CIVIL. ENGINEERING
Jalan Kabayan No. 50 Sumbawa Besar
DAFTAR ANALISA HARGA SATUAN UPAH BAHAN
SNVT : PENATAAN BANGUNAN DAN LINGKUNGAN PROV. NTB
KEGIATAN : PELAKSANAANPENATAAN BANGUNANDAN LINGKUNGAN PROV. NTB
PEKERJAAN : PEMBANGUNAN PSD REVITALISASI KAWASAN PUSAT KOTA SUMBAWA
LOKASI : KAWASAN PUSAT KOTA SUMBAWA BESAR KAB. SUMBAWA
TAHUN : 2O13
ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN
No Sat Koepesien
Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga
Analisa jaan Bahan
A.1 1 m' Pengukuran dan pemasangan Bowplang
Bahan
0.012 M³ Kayu Klas III Rp. 1,750,000.00 21,000.00
0.020 Kg Paku Rp. 17,500.00 350.00
0.007 M³ Papan Kayu Klas II Rp. 2,500,000.00 17,500.00
Jumlah (I) 38,850.00
Tenaga
0.100 Hari Tukang kayu Rp. 60,000.00 6,000.00
0.100 Hari Pekerja Rp. 44,000.00 4,400.00
0.010 Hari Kepala tukang Rp. 65,000.00 650.00
0.005 Hari Mandor Rp. 72,820.00 364.10
Jumlah (II) 11,414.10
Jumlah (I) + (II) 50,264.10
Over Head 7.5 % 7,539.62
Harga Satuan 57,803.72
A.2 1 m3 Bongkar Dinding Bata & Konstin
Tenaga
0.100 Hari Tukang Bongkar Rp. 44,000.00 4,400.00
0.100 Hari Mandor Rp. 72,820.00 7,282.00
Jumlah (II) 11,682.00
Jumlah (I) + (II) 69,485.72
Over Head 15 % 10,422.86
Harga Satuan 79,908.57
A.3 1 m2 Pembersihan Lapangan dan Lokasi
Tenaga
0.050 Hari Tukang Batu Rp. 60,000.00 3,000.00
0.005 Hari Pekerja Rp. 44,000.00 220.00
Jumlah (II) 3,220.00
Jumlah (I) + (II) 3,220.00
Over Head 15 % 483.00
Harga Satuan 3,703.00
No Sat Koepesien
Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga
Analisa jaan Bahan
B.1 1m
3
Galian tanah biasa sedalam 1 meter
Tenaga
0.750 Hari Pekerja Rp. 44,000.00 33,000.00
0.025 Hari Mandor Rp. 72,820.00 1,820.50
Jumlah (I) 34,820.50
Over Head 15 % 5,223.08
Harga Satuan 40,043.58
B.2 1m
3
Galian tanah biasa sedalam 2 meter
Tenaga
0.900 Hari Pekerja Rp. 44,000.00 39,600.00
0.045 Hari Mandor Rp. 72,820.00 3,276.90
Jumlah (I) 42,876.90
Over Head 15 % 6,431.54
Harga Satuan 49,308.44
B.3 1m3
Urugan kembali
Mengurug Kembali 1 m3 dihitung dari 1,3 kali dari indek pekerjaan Galian
B.4 1m
3
Pemadatan tanah
Tenaga
0.500 Hari Pekerja Rp. 44,000.00 22,000.00
0.050 Hari Mandor Rp. 72,820.00 3,641.00
Jumlah (I) 25,641.00
Over Head 15 % 3,846.15
Harga Satuan 29,487.15
B.5. 1 m
3
Urugan pasir bawah penutup lantai
Bahan
1.200 M³ Pasir Rp. 25,000.00 30,000.00
Jumlah (I) 30,000.00
Tenaga
0.300 Hari Pekerja Rp. 44,000.00 13,200.00
0.010 Hari Mandor Rp. 72,820.00 728.20
Jumlah (II) 13,928.20
Jumlah (I) + (II) 43,928.20
Over Head 15 % 6,589.23
Harga Satuan 50,517.43
B.6 1 m
3
Urugan tanah (konversi dari analisa urugan pasir)
Bahan
1.200 M³ Tanah Urug Rp. 27,500.00 33,000.00
Jumlah (I) 33,000.00
Tenaga
0.300 Hari Pekerja Rp. 44,000.00 13,200.00
0.010 Hari Mandor Rp. 72,820.00 728.20
Jumlah (II) 13,928.20
Jumlah (I) + (II) 46,928.20
Over Head 15 % 7,039.23
Harga Satuan 53,967.43
No Sat Koepesien
Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga
Analisa jaan Bahan
C. ANALISA BIAYA KONSTRUKSI PONDASI (SNI DT-91-0007-2007)
C.1 1m
3
Pasangan Pondasi Batu Kali 1 Pc : 3 Ps
Bahan
1.200 M³ Batu belah Rp. 80,000.00 96,000.00
202.000 Kg Semen Portland Rp. 1,200.00 242,400.00
0.485 M³ pasir pasang Rp. 80,000.00 38,800.00
Jumlah (I) 377,200.00
Tenaga
1.500 Hari Pekerja Rp. 44,000.00 66,000.00
0.600 Hari Tukang batu Rp. 60,000.00 36,000.00
0.060 Hari Kepala Tukang Rp. 65,000.00 3,900.00
0.075 Hari Mandor Rp. 72,820.00 5,461.50
Jumlah (II) 111,361.50
Jumlah (I) + (II) 488,561.50
Over Head 15 % 73,284.23
Harga Satuan 561,845.73
C.3 1m
3
Pasangan Pondasi Batu belah campuran 1 Pc : 5 Ps
Bahan
1.200 M³ Batu belah Rp. 80,000.00 96,000.00
136.000 Kg Semen Portland Rp. 1,200.00 163,200.00
0.544 M³ pasir pasang Rp. 80,000.00 43,520.00
Jumlah (I) 302,720.00
Tenaga
1.500 Hari Pekerja Rp. 44,000.00 66,000.00
0.600 Hari Tukang batu Rp. 60,000.00 36,000.00
0.060 Hari Kepala Tukang Rp. 65,000.00 3,900.00
0.075 Hari Mandor Rp. 60,000.00 4,500.00
Jumlah (II) 110,400.00
Jumlah (I) + (II) 413,120.00
Over Head 15 % 61,968.00
Harga Satuan 475,088.00
C.4 1m3 Pasangan batu kosong (aanstanping)
Bahan
1.200 M³ Batu belah Rp. 80,000.00 96,000.00
0.432 M³ pasir pasang Rp. 80,000.00 34,560.00
Jumlah (I) 130,560.00
Tenaga
0.780 Hari Pekerja Rp. 44,000.00 34,320.00
0.390 Hari Tukang batu Rp. 60,000.00 23,400.00
0.039 Hari Kepala Tukang Rp. 65,000.00 2,535.00
0.075 Hari Mandor Rp. 72,820.00 5,461.50
Jumlah (II) 65,716.50
Jumlah (I) + (II) 196,276.50
Over Head 15 % 29,441.48
Harga Satuan 225,717.98
D. ANALISA BIAYA PEKERJAAN DINDING
No Sat Koepesien
Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga
Analisa jaan Bahan
D.1 1m2
Pasangan bata merah tebal 1 bata. 1 Pc : 3 Ps
Bahan
144.000 Bh Bata merah Rp. 450.00 64,800.00
32.950 Kg Semen Portland Rp. 1,200.00 39,540.00
0.091 M³ pasir pasang Rp. 80,000.00 7,280.00
Jumlah (I) 111,620.00
Tenaga
0.600 Hari Pekerja Rp. 44,000.00 26,400.00
0.200 Hari Tukang batu Rp. 60,000.00 12,000.00
0.020 Hari Kepala Tukang Rp. 65,000.00 1,300.00
0.030 Hari Mandor Rp. 72,820.00 2,184.60
Jumlah (II) 41,884.60
Jumlah (I) + (II) 153,504.60
Over Head 15 % 23,025.69
Harga Satuan 176,530.29
D.2 1m
2
Pasangan bata merah tebal ½ bata. 1 Pc : 3 Ps
Bahan
70.000 Bh Bata merah Rp. 450.00 31,500.00
14.370 Kg Semen Portland Rp. 1,200.00 17,244.00
0.040 M³ pasir pasang Rp. 80,000.00 3,200.00
Jumlah (I) 51,944.00
Tenaga
0.300 Hari Pekerja Rp. 44,000.00 13,200.00
0.100 Hari Tukang batu Rp. 60,000.00 6,000.00
0.010 Hari Kepala Tukang Rp. 65,000.00 650.00
0.015 Hari Mandor Rp. 72,820.00 1,092.30
Jumlah (II) 20,942.30
Jumlah (I) + (II) 72,886.30
Over Head 15 % 10,932.95
Harga Satuan 83,819.25
D.3 1m2
Pasangan bata merah tebal ½ bata. 1 Pc : 5 Ps
Bahan
70.000 Bh Bata merah Rp. 450.00 31,500.00
9.680 Kg Semen Portland Rp. 1,200.00 11,616.00
0.043 M³ pasir pasang Rp. 80,000.00 3,440.00
Jumlah (I) 46,556.00
Tenaga
0.300 Hari Pekerja Rp. 44,000.00 13,200.00
0.100 Hari Tukang batu Rp. 60,000.00 6,000.00
0.010 Hari Kepala Tukang Rp. 65,000.00 650.00
0.015 Hari Mandor Rp. 72,820.00 1,092.30
Jumlah (II) 20,942.30
Jumlah (I) + (II) 67,498.30
Over Head 15 % 10,124.75
Harga Satuan 77,623.05
E. ANALISA BIAYA KONSTRUKSI PEKERJAAN PLESTERAN (SNI DT-0010-2007)
No Sat Koepesien
Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga
Analisa jaan Bahan
E.1 1m
2
Plesteran 1 Pc : 3 Ps tebal 15 mm.
Bahan
7.760 Kg Semen Portland Rp. 1,200.00 9,312.00
0.023 M³ Pasir pasang Rp. 80,000.00 1,840.00
Jumlah (I) 11,152.00
Tenaga
0.200 Hari Pekerja Rp. 44,000.00 8,800.00
0.150 Hari Tukang batu Rp. 60,000.00 9,000.00
0.015 Hari Kepala Tukang Rp. 65,000.00 975.00
0.010 Hari Mandor Rp. 72,820.00 728.20
Jumlah (II) 19,503.20
Jumlah (I) + (II) 30,655.20
Over Head 15 % 4,598.28
Harga Satuan 35,253.48
E.2 1m
2
Plesteran 1 Pc : 3 Ps tebal 15 mm.
Bahan
7.070 Kg Semen Portland Rp. 1,200.00 8,484.00
0.021 M³ Pasir pasang Rp. 80,000.00 1,680.00
Jumlah (I) 10,164.00
Tenaga
0.260 Hari Pekerja Rp. 44,000.00 11,440.00
0.200 Hari Tukang batu Rp. 60,000.00 12,000.00
0.020 Hari Kepala Tukang Rp. 65,000.00 1,300.00
0.013 Hari Mandor Rp. 72,820.00 946.66
Jumlah (II) 25,686.66
Jumlah (I) + (II) 35,850.66
Over Head 15 % 5,377.60
Harga Satuan 41,228.26
E.3 1m
2
Plesteran 1 Pc : 5 Ps tebal 15 mm.
Bahan
5.148 Kg Semen Portland Rp. 1,200.00 6,177.60
0.026 M³ Tanah Paras Rp. 30,000.00 780.00
Jumlah (I) 6,957.60
Tenaga
0.200 Hari Pekerja Rp. 44,000.00 8,800.00
0.150 Hari Tukang batu Rp. 60,000.00 9,000.00
0.015 Hari Kepala Tukang Rp. 65,000.00 975.00
0.010 Hari Mandor Rp. 72,820.00 728.20
Jumlah (II) 19,503.20
Jumlah (I) + (II) 26,460.80
Over Head 15 % 3,969.12
Harga Satuan 30,429.92
E.6 1m2
Finishing siar pasangan batu kali 1Pc : 2 Ps
Bahan
6.340 Kg Semen Portland Rp. 1,200.00 7,608.00
0.012 M³ Pasir pasang Rp. 80,000.00 960.00
Jumlah (I) 8,568.00
Tenaga
0.075 Hari Pekerja Rp. 44,000.00 3,300.00
0.035 Hari Tukang batu Rp. 60,000.00 2,100.00
0.004 Hari Kepala Tukang Rp. 65,000.00 260.00
0.004 Hari Mandor Rp. 72,820.00 291.28
Jumlah (II) 5,951.28
Jumlah (I) + (II) 14,519.28
Over Head 15 % 2,177.89
Harga Satuan 16,697.17
No Sat Koepesien
Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga
Analisa jaan Bahan
E.7 1m
2
memasang acian
Bahan
3.250 Kg Semen Portland Rp. 1,200.00 3,900.00
0.031 M³ Pasir pasang Rp. 80,000.00 0.00
Jumlah (I) 3,900.00
Tenaga
0.150 Hari Pekerja Rp. 44,000.00 6,600.00
0.100 Hari Tukang batu Rp. 60,000.00 6,000.00
0.010 Hari Kepala Tukang Rp. 65,000.00 650.00
0.008 Hari Mandor Rp. 72,820.00 582.56
Jumlah (II) 13,832.56
Jumlah (I) + (II) 17,732.56
Over Head 15 % 2,659.88
Harga Satuan 20,392.44
F. ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU (SNI DT 91-0011-2007)
F.1 1m
3
Membuat dan memasang Kusen Pintu dan kusen Jemdela kayu II
Bahan
1.100 m³ Kayu Klas II Rp. 2,500,000.00 2,750,000.00
1.250 Kg Paku Rp. 17,500.00 21,875.00
1.000 Kg Lem Kayu Rp. 25,000.00 25,000.00
Jumlah (I) 2,796,875.00
Tenaga
6.000 Hari Pekerja Rp. 44,000.00 264,000.00
20.000 Hari Tukang kayu Rp. 60,000.00 1,200,000.00
2.000 Hari Kepala Tukang kayu Rp. 65,000.00 130,000.00
0.300 Hari Mandor Rp. 72,820.00 21,846.00
Jumlah (II) 1,615,846.00
Jumlah (I) + (II) 4,412,721.00
Over Head 15 % 661,908.15
Harga Satuan 5,074,629.15
F.3 1m
2
Membuat dan memasang Pintu dan jendela kaca kayu klas II
Bahan
0.0240 m³ Papan Kayu Klas II Rp. 2,500,000.00 60,000.00
0.3000 Kg Lem kayu Rp. 25,000.00 7,500.00
0.8900 M2 Kaca 3 mm (bening) Rp. 125,000.00 111,250.00
, Jumlah (I) 178,750.00
Tenaga
0.8000 Hari Pekerja Rp. 44,000.00 35,200.00
2.0000 Hari Tukang kayu Rp. 60,000.00 120,000.00
0.2000 Hari Kepala Tukang kayu Rp. 65,000.00 13,000.00
0.0400 Hari Mandor Rp. 72,820.00 2,912.80
Jumlah (II) 171,112.80
Jumlah (I) + (II) 349,862.80
Over Head 15 % 52,479.42
Harga Satuan 402,342.22
No Sat Koepesien
Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga
Analisa jaan Bahan
F.4 1m2 Memasang jelusi kayu klas II
Bahan
0.060 m³ Papan Kayu Kls II Rp. 2,500,000.00 150,000.00
0.150 Kg Paku Rp. 17,500.00 2,625.00
Jumlah (I) 152,625.00
Tenaga
0.5000 Hari Pekerja Rp. 44,000.00 22,000.00
2.0000 Hari Tukang kayu Rp. 60,000.00 120,000.00
0.2000 Hari Kepala Tukang kayu Rp. 65,000.00 13,000.00
0.0250 Hari Mandor Rp. 72,820.00 1,820.50
Jumlah (II) 156,820.50
Jumlah (I) + (II) 309,445.50
Over Head 15 % 46,416.83
Harga Satuan 355,862.33
F.5 1m2 Membuat daun pintu double tacwood rangka kayu klas II
Bahan
0.025 m3 Papan Kayu Kls II Rp. 2,500,000.00 62,500.00
0.030 Kg Paku Rp. 17,500.00 525.00
0.500 Kg Lem Kayu Rp. 25,000.00 12,500.00
1.000 Lbr Tecwood 90 x220 x 4 mm Rp. 75,000.00 75,000.00
Jumlah (I) 150,525.00
Tenaga
0.800 Hari Pekerja Rp. 44,000.00 35,200.00
2.000 Hari Tukang kayu Rp. 60,000.00 120,000.00
0.200 Hari Kepala Tukang kayu Rp. 65,000.00 13,000.00
0.030 Hari Mandor Rp. 72,820.00 2,184.60
Jumlah (II) 170,384.60
Jumlah (I) + (II) 320,909.60
Over Head 15 % 48,136.44
Harga Satuan 369,046.04
F.10 1m
3
Memasang Konstruksi kuda-kuda Konvensional kayu II
Bahan
1.1000 m3 Kayu Klas II Rp. 2,500,000.00 2,750,000.00
15.0000 Bh Begel Plat Rp. 3,500.00 52,500.00
5.6000 Kg Paku Rp. 17,500.00 98,000.00
Jumlah (I) 2,900,500.00
Tenaga
4.0000 Hari Pekerja Rp. 44,000.00 176,000.00
12.0000 Hari Tukang kayu Rp. 60,000.00 720,000.00
1.2000 Hari Kepala Tukang kayu Rp. 65,000.00 78,000.00
0.2000 Hari Mandor Rp. 72,820.00 14,564.00
Jumlah (II) 988,564.00
Jumlah (I) + (II) 3,889,064.00
Over Head 15 % 583,359.60
Harga Satuan 4,472,423.60
No Sat Koepesien
Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga
Analisa jaan Bahan
F.11 1m
3
memasang Konstruksi kuda-kuda ekspose kayu klas II
Bahan
1.200 m3 Kayu Klas II Rp. 2,500,000.00 3,000,000.00
15.000 Bh Begel Plat Rp. 3,500.00 52,500.00
5.600 Kg Paku Rp. 17,500.00 98,000.00
Jumlah (I) 3,150,500.00
Tenaga
6.000 Hari Pekerja Rp. 44,000.00 264,000.00
20.000 Hari Tukang kayu Rp. 60,000.00 1,200,000.00
2.000 Hari Kepala Tukang kayu Rp. 65,000.00 130,000.00
0.300 Hari Mandor Rp. 72,820.00 21,846.00
Jumlah (II) 1,615,846.00
Jumlah (I) + (II) 4,766,346.00
Over Head 15 % 714,951.90
Harga Satuan 5,481,297.90
F.12 1m3
Memasang Konstruksi gording kayu klas I
Bahan
1.100 m³ Kayu Klas I Rp. 3,500,000.00 3,850,000.00
15.000 Bh Begel Plat Rp. 3,500.00 52,500.00
3.000 Kg Paku Rp. 17,500.00 52,500.00
Jumlah (I) 3,955,000.00
Tenaga
2.4000 Hari Pekerja Rp. 44,000.00 105,600.00
7.2000 Hari Tukang kayu Rp. 60,000.00 432,000.00
0.7200 Hari Kepala Tukang kayu Rp. 65,000.00 46,800.00
0.1200 Hari Mandor Rp. 72,820.00 8,738.40
Jumlah (II) 593,138.40
Jumlah (I) + (II) 4,548,138.40
Over Head 15 % 682,220.76
Harga Satuan 5,230,359.16
F.12a 1m
3
Memasang Konstruksi gording kayu klas II
Bahan
1.100 m³ Kayu Klas I Rp. 2,500,000.00 2,750,000.00
15.000 Bh Begel Plat Rp. 3,500.00 52,500.00
3.000 Kg Paku Rp. 17,500.00 52,500.00
Jumlah (I) 2,855,000.00
Tenaga
2.4000 Hari Pekerja Rp. 44,000.00 105,600.00
7.2000 Hari Tukang kayu Rp. 60,000.00 432,000.00
0.7200 Hari Kepala Tukang Rp. 65,000.00 46,800.00
0.1200 Hari Mandor Rp. 72,820.00 8,738.40
Jumlah (II) 593,138.40
Jumlah (I) + (II) 3,448,138.40
Over Head 15 % 517,220.76
Harga Satuan 3,965,359.16
No Sat Koepesien
Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga
Analisa jaan Bahan
F.13 1m
3
Memasang rangka atap multi roof usuk klas II dan reng kayu Klas I
Bahan
0.014 m³ Kayu Klas II Rp. 2,500,000.00 35,000.00
0.009 m³ Kayu Klas I Rp. 3,500,000.00 31,500.00
1.200 kg Paku Rp. 17,500.00 21,000.00
Jumlah (I) 87,500.00
Tenaga
0.100 Hari Pekerja Rp. 44,000.00 4,400.00
0.100 Hari Tukang kayu Rp. 60,000.00 6,000.00
0.010 Hari Kepala Tukang Rp. 65,000.00 650.00
0.005 Hari Mandor Rp. 72,820.00 364.10
Jumlah (II) 11,414.10
Jumlah (I) + (II) 98,914.10
Over Head 15 % 14,837.12
Harga Satuan 113,751.22
F.14 1m3
Memasang rangka langit-langit (60x60) cm kayu klas II
Bahan
0.016 m³ Kayu Klas II Rp. 2,500,000.00 40,000.00
0.250 Kg Paku Rp. 17,500.00 4,375.00
Jumlah (I) 44,375.00
Tenaga
0.200 Hari Pekerja Rp. 44,000.00 8,800.00
0.300 Hari Tukang kayu Rp. 60,000.00 18,000.00
0.030 Hari Kepala Tukang Rp. 65,000.00 1,950.00
0.010 Hari Mandor Rp. 72,820.00 728.20
Jumlah (II) 29,478.20
Jumlah (I) + (II) 73,853.20
Over Head 15 % 11,077.98
Harga Satuan 84,931.18
F.15 1m
2
Memasang listplang ukuran (2x20) cm, kayu klas I
Bahan
0.011 m³ Kayu klas I Rp. 3,500,000.00 38,500.00
0.100 Kg Paku Rp. 17,500.00 1,750.00
Jumlah (I) 40,250.00
Tenaga
0.010 Oh Pekerja Rp. 44,000.00 440.00
0.200 Oh Tukang kayu Rp. 60,000.00 12,000.00
0.025 Oh Kepala Tukang Rp. 65,000.00 1,625.00
0.005 Oh Mandor Rp. 72,820.00 364.10
Jumlah (II) 14,429.10
Jumlah (I) + (II) 54,679.10
Over Head 15 % 8,201.87
Harga Satuan 62,880.97
G. ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON (SNI DT 91-0008-2007)
No Sat Koepesien
Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga
Analisa jaan Bahan
G.1 1 m
3
Membuat lantai kerja beton mutu (K100) stum (3-6) cm wc = 0,87
Bahan
230.000 Kg Semen Rp. 1,200.00 276,000.00
0.638 M³ Pasir Cor Rp. 80,000.00 51,040.00
0.761 M³ Kerikil Rp. 100,000.00 76,100.00
2.000 Ltr Air Kerja Rp. 250.00 500.00
Jumlah (I) 403,640.00
Tenaga
1.200 Hari Pekerja Rp. 44,000.00 52,800.00
0.200 Hari Tukang batu Rp. 60,000.00 12,000.00
0.020 Hari Kepala Tukang Batu Rp. 65,000.00 1,300.00
0.8800 Hari Mandor Rp. 72,820.00 64,081.60
Jumlah (II) 130,181.60
Jumlah (I) + (II) 533,821.60
Over Head 15 % 80,073.24
Harga Satuan 613,894.84
G.2 1 m
3
Membuat lantai kerja beton mutu Fc = 14,5 (K175) stum (12-2) cm wc = 0,66
Bahan
326.000 Kg Semen Rp. 1,200.00 391,200.00
0.543 m³ Pasir Cor Rp. 80,000.00 43,428.57
0.762 m³ Kerikil Rp. 100,000.00 76,222.22
215.000 liter Air Bersih Rp. 250.00 53,750.00
Jumlah (I) 564,600.79
Tenaga
1.650 Hari Pekerja Rp. 44,000.00 72,600.00
0.275 Hari Tukang batu Rp. 60,000.00 16,500.00
0.280 Hari Kepala Tukang Batu Rp. 65,000.00 18,200.00
0.8300 Hari Mandor Rp. 72,820.00 60,440.60
Jumlah (II) 167,740.60
Jumlah (I) + (II) 732,341.39
Over Head 15 % 109,851.21
Harga Satuan 842,192.60
G.3 1 m
3
Membuat lantai kerja beton mutu Fc = 16,9 (K200) stum (12-2) cm wc = 0,61
Bahan
352.000 Kg Semen Rp. 1,200.00 422,400.00
0.622 m³ Pasir Cor Rp. 80,000.00 49,760.00
0.754 m³ Kerikil Rp. 100,000.00 75,400.00
215.000 liter Air Bersih Rp. 250.00 53,750.00
Jumlah (I) 601,310.00
Tenaga
1.650 Hari Pekerja Rp. 44,000.00 72,600.00
0.275 Hari Tukang batu Rp. 60,000.00 16,500.00
0.280 Hari Kepala Tukang Batu Rp. 65,000.00 18,200.00
0.0830 Hari Mandor Rp. 72,820.00 6,044.06
Jumlah (II) 113,344.06
Jumlah (I) + (II) 714,654.06
Over Head 15 % 107,198.11
Harga Satuan 821,852.17
G.4 1 m
3
Membuat lantai kerja beton mutu Fc = 19,3 Mpa (K225) stum (12-2) cm wc = 0,58
Bahan
371.000 Kg Semen Rp. 1,200.00 445,200.00
0.499 m³ Pasir Cor Rp. 80,000.00 39,920.00
0.776 m³ Kerikil Rp. 100,000.00 77,600.00
215.000 liter Air Bersih Rp. 250.00 53,750.00
Jumlah (I) 616,470.00
Tenaga
1.650 Hari Pekerja Rp. 36,500.00 60,225.00
0.275 Hari Tukang batu Rp. 48,000.00 13,200.00
0.280 Hari Kepala Tukang Batu Rp. 52,500.00 14,700.00
0.083 Hari Mandor Rp. 58,000.00 4,814.00
Jumlah (II) 92,939.00
Jumlah (I) + (II) 709,409.00
Over Head 15 % 106,411.35
Harga Satuan 815,820.35
No Sat Koepesien
Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga
Analisa jaan Bahan
G.5 1 Kg Pembesian dengan besi polos atau besi ulir
Bahan
1.050 Kg Besi beton Rp. 9,500.00 9,975.00
0.015 Kg Kawat Beton Rp. 17,500.00 262.50
Jumlah (I) 10,237.50
Tenaga
0.007 Hari Pekerja Rp. 44,000.00 308.00
0.007 Hari Tukang besi Rp. 60,000.00 420.00
0.007 Hari Kepala Tukang Besi Rp. 65,000.00 455.00
0.0040 Hari Mandor Rp. 72,820.00 291.28
Jumlah (II) 1,474.28
Jumlah (I) + (II) 11,711.78
Over Head 15 % 1,756.77
Harga Satuan 13,468.55
G.6 1 m
3
Membuat Pondasi Beton Bertulang (PI)=Besi +133,06 Kg
Bahan
0.200 M³ Kayu klas III Rp. 1,750,000.00 350,000.00
1.500 Kg Paku Rp. 17,500.00 26,250.00
0.400 Ltr Minyak bekisting Rp. 3,500.00 1,400.00
73.902 Kg Besi Beton Rp. 9,500.00 702,069.00
2.250 Kg Kawat Beton Rp. 17,500.00 39,375.00
336.000 Kg Semen Rp. 1,200.00 403,200.00
0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00
0.810 M³ Krikil Rp. 100,000.00 81,000.00
Jumlah (I) 1,646,494.00
Tenaga
5.300 Hari Pekerja Rp. 44,000.00 233,200.00
0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00
1.300 Hari Tukang kayu Rp. 60,000.00 78,000.00
1.050 Hari Tukang Besi Rp. 60,000.00 63,000.00
0.262 Hari Kepala Tukang Besi Rp. 65,000.00 17,030.00
0.265 Hari Mandor Rp. 72,820.00 19,297.30
Jumlah (II) 427,027.30
Jumlah (I) + (II) 2,073,521.30
Over Head 15 % 311,028.20
Harga Satuan 2,384,549.50
G.6.a 1 m3
Membuat Pondasi Beton Bertulang (PI)=Besi +139,236 Kg
Bahan
0.200 M³ Kayu klas III Rp. 1,750,000.00 350,000.00
1.500 Kg Paku Rp. 17,500.00 26,250.00
0.400 Ltr Minyak bekisting Rp. 3,500.00 1,400.00
139.236 Kg Besi Beton Rp. 9,500.00 1,322,742.00
2.250 Kg Kawat Beton Rp. 17,500.00 39,375.00
336.000 Kg Semen Rp. 1,200.00 403,200.00
0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00
0.810 M³ Krikil Rp. 100,000.00 81,000.00
Jumlah (I) 2,267,167.00
Tenaga
5.300 Hari Pekerja Rp. 44,000.00 233,200.00
0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00
1.300 Hari Tukang kayu Rp. 60,000.00 78,000.00
1.050 Hari Tukang Besi Rp. 60,000.00 63,000.00
0.262 Hari Kepala Tukang Besi Rp. 65,000.00 17,030.00
0.265 Hari Mandor Rp. 72,820.00 19,297.30
Jumlah (II) 427,027.30
Jumlah (I) + (II) 2,694,194.30
Over Head 15 % 404,129.15
Harga Satuan 3,098,323.45
No Sat Koepesien
Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga
Analisa jaan Bahan
G.7.a 1 m
3
Membuat sloof Beton Bertulang 20/35 Besi = 190,316 Kg
Bahan
0.267 M³ Kayu klas III Rp. 1,750,000.00 467,250.00
2.000 Kg Paku Rp. 17,500.00 35,000.00
0.600 Ltr Minyak bekisting Rp. 3,500.00 2,100.00
252.850 Kg Besi Beton Rp. 9,500.00 2,402,075.00
3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00
336.000 Kg Semen Rp. 1,200.00 403,200.00
0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00
0.810 M³ Krikil Rp. 100,000.00 81,000.00
Jumlah (I) 3,486,325.00
Tenaga
5.600 Hari Pekerja Rp. 44,000.00 246,400.00
0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00
1.560 Hari Tukang kayu Rp. 60,000.00 93,600.00
1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00
0.323 Hari Kepala Tukang Besi Rp. 65,000.00 20,995.00
0.283 Hari Mandor Rp. 72,820.00 20,608.06
Jumlah (II) 482,103.06
Jumlah (I) + (II) 3,968,428.06
Over Head 15 % 595,264.21
Harga Satuan 4,563,692.27
G.7.b 1 m
3
Membuat sloof Beton Bertulang 20/35 Besi = 243,389 Kg
Bahan
0.267 M³ Kayu klas III Rp. 1,750,000.00 467,250.00
2.000 Kg Paku Rp. 17,500.00 35,000.00
0.600 Ltr Minyak bekisting Rp. 3,500.00 2,100.00
243.000 Kg Besi Beton Rp. 9,500.00 2,308,500.00
3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00
336.000 Kg Semen Rp. 1,200.00 403,200.00
0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00
0.810 M³ Krikil Rp. 100,000.00 81,000.00
Jumlah (I) 3,392,750.00
Tenaga
5.600 Hari Pekerja Rp. 44,000.00 246,400.00
0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00
1.560 Hari Tukang kayu Rp. 60,000.00 93,600.00
1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00
0.323 Hari Kepala Tukang Besi Rp. 65,000.00 20,995.00
0.283 Hari Mandor Rp. 72,820.00 20,608.06
Jumlah (II) 482,103.06
Jumlah (I) + (II) 3,874,853.06
Over Head 15 % 581,227.96
Harga Satuan 4,456,081.02
No Sat Koepesien
Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga
Analisa jaan Bahan
G.7.c 1 m
3
Membuat sloof Beton Bertulang 15/20 Besi = 157,961 Kg
Bahan
0.308 M³ Kayu klas III Rp. 1,750,000.00 539,000.00
2.000 Kg Paku Rp. 17,500.00 35,000.00
0.600 Ltr Minyak bekisting Rp. 3,500.00 2,100.00
157.961 Kg Besi Beton Rp. 9,500.00 1,500,629.50
3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00
336.000 Kg Semen Rp. 1,200.00 403,200.00
0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00
0.810 M³ Krikil Rp. 100,000.00 81,000.00
Jumlah (I) 2,656,629.50
Tenaga
5.650 Hari Pekerja Rp. 44,000.00 248,600.00
0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00
1.560 Hari Tukang kayu Rp. 60,000.00 93,600.00
1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00
0.323 Hari Kepala Tukang Besi Rp. 65,000.00 20,995.00
0.283 Hari Mandor Rp. 72,820.00 20,608.06
Jumlah (II) 484,303.06
Jumlah (I) + (II) 3,140,932.56
Over Head 15 % 471,139.88
Harga Satuan 3,612,072.44
G.7.d 1 m
3
Membuat sloof/ring balok/baok latai Beton Bertulang 10/15 279.88 Kg besi + bekesting
Bahan
0.400 M³ Kayu klas III Rp. 1,750,000.00 700,000.00
2.000 Kg Paku Rp. 17,500.00 35,000.00
0.600 Ltr Minyak bekisting Rp. 3,500.00 2,100.00
279.890 Kg Besi Beton Rp. 9,500.00 2,658,955.00
3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00
336.000 Kg Semen Rp. 1,200.00 403,200.00
0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00
0.810 M³ Krikil Rp. 100,000.00 81,000.00
Jumlah (I) 3,975,955.00
Tenaga
5.650 Hari Pekerja Rp. 44,000.00 248,600.00
0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00
1.560 Hari Tukang kayu Rp. 60,000.00 93,600.00
1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00
0.323 Hari Kepala Tukang Besi Rp. 65,000.00 20,995.00
0.283 Hari Mandor Rp. 72,820.00 20,608.06
Jumlah (II) 484,303.06
Jumlah (I) + (II) 4,460,258.06
Over Head 15 % 669,038.71
Harga Satuan 5,129,296.77
No Sat Koepesien
Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga
Analisa jaan Bahan
G.7.d1 1 m
3
Membuat sloof Beton Bertulang 20/30 132.43 kg Besi begisting
Bahan
0.200 M³ Kayu klas III Rp. 1,750,000.00 350,000.00
2.000 Kg Paku Rp. 17,500.00 35,000.00
0.600 Ltr Minyak bekisting Rp. 3,500.00 2,100.00
252.850 Kg Besi Beton Rp. 9,500.00 2,402,075.00
3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00
336.000 Kg Semen Rp. 1,200.00 403,200.00
0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00
0.810 M³ Krikil Rp. 100,000.00 81,000.00
Jumlah (I) 3,369,075.00
Tenaga
5.650 Hari Pekerja Rp. 44,000.00 248,600.00
0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00
1.560 Hari Tukang kayu Rp. 60,000.00 93,600.00
1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00
0.323 Hari Kepala Tukang Besi Rp. 65,000.00 20,995.00
0.283 Hari Mandor Rp. 72,820.00 20,608.06
Jumlah (II) 484,303.06
Jumlah (I) + (II) 3,853,378.06
Over Head 15 % 578,006.71
Harga Satuan 4,431,384.77
G.8.b 1 m
3
Membuat kolom beton Bertulang 20/20 = 421.72 kg (lantai I)
Bahan
0.250 M³ Kayu klas III Rp. 1,750,000.00 437,500.00
4.000 Kg Paku Rp. 17,500.00 70,000.00
2.000 Ltr Minyak bekisting Rp. 3,500.00 7,000.00
156.030 Kg Besi Beton Rp. 9,500.00 1,482,285.00
4.500 Kg Kawat Beton Rp. 17,500.00 78,750.00
336.000 Kg Semen Rp. 1,200.00 403,200.00
0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00
0.810 M³ Krikil Rp. 100,000.00 81,000.00
0.150 M³ Kayu klas II Rp. 2,500,000.00 375,000.00
3.600 Lbr triplek 9 mm Rp. 125,000.00 450,000.00
20.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 170,000.00
Jumlah (I) 3,597,935.00
Tenaga
7.050 Hari Pekerja Rp. 44,000.00 310,200.00
0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00
1.650 Hari Tukang kayu Rp. 60,000.00 99,000.00
2.100 Hari Tukang Besi Rp. 60,000.00 126,000.00
0.403 Hari Kepala Tukang Besi Rp. 65,000.00 26,195.00
0.353 Hari Mandor Rp. 72,820.00 25,705.46
Jumlah (II) 603,600.46
Jumlah (I) + (II) 4,201,535.46
Over Head 15 % 630,230.32
Harga Satuan 4,831,765.78
No Sat Koepesien
Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga
Analisa jaan Bahan
G.8.c 1 m
3
Membuat kolom beton Bertulang 20/20 = 219.088 kg (lantai II)
Bahan
0.200 M³ Kayu klas III Rp. 1,750,000.00 350,000.00
4.000 Kg Paku Rp. 17,500.00 70,000.00
2.000 Ltr Minyak bekisting Rp. 3,500.00 7,000.00
156.030 Kg Besi Beton Rp. 9,500.00 1,482,285.00
4.500 Kg Kawat Beton Rp. 17,500.00 78,750.00
336.000 Kg Semen Rp. 1,200.00 403,200.00
0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00
0.810 M³ Krikil Rp. 100,000.00 81,000.00
0.150 M³ Kayu klas II Rp. 2,500,000.00 375,000.00
3.500 Lbr triplek 9 mm Rp. 125,000.00 437,500.00
20.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 170,000.00
Jumlah (I) 3,497,935.00
Tenaga
7.050 Hari Pekerja Rp. 44,000.00 310,200.00
0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00
1.650 Hari Tukang kayu Rp. 60,000.00 99,000.00
2.100 Hari Tukang Besi Rp. 60,000.00 126,000.00
0.403 Hari Kepala Tukang Besi Rp. 65,000.00 26,195.00
0.353 Hari Mandor Rp. 72,820.00 25,705.46
Jumlah (II) 603,600.46
Jumlah (I) + (II) 4,101,535.46
Over Head 15 % 615,230.32
Harga Satuan 4,716,765.78
G.8.h 1 m3
Membuat kolom beton Bertulang 15/20 besi = 170.667 kg
Bahan
0.400 M³ Kayu klas III Rp. 1,750,000.00 700,000.00
4.000 Kg Paku Rp. 17,500.00 70,000.00
2.000 Ltr Minyak bekisting Rp. 3,500.00 7,000.00
170.667 Kg Besi Beton Rp. 9,500.00 1,621,336.50
4.500 Kg Kawat Beton Rp. 17,500.00 78,750.00
336.000 Kg Semen Rp. 1,200.00 403,200.00
0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00
0.810 M³ Krikil Rp. 100,000.00 81,000.00
0.150 M³ Kayu klas II Rp. 2,500,000.00 375,000.00
3.500 Lbr triplek 9 mm Rp. 125,000.00 437,500.00
20.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 170,000.00
Jumlah (I) 3,986,986.50
Tenaga
7.050 Hari Pekerja Rp. 44,000.00 310,200.00
0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00
1.650 Hari Tukang kayu Rp. 60,000.00 99,000.00
2.100 Hari Tukang Besi Rp. 60,000.00 126,000.00
0.403 Hari Kepala Tukang Besi Rp. 65,000.00 26,195.00
0.353 Hari Mandor Rp. 72,820.00 25,705.46
Jumlah (II) 603,600.46
Jumlah (I) + (II) 4,590,586.96
Over Head 15 % 688,588.04
Harga Satuan 5,279,175.00
No Sat Koepesien
Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga
Analisa jaan Bahan
G.8.j 1 m
3
Membuat kolom beton Bertulang 13/13 besi = 187.574 kg
Bahan
0.267 M³ Kayu klas III Rp. 1,750,000.00 467,250.00
4.000 Kg Paku Rp. 17,500.00 70,000.00
2.000 Ltr Minyak bekisting Rp. 3,500.00 7,000.00
187.574 Kg Besi Beton Rp. 9,500.00 1,781,953.00
4.500 Kg Kawat Beton Rp. 17,500.00 78,750.00
336.000 Kg Semen Rp. 1,200.00 403,200.00
0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00
0.810 M³ Krikil Rp. 100,000.00 81,000.00
0.150 M³ Kayu klas II Rp. 2,500,000.00 375,000.00
5.340 Lbr triplek 9 mm Rp. 125,000.00 667,500.00
20.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 170,000.00
Jumlah (I) 4,144,853.00
Tenaga
7.050 Hari Pekerja Rp. 44,000.00 310,200.00
0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00
1.650 Hari Tukang kayu Rp. 60,000.00 99,000.00
2.100 Hari Tukang Besi Rp. 60,000.00 126,000.00
0.403 Hari Kepala Tukang Besi Rp. 65,000.00 26,195.00
0.353 Hari Mandor Rp. 72,820.00 25,705.46
Jumlah (II) 603,600.46
Jumlah (I) + (II) 4,748,453.46
Over Head 15 % 712,268.02
Harga Satuan 5,460,721.48
G.9.b 1 m3
Membuat balok beton bertulang 20/30 = 193.98 besi + begisting
Bahan
0.167 M³ Kayu klas III Rp. 1,750,000.00 292,250.00
3.200 Kg Paku Rp. 17,500.00 56,000.00
1.600 Ltr Minyak bekisting Rp. 3,500.00 5,600.00
193.977 Kg Besi Beton Rp. 9,500.00 1,842,781.50
3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00
336.000 Kg Semen Rp. 1,200.00 403,200.00
0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00
0.810 M³ Krikil Rp. 100,000.00 81,000.00
0.140 M³ Kayu klas II Rp. 2,500,000.00 350,000.00
2.800 Lbr triplek 9 mm Rp. 125,000.00 350,000.00
16.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 136,000.00
Jumlah (I) 3,612,531.50
Tenaga
6.350 Hari Pekerja Rp. 44,000.00 279,400.00
0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00
1.650 Hari Tukang kayu Rp. 60,000.00 99,000.00
1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00
0.333 Hari Kepala Tukang Besi Rp. 65,000.00 21,645.00
0.318 Hari Mandor Rp. 72,820.00 23,156.76
Jumlah (II) 523,701.76
Jumlah (I) + (II) 4,136,233.26
Over Head 15 % 620,434.99
Harga Satuan 4,756,668.25
No Sat Koepesien
Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga
Analisa jaan Bahan
G.9.c 1 m
3
Membuat balok beton bertulang 13/30 = 169.94 besi + begisting
Bahan
0.167 M³ Kayu klas III Rp. 1,750,000.00 292,250.00
3.200 Kg Paku Rp. 17,500.00 56,000.00
1.600 Ltr Minyak bekisting Rp. 3,500.00 5,600.00
169.940 Kg Besi Beton Rp. 9,500.00 1,614,430.00
3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00
336.000 Kg Semen Rp. 1,200.00 403,200.00
0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00
0.810 M³ Krikil Rp. 100,000.00 81,000.00
0.140 M³ Kayu klas II Rp. 2,500,000.00 350,000.00
2.800 Lbr triplek 9 mm Rp. 125,000.00 350,000.00
16.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 136,000.00
Jumlah (I) 3,384,180.00
Tenaga
6.350 Hari Pekerja Rp. 44,000.00 279,400.00
0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00
1.650 Hari Tukang kayu Rp. 60,000.00 99,000.00
1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00
0.333 Hari Kepala Tukang Besi Rp. 65,000.00 21,645.00
0.318 Hari Mandor Rp. 72,820.00 23,156.76
Jumlah (II) 523,701.76
Jumlah (I) + (II) 3,907,881.76
Over Head 15 % 586,182.26
Harga Satuan 4,494,064.02
G.9.d 1 m3
Membuat balok beton bertulang 13/80 = 132.05 besi + begisting
Bahan
0.500 M³ Kayu klas III Rp. 1,750,000.00 875,000.00
3.200 Kg Paku Rp. 17,500.00 56,000.00
1.600 Ltr Minyak bekisting Rp. 3,500.00 5,600.00
132.053 Kg Besi Beton Rp. 9,500.00 1,254,503.50
3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00
336.000 Kg Semen Rp. 1,200.00 403,200.00
0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00
0.810 M³ Krikil Rp. 100,000.00 81,000.00
0.140 M³ Kayu klas II Rp. 2,500,000.00 350,000.00
2.800 Lbr triplek 9 mm Rp. 125,000.00 350,000.00
16.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 136,000.00
Jumlah (I) 3,607,003.50
Tenaga
6.350 Hari Pekerja Rp. 44,000.00 279,400.00
0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00
1.650 Hari Tukang kayu Rp. 60,000.00 99,000.00
1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00
0.333 Hari Kepala Tukang Besi Rp. 65,000.00 21,645.00
0.318 Hari Mandor Rp. 72,820.00 23,156.76
Jumlah (II) 523,701.76
Jumlah (I) + (II) 4,130,705.26
Over Head 15 % 619,605.79
Harga Satuan 4,750,311.05
No Sat Koepesien
Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga
Analisa jaan Bahan
G.9.e 1 m
3
Membuat balok beton bertulang 25/40 = 202.72 besi + begisting
Bahan
0.200 M³ Kayu klas III Rp. 1,750,000.00 350,000.00
3.200 Kg Paku Rp. 17,500.00 56,000.00
1.600 Ltr Minyak bekisting Rp. 3,500.00 5,600.00
202.720 Kg Besi Beton Rp. 9,500.00 1,925,840.00
3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00
336.000 Kg Semen Rp. 1,200.00 403,200.00
0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00
0.810 M³ Krikil Rp. 100,000.00 81,000.00
0.140 M³ Kayu klas II Rp. 2,500,000.00 350,000.00
2.800 Lbr triplek 9 mm Rp. 125,000.00 350,000.00
16.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 136,000.00
Jumlah (I) 3,753,340.00
Tenaga
6.350 Hari Pekerja Rp. 44,000.00 279,400.00
0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00
1.650 Hari Tukang kayu Rp. 60,000.00 99,000.00
1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00
0.333 Hari Kepala Tukang Besi Rp. 65,000.00 21,645.00
0.318 Hari Mandor Rp. 72,820.00 23,156.76
Jumlah (II) 523,701.76
Jumlah (I) + (II) 4,277,041.76
Over Head 15 % 641,556.26
Harga Satuan 4,918,598.02
G.9.f 1 m3
Membuat balok beton bertulang 25/50 = 240.76kg besi + begisting
Bahan
0.200 M³ Kayu klas III Rp. 1,750,000.00 350,000.00
3.200 Kg Paku Rp. 17,500.00 56,000.00
1.600 Ltr Minyak bekisting Rp. 3,500.00 5,600.00
240.760 Kg Besi Beton Rp. 9,500.00 2,287,220.00
3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00
336.000 Kg Semen Rp. 1,200.00 403,200.00
0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00
0.810 M³ Krikil Rp. 100,000.00 81,000.00
0.140 M³ Kayu klas II Rp. 2,500,000.00 350,000.00
2.800 Lbr triplek 9 mm Rp. 125,000.00 350,000.00
16.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 136,000.00
Jumlah (I) 4,114,720.00
Tenaga
6.350 Hari Pekerja Rp. 44,000.00 279,400.00
0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00
1.650 Hari Tukang kayu Rp. 60,000.00 99,000.00
1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00
0.333 Hari Kepala Tukang Besi Rp. 65,000.00 21,645.00
0.318 Hari Mandor Rp. 72,820.00 23,156.76
Jumlah (II) 523,701.76
Jumlah (I) + (II) 4,638,421.76
Over Head 15 % 695,763.26
Harga Satuan 5,334,185.02
No Sat Koepesien
Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga
Analisa jaan Bahan
G.9.h 1 m
3
Membuat balok beton bertulang 20/30 = 238.19 besi + begisting
Bahan
0.250 M³ Kayu klas III Rp. 1,750,000.00 437,500.00
3.200 Kg Paku Rp. 17,500.00 56,000.00
1.600 Ltr Minyak bekisting Rp. 3,500.00 5,600.00
238.190 Kg Besi Beton Rp. 9,500.00 2,262,805.00
3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00
336.000 Kg Semen Rp. 1,200.00 403,200.00
0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00
0.810 M³ Krikil Rp. 100,000.00 81,000.00
0.140 M³ Kayu klas II Rp. 2,500,000.00 350,000.00
2.800 Lbr triplek 9 mm Rp. 125,000.00 350,000.00
16.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 136,000.00
Jumlah (I) 4,177,805.00
Tenaga
6.350 Hari Pekerja Rp. 44,000.00 279,400.00
0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00
1.650 Hari Tukang kayu Rp. 60,000.00 99,000.00
1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00
0.333 Hari Kepala Tukang Besi Rp. 65,000.00 21,645.00
0.318 Hari Mandor Rp. 72,820.00 23,156.76
Jumlah (II) 523,701.76
Jumlah (I) + (II) 4,701,506.76
Over Head 15 % 705,226.01
Harga Satuan 5,406,732.77
G.10 1 m3
Membuat kolom praktis (10/10) cm
Bahan
0.008 M³ Kayu klas III Rp. 1,750,000.00 14,000.00
0.010 Kg Paku Rp. 17,500.00 175.00
2.689 Kg Besi Beton Rp. 9,500.00 25,545.50
0.450 Kg Kawat Beton Rp. 17,500.00 7,875.00
336.000 Kg Semen Rp. 1,200.00 403,200.00
0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00
0.810 M³ Krikil Rp. 100,000.00 81,000.00
0.140 M³ Kayu klas II Rp. 2,500,000.00 350,000.00
2.800 Lbr triplek 9 mm Rp. 2,500,000.00 7,000,000.00
16.000 Btg Kayu dolken O 10 - 4m Rp. 125,000.00 2,000,000.00
Jumlah (I) 924,995.50
Tenaga
6.350 Hari Pekerja Rp. 44,000.00 279,400.00
0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00
1.650 Hari Tukang kayu Rp. 60,000.00 99,000.00
0.020 Hari Tukang Besi Rp. 60,000.00 1,200.00
0.006 Hari Kepala Tukang Besi Rp. 65,000.00 390.00
0.003 Hari Mandor Rp. 72,820.00 218.46
Jumlah (II) 396,708.46
Jumlah (I) + (II) 1,321,703.96
Over Head 15 % 198,255.59
Harga Satuan 1,519,959.55
No Sat Koepesien
Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga
Analisa jaan Bahan
G.11 1 m
3
Membuat balok beton bertulang (10/15) cm
Bahan
0.385 M³ Kayu klas III Rp. 1,750,000.00 673,750.00
3.200 Kg Paku Rp. 17,500.00 56,000.00
1.600 Ltr Minyak bekisting Rp. 3,500.00 5,600.00
207.619 Kg Besi Beton Rp. 9,500.00 1,972,380.50
3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00
336.000 Kg Semen Rp. 1,200.00 403,200.00
0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00
0.810 M³ Krikil Rp. 100,000.00 81,000.00
0.140 M³ Kayu klas II Rp. 2,500,000.00 350,000.00
8.940 Lbr triplek 9 mm Rp. 125,000.00 1,117,500.00
16.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 136,000.00
Jumlah (I) 4,891,130.50
Tenaga
6.350 Hari Pekerja Rp. 44,000.00 279,400.00
0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00
1.650 Hari Tukang kayu Rp. 60,000.00 99,000.00
1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00
0.333 Hari Kepala Tukang Besi Rp. 65,000.00 21,645.00
0.318 Hari Mandor Rp. 72,820.00 23,156.76
Jumlah (II) 523,701.76
Jumlah (I) + (II) 5,414,832.26
Over Head 15 % 812,224.84
Harga Satuan 6,227,057.10
G.12a 1 m3
Membuat lantai beton bertulang tebal 12 cm 162.252 kg besi + begisting
Bahan
0.250 M³ Kayu klas III Rp. 1,750,000.00 437,500.00
3.200 Kg Paku Rp. 17,500.00 56,000.00
1.600 Ltr Minyak bekisting Rp. 3,500.00 5,600.00
162.252 Kg Besi Beton Rp. 9,500.00 1,541,394.00
2.500 Kg Kawat Beton Rp. 17,500.00 43,750.00
323.000 Kg Semen Rp. 1,200.00 387,600.00
0.520 M³ Pasir Cor Rp. 80,000.00 41,600.00
0.780 M³ Krikil Rp. 100,000.00 78,000.00
0.120 M³ Kayu klas II Rp. 2,500,000.00 300,000.00
2.800 Lbr triplek 9 mm Rp. 125,000.00 350,000.00
32.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 272,000.00
Jumlah (I) 3,513,444.00
Tenaga
5.800 Hari Pekerja Rp. 44,000.00 255,200.00
0.350 Hari Tukang Batu Rp. 60,000.00 21,000.00
2.800 Hari Tukang kayu Rp. 60,000.00 168,000.00
1.050 Hari Tukang Besi Rp. 60,000.00 63,000.00
0.420 Hari Kepala Tukang Besi Rp. 65,000.00 27,300.00
0.185 Hari Mandor Rp. 72,820.00 13,471.70
Jumlah (II) 547,971.70
Jumlah (I) + (II) 4,061,415.70
Over Head 15 % 609,212.36
Harga Satuan 4,670,628.06
No Sat Koepesien
Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga
Analisa jaan Bahan
G.12b 1 m
3
Membuat lantai beton bertulang tebal 10 cm 181.49 kg besi + begisting
Bahan
0.300 M³ Kayu klas III Rp. 1,750,000.00 525,000.00
3.200 Kg Paku Rp. 17,500.00 56,000.00
1.600 Ltr Minyak bekisting Rp. 3,500.00 5,600.00
181.490 Kg Besi Beton Rp. 9,500.00 1,724,155.00
2.500 Kg Kawat Beton Rp. 17,500.00 43,750.00
323.000 Kg Semen Rp. 1,200.00 387,600.00
0.520 M³ Pasir Cor Rp. 80,000.00 41,600.00
0.780 M³ Krikil Rp. 100,000.00 78,000.00
0.120 M³ Kayu klas II Rp. 2,500,000.00 300,000.00
2.800 Lbr triplek 9 mm Rp. 125,000.00 350,000.00
32.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 272,000.00
Jumlah (I) 3,783,705.00
Tenaga
5.800 Hari Pekerja Rp. 44,000.00 255,200.00
0.350 Hari Tukang Batu Rp. 60,000.00 21,000.00
2.800 Hari Tukang kayu Rp. 60,000.00 168,000.00
1.050 Hari Tukang Besi Rp. 60,000.00 63,000.00
0.420 Hari Kepala Tukang Besi Rp. 65,000.00 27,300.00
0.185 Hari Mandor Rp. 72,820.00 13,471.70
Jumlah (II) 547,971.70
Jumlah (I) + (II) 4,331,676.70
Over Head 15 % 649,751.51
Harga Satuan 4,981,428.21
G.12c 1 m3
Membuat lantai beton bertulang tebal 15 cm 241.51 kg besi + begisting
Bahan
0.200 M³ Kayu klas III Rp. 1,750,000.00 350,000.00
3.200 Kg Paku Rp. 17,500.00 56,000.00
1.600 Ltr Minyak bekisting Rp. 3,500.00 5,600.00
241.515 Kg Besi Beton Rp. 9,500.00 2,294,392.50
2.250 Kg Kawat Beton Rp. 17,500.00 39,375.00
323.000 Kg Semen Rp. 1,200.00 387,600.00
0.520 M³ Pasir Cor Rp. 80,000.00 41,600.00
0.780 M³ Krikil Rp. 100,000.00 78,000.00
0.120 M³ Kayu klas II Rp. 2,500,000.00 300,000.00
2.800 Lbr triplek 9 mm Rp. 125,000.00 350,000.00
32.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 272,000.00
Jumlah (I) 4,174,567.50
Tenaga
5.800 Hari Pekerja Rp. 44,000.00 255,200.00
0.350 Hari Tukang Batu Rp. 60,000.00 21,000.00
2.800 Hari Tukang kayu Rp. 60,000.00 168,000.00
1.050 Hari Tukang Besi Rp. 60,000.00 63,000.00
0.420 Hari Kepala Tukang Besi Rp. 65,000.00 27,300.00
0.185 Hari Mandor Rp. 72,820.00 13,471.70
Jumlah (II) 547,971.70
Jumlah (I) + (II) 4,722,539.20
Over Head 15 % 708,380.88
Harga Satuan 5,430,920.08
No Sat Koepesien
Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga
Analisa jaan Bahan
G.12d 1 m
3
Membuat lantai beton bertulang tebal 20 cm 181.14 kg besi + begisting
Bahan
0.150 M³ Kayu klas III Rp. 1,750,000.00 262,500.00
3.200 Kg Paku Rp. 17,500.00 56,000.00
1.600 Ltr Minyak bekisting Rp. 3,500.00 5,600.00
181.140 Kg Besi Beton Rp. 9,500.00 1,720,830.00
2.250 Kg Kawat Beton Rp. 17,500.00 39,375.00
323.000 Kg Semen Rp. 1,200.00 387,600.00
0.520 M³ Pasir Cor Rp. 80,000.00 41,600.00
0.780 M³ Krikil Rp. 100,000.00 78,000.00
0.120 M³ Kayu klas II Rp. 2,500,000.00 300,000.00
2.800 Lbr triplek 9 mm Rp. 125,000.00 350,000.00
32.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 272,000.00
Jumlah (I) 3,513,505.00
Tenaga
5.800 Hari Pekerja Rp. 44,000.00 255,200.00
0.350 Hari Tukang Batu Rp. 60,000.00 21,000.00
2.800 Hari Tukang kayu Rp. 60,000.00 168,000.00
1.050 Hari Tukang Besi Rp. 60,000.00 63,000.00
0.420 Hari Kepala Tukang Besi Rp. 65,000.00 27,300.00
0.185 Hari Mandor Rp. 72,820.00 13,471.70
Jumlah (II) 547,971.70
Jumlah (I) + (II) 4,061,476.70
Over Head 15 % 609,221.51
Harga Satuan 4,670,698.21
G.14a 1 m3
Membuat lantai rabat beton bertulang tebal 10 cm 181.49 kg besi + begisting
Bahan
53.303 Kg Besi Beton Rp. 9,500.00 506,378.50
2.250 Kg Kawat Beton Rp. 17,500.00 39,375.00
323.000 Kg Semen Rp. 1,200.00 387,600.00
0.520 M³ Pasir Cor Rp. 80,000.00 41,600.00
0.780 M³ Krikil Rp. 100,000.00 78,000.00
0.120 M³ Kayu klas II Rp. 2,500,000.00 300,000.00
2.800 Lbr triplek 9 mm Rp. 125,000.00 350,000.00
32.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 272,000.00
Jumlah (I) 1,974,953.50
Tenaga
5.800 Hari Pekerja Rp. 44,000.00 255,200.00
0.350 Hari Tukang Batu Rp. 60,000.00 21,000.00
2.800 Hari Tukang kayu Rp. 60,000.00 168,000.00
1.050 Hari Tukang Besi Rp. 60,000.00 63,000.00
0.420 Hari Kepala Tukang Besi Rp. 65,000.00 27,300.00
0.185 Hari Mandor Rp. 72,820.00 13,471.70
Jumlah (II) 547,971.70
Jumlah (I) + (II) 2,522,925.20
Over Head 15 % 0.00
Harga Satuan 2,522,925.20
No Sat Koepesien
Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga
Analisa jaan Bahan
G.14b 1 m
3
Membuat lantai rabat beton bertulang tebal 12 cm 162.252 kg besi + begisting
Bahan
83.266 Kg Besi Beton Rp. 9,500.00 791,027.00
2.250 Kg Kawat Beton Rp. 17,500.00 39,375.00
323.000 Kg Semen Rp. 1,200.00 387,600.00
0.520 M³ Pasir Cor Rp. 80,000.00 41,600.00
0.780 M³ Krikil Rp. 100,000.00 78,000.00
Jumlah (I) 1,337,602.00
Tenaga
5.800 Hari Pekerja Rp. 44,000.00 255,200.00
0.350 Hari Tukang Batu Rp. 60,000.00 21,000.00
1.050 Hari Tukang Besi Rp. 60,000.00 63,000.00
0.420 Hari Kepala Tukang Besi Rp. 65,000.00 27,300.00
0.185 Hari Mandor Rp. 72,820.00 13,471.70
Jumlah (II) 379,971.70
Jumlah (I) + (II) 1,717,573.70
Over Head 15 % 257,636.06
Harga Satuan 1,975,209.76
G.12f 1 m
3
Membuat plat topian tebal 8 cm 150.62 kg besi + begisting
Bahan
0.375 M³ Kayu klas III Rp. 1,750,000.00 656,250.00
3.200 Kg Paku Rp. 17,500.00 56,000.00
1.600 Ltr Minyak bekisting Rp. 3,500.00 5,600.00
150.622 Kg Besi Beton Rp. 9,500.00 1,430,909.00
2.500 Kg Kawat Beton Rp. 17,500.00 43,750.00
323.000 Kg Semen Rp. 1,200.00 387,600.00
0.520 M³ Pasir Cor Rp. 80,000.00 41,600.00
0.780 M³ Krikil Rp. 100,000.00 78,000.00
0.120 M³ Kayu klas II Rp. 2,500,000.00 300,000.00
4.340 Lbr triplek 9 mm Rp. 125,000.00 542,500.00
32.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 272,000.00
Jumlah (I) 3,814,209.00
Tenaga
5.800 Hari Pekerja Rp. 44,000.00 255,200.00
0.350 Hari Tukang Batu Rp. 60,000.00 21,000.00
2.800 Hari Tukang kayu Rp. 60,000.00 168,000.00
1.050 Hari Tukang Besi Rp. 60,000.00 63,000.00
0.420 Hari Kepala Tukang Besi Rp. 65,000.00 27,300.00
0.185 Hari Mandor Rp. 72,820.00 13,471.70
Jumlah (II) 547,971.70
Jumlah (I) + (II) 4,362,180.70
Over Head 15 % 654,327.11
Harga Satuan 5,016,507.81
No Sat Koepesien
Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga
Analisa jaan Bahan
G.12g 1 m
3
Membuat beton Lisplank tebal 7/50 cm 139.16 kg besi + begisting
Bahan
0.375 M³ Kayu klas III Rp. 1,750,000.00 656,250.00
3.200 Kg Paku Rp. 17,500.00 56,000.00
1.600 Ltr Minyak bekisting Rp. 3,500.00 5,600.00
150.622 Kg Besi Beton Rp. 9,500.00 1,430,909.00
2.250 Kg Kawat Beton Rp. 17,500.00 39,375.00
323.000 Kg Semen Rp. 1,200.00 387,600.00
0.520 M³ Pasir Cor Rp. 80,000.00 41,600.00
0.780 M³ Krikil Rp. 100,000.00 78,000.00
0.120 M³ Kayu klas II Rp. 2,500,000.00 300,000.00
9.920 Lbr triplek 9 mm Rp. 125,000.00 1,240,000.00
32.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 272,000.00
Jumlah (I) 4,507,334.00
Tenaga
5.800 Hari Pekerja Rp. 44,000.00 255,200.00
0.350 Hari Tukang Batu Rp. 60,000.00 21,000.00
2.800 Hari Tukang kayu Rp. 60,000.00 168,000.00
1.050 Hari Tukang Besi Rp. 60,000.00 63,000.00
0.420 Hari Kepala Tukang Besi Rp. 65,000.00 27,300.00
0.185 Hari Mandor Rp. 72,820.00 13,471.70
Jumlah (II) 547,971.70
Jumlah (I) + (II) 5,055,305.70
Over Head 15 % 758,295.86
Harga Satuan 5,813,601.56
G.13b 1 m3
Membuat Foot beton bertulang 150 x150 139.16 Kg besi + Begisting
Bahan
0.120 M³ Kayu klas III Rp. 1,750,000.00 210,000.00
3.000 Kg Paku Rp. 17,500.00 52,500.00
1.200 Ltr Minyak bekisting Rp. 3,500.00 4,200.00
139.160 Kg Besi Beton Rp. 9,500.00 1,322,020.00
3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00
323.000 Kg Semen Rp. 1,200.00 387,600.00
0.520 M³ Pasir Cor Rp. 80,000.00 41,600.00
0.780 M³ Krikil Rp. 100,000.00 78,000.00
0.105 M³ Kayu klas II Rp. 2,500,000.00 262,500.00
2.500 Lbr triplek 9 mm Rp. 125,000.00 312,500.00
14.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 119,000.00
Jumlah (I) 2,842,420.00
Tenaga
5.800 Hari Pekerja Rp. 44,000.00 255,200.00
0.350 Hari Tukang Batu Rp. 60,000.00 21,000.00
2.300 Hari Tukang kayu Rp. 60,000.00 138,000.00
1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00
0.405 Hari Kepala Tukang Besi Rp. 65,000.00 26,325.00
0.202 Hari Mandor Rp. 72,820.00 14,709.64
Jumlah (II) 539,234.64
Jumlah (I) + (II) 3,381,654.64
Over Head 15 % 507,248.20
Harga Satuan 3,888,902.84
No Sat Koepesien
Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga
Analisa jaan Bahan
G.13c 1 m
3
Membuat Foot beton bertulang 120 x120 155.43 Kg besi + Begisting
Bahan
0.120 M³ Kayu klas III Rp. 1,750,000.00 210,000.00
3.000 Kg Paku Rp. 17,500.00 52,500.00
1.200 Ltr Minyak bekisting Rp. 3,500.00 4,200.00
155.430 Kg Besi Beton Rp. 9,500.00 1,476,585.00
3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00
323.000 Kg Semen Rp. 1,200.00 387,600.00
0.520 M³ Pasir Cor Rp. 80,000.00 41,600.00
0.780 M³ Krikil Rp. 100,000.00 78,000.00
0.105 M³ Kayu klas II Rp. 2,500,000.00 262,500.00
2.500 Lbr triplek 9 mm Rp. 125,000.00 312,500.00
14.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 119,000.00
Jumlah (I) 2,996,985.00
Tenaga
5.800 Hari Pekerja Rp. 44,000.00 255,200.00
0.350 Hari Tukang Batu Rp. 60,000.00 21,000.00
2.300 Hari Tukang kayu Rp. 60,000.00 138,000.00
1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00
0.405 Hari Kepala Tukang Besi Rp. 65,000.00 26,325.00
0.202 Hari Mandor Rp. 72,820.00 14,709.64
Jumlah (II) 539,234.64
Jumlah (I) + (II) 3,536,219.64
Over Head 15 % 530,432.95
Harga Satuan 4,066,652.59
G.13d 1 m3
Membuat Foot beton bertulang 100 x100 158.88 Kg besi + Begisting
Bahan
0.120 M³ Kayu klas III Rp. 1,750,000.00 210,000.00
3.000 Kg Paku Rp. 17,500.00 52,500.00
1.200 Ltr Minyak bekisting Rp. 3,500.00 4,200.00
158.880 Kg Besi Beton Rp. 9,500.00 1,509,360.00
3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00
323.000 Kg Semen Rp. 1,200.00 387,600.00
0.520 M³ Pasir Cor Rp. 80,000.00 41,600.00
0.780 M³ Krikil Rp. 100,000.00 78,000.00
0.105 M³ Kayu klas II Rp. 2,500,000.00 262,500.00
2.500 Lbr triplek 9 mm Rp. 125,000.00 312,500.00
14.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 119,000.00
Jumlah (I) 3,029,760.00
Tenaga
5.800 Hari Pekerja Rp. 44,000.00 255,200.00
0.350 Hari Tukang Batu Rp. 60,000.00 21,000.00
2.300 Hari Tukang kayu Rp. 60,000.00 138,000.00
1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00
0.405 Hari Kepala Tukang Besi Rp. 65,000.00 26,325.00
0.202 Hari Mandor Rp. 72,820.00 14,709.64
Jumlah (II) 539,234.64
Jumlah (I) + (II) 3,568,994.64
Over Head 15 % 535,349.20
Harga Satuan 4,104,343.84
H. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP ATAP ( SNI DT - 91 - 0011 - 2007)
No Sat Koepesien
Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga
Analisa jaan Bahan
H.3 1 m2 Pasang Usuk reng genteng Pejaten/Kayu klas II
Bahan
0.012 M³ Kayu Klas II Rp. 2,500,000.00 30,000.00
0.150 Kg Paku Rp. 17,500.00 2,625.00
Jumlah (I) 32,625.00
Tenaga
0.100 Hari Pekerja Rp. 44,000.00 4,400.00
0.100 Hari Tukang kayu Rp. 60,000.00 6,000.00
0.010 Hari Kepala Tukang kayu Rp. 65,000.00 650.00
0.005 Hari Mandor Rp. 72,820.00 364.10
Jumlah (II) 11,414.10
Jumlah (I) + (II) 44,039.10
Over Head 15 % 6,605.87
Harga Satuan 50,644.97
H.4 1 m2 Pasang Nok Atap Spandek
Bahan
1.100 M2 Kayu Klas II Rp. 2,500,000.00 2,750,000.00
0.001 Bh Mesin Bor Rp. 17,000.00 17.00
6.000 Bh Paku Skrup Rp. 350.00 2,100.00
1.500 Kwh Listrik Rp. 200.00 300.00
Jumlah (I) 2,750,017.00
Tenaga
2.000 Hari Pekerja Rp. 44,000.00 88,000.00
0.200 Hari Tukang kayu Rp. 60,000.00 12,000.00
0.020 Hari Kepala Tukang kayu Rp. 65,000.00 1,300.00
0.005 Hari Mandor Rp. 72,820.00 364.10
Jumlah (II) 101,664.10
Jumlah (I) + (II) 2,851,681.10
Over Head 15 % 427,752.17
Harga Satuan 3,279,433.27
H.5 1 m Talang
Bahan
0.500 Lbr Seng Talang Rp. 55,000.00 27,500.00
0.015 Kg Paku Rp. 17,500.00 262.50
0.010 M3 Papan kayu Klas II Rp. 2,500,000.00 25,000.00
0.250 Kg Meni Besi Rp. 22,500.00 5,625.00
Jumlah (I) 27,762.50
Tenaga
0.150 Hari Pekerja Rp. 44,000.00 6,600.00
0.400 Hari Tukang kayu Rp. 60,000.00 24,000.00
0.025 Hari Kepala Tukang kayu Rp. 65,000.00 1,625.00
0.001 Hari Mandor Rp. 72,820.00 72.82
Jumlah (II) 32,297.82
Jumlah (I) + (II) 60,060.32
Over Head 15 % 9,009.05
Harga Satuan 69,069.37
No Sat Koepesien
Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga
Analisa jaan Bahan
H.6 1 m2 Pasang Atap genteng Lokal
Bahan
22.000 Lbr Genteng lokal Rp. 1,000.00 22,000.00
Jumlah (I) 22,000.00
Tenaga
0.015 Hari Pekerja Rp. 44,000.00 660.00
0.075 Hari Tukang kayu Rp. 60,000.00 4,500.00
0.008 Hari Kepala Tukang kayu Rp. 65,000.00 520.00
0.001 Hari Mandor Rp. 72,820.00 72.82
Jumlah (II) 5,752.82
Jumlah (I) + (II) 27,752.82
Over Head 15 % 4,162.92
Harga Satuan 31,915.74
H.7 1 m2 Pasang Atap genteng Metal Multi Roof
Bahan
1.000 Lbr Genteng Multiroof Rp. 97,500.00 97,500.00
5.000 Bh Paku Piles Rp. 350.00 1,750.00
Jumlah (I) 97,500.00
Tenaga
0.015 Hari Pekerja Rp. 44,000.00 660.00
0.075 Hari Tukang kayu Rp. 60,000.00 4,500.00
0.008 Hari Kepala Tukang kayu Rp. 65,000.00 520.00
0.008 Hari Mandor Rp. 72,820.00 582.56
Jumlah (II) 6,262.56
Jumlah (I) + (II) 103,762.56
Over Head 15 % 15,564.38
Harga Satuan 119,326.94
H.8 1 m2 Pasang Atap genteng Sirap
Bahan
21.000 bh Genteng Sirap Rp. 2,000.00 42,000.00
Jumlah (I) 42,000.00
Tenaga
0.120 Hari Pekerja Rp. 44,000.00 5,280.00
0.070 Hari Tukang kayu Rp. 60,000.00 4,200.00
0.020 Hari Kepala Tukang kayu Rp. 65,000.00 1,300.00
Jumlah (II) 10,780.00
Jumlah (I) + (II) 52,780.00
Over Head 15 % 7,917.00
Harga Satuan 60,697.00
H. ANALISA BIAYA KONSTRUKSI PEKERJAAN LANGIT-LANGIT ( SNI DT - 91 - 0011 - 2007)
I.1 1 m2 Memasang langit-langit Gymsum Bord
Bahan
0.364 Lbr Gypsum boardt Rp. 85,000.00 30,940.00
0.111 Kg Paku Rp. 17,500.00 1,942.50
Jumlah (I) 32,882.50
Tenaga
0.100 Hari Pekerja Rp. 44,000.00 4,400.00
0.050 Hari Tukang kayu Rp. 60,000.00 3,000.00
0.005 Hari Kepala Tukang kayu Rp. 65,000.00 325.00
0.005 Hari Mandor Rp. 72,820.00 364.10
Jumlah (II) 8,089.10
Jumlah (I) + (II) 40,971.60
Over Head 15 % 6,145.74
Harga Satuan 47,117.34
No Sat Koepesien
Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga
Analisa jaan Bahan
I.1.1 1 m2 Pasang Plapond Kalsibord
Bahan
0.364 Lbr Kalsilboard 4.5 Rp. 75,000.00 27,300.00
0.111 Kg Paku Rp. 17,500.00 1,942.50
Jumlah (I) 29,242.50
Tenaga
0.100 Hari Pekerja Rp. 44,000.00 4,400.00
0.050 Hari Tukang kayu Rp. 60,000.00 3,000.00
0.005 Hari Kepala Tukang kayu Rp. 65,000.00 325.00
0.005 Hari Mandor Rp. 72,820.00 364.10
Jumlah (II) 8,089.10
Jumlah (I) + (II) 37,331.60
Over Head 15 % 5,599.74
Harga Satuan 42,931.34
I.2a 1 m Memasang langit-langit Gymsum C7
Bahan
1.100 m1 List Plapond Gypsum Kalsiboard C7 Rp. 17,500.00 19,250.00
0.010 Kg Paku Rp. 17,500.00 175.00
Jumlah (I) 19,425.00
Tenaga
0.050 Hari Pekerja Rp. 44,000.00 2,200.00
0.050 Hari Tukang kayu Rp. 60,000.00 3,000.00
0.005 Hari Kepala Tukang kayu Rp. 65,000.00 325.00
0.003 Hari Mandor Rp. 72,820.00 218.46
Jumlah (II) 5,743.46
Jumlah (I) + (II) 25,168.46
Over Head 15 % 3,775.27
Harga Satuan 28,943.73
I.2b 1 m Memasang langit-langit Gymsum B5
Bahan
1.100 m1 List Plapond Gypsum Kalsiboard B5 Rp. 20,000.00 22,000.00
0.010 Kg Paku Rp. 17,500.00 175.00
Jumlah (I) 22,175.00
Tenaga
0.050 Hari Pekerja Rp. 44,000.00 2,200.00
0.050 Hari Tukang kayu Rp. 60,000.00 3,000.00
0.005 Hari Kepala Tukang kayu Rp. 65,000.00 325.00
0.003 Hari Mandor Rp. 72,820.00 218.46
Jumlah (II) 5,743.46
Jumlah (I) + (II) 27,918.46
Over Head 15 % 4,187.77
Harga Satuan 32,106.23
No Sat Koepesien
Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga
Analisa jaan Bahan
J. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP LANTAI ( SNI D - 91 - 0012 - 2007)
J.1 1 m
2
Pasang lantai keramik ukuran (30x30) cm
Bahan
11.870 Bj keramik 30x30 Rp. 4,001.68 47,500.00
10.000 Kg Semen Rp. 1,200.00 12,000.00
0.045 m³ Pasir pasang Rp. 80,000.00 3,600.00
1.500 Kg Semen warna Rp. 7,500.00 11,250.00
Jumlah (I) 74,350.00
Tenaga
0.620 Hari Pekerja Rp. 44,000.00 27,280.00
0.350 Hari Tukang batu Rp. 60,000.00 21,000.00
0.035 Hari Kepala tukang Batu Rp. 65,000.00 2,275.00
0.030 Hari Mandor Rp. 72,820.00 2,184.60
Jumlah (II) 52,739.60
Jumlah (I) + (II) 127,089.60
Over Head 15 % 19,063.44
Harga Satuan 146,153.04
J.2 1 m
2
Pasang lantai keramik ukuran (40x40) cm
Bahan
6.562 Bj keramik Cutting 39x39 Rp. 50,000.00 328,100.00
10.000 Kg Semen Rp. 1,200.00 12,000.00
0.045 m³ Pasir pasang Rp. 80,000.00 3,600.00
1.500 Kg Semen warna Rp. 7,500.00 11,250.00
Jumlah (I) 354,950.00
Tenaga
0.620 Hari Pekerja Rp. 44,000.00 27,280.00
0.350 Hari Tukang batu Rp. 60,000.00 21,000.00
0.035 Hari Kepala tukang Batu Rp. 65,000.00 2,275.00
0.030 Hari Mandor Rp. 72,820.00 2,184.60
Jumlah (II) 52,739.60
Jumlah (I) + (II) 407,689.60
Over Head 15 % 61,153.44
Harga Satuan 468,843.04
J.8 1 m2 Pasang dinding Kramik (20 x 20) cm
Bahan
20.000 Bj Kramik Cutting 20 x 20 ( Klas Tinggi) Rp. 2,750.00 55,000.00
9.300 Kg Semen Rp. 1,200.00 11,160.00
0.018 m³ Pasir pasang Rp. 80,000.00 1,440.00
1.940 Kg Semen warna Rp. 7,500.00 14,550.00
Jumlah (I) 82,150.00
Tenaga
0.600 Hari Pekerja Rp. 44,000.00 26,400.00
0.450 Hari Tukang batu Rp. 60,000.00 27,000.00
0.045 Hari Kepala tukang Batu Rp. 65,000.00 2,925.00
0.030 Hari Mandor Rp. 72,820.00 2,184.60
Jumlah (II) 58,509.60
Jumlah (I) + (II) 140,659.60
Over Head 15 % 21,098.94
Harga Satuan 161,758.54
No Sat Koepesien
Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga
Analisa jaan Bahan
J.7 1 m
2
Pasang Lantai Kramik Aksesbilitas ( 30 x 30 ) Cm
Bahan
11.870 Bh Kramik Aksesbilitas 30 x 30 Rp. 4,212.30 50,000.00
10.000 Kg Semen Rp. 1,200.00 12,000.00
0.045 m³ Pasir pasang Rp. 80,000.00 3,600.00
1.500 Kg Semen warna Rp. 7,500.00 11,250.00
Jumlah (I) 76,850.00
Tenaga
0.620 Hari Pekerja Rp. 44,000.00 27,280.00
0.350 Hari Tukang batu Rp. 60,000.00 21,000.00
0.035 Hari Kepala tukang Rp. 65,000.00 2,275.00
0.031 Hari Mandor Rp. 72,820.00 2,257.42
Jumlah (II) 52,812.42
Jumlah (I) + (II) 129,662.42
Over Head 15 % 19,449.36
Harga Satuan 149,111.78
J.11 1 m2
Memasang batu Andesir Bakar
Bahan
1.100 M2 Batu Alam Andesir Bakar Rp. 150,000.00 165,000.00
11.750 Kg Semen Rp. 1,200.00 14,100.00
0.035 m³ Pasir pasang Rp. 80,000.00 2,800.00
Jumlah (I) 181,900.00
Tenaga
0.6200 Hari Pekerja Rp. 44,000.00 27,280.00
0.3500 Hari Tukang batu Rp. 60,000.00 21,000.00
0.0350 Hari Kepala tukang batu Rp. 65,000.00 2,275.00
0.0030 Hari Mandor Rp. 72,820.00 218.46
Jumlah (II) 50,773.46
Jumlah (I) + (II) 232,673.46
Over Head 15 % 34,901.02
Harga Satuan 267,574.48
J.11b 1 m
2
Memasang Batu candi Bakar
Bahan
1.100 M2 Batu Alam Candi Rp. 175,000.00 192,500.00
11.750 Kg Semen Rp. 1,200.00 14,100.00
0.035 m³ Pasir pasang Rp. 80,000.00 2,800.00
Jumlah (I) 209,400.00
Tenaga
0.6200 Hari Pekerja Rp. 44,000.00 27,280.00
0.3500 Hari Tukang batu Rp. 60,000.00 21,000.00
0.0350 Hari Kepala tukang Batu Rp. 65,000.00 2,275.00
0.0300 Hari Mandor Rp. 72,820.00 2,184.60
Jumlah (II) 52,739.60
Jumlah (I) + (II) 262,139.60
Over Head 15 % 39,320.94
Harga Satuan 301,460.54
No Sat Koepesien
Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga
Analisa jaan Bahan
J.11c 1 m
2
Memasang Batu Palimanan
Bahan
1.100 M2 Batu Alam Palimanan Rp. 150,000.00 165,000.00
11.750 Kg Semen Rp. 1,200.00 14,100.00
0.035 m³ Pasir pasang Rp. 80,000.00 2,800.00
Jumlah (I) 181,900.00
Tenaga
0.6200 Hari Pekerja Rp. 44,000.00 27,280.00
0.3500 Hari Tukang batu Rp. 60,000.00 21,000.00
0.0350 Hari Kepala tukang Batu Rp. 65,000.00 2,275.00
0.0300 Hari Mandor Rp. 72,820.00 2,184.60
Jumlah (II) 52,739.60
Jumlah (I) + (II) 234,639.60
Over Head 15 % 35,195.94
Harga Satuan 269,835.54
J.11a 1 m2
Pasang Latai Koral Sikat
Bahan
16.667 Kg Koral Sikat Rp. 8,999.98 150,000.00
0.235 Kg Semen Rp. 1,200.00 282.00
0.035 m³ Pasir pasang Rp. 80,000.00 2,800.00
0.500 Ltr HCL Rp. 7,500.00 3,750.00
Jumlah (I) 156,832.00
Tenaga
0.6200 Hari Pekerja Rp. 44,000.00 27,280.00
0.3500 Hari Tukang batu Rp. 60,000.00 21,000.00
0.0350 Hari Kepala tukang Batu Rp. 65,000.00 2,275.00
0.0300 Hari Mandor Rp. 72,820.00 2,184.60
Jumlah (II) 52,739.60
Jumlah (I) + (II) 209,571.60
Over Head 15 % 31,435.74
Harga Satuan 241,007.34
J.11b 1 m2
Memasang Batu Bulat Dia 1 Cm
Bahan
16.667 M2 Batu Bulat Dia 1 Cm Rp. 8,099.98 135,000.00
0.235 Kg Semen Rp. 1,200.00 282.00
0.035 m³ Pasir pasang Rp. 80,000.00 2,800.00
0.500 Ltr HCL Rp. 7,500.00 3,750.00
Jumlah (I) 141,832.00
Tenaga
0.6200 Hari Pekerja Rp. 44,000.00 27,280.00
0.3500 Hari Tukang batu Rp. 60,000.00 21,000.00
0.0350 Hari Kepala tukang Batu Rp. 65,000.00 2,275.00
0.0300 Hari Mandor Rp. 72,820.00 2,184.60
Jumlah (II) 52,739.60
Jumlah (I) + (II) 194,571.60
Over Head 15 % 29,185.74
Harga Satuan 223,757.34
No Sat Koepesien
Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga
Analisa jaan Bahan
J.12 1 m
2
Memasang Paving Gress Blok (tebal 8 cm)
Bahan
1.100 M2 Gras Blok Pres Beton Rp. 50,000.00 55,000.00
0.200 Kg Pasir urug Rp. 25,000.00 5,000.00
Jumlah (I) 60,000.00
Tenaga
0.2500 Hari Pekerja Rp. 44,000.00 11,000.00
0.2500 Hari Tukang batu Rp. 60,000.00 15,000.00
0.0250 Hari Kepala tukang Batu Rp. 65,000.00 1,625.00
0.0250 Hari Mandor Rp. 72,820.00 1,820.50
Jumlah (II) 29,445.50
Jumlah (I) + (II) 89,445.50
Over Head 15 % 13,416.83
Harga Satuan 102,862.33
J.16 1 m Memasang Curb Beton
Bahan
2.400 Bh Crub Beton 20 x 40 x25 Rp. 55,000.00 132,000.00
Jumlah (I) 132,000.00
Tenaga
0.5000 Hari Pekerja Rp. 44,000.00 22,000.00
0.2500 Hari Tukang batu Rp. 60,000.00 15,000.00
0.0250 Hari Kepala tukang Batu Rp. 65,000.00 1,625.00
0.0250 Hari Mandor Rp. 72,820.00 1,820.50
Jumlah (II) 40,445.50
Jumlah (I) + (II) 172,445.50
Over Head 15 % 25,866.83
Harga Satuan 198,312.33
J.17 1 Bh Memasang Roster Block 20x20 + Plesteran List Lebar 5 cm
Bahan
1.000 Bh Roster Block 20x20 Cm Rp. 35,000.00 35,000.00
Jumlah (I) 35,000.00
Tenaga
0.0000 Hari Pekerja Rp. 44,000.00 0.00
0.0500 Hari Tukang batu Rp. 60,000.00 3,000.00
0.0000 Hari Kepala tukang Batu Rp. 65,000.00 0.00
0.0000 Hari Mandor Rp. 72,820.00 0.00
Jumlah (II) 3,000.00
Jumlah (I) + (II) 38,000.00
Over Head 15 % 5,700.00
Harga Satuan 43,700.00
K. ANALISA BIAYA KONSTRUKSI PEKERJAAN KACA DAN PENGUNCI ( SNI 03-2838-2002)
K.1 1.Bh Memasang Kunci Tanam
Bahan
1.000 bh Kuda Pintu Alumenium Rp. 150,000.00 150,000.00
Jumlah (I) 150,000.00
Tenaga
0.100 Hari Pekerja Rp. 44,000.00 4,400.00
0.500 Hari Tukang Kayu Rp. 60,000.00 30,000.00
0.010 Hari Kepala Tukang Kayu Rp. 65,000.00 650.00
0.005 Hari Mandor Rp. 72,820.00 364.10
Jumlah (II) 35,414.10
Jumlah (I) + (II) 185,414.10
Over Head 15 % 27,812.12
Harga Satuan 213,226.22
No Sat Koepesien
Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga
Analisa jaan Bahan
K.2 1.Bh Memasang Engsel Pintu
Bahan
1.000 bh Engsel Pintu Rp. 35,000.00 35,000.00
Jumlah (I) 35,000.00
Tenaga
0.015 Hari Pekerja Rp. 44,000.00 660.00
0.150 Hari Tukang Kayu Rp. 60,000.00 9,000.00
0.015 Hari Kepala Tukang Rp. 65,000.00 975.00
0.001 Hari Mandor Rp. 72,820.00 72.82
Jumlah (II) 10,707.82
Jumlah (I) + (II) 45,707.82
Over Head 15 % 6,856.17
Harga Satuan 52,563.99
K.3 1 Bh Memasang Engsel Jendela
Bahan
1.000 bh Engsel Jendela Rp. 25,000.00 25,000.00
Jumlah (I) 25,000.00
Tenaga
0.010 Hari Pekerja Rp. 44,000.00 440.00
0.100 Hari Tukang Kayu Rp. 60,000.00 6,000.00
0.010 Hari Kepala Tukang Rp. 65,000.00 650.00
0.001 Hari Mandor Rp. 72,820.00 72.82
Jumlah (II) 7,162.82
Jumlah (I) + (II) 32,162.82
Over Head 15 % 4,824.42
Harga Satuan 36,987.24
L. ANALISA BIAYA KONSTRUKSI PEKERJAAN SANTASI AIR (SNI 03-2839 - 2002)
No Sat Koepesien
Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga
Analisa jaan Bahan
L.1 1 Bh Memasang Closet Duduk
Bahan
1.000 bh Kloset Duduk sekulitas Toto Rp. 1,950,000.00 1,950,000.00
6% Hk perlengkapan Rp. 117,000.00 7,020.00
Jumlah (I) 1,957,020.00
Tenaga
3.300 Hari Pekerja Rp. 44,000.00 145,200.00
1.100 Hari Tukang batu Rp. 60,000.00 66,000.00
0.001 Hari Kepala Tukang Batu Rp. 65,000.00 65.00
0.160 Hari Mandor Rp. 72,820.00 11,651.20
Jumlah (II) 222,916.20
Jumlah (I) + (II) 2,179,936.20
Over Head 15 % 326,990.43
Harga Satuan 2,506,926.63
L.1a 1. Bh Memasang kloset jongkok
Bahan
1.000 bh Kloset jongkok Sekualitas Toto Rp. 175,000.00 175,000.00
6% Hk perlengkapan Rp. 10,500.00 630.00
Jumlah (I) 175,630.00
Tenaga
3.300 Hari Pekerja Rp. 44,000.00 145,200.00
1.100 Hari Tukang batu Rp. 60,000.00 66,000.00
0.001 Hari Kepala Tukang Rp. 65,000.00 65.00
0.160 Hari Mandor Rp. 72,820.00 11,651.20
Jumlah (II) 222,916.20
Jumlah (I) + (II) 398,546.20
Over Head 15 % 59,781.93
Harga Satuan 458,328.13
L.2 1 Bh Memasang Urinoar
Bahan
1.0000 bh Closed duduk Sekualitas Toto Rp. 1,950,000.00 1,950,000.00
3% Hk Perlengkapan Rp. 58,500.00 1,755.00
6.0000 kg Semen Rp. 1,200.00 7,200.00
0.0100 m3 Pasir pasang Rp. 80,000.00 800.00
Jumlah (I) 1,959,755.00
Tenaga
1.000 Hari Pekerja Rp. 44,000.00 44,000.00
1.000 Hari Tukang batu Rp. 60,000.00 60,000.00
0.100 Hari Kepala Tukang Batu Rp. 65,000.00 6,500.00
0.100 Hari Mandor Rp. 72,820.00 7,282.00
Jumlah (II) 117,782.00
Jumlah (I) + (II) 2,077,537.00
Over Head 15 % 311,630.55
Harga Satuan 2,389,167.55
No Sat Koepesien
Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga
Analisa jaan Bahan
L.3 1 Bh Memasang wastafel
Bahan
1.0000 bh Weshtafel Klas Menengah dan Accessories Rp. 650,000.00 650,000.00
12% Hk Perlengkapan Rp. 78,000.00 9,360.00
6.0000 kg Semen Rp. 1,200.00 7,200.00
0.0100 m3 Pasir pasang Rp. 80,000.00 800.00
Jumlah (I) 667,360.00
Tenaga
1.200 Hari Pekerja Rp. 44,000.00 52,800.00
1.450 Hari Tukang batu Rp. 60,000.00 87,000.00
0.150 Hari Kepala Tukang Batu Rp. 65,000.00 9,750.00
0.100 Hari Mandor Rp. 72,820.00 7,282.00
Jumlah (II) 156,832.00
Jumlah (I) + (II) 824,192.00
Over Head 15 % 123,628.80
Harga Satuan 947,820.80
L.4 1 Bh Memasang Bak cuci Stanlist steel
Bahan
1.0000 bh Bak cuci Stanlist steel Rp. 225,000.00 225,000.00
0.010 bh Water draine + asesories Rp. 2,250.00 22.50
Jumlah (I) 225,022.50
Tenaga
0.030 Hari Pekerja Rp. 44,000.00 1,320.00
0.300 Hari Tukang batu Rp. 60,000.00 18,000.00
0.030 Hari Kepala Tukang Batu Rp. 65,000.00 1,950.00
0.002 Hari Mandor Rp. 72,820.00 145.64
Jumlah (II) 21,415.64
Jumlah (I) + (II) 246,438.14
Over Head 15 % 36,965.72
Harga Satuan 283,403.86
L.5 1 Bh Memasang avour
Bahan
1.0000 bh Fiber draine (Avour) Rp. 40,000.00 40,000.00
Jumlah (I) 40,000.00
Tenaga
0.010 Hari Pekerja Rp. 44,000.00 440.00
0.100 Hari Tukang batu Rp. 60,000.00 6,000.00
0.010 Hari Kepala Tukang Batu Rp. 65,000.00 650.00
0.001 Hari Mandor Rp. 72,820.00 72.82
Jumlah (II) 7,162.82
Jumlah (I) + (II) 47,162.82
Over Head 15 % 7,074.42
Harga Satuan 54,237.24
L.6 1 m Memasang Pipa Galvanis Dia 2.5"
Bahan
2.0000 m Pipa Galpanis Dia 2.5" Rp. 37,500.00 75,000.00
35% Hk Perlengkapan Rp. 13,125.00 4,593.75
Jumlah (I) 75,000.00
Tenaga
0.036 Hari Pekerja Rp. 44,000.00 1,584.00
0.060 Hari Tukang pipa Rp. 60,000.00 3,600.00
0.006 Hari Kepala Tukang pipa Rp. 65,000.00 390.00
0.002 Hari Mandor Rp. 72,820.00 145.64
Jumlah (II) 5,719.64
Jumlah (I) + (II) 80,719.64
Over Head 15 % 12,107.95
Harga Satuan 92,827.59
No Sat Koepesien
Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga
Analisa jaan Bahan
L.7 1 m Memasang pipa PVC Tipe AW dia 3/4"
Bahan
1.200 m' Pipa PVC dia 3/4" + Assesoris Rp. 12,500.00 15,000.00
35% Hk Perlengkapan ( Harga Pipa ) Rp. 4,375.00 1,531.25
Jumlah (I) 16,531.25
Tenaga
0.0360 Hari Pekerja Rp. 44,000.00 1,584.00
0.0600 Hari Tukang pipa Rp. 60,000.00 3,600.00
0.0060 Hari Kepala Tukang pipa Rp. 65,000.00 390.00
0.0020 Hari Mandor Rp. 72,820.00 145.64
Jumlah (II) 5,719.64
Jumlah (I) + (II) 22,250.89
Over Head 15 % 3,337.63
Harga Satuan 25,588.52
L.8 1 m Memasang pipa PVC Tipe AW dia 4"
Bahan
1.200 m' Pipa PVC dia 4" + Assesoris Rp. 45,000.00 54,000.00
35% Hk Perlengkapan ( Harga Pipa ) Rp. 15,750.00 5,512.50
Jumlah (I) 59,512.50
Tenaga
0.0360 Hari Pekerja Rp. 44,000.00 1,584.00
0.0600 Hari Tukang pipa Rp. 60,000.00 3,600.00
0.0060 Hari Kepala Tukang pipa Rp. 65,000.00 390.00
0.0020 Hari Mandor Rp. 72,820.00 145.64
Jumlah (II) 5,719.64
Jumlah (I) + (II) 65,232.14
Over Head 15 % 9,784.82
Harga Satuan 75,016.96
L.9 1 m Memasang pipa PVC Tipe AW dia 3"
Bahan
1.200 m' Pipa PVC dia 3" + Assesoris Rp. 35,000.00 42,000.00
35% Hk Perlengkapan ( Harga Pipa ) Rp. 12,250.00 4,287.50
Jumlah (I) 46,287.50
Tenaga
0.0360 Hari Pekerja Rp. 44,000.00 1,584.00
0.0600 Hari Tukang pipa Rp. 60,000.00 3,600.00
0.0060 Hari Kepala Tukang pipa Rp. 65,000.00 390.00
0.0020 Hari Mandor Rp. 72,820.00 145.64
Jumlah (II) 5,719.64
Jumlah (I) + (II) 52,007.14
Over Head 15 % 7,801.07
Harga Satuan 59,808.21
L.14 1 Bh Memasang Kran Dia 1/2" (mutu tinggi)
Bahan
1.000 Bh kran dia 1/2" (Mutu tinggi) Rp. 35,000.00 35,000.00
35% Hk Perlengkapan Rp. 12,250.00 4,287.50
Jumlah (I) 39,287.50
Tenaga
0.0360 Hari Pekerja Rp. 44,000.00 1,584.00
0.0600 Hari Tukang pipa Rp. 60,000.00 3,600.00
0.0060 Hari Kepala Tukang pipa Rp. 65,000.00 390.00
0.0020 Hari Mandor Rp. 72,820.00 145.64
Jumlah (II) 5,719.64
Jumlah (I) + (II) 45,007.14
Over Head 15 % 6,751.07
Harga Satuan 51,758.21
No Sat Koepesien
Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga
Analisa jaan Bahan
L.14a 1 Bh Memasang Shower Spray
Bahan
1.000 Bh showaer spray Rp. 125,000.00 125,000.00
35% Hk Perlengkapan Rp. 43,750.00 15,312.50
Jumlah (I) 140,312.50
Tenaga
0.0360 Hari Pekerja Rp. 44,000.00 1,584.00
0.0600 Hari Tukang pipa Rp. 60,000.00 3,600.00
0.0060 Hari Kepala Tukang pipa Rp. 65,000.00 390.00
0.0020 Hari Mandor Rp. 72,820.00 145.64
Jumlah (II) 5,719.64
Jumlah (I) + (II) 146,032.14
Over Head 15 % 21,904.82
Harga Satuan 167,936.96
L.15 1 UNIT SEPTIKTANK
Bahan
B2 Galian Tanah Rp. 42,876.90 42,876.90
G.12.b Beton Mutu K225 Plat dasa Septinktank Rp. 4,331,676.70 4,331,676.70
D.2 Pasangan transram 1 Pc : 3Ps Rp. 72,886.30 72,886.30
E.1 Plesteran transram Plat beton penutup Septiktank Rp. 30,655.20 30,655.20
G.12.b Plat beton penutup Septiktank Rp. 4,331,676.70 4,331,676.70
Pipa Pembuang hawa dia 1.5" Rp. 50,000.00 50,000.00
Lubang Kontol Rp. 50,000.00 50,000.00
Jumlah (I) 8,909,771.80
Over Head 15 % 1,336,465.77
Harga Satuan 10,246,237.57
L.16 1 UNIT PERESAPAN
Bahan
B2 Galian Tanah Rp. 42,876.90 42,876.90
G.12.b Lapisan Ijuk Rp. 15,000.00 15,000.00
G.12.b Beton Mutu K225 Plat dasa Septinktank Rp. 4,331,676.70 4,331,676.70
D.2 Pasangan transram 1 Pc : 3Ps Rp. 72,886.30 72,886.30
E.1 Plesteran transram Plat beton penutup Septiktank Rp. 30,655.20 30,655.20
G.12.b Plat beton penutup Septiktank Rp. 4,331,676.70 4,331,676.70
Pipa Pembuang hawa dia 1.5" Rp. 50,000.00 50,000.00
Lubang Kontol Rp. 50,000.00 50,000.00
Jumlah (I) 8,881,894.90
Harga Satuan 1,332,284.24
Harga Satuan 10,214,179.14
K. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENGECATAN
No Sat Koepesien
Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga
Analisa jaan Bahan
M.1 1 m
2
Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup
Bahan
0.200 Kg Meni Kayu Rp. 20,000.00 4,000.00
0.150 Kg Plamir Kayu Rp. 15,000.00 2,250.00
Dasar 0.170 Kg Cat Kayu Mutu menengah Rp. 45,000.00 7,650.00
Penutup 2.600 Kg Cat Kayu Mutu menengah Rp. 45,000.00 117,000.00
Jumlah (I) 130,900.00
Tenaga
0.070 Hari Pekerja Rp. 44,000.00 3,080.00
0.090 Hari Tukang cat Rp. 60,000.00 5,400.00
0.060 Hari Kepala tukang Cat Rp. 65,000.00 3,900.00
0.0300 Hari Mandor Rp. 72,820.00 2,184.60
Jumlah (II) 14,564.60
Jumlah (I) + (II) 145,464.60
Over Head 15 % 21,819.69
Harga Satuan 167,284.29
M.2 1 m
2
Politur
Bahan
0.150 Kg Politur Rp. 35,000.00 5,250.00
0.372 Kg Politur Rp. 35,000.00 13,020.00
2.000 Lbr Amplas Rp. 3,500.00 7,000.00
Jumlah (I) 25,270.00
Tenaga
0.000 Hari Pekerja Rp. 44,000.00 -
0.060 Hari Tukang cat Rp. 60,000.00 3,600.00
0.016 Hari Kepala tukang Cat Rp. 65,000.00 1,040.00
0.0300 Hari Mandor Rp. 72,820.00 2,184.60
Jumlah (II) 6,824.60
Jumlah (I) + (II) 32,094.60
Over Head 15 % 4,814.19
Harga Satuan 36,908.79
M.4 1 m
2
Pengecatan tembok Baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup
Bahan
0.100 Kg Plamir Tembok Rp. 17,500.00 1,750.00
0.100 Kg Cat tembok (Mutu Tinggi) Rp. 25,000.00 2,500.00
0.260 Kg Cat tembok (Mutu Tinggi) Rp. 25,000.00 6,500.00
Jumlah (I) 10,750.00
Tenaga
0.020 Hari Pekerja Rp. 44,000.00 880.00
0.063 Hari Tukang cat Rp. 60,000.00 3,780.00
0.006 Hari Kepala tukang Cat Rp. 65,000.00 390.00
0.0030 Hari Mandor Rp. 72,820.00 218.46
Jumlah (II) 5,268.46
Jumlah (I) + (II) 16,018.46
Over Head 15 % 2,402.77
Harga Satuan 18,421.23
N. ANALISA BIAYA KONSTRUKSI PEKERJAAN RANGKA BAJA
N.2a 1kg Pabrikasi Besi Profil
Bahan
1.150 Kg Besi profil WF Rp. 13,500.00 15,525.00
Jumlah (I) 15,525.00
Tenaga
0.060 Hari Tukang Besi Rp. 60,000.00 3,600.00
0.060 Hari Kepala tukang Besi Rp. 65,000.00 3,900.00
0.060 Hari Buruh terampil Rp. 60,000.00 3,600.00
0.0030 Hari Mandor Rp. 72,820.00 218.46
Jumlah (II) 11,318.46
Jumlah (I) + (II) 26,843.46
Over Head 15 % 4,026.52
Harga Satuan 30,869.98
N.2b 1kg Pabrikasi Besi Plat
Bahan
1.150 Kg Besi plat Rp. 13,500.00 15,525.00
Jumlah (I) 15,525.00
Tenaga
0.060 Hari Tukang Besi Rp. 60,000.00 3,600.00
0.060 Hari Kepala tukang Besi Rp. 65,000.00 3,900.00
0.060 Hari Buruh terampil Rp. 60,000.00 3,600.00
0.0030 Hari Mandor Rp. 72,820.00 218.46
Jumlah (II) 11,318.46
Jumlah (I) + (II) 26,843.46
Over Head 15 % 4,026.52
Harga Satuan 30,869.98
N.2c 1kg Pekerjaan Rakitan (penyetelan erection)
Bahan
0.100 Ltr Solar Rp. 4,500.00 450.00
0.010 Ltr Oli Mesin Rp. 22,500.00 225.00
Jumlah (I) 675.00
Tenaga
0.010 Hari Tukang Besi Rp. 60,000.00 600.00
0.001 Hari Kepala tukang Besi Rp. 65,000.00 65.00
0.010 Hari Buruh terampil Rp. 60,000.00 600.00
0.0010 Hari Mandor Rp. 72,820.00 72.82
Jumlah (II) 1,337.82
Jumlah (I) + (II) 2,012.82
Over Head 15 % 301.92
Harga Satuan 2,314.74
N.2d 10 cm Mengerjakan Las Listrik
Bahan
0.040 Kg Kawat Las Stanlesstel Rp. 50,000.00 2,000.00
0.170 Jam Trafo Las / Genset (sewa Alat Las Rp. 25,000.00 4,250.00
0.070 Ltr Solar Rp. 4,500.00 315.00
0.040 Ltr Olie Mesin Rp. 22,500.00 900.00
Jumlah (I) 7,465.00
Tenaga
0.0200 Hari Tukang Besi Rp. 60,000.00 1,200.00
0.0002 Hari Kepala tukang Besi Rp. 65,000.00 13.00
0.0040 Hari Buruh terampil Rp. 60,000.00 240.00
0.0020 Hari Mandor Rp. 72,820.00 145.64
Jumlah (II) 1,598.64
Jumlah (I) + (II) 9,063.64
Over Head 15 % 1,359.55
Harga Satuan 10,423.19
Harga 1 Cm 1,042.32
N.2d.a 1 m Kusen Allumenium
Bahan
1.100 m Profil Allumenium Rp. 350,000.00 385,000.00
2.000 bh Skrup fixel Rp. 350.00 700.00
0.070 tube Sealant Rp. 50,000.00 3,500.00
Jumlah (I) 389,200.00
Tenaga
0.0430 Hari Pekerja Rp. 60,000.00 2,580.00
0.0430 Hari Tukang Besi Rp. 65,000.00 2,795.00
0.0043 Hari Kepala tukang Besi Rp. 60,000.00 258.00
0.0021 Hari Mandor Rp. 72,820.00 152.92
Jumlah (II) 5,785.92
Jumlah (I) + (II) 394,985.92
Over Head 15 % 59,247.89
Harga Satuan 454,233.81
Sumbawa Besar, 6 Pebruari 2013
CV. ARAMCO
M. NAGIB USMAN
Direktur

More Related Content

Viewers also liked

Through Theatre to Cinema
Through Theatre to CinemaThrough Theatre to Cinema
Through Theatre to CinemaDanielle Morris
 
Ecuaciones cuadraticas math 102
Ecuaciones cuadraticas math 102Ecuaciones cuadraticas math 102
Ecuaciones cuadraticas math 102Lilliam Del Valle
 
Дитячий майданчик власноруч
Дитячий майданчик власноручДитячий майданчик власноруч
Дитячий майданчик власноручpostpaper
 
Kryon a viagem para casa (a história de michael thomas e os 7 anjos)
Kryon   a viagem para casa (a história de michael thomas e os 7 anjos)Kryon   a viagem para casa (a história de michael thomas e os 7 anjos)
Kryon a viagem para casa (a história de michael thomas e os 7 anjos)Indioê Alan Autovicz
 
Contoh rpp 2013
Contoh rpp 2013Contoh rpp 2013
Contoh rpp 2013pakmujib
 
Land transportation
Land transportationLand transportation
Land transportationBadr Banar
 

Viewers also liked (8)

Through Theatre to Cinema
Through Theatre to CinemaThrough Theatre to Cinema
Through Theatre to Cinema
 
Ecuaciones cuadraticas math 102
Ecuaciones cuadraticas math 102Ecuaciones cuadraticas math 102
Ecuaciones cuadraticas math 102
 
Дитячий майданчик власноруч
Дитячий майданчик власноручДитячий майданчик власноруч
Дитячий майданчик власноруч
 
Kryon a viagem para casa (a história de michael thomas e os 7 anjos)
Kryon   a viagem para casa (a história de michael thomas e os 7 anjos)Kryon   a viagem para casa (a história de michael thomas e os 7 anjos)
Kryon a viagem para casa (a história de michael thomas e os 7 anjos)
 
Monte crista- 2016
Monte crista- 2016 Monte crista- 2016
Monte crista- 2016
 
A desobediencia civil thoreau
A desobediencia civil   thoreauA desobediencia civil   thoreau
A desobediencia civil thoreau
 
Contoh rpp 2013
Contoh rpp 2013Contoh rpp 2013
Contoh rpp 2013
 
Land transportation
Land transportationLand transportation
Land transportation
 

Similar to Daftarbahanbangunan

3. pekerjaan sipil dan bangunan
3. pekerjaan sipil dan bangunan3. pekerjaan sipil dan bangunan
3. pekerjaan sipil dan bangunanSyahrul Najmi
 
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdfFarm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdfAvin Kharel
 
BQ RSJ TAHAP 1 TA 2022 Revisi 21 Februari 2022.pdf
BQ RSJ  TAHAP 1 TA 2022 Revisi  21 Februari 2022.pdfBQ RSJ  TAHAP 1 TA 2022 Revisi  21 Februari 2022.pdf
BQ RSJ TAHAP 1 TA 2022 Revisi 21 Februari 2022.pdfsuryaman10
 
7. m. darul ikhsan pematang duku oe
7. m. darul ikhsan pematang duku oe7. m. darul ikhsan pematang duku oe
7. m. darul ikhsan pematang duku oeKashmir Brown
 
92795289 building-data
92795289 building-data92795289 building-data
92795289 building-dataimaduddin91
 
5.bq analisa rsud tugurejo
5.bq analisa rsud tugurejo5.bq analisa rsud tugurejo
5.bq analisa rsud tugurejoIsmail Saleh
 
2.pengajuanrabcandramas terasdepanatapasbes
2.pengajuanrabcandramas terasdepanatapasbes2.pengajuanrabcandramas terasdepanatapasbes
2.pengajuanrabcandramas terasdepanatapasbesDeny Sulistio
 
Siap2 addendum cssd
Siap2 addendum cssdSiap2 addendum cssd
Siap2 addendum cssdJay Mu'jijai
 
Master Schedule vs Actual Progress Bp Andi Week 13.pdf
Master Schedule vs Actual Progress Bp Andi Week 13.pdfMaster Schedule vs Actual Progress Bp Andi Week 13.pdf
Master Schedule vs Actual Progress Bp Andi Week 13.pdfAJI DARMAWAN
 
Business plan on fly ash bricks
Business plan on fly ash bricksBusiness plan on fly ash bricks
Business plan on fly ash bricksAtikant Kashyap
 
Intro. to management lecture 08
Intro. to management lecture 08Intro. to management lecture 08
Intro. to management lecture 08Haitham Sharnouby
 
Analisa Efisiensi Biaya Metoda Pracetak Half Slab Plat Beton Pada Proyek Apar...
Analisa Efisiensi Biaya Metoda Pracetak Half Slab Plat Beton Pada Proyek Apar...Analisa Efisiensi Biaya Metoda Pracetak Half Slab Plat Beton Pada Proyek Apar...
Analisa Efisiensi Biaya Metoda Pracetak Half Slab Plat Beton Pada Proyek Apar...Bayu Pinasthika
 
Adendum blh 2009 diperbaiki
Adendum blh 2009 diperbaikiAdendum blh 2009 diperbaiki
Adendum blh 2009 diperbaikikurniawan yusril
 

Similar to Daftarbahanbangunan (20)

Daftar bahan bangunan
Daftar bahan bangunanDaftar bahan bangunan
Daftar bahan bangunan
 
3. pekerjaan sipil dan bangunan
3. pekerjaan sipil dan bangunan3. pekerjaan sipil dan bangunan
3. pekerjaan sipil dan bangunan
 
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdfFarm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
 
BQ RSJ TAHAP 1 TA 2022 Revisi 21 Februari 2022.pdf
BQ RSJ  TAHAP 1 TA 2022 Revisi  21 Februari 2022.pdfBQ RSJ  TAHAP 1 TA 2022 Revisi  21 Februari 2022.pdf
BQ RSJ TAHAP 1 TA 2022 Revisi 21 Februari 2022.pdf
 
7. m. darul ikhsan pematang duku oe
7. m. darul ikhsan pematang duku oe7. m. darul ikhsan pematang duku oe
7. m. darul ikhsan pematang duku oe
 
92795289 building-data
92795289 building-data92795289 building-data
92795289 building-data
 
rab rsud tugurejo
rab rsud tugurejo rab rsud tugurejo
rab rsud tugurejo
 
5.bq analisa rsud tugurejo
5.bq analisa rsud tugurejo5.bq analisa rsud tugurejo
5.bq analisa rsud tugurejo
 
Single storied house
Single storied houseSingle storied house
Single storied house
 
Analisa
AnalisaAnalisa
Analisa
 
Stilt house
Stilt houseStilt house
Stilt house
 
2.pengajuanrabcandramas terasdepanatapasbes
2.pengajuanrabcandramas terasdepanatapasbes2.pengajuanrabcandramas terasdepanatapasbes
2.pengajuanrabcandramas terasdepanatapasbes
 
Rab
RabRab
Rab
 
Siap2 addendum cssd
Siap2 addendum cssdSiap2 addendum cssd
Siap2 addendum cssd
 
Rab final bata
Rab final bataRab final bata
Rab final bata
 
Master Schedule vs Actual Progress Bp Andi Week 13.pdf
Master Schedule vs Actual Progress Bp Andi Week 13.pdfMaster Schedule vs Actual Progress Bp Andi Week 13.pdf
Master Schedule vs Actual Progress Bp Andi Week 13.pdf
 
Business plan on fly ash bricks
Business plan on fly ash bricksBusiness plan on fly ash bricks
Business plan on fly ash bricks
 
Intro. to management lecture 08
Intro. to management lecture 08Intro. to management lecture 08
Intro. to management lecture 08
 
Analisa Efisiensi Biaya Metoda Pracetak Half Slab Plat Beton Pada Proyek Apar...
Analisa Efisiensi Biaya Metoda Pracetak Half Slab Plat Beton Pada Proyek Apar...Analisa Efisiensi Biaya Metoda Pracetak Half Slab Plat Beton Pada Proyek Apar...
Analisa Efisiensi Biaya Metoda Pracetak Half Slab Plat Beton Pada Proyek Apar...
 
Adendum blh 2009 diperbaiki
Adendum blh 2009 diperbaikiAdendum blh 2009 diperbaiki
Adendum blh 2009 diperbaiki
 

Recently uploaded

Indian Call Girl In Dubai #$# O5634O3O18 #$# Dubai Call Girl
Indian Call Girl In Dubai #$# O5634O3O18 #$# Dubai Call GirlIndian Call Girl In Dubai #$# O5634O3O18 #$# Dubai Call Girl
Indian Call Girl In Dubai #$# O5634O3O18 #$# Dubai Call GirlAroojKhan71
 
Dubai Call Girls O525547&19 (Asii) Call Girls Dubai
Dubai Call Girls O525547&19 (Asii) Call Girls DubaiDubai Call Girls O525547&19 (Asii) Call Girls Dubai
Dubai Call Girls O525547&19 (Asii) Call Girls Dubaikojalkojal131
 
Korba Call Girls #9907093804 Contact Number Escorts Service Korba
Korba Call Girls #9907093804 Contact Number Escorts Service KorbaKorba Call Girls #9907093804 Contact Number Escorts Service Korba
Korba Call Girls #9907093804 Contact Number Escorts Service Korbasrsj9000
 
Best VIP Call Girls Noida Sector 50 Call Me: 8448380779
Best VIP Call Girls Noida Sector 50 Call Me: 8448380779Best VIP Call Girls Noida Sector 50 Call Me: 8448380779
Best VIP Call Girls Noida Sector 50 Call Me: 8448380779Delhi Call girls
 
The 15 Minute Breakdown: 2024 Beauty Marketing Study
The 15 Minute Breakdown: 2024 Beauty Marketing StudyThe 15 Minute Breakdown: 2024 Beauty Marketing Study
The 15 Minute Breakdown: 2024 Beauty Marketing StudyKatherineBishop4
 
The 15 Minute Breakdown: 2024 Beauty Marketing Study
The 15 Minute Breakdown: 2024 Beauty Marketing StudyThe 15 Minute Breakdown: 2024 Beauty Marketing Study
The 15 Minute Breakdown: 2024 Beauty Marketing StudyTinuiti
 
Best VIP Call Girls Noida Sector 55 Call Me: 8448380779
Best VIP Call Girls Noida Sector 55 Call Me: 8448380779Best VIP Call Girls Noida Sector 55 Call Me: 8448380779
Best VIP Call Girls Noida Sector 55 Call Me: 8448380779Delhi Call girls
 
Best VIP Call Girls Noida Sector 51 Call Me: 8448380779
Best VIP Call Girls Noida Sector 51 Call Me: 8448380779Best VIP Call Girls Noida Sector 51 Call Me: 8448380779
Best VIP Call Girls Noida Sector 51 Call Me: 8448380779Delhi Call girls
 
Film= Dubai Call Girls O525547819 Call Girls Dubai Whsatapp
Film= Dubai Call Girls O525547819 Call Girls Dubai WhsatappFilm= Dubai Call Girls O525547819 Call Girls Dubai Whsatapp
Film= Dubai Call Girls O525547819 Call Girls Dubai Whsatappkojalkojal131
 
Supermarket Floral Ad Roundup- Week 17 2024.pdf
Supermarket Floral Ad Roundup- Week 17 2024.pdfSupermarket Floral Ad Roundup- Week 17 2024.pdf
Supermarket Floral Ad Roundup- Week 17 2024.pdfKarliNelson4
 

Recently uploaded (11)

Indian Call Girl In Dubai #$# O5634O3O18 #$# Dubai Call Girl
Indian Call Girl In Dubai #$# O5634O3O18 #$# Dubai Call GirlIndian Call Girl In Dubai #$# O5634O3O18 #$# Dubai Call Girl
Indian Call Girl In Dubai #$# O5634O3O18 #$# Dubai Call Girl
 
Dubai Call Girls O525547&19 (Asii) Call Girls Dubai
Dubai Call Girls O525547&19 (Asii) Call Girls DubaiDubai Call Girls O525547&19 (Asii) Call Girls Dubai
Dubai Call Girls O525547&19 (Asii) Call Girls Dubai
 
Korba Call Girls #9907093804 Contact Number Escorts Service Korba
Korba Call Girls #9907093804 Contact Number Escorts Service KorbaKorba Call Girls #9907093804 Contact Number Escorts Service Korba
Korba Call Girls #9907093804 Contact Number Escorts Service Korba
 
Best VIP Call Girls Noida Sector 50 Call Me: 8448380779
Best VIP Call Girls Noida Sector 50 Call Me: 8448380779Best VIP Call Girls Noida Sector 50 Call Me: 8448380779
Best VIP Call Girls Noida Sector 50 Call Me: 8448380779
 
Model Call Girl in Yamuna Vihar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in  Yamuna Vihar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in  Yamuna Vihar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Yamuna Vihar Delhi reach out to us at 🔝9953056974🔝
 
The 15 Minute Breakdown: 2024 Beauty Marketing Study
The 15 Minute Breakdown: 2024 Beauty Marketing StudyThe 15 Minute Breakdown: 2024 Beauty Marketing Study
The 15 Minute Breakdown: 2024 Beauty Marketing Study
 
The 15 Minute Breakdown: 2024 Beauty Marketing Study
The 15 Minute Breakdown: 2024 Beauty Marketing StudyThe 15 Minute Breakdown: 2024 Beauty Marketing Study
The 15 Minute Breakdown: 2024 Beauty Marketing Study
 
Best VIP Call Girls Noida Sector 55 Call Me: 8448380779
Best VIP Call Girls Noida Sector 55 Call Me: 8448380779Best VIP Call Girls Noida Sector 55 Call Me: 8448380779
Best VIP Call Girls Noida Sector 55 Call Me: 8448380779
 
Best VIP Call Girls Noida Sector 51 Call Me: 8448380779
Best VIP Call Girls Noida Sector 51 Call Me: 8448380779Best VIP Call Girls Noida Sector 51 Call Me: 8448380779
Best VIP Call Girls Noida Sector 51 Call Me: 8448380779
 
Film= Dubai Call Girls O525547819 Call Girls Dubai Whsatapp
Film= Dubai Call Girls O525547819 Call Girls Dubai WhsatappFilm= Dubai Call Girls O525547819 Call Girls Dubai Whsatapp
Film= Dubai Call Girls O525547819 Call Girls Dubai Whsatapp
 
Supermarket Floral Ad Roundup- Week 17 2024.pdf
Supermarket Floral Ad Roundup- Week 17 2024.pdfSupermarket Floral Ad Roundup- Week 17 2024.pdf
Supermarket Floral Ad Roundup- Week 17 2024.pdf
 

Daftarbahanbangunan

  • 1. CIVIL. ENGINEERING Jalan Kabayan No. 50 Sumbawa Besar DAFTAR ANALISA HARGA SATUAN UPAH BAHAN SNVT : PENATAAN BANGUNAN DAN LINGKUNGAN PROV. NTB KEGIATAN : PELAKSANAANPENATAAN BANGUNANDAN LINGKUNGAN PROV. NTB PEKERJAAN : PEMBANGUNAN PSD REVITALISASI KAWASAN PUSAT KOTA SUMBAWA LOKASI : KAWASAN PUSAT KOTA SUMBAWA BESAR KAB. SUMBAWA TAHUN : 2O13 ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN No Sat Koepesien Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan A.1 1 m' Pengukuran dan pemasangan Bowplang Bahan 0.012 M³ Kayu Klas III Rp. 1,750,000.00 21,000.00 0.020 Kg Paku Rp. 17,500.00 350.00 0.007 M³ Papan Kayu Klas II Rp. 2,500,000.00 17,500.00 Jumlah (I) 38,850.00 Tenaga 0.100 Hari Tukang kayu Rp. 60,000.00 6,000.00 0.100 Hari Pekerja Rp. 44,000.00 4,400.00 0.010 Hari Kepala tukang Rp. 65,000.00 650.00 0.005 Hari Mandor Rp. 72,820.00 364.10 Jumlah (II) 11,414.10 Jumlah (I) + (II) 50,264.10 Over Head 7.5 % 7,539.62 Harga Satuan 57,803.72 A.2 1 m3 Bongkar Dinding Bata & Konstin Tenaga 0.100 Hari Tukang Bongkar Rp. 44,000.00 4,400.00 0.100 Hari Mandor Rp. 72,820.00 7,282.00 Jumlah (II) 11,682.00 Jumlah (I) + (II) 69,485.72 Over Head 15 % 10,422.86 Harga Satuan 79,908.57 A.3 1 m2 Pembersihan Lapangan dan Lokasi Tenaga 0.050 Hari Tukang Batu Rp. 60,000.00 3,000.00 0.005 Hari Pekerja Rp. 44,000.00 220.00 Jumlah (II) 3,220.00 Jumlah (I) + (II) 3,220.00 Over Head 15 % 483.00 Harga Satuan 3,703.00
  • 2. No Sat Koepesien Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan B.1 1m 3 Galian tanah biasa sedalam 1 meter Tenaga 0.750 Hari Pekerja Rp. 44,000.00 33,000.00 0.025 Hari Mandor Rp. 72,820.00 1,820.50 Jumlah (I) 34,820.50 Over Head 15 % 5,223.08 Harga Satuan 40,043.58 B.2 1m 3 Galian tanah biasa sedalam 2 meter Tenaga 0.900 Hari Pekerja Rp. 44,000.00 39,600.00 0.045 Hari Mandor Rp. 72,820.00 3,276.90 Jumlah (I) 42,876.90 Over Head 15 % 6,431.54 Harga Satuan 49,308.44 B.3 1m3 Urugan kembali Mengurug Kembali 1 m3 dihitung dari 1,3 kali dari indek pekerjaan Galian B.4 1m 3 Pemadatan tanah Tenaga 0.500 Hari Pekerja Rp. 44,000.00 22,000.00 0.050 Hari Mandor Rp. 72,820.00 3,641.00 Jumlah (I) 25,641.00 Over Head 15 % 3,846.15 Harga Satuan 29,487.15 B.5. 1 m 3 Urugan pasir bawah penutup lantai Bahan 1.200 M³ Pasir Rp. 25,000.00 30,000.00 Jumlah (I) 30,000.00 Tenaga 0.300 Hari Pekerja Rp. 44,000.00 13,200.00 0.010 Hari Mandor Rp. 72,820.00 728.20 Jumlah (II) 13,928.20 Jumlah (I) + (II) 43,928.20 Over Head 15 % 6,589.23 Harga Satuan 50,517.43 B.6 1 m 3 Urugan tanah (konversi dari analisa urugan pasir) Bahan 1.200 M³ Tanah Urug Rp. 27,500.00 33,000.00 Jumlah (I) 33,000.00 Tenaga 0.300 Hari Pekerja Rp. 44,000.00 13,200.00 0.010 Hari Mandor Rp. 72,820.00 728.20 Jumlah (II) 13,928.20 Jumlah (I) + (II) 46,928.20 Over Head 15 % 7,039.23 Harga Satuan 53,967.43
  • 3. No Sat Koepesien Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan C. ANALISA BIAYA KONSTRUKSI PONDASI (SNI DT-91-0007-2007) C.1 1m 3 Pasangan Pondasi Batu Kali 1 Pc : 3 Ps Bahan 1.200 M³ Batu belah Rp. 80,000.00 96,000.00 202.000 Kg Semen Portland Rp. 1,200.00 242,400.00 0.485 M³ pasir pasang Rp. 80,000.00 38,800.00 Jumlah (I) 377,200.00 Tenaga 1.500 Hari Pekerja Rp. 44,000.00 66,000.00 0.600 Hari Tukang batu Rp. 60,000.00 36,000.00 0.060 Hari Kepala Tukang Rp. 65,000.00 3,900.00 0.075 Hari Mandor Rp. 72,820.00 5,461.50 Jumlah (II) 111,361.50 Jumlah (I) + (II) 488,561.50 Over Head 15 % 73,284.23 Harga Satuan 561,845.73 C.3 1m 3 Pasangan Pondasi Batu belah campuran 1 Pc : 5 Ps Bahan 1.200 M³ Batu belah Rp. 80,000.00 96,000.00 136.000 Kg Semen Portland Rp. 1,200.00 163,200.00 0.544 M³ pasir pasang Rp. 80,000.00 43,520.00 Jumlah (I) 302,720.00 Tenaga 1.500 Hari Pekerja Rp. 44,000.00 66,000.00 0.600 Hari Tukang batu Rp. 60,000.00 36,000.00 0.060 Hari Kepala Tukang Rp. 65,000.00 3,900.00 0.075 Hari Mandor Rp. 60,000.00 4,500.00 Jumlah (II) 110,400.00 Jumlah (I) + (II) 413,120.00 Over Head 15 % 61,968.00 Harga Satuan 475,088.00 C.4 1m3 Pasangan batu kosong (aanstanping) Bahan 1.200 M³ Batu belah Rp. 80,000.00 96,000.00 0.432 M³ pasir pasang Rp. 80,000.00 34,560.00 Jumlah (I) 130,560.00 Tenaga 0.780 Hari Pekerja Rp. 44,000.00 34,320.00 0.390 Hari Tukang batu Rp. 60,000.00 23,400.00 0.039 Hari Kepala Tukang Rp. 65,000.00 2,535.00 0.075 Hari Mandor Rp. 72,820.00 5,461.50 Jumlah (II) 65,716.50 Jumlah (I) + (II) 196,276.50 Over Head 15 % 29,441.48 Harga Satuan 225,717.98
  • 4. D. ANALISA BIAYA PEKERJAAN DINDING No Sat Koepesien Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan D.1 1m2 Pasangan bata merah tebal 1 bata. 1 Pc : 3 Ps Bahan 144.000 Bh Bata merah Rp. 450.00 64,800.00 32.950 Kg Semen Portland Rp. 1,200.00 39,540.00 0.091 M³ pasir pasang Rp. 80,000.00 7,280.00 Jumlah (I) 111,620.00 Tenaga 0.600 Hari Pekerja Rp. 44,000.00 26,400.00 0.200 Hari Tukang batu Rp. 60,000.00 12,000.00 0.020 Hari Kepala Tukang Rp. 65,000.00 1,300.00 0.030 Hari Mandor Rp. 72,820.00 2,184.60 Jumlah (II) 41,884.60 Jumlah (I) + (II) 153,504.60 Over Head 15 % 23,025.69 Harga Satuan 176,530.29 D.2 1m 2 Pasangan bata merah tebal ½ bata. 1 Pc : 3 Ps Bahan 70.000 Bh Bata merah Rp. 450.00 31,500.00 14.370 Kg Semen Portland Rp. 1,200.00 17,244.00 0.040 M³ pasir pasang Rp. 80,000.00 3,200.00 Jumlah (I) 51,944.00 Tenaga 0.300 Hari Pekerja Rp. 44,000.00 13,200.00 0.100 Hari Tukang batu Rp. 60,000.00 6,000.00 0.010 Hari Kepala Tukang Rp. 65,000.00 650.00 0.015 Hari Mandor Rp. 72,820.00 1,092.30 Jumlah (II) 20,942.30 Jumlah (I) + (II) 72,886.30 Over Head 15 % 10,932.95 Harga Satuan 83,819.25 D.3 1m2 Pasangan bata merah tebal ½ bata. 1 Pc : 5 Ps Bahan 70.000 Bh Bata merah Rp. 450.00 31,500.00 9.680 Kg Semen Portland Rp. 1,200.00 11,616.00 0.043 M³ pasir pasang Rp. 80,000.00 3,440.00 Jumlah (I) 46,556.00 Tenaga 0.300 Hari Pekerja Rp. 44,000.00 13,200.00 0.100 Hari Tukang batu Rp. 60,000.00 6,000.00 0.010 Hari Kepala Tukang Rp. 65,000.00 650.00 0.015 Hari Mandor Rp. 72,820.00 1,092.30 Jumlah (II) 20,942.30 Jumlah (I) + (II) 67,498.30 Over Head 15 % 10,124.75 Harga Satuan 77,623.05
  • 5. E. ANALISA BIAYA KONSTRUKSI PEKERJAAN PLESTERAN (SNI DT-0010-2007) No Sat Koepesien Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan E.1 1m 2 Plesteran 1 Pc : 3 Ps tebal 15 mm. Bahan 7.760 Kg Semen Portland Rp. 1,200.00 9,312.00 0.023 M³ Pasir pasang Rp. 80,000.00 1,840.00 Jumlah (I) 11,152.00 Tenaga 0.200 Hari Pekerja Rp. 44,000.00 8,800.00 0.150 Hari Tukang batu Rp. 60,000.00 9,000.00 0.015 Hari Kepala Tukang Rp. 65,000.00 975.00 0.010 Hari Mandor Rp. 72,820.00 728.20 Jumlah (II) 19,503.20 Jumlah (I) + (II) 30,655.20 Over Head 15 % 4,598.28 Harga Satuan 35,253.48 E.2 1m 2 Plesteran 1 Pc : 3 Ps tebal 15 mm. Bahan 7.070 Kg Semen Portland Rp. 1,200.00 8,484.00 0.021 M³ Pasir pasang Rp. 80,000.00 1,680.00 Jumlah (I) 10,164.00 Tenaga 0.260 Hari Pekerja Rp. 44,000.00 11,440.00 0.200 Hari Tukang batu Rp. 60,000.00 12,000.00 0.020 Hari Kepala Tukang Rp. 65,000.00 1,300.00 0.013 Hari Mandor Rp. 72,820.00 946.66 Jumlah (II) 25,686.66 Jumlah (I) + (II) 35,850.66 Over Head 15 % 5,377.60 Harga Satuan 41,228.26 E.3 1m 2 Plesteran 1 Pc : 5 Ps tebal 15 mm. Bahan 5.148 Kg Semen Portland Rp. 1,200.00 6,177.60 0.026 M³ Tanah Paras Rp. 30,000.00 780.00 Jumlah (I) 6,957.60 Tenaga 0.200 Hari Pekerja Rp. 44,000.00 8,800.00 0.150 Hari Tukang batu Rp. 60,000.00 9,000.00 0.015 Hari Kepala Tukang Rp. 65,000.00 975.00 0.010 Hari Mandor Rp. 72,820.00 728.20 Jumlah (II) 19,503.20 Jumlah (I) + (II) 26,460.80 Over Head 15 % 3,969.12 Harga Satuan 30,429.92 E.6 1m2 Finishing siar pasangan batu kali 1Pc : 2 Ps Bahan 6.340 Kg Semen Portland Rp. 1,200.00 7,608.00 0.012 M³ Pasir pasang Rp. 80,000.00 960.00 Jumlah (I) 8,568.00 Tenaga 0.075 Hari Pekerja Rp. 44,000.00 3,300.00 0.035 Hari Tukang batu Rp. 60,000.00 2,100.00 0.004 Hari Kepala Tukang Rp. 65,000.00 260.00 0.004 Hari Mandor Rp. 72,820.00 291.28 Jumlah (II) 5,951.28 Jumlah (I) + (II) 14,519.28 Over Head 15 % 2,177.89 Harga Satuan 16,697.17
  • 6. No Sat Koepesien Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan E.7 1m 2 memasang acian Bahan 3.250 Kg Semen Portland Rp. 1,200.00 3,900.00 0.031 M³ Pasir pasang Rp. 80,000.00 0.00 Jumlah (I) 3,900.00 Tenaga 0.150 Hari Pekerja Rp. 44,000.00 6,600.00 0.100 Hari Tukang batu Rp. 60,000.00 6,000.00 0.010 Hari Kepala Tukang Rp. 65,000.00 650.00 0.008 Hari Mandor Rp. 72,820.00 582.56 Jumlah (II) 13,832.56 Jumlah (I) + (II) 17,732.56 Over Head 15 % 2,659.88 Harga Satuan 20,392.44 F. ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU (SNI DT 91-0011-2007) F.1 1m 3 Membuat dan memasang Kusen Pintu dan kusen Jemdela kayu II Bahan 1.100 m³ Kayu Klas II Rp. 2,500,000.00 2,750,000.00 1.250 Kg Paku Rp. 17,500.00 21,875.00 1.000 Kg Lem Kayu Rp. 25,000.00 25,000.00 Jumlah (I) 2,796,875.00 Tenaga 6.000 Hari Pekerja Rp. 44,000.00 264,000.00 20.000 Hari Tukang kayu Rp. 60,000.00 1,200,000.00 2.000 Hari Kepala Tukang kayu Rp. 65,000.00 130,000.00 0.300 Hari Mandor Rp. 72,820.00 21,846.00 Jumlah (II) 1,615,846.00 Jumlah (I) + (II) 4,412,721.00 Over Head 15 % 661,908.15 Harga Satuan 5,074,629.15 F.3 1m 2 Membuat dan memasang Pintu dan jendela kaca kayu klas II Bahan 0.0240 m³ Papan Kayu Klas II Rp. 2,500,000.00 60,000.00 0.3000 Kg Lem kayu Rp. 25,000.00 7,500.00 0.8900 M2 Kaca 3 mm (bening) Rp. 125,000.00 111,250.00 , Jumlah (I) 178,750.00 Tenaga 0.8000 Hari Pekerja Rp. 44,000.00 35,200.00 2.0000 Hari Tukang kayu Rp. 60,000.00 120,000.00 0.2000 Hari Kepala Tukang kayu Rp. 65,000.00 13,000.00 0.0400 Hari Mandor Rp. 72,820.00 2,912.80 Jumlah (II) 171,112.80 Jumlah (I) + (II) 349,862.80 Over Head 15 % 52,479.42 Harga Satuan 402,342.22
  • 7. No Sat Koepesien Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan F.4 1m2 Memasang jelusi kayu klas II Bahan 0.060 m³ Papan Kayu Kls II Rp. 2,500,000.00 150,000.00 0.150 Kg Paku Rp. 17,500.00 2,625.00 Jumlah (I) 152,625.00 Tenaga 0.5000 Hari Pekerja Rp. 44,000.00 22,000.00 2.0000 Hari Tukang kayu Rp. 60,000.00 120,000.00 0.2000 Hari Kepala Tukang kayu Rp. 65,000.00 13,000.00 0.0250 Hari Mandor Rp. 72,820.00 1,820.50 Jumlah (II) 156,820.50 Jumlah (I) + (II) 309,445.50 Over Head 15 % 46,416.83 Harga Satuan 355,862.33 F.5 1m2 Membuat daun pintu double tacwood rangka kayu klas II Bahan 0.025 m3 Papan Kayu Kls II Rp. 2,500,000.00 62,500.00 0.030 Kg Paku Rp. 17,500.00 525.00 0.500 Kg Lem Kayu Rp. 25,000.00 12,500.00 1.000 Lbr Tecwood 90 x220 x 4 mm Rp. 75,000.00 75,000.00 Jumlah (I) 150,525.00 Tenaga 0.800 Hari Pekerja Rp. 44,000.00 35,200.00 2.000 Hari Tukang kayu Rp. 60,000.00 120,000.00 0.200 Hari Kepala Tukang kayu Rp. 65,000.00 13,000.00 0.030 Hari Mandor Rp. 72,820.00 2,184.60 Jumlah (II) 170,384.60 Jumlah (I) + (II) 320,909.60 Over Head 15 % 48,136.44 Harga Satuan 369,046.04 F.10 1m 3 Memasang Konstruksi kuda-kuda Konvensional kayu II Bahan 1.1000 m3 Kayu Klas II Rp. 2,500,000.00 2,750,000.00 15.0000 Bh Begel Plat Rp. 3,500.00 52,500.00 5.6000 Kg Paku Rp. 17,500.00 98,000.00 Jumlah (I) 2,900,500.00 Tenaga 4.0000 Hari Pekerja Rp. 44,000.00 176,000.00 12.0000 Hari Tukang kayu Rp. 60,000.00 720,000.00 1.2000 Hari Kepala Tukang kayu Rp. 65,000.00 78,000.00 0.2000 Hari Mandor Rp. 72,820.00 14,564.00 Jumlah (II) 988,564.00 Jumlah (I) + (II) 3,889,064.00 Over Head 15 % 583,359.60 Harga Satuan 4,472,423.60
  • 8. No Sat Koepesien Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan F.11 1m 3 memasang Konstruksi kuda-kuda ekspose kayu klas II Bahan 1.200 m3 Kayu Klas II Rp. 2,500,000.00 3,000,000.00 15.000 Bh Begel Plat Rp. 3,500.00 52,500.00 5.600 Kg Paku Rp. 17,500.00 98,000.00 Jumlah (I) 3,150,500.00 Tenaga 6.000 Hari Pekerja Rp. 44,000.00 264,000.00 20.000 Hari Tukang kayu Rp. 60,000.00 1,200,000.00 2.000 Hari Kepala Tukang kayu Rp. 65,000.00 130,000.00 0.300 Hari Mandor Rp. 72,820.00 21,846.00 Jumlah (II) 1,615,846.00 Jumlah (I) + (II) 4,766,346.00 Over Head 15 % 714,951.90 Harga Satuan 5,481,297.90 F.12 1m3 Memasang Konstruksi gording kayu klas I Bahan 1.100 m³ Kayu Klas I Rp. 3,500,000.00 3,850,000.00 15.000 Bh Begel Plat Rp. 3,500.00 52,500.00 3.000 Kg Paku Rp. 17,500.00 52,500.00 Jumlah (I) 3,955,000.00 Tenaga 2.4000 Hari Pekerja Rp. 44,000.00 105,600.00 7.2000 Hari Tukang kayu Rp. 60,000.00 432,000.00 0.7200 Hari Kepala Tukang kayu Rp. 65,000.00 46,800.00 0.1200 Hari Mandor Rp. 72,820.00 8,738.40 Jumlah (II) 593,138.40 Jumlah (I) + (II) 4,548,138.40 Over Head 15 % 682,220.76 Harga Satuan 5,230,359.16 F.12a 1m 3 Memasang Konstruksi gording kayu klas II Bahan 1.100 m³ Kayu Klas I Rp. 2,500,000.00 2,750,000.00 15.000 Bh Begel Plat Rp. 3,500.00 52,500.00 3.000 Kg Paku Rp. 17,500.00 52,500.00 Jumlah (I) 2,855,000.00 Tenaga 2.4000 Hari Pekerja Rp. 44,000.00 105,600.00 7.2000 Hari Tukang kayu Rp. 60,000.00 432,000.00 0.7200 Hari Kepala Tukang Rp. 65,000.00 46,800.00 0.1200 Hari Mandor Rp. 72,820.00 8,738.40 Jumlah (II) 593,138.40 Jumlah (I) + (II) 3,448,138.40 Over Head 15 % 517,220.76 Harga Satuan 3,965,359.16
  • 9. No Sat Koepesien Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan F.13 1m 3 Memasang rangka atap multi roof usuk klas II dan reng kayu Klas I Bahan 0.014 m³ Kayu Klas II Rp. 2,500,000.00 35,000.00 0.009 m³ Kayu Klas I Rp. 3,500,000.00 31,500.00 1.200 kg Paku Rp. 17,500.00 21,000.00 Jumlah (I) 87,500.00 Tenaga 0.100 Hari Pekerja Rp. 44,000.00 4,400.00 0.100 Hari Tukang kayu Rp. 60,000.00 6,000.00 0.010 Hari Kepala Tukang Rp. 65,000.00 650.00 0.005 Hari Mandor Rp. 72,820.00 364.10 Jumlah (II) 11,414.10 Jumlah (I) + (II) 98,914.10 Over Head 15 % 14,837.12 Harga Satuan 113,751.22 F.14 1m3 Memasang rangka langit-langit (60x60) cm kayu klas II Bahan 0.016 m³ Kayu Klas II Rp. 2,500,000.00 40,000.00 0.250 Kg Paku Rp. 17,500.00 4,375.00 Jumlah (I) 44,375.00 Tenaga 0.200 Hari Pekerja Rp. 44,000.00 8,800.00 0.300 Hari Tukang kayu Rp. 60,000.00 18,000.00 0.030 Hari Kepala Tukang Rp. 65,000.00 1,950.00 0.010 Hari Mandor Rp. 72,820.00 728.20 Jumlah (II) 29,478.20 Jumlah (I) + (II) 73,853.20 Over Head 15 % 11,077.98 Harga Satuan 84,931.18 F.15 1m 2 Memasang listplang ukuran (2x20) cm, kayu klas I Bahan 0.011 m³ Kayu klas I Rp. 3,500,000.00 38,500.00 0.100 Kg Paku Rp. 17,500.00 1,750.00 Jumlah (I) 40,250.00 Tenaga 0.010 Oh Pekerja Rp. 44,000.00 440.00 0.200 Oh Tukang kayu Rp. 60,000.00 12,000.00 0.025 Oh Kepala Tukang Rp. 65,000.00 1,625.00 0.005 Oh Mandor Rp. 72,820.00 364.10 Jumlah (II) 14,429.10 Jumlah (I) + (II) 54,679.10 Over Head 15 % 8,201.87 Harga Satuan 62,880.97
  • 10. G. ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON (SNI DT 91-0008-2007) No Sat Koepesien Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan G.1 1 m 3 Membuat lantai kerja beton mutu (K100) stum (3-6) cm wc = 0,87 Bahan 230.000 Kg Semen Rp. 1,200.00 276,000.00 0.638 M³ Pasir Cor Rp. 80,000.00 51,040.00 0.761 M³ Kerikil Rp. 100,000.00 76,100.00 2.000 Ltr Air Kerja Rp. 250.00 500.00 Jumlah (I) 403,640.00 Tenaga 1.200 Hari Pekerja Rp. 44,000.00 52,800.00 0.200 Hari Tukang batu Rp. 60,000.00 12,000.00 0.020 Hari Kepala Tukang Batu Rp. 65,000.00 1,300.00 0.8800 Hari Mandor Rp. 72,820.00 64,081.60 Jumlah (II) 130,181.60 Jumlah (I) + (II) 533,821.60 Over Head 15 % 80,073.24 Harga Satuan 613,894.84 G.2 1 m 3 Membuat lantai kerja beton mutu Fc = 14,5 (K175) stum (12-2) cm wc = 0,66 Bahan 326.000 Kg Semen Rp. 1,200.00 391,200.00 0.543 m³ Pasir Cor Rp. 80,000.00 43,428.57 0.762 m³ Kerikil Rp. 100,000.00 76,222.22 215.000 liter Air Bersih Rp. 250.00 53,750.00 Jumlah (I) 564,600.79 Tenaga 1.650 Hari Pekerja Rp. 44,000.00 72,600.00 0.275 Hari Tukang batu Rp. 60,000.00 16,500.00 0.280 Hari Kepala Tukang Batu Rp. 65,000.00 18,200.00 0.8300 Hari Mandor Rp. 72,820.00 60,440.60 Jumlah (II) 167,740.60 Jumlah (I) + (II) 732,341.39 Over Head 15 % 109,851.21 Harga Satuan 842,192.60 G.3 1 m 3 Membuat lantai kerja beton mutu Fc = 16,9 (K200) stum (12-2) cm wc = 0,61 Bahan 352.000 Kg Semen Rp. 1,200.00 422,400.00 0.622 m³ Pasir Cor Rp. 80,000.00 49,760.00 0.754 m³ Kerikil Rp. 100,000.00 75,400.00 215.000 liter Air Bersih Rp. 250.00 53,750.00 Jumlah (I) 601,310.00 Tenaga 1.650 Hari Pekerja Rp. 44,000.00 72,600.00 0.275 Hari Tukang batu Rp. 60,000.00 16,500.00 0.280 Hari Kepala Tukang Batu Rp. 65,000.00 18,200.00 0.0830 Hari Mandor Rp. 72,820.00 6,044.06 Jumlah (II) 113,344.06 Jumlah (I) + (II) 714,654.06 Over Head 15 % 107,198.11 Harga Satuan 821,852.17 G.4 1 m 3 Membuat lantai kerja beton mutu Fc = 19,3 Mpa (K225) stum (12-2) cm wc = 0,58 Bahan 371.000 Kg Semen Rp. 1,200.00 445,200.00 0.499 m³ Pasir Cor Rp. 80,000.00 39,920.00 0.776 m³ Kerikil Rp. 100,000.00 77,600.00 215.000 liter Air Bersih Rp. 250.00 53,750.00 Jumlah (I) 616,470.00 Tenaga 1.650 Hari Pekerja Rp. 36,500.00 60,225.00 0.275 Hari Tukang batu Rp. 48,000.00 13,200.00 0.280 Hari Kepala Tukang Batu Rp. 52,500.00 14,700.00 0.083 Hari Mandor Rp. 58,000.00 4,814.00 Jumlah (II) 92,939.00 Jumlah (I) + (II) 709,409.00 Over Head 15 % 106,411.35 Harga Satuan 815,820.35 No Sat Koepesien
  • 11. Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan G.5 1 Kg Pembesian dengan besi polos atau besi ulir Bahan 1.050 Kg Besi beton Rp. 9,500.00 9,975.00 0.015 Kg Kawat Beton Rp. 17,500.00 262.50 Jumlah (I) 10,237.50 Tenaga 0.007 Hari Pekerja Rp. 44,000.00 308.00 0.007 Hari Tukang besi Rp. 60,000.00 420.00 0.007 Hari Kepala Tukang Besi Rp. 65,000.00 455.00 0.0040 Hari Mandor Rp. 72,820.00 291.28 Jumlah (II) 1,474.28 Jumlah (I) + (II) 11,711.78 Over Head 15 % 1,756.77 Harga Satuan 13,468.55 G.6 1 m 3 Membuat Pondasi Beton Bertulang (PI)=Besi +133,06 Kg Bahan 0.200 M³ Kayu klas III Rp. 1,750,000.00 350,000.00 1.500 Kg Paku Rp. 17,500.00 26,250.00 0.400 Ltr Minyak bekisting Rp. 3,500.00 1,400.00 73.902 Kg Besi Beton Rp. 9,500.00 702,069.00 2.250 Kg Kawat Beton Rp. 17,500.00 39,375.00 336.000 Kg Semen Rp. 1,200.00 403,200.00 0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00 0.810 M³ Krikil Rp. 100,000.00 81,000.00 Jumlah (I) 1,646,494.00 Tenaga 5.300 Hari Pekerja Rp. 44,000.00 233,200.00 0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00 1.300 Hari Tukang kayu Rp. 60,000.00 78,000.00 1.050 Hari Tukang Besi Rp. 60,000.00 63,000.00 0.262 Hari Kepala Tukang Besi Rp. 65,000.00 17,030.00 0.265 Hari Mandor Rp. 72,820.00 19,297.30 Jumlah (II) 427,027.30 Jumlah (I) + (II) 2,073,521.30 Over Head 15 % 311,028.20 Harga Satuan 2,384,549.50 G.6.a 1 m3 Membuat Pondasi Beton Bertulang (PI)=Besi +139,236 Kg Bahan 0.200 M³ Kayu klas III Rp. 1,750,000.00 350,000.00 1.500 Kg Paku Rp. 17,500.00 26,250.00 0.400 Ltr Minyak bekisting Rp. 3,500.00 1,400.00 139.236 Kg Besi Beton Rp. 9,500.00 1,322,742.00 2.250 Kg Kawat Beton Rp. 17,500.00 39,375.00 336.000 Kg Semen Rp. 1,200.00 403,200.00 0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00 0.810 M³ Krikil Rp. 100,000.00 81,000.00 Jumlah (I) 2,267,167.00 Tenaga 5.300 Hari Pekerja Rp. 44,000.00 233,200.00 0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00 1.300 Hari Tukang kayu Rp. 60,000.00 78,000.00 1.050 Hari Tukang Besi Rp. 60,000.00 63,000.00 0.262 Hari Kepala Tukang Besi Rp. 65,000.00 17,030.00 0.265 Hari Mandor Rp. 72,820.00 19,297.30 Jumlah (II) 427,027.30 Jumlah (I) + (II) 2,694,194.30 Over Head 15 % 404,129.15 Harga Satuan 3,098,323.45
  • 12. No Sat Koepesien Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan G.7.a 1 m 3 Membuat sloof Beton Bertulang 20/35 Besi = 190,316 Kg Bahan 0.267 M³ Kayu klas III Rp. 1,750,000.00 467,250.00 2.000 Kg Paku Rp. 17,500.00 35,000.00 0.600 Ltr Minyak bekisting Rp. 3,500.00 2,100.00 252.850 Kg Besi Beton Rp. 9,500.00 2,402,075.00 3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00 336.000 Kg Semen Rp. 1,200.00 403,200.00 0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00 0.810 M³ Krikil Rp. 100,000.00 81,000.00 Jumlah (I) 3,486,325.00 Tenaga 5.600 Hari Pekerja Rp. 44,000.00 246,400.00 0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00 1.560 Hari Tukang kayu Rp. 60,000.00 93,600.00 1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00 0.323 Hari Kepala Tukang Besi Rp. 65,000.00 20,995.00 0.283 Hari Mandor Rp. 72,820.00 20,608.06 Jumlah (II) 482,103.06 Jumlah (I) + (II) 3,968,428.06 Over Head 15 % 595,264.21 Harga Satuan 4,563,692.27 G.7.b 1 m 3 Membuat sloof Beton Bertulang 20/35 Besi = 243,389 Kg Bahan 0.267 M³ Kayu klas III Rp. 1,750,000.00 467,250.00 2.000 Kg Paku Rp. 17,500.00 35,000.00 0.600 Ltr Minyak bekisting Rp. 3,500.00 2,100.00 243.000 Kg Besi Beton Rp. 9,500.00 2,308,500.00 3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00 336.000 Kg Semen Rp. 1,200.00 403,200.00 0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00 0.810 M³ Krikil Rp. 100,000.00 81,000.00 Jumlah (I) 3,392,750.00 Tenaga 5.600 Hari Pekerja Rp. 44,000.00 246,400.00 0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00 1.560 Hari Tukang kayu Rp. 60,000.00 93,600.00 1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00 0.323 Hari Kepala Tukang Besi Rp. 65,000.00 20,995.00 0.283 Hari Mandor Rp. 72,820.00 20,608.06 Jumlah (II) 482,103.06 Jumlah (I) + (II) 3,874,853.06 Over Head 15 % 581,227.96 Harga Satuan 4,456,081.02
  • 13. No Sat Koepesien Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan G.7.c 1 m 3 Membuat sloof Beton Bertulang 15/20 Besi = 157,961 Kg Bahan 0.308 M³ Kayu klas III Rp. 1,750,000.00 539,000.00 2.000 Kg Paku Rp. 17,500.00 35,000.00 0.600 Ltr Minyak bekisting Rp. 3,500.00 2,100.00 157.961 Kg Besi Beton Rp. 9,500.00 1,500,629.50 3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00 336.000 Kg Semen Rp. 1,200.00 403,200.00 0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00 0.810 M³ Krikil Rp. 100,000.00 81,000.00 Jumlah (I) 2,656,629.50 Tenaga 5.650 Hari Pekerja Rp. 44,000.00 248,600.00 0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00 1.560 Hari Tukang kayu Rp. 60,000.00 93,600.00 1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00 0.323 Hari Kepala Tukang Besi Rp. 65,000.00 20,995.00 0.283 Hari Mandor Rp. 72,820.00 20,608.06 Jumlah (II) 484,303.06 Jumlah (I) + (II) 3,140,932.56 Over Head 15 % 471,139.88 Harga Satuan 3,612,072.44 G.7.d 1 m 3 Membuat sloof/ring balok/baok latai Beton Bertulang 10/15 279.88 Kg besi + bekesting Bahan 0.400 M³ Kayu klas III Rp. 1,750,000.00 700,000.00 2.000 Kg Paku Rp. 17,500.00 35,000.00 0.600 Ltr Minyak bekisting Rp. 3,500.00 2,100.00 279.890 Kg Besi Beton Rp. 9,500.00 2,658,955.00 3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00 336.000 Kg Semen Rp. 1,200.00 403,200.00 0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00 0.810 M³ Krikil Rp. 100,000.00 81,000.00 Jumlah (I) 3,975,955.00 Tenaga 5.650 Hari Pekerja Rp. 44,000.00 248,600.00 0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00 1.560 Hari Tukang kayu Rp. 60,000.00 93,600.00 1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00 0.323 Hari Kepala Tukang Besi Rp. 65,000.00 20,995.00 0.283 Hari Mandor Rp. 72,820.00 20,608.06 Jumlah (II) 484,303.06 Jumlah (I) + (II) 4,460,258.06 Over Head 15 % 669,038.71 Harga Satuan 5,129,296.77
  • 14. No Sat Koepesien Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan G.7.d1 1 m 3 Membuat sloof Beton Bertulang 20/30 132.43 kg Besi begisting Bahan 0.200 M³ Kayu klas III Rp. 1,750,000.00 350,000.00 2.000 Kg Paku Rp. 17,500.00 35,000.00 0.600 Ltr Minyak bekisting Rp. 3,500.00 2,100.00 252.850 Kg Besi Beton Rp. 9,500.00 2,402,075.00 3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00 336.000 Kg Semen Rp. 1,200.00 403,200.00 0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00 0.810 M³ Krikil Rp. 100,000.00 81,000.00 Jumlah (I) 3,369,075.00 Tenaga 5.650 Hari Pekerja Rp. 44,000.00 248,600.00 0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00 1.560 Hari Tukang kayu Rp. 60,000.00 93,600.00 1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00 0.323 Hari Kepala Tukang Besi Rp. 65,000.00 20,995.00 0.283 Hari Mandor Rp. 72,820.00 20,608.06 Jumlah (II) 484,303.06 Jumlah (I) + (II) 3,853,378.06 Over Head 15 % 578,006.71 Harga Satuan 4,431,384.77 G.8.b 1 m 3 Membuat kolom beton Bertulang 20/20 = 421.72 kg (lantai I) Bahan 0.250 M³ Kayu klas III Rp. 1,750,000.00 437,500.00 4.000 Kg Paku Rp. 17,500.00 70,000.00 2.000 Ltr Minyak bekisting Rp. 3,500.00 7,000.00 156.030 Kg Besi Beton Rp. 9,500.00 1,482,285.00 4.500 Kg Kawat Beton Rp. 17,500.00 78,750.00 336.000 Kg Semen Rp. 1,200.00 403,200.00 0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00 0.810 M³ Krikil Rp. 100,000.00 81,000.00 0.150 M³ Kayu klas II Rp. 2,500,000.00 375,000.00 3.600 Lbr triplek 9 mm Rp. 125,000.00 450,000.00 20.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 170,000.00 Jumlah (I) 3,597,935.00 Tenaga 7.050 Hari Pekerja Rp. 44,000.00 310,200.00 0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00 1.650 Hari Tukang kayu Rp. 60,000.00 99,000.00 2.100 Hari Tukang Besi Rp. 60,000.00 126,000.00 0.403 Hari Kepala Tukang Besi Rp. 65,000.00 26,195.00 0.353 Hari Mandor Rp. 72,820.00 25,705.46 Jumlah (II) 603,600.46 Jumlah (I) + (II) 4,201,535.46 Over Head 15 % 630,230.32 Harga Satuan 4,831,765.78
  • 15. No Sat Koepesien Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan G.8.c 1 m 3 Membuat kolom beton Bertulang 20/20 = 219.088 kg (lantai II) Bahan 0.200 M³ Kayu klas III Rp. 1,750,000.00 350,000.00 4.000 Kg Paku Rp. 17,500.00 70,000.00 2.000 Ltr Minyak bekisting Rp. 3,500.00 7,000.00 156.030 Kg Besi Beton Rp. 9,500.00 1,482,285.00 4.500 Kg Kawat Beton Rp. 17,500.00 78,750.00 336.000 Kg Semen Rp. 1,200.00 403,200.00 0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00 0.810 M³ Krikil Rp. 100,000.00 81,000.00 0.150 M³ Kayu klas II Rp. 2,500,000.00 375,000.00 3.500 Lbr triplek 9 mm Rp. 125,000.00 437,500.00 20.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 170,000.00 Jumlah (I) 3,497,935.00 Tenaga 7.050 Hari Pekerja Rp. 44,000.00 310,200.00 0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00 1.650 Hari Tukang kayu Rp. 60,000.00 99,000.00 2.100 Hari Tukang Besi Rp. 60,000.00 126,000.00 0.403 Hari Kepala Tukang Besi Rp. 65,000.00 26,195.00 0.353 Hari Mandor Rp. 72,820.00 25,705.46 Jumlah (II) 603,600.46 Jumlah (I) + (II) 4,101,535.46 Over Head 15 % 615,230.32 Harga Satuan 4,716,765.78 G.8.h 1 m3 Membuat kolom beton Bertulang 15/20 besi = 170.667 kg Bahan 0.400 M³ Kayu klas III Rp. 1,750,000.00 700,000.00 4.000 Kg Paku Rp. 17,500.00 70,000.00 2.000 Ltr Minyak bekisting Rp. 3,500.00 7,000.00 170.667 Kg Besi Beton Rp. 9,500.00 1,621,336.50 4.500 Kg Kawat Beton Rp. 17,500.00 78,750.00 336.000 Kg Semen Rp. 1,200.00 403,200.00 0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00 0.810 M³ Krikil Rp. 100,000.00 81,000.00 0.150 M³ Kayu klas II Rp. 2,500,000.00 375,000.00 3.500 Lbr triplek 9 mm Rp. 125,000.00 437,500.00 20.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 170,000.00 Jumlah (I) 3,986,986.50 Tenaga 7.050 Hari Pekerja Rp. 44,000.00 310,200.00 0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00 1.650 Hari Tukang kayu Rp. 60,000.00 99,000.00 2.100 Hari Tukang Besi Rp. 60,000.00 126,000.00 0.403 Hari Kepala Tukang Besi Rp. 65,000.00 26,195.00 0.353 Hari Mandor Rp. 72,820.00 25,705.46 Jumlah (II) 603,600.46 Jumlah (I) + (II) 4,590,586.96 Over Head 15 % 688,588.04 Harga Satuan 5,279,175.00
  • 16. No Sat Koepesien Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan G.8.j 1 m 3 Membuat kolom beton Bertulang 13/13 besi = 187.574 kg Bahan 0.267 M³ Kayu klas III Rp. 1,750,000.00 467,250.00 4.000 Kg Paku Rp. 17,500.00 70,000.00 2.000 Ltr Minyak bekisting Rp. 3,500.00 7,000.00 187.574 Kg Besi Beton Rp. 9,500.00 1,781,953.00 4.500 Kg Kawat Beton Rp. 17,500.00 78,750.00 336.000 Kg Semen Rp. 1,200.00 403,200.00 0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00 0.810 M³ Krikil Rp. 100,000.00 81,000.00 0.150 M³ Kayu klas II Rp. 2,500,000.00 375,000.00 5.340 Lbr triplek 9 mm Rp. 125,000.00 667,500.00 20.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 170,000.00 Jumlah (I) 4,144,853.00 Tenaga 7.050 Hari Pekerja Rp. 44,000.00 310,200.00 0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00 1.650 Hari Tukang kayu Rp. 60,000.00 99,000.00 2.100 Hari Tukang Besi Rp. 60,000.00 126,000.00 0.403 Hari Kepala Tukang Besi Rp. 65,000.00 26,195.00 0.353 Hari Mandor Rp. 72,820.00 25,705.46 Jumlah (II) 603,600.46 Jumlah (I) + (II) 4,748,453.46 Over Head 15 % 712,268.02 Harga Satuan 5,460,721.48 G.9.b 1 m3 Membuat balok beton bertulang 20/30 = 193.98 besi + begisting Bahan 0.167 M³ Kayu klas III Rp. 1,750,000.00 292,250.00 3.200 Kg Paku Rp. 17,500.00 56,000.00 1.600 Ltr Minyak bekisting Rp. 3,500.00 5,600.00 193.977 Kg Besi Beton Rp. 9,500.00 1,842,781.50 3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00 336.000 Kg Semen Rp. 1,200.00 403,200.00 0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00 0.810 M³ Krikil Rp. 100,000.00 81,000.00 0.140 M³ Kayu klas II Rp. 2,500,000.00 350,000.00 2.800 Lbr triplek 9 mm Rp. 125,000.00 350,000.00 16.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 136,000.00 Jumlah (I) 3,612,531.50 Tenaga 6.350 Hari Pekerja Rp. 44,000.00 279,400.00 0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00 1.650 Hari Tukang kayu Rp. 60,000.00 99,000.00 1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00 0.333 Hari Kepala Tukang Besi Rp. 65,000.00 21,645.00 0.318 Hari Mandor Rp. 72,820.00 23,156.76 Jumlah (II) 523,701.76 Jumlah (I) + (II) 4,136,233.26 Over Head 15 % 620,434.99 Harga Satuan 4,756,668.25
  • 17. No Sat Koepesien Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan G.9.c 1 m 3 Membuat balok beton bertulang 13/30 = 169.94 besi + begisting Bahan 0.167 M³ Kayu klas III Rp. 1,750,000.00 292,250.00 3.200 Kg Paku Rp. 17,500.00 56,000.00 1.600 Ltr Minyak bekisting Rp. 3,500.00 5,600.00 169.940 Kg Besi Beton Rp. 9,500.00 1,614,430.00 3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00 336.000 Kg Semen Rp. 1,200.00 403,200.00 0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00 0.810 M³ Krikil Rp. 100,000.00 81,000.00 0.140 M³ Kayu klas II Rp. 2,500,000.00 350,000.00 2.800 Lbr triplek 9 mm Rp. 125,000.00 350,000.00 16.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 136,000.00 Jumlah (I) 3,384,180.00 Tenaga 6.350 Hari Pekerja Rp. 44,000.00 279,400.00 0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00 1.650 Hari Tukang kayu Rp. 60,000.00 99,000.00 1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00 0.333 Hari Kepala Tukang Besi Rp. 65,000.00 21,645.00 0.318 Hari Mandor Rp. 72,820.00 23,156.76 Jumlah (II) 523,701.76 Jumlah (I) + (II) 3,907,881.76 Over Head 15 % 586,182.26 Harga Satuan 4,494,064.02 G.9.d 1 m3 Membuat balok beton bertulang 13/80 = 132.05 besi + begisting Bahan 0.500 M³ Kayu klas III Rp. 1,750,000.00 875,000.00 3.200 Kg Paku Rp. 17,500.00 56,000.00 1.600 Ltr Minyak bekisting Rp. 3,500.00 5,600.00 132.053 Kg Besi Beton Rp. 9,500.00 1,254,503.50 3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00 336.000 Kg Semen Rp. 1,200.00 403,200.00 0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00 0.810 M³ Krikil Rp. 100,000.00 81,000.00 0.140 M³ Kayu klas II Rp. 2,500,000.00 350,000.00 2.800 Lbr triplek 9 mm Rp. 125,000.00 350,000.00 16.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 136,000.00 Jumlah (I) 3,607,003.50 Tenaga 6.350 Hari Pekerja Rp. 44,000.00 279,400.00 0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00 1.650 Hari Tukang kayu Rp. 60,000.00 99,000.00 1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00 0.333 Hari Kepala Tukang Besi Rp. 65,000.00 21,645.00 0.318 Hari Mandor Rp. 72,820.00 23,156.76 Jumlah (II) 523,701.76 Jumlah (I) + (II) 4,130,705.26 Over Head 15 % 619,605.79 Harga Satuan 4,750,311.05
  • 18. No Sat Koepesien Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan G.9.e 1 m 3 Membuat balok beton bertulang 25/40 = 202.72 besi + begisting Bahan 0.200 M³ Kayu klas III Rp. 1,750,000.00 350,000.00 3.200 Kg Paku Rp. 17,500.00 56,000.00 1.600 Ltr Minyak bekisting Rp. 3,500.00 5,600.00 202.720 Kg Besi Beton Rp. 9,500.00 1,925,840.00 3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00 336.000 Kg Semen Rp. 1,200.00 403,200.00 0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00 0.810 M³ Krikil Rp. 100,000.00 81,000.00 0.140 M³ Kayu klas II Rp. 2,500,000.00 350,000.00 2.800 Lbr triplek 9 mm Rp. 125,000.00 350,000.00 16.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 136,000.00 Jumlah (I) 3,753,340.00 Tenaga 6.350 Hari Pekerja Rp. 44,000.00 279,400.00 0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00 1.650 Hari Tukang kayu Rp. 60,000.00 99,000.00 1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00 0.333 Hari Kepala Tukang Besi Rp. 65,000.00 21,645.00 0.318 Hari Mandor Rp. 72,820.00 23,156.76 Jumlah (II) 523,701.76 Jumlah (I) + (II) 4,277,041.76 Over Head 15 % 641,556.26 Harga Satuan 4,918,598.02 G.9.f 1 m3 Membuat balok beton bertulang 25/50 = 240.76kg besi + begisting Bahan 0.200 M³ Kayu klas III Rp. 1,750,000.00 350,000.00 3.200 Kg Paku Rp. 17,500.00 56,000.00 1.600 Ltr Minyak bekisting Rp. 3,500.00 5,600.00 240.760 Kg Besi Beton Rp. 9,500.00 2,287,220.00 3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00 336.000 Kg Semen Rp. 1,200.00 403,200.00 0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00 0.810 M³ Krikil Rp. 100,000.00 81,000.00 0.140 M³ Kayu klas II Rp. 2,500,000.00 350,000.00 2.800 Lbr triplek 9 mm Rp. 125,000.00 350,000.00 16.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 136,000.00 Jumlah (I) 4,114,720.00 Tenaga 6.350 Hari Pekerja Rp. 44,000.00 279,400.00 0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00 1.650 Hari Tukang kayu Rp. 60,000.00 99,000.00 1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00 0.333 Hari Kepala Tukang Besi Rp. 65,000.00 21,645.00 0.318 Hari Mandor Rp. 72,820.00 23,156.76 Jumlah (II) 523,701.76 Jumlah (I) + (II) 4,638,421.76 Over Head 15 % 695,763.26 Harga Satuan 5,334,185.02
  • 19. No Sat Koepesien Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan G.9.h 1 m 3 Membuat balok beton bertulang 20/30 = 238.19 besi + begisting Bahan 0.250 M³ Kayu klas III Rp. 1,750,000.00 437,500.00 3.200 Kg Paku Rp. 17,500.00 56,000.00 1.600 Ltr Minyak bekisting Rp. 3,500.00 5,600.00 238.190 Kg Besi Beton Rp. 9,500.00 2,262,805.00 3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00 336.000 Kg Semen Rp. 1,200.00 403,200.00 0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00 0.810 M³ Krikil Rp. 100,000.00 81,000.00 0.140 M³ Kayu klas II Rp. 2,500,000.00 350,000.00 2.800 Lbr triplek 9 mm Rp. 125,000.00 350,000.00 16.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 136,000.00 Jumlah (I) 4,177,805.00 Tenaga 6.350 Hari Pekerja Rp. 44,000.00 279,400.00 0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00 1.650 Hari Tukang kayu Rp. 60,000.00 99,000.00 1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00 0.333 Hari Kepala Tukang Besi Rp. 65,000.00 21,645.00 0.318 Hari Mandor Rp. 72,820.00 23,156.76 Jumlah (II) 523,701.76 Jumlah (I) + (II) 4,701,506.76 Over Head 15 % 705,226.01 Harga Satuan 5,406,732.77 G.10 1 m3 Membuat kolom praktis (10/10) cm Bahan 0.008 M³ Kayu klas III Rp. 1,750,000.00 14,000.00 0.010 Kg Paku Rp. 17,500.00 175.00 2.689 Kg Besi Beton Rp. 9,500.00 25,545.50 0.450 Kg Kawat Beton Rp. 17,500.00 7,875.00 336.000 Kg Semen Rp. 1,200.00 403,200.00 0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00 0.810 M³ Krikil Rp. 100,000.00 81,000.00 0.140 M³ Kayu klas II Rp. 2,500,000.00 350,000.00 2.800 Lbr triplek 9 mm Rp. 2,500,000.00 7,000,000.00 16.000 Btg Kayu dolken O 10 - 4m Rp. 125,000.00 2,000,000.00 Jumlah (I) 924,995.50 Tenaga 6.350 Hari Pekerja Rp. 44,000.00 279,400.00 0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00 1.650 Hari Tukang kayu Rp. 60,000.00 99,000.00 0.020 Hari Tukang Besi Rp. 60,000.00 1,200.00 0.006 Hari Kepala Tukang Besi Rp. 65,000.00 390.00 0.003 Hari Mandor Rp. 72,820.00 218.46 Jumlah (II) 396,708.46 Jumlah (I) + (II) 1,321,703.96 Over Head 15 % 198,255.59 Harga Satuan 1,519,959.55
  • 20. No Sat Koepesien Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan G.11 1 m 3 Membuat balok beton bertulang (10/15) cm Bahan 0.385 M³ Kayu klas III Rp. 1,750,000.00 673,750.00 3.200 Kg Paku Rp. 17,500.00 56,000.00 1.600 Ltr Minyak bekisting Rp. 3,500.00 5,600.00 207.619 Kg Besi Beton Rp. 9,500.00 1,972,380.50 3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00 336.000 Kg Semen Rp. 1,200.00 403,200.00 0.540 M³ Pasir Cor Rp. 80,000.00 43,200.00 0.810 M³ Krikil Rp. 100,000.00 81,000.00 0.140 M³ Kayu klas II Rp. 2,500,000.00 350,000.00 8.940 Lbr triplek 9 mm Rp. 125,000.00 1,117,500.00 16.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 136,000.00 Jumlah (I) 4,891,130.50 Tenaga 6.350 Hari Pekerja Rp. 44,000.00 279,400.00 0.275 Hari Tukang Batu Rp. 60,000.00 16,500.00 1.650 Hari Tukang kayu Rp. 60,000.00 99,000.00 1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00 0.333 Hari Kepala Tukang Besi Rp. 65,000.00 21,645.00 0.318 Hari Mandor Rp. 72,820.00 23,156.76 Jumlah (II) 523,701.76 Jumlah (I) + (II) 5,414,832.26 Over Head 15 % 812,224.84 Harga Satuan 6,227,057.10 G.12a 1 m3 Membuat lantai beton bertulang tebal 12 cm 162.252 kg besi + begisting Bahan 0.250 M³ Kayu klas III Rp. 1,750,000.00 437,500.00 3.200 Kg Paku Rp. 17,500.00 56,000.00 1.600 Ltr Minyak bekisting Rp. 3,500.00 5,600.00 162.252 Kg Besi Beton Rp. 9,500.00 1,541,394.00 2.500 Kg Kawat Beton Rp. 17,500.00 43,750.00 323.000 Kg Semen Rp. 1,200.00 387,600.00 0.520 M³ Pasir Cor Rp. 80,000.00 41,600.00 0.780 M³ Krikil Rp. 100,000.00 78,000.00 0.120 M³ Kayu klas II Rp. 2,500,000.00 300,000.00 2.800 Lbr triplek 9 mm Rp. 125,000.00 350,000.00 32.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 272,000.00 Jumlah (I) 3,513,444.00 Tenaga 5.800 Hari Pekerja Rp. 44,000.00 255,200.00 0.350 Hari Tukang Batu Rp. 60,000.00 21,000.00 2.800 Hari Tukang kayu Rp. 60,000.00 168,000.00 1.050 Hari Tukang Besi Rp. 60,000.00 63,000.00 0.420 Hari Kepala Tukang Besi Rp. 65,000.00 27,300.00 0.185 Hari Mandor Rp. 72,820.00 13,471.70 Jumlah (II) 547,971.70 Jumlah (I) + (II) 4,061,415.70 Over Head 15 % 609,212.36 Harga Satuan 4,670,628.06
  • 21. No Sat Koepesien Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan G.12b 1 m 3 Membuat lantai beton bertulang tebal 10 cm 181.49 kg besi + begisting Bahan 0.300 M³ Kayu klas III Rp. 1,750,000.00 525,000.00 3.200 Kg Paku Rp. 17,500.00 56,000.00 1.600 Ltr Minyak bekisting Rp. 3,500.00 5,600.00 181.490 Kg Besi Beton Rp. 9,500.00 1,724,155.00 2.500 Kg Kawat Beton Rp. 17,500.00 43,750.00 323.000 Kg Semen Rp. 1,200.00 387,600.00 0.520 M³ Pasir Cor Rp. 80,000.00 41,600.00 0.780 M³ Krikil Rp. 100,000.00 78,000.00 0.120 M³ Kayu klas II Rp. 2,500,000.00 300,000.00 2.800 Lbr triplek 9 mm Rp. 125,000.00 350,000.00 32.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 272,000.00 Jumlah (I) 3,783,705.00 Tenaga 5.800 Hari Pekerja Rp. 44,000.00 255,200.00 0.350 Hari Tukang Batu Rp. 60,000.00 21,000.00 2.800 Hari Tukang kayu Rp. 60,000.00 168,000.00 1.050 Hari Tukang Besi Rp. 60,000.00 63,000.00 0.420 Hari Kepala Tukang Besi Rp. 65,000.00 27,300.00 0.185 Hari Mandor Rp. 72,820.00 13,471.70 Jumlah (II) 547,971.70 Jumlah (I) + (II) 4,331,676.70 Over Head 15 % 649,751.51 Harga Satuan 4,981,428.21 G.12c 1 m3 Membuat lantai beton bertulang tebal 15 cm 241.51 kg besi + begisting Bahan 0.200 M³ Kayu klas III Rp. 1,750,000.00 350,000.00 3.200 Kg Paku Rp. 17,500.00 56,000.00 1.600 Ltr Minyak bekisting Rp. 3,500.00 5,600.00 241.515 Kg Besi Beton Rp. 9,500.00 2,294,392.50 2.250 Kg Kawat Beton Rp. 17,500.00 39,375.00 323.000 Kg Semen Rp. 1,200.00 387,600.00 0.520 M³ Pasir Cor Rp. 80,000.00 41,600.00 0.780 M³ Krikil Rp. 100,000.00 78,000.00 0.120 M³ Kayu klas II Rp. 2,500,000.00 300,000.00 2.800 Lbr triplek 9 mm Rp. 125,000.00 350,000.00 32.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 272,000.00 Jumlah (I) 4,174,567.50 Tenaga 5.800 Hari Pekerja Rp. 44,000.00 255,200.00 0.350 Hari Tukang Batu Rp. 60,000.00 21,000.00 2.800 Hari Tukang kayu Rp. 60,000.00 168,000.00 1.050 Hari Tukang Besi Rp. 60,000.00 63,000.00 0.420 Hari Kepala Tukang Besi Rp. 65,000.00 27,300.00 0.185 Hari Mandor Rp. 72,820.00 13,471.70 Jumlah (II) 547,971.70 Jumlah (I) + (II) 4,722,539.20 Over Head 15 % 708,380.88 Harga Satuan 5,430,920.08
  • 22. No Sat Koepesien Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan G.12d 1 m 3 Membuat lantai beton bertulang tebal 20 cm 181.14 kg besi + begisting Bahan 0.150 M³ Kayu klas III Rp. 1,750,000.00 262,500.00 3.200 Kg Paku Rp. 17,500.00 56,000.00 1.600 Ltr Minyak bekisting Rp. 3,500.00 5,600.00 181.140 Kg Besi Beton Rp. 9,500.00 1,720,830.00 2.250 Kg Kawat Beton Rp. 17,500.00 39,375.00 323.000 Kg Semen Rp. 1,200.00 387,600.00 0.520 M³ Pasir Cor Rp. 80,000.00 41,600.00 0.780 M³ Krikil Rp. 100,000.00 78,000.00 0.120 M³ Kayu klas II Rp. 2,500,000.00 300,000.00 2.800 Lbr triplek 9 mm Rp. 125,000.00 350,000.00 32.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 272,000.00 Jumlah (I) 3,513,505.00 Tenaga 5.800 Hari Pekerja Rp. 44,000.00 255,200.00 0.350 Hari Tukang Batu Rp. 60,000.00 21,000.00 2.800 Hari Tukang kayu Rp. 60,000.00 168,000.00 1.050 Hari Tukang Besi Rp. 60,000.00 63,000.00 0.420 Hari Kepala Tukang Besi Rp. 65,000.00 27,300.00 0.185 Hari Mandor Rp. 72,820.00 13,471.70 Jumlah (II) 547,971.70 Jumlah (I) + (II) 4,061,476.70 Over Head 15 % 609,221.51 Harga Satuan 4,670,698.21 G.14a 1 m3 Membuat lantai rabat beton bertulang tebal 10 cm 181.49 kg besi + begisting Bahan 53.303 Kg Besi Beton Rp. 9,500.00 506,378.50 2.250 Kg Kawat Beton Rp. 17,500.00 39,375.00 323.000 Kg Semen Rp. 1,200.00 387,600.00 0.520 M³ Pasir Cor Rp. 80,000.00 41,600.00 0.780 M³ Krikil Rp. 100,000.00 78,000.00 0.120 M³ Kayu klas II Rp. 2,500,000.00 300,000.00 2.800 Lbr triplek 9 mm Rp. 125,000.00 350,000.00 32.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 272,000.00 Jumlah (I) 1,974,953.50 Tenaga 5.800 Hari Pekerja Rp. 44,000.00 255,200.00 0.350 Hari Tukang Batu Rp. 60,000.00 21,000.00 2.800 Hari Tukang kayu Rp. 60,000.00 168,000.00 1.050 Hari Tukang Besi Rp. 60,000.00 63,000.00 0.420 Hari Kepala Tukang Besi Rp. 65,000.00 27,300.00 0.185 Hari Mandor Rp. 72,820.00 13,471.70 Jumlah (II) 547,971.70 Jumlah (I) + (II) 2,522,925.20 Over Head 15 % 0.00 Harga Satuan 2,522,925.20
  • 23. No Sat Koepesien Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan G.14b 1 m 3 Membuat lantai rabat beton bertulang tebal 12 cm 162.252 kg besi + begisting Bahan 83.266 Kg Besi Beton Rp. 9,500.00 791,027.00 2.250 Kg Kawat Beton Rp. 17,500.00 39,375.00 323.000 Kg Semen Rp. 1,200.00 387,600.00 0.520 M³ Pasir Cor Rp. 80,000.00 41,600.00 0.780 M³ Krikil Rp. 100,000.00 78,000.00 Jumlah (I) 1,337,602.00 Tenaga 5.800 Hari Pekerja Rp. 44,000.00 255,200.00 0.350 Hari Tukang Batu Rp. 60,000.00 21,000.00 1.050 Hari Tukang Besi Rp. 60,000.00 63,000.00 0.420 Hari Kepala Tukang Besi Rp. 65,000.00 27,300.00 0.185 Hari Mandor Rp. 72,820.00 13,471.70 Jumlah (II) 379,971.70 Jumlah (I) + (II) 1,717,573.70 Over Head 15 % 257,636.06 Harga Satuan 1,975,209.76 G.12f 1 m 3 Membuat plat topian tebal 8 cm 150.62 kg besi + begisting Bahan 0.375 M³ Kayu klas III Rp. 1,750,000.00 656,250.00 3.200 Kg Paku Rp. 17,500.00 56,000.00 1.600 Ltr Minyak bekisting Rp. 3,500.00 5,600.00 150.622 Kg Besi Beton Rp. 9,500.00 1,430,909.00 2.500 Kg Kawat Beton Rp. 17,500.00 43,750.00 323.000 Kg Semen Rp. 1,200.00 387,600.00 0.520 M³ Pasir Cor Rp. 80,000.00 41,600.00 0.780 M³ Krikil Rp. 100,000.00 78,000.00 0.120 M³ Kayu klas II Rp. 2,500,000.00 300,000.00 4.340 Lbr triplek 9 mm Rp. 125,000.00 542,500.00 32.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 272,000.00 Jumlah (I) 3,814,209.00 Tenaga 5.800 Hari Pekerja Rp. 44,000.00 255,200.00 0.350 Hari Tukang Batu Rp. 60,000.00 21,000.00 2.800 Hari Tukang kayu Rp. 60,000.00 168,000.00 1.050 Hari Tukang Besi Rp. 60,000.00 63,000.00 0.420 Hari Kepala Tukang Besi Rp. 65,000.00 27,300.00 0.185 Hari Mandor Rp. 72,820.00 13,471.70 Jumlah (II) 547,971.70 Jumlah (I) + (II) 4,362,180.70 Over Head 15 % 654,327.11 Harga Satuan 5,016,507.81
  • 24. No Sat Koepesien Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan G.12g 1 m 3 Membuat beton Lisplank tebal 7/50 cm 139.16 kg besi + begisting Bahan 0.375 M³ Kayu klas III Rp. 1,750,000.00 656,250.00 3.200 Kg Paku Rp. 17,500.00 56,000.00 1.600 Ltr Minyak bekisting Rp. 3,500.00 5,600.00 150.622 Kg Besi Beton Rp. 9,500.00 1,430,909.00 2.250 Kg Kawat Beton Rp. 17,500.00 39,375.00 323.000 Kg Semen Rp. 1,200.00 387,600.00 0.520 M³ Pasir Cor Rp. 80,000.00 41,600.00 0.780 M³ Krikil Rp. 100,000.00 78,000.00 0.120 M³ Kayu klas II Rp. 2,500,000.00 300,000.00 9.920 Lbr triplek 9 mm Rp. 125,000.00 1,240,000.00 32.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 272,000.00 Jumlah (I) 4,507,334.00 Tenaga 5.800 Hari Pekerja Rp. 44,000.00 255,200.00 0.350 Hari Tukang Batu Rp. 60,000.00 21,000.00 2.800 Hari Tukang kayu Rp. 60,000.00 168,000.00 1.050 Hari Tukang Besi Rp. 60,000.00 63,000.00 0.420 Hari Kepala Tukang Besi Rp. 65,000.00 27,300.00 0.185 Hari Mandor Rp. 72,820.00 13,471.70 Jumlah (II) 547,971.70 Jumlah (I) + (II) 5,055,305.70 Over Head 15 % 758,295.86 Harga Satuan 5,813,601.56 G.13b 1 m3 Membuat Foot beton bertulang 150 x150 139.16 Kg besi + Begisting Bahan 0.120 M³ Kayu klas III Rp. 1,750,000.00 210,000.00 3.000 Kg Paku Rp. 17,500.00 52,500.00 1.200 Ltr Minyak bekisting Rp. 3,500.00 4,200.00 139.160 Kg Besi Beton Rp. 9,500.00 1,322,020.00 3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00 323.000 Kg Semen Rp. 1,200.00 387,600.00 0.520 M³ Pasir Cor Rp. 80,000.00 41,600.00 0.780 M³ Krikil Rp. 100,000.00 78,000.00 0.105 M³ Kayu klas II Rp. 2,500,000.00 262,500.00 2.500 Lbr triplek 9 mm Rp. 125,000.00 312,500.00 14.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 119,000.00 Jumlah (I) 2,842,420.00 Tenaga 5.800 Hari Pekerja Rp. 44,000.00 255,200.00 0.350 Hari Tukang Batu Rp. 60,000.00 21,000.00 2.300 Hari Tukang kayu Rp. 60,000.00 138,000.00 1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00 0.405 Hari Kepala Tukang Besi Rp. 65,000.00 26,325.00 0.202 Hari Mandor Rp. 72,820.00 14,709.64 Jumlah (II) 539,234.64 Jumlah (I) + (II) 3,381,654.64 Over Head 15 % 507,248.20 Harga Satuan 3,888,902.84
  • 25. No Sat Koepesien Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan G.13c 1 m 3 Membuat Foot beton bertulang 120 x120 155.43 Kg besi + Begisting Bahan 0.120 M³ Kayu klas III Rp. 1,750,000.00 210,000.00 3.000 Kg Paku Rp. 17,500.00 52,500.00 1.200 Ltr Minyak bekisting Rp. 3,500.00 4,200.00 155.430 Kg Besi Beton Rp. 9,500.00 1,476,585.00 3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00 323.000 Kg Semen Rp. 1,200.00 387,600.00 0.520 M³ Pasir Cor Rp. 80,000.00 41,600.00 0.780 M³ Krikil Rp. 100,000.00 78,000.00 0.105 M³ Kayu klas II Rp. 2,500,000.00 262,500.00 2.500 Lbr triplek 9 mm Rp. 125,000.00 312,500.00 14.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 119,000.00 Jumlah (I) 2,996,985.00 Tenaga 5.800 Hari Pekerja Rp. 44,000.00 255,200.00 0.350 Hari Tukang Batu Rp. 60,000.00 21,000.00 2.300 Hari Tukang kayu Rp. 60,000.00 138,000.00 1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00 0.405 Hari Kepala Tukang Besi Rp. 65,000.00 26,325.00 0.202 Hari Mandor Rp. 72,820.00 14,709.64 Jumlah (II) 539,234.64 Jumlah (I) + (II) 3,536,219.64 Over Head 15 % 530,432.95 Harga Satuan 4,066,652.59 G.13d 1 m3 Membuat Foot beton bertulang 100 x100 158.88 Kg besi + Begisting Bahan 0.120 M³ Kayu klas III Rp. 1,750,000.00 210,000.00 3.000 Kg Paku Rp. 17,500.00 52,500.00 1.200 Ltr Minyak bekisting Rp. 3,500.00 4,200.00 158.880 Kg Besi Beton Rp. 9,500.00 1,509,360.00 3.000 Kg Kawat Beton Rp. 17,500.00 52,500.00 323.000 Kg Semen Rp. 1,200.00 387,600.00 0.520 M³ Pasir Cor Rp. 80,000.00 41,600.00 0.780 M³ Krikil Rp. 100,000.00 78,000.00 0.105 M³ Kayu klas II Rp. 2,500,000.00 262,500.00 2.500 Lbr triplek 9 mm Rp. 125,000.00 312,500.00 14.000 Btg Kayu dolken O 10 - 4m Rp. 8,500.00 119,000.00 Jumlah (I) 3,029,760.00 Tenaga 5.800 Hari Pekerja Rp. 44,000.00 255,200.00 0.350 Hari Tukang Batu Rp. 60,000.00 21,000.00 2.300 Hari Tukang kayu Rp. 60,000.00 138,000.00 1.400 Hari Tukang Besi Rp. 60,000.00 84,000.00 0.405 Hari Kepala Tukang Besi Rp. 65,000.00 26,325.00 0.202 Hari Mandor Rp. 72,820.00 14,709.64 Jumlah (II) 539,234.64 Jumlah (I) + (II) 3,568,994.64 Over Head 15 % 535,349.20 Harga Satuan 4,104,343.84
  • 26. H. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP ATAP ( SNI DT - 91 - 0011 - 2007) No Sat Koepesien Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan H.3 1 m2 Pasang Usuk reng genteng Pejaten/Kayu klas II Bahan 0.012 M³ Kayu Klas II Rp. 2,500,000.00 30,000.00 0.150 Kg Paku Rp. 17,500.00 2,625.00 Jumlah (I) 32,625.00 Tenaga 0.100 Hari Pekerja Rp. 44,000.00 4,400.00 0.100 Hari Tukang kayu Rp. 60,000.00 6,000.00 0.010 Hari Kepala Tukang kayu Rp. 65,000.00 650.00 0.005 Hari Mandor Rp. 72,820.00 364.10 Jumlah (II) 11,414.10 Jumlah (I) + (II) 44,039.10 Over Head 15 % 6,605.87 Harga Satuan 50,644.97 H.4 1 m2 Pasang Nok Atap Spandek Bahan 1.100 M2 Kayu Klas II Rp. 2,500,000.00 2,750,000.00 0.001 Bh Mesin Bor Rp. 17,000.00 17.00 6.000 Bh Paku Skrup Rp. 350.00 2,100.00 1.500 Kwh Listrik Rp. 200.00 300.00 Jumlah (I) 2,750,017.00 Tenaga 2.000 Hari Pekerja Rp. 44,000.00 88,000.00 0.200 Hari Tukang kayu Rp. 60,000.00 12,000.00 0.020 Hari Kepala Tukang kayu Rp. 65,000.00 1,300.00 0.005 Hari Mandor Rp. 72,820.00 364.10 Jumlah (II) 101,664.10 Jumlah (I) + (II) 2,851,681.10 Over Head 15 % 427,752.17 Harga Satuan 3,279,433.27 H.5 1 m Talang Bahan 0.500 Lbr Seng Talang Rp. 55,000.00 27,500.00 0.015 Kg Paku Rp. 17,500.00 262.50 0.010 M3 Papan kayu Klas II Rp. 2,500,000.00 25,000.00 0.250 Kg Meni Besi Rp. 22,500.00 5,625.00 Jumlah (I) 27,762.50 Tenaga 0.150 Hari Pekerja Rp. 44,000.00 6,600.00 0.400 Hari Tukang kayu Rp. 60,000.00 24,000.00 0.025 Hari Kepala Tukang kayu Rp. 65,000.00 1,625.00 0.001 Hari Mandor Rp. 72,820.00 72.82 Jumlah (II) 32,297.82 Jumlah (I) + (II) 60,060.32 Over Head 15 % 9,009.05 Harga Satuan 69,069.37
  • 27. No Sat Koepesien Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan H.6 1 m2 Pasang Atap genteng Lokal Bahan 22.000 Lbr Genteng lokal Rp. 1,000.00 22,000.00 Jumlah (I) 22,000.00 Tenaga 0.015 Hari Pekerja Rp. 44,000.00 660.00 0.075 Hari Tukang kayu Rp. 60,000.00 4,500.00 0.008 Hari Kepala Tukang kayu Rp. 65,000.00 520.00 0.001 Hari Mandor Rp. 72,820.00 72.82 Jumlah (II) 5,752.82 Jumlah (I) + (II) 27,752.82 Over Head 15 % 4,162.92 Harga Satuan 31,915.74 H.7 1 m2 Pasang Atap genteng Metal Multi Roof Bahan 1.000 Lbr Genteng Multiroof Rp. 97,500.00 97,500.00 5.000 Bh Paku Piles Rp. 350.00 1,750.00 Jumlah (I) 97,500.00 Tenaga 0.015 Hari Pekerja Rp. 44,000.00 660.00 0.075 Hari Tukang kayu Rp. 60,000.00 4,500.00 0.008 Hari Kepala Tukang kayu Rp. 65,000.00 520.00 0.008 Hari Mandor Rp. 72,820.00 582.56 Jumlah (II) 6,262.56 Jumlah (I) + (II) 103,762.56 Over Head 15 % 15,564.38 Harga Satuan 119,326.94 H.8 1 m2 Pasang Atap genteng Sirap Bahan 21.000 bh Genteng Sirap Rp. 2,000.00 42,000.00 Jumlah (I) 42,000.00 Tenaga 0.120 Hari Pekerja Rp. 44,000.00 5,280.00 0.070 Hari Tukang kayu Rp. 60,000.00 4,200.00 0.020 Hari Kepala Tukang kayu Rp. 65,000.00 1,300.00 Jumlah (II) 10,780.00 Jumlah (I) + (II) 52,780.00 Over Head 15 % 7,917.00 Harga Satuan 60,697.00 H. ANALISA BIAYA KONSTRUKSI PEKERJAAN LANGIT-LANGIT ( SNI DT - 91 - 0011 - 2007) I.1 1 m2 Memasang langit-langit Gymsum Bord Bahan 0.364 Lbr Gypsum boardt Rp. 85,000.00 30,940.00 0.111 Kg Paku Rp. 17,500.00 1,942.50 Jumlah (I) 32,882.50 Tenaga 0.100 Hari Pekerja Rp. 44,000.00 4,400.00 0.050 Hari Tukang kayu Rp. 60,000.00 3,000.00 0.005 Hari Kepala Tukang kayu Rp. 65,000.00 325.00 0.005 Hari Mandor Rp. 72,820.00 364.10 Jumlah (II) 8,089.10 Jumlah (I) + (II) 40,971.60 Over Head 15 % 6,145.74 Harga Satuan 47,117.34
  • 28. No Sat Koepesien Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan I.1.1 1 m2 Pasang Plapond Kalsibord Bahan 0.364 Lbr Kalsilboard 4.5 Rp. 75,000.00 27,300.00 0.111 Kg Paku Rp. 17,500.00 1,942.50 Jumlah (I) 29,242.50 Tenaga 0.100 Hari Pekerja Rp. 44,000.00 4,400.00 0.050 Hari Tukang kayu Rp. 60,000.00 3,000.00 0.005 Hari Kepala Tukang kayu Rp. 65,000.00 325.00 0.005 Hari Mandor Rp. 72,820.00 364.10 Jumlah (II) 8,089.10 Jumlah (I) + (II) 37,331.60 Over Head 15 % 5,599.74 Harga Satuan 42,931.34 I.2a 1 m Memasang langit-langit Gymsum C7 Bahan 1.100 m1 List Plapond Gypsum Kalsiboard C7 Rp. 17,500.00 19,250.00 0.010 Kg Paku Rp. 17,500.00 175.00 Jumlah (I) 19,425.00 Tenaga 0.050 Hari Pekerja Rp. 44,000.00 2,200.00 0.050 Hari Tukang kayu Rp. 60,000.00 3,000.00 0.005 Hari Kepala Tukang kayu Rp. 65,000.00 325.00 0.003 Hari Mandor Rp. 72,820.00 218.46 Jumlah (II) 5,743.46 Jumlah (I) + (II) 25,168.46 Over Head 15 % 3,775.27 Harga Satuan 28,943.73 I.2b 1 m Memasang langit-langit Gymsum B5 Bahan 1.100 m1 List Plapond Gypsum Kalsiboard B5 Rp. 20,000.00 22,000.00 0.010 Kg Paku Rp. 17,500.00 175.00 Jumlah (I) 22,175.00 Tenaga 0.050 Hari Pekerja Rp. 44,000.00 2,200.00 0.050 Hari Tukang kayu Rp. 60,000.00 3,000.00 0.005 Hari Kepala Tukang kayu Rp. 65,000.00 325.00 0.003 Hari Mandor Rp. 72,820.00 218.46 Jumlah (II) 5,743.46 Jumlah (I) + (II) 27,918.46 Over Head 15 % 4,187.77 Harga Satuan 32,106.23
  • 29. No Sat Koepesien Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan J. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP LANTAI ( SNI D - 91 - 0012 - 2007) J.1 1 m 2 Pasang lantai keramik ukuran (30x30) cm Bahan 11.870 Bj keramik 30x30 Rp. 4,001.68 47,500.00 10.000 Kg Semen Rp. 1,200.00 12,000.00 0.045 m³ Pasir pasang Rp. 80,000.00 3,600.00 1.500 Kg Semen warna Rp. 7,500.00 11,250.00 Jumlah (I) 74,350.00 Tenaga 0.620 Hari Pekerja Rp. 44,000.00 27,280.00 0.350 Hari Tukang batu Rp. 60,000.00 21,000.00 0.035 Hari Kepala tukang Batu Rp. 65,000.00 2,275.00 0.030 Hari Mandor Rp. 72,820.00 2,184.60 Jumlah (II) 52,739.60 Jumlah (I) + (II) 127,089.60 Over Head 15 % 19,063.44 Harga Satuan 146,153.04 J.2 1 m 2 Pasang lantai keramik ukuran (40x40) cm Bahan 6.562 Bj keramik Cutting 39x39 Rp. 50,000.00 328,100.00 10.000 Kg Semen Rp. 1,200.00 12,000.00 0.045 m³ Pasir pasang Rp. 80,000.00 3,600.00 1.500 Kg Semen warna Rp. 7,500.00 11,250.00 Jumlah (I) 354,950.00 Tenaga 0.620 Hari Pekerja Rp. 44,000.00 27,280.00 0.350 Hari Tukang batu Rp. 60,000.00 21,000.00 0.035 Hari Kepala tukang Batu Rp. 65,000.00 2,275.00 0.030 Hari Mandor Rp. 72,820.00 2,184.60 Jumlah (II) 52,739.60 Jumlah (I) + (II) 407,689.60 Over Head 15 % 61,153.44 Harga Satuan 468,843.04 J.8 1 m2 Pasang dinding Kramik (20 x 20) cm Bahan 20.000 Bj Kramik Cutting 20 x 20 ( Klas Tinggi) Rp. 2,750.00 55,000.00 9.300 Kg Semen Rp. 1,200.00 11,160.00 0.018 m³ Pasir pasang Rp. 80,000.00 1,440.00 1.940 Kg Semen warna Rp. 7,500.00 14,550.00 Jumlah (I) 82,150.00 Tenaga 0.600 Hari Pekerja Rp. 44,000.00 26,400.00 0.450 Hari Tukang batu Rp. 60,000.00 27,000.00 0.045 Hari Kepala tukang Batu Rp. 65,000.00 2,925.00 0.030 Hari Mandor Rp. 72,820.00 2,184.60 Jumlah (II) 58,509.60 Jumlah (I) + (II) 140,659.60 Over Head 15 % 21,098.94 Harga Satuan 161,758.54
  • 30. No Sat Koepesien Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan J.7 1 m 2 Pasang Lantai Kramik Aksesbilitas ( 30 x 30 ) Cm Bahan 11.870 Bh Kramik Aksesbilitas 30 x 30 Rp. 4,212.30 50,000.00 10.000 Kg Semen Rp. 1,200.00 12,000.00 0.045 m³ Pasir pasang Rp. 80,000.00 3,600.00 1.500 Kg Semen warna Rp. 7,500.00 11,250.00 Jumlah (I) 76,850.00 Tenaga 0.620 Hari Pekerja Rp. 44,000.00 27,280.00 0.350 Hari Tukang batu Rp. 60,000.00 21,000.00 0.035 Hari Kepala tukang Rp. 65,000.00 2,275.00 0.031 Hari Mandor Rp. 72,820.00 2,257.42 Jumlah (II) 52,812.42 Jumlah (I) + (II) 129,662.42 Over Head 15 % 19,449.36 Harga Satuan 149,111.78 J.11 1 m2 Memasang batu Andesir Bakar Bahan 1.100 M2 Batu Alam Andesir Bakar Rp. 150,000.00 165,000.00 11.750 Kg Semen Rp. 1,200.00 14,100.00 0.035 m³ Pasir pasang Rp. 80,000.00 2,800.00 Jumlah (I) 181,900.00 Tenaga 0.6200 Hari Pekerja Rp. 44,000.00 27,280.00 0.3500 Hari Tukang batu Rp. 60,000.00 21,000.00 0.0350 Hari Kepala tukang batu Rp. 65,000.00 2,275.00 0.0030 Hari Mandor Rp. 72,820.00 218.46 Jumlah (II) 50,773.46 Jumlah (I) + (II) 232,673.46 Over Head 15 % 34,901.02 Harga Satuan 267,574.48 J.11b 1 m 2 Memasang Batu candi Bakar Bahan 1.100 M2 Batu Alam Candi Rp. 175,000.00 192,500.00 11.750 Kg Semen Rp. 1,200.00 14,100.00 0.035 m³ Pasir pasang Rp. 80,000.00 2,800.00 Jumlah (I) 209,400.00 Tenaga 0.6200 Hari Pekerja Rp. 44,000.00 27,280.00 0.3500 Hari Tukang batu Rp. 60,000.00 21,000.00 0.0350 Hari Kepala tukang Batu Rp. 65,000.00 2,275.00 0.0300 Hari Mandor Rp. 72,820.00 2,184.60 Jumlah (II) 52,739.60 Jumlah (I) + (II) 262,139.60 Over Head 15 % 39,320.94 Harga Satuan 301,460.54
  • 31. No Sat Koepesien Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan J.11c 1 m 2 Memasang Batu Palimanan Bahan 1.100 M2 Batu Alam Palimanan Rp. 150,000.00 165,000.00 11.750 Kg Semen Rp. 1,200.00 14,100.00 0.035 m³ Pasir pasang Rp. 80,000.00 2,800.00 Jumlah (I) 181,900.00 Tenaga 0.6200 Hari Pekerja Rp. 44,000.00 27,280.00 0.3500 Hari Tukang batu Rp. 60,000.00 21,000.00 0.0350 Hari Kepala tukang Batu Rp. 65,000.00 2,275.00 0.0300 Hari Mandor Rp. 72,820.00 2,184.60 Jumlah (II) 52,739.60 Jumlah (I) + (II) 234,639.60 Over Head 15 % 35,195.94 Harga Satuan 269,835.54 J.11a 1 m2 Pasang Latai Koral Sikat Bahan 16.667 Kg Koral Sikat Rp. 8,999.98 150,000.00 0.235 Kg Semen Rp. 1,200.00 282.00 0.035 m³ Pasir pasang Rp. 80,000.00 2,800.00 0.500 Ltr HCL Rp. 7,500.00 3,750.00 Jumlah (I) 156,832.00 Tenaga 0.6200 Hari Pekerja Rp. 44,000.00 27,280.00 0.3500 Hari Tukang batu Rp. 60,000.00 21,000.00 0.0350 Hari Kepala tukang Batu Rp. 65,000.00 2,275.00 0.0300 Hari Mandor Rp. 72,820.00 2,184.60 Jumlah (II) 52,739.60 Jumlah (I) + (II) 209,571.60 Over Head 15 % 31,435.74 Harga Satuan 241,007.34 J.11b 1 m2 Memasang Batu Bulat Dia 1 Cm Bahan 16.667 M2 Batu Bulat Dia 1 Cm Rp. 8,099.98 135,000.00 0.235 Kg Semen Rp. 1,200.00 282.00 0.035 m³ Pasir pasang Rp. 80,000.00 2,800.00 0.500 Ltr HCL Rp. 7,500.00 3,750.00 Jumlah (I) 141,832.00 Tenaga 0.6200 Hari Pekerja Rp. 44,000.00 27,280.00 0.3500 Hari Tukang batu Rp. 60,000.00 21,000.00 0.0350 Hari Kepala tukang Batu Rp. 65,000.00 2,275.00 0.0300 Hari Mandor Rp. 72,820.00 2,184.60 Jumlah (II) 52,739.60 Jumlah (I) + (II) 194,571.60 Over Head 15 % 29,185.74 Harga Satuan 223,757.34
  • 32. No Sat Koepesien Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan J.12 1 m 2 Memasang Paving Gress Blok (tebal 8 cm) Bahan 1.100 M2 Gras Blok Pres Beton Rp. 50,000.00 55,000.00 0.200 Kg Pasir urug Rp. 25,000.00 5,000.00 Jumlah (I) 60,000.00 Tenaga 0.2500 Hari Pekerja Rp. 44,000.00 11,000.00 0.2500 Hari Tukang batu Rp. 60,000.00 15,000.00 0.0250 Hari Kepala tukang Batu Rp. 65,000.00 1,625.00 0.0250 Hari Mandor Rp. 72,820.00 1,820.50 Jumlah (II) 29,445.50 Jumlah (I) + (II) 89,445.50 Over Head 15 % 13,416.83 Harga Satuan 102,862.33 J.16 1 m Memasang Curb Beton Bahan 2.400 Bh Crub Beton 20 x 40 x25 Rp. 55,000.00 132,000.00 Jumlah (I) 132,000.00 Tenaga 0.5000 Hari Pekerja Rp. 44,000.00 22,000.00 0.2500 Hari Tukang batu Rp. 60,000.00 15,000.00 0.0250 Hari Kepala tukang Batu Rp. 65,000.00 1,625.00 0.0250 Hari Mandor Rp. 72,820.00 1,820.50 Jumlah (II) 40,445.50 Jumlah (I) + (II) 172,445.50 Over Head 15 % 25,866.83 Harga Satuan 198,312.33 J.17 1 Bh Memasang Roster Block 20x20 + Plesteran List Lebar 5 cm Bahan 1.000 Bh Roster Block 20x20 Cm Rp. 35,000.00 35,000.00 Jumlah (I) 35,000.00 Tenaga 0.0000 Hari Pekerja Rp. 44,000.00 0.00 0.0500 Hari Tukang batu Rp. 60,000.00 3,000.00 0.0000 Hari Kepala tukang Batu Rp. 65,000.00 0.00 0.0000 Hari Mandor Rp. 72,820.00 0.00 Jumlah (II) 3,000.00 Jumlah (I) + (II) 38,000.00 Over Head 15 % 5,700.00 Harga Satuan 43,700.00 K. ANALISA BIAYA KONSTRUKSI PEKERJAAN KACA DAN PENGUNCI ( SNI 03-2838-2002) K.1 1.Bh Memasang Kunci Tanam Bahan 1.000 bh Kuda Pintu Alumenium Rp. 150,000.00 150,000.00 Jumlah (I) 150,000.00 Tenaga 0.100 Hari Pekerja Rp. 44,000.00 4,400.00 0.500 Hari Tukang Kayu Rp. 60,000.00 30,000.00 0.010 Hari Kepala Tukang Kayu Rp. 65,000.00 650.00 0.005 Hari Mandor Rp. 72,820.00 364.10 Jumlah (II) 35,414.10 Jumlah (I) + (II) 185,414.10 Over Head 15 % 27,812.12 Harga Satuan 213,226.22
  • 33. No Sat Koepesien Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan K.2 1.Bh Memasang Engsel Pintu Bahan 1.000 bh Engsel Pintu Rp. 35,000.00 35,000.00 Jumlah (I) 35,000.00 Tenaga 0.015 Hari Pekerja Rp. 44,000.00 660.00 0.150 Hari Tukang Kayu Rp. 60,000.00 9,000.00 0.015 Hari Kepala Tukang Rp. 65,000.00 975.00 0.001 Hari Mandor Rp. 72,820.00 72.82 Jumlah (II) 10,707.82 Jumlah (I) + (II) 45,707.82 Over Head 15 % 6,856.17 Harga Satuan 52,563.99 K.3 1 Bh Memasang Engsel Jendela Bahan 1.000 bh Engsel Jendela Rp. 25,000.00 25,000.00 Jumlah (I) 25,000.00 Tenaga 0.010 Hari Pekerja Rp. 44,000.00 440.00 0.100 Hari Tukang Kayu Rp. 60,000.00 6,000.00 0.010 Hari Kepala Tukang Rp. 65,000.00 650.00 0.001 Hari Mandor Rp. 72,820.00 72.82 Jumlah (II) 7,162.82 Jumlah (I) + (II) 32,162.82 Over Head 15 % 4,824.42 Harga Satuan 36,987.24
  • 34.
  • 35.
  • 36.
  • 37.
  • 38.
  • 39. L. ANALISA BIAYA KONSTRUKSI PEKERJAAN SANTASI AIR (SNI 03-2839 - 2002) No Sat Koepesien Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan L.1 1 Bh Memasang Closet Duduk Bahan 1.000 bh Kloset Duduk sekulitas Toto Rp. 1,950,000.00 1,950,000.00 6% Hk perlengkapan Rp. 117,000.00 7,020.00 Jumlah (I) 1,957,020.00 Tenaga 3.300 Hari Pekerja Rp. 44,000.00 145,200.00 1.100 Hari Tukang batu Rp. 60,000.00 66,000.00 0.001 Hari Kepala Tukang Batu Rp. 65,000.00 65.00 0.160 Hari Mandor Rp. 72,820.00 11,651.20 Jumlah (II) 222,916.20 Jumlah (I) + (II) 2,179,936.20 Over Head 15 % 326,990.43 Harga Satuan 2,506,926.63 L.1a 1. Bh Memasang kloset jongkok Bahan 1.000 bh Kloset jongkok Sekualitas Toto Rp. 175,000.00 175,000.00 6% Hk perlengkapan Rp. 10,500.00 630.00 Jumlah (I) 175,630.00 Tenaga 3.300 Hari Pekerja Rp. 44,000.00 145,200.00 1.100 Hari Tukang batu Rp. 60,000.00 66,000.00 0.001 Hari Kepala Tukang Rp. 65,000.00 65.00 0.160 Hari Mandor Rp. 72,820.00 11,651.20 Jumlah (II) 222,916.20 Jumlah (I) + (II) 398,546.20 Over Head 15 % 59,781.93 Harga Satuan 458,328.13 L.2 1 Bh Memasang Urinoar Bahan 1.0000 bh Closed duduk Sekualitas Toto Rp. 1,950,000.00 1,950,000.00 3% Hk Perlengkapan Rp. 58,500.00 1,755.00 6.0000 kg Semen Rp. 1,200.00 7,200.00 0.0100 m3 Pasir pasang Rp. 80,000.00 800.00 Jumlah (I) 1,959,755.00 Tenaga 1.000 Hari Pekerja Rp. 44,000.00 44,000.00 1.000 Hari Tukang batu Rp. 60,000.00 60,000.00 0.100 Hari Kepala Tukang Batu Rp. 65,000.00 6,500.00 0.100 Hari Mandor Rp. 72,820.00 7,282.00 Jumlah (II) 117,782.00 Jumlah (I) + (II) 2,077,537.00 Over Head 15 % 311,630.55 Harga Satuan 2,389,167.55
  • 40. No Sat Koepesien Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan L.3 1 Bh Memasang wastafel Bahan 1.0000 bh Weshtafel Klas Menengah dan Accessories Rp. 650,000.00 650,000.00 12% Hk Perlengkapan Rp. 78,000.00 9,360.00 6.0000 kg Semen Rp. 1,200.00 7,200.00 0.0100 m3 Pasir pasang Rp. 80,000.00 800.00 Jumlah (I) 667,360.00 Tenaga 1.200 Hari Pekerja Rp. 44,000.00 52,800.00 1.450 Hari Tukang batu Rp. 60,000.00 87,000.00 0.150 Hari Kepala Tukang Batu Rp. 65,000.00 9,750.00 0.100 Hari Mandor Rp. 72,820.00 7,282.00 Jumlah (II) 156,832.00 Jumlah (I) + (II) 824,192.00 Over Head 15 % 123,628.80 Harga Satuan 947,820.80 L.4 1 Bh Memasang Bak cuci Stanlist steel Bahan 1.0000 bh Bak cuci Stanlist steel Rp. 225,000.00 225,000.00 0.010 bh Water draine + asesories Rp. 2,250.00 22.50 Jumlah (I) 225,022.50 Tenaga 0.030 Hari Pekerja Rp. 44,000.00 1,320.00 0.300 Hari Tukang batu Rp. 60,000.00 18,000.00 0.030 Hari Kepala Tukang Batu Rp. 65,000.00 1,950.00 0.002 Hari Mandor Rp. 72,820.00 145.64 Jumlah (II) 21,415.64 Jumlah (I) + (II) 246,438.14 Over Head 15 % 36,965.72 Harga Satuan 283,403.86 L.5 1 Bh Memasang avour Bahan 1.0000 bh Fiber draine (Avour) Rp. 40,000.00 40,000.00 Jumlah (I) 40,000.00 Tenaga 0.010 Hari Pekerja Rp. 44,000.00 440.00 0.100 Hari Tukang batu Rp. 60,000.00 6,000.00 0.010 Hari Kepala Tukang Batu Rp. 65,000.00 650.00 0.001 Hari Mandor Rp. 72,820.00 72.82 Jumlah (II) 7,162.82 Jumlah (I) + (II) 47,162.82 Over Head 15 % 7,074.42 Harga Satuan 54,237.24 L.6 1 m Memasang Pipa Galvanis Dia 2.5" Bahan 2.0000 m Pipa Galpanis Dia 2.5" Rp. 37,500.00 75,000.00 35% Hk Perlengkapan Rp. 13,125.00 4,593.75 Jumlah (I) 75,000.00 Tenaga 0.036 Hari Pekerja Rp. 44,000.00 1,584.00 0.060 Hari Tukang pipa Rp. 60,000.00 3,600.00 0.006 Hari Kepala Tukang pipa Rp. 65,000.00 390.00 0.002 Hari Mandor Rp. 72,820.00 145.64 Jumlah (II) 5,719.64 Jumlah (I) + (II) 80,719.64 Over Head 15 % 12,107.95 Harga Satuan 92,827.59
  • 41. No Sat Koepesien Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan L.7 1 m Memasang pipa PVC Tipe AW dia 3/4" Bahan 1.200 m' Pipa PVC dia 3/4" + Assesoris Rp. 12,500.00 15,000.00 35% Hk Perlengkapan ( Harga Pipa ) Rp. 4,375.00 1,531.25 Jumlah (I) 16,531.25 Tenaga 0.0360 Hari Pekerja Rp. 44,000.00 1,584.00 0.0600 Hari Tukang pipa Rp. 60,000.00 3,600.00 0.0060 Hari Kepala Tukang pipa Rp. 65,000.00 390.00 0.0020 Hari Mandor Rp. 72,820.00 145.64 Jumlah (II) 5,719.64 Jumlah (I) + (II) 22,250.89 Over Head 15 % 3,337.63 Harga Satuan 25,588.52 L.8 1 m Memasang pipa PVC Tipe AW dia 4" Bahan 1.200 m' Pipa PVC dia 4" + Assesoris Rp. 45,000.00 54,000.00 35% Hk Perlengkapan ( Harga Pipa ) Rp. 15,750.00 5,512.50 Jumlah (I) 59,512.50 Tenaga 0.0360 Hari Pekerja Rp. 44,000.00 1,584.00 0.0600 Hari Tukang pipa Rp. 60,000.00 3,600.00 0.0060 Hari Kepala Tukang pipa Rp. 65,000.00 390.00 0.0020 Hari Mandor Rp. 72,820.00 145.64 Jumlah (II) 5,719.64 Jumlah (I) + (II) 65,232.14 Over Head 15 % 9,784.82 Harga Satuan 75,016.96 L.9 1 m Memasang pipa PVC Tipe AW dia 3" Bahan 1.200 m' Pipa PVC dia 3" + Assesoris Rp. 35,000.00 42,000.00 35% Hk Perlengkapan ( Harga Pipa ) Rp. 12,250.00 4,287.50 Jumlah (I) 46,287.50 Tenaga 0.0360 Hari Pekerja Rp. 44,000.00 1,584.00 0.0600 Hari Tukang pipa Rp. 60,000.00 3,600.00 0.0060 Hari Kepala Tukang pipa Rp. 65,000.00 390.00 0.0020 Hari Mandor Rp. 72,820.00 145.64 Jumlah (II) 5,719.64 Jumlah (I) + (II) 52,007.14 Over Head 15 % 7,801.07 Harga Satuan 59,808.21 L.14 1 Bh Memasang Kran Dia 1/2" (mutu tinggi) Bahan 1.000 Bh kran dia 1/2" (Mutu tinggi) Rp. 35,000.00 35,000.00 35% Hk Perlengkapan Rp. 12,250.00 4,287.50 Jumlah (I) 39,287.50 Tenaga 0.0360 Hari Pekerja Rp. 44,000.00 1,584.00 0.0600 Hari Tukang pipa Rp. 60,000.00 3,600.00 0.0060 Hari Kepala Tukang pipa Rp. 65,000.00 390.00 0.0020 Hari Mandor Rp. 72,820.00 145.64 Jumlah (II) 5,719.64 Jumlah (I) + (II) 45,007.14 Over Head 15 % 6,751.07 Harga Satuan 51,758.21
  • 42. No Sat Koepesien Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan L.14a 1 Bh Memasang Shower Spray Bahan 1.000 Bh showaer spray Rp. 125,000.00 125,000.00 35% Hk Perlengkapan Rp. 43,750.00 15,312.50 Jumlah (I) 140,312.50 Tenaga 0.0360 Hari Pekerja Rp. 44,000.00 1,584.00 0.0600 Hari Tukang pipa Rp. 60,000.00 3,600.00 0.0060 Hari Kepala Tukang pipa Rp. 65,000.00 390.00 0.0020 Hari Mandor Rp. 72,820.00 145.64 Jumlah (II) 5,719.64 Jumlah (I) + (II) 146,032.14 Over Head 15 % 21,904.82 Harga Satuan 167,936.96 L.15 1 UNIT SEPTIKTANK Bahan B2 Galian Tanah Rp. 42,876.90 42,876.90 G.12.b Beton Mutu K225 Plat dasa Septinktank Rp. 4,331,676.70 4,331,676.70 D.2 Pasangan transram 1 Pc : 3Ps Rp. 72,886.30 72,886.30 E.1 Plesteran transram Plat beton penutup Septiktank Rp. 30,655.20 30,655.20 G.12.b Plat beton penutup Septiktank Rp. 4,331,676.70 4,331,676.70 Pipa Pembuang hawa dia 1.5" Rp. 50,000.00 50,000.00 Lubang Kontol Rp. 50,000.00 50,000.00 Jumlah (I) 8,909,771.80 Over Head 15 % 1,336,465.77 Harga Satuan 10,246,237.57 L.16 1 UNIT PERESAPAN Bahan B2 Galian Tanah Rp. 42,876.90 42,876.90 G.12.b Lapisan Ijuk Rp. 15,000.00 15,000.00 G.12.b Beton Mutu K225 Plat dasa Septinktank Rp. 4,331,676.70 4,331,676.70 D.2 Pasangan transram 1 Pc : 3Ps Rp. 72,886.30 72,886.30 E.1 Plesteran transram Plat beton penutup Septiktank Rp. 30,655.20 30,655.20 G.12.b Plat beton penutup Septiktank Rp. 4,331,676.70 4,331,676.70 Pipa Pembuang hawa dia 1.5" Rp. 50,000.00 50,000.00 Lubang Kontol Rp. 50,000.00 50,000.00 Jumlah (I) 8,881,894.90 Harga Satuan 1,332,284.24 Harga Satuan 10,214,179.14
  • 43. K. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENGECATAN No Sat Koepesien Peker Sat Bahan Nama Bahan Harga Sat Bahan Jumlah Harga Analisa jaan Bahan M.1 1 m 2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup Bahan 0.200 Kg Meni Kayu Rp. 20,000.00 4,000.00 0.150 Kg Plamir Kayu Rp. 15,000.00 2,250.00 Dasar 0.170 Kg Cat Kayu Mutu menengah Rp. 45,000.00 7,650.00 Penutup 2.600 Kg Cat Kayu Mutu menengah Rp. 45,000.00 117,000.00 Jumlah (I) 130,900.00 Tenaga 0.070 Hari Pekerja Rp. 44,000.00 3,080.00 0.090 Hari Tukang cat Rp. 60,000.00 5,400.00 0.060 Hari Kepala tukang Cat Rp. 65,000.00 3,900.00 0.0300 Hari Mandor Rp. 72,820.00 2,184.60 Jumlah (II) 14,564.60 Jumlah (I) + (II) 145,464.60 Over Head 15 % 21,819.69 Harga Satuan 167,284.29 M.2 1 m 2 Politur Bahan 0.150 Kg Politur Rp. 35,000.00 5,250.00 0.372 Kg Politur Rp. 35,000.00 13,020.00 2.000 Lbr Amplas Rp. 3,500.00 7,000.00 Jumlah (I) 25,270.00 Tenaga 0.000 Hari Pekerja Rp. 44,000.00 - 0.060 Hari Tukang cat Rp. 60,000.00 3,600.00 0.016 Hari Kepala tukang Cat Rp. 65,000.00 1,040.00 0.0300 Hari Mandor Rp. 72,820.00 2,184.60 Jumlah (II) 6,824.60 Jumlah (I) + (II) 32,094.60 Over Head 15 % 4,814.19 Harga Satuan 36,908.79 M.4 1 m 2 Pengecatan tembok Baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup Bahan 0.100 Kg Plamir Tembok Rp. 17,500.00 1,750.00 0.100 Kg Cat tembok (Mutu Tinggi) Rp. 25,000.00 2,500.00 0.260 Kg Cat tembok (Mutu Tinggi) Rp. 25,000.00 6,500.00 Jumlah (I) 10,750.00 Tenaga 0.020 Hari Pekerja Rp. 44,000.00 880.00 0.063 Hari Tukang cat Rp. 60,000.00 3,780.00 0.006 Hari Kepala tukang Cat Rp. 65,000.00 390.00 0.0030 Hari Mandor Rp. 72,820.00 218.46 Jumlah (II) 5,268.46 Jumlah (I) + (II) 16,018.46 Over Head 15 % 2,402.77 Harga Satuan 18,421.23
  • 44. N. ANALISA BIAYA KONSTRUKSI PEKERJAAN RANGKA BAJA N.2a 1kg Pabrikasi Besi Profil Bahan 1.150 Kg Besi profil WF Rp. 13,500.00 15,525.00 Jumlah (I) 15,525.00 Tenaga 0.060 Hari Tukang Besi Rp. 60,000.00 3,600.00 0.060 Hari Kepala tukang Besi Rp. 65,000.00 3,900.00 0.060 Hari Buruh terampil Rp. 60,000.00 3,600.00 0.0030 Hari Mandor Rp. 72,820.00 218.46 Jumlah (II) 11,318.46 Jumlah (I) + (II) 26,843.46 Over Head 15 % 4,026.52 Harga Satuan 30,869.98 N.2b 1kg Pabrikasi Besi Plat Bahan 1.150 Kg Besi plat Rp. 13,500.00 15,525.00 Jumlah (I) 15,525.00 Tenaga 0.060 Hari Tukang Besi Rp. 60,000.00 3,600.00 0.060 Hari Kepala tukang Besi Rp. 65,000.00 3,900.00 0.060 Hari Buruh terampil Rp. 60,000.00 3,600.00 0.0030 Hari Mandor Rp. 72,820.00 218.46 Jumlah (II) 11,318.46 Jumlah (I) + (II) 26,843.46 Over Head 15 % 4,026.52 Harga Satuan 30,869.98 N.2c 1kg Pekerjaan Rakitan (penyetelan erection) Bahan 0.100 Ltr Solar Rp. 4,500.00 450.00 0.010 Ltr Oli Mesin Rp. 22,500.00 225.00 Jumlah (I) 675.00 Tenaga 0.010 Hari Tukang Besi Rp. 60,000.00 600.00 0.001 Hari Kepala tukang Besi Rp. 65,000.00 65.00 0.010 Hari Buruh terampil Rp. 60,000.00 600.00 0.0010 Hari Mandor Rp. 72,820.00 72.82 Jumlah (II) 1,337.82 Jumlah (I) + (II) 2,012.82 Over Head 15 % 301.92 Harga Satuan 2,314.74 N.2d 10 cm Mengerjakan Las Listrik Bahan 0.040 Kg Kawat Las Stanlesstel Rp. 50,000.00 2,000.00 0.170 Jam Trafo Las / Genset (sewa Alat Las Rp. 25,000.00 4,250.00 0.070 Ltr Solar Rp. 4,500.00 315.00 0.040 Ltr Olie Mesin Rp. 22,500.00 900.00 Jumlah (I) 7,465.00 Tenaga 0.0200 Hari Tukang Besi Rp. 60,000.00 1,200.00 0.0002 Hari Kepala tukang Besi Rp. 65,000.00 13.00 0.0040 Hari Buruh terampil Rp. 60,000.00 240.00 0.0020 Hari Mandor Rp. 72,820.00 145.64 Jumlah (II) 1,598.64 Jumlah (I) + (II) 9,063.64 Over Head 15 % 1,359.55 Harga Satuan 10,423.19 Harga 1 Cm 1,042.32
  • 45. N.2d.a 1 m Kusen Allumenium Bahan 1.100 m Profil Allumenium Rp. 350,000.00 385,000.00 2.000 bh Skrup fixel Rp. 350.00 700.00 0.070 tube Sealant Rp. 50,000.00 3,500.00 Jumlah (I) 389,200.00 Tenaga 0.0430 Hari Pekerja Rp. 60,000.00 2,580.00 0.0430 Hari Tukang Besi Rp. 65,000.00 2,795.00 0.0043 Hari Kepala tukang Besi Rp. 60,000.00 258.00 0.0021 Hari Mandor Rp. 72,820.00 152.92 Jumlah (II) 5,785.92 Jumlah (I) + (II) 394,985.92 Over Head 15 % 59,247.89 Harga Satuan 454,233.81 Sumbawa Besar, 6 Pebruari 2013 CV. ARAMCO M. NAGIB USMAN Direktur