrama )
8.270 m' Rangka kusen alumunium 4" (brown)
2.540 m' Rangka daun bv
2.240 m' Tube sealant
1.120 m' Silicon gel
14.000 bh Sekrup fixer
1.000 unit Upah
9 03-7393-2008 6.11 1 Unit Kusen alluminium Type PJ1 ( Aula )
21.200 m' Rangka kusen alumunium 4" (brown)
11.600 m' Rangka daun pintu
9.520 m' Rangka daun juendela / bv
48.880 m' Tube sealant
24.440 m' Silicon gel
36.000 bh Sekrup fixer
1.000 unit Upah
10 03-7393-2008 6.11 1 Unit Kusen alluminium Type PJ2 ( Aula )
17.250 m' Rangka kusen alumunium 4" (brown)
14.200 m' Rangka daun juendela / bv
22.200 m' Tube sealant
11.100 m' Silicon gel
33.000 bh Sekrup fixer
1.000 unit Upah
11 03-7393-2008 6.11 1 Unit Kusen alluminium Type PBV ( Aula )
13.300 m' Rangka kusen alumunium 4" (brown)
7.000 m' Rangka daun juendela / bv
10.360 m' Tube sealant
5.180 m' Silicon gel
22.000 bh Sekrup fixer
1.000 unit Upah
12 03-7393-2008 6.11 1 Unit Kusen alluminium Type J1 ( Aula )
11.140 m' Rangka kusen alumunium 4" (brown)
11.600 m' Rangka daun juendela / bv
18.240 m' Tube sealant
9.120 m' Silicon gel
24.000 bh Sekrup fixer
1.000 unit Upah
13 03-7393-2008 6.11 1 Unit Kusen alluminium Type BV ( Aula )
4.520 m' Rangka kusen alumunium 4" (brown)
4.400 m' Rangka daun juendela / bv
6.320 m' Tube sealant
3.160 m' Silicon gel
8.000 bh Sekrup fixer
1.000 unit Upah
14 03-7393-2008 6.11 1 Unit Kusen alluminium Type P2 ( Aula )
11.190 m' Rangka kusen allumunium 4" (brown)
11.000 m' Rangka daun pintu
29.800 m' Tube sealant
14.900 m' Silicon gel
26.000 bh Sekrup fixer
1.000 unit Upah
15 03-7393-2008 6.11 1 Unit Kusen alluminium Type P3 ( Aula )
11.200 m' Rangka kusen allumunium 4" (brown)
5.120 m' Rangka daun juendela / bv
8.080 m' Tube sealant
4.040 m' Silicon gel
19.000 bh Sekrup fixer
1.000 unit Upah
16 03-7393-2008 6.11 1 Unit Kusen alluminium Type P4 ( Aula )
7.900 m' Rangka kusen allumunium 4" (brown)
2.400 m' Rangka daun juendela / bv
3.720 m' Tube sealant
1.860 m' Silicon gel
16.000 bh Sekrup fixer
1.000 unit Upah
17 03-7393-2008 6.11 1 Unit Kusen alluminium Type BV atas ( Aula )
3.600 m' Rangka kusen allumunium 4" (brown)
0.600 m2 Kaca talip bening 5 mm
3.200 m' Tube sealant
1.600 m' Silicon gel
12.000 bh Sekrup fixer
1.000 unit Upah
18 03-7393-2008 6.11 1 Unit Kusen alluminium Type P1 ( mushola )
6.110 m' Rangka kusen allumunium 4" (brown)
13.860 m' Rangka daun pintu aluminium brown
21.360 m' Tube sealant
10.680 m' Silicon gel
12.000 bh Sekrup fixer
1.000 unit Upah
19 03-7393-2008 6.11 1 Unit Kusen alluminium Type J1 ( mushola )
11.450 m' Rangka kusen allumunium 4" (brown)
7.920 m' Rangka daun juendela aluminium brown
24.480 m' Tube sealant
12.240 m' Silicon gel
16.000 bh Sekrup fixer
1.000 unit Upah
20 03-7393-2008 6.11 1 Unit Kusen alluminium Type J2 ( mushola )
10.160 m' Rangka kusen allumunium 4" (brown)
12.930 m' Rangka daun juendela aluminium brown
26.216 m' Tube sealant
13.108 m' Silicon gel
18.000 bh Sekrup fixer
1.000 unit Upah
21 03-7393-2008 6.11 1 Unit Kusen alluminium Type BV ( mushola )
2.680 m' Rangka kusen allumunium 4" (brown)
2.200 m' Rangka daun juendela aluminium brown
2.800 m' Tube sealant
1.400 m' Silicon gel
8.000 bh Sekrup fixer
1.000 unit Upah
22 03-7393-2008 6.11 1 Unit Kusen alluminium Type P1 ( pos jaga )
5.220 m' Rangka kusen allumunium 4" (brown)
6.580 m' Rangka daun pintu aluminium brown
11.600 m' Tube sealant
5.800 m' Silicon gel
10.000 bh Sekrup fixer
1.000 unit Upah
23 03-7393-2008 6.11 1 Unit Kusen alluminium Type J1 ( pos jaga )
20.500 m' Rangka kusen allumunium 4" (brown)
27.700 m' Tube sealant
13.850 m' Silicon gel
26.000 bh Sekrup fixer
1.000 unit Upah
L. PEKERJAAN CAT
1 03-24 6.1 1 M2 Mengikis / Mengerok Permukaan Cat Tembok Lama :
0.0500 kg Soda api
0.1500 oh Pekerja
0.0025 oh Mandor
2 03-24 6.8 1 M2 Pengecatan kayu baru ( 1 lap. Plamir ) 1 lap. Cat dasar & 2 lap cat penutup :
0.2000 kg Cat meni
0.1500 kg Plamur
0.1700 kg Cat dasar
0.2600 kg Cat penutup 2 kali
0.0700 oh Pekerja
0.0090 oh Tukang cat
0.0060 oh Kepala tukang
0.0025 oh Mandor
3 03-24 6.14 1 M2 Pengecatan tembok baru ( 1 lap. Plamir ) 1 lap. Cat dasar & 2 lap cat penutup :
0.1000 kg Plamur
0.1000 kg Cat dasar
0.2600 kg Cat penutup 2 kali
0.2600 lbr Amplas
0.0200 oh Pekerja
0.0630 oh Tukang cat
0.0063 oh Kepala tukang
0.0025 oh Mandor
4 03-24 6.15 1 M2 Pengecatan tembok lama ( 1 lap. Plamir ) 1 lap. Cat dasar & 2 lap cat penutup :
0.1000 kg Cat dasar
0.1800 kg Cat penutup 2 kali
0.2600 lbr Amplas
0.0280 oh Pekerja
0.0420 oh Tukang cat
0.0042 oh Kepala tukang
0.0025 oh Mandor
M. PEKERJAAN KACA
1 6.17 1 M2 Memasang kaca bening 5 mm :
1.1000 m2 Kaca bening 5 mm
0.0150 oh Pekerja
0.1500 oh Tukang
0.0150 oh Kepala tukang
0.0008 oh Mandor
2 6,17a 1 M2 Memasang kaca bening 12 mm :
1.1000 m2 Kaca bening 12 mm
0.0150 oh Pekerja
0.1500 oh Tukang
0.0150 oh Kepala tukang
0.0008 oh Mandor
N. PEKERJAAN SANITASI
1 6.25 1 M' Pasang pipa GIP 1 1/2" :
1.2000 m' Pipa GIP 1 1/2"
0.3500 ls Perlengkapan 35 % harga pipa
0.1080 oh Pekerja
0.1800 oh Tukang
0.0180 oh Kepala tukang
0.0540 oh Mandor
2 6.25 1 M' Pasang pipa PVC AW 1/2" :
1.2000 m' Pipa PVC
0.3500 ls Perlengkapan 35 % harga pipa
0.0360 oh Pekerja
0.0600 oh Tukang
0.0060 oh Kepala tukang
0.0018 oh Mandor
3 1 M' Pasang pipa PVC 3/4" :
1.2000 m' Pipa PVC
0.3500 ls Perlengkapan 35 % harga pipa
0.0360 oh Pekerja
0.0600 oh Tukang
0.0060 oh Kepala tukang
0.0018 oh Mandor
4 1 M' Pasang pipa PVC 1" :
1.2000 m' Pipa PVC
0.3500 ls Perlengkapan 35 % harga pipa
0.0360 oh Pekerja
0.0600 oh Tukang
0.0060 oh Kepala tukang
0.0018 oh Mandor
5 1 M' Pasang pipa PVC 1 1/2" :
1.2000 m' Pipa PVC
0.3500 ls Perlengkapan 35 % harga pipa
0.0360 oh Pekerja
0.0600 oh Tukang
0.0060 oh Kepala tukang
0.0018 oh Mandor
6 6.29 1 M' Pasang pipa PVC 2" :
1.2000 m' Pipa PVC
0.3500 ls Perlengkapan 35 % harga pipa
0.0540 oh Pekerja
0.0900 oh Tukang
0.0090 oh Kepala tukang
0.0027 oh Mandor
7 6.31 1 M' Pasang pipa PVC 3" :
1.2000 m' Pipa PVC
0.3500 ls Perlengkapan 35 % harga pipa
0.0810 oh Pekerja
0.1350 oh Tukang
0.0140 oh Kepala tukang
0.0041 oh Mandor
8 1 M' Pasang pipa PVC 4" :
1.2000 m' Pipa PVC
0.3500 ls Perlengkapan 35 % harga pipa
0.0810 oh Pekerja
0.1350 oh Tukang
0.0140 oh Kepala tukang
0.0041 oh Mandor
9 6.1 1 Bh Memasang Klosed duduk monoblok ( TOTO ) :
1.0000 bh Klosed duduk
0.0600 ls Perlengkapan 6 % harga pipa
3.3000 oh Pekerja
1.1000 oh Tukang
0.0010 oh Kepala tukang
0.1600 oh Mandor
10 6.5 1 Bh Memasang Wastafel :
1.0000 bh Wastafel meja oval
0.3000 ls Perlengkapan 30 % harga pipa
6.0000 kg Portland cement
0.0100 m3 Pasir pasang
1.2000 oh Pekerja
0.1450 oh Tukang
0.1500 oh Kepala tukang
0.1000 oh Mandor
11 6.5 1 Bh Memasang Shower lengkap :
1.0000 bh Shower
0.3000 ls Perlengkapan 30 % harga pipa
6.0000 kg Portland cement
0.0100 m3 Pasir pasang
1.2000 oh Pekerja
0.1450 oh Tukang
0.1500 oh Kepala tukang
0.1000 oh Mandor
12 6.36 1 Bh Memasang Floor Drain
1.0000 bh Floor Drain
0.0100 oh Pekerja
0.1000 oh Tukang
0.0100 oh Kepala tukang
0.0050 oh Mandor
13 6.35 1 Bh Memasang Kran dia 3/4" dan 1/2"
1.0000 bh Kran air
1.0000 set Seal tape
0.0100 oh Pekerja
0.1000 oh Tukang
0.0100 oh Kepala tukang
0.0050 oh Mandor
14 1 M2 Pasang paving blok Holland t = 6 cm : K 300
45.0000 bh paving holland t = 6 cm
0.0800 m3 Pasir pasang
0.4000 oh pekerja
0.2000 oh tukang batu
0.0200 oh kepala tukang
0.0200 oh mandor
15 1 M' Pasang kansteen beton
2.0000 bh kansteen 10x20x50
0.0500 m3 Pasir pasang
0.1000 oh pekerja
0.0500 oh kepala tukang
0.0100 oh mandor
16 1 M' Saluran U 30 :
0.4000 m2 pas. batu bata 1:5
0.2400 m2 plesteran 1:5
0.0100 m3 pasir urug
0.0400 m3 galian tanah
1.0000 m' buis beton U 30
17 1 BH Bak kontrol U 30 :
0.3600 m2 m2 pas.batu bata 1:5
0.0100 m3 m3 pas. koral
0.0045 m3 m3 pasir urug
0.5040 m3 m2 plester 1:5
0.0429 m3 m3 galian tanah
18 1 M' Saluran O 30 :
0.4000 m2 pas. batu bata 1:5
0.0100 m3 pasir urug
0.0400 m3 galian tanah
1.0000 m' buis beton 0 30
19 1 M' Pasang grill penutup saluran
10.3675 kg besi siku 50.50.5
6.3200 kg besi dia 16 mm
15.0000 ttk las
0.4000 oh pekerja
0.2000 oh tukang
0.0200 oh kepala tukang
0.0200 oh mandor
20 1 M2 Pasang atap Pollycarbonate datar
1.2000 m2 m2 pollycarbonat datar
0.4700 kg kg angkur baut
0.2300 oh tukang
0.0230 oh kepala tukang
0.0230 oh mandor
21 1 Unit Memasang rangka atap doorloop rangka pipa hitam
11.6 m' kuda-kuda pipa hitam 2"
75.0000 m' gording pipa hitam 1"
15.3600 kg plat landas 6 mm
14.9760 kg angkur baut 16 mm
1.0000 ls las
0.0520 oh mandor
0.1050 oh kep tukang besi
1.0500 oh tukang besi
1.0500 oh pekerja
22 1 Unit Memasang resapan dari bis beton + penutup
1.500 m' galian tanah
1.0000 bh Bis beton ø 80 cm
0.0500 m3 Penutup dari plat beton t = 5 cm
1.0000 bh besi pengan tutup

More Related Content

What's hot

Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works ALI HYDER GADHI
 
Rate analysis road work in Estimation & Rate Analyisis
Rate analysis road work in Estimation & Rate AnalyisisRate analysis road work in Estimation & Rate Analyisis
Rate analysis road work in Estimation & Rate AnalyisisJaptyesh Singh
 
97170708 estimate-of-material-and-labor
97170708 estimate-of-material-and-labor97170708 estimate-of-material-and-labor
97170708 estimate-of-material-and-laborimaduddin91
 
Materials%20required%20for%20different%20items%20of%20work
Materials%20required%20for%20different%20items%20of%20workMaterials%20required%20for%20different%20items%20of%20work
Materials%20required%20for%20different%20items%20of%20workAnu Bhadauria
 
Two-stage Crusher
Two-stage CrusherTwo-stage Crusher
Two-stage CrusherEvita Lee
 
Cost of breeder farm
Cost of breeder farmCost of breeder farm
Cost of breeder farmOmar Faruque
 
Rate Analysis Site Meeting
Rate Analysis   Site MeetingRate Analysis   Site Meeting
Rate Analysis Site MeetingSanjay Patnaik
 
availability and price of engineering materials in bangladesh
availability and price of engineering materials in bangladeshavailability and price of engineering materials in bangladesh
availability and price of engineering materials in bangladeshFayaz Uddin
 

What's hot (10)

Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works
 
Rate analysis road work in Estimation & Rate Analyisis
Rate analysis road work in Estimation & Rate AnalyisisRate analysis road work in Estimation & Rate Analyisis
Rate analysis road work in Estimation & Rate Analyisis
 
97170708 estimate-of-material-and-labor
97170708 estimate-of-material-and-labor97170708 estimate-of-material-and-labor
97170708 estimate-of-material-and-labor
 
Materials%20required%20for%20different%20items%20of%20work
Materials%20required%20for%20different%20items%20of%20workMaterials%20required%20for%20different%20items%20of%20work
Materials%20required%20for%20different%20items%20of%20work
 
Cost Reduction Project
Cost Reduction ProjectCost Reduction Project
Cost Reduction Project
 
Ball mill
Ball millBall mill
Ball mill
 
Two-stage Crusher
Two-stage CrusherTwo-stage Crusher
Two-stage Crusher
 
Cost of breeder farm
Cost of breeder farmCost of breeder farm
Cost of breeder farm
 
Rate Analysis Site Meeting
Rate Analysis   Site MeetingRate Analysis   Site Meeting
Rate Analysis Site Meeting
 
availability and price of engineering materials in bangladesh
availability and price of engineering materials in bangladeshavailability and price of engineering materials in bangladesh
availability and price of engineering materials in bangladesh
 

Similar to rab rsud tugurejo

3. pekerjaan sipil dan bangunan
3. pekerjaan sipil dan bangunan3. pekerjaan sipil dan bangunan
3. pekerjaan sipil dan bangunanSyahrul Najmi
 
Civil standard notes
Civil standard notesCivil standard notes
Civil standard notesmanu287448
 
BQ RSJ TAHAP 1 TA 2022 Revisi 21 Februari 2022.pdf
BQ RSJ  TAHAP 1 TA 2022 Revisi  21 Februari 2022.pdfBQ RSJ  TAHAP 1 TA 2022 Revisi  21 Februari 2022.pdf
BQ RSJ TAHAP 1 TA 2022 Revisi 21 Februari 2022.pdfsuryaman10
 
Basic of civil engineering
Basic of civil engineeringBasic of civil engineering
Basic of civil engineeringVignesh Kumar
 
Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal ashleyyeap
 
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdfFarm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdfAvin Kharel
 
Intro. to management lecture 08
Intro. to management lecture 08Intro. to management lecture 08
Intro. to management lecture 08Haitham Sharnouby
 
Katalog bahan 1 bahan arsitektural dan sipil
Katalog bahan 1 bahan arsitektural dan sipilKatalog bahan 1 bahan arsitektural dan sipil
Katalog bahan 1 bahan arsitektural dan sipilDIMENSIfurniture
 
2.pengajuanrabcandramas terasdepanatapasbes
2.pengajuanrabcandramas terasdepanatapasbes2.pengajuanrabcandramas terasdepanatapasbes
2.pengajuanrabcandramas terasdepanatapasbesDeny Sulistio
 

Similar to rab rsud tugurejo (20)

3. pekerjaan sipil dan bangunan
3. pekerjaan sipil dan bangunan3. pekerjaan sipil dan bangunan
3. pekerjaan sipil dan bangunan
 
Construction detail
Construction detailConstruction detail
Construction detail
 
Civil standard notes
Civil standard notesCivil standard notes
Civil standard notes
 
Civil book
Civil bookCivil book
Civil book
 
Civil guide
Civil guideCivil guide
Civil guide
 
BQ RSJ TAHAP 1 TA 2022 Revisi 21 Februari 2022.pdf
BQ RSJ  TAHAP 1 TA 2022 Revisi  21 Februari 2022.pdfBQ RSJ  TAHAP 1 TA 2022 Revisi  21 Februari 2022.pdf
BQ RSJ TAHAP 1 TA 2022 Revisi 21 Februari 2022.pdf
 
Basic of civil engineering
Basic of civil engineeringBasic of civil engineering
Basic of civil engineering
 
Daftarbahanbangunan
Daftarbahanbangunan Daftarbahanbangunan
Daftarbahanbangunan
 
Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal
 
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdfFarm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
 
Intro. to management lecture 08
Intro. to management lecture 08Intro. to management lecture 08
Intro. to management lecture 08
 
Bhadanis CONCRETE WORK ESTIMATION GUIDE
Bhadanis CONCRETE WORK ESTIMATION GUIDE Bhadanis CONCRETE WORK ESTIMATION GUIDE
Bhadanis CONCRETE WORK ESTIMATION GUIDE
 
Bhadanis RCC WORK ESTIMATION GUIDE PCC WORK ESTIMATION
Bhadanis RCC WORK ESTIMATION GUIDE PCC WORK ESTIMATIONBhadanis RCC WORK ESTIMATION GUIDE PCC WORK ESTIMATION
Bhadanis RCC WORK ESTIMATION GUIDE PCC WORK ESTIMATION
 
ROAD WORK ESTIMATION GUIDE MATERIAL BHADANIS
ROAD WORK ESTIMATION GUIDE MATERIAL BHADANISROAD WORK ESTIMATION GUIDE MATERIAL BHADANIS
ROAD WORK ESTIMATION GUIDE MATERIAL BHADANIS
 
BHADANIS - PLASTER WORK ESTIMATION GUIDE
BHADANIS - PLASTER WORK ESTIMATION GUIDE BHADANIS - PLASTER WORK ESTIMATION GUIDE
BHADANIS - PLASTER WORK ESTIMATION GUIDE
 
BHADANIS - BRICK WORK ESTIMATION GUIDE CIVIL WORKS CONSTRUCTION ESTIMATION
BHADANIS - BRICK WORK ESTIMATION GUIDE CIVIL WORKS CONSTRUCTION ESTIMATIONBHADANIS - BRICK WORK ESTIMATION GUIDE CIVIL WORKS CONSTRUCTION ESTIMATION
BHADANIS - BRICK WORK ESTIMATION GUIDE CIVIL WORKS CONSTRUCTION ESTIMATION
 
BHADANIS Construction Material Estimation Guide
BHADANIS Construction Material Estimation GuideBHADANIS Construction Material Estimation Guide
BHADANIS Construction Material Estimation Guide
 
Katalog bahan 1 bahan arsitektural dan sipil
Katalog bahan 1 bahan arsitektural dan sipilKatalog bahan 1 bahan arsitektural dan sipil
Katalog bahan 1 bahan arsitektural dan sipil
 
2.pengajuanrabcandramas terasdepanatapasbes
2.pengajuanrabcandramas terasdepanatapasbes2.pengajuanrabcandramas terasdepanatapasbes
2.pengajuanrabcandramas terasdepanatapasbes
 
EQS - RATE ANALYSIS.pdf
EQS -  RATE ANALYSIS.pdfEQS -  RATE ANALYSIS.pdf
EQS - RATE ANALYSIS.pdf
 

Recently uploaded

Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 

Recently uploaded (20)

Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 

rab rsud tugurejo

  • 1. HARGA UPAH HARGA SNI KODE SATUAN PEKERJA BAHAN (Rp.) (Rp.) (Rp.) (Rp.) A. PEKERJAAN TANAH 1 03-2835-2008 6.1 1 M3 Galian tanah biasa sedalam 1 m 0.7500 oh Pekerja 0.0250 oh Mandor Jml Total 2 03-2835-2008 6.2 1 M3 Galian tanah biasa sedalam 2 m 0.9000 oh Pekerja 0.0450 oh Mandor Jml Total 3 03-2835-2008 6.9 1 M3 Mengurug tanah kembali ( 1/3 dari indek pek galian ) 0.3000 oh Pekerja 0.0150 oh Mandor Jml Total 4 03-2835-2008 6.11 1 M3 Urugan pasir 1.2000 m3 Pasir urug 0.3000 oh Pekerja 0.0100 oh Mandor Jml Total 5 03-2835-2008 6.15 1 M3 Urugan tanah + pemadatan 0.2500 oh Pekerja 0.0250 oh Mandor 1.0000 ls Pemadatan Jml Total 6 03-2835-2008 6.15 1 M3 Urugan fill + pemadatan 0.2500 oh Pekerja 0.0250 oh Mandor 1.0000 ls Pemadatan Jml Total 7 03-2835-2008 6.15 1 M3 Pembuangan tanah sejauh 150 m 0.5160 oh Pekerja 0.0500 oh Mandor Jml Total B. PEKERJAAN PONDASI 1 03-2836-2008 6.9 1 M3 Pasang batu kosong / anstamping 1.2000 m3 Batu belah 0.4330 m3 Pasir urug 0.7800 oh Pekerja 0.3900 oh Tukang batu 0.0390 oh Kepala tukang 0.0390 oh Mandor 2 03-2836-2008 6.3 1 M3 Pasang batu belah 1 Pc : 5 Ps 1.2000 m3 Batu belah 136.0000 kg Portland Cemen ( PC ) 0.5440 m3 Pasir pasang 1.5000 oh Pekerja 0.6000 oh Tukang batu 0.0600 oh Kepala tukang 0.0750 oh Mandor C. PEKERJAAN DINDING & PLESTERAN 1 03-6897-2008 6,10 1 M2 Pasang batu bata merah (5x11x22) cm tbl 1/2 bata camp 1 Pc : 5 Ps 70.0000 m3 Batu bata 9.6800 kg Portland Cemen ( PC ) 0.0450 m3 Pasir pasang 0.3000 oh Pekerja 0.1000 oh Tukang batu 0.0100 oh Kepala tukang 0.0150 oh Mandor ANALISA HARGA SATUAN PEKERJAAN NO JUMLAHANALISA PEKERJAAN
  • 2. 2 03-2837-2008 6.16 1 M2 Plesteran 1 Pc : 5 Ps- tbl 20 mm 6.9120 kg Portland Cemen ( PC ) 0.0350 m3 Pasir pasang 0.2600 oh Pekerja 0.2000 oh Tukang batu 0.0200 oh Kepala tukang 0.0130 oh Mandor 3 03-2837-2008 6.15 1 M2 Plesteran 1 Pc : 4 Ps- tbl 20 mm 8.3200 kg Portland Cemen ( PC ) 0.0320 m3 Pasir pasang 0.2600 oh Pekerja 0.2000 oh Tukang batu 0.0200 oh Kepala tukang 0.0130 oh Mandor 4 03-2837-2008 6.19 1 M2 Plesteran braben 1 Pc : 5 Ps- tbl 15 mm 5.1840 kg Portland Cemen ( PC ) 0.0260 m3 Pasir pasang 0.1500 oh Pekerja 0.0700 oh Tukang batu 0.0070 oh Kepala tukang 0.0080 oh Mandor 5 03-2837-2008 6,20 1 M' Plesteran skoning 1 : 2 lebar 10 mm 0.5000 kg Portland Cemen ( PC ) 0.0130 m3 Pasir pasang 0.0570 oh Pekerja 0.0380 oh Tukang batu 0.0380 oh Kepala tukang 0.0030 oh Mandor 6 03-2837-2008 6,26 1 M' Memasang finishing siar batu kali 1Pc : 2Ps 6.3400 kg Portland Cemen ( PC ) 0.1200 m3 Pasir pasang 0.3000 oh Pekerja 0.1400 oh Tukang batu 0.0140 oh Kepala tukang 0.0150 oh Mandor 7 03-2837-2008 6,27 1 M2 Memasang acian 3.2500 kg Portland Cemen ( PC ) 0.1500 oh Pekerja 0.1000 oh Tukang batu 0.0100 oh Kepala tukang 0.0080 oh Mandor D. PEKERJAAN LANTAI 1 03-7395-2008 6.9 1 M2 Lantai keramik polish 60/60 ( Aula ) : 3.0000 bh keramik polish 60x60 14.7000 kg Portland Cemen ( PC ) 1.9500 kg PC warna 0.0675 m3 Pasir pasang 0.3750 oh Pekerja 0.1800 oh Tukang batu 0.0180 oh Kepala tukang 0.0195 oh Mandor 2 03-7395-2008 6.9 1 M2 Lantai keramik unpolish 60/60 ( Aula ) : 3.0000 bh keramik polish 60x60 14.7000 kg Portland Cemen ( PC ) 1.9500 kg PC warna 0.0675 m3 Pasir pasang 0.3750 oh Pekerja 0.1800 oh Tukang batu 0.0180 oh Kepala tukang 0.0195 oh Mandor
  • 3. 3 03-7395-2008 6.9 1 M2 Lantai granito 60/60 ( Aula ) : 3.0000 bh granito 60x60 14.7000 kg Portland Cemen ( PC ) 1.9500 kg PC warna 0.0675 m3 Pasir pasang 0.3750 oh Pekerja 0.1800 oh Tukang batu 0.0180 oh Kepala tukang 0.0195 oh Mandor 4 03-7395-2008 6.9 1 M2 Lantai keramik 40/40 (Polish) : 6.6300 bh keramik 40x40 9.8000 kg Portland Cemen ( PC ) 1.3000 kg PC warna 0.0450 m3 Pasir pasang 0.2500 oh Pekerja 0.1200 oh Tukang batu 0.0120 oh Kepala tukang 0.0130 oh Mandor 5 03-7395-2008 6.9 1 M2 Lantai keramik 40/40 (Un polish) : 6.6300 bh keramik 40x40 9.8000 kg Portland Cemen ( PC ) 1.3000 kg PC warna 0.0450 m3 Pasir pasang 0.2500 oh Pekerja 0.1200 oh Tukang batu 0.0120 oh Kepala tukang 0.0130 oh Mandor 6 03-7395-2008 6.35 1 M2 Lantai keramik unpolish 30/30 : 11.8700 bh Keramik 30x30 10.0000 kg Portland Cemen ( PC ) 1.5000 kg PC warna 0.0450 m3 Pasir pasang 0.6200 oh Pekerja 0.3500 oh Tukang batu 0.0350 oh Kepala tukang 0.0300 oh Mandor 7 03-7395-2008 6.35 1 M2 Lantai keramik 30/30 : 11.8700 bh Keramik 30x30 10.0000 kg Portland Cemen ( PC ) 1.5000 kg PC warna 0.0450 m3 Pasir pasang 0.6200 oh Pekerja 0.3500 oh Tukang batu 0.0350 oh Kepala tukang 0.0300 oh Mandor 8 03-7395-2008 6.54 1 M2 Pasang keramik dinding 20x25 : 21.5000 bh Keramik 20x25 10.4000 kg Portland Cemen ( PC ) 1.6200 kg PC warna 0.0450 m3 Pasir pasang 0.6200 oh Pekerja 0.3500 oh Tukang batu 0.0350 oh Kepala tukang 0.0300 oh Mandor 9 03-7395-2008 6.36 1 M2 Pasang keramik lantai 20x20 : 26.5000 bh Keramik 20x20 10.4000 kg Portland Cemen ( PC ) 1.6200 kg PC warna 0.0450 m3 Pasir pasang
  • 4. 0.6200 oh Pekerja 0.3500 oh Tukang batu 0.0350 oh Kepala tukang 0.0300 oh Mandor 10 03-7395-2008 1 M' Pasang nozing tangga 5x20 : 5.000 bh Nozing 5x20 2.600 kg Portland Cemen ( PC ) 0.405 kg PC warna 0.011 m3 Pasir pasang 0.088 oh Tukang 0.009 oh Kepala tukang 0.155 oh Pekerja 0.008 oh Mandor 11 03-7395-2008 1 M' Pasang keramik border dinidng km/wc 5x30 : 4.000 bh Keramik border 5x30 1.140 kg Portland Cemen ( PC ) 0.025 kg PC warna 0.003 m3 Pasir pasang 0.090 oh Tukang 0.009 oh Kepala tukang 0.090 oh Pekerja 0.005 oh Mandor 12 1 M' Pasang plint kaca rayband 5 mm L = 10 cm 0.1000 m2 Plint kaca rayband 5 mm L = 10 cm 1.1400 kg Portland Cemen ( PC ) 0.090 oh Pekerja 0.090 oh Tukang 0.009 oh Kepala tukang 0.005 oh Mandor 13 03-7395-2008 1 M' Pasang kuku macan 2,5x10 : 10.000 bh Kuku macan 2,5x10 0.945 kg Portland Cemen ( PC ) 0.147 kg PC warna 0.004 m3 Pasir pasang 0.032 oh Tukang 0.003 oh Kepala tukang 0.056 oh Pekerja 0.003 oh Mandor 14 03-7395-2008 6.57 1 M2 Pasang batu serit / mortar 1.1000 m2 Batu serit 11.7500 kg Portland Cemen ( PC ) 0.0350 m3 Pasir pasang 0.6200 oh Pekerja 0.3500 oh Tukang batu 0.0350 oh Kepala tukang 0.0300 oh Mandor E. PEKERJAAN BETON 1 03-7394-2008 6.4 1 M3 Beton lantai kerja mutu fc = 7,4 Mpa ( K100) slum (3-6) cm w/c = 0,87 230.0000 kg Portland Cemen ( PC ) 893.0000 kg Pasir beton 1,024.0000 kg Kerikil (maksimum 30 mm) 200.0000 ltr air 1.2000 oh Pekerja 0.2000 oh Tukang batu 0.0200 oh Kepala tukang 0.0060 oh Mandor 2 03-7394-2008 6.5 1 M3 Beton mutu fc = 9,8 Mpa ( K175) slum (12±2) cm w/c = 0,66 326.0000 kg Portland Cemen ( PC ) 760.0000 kg Pasir beton 1,029.0000 kg Kerikil (maksimum 30 mm)
  • 5. 215.0000 ltr air 1.6500 oh Pekerja 0.2500 oh Tukang batu 0.0250 oh Kepala tukang 0.0800 oh Mandor 3 03-7394-2008 6.7 1 M3 Beton mutu fc = 19,3 Mpa ( K225) slum (12±2) cm w/c = 0,58 371.0000 kg Portland Cemen ( PC ) 698.0000 kg Pasir beton 1,047.0000 kg Kerikil (maksimum 30 mm) 215.0000 ltr air 1.6500 oh Pekerja 0.2500 oh Tukang batu 0.0250 oh Kepala tukang 0.0800 oh Mandor 4 03-7394-2008 6.9 1 M3 Beton mutu fc = 24 Mpa ( K275) slum (12±2) cm w/c = 0,53 406.0000 kg Portland Cemen ( PC ) 684.0000 kg Pasir beton 1,026.0000 kg Kerikil (maksimum 30 mm) 215.0000 ltr air 1.6500 oh Pekerja 0.2500 oh Tukang batu 0.0250 oh Kepala tukang 0.0800 oh Mandor 5 03-7394-2008 6.9 1 M3 Beton mutu fc = 26.4 Mpa ( K300) slum (12±2) cm w/c = 0,52 413.0000 kg Portland Cemen ( PC ) 681.0000 kg Pasir beton 1,021.0000 kg Kerikil (maksimum 30 mm) 215.0000 ltr air 1.6500 oh Pekerja 0.2750 oh Tukang batu 0.0280 oh Kepala tukang 0.0830 oh Mandor 6 03-7394-2008 6.17 10 kg Pembesian dengan besi polos / ulir 10.5000 kg Besi polos / ulir 0.1500 kg Kawat beton 0.0700 oh Pekerja 0.0700 oh Tukang batu 0.0070 oh Kepala tukang 0.0040 oh Mandor 1 kg Pembesian dengan besi polos / ulir 7 03-7394-2008 6.21 1 M2 Memasang Bekisting untuk sloof 0.0450 m3 Kayu kelas III (terentang) 0.3000 kg Paku biasa 2"-5" 0.1000 ltr Minyak bekisting 0.5200 oh Pekerja 0.2600 oh Tukang batu 0.0260 oh Kepala tukang 0.0260 oh Mandor 8 03-7394-2008 6.22 1 M2 Memasang Bekisting untuk kolom 0.0400 m3 Kayu kelas III (terentang) 0.4000 kg Paku biasa 2"-5" 0.2000 ltr Minyak bekisting 0.0150 m3 Balok kayu kelas II 0.3500 lbr Multiplex 6 mm 2.0000 btg Dolken kayu dia 8-10 cm / 4 m 0.6600 oh Pekerja 0.3300 oh Tukang batu 0.0330 oh Kepala tukang 0.0330 oh Mandor 9 03-7394-2008 6.23 1 M2 Memasang Bekisting untuk balok
  • 6. 0.0400 m3 Kayu kelas III (terentang) 0.4000 kg Paku biasa 2"-5" 0.2000 ltr Minyak bekisting 0.0180 m3 Balok kayu kelas II 0.3500 lbr Multiplex 6 mm 2.0000 btg Dolken kayu dia 8-10 cm / 4 m 0.6600 oh Pekerja 0.3300 oh Tukang batu 0.0330 oh Kepala tukang 0.0330 oh Mandor 10 03-7394-2008 6.24 1 M2 Memasang Bekisting untuk lantai 0.0400 m3 Kayu kelas III (terentang) 0.4000 kg Paku biasa 2"-5" 0.2000 ltr Minyak bekisting 0.0150 m3 Balok kayu kelas II 0.3500 lbr Multiplex 6 mm 2.0000 btg Dolken kayu dia 8-10 cm / 4 m 0.6600 oh Pekerja 0.3300 oh Tukang batu 0.0330 oh Kepala tukang 0.0330 oh Mandor 11 03-7394-2008 6.26 1 M2 Memasang Bekisting untuk tangga 0.0300 m3 Kayu kelas III (terentang) 0.4000 kg Paku biasa 2"-5" 0.1500 ltr Minyak bekisting 0.0150 m3 Balok kayu kelas II 0.3500 lbr Multiplex 6 mm 2.0000 btg Dolken kayu dia 8-10 cm / 4 m 0.6600 oh Pekerja 0.3300 oh Tukang batu 0.0330 oh Kepala tukang 0.0330 oh Mandor 12 Dihitung 1 M3 Beton bertulang praktis 15 x 15 : 1.0000 m3 Beton K 225 149.5207 kg Besi 13.3332 m2 Bekisting Jml Total 13 Dihitung 1 M3 Beton bertulang sloof 15 x 20 : 1.0000 m3 Beton K 225 173.2849 kg Besi 13.3320 m2 Bekisting Jml Total 14 Dihitung 1 M3 Beton bertulang sloof 15 x 25 ( Asrama ) : 1.0000 m3 Beton K 225 144.9191 kg Besi 13.3335 m2 Bekisting Jml Total 15 Dihitung 1 M3 Beton bertulang sloof 20 x 40 ( Asrama ) : 1.0000 m3 Beton K 225 153.8700 kg Besi 10.0000 m2 Bekisting Jml Total 16 Dihitung 1 M3 Beton bertulang sloof 20 x 30 ( Aula ) : 1.0000 m3 Beton K 225 197.3039 kg Besi 10.0002 m2 Bekisting Jml Total 17 Dihitung 1 M3 Beton bertulang balok 20 x 40 B1 ( Aula ) : 1.0000 m3 Beton K 225 144.1000 kg Besi 12.5000 m2 Bekisting Jml Total 18 Dihitung 1 M3 Beton bertulang balok 20 x 30 B2 ( Aula ) : 1.0000 m3 Beton K 225
  • 7. 177.6702 kg Besi 13.3336 m2 Bekisting Jml Total 19 Dihitung 1 M3 Beton bertulang balok 15 x 25 B3 ( Aula ) : 1.0000 m3 Beton K 225 187.2023 kg Besi 17.3336 m2 Bekisting Jml Total 20 Dihitung 1 M3 Beton bertulang balok 15 x 20 B4 ( Aula ) : 1.0000 m3 Beton K 225 219.5311 kg Besi 18.3332 m2 Bekisting Jml Total 21 Dihitung 1 M3 Beton bertulang balok 30 x 70 B1 (Asrama ) : 1.0000 m3 Beton K 225 153.5364 kg Besi 5.2382 m2 Bekisting Jml Total 21 Dihitung 1 M3 Beton bertulang balok 25 x 50 B2 ( Asrama ) : 1.0000 m3 Beton K 225 198.1280 kg Besi 10.0000 m2 Bekisting Jml Total 22 Dihitung 1 M3 Beton bertulang balok 20 x 30 B3 ( Asrama ) : 1.0000 m3 Beton K 225 184.0703 kg Besi 13.3336 m2 Bekisting Jml Total 23 Dihitung 1 M3 Beton bertulang balok 15 x 25 B3 (Asrama) : 1.0000 m3 Beton K 225 153.3032 kg Besi 17.3336 m2 Bekisting Jml Total 24 Dihitung 1 M3 Beton bertulang balok 15 x 25 B4 (Asrama) : 1.0000 m3 Beton K 225 156.4393 kg Besi 17.3336 m2 Bekisting Jml Total 25 Dihitung 1 M3 Beton bertulang plat konsol penyangga talang t = 15 cm : 1.0000 m3 Beton K 225 21.068 kg Besi 6.667 m2 Bekisting Jml Total 26 Dihitung 1 M3 Beton bertulang ring balok 15 x 25 RB1 ( Asrama / Aula ) : 1.0000 m3 Beton K 225 144.9191 kg Besi 13.3335 m2 Bekisting Jml Total 27 Dihitung 1 M3 Beton bertulang ring balok 15 x 20 RB 2 ( Asrma ) : 1.0000 m3 Beton K 225 173.2849 kg Besi 13.3332 m2 Bekisting Jml Total 28 Dihitung 1 M3 Beton bertulang ring balok 15 x 25 RB3 ( Aula ) : 1.0000 m3 Beton K 225 144.9191 kg Besi 13.3335 m2 Bekisting Jml Total 29 Dihitung 1 M3 Beton bertulang kolom 30 x 50 K1 ( Asrama ) : 1.0000 m3 Beton K 225 149.3515 kg Besi 10.6672 m2 Bekisting Jml Total 30 Dihitung 1 M3 Beton bertulang kolom 30 x 30 K2 ( Asrama ) : 1.0000 m3 Beton K 225 106.9012 kg Besi 13.3332 m2 Bekisting
  • 8. Jml Total 31 Dihitung 1 M3 Beton bertulang kolom 20 x 20 ( Asrama / Aula ) : 1.0000 m3 Beton K 225 135.8600 kg Besi 20.0000 m2 Bekisting Jml Total 32 Dihitung 1 M3 Beton bertulang kolom atas talang 15 x 30 ( Asrama ) : 1.0000 m3 Beton K 225 126.0032 kg Besi 19.9998 m2 Bekisting Jml Total 33 Dihitung 1 M3 Beton bertulang kolom 15 x 50 ( Asrama ) : 1.0000 m3 Beton K 225 79.2687 kg Besi 17.3329 m2 Bekisting Jml Total 33 Dihitung 1 M3 Beton bertulang kolom 30 x 70 K1 ( Aula ) : 1.0000 m3 Beton K 225 169.9082 kg Besi 9.5240 m2 Bekisting Jml Total 34 Dihitung 1 M3 Beton bertulang kolom 30 x 30 K2 ( Aula ) : 1.0000 m3 Beton K 225 157.8651 kg Besi 13.3332 m2 Bekisting Jml Total 35 Dihitung 1 M3 Beton bertulang balok tangga 15 x 25 ( Asrama ) : 1.0000 m3 Beton K 225 192.2264 kg Besi 17.3336 m2 Bekisting Jml Total 36 Dihitung 1 M3 Beton bertulang kolom 15 x 20 (Pos jaga ) : 1.0000 m3 Beton K 225 169.3550 kg Besi 23.3331 m2 Bekisting Jml Total 37 Dihitung 1 M3 Beton bertulang kuda-kuda 15 x 25 B3 ( Mushola ) : 1.0000 m3 Beton K 225 187.2023 kg Besi 17.3336 m2 Bekisting Jml Total 38 Dihitung 1 M3 Beton bertulang kolom 30 x 30 (Doorlupe ) : 1.0000 m3 Beton K 225 70.8615 kg Besi 13.3332 m2 Bekisting Jml Total 39 Dihitung 1 M3 Beton bertulang pedestal 30x40 ( Aula ) : 1.0000 m3 Beton K 225 52.4896 kg Besi 5.8331 m2 Bekisting Jml Total 40 Dihitung 1 M3 Beton bertulang pedestal 25x30 ( Asrama ) : 1.0000 m3 Beton K 225 76.1248 kg Besi 7.3332 m2 Bekisting Jml Total 41 Dihitung 1 Bh Pondasi foot plat 175x175 F1 ( Asrama ) : 4.5938 m3 Galian tanah 1.8375 m3 Urugan kembali 0.3063 m3 Urugan pasir 0.1531 m3 Beton K 100 0.7656 m3 Beton K 225 81.7020 kg Besi 1.4000 m2 Bekisting Jml Total 42 Dihitung 1 Bh Pondasi foot plat 100x100 F2 ( Asrama ) :
  • 9. 1.0000 m3 Galian tanah 0.4000 m3 Urugan kembali 0.1000 m3 Urugan pasir 0.0500 m3 Beton K 100 0.2500 m3 Beton K 225 32.7972 kg Besi 0.8000 m2 Bekisting Jml Total 43 Dihitung 1 Bh Pondasi foot plat 80x80 F2 ( Asrama ) : 0.6400 m3 Galian tanah 0.2560 m3 Urugan kembali 0.0640 m3 Urugan pasir 0.0320 m3 Beton K 100 0.1600 m3 Beton K 225 21.5100 kg Besi 0.6400 m2 Bekisting Jml Total 44 Dihitung 1 Bh Pondasi foot plat 120x120 F1 ( Aula ) : 1.5840 m3 Galian tanah 0.6336 m3 Urugan kembali 0.0720 m3 Urugan pasir 0.0720 m3 Beton K 100 0.3600 m3 Beton K 225 50.2048 kg Besi 0.9600 m2 Bekisting Jml Total 45 Dihitung 1 Bh Pondasi foot plat tangga 60x150 F3 ( Asrama ) : 0.9750 m3 Galian tanah 0.3900 m3 Urugan kembali 0.0488 m3 Urugan pasir 0.0488 m3 Beton K 100 0.2438 m3 Beton K 225 26.1280 kg Besi 0.8600 m2 Bekisting Jml Total 46 Dihitung 1 M3 Beton bertulang plat T = 10 cm 1.0000 m3 Beton K 225 62.000 kg Besi 10.000 m2 Bekisting Jml Total 47 Dihitung 1 M3 Beton bertulang plat lantai T = 12 cm 1.0000 m3 Beton K 225 92.996 kg Besi 8.333 m2 Bekisting Jml Total 48 Dihitung 1 M3 Beton bertulang plat tangga T = 12 cm 1.000 m3 Beton K 225 189.137 kg Besi 8.333 m2 Bekisting Jml Total 49 Dihitung 1 M3 Beton bertulang plat T = 8 cm 1.0000 m3 Beton K 225 49.1250 kg Besi 12.500 m2 Bekisting Jml Total 50 Dihitung 1 M3 Beton bertulang plat T = 6 cm 1.0000 m3 Beton K 225 65.2380 kg Besi 16.667 m2 Bekisting Jml Total 51 Dihitung 1 Bh Beton bertulang poor mini pail 60x120 t= 40 cm (Aula) 0.288 m3 Beton K 300 48.980 kg Besi 1.440 m2 Bekisting Jml Total F. PEKERJAAN KAYU ATAP 1 03-3434-2008 6.15 1 M3 Memasang konstruksi gording kayu kelas II
  • 10. 1.1000 m3 Kayu kruing balok 15.0000 kg Besi strip 3.0000 kg Paku biasa 2"-5" 2.4000 oh Pekerja 7.2000 oh Tukang kayu 0.7200 oh Kepala tukang 0.1200 oh Mandor 2 03-3434-2008 6,15a 1 M3 Memasang konstruksi nok / jurai kayu kelas II 1.1000 m3 Kayu kruing balok 15.0000 kg Besi strip 3.0000 kg Paku biasa 2"-5" 2.4000 oh Pekerja 7.2000 oh Tukang kayu 0.7200 oh Kepala tukang 0.1200 oh Mandor 3 03-3434-2008 6.16 1 M2 Memasang rangka atap genteng glazur, kayu kelas II 0.0140 m3 Kayu kelas II kruing (5x7) cm 0.0080 m3 Reng bengkirai (3x5) cm 0.2500 kg Paku biasa 2"-5" 0.1000 oh Pekerja 0.1000 oh Tukang kayu 0.0100 oh Kepala tukang 0.0050 oh Mandor 4 03-3434-2008 6.22 1 M' Memasang listplank Uk ( 3x30 ) cm kayu kelas II 0.0110 m3 Kayu kelas II bengkirai papan 0.0500 kg Paku biasa 2"-5" 0.1000 oh Pekerja 0.2000 oh Tukang kayu 0.0200 oh Kepala tukang 0.0050 oh Mandor 5 3434-2008 1 M' Memasang reiter kayu kruing ( 2x20 ) cm 0.004 m3 Kayu kruing 0.040 kg Paku biasa 2"-5" 0.175 oh Pekerja 0.175 oh Tukang kayu 0.010 oh Kepala tukang 0.004 oh Mandor G. PEKERJAAN PENUTUP ATAP 1 03-3436-2002 6.3 1 M2 Pasang atap genteng glazur 18.0000 bh Genteng glazur 0.1500 oh Pekerja 0.0600 oh Tukang kayu 0.0060 oh Kepala tukang 0.0080 oh Mandor 2 03-3436-2002 6.5 1 M' Pasang bubungan genteng glazur 4.0000 bh Bubungan genteng glazur 8.0000 kg Portland Cemen ( PC ) 0.0320 m3 Pasir pasang 0.4000 oh Pekerja 0.2000 oh Tukang kayu 0.0200 oh Kepala tukang 0.0020 oh Mandor 3 03-3436-2002 6.42 1 M2 Pasang alluminium foil / sisalation 1.0500 m2 Alluminium foil 0.1500 oh Pekerja 0.0500 oh Tukang kayu 0.0050 oh Kepala tukang 0.1200 oh Mandor 4 03-7393-2008 6.18 1 M' Pasang talang jurai seng BJLS 28 lebat 90 cm
  • 11. 1.0500 lbr Seng plat 0.0150 kg Paku biasa 1"-2,5" 0.0190 m3 Papan kelas II 0.2000 oh Pekerja 0.4000 oh Tukang kayu 0.0250 oh Kepala tukang 0.0100 oh Mandor H. PEKERJAAN LANGIT-LANGIT 1 03-2839-2008 6.7 1 M2 Plafond gypsum board (120x240) tebal 9 mm: 0.3640 lbr Gypsum Board 9 mm 1.0250 btg Rangka hollow 2x4 cm t = 0,35 mm 3.0000 bh Stifenner 0.1100 kg Paku keling/sekrup 4.0000 bh Penggantung dan Ramzet 0.1000 oh Pekerja 0.0500 oh Tukang kayu 0.0050 oh Kepala tukang 0.0050 oh Mandor 2 03-2839-2008 6.7 1 M2 Plafond kalsiboard (120x240) tebal 4 mm: 0.3640 lbr Kalsiboar 4 mm 1.0250 btg Rangka hollow 2x4 cm 3.0000 bh Stifenner 0.1100 kg Paku keling/sekrup 4.0000 bh Penggantung dan Ramzet 0.1000 oh Pekerja 0.0500 oh Tukang kayu 0.0050 oh Kepala tukang 0.0050 oh Mandor 3 Hitung 1 M2 Kompon plat 0.0784 zak Semen gypsum 0.1500 lbr Amplas 0.1600 oh Pekerja 0.0800 oh Tukang batu 0.0080 oh Kepala tukang 0.0080 oh Mandor 4 03-2839-2008 6.9 1m' Pasang list plafond gypsum 1.0000 m' m' List Profil Gypsum 0.6500 kg kg Compon 1.0000 ls Upah I. PEKERJAAN KAYU KUSEN 1 03-3434-2008 6.8 1 M2 Daun pintu dobel teakwood 9mm lapis HPL rangka ky bengkirai : 0.0250 m3 Kayu bengkirai 0.0300 kg kg paku 0.5000 kg Lem kayu 2.0000 m2 HPL 2.0000 m2 Teakwood 9 mm 0.6000 oh Pekerja 2.0000 oh Tukang kayu 0.2000 oh Kepala tukang 0.0400 oh Mandor J. PEKERJAAN BESI 1 03-7393-2008 6.2 1 Kg Pasang rangka kuda-kuda baja IWF : 1.1500 kg Besi IWF 0.0600 oh Pekerja 0.0600 oh Tukang besi 0.0060 oh Kepala tukang 0.0030 oh Mandor 2 03-7393-2008 6.2 1 m2 Pasang mainan listplank hollow 4x4 ( Aula ) : 9.1000 m' pipa hollow kotak 4x4 t = 2 mm 12.0000 tk las
  • 12. 0.0300 oh Pekerja 0.0300 oh Tukang besi 0.0030 oh Kepala tukang 0.0015 oh Mandor K. PEKERJAAN KUSEN ALLUMINIUM 1 03-7393-2008 6.11 1 Unit Kusen alumunium Type J1 ( Asrama ) 125.880 m' Rangka kusen alumunium 4" (brown) 64.200 m' Frame daun jendela / BV 131.640 m' Tube sealant 65.820 m' Silicon gel 180.000 bh Sekrup fixer 1.000 unit Upah 2 03-7393-2008 6.11 1 Unit Kusen alluminium Type J2 ( Asrama ) 83.920 m' Rangka kusen alumunium 4" (brown) 42.800 m' Frame daun bv 87.760 m' Tube sealant 43.880 m' Silicon gel 120.000 bh Sekrup fixer 1.000 unit Upah 3 03-7393-2008 6.11 1 Unit Kusen alluminium Type J3 ( Asrama ) 48.320 m' Rangka kusen alumunium 4" (brown) 25.120 m' Frame daun jendela 17.120 m' Frame daun bv 37.120 m' Tube sealant 18.560 m' Silicon gel 112.000 bh Sekrup fixer 1.000 unit Upah 4 03-7393-2008 6.11 1 Unit Kusen alluminium Type J4 ( Asrama ) 12.480 m' Rangka kusen alumunium 4" (brown) 6.480 m' Frame daun jendela 4.480 m' Frame daun bv 9.680 m' Tube sealant 4.840 m' Silicon gel 28.000 bh Sekrup fixer 1.000 unit Upah 5 03-7393-2008 6.11 1 Unit Kusen alluminium Type J5 tampak depan ( Asrama ) 79.400 m' Rangka kusen allumunium 4" (brown) 184.600 m' Tube sealant 92.300 m' Silicon gel 76.000 bh Sekrup fixer 1.000 unit Upah 6 03-7393-2008 6.11 1 Unit Kusen alluminium Type BV ( Asrama ) 4.080 m' Rangka kusen allumunium 4" (brown) 4.000 m' Frame daun bv 4.280 m' Tube sealant 2.140 m' Silicon gel 12.000 bh Sekrup fixer 1.000 unit Upah 7 03-7393-2008 6.11 1 Unit Kusen alluminium Type P2 ( Asrama ) 10.600 m' Rangka kusen alumunium 4" (brown) 12.800 m' Rangka daun pintu 4.800 m' Frame daun jendela / bv 15.920 m' Tube sealant 7.960 m' Silicon gel 21.000 bh Sekrup fixer 1.000 unit Upah 8 03-7393-2008 6.11 1 Unit Kusen alluminium Type P3 ( Asrama )
  • 13. 8.270 m' Rangka kusen alumunium 4" (brown) 2.540 m' Rangka daun bv 2.240 m' Tube sealant 1.120 m' Silicon gel 14.000 bh Sekrup fixer 1.000 unit Upah 9 03-7393-2008 6.11 1 Unit Kusen alluminium Type PJ1 ( Aula ) 21.200 m' Rangka kusen alumunium 4" (brown) 11.600 m' Rangka daun pintu 9.520 m' Rangka daun juendela / bv 48.880 m' Tube sealant 24.440 m' Silicon gel 36.000 bh Sekrup fixer 1.000 unit Upah 10 03-7393-2008 6.11 1 Unit Kusen alluminium Type PJ2 ( Aula ) 17.250 m' Rangka kusen alumunium 4" (brown) 14.200 m' Rangka daun juendela / bv 22.200 m' Tube sealant 11.100 m' Silicon gel 33.000 bh Sekrup fixer 1.000 unit Upah 11 03-7393-2008 6.11 1 Unit Kusen alluminium Type PBV ( Aula ) 13.300 m' Rangka kusen alumunium 4" (brown) 7.000 m' Rangka daun juendela / bv 10.360 m' Tube sealant 5.180 m' Silicon gel 22.000 bh Sekrup fixer 1.000 unit Upah 12 03-7393-2008 6.11 1 Unit Kusen alluminium Type J1 ( Aula ) 11.140 m' Rangka kusen alumunium 4" (brown) 11.600 m' Rangka daun juendela / bv 18.240 m' Tube sealant 9.120 m' Silicon gel 24.000 bh Sekrup fixer 1.000 unit Upah 13 03-7393-2008 6.11 1 Unit Kusen alluminium Type BV ( Aula ) 4.520 m' Rangka kusen alumunium 4" (brown) 4.400 m' Rangka daun juendela / bv 6.320 m' Tube sealant 3.160 m' Silicon gel 8.000 bh Sekrup fixer 1.000 unit Upah 14 03-7393-2008 6.11 1 Unit Kusen alluminium Type P2 ( Aula ) 11.190 m' Rangka kusen allumunium 4" (brown) 11.000 m' Rangka daun pintu 29.800 m' Tube sealant 14.900 m' Silicon gel 26.000 bh Sekrup fixer 1.000 unit Upah 15 03-7393-2008 6.11 1 Unit Kusen alluminium Type P3 ( Aula ) 11.200 m' Rangka kusen allumunium 4" (brown) 5.120 m' Rangka daun juendela / bv 8.080 m' Tube sealant 4.040 m' Silicon gel 19.000 bh Sekrup fixer 1.000 unit Upah 16 03-7393-2008 6.11 1 Unit Kusen alluminium Type P4 ( Aula ) 7.900 m' Rangka kusen allumunium 4" (brown) 2.400 m' Rangka daun juendela / bv
  • 14. 3.720 m' Tube sealant 1.860 m' Silicon gel 16.000 bh Sekrup fixer 1.000 unit Upah 17 03-7393-2008 6.11 1 Unit Kusen alluminium Type BV atas ( Aula ) 3.600 m' Rangka kusen allumunium 4" (brown) 0.600 m2 Kaca talip bening 5 mm 3.200 m' Tube sealant 1.600 m' Silicon gel 12.000 bh Sekrup fixer 1.000 unit Upah 18 03-7393-2008 6.11 1 Unit Kusen alluminium Type P1 ( mushola ) 6.110 m' Rangka kusen allumunium 4" (brown) 13.860 m' Rangka daun pintu aluminium brown 21.360 m' Tube sealant 10.680 m' Silicon gel 12.000 bh Sekrup fixer 1.000 unit Upah 19 03-7393-2008 6.11 1 Unit Kusen alluminium Type J1 ( mushola ) 11.450 m' Rangka kusen allumunium 4" (brown) 7.920 m' Rangka daun juendela aluminium brown 24.480 m' Tube sealant 12.240 m' Silicon gel 16.000 bh Sekrup fixer 1.000 unit Upah 20 03-7393-2008 6.11 1 Unit Kusen alluminium Type J2 ( mushola ) 10.160 m' Rangka kusen allumunium 4" (brown) 12.930 m' Rangka daun juendela aluminium brown 26.216 m' Tube sealant 13.108 m' Silicon gel 18.000 bh Sekrup fixer 1.000 unit Upah 21 03-7393-2008 6.11 1 Unit Kusen alluminium Type BV ( mushola ) 2.680 m' Rangka kusen allumunium 4" (brown) 2.200 m' Rangka daun juendela aluminium brown 2.800 m' Tube sealant 1.400 m' Silicon gel 8.000 bh Sekrup fixer 1.000 unit Upah 22 03-7393-2008 6.11 1 Unit Kusen alluminium Type P1 ( pos jaga ) 5.220 m' Rangka kusen allumunium 4" (brown) 6.580 m' Rangka daun pintu aluminium brown 11.600 m' Tube sealant 5.800 m' Silicon gel 10.000 bh Sekrup fixer 1.000 unit Upah 23 03-7393-2008 6.11 1 Unit Kusen alluminium Type J1 ( pos jaga ) 20.500 m' Rangka kusen allumunium 4" (brown) 27.700 m' Tube sealant 13.850 m' Silicon gel 26.000 bh Sekrup fixer 1.000 unit Upah L. PEKERJAAN CAT 1 03-24 6.1 1 M2 Mengikis / Mengerok Permukaan Cat Tembok Lama : 0.0500 kg Soda api 0.1500 oh Pekerja 0.0025 oh Mandor 2 03-24 6.8 1 M2 Pengecatan kayu baru ( 1 lap. Plamir ) 1 lap. Cat dasar & 2 lap cat penutup :
  • 15. 0.2000 kg Cat meni 0.1500 kg Plamur 0.1700 kg Cat dasar 0.2600 kg Cat penutup 2 kali 0.0700 oh Pekerja 0.0090 oh Tukang cat 0.0060 oh Kepala tukang 0.0025 oh Mandor 3 03-24 6.14 1 M2 Pengecatan tembok baru ( 1 lap. Plamir ) 1 lap. Cat dasar & 2 lap cat penutup : 0.1000 kg Plamur 0.1000 kg Cat dasar 0.2600 kg Cat penutup 2 kali 0.2600 lbr Amplas 0.0200 oh Pekerja 0.0630 oh Tukang cat 0.0063 oh Kepala tukang 0.0025 oh Mandor 4 03-24 6.15 1 M2 Pengecatan tembok lama ( 1 lap. Plamir ) 1 lap. Cat dasar & 2 lap cat penutup : 0.1000 kg Cat dasar 0.1800 kg Cat penutup 2 kali 0.2600 lbr Amplas 0.0280 oh Pekerja 0.0420 oh Tukang cat 0.0042 oh Kepala tukang 0.0025 oh Mandor M. PEKERJAAN KACA 1 6.17 1 M2 Memasang kaca bening 5 mm : 1.1000 m2 Kaca bening 5 mm 0.0150 oh Pekerja 0.1500 oh Tukang 0.0150 oh Kepala tukang 0.0008 oh Mandor 2 6,17a 1 M2 Memasang kaca bening 12 mm : 1.1000 m2 Kaca bening 12 mm 0.0150 oh Pekerja 0.1500 oh Tukang 0.0150 oh Kepala tukang 0.0008 oh Mandor N. PEKERJAAN SANITASI 1 6.25 1 M' Pasang pipa GIP 1 1/2" : 1.2000 m' Pipa GIP 1 1/2" 0.3500 ls Perlengkapan 35 % harga pipa 0.1080 oh Pekerja 0.1800 oh Tukang 0.0180 oh Kepala tukang 0.0540 oh Mandor 2 6.25 1 M' Pasang pipa PVC AW 1/2" : 1.2000 m' Pipa PVC 0.3500 ls Perlengkapan 35 % harga pipa 0.0360 oh Pekerja 0.0600 oh Tukang 0.0060 oh Kepala tukang 0.0018 oh Mandor 3 1 M' Pasang pipa PVC 3/4" : 1.2000 m' Pipa PVC 0.3500 ls Perlengkapan 35 % harga pipa 0.0360 oh Pekerja 0.0600 oh Tukang 0.0060 oh Kepala tukang 0.0018 oh Mandor
  • 16. 4 1 M' Pasang pipa PVC 1" : 1.2000 m' Pipa PVC 0.3500 ls Perlengkapan 35 % harga pipa 0.0360 oh Pekerja 0.0600 oh Tukang 0.0060 oh Kepala tukang 0.0018 oh Mandor 5 1 M' Pasang pipa PVC 1 1/2" : 1.2000 m' Pipa PVC 0.3500 ls Perlengkapan 35 % harga pipa 0.0360 oh Pekerja 0.0600 oh Tukang 0.0060 oh Kepala tukang 0.0018 oh Mandor 6 6.29 1 M' Pasang pipa PVC 2" : 1.2000 m' Pipa PVC 0.3500 ls Perlengkapan 35 % harga pipa 0.0540 oh Pekerja 0.0900 oh Tukang 0.0090 oh Kepala tukang 0.0027 oh Mandor 7 6.31 1 M' Pasang pipa PVC 3" : 1.2000 m' Pipa PVC 0.3500 ls Perlengkapan 35 % harga pipa 0.0810 oh Pekerja 0.1350 oh Tukang 0.0140 oh Kepala tukang 0.0041 oh Mandor 8 1 M' Pasang pipa PVC 4" : 1.2000 m' Pipa PVC 0.3500 ls Perlengkapan 35 % harga pipa 0.0810 oh Pekerja 0.1350 oh Tukang 0.0140 oh Kepala tukang 0.0041 oh Mandor 9 6.1 1 Bh Memasang Klosed duduk monoblok ( TOTO ) : 1.0000 bh Klosed duduk 0.0600 ls Perlengkapan 6 % harga pipa 3.3000 oh Pekerja 1.1000 oh Tukang 0.0010 oh Kepala tukang 0.1600 oh Mandor 10 6.5 1 Bh Memasang Wastafel : 1.0000 bh Wastafel meja oval 0.3000 ls Perlengkapan 30 % harga pipa 6.0000 kg Portland cement 0.0100 m3 Pasir pasang 1.2000 oh Pekerja 0.1450 oh Tukang 0.1500 oh Kepala tukang 0.1000 oh Mandor 11 6.5 1 Bh Memasang Shower lengkap : 1.0000 bh Shower 0.3000 ls Perlengkapan 30 % harga pipa 6.0000 kg Portland cement 0.0100 m3 Pasir pasang 1.2000 oh Pekerja 0.1450 oh Tukang 0.1500 oh Kepala tukang
  • 17. 0.1000 oh Mandor 12 6.36 1 Bh Memasang Floor Drain 1.0000 bh Floor Drain 0.0100 oh Pekerja 0.1000 oh Tukang 0.0100 oh Kepala tukang 0.0050 oh Mandor 13 6.35 1 Bh Memasang Kran dia 3/4" dan 1/2" 1.0000 bh Kran air 1.0000 set Seal tape 0.0100 oh Pekerja 0.1000 oh Tukang 0.0100 oh Kepala tukang 0.0050 oh Mandor 14 1 M2 Pasang paving blok Holland t = 6 cm : K 300 45.0000 bh paving holland t = 6 cm 0.0800 m3 Pasir pasang 0.4000 oh pekerja 0.2000 oh tukang batu 0.0200 oh kepala tukang 0.0200 oh mandor 15 1 M' Pasang kansteen beton 2.0000 bh kansteen 10x20x50 0.0500 m3 Pasir pasang 0.1000 oh pekerja 0.0500 oh kepala tukang 0.0100 oh mandor 16 1 M' Saluran U 30 : 0.4000 m2 pas. batu bata 1:5 0.2400 m2 plesteran 1:5 0.0100 m3 pasir urug 0.0400 m3 galian tanah 1.0000 m' buis beton U 30 17 1 BH Bak kontrol U 30 : 0.3600 m2 m2 pas.batu bata 1:5 0.0100 m3 m3 pas. koral 0.0045 m3 m3 pasir urug 0.5040 m3 m2 plester 1:5 0.0429 m3 m3 galian tanah 18 1 M' Saluran O 30 : 0.4000 m2 pas. batu bata 1:5 0.0100 m3 pasir urug 0.0400 m3 galian tanah 1.0000 m' buis beton 0 30 19 1 M' Pasang grill penutup saluran 10.3675 kg besi siku 50.50.5 6.3200 kg besi dia 16 mm 15.0000 ttk las 0.4000 oh pekerja 0.2000 oh tukang 0.0200 oh kepala tukang 0.0200 oh mandor 20 1 M2 Pasang atap Pollycarbonate datar 1.2000 m2 m2 pollycarbonat datar 0.4700 kg kg angkur baut 0.2300 oh tukang 0.0230 oh kepala tukang 0.0230 oh mandor
  • 18. 21 1 Unit Memasang rangka atap doorloop rangka pipa hitam 11.6 m' kuda-kuda pipa hitam 2" 75.0000 m' gording pipa hitam 1" 15.3600 kg plat landas 6 mm 14.9760 kg angkur baut 16 mm 1.0000 ls las 0.0520 oh mandor 0.1050 oh kep tukang besi 1.0500 oh tukang besi 1.0500 oh pekerja 22 1 Unit Memasang resapan dari bis beton + penutup 1.500 m' galian tanah 1.0000 bh Bis beton ø 80 cm 0.0500 m3 Penutup dari plat beton t = 5 cm 1.0000 bh besi pengan tutup