Project Management 2.0

          Janardan Revuru, PMP




1/38
About Me
        Currently working as Project Manager @ HP
        Last 7 years as Project Manager
        Fifteen years in IT/Software
        Worked for startups, SIEMENS, MOTOROLA,
         NORTEL
        Interested in Open Source and Web 2.0
        Blogger on topics - Productivity Software,
         Financial Management, Project Management
        Academics: B.E, MBA, PMP and Certified
         Financial Manager
2/38   Project Management 2.0                    01 Dec 2011
Agenda
        Objective
        Traditional Project Management
        What is Project Management 2.0?
        Web 2.0 and Tools
        Future Trends




3/38   Project Management 2.0              01 Dec 2011
Central Theme


             Evolving and disruptive
                      trends
            in enterprises and future
             role of Project Manager

4/38   Project Management 2.0     01 Dec 2011
Objective
        Awareness of emerging technologies and tools
        Definitive way to choose communication tools
        Contribution to PM 2.0
            http://projectmanagement2dot0.blogger.com




5/38   Project Management 2.0                           01 Dec 2011
Business Context
        Increased competition
        Changing consumer preferences
        Shorter time to market
        Rapid technology changes




6/38   Project Management 2.0            01 Dec 2011
Business Imperatives
        Hiring and keeping best people
        Driving innovation
        Customers. Customers. Customers.
        Sustain cost-reduction measures
        Technology as strategic asset
        Reaching global markets
        Increased collaboration




7/38   Project Management 2.0               01 Dec 2011
Top 3 Challenges for Project
       Managers
       1. Distributed teams
       2. Limitations with Traditional tools
       3. Rigid Communication Channels




8/38   Project Management 2.0                  01 Dec 2011
Challenges – Distributed Teams
        Different geography
        Different time zones   Communicati
        Different cultures     on
        Virtual teams
                                overheads or
                                delays




9/38   Project Management 2.0          01 Dec 2011
Challenges – Traditional Tools
         Email overload/overuse
            Workflow tool – create, review, approve
            Document repository
            For status tracking
            Distribution list
         Desktop Centered
            Project Tracking applications
            Documents
            Email archives (PST)



10/38   Project Management 2.0                         01 Dec 2011
Challenges – Communication
        channels


                                 Control

            Top Down             Imposed

                                 Stiffness




11/38   Project Management 2.0               01 Dec 2011
The Next Gen Enterprise




12/38 Project Management 2.0
                               01 Dec 2011
Enterprise 2.0 and Web 2.0
                  Web 2.0



                Collaboration
                     2.0



                Enterprise 2.0




                  Project
                Management
                    2.0




13/38   Project Management 2.0       01 Dec 2011
Enterprise 2.0
         Agility
         Innovation
         Team Productivity
         Office 2.0
         Social Media




                                 Enterprise Web 2.0 to hit $4.6B in 2013


14/38   Project Management 2.0                                01 Dec 2011
Project Management 2.0
                   Top Down Approach                        Bottom up Approach
           Inflexibility                            Flexibility
           Bureaucracy                              Agility
           Overall control                          Collaboration
           Imposed processes                        Team-driven process
           External motivation                      Internal motivation



                                      Project Management 2.0
                             Control and Collaboration
                             Clarity of Project Goals
                             Visibility of internal organizational
                             processes
                             Coordination and collective intelligence


15/38   Project Management 2.0                                               01 Dec 2011
Web 2.0 Features
         Post dot-com bust era
         Tim O’Reilly coined the word
         Web as a platform
         Human Aspects
            Made of people (not techies)
            Wisdom of crowds (“crowdsourcing”)
            Personalization
            Community
            Network Effect



16/38   Project Management 2.0                    01 Dec 2011
Web 2.0 Tools
         Wiki
         Blogs
         RSS
         Integrated Project Site
         Mashups
         Podcasts (audio, video)
         Tagging
         Social Bookmarking
         Social Networking

17/38   Project Management 2.0      01 Dec 2011
Application of Web 2.0




18/38 Project Management 2.0
                               01 Dec 2011
Best use of Web 2.0 Tools
         When report needs input from more than 3
          people
         When project contributors or stakeholders could
          change during life of the project
         Your team/organization focus is on continuous
          improvement
         When teams are in different geographies and
          time zones



19/38   Project Management 2.0                       01 Dec 2011
Project Communication Plan
                                                                                                                                                 How (Typical
                                                                             Who (Responsible,                 When (Timing
What (The Content)        Why (Communication Purpose)                                                                                            Methods
                                                                             Audiences)                        or Periodicity)
                                                                                                                                                 of Communication)

                                                              A. Initial Communications
Project Charter           This is the foundation of approval and project     Requestor, Sponsor; Executives,   As early as possible, updated     Discussion; Analysis,
                          continuation                                       Decision-Makers                   with changed and/or approved      Informal or Formal Report
                                                                                                               status
Initial High Level Plan   Agree to high-level plan and commitments needs Sponsor, Leadership Team, Team        As early as possible, updated     Meeting; Structured
                          to achieve it                                  Members, Executives, Interested       with change and/or approved       Discussion; Formal Report
                                                                         parties                               status

                                                           B. Recurring Communications
                          Identify current status, planned end date and      Leadership team; Team             Weekly or in a cycle identified    Formal report
Status report             cost; includes open issues; accomplishments        members, Sponsors, Decision       in plan
                          and high level schedule                            makers

                          Visually show progress in results and/or time or   Leadership team, Sponsor,         Monthly or identified in           Graphic representation on
Stoplight,                cost used, to maintain excitement with those       Interested Parties                communication plan                 project room walls or in
                          who prefer charts and numbers                                                                                           presentations
Countdown, Burn
down charts
                                                           C. Close-out Communications
                          Approve results to date, and approval to           Sponsor, Decision-makers;         At major milestones or stage       Meeting, Formal report
Milestone or Stage-       proceed, revise or cancel                          Leadership team; Team members     gate approvals
gate reviews
                          Capture and apply the most important lessons       Leadership team, team members,    End of each phase, stage or        Solicitation, then
Lessons Learned           learned for later initiative                       Sponsor, Decision makers          project                            discussion. Analysis and
                                                                                                                                                  informal reporting

                          Reward all stakeholders for phase and end          Sponsor, Team Members,            End of each phase, stage or        Capture the celebration
Team Celebration     results                                                 Leadership team and interested    project                            pictures
 20/38 Project Management 2.0
                                                                             parties
                                                                                                                                                 01 Dec 2011
Web 2.0 Tools - Mashups




21/38   Project Management 2.0    01 Dec 2011
Status Report – Mashups
         Example
Project Name: PM2.0
Summary           Statu                              Project
                             Accomplishments:
                  s                                  Blogs
                             1. Milestone AX
Schedule                     2. Alpha Testing
                             3.                  Requirements
Scope                                            Management
                             4.
Budget
                                                 Budget
Quality
                                                 Tracking
 Top Risks                    KPI    Index
                                                Defect
 1. Procurement
                              SPI    1.2        Tracking Tool
 stuck
 2. Attrition 30%             CPI    1.1
 3.                                              Project Tracker

 22/38   Project Management 2.0                             01 Dec 2011
Mashups
         Enterprise Mashups
            Will enable situational applications to be built
            Structured and unstructured data
            Yahoo! Pipes for end users
            JackBe Presto – for visually rich and interactive
              dashboards
         Project Management Mashups
            Serena Project and Portfolio Management (PPM)
            Projects, People, Costs management



23/38   Project Management 2.0                              01 Dec 2011
Wiki in Projects
        Features                  Uses
         Easy to create/edit      Minutes of the
         Multiple simultaneous       meeting
          users                      Requirements
         Versioning                  gathering
         Access Control             Planning project
                                      design
                                     Risk Analysis
                                     User Stories and Use
                                      cases
24/38   Project Management 2.0
                                     Project Tracking Dec 2011
                                                     01
Wiki Products
                                 MindMap support. Fast. Flash support.


                                        Wiki rules like Wikipedia.
                                        Easy backup.
                                                     Enterprise class.
                                                     Calendar plugin.
                                                     Spreadsheet plugin


                                                    Wikipedia.
                                                    Wider community.




25/38   Project Management 2.0                          01 Dec 2011
Blogs for Project Management
        Features                 Purpose
         Short for web log       Project Updates
         Replaced BBS, Email     Project
          Lists                      Announcements
         Posts are listed          Exchange of ideas
          chronological order       Involvement of
                                     stakeholders
                                    Get feedback
                                    Connect with partners
                                    Tacit Knowledge
26/38   Project Management 2.0                     01 Dec 2011
Blog Products
                                 Informal blogs.
                                 Lively look and feel.
                                    Facebook-like UI.
                                    Social Networking.




                                 Internet Forum.
                                 Good for interaction
                                 with multiple
                                 functions (outside
                                 R&D).




27/38   Project Management 2.0            01 Dec 2011
RSS for Project Management
        Features                    Purpose
         Web feed formats           Notify stakeholders
         Notification of updates    User freedom to opt-
         Many clients               out
         Aggregate many
           sources




28/38   Project Management 2.0                       01 Dec 2011
RSS Clients




29/38   Project Management 2.0   01 Dec 2011
Integrated Project Site
        Features                     Purpose
         Centralized                 One Place for all
            Information and              Project Information
            communication               Contact information
           Manage workflows            RACI Chart
           Secure through              Meeting calendar
            access control              Project goals and
                                         vision
           Manage Auditing
                                        Document repository
           No client installation
                                        Project schedule
30/38   Project Management 2.0
                                        Status Reports
                                                      01 Dec 2011
IPS Products
                                 Task Management with Email integr

                                 Office suite, CRM, Project Managem




                                 Rated as Top Project Management T
                                 Covers all Project Management
                                                 Knowledge Areas




31/38   Project Management 2.0                     01 Dec 2011
Try Yourself!
                             1. Install




        2. Download                               4. Open


        3. Unzip            to C:xampphtdocs   URL http://localost/<app>



32/38    Project Management 2.0                                         01 Dec 2011
Project Management Software
         Basic Project Management
            Task, Team, Goal Management
            Lighthouse, Basecamp
         Wiki-based Project Management
            Management of Tasks, Team, Goals, Documents
             and schedule
            TracProject
         Bug and Ticket Tracking
            16bugs



33/38   Project Management 2.0                      01 Dec 2011
Project Management Software
        (2)
         Collaboration and Conferencing
            activeCollab
            Vyew
         Invoices
            Simple Invoices
            Less Accounting
         Time Tracking
            syncd
            fourteenDayz



34/38   Project Management 2.0             01 Dec 2011
Conclusion
         Collaboration as way of life, than competitive
          advantage
         Mashups to be used extensively
         Open formats and tools for easy integration




35/38   Project Management 2.0                        01 Dec 2011
Comments
                                 Thoughts
                                   Q&A




36/38   Project Management 2.0              01 Dec 2011
Connection
              ProjectManagement2dot0



                                    Janardan@

                                 Janardan.Revuru@




                                                    Janardan Revuru


37/38   Project Management 2.0                                        01 Dec 2011
THANK YOU



38/38   Project Management 2.0               01 Dec 2011

More Related Content

What's hot

The Art of Building a Process Design Team
The Art of Building a Process Design TeamThe Art of Building a Process Design Team
The Art of Building a Process Design TeamTroy DuMoulin
 
Ready, Aim, Fire! Using Social Media Analytics to Hit Your Target Market
Ready, Aim, Fire! Using Social Media Analytics to Hit Your Target MarketReady, Aim, Fire! Using Social Media Analytics to Hit Your Target Market
Ready, Aim, Fire! Using Social Media Analytics to Hit Your Target MarketCareer Communications Group
 
Grouputer: Going Beyond Web Conferencing
Grouputer: Going Beyond Web ConferencingGrouputer: Going Beyond Web Conferencing
Grouputer: Going Beyond Web Conferencingahudson15
 
Towards the intranet of the future
Towards the intranet of the futureTowards the intranet of the future
Towards the intranet of the futureJanus Boye
 
MMPD Business Plan Continuity
MMPD Business Plan ContinuityMMPD Business Plan Continuity
MMPD Business Plan ContinuityREAQUA - LORENTZ
 
Catalyze Webcast Facilitating JAD Sessions - Jackie Parker 082307
Catalyze Webcast   Facilitating JAD Sessions - Jackie Parker 082307Catalyze Webcast   Facilitating JAD Sessions - Jackie Parker 082307
Catalyze Webcast Facilitating JAD Sessions - Jackie Parker 082307Tom Humbarger
 
Portfolio Deck
Portfolio DeckPortfolio Deck
Portfolio DeckJohn Fouts
 
The 7 enablers and constraints of itsm 2011 v1 final
The 7 enablers and constraints of itsm 2011 v1 finalThe 7 enablers and constraints of itsm 2011 v1 final
The 7 enablers and constraints of itsm 2011 v1 finalTroy DuMoulin
 
Eservices project planning
Eservices project planningEservices project planning
Eservices project planningChetan Manchanda
 
Making change happen messages from 4000 managers and staff - quick ppt 121...
Making change happen    messages from 4000 managers and staff - quick ppt 121...Making change happen    messages from 4000 managers and staff - quick ppt 121...
Making change happen messages from 4000 managers and staff - quick ppt 121...Synthetron
 
Projecptlace online collaboration
Projecptlace online collaborationProjecptlace online collaboration
Projecptlace online collaborationgabrielhreports
 
Projecptlace online collaboration 2013
Projecptlace online collaboration 2013Projecptlace online collaboration 2013
Projecptlace online collaboration 2013Sophiepacton
 
Planning for and assessing an itsm program
Planning for and assessing an itsm programPlanning for and assessing an itsm program
Planning for and assessing an itsm programTroy DuMoulin
 
Engaging Stakeholders
Engaging StakeholdersEngaging Stakeholders
Engaging Stakeholdersbquteam
 
SoSoCo project for elderly
SoSoCo project for elderlySoSoCo project for elderly
SoSoCo project for elderlyJackson Choi
 

What's hot (19)

The Art of Building a Process Design Team
The Art of Building a Process Design TeamThe Art of Building a Process Design Team
The Art of Building a Process Design Team
 
Ready, Aim, Fire! Using Social Media Analytics to Hit Your Target Market
Ready, Aim, Fire! Using Social Media Analytics to Hit Your Target MarketReady, Aim, Fire! Using Social Media Analytics to Hit Your Target Market
Ready, Aim, Fire! Using Social Media Analytics to Hit Your Target Market
 
Grouputer: Going Beyond Web Conferencing
Grouputer: Going Beyond Web ConferencingGrouputer: Going Beyond Web Conferencing
Grouputer: Going Beyond Web Conferencing
 
Towards the intranet of the future
Towards the intranet of the futureTowards the intranet of the future
Towards the intranet of the future
 
MMPD Business Plan Continuity
MMPD Business Plan ContinuityMMPD Business Plan Continuity
MMPD Business Plan Continuity
 
Catalyze Webcast Facilitating JAD Sessions - Jackie Parker 082307
Catalyze Webcast   Facilitating JAD Sessions - Jackie Parker 082307Catalyze Webcast   Facilitating JAD Sessions - Jackie Parker 082307
Catalyze Webcast Facilitating JAD Sessions - Jackie Parker 082307
 
Portfolio Deck
Portfolio DeckPortfolio Deck
Portfolio Deck
 
The 7 enablers and constraints of itsm 2011 v1 final
The 7 enablers and constraints of itsm 2011 v1 finalThe 7 enablers and constraints of itsm 2011 v1 final
The 7 enablers and constraints of itsm 2011 v1 final
 
Eservices project planning
Eservices project planningEservices project planning
Eservices project planning
 
Innovation through connectedness
Innovation through connectednessInnovation through connectedness
Innovation through connectedness
 
VC M&E Module 1 - Clients of the M&E System
VC M&E Module 1 - Clients of the M&E SystemVC M&E Module 1 - Clients of the M&E System
VC M&E Module 1 - Clients of the M&E System
 
Making change happen messages from 4000 managers and staff - quick ppt 121...
Making change happen    messages from 4000 managers and staff - quick ppt 121...Making change happen    messages from 4000 managers and staff - quick ppt 121...
Making change happen messages from 4000 managers and staff - quick ppt 121...
 
PMI SCC Social Medial & Project Management
PMI SCC Social Medial & Project Management PMI SCC Social Medial & Project Management
PMI SCC Social Medial & Project Management
 
Projecptlace online collaboration
Projecptlace online collaborationProjecptlace online collaboration
Projecptlace online collaboration
 
Projecptlace online collaboration 2013
Projecptlace online collaboration 2013Projecptlace online collaboration 2013
Projecptlace online collaboration 2013
 
Planning for and assessing an itsm program
Planning for and assessing an itsm programPlanning for and assessing an itsm program
Planning for and assessing an itsm program
 
Engaging Stakeholders
Engaging StakeholdersEngaging Stakeholders
Engaging Stakeholders
 
SoSoCo project for elderly
SoSoCo project for elderlySoSoCo project for elderly
SoSoCo project for elderly
 
JAD Guidelines
JAD GuidelinesJAD Guidelines
JAD Guidelines
 

Viewers also liked

Project management 2.0
Project management 2.0Project management 2.0
Project management 2.0nadranaj
 
Migue final presentation_v28
Migue final presentation_v28Migue final presentation_v28
Migue final presentation_v28askroll
 
04 CATÁLOGO DE TERMOS Y ÁNFORAS
04 CATÁLOGO DE TERMOS Y ÁNFORAS04 CATÁLOGO DE TERMOS Y ÁNFORAS
04 CATÁLOGO DE TERMOS Y ÁNFORASDelton Santamaría
 
Agencies Developer Products
Agencies Developer ProductsAgencies Developer Products
Agencies Developer ProductsJeff Eddings
 
Dynamic scene understanding using temporal association rules
Dynamic scene understanding using temporal association rulesDynamic scene understanding using temporal association rules
Dynamic scene understanding using temporal association rulesijunejo
 
Microsoft power point curso-2006_sesion2_kohonen
Microsoft power point   curso-2006_sesion2_kohonenMicrosoft power point   curso-2006_sesion2_kohonen
Microsoft power point curso-2006_sesion2_kohonenaskroll
 

Viewers also liked (9)

Project management 2.0
Project management 2.0Project management 2.0
Project management 2.0
 
CATÁLGO DE TECNOLOGÍA
CATÁLGO DE TECNOLOGÍACATÁLGO DE TECNOLOGÍA
CATÁLGO DE TECNOLOGÍA
 
Migue final presentation_v28
Migue final presentation_v28Migue final presentation_v28
Migue final presentation_v28
 
03 CATÁLOGO DE LLAVEROS
03 CATÁLOGO DE LLAVEROS03 CATÁLOGO DE LLAVEROS
03 CATÁLOGO DE LLAVEROS
 
04 CATÁLOGO DE TERMOS Y ÁNFORAS
04 CATÁLOGO DE TERMOS Y ÁNFORAS04 CATÁLOGO DE TERMOS Y ÁNFORAS
04 CATÁLOGO DE TERMOS Y ÁNFORAS
 
Agencies Developer Products
Agencies Developer ProductsAgencies Developer Products
Agencies Developer Products
 
Dynamic scene understanding using temporal association rules
Dynamic scene understanding using temporal association rulesDynamic scene understanding using temporal association rules
Dynamic scene understanding using temporal association rules
 
Innovating
InnovatingInnovating
Innovating
 
Microsoft power point curso-2006_sesion2_kohonen
Microsoft power point   curso-2006_sesion2_kohonenMicrosoft power point   curso-2006_sesion2_kohonen
Microsoft power point curso-2006_sesion2_kohonen
 

Similar to Project management 2.0

Project Management of a Globally Distributed Team - Tools and Techniques
Project Management of a Globally Distributed Team - Tools and TechniquesProject Management of a Globally Distributed Team - Tools and Techniques
Project Management of a Globally Distributed Team - Tools and TechniquesDATA Inc.
 
Project post-mortem analysis
Project post-mortem analysisProject post-mortem analysis
Project post-mortem analysisJaiveer Singh
 
6 Ways To Make Web 2.0 Work
6 Ways To Make Web 2.0 Work6 Ways To Make Web 2.0 Work
6 Ways To Make Web 2.0 WorkKaren Livecchia
 
Six ways to make Web 2.0 work
Six ways to make Web 2.0 workSix ways to make Web 2.0 work
Six ways to make Web 2.0 workTechnomatix
 
Project+ updated prsntn 2012
Project+ updated prsntn 2012Project+ updated prsntn 2012
Project+ updated prsntn 2012CAMTIC
 
Making Rules Project Management
Making Rules  Project ManagementMaking Rules  Project Management
Making Rules Project ManagementUday Sharma
 
Implementation - Communote Enterprise Microblogging (engl.)
Implementation - Communote Enterprise Microblogging (engl.)Implementation - Communote Enterprise Microblogging (engl.)
Implementation - Communote Enterprise Microblogging (engl.)Communote GmbH
 
Essentials egov ict_project_management_v1
Essentials egov ict_project_management_v1Essentials egov ict_project_management_v1
Essentials egov ict_project_management_v1John Macasio
 
Managing Projects on SharePoint - Rich Blank - July 2010
Managing Projects on SharePoint - Rich Blank - July 2010Managing Projects on SharePoint - Rich Blank - July 2010
Managing Projects on SharePoint - Rich Blank - July 2010Rich Blank
 
PMO Charter Template
PMO Charter TemplatePMO Charter Template
PMO Charter TemplateDemand Metric
 
Romeo.mitchell
Romeo.mitchellRomeo.mitchell
Romeo.mitchellNASAPMC
 
Romeo.mitchell
Romeo.mitchellRomeo.mitchell
Romeo.mitchellNASAPMC
 
Overview Of Project Management - P&MSP2010 (2/11)
Overview Of Project Management - P&MSP2010 (2/11)Overview Of Project Management - P&MSP2010 (2/11)
Overview Of Project Management - P&MSP2010 (2/11)Emanuele Della Valle
 
Communications Management PlanProject NameTable of Contents.docx
Communications Management PlanProject NameTable of Contents.docxCommunications Management PlanProject NameTable of Contents.docx
Communications Management PlanProject NameTable of Contents.docxclarebernice
 

Similar to Project management 2.0 (20)

Project Management of a Globally Distributed Team - Tools and Techniques
Project Management of a Globally Distributed Team - Tools and TechniquesProject Management of a Globally Distributed Team - Tools and Techniques
Project Management of a Globally Distributed Team - Tools and Techniques
 
Project post-mortem analysis
Project post-mortem analysisProject post-mortem analysis
Project post-mortem analysis
 
6 Ways To Make Web 2.0 Work
6 Ways To Make Web 2.0 Work6 Ways To Make Web 2.0 Work
6 Ways To Make Web 2.0 Work
 
Six ways to make Web 2.0 work
Six ways to make Web 2.0 workSix ways to make Web 2.0 work
Six ways to make Web 2.0 work
 
MCP1
MCP1MCP1
MCP1
 
Project+ updated prsntn 2012
Project+ updated prsntn 2012Project+ updated prsntn 2012
Project+ updated prsntn 2012
 
Chapter 10
Chapter 10Chapter 10
Chapter 10
 
Making Rules Project Management
Making Rules  Project ManagementMaking Rules  Project Management
Making Rules Project Management
 
Implementation - Communote Enterprise Microblogging (engl.)
Implementation - Communote Enterprise Microblogging (engl.)Implementation - Communote Enterprise Microblogging (engl.)
Implementation - Communote Enterprise Microblogging (engl.)
 
Essentials egov ict_project_management_v1
Essentials egov ict_project_management_v1Essentials egov ict_project_management_v1
Essentials egov ict_project_management_v1
 
Trn 12
Trn 12Trn 12
Trn 12
 
Managing Projects on SharePoint - Rich Blank - July 2010
Managing Projects on SharePoint - Rich Blank - July 2010Managing Projects on SharePoint - Rich Blank - July 2010
Managing Projects on SharePoint - Rich Blank - July 2010
 
How web 2.0 affects project management
How web 2.0 affects project managementHow web 2.0 affects project management
How web 2.0 affects project management
 
Lecture 2
Lecture 2 Lecture 2
Lecture 2
 
Project governance
Project governanceProject governance
Project governance
 
PMO Charter Template
PMO Charter TemplatePMO Charter Template
PMO Charter Template
 
Romeo.mitchell
Romeo.mitchellRomeo.mitchell
Romeo.mitchell
 
Romeo.mitchell
Romeo.mitchellRomeo.mitchell
Romeo.mitchell
 
Overview Of Project Management - P&MSP2010 (2/11)
Overview Of Project Management - P&MSP2010 (2/11)Overview Of Project Management - P&MSP2010 (2/11)
Overview Of Project Management - P&MSP2010 (2/11)
 
Communications Management PlanProject NameTable of Contents.docx
Communications Management PlanProject NameTable of Contents.docxCommunications Management PlanProject NameTable of Contents.docx
Communications Management PlanProject NameTable of Contents.docx
 

Recently uploaded

2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxAbhayThakur200703
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
A.I. Bot Summit 3 Opening Keynote - Perry Belcher
A.I. Bot Summit 3 Opening Keynote - Perry BelcherA.I. Bot Summit 3 Opening Keynote - Perry Belcher
A.I. Bot Summit 3 Opening Keynote - Perry BelcherPerry Belcher
 
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756dollysharma2066
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfOrient Homes
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiFULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiMalviyaNagarCallGirl
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 

Recently uploaded (20)

2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptx
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
A.I. Bot Summit 3 Opening Keynote - Perry Belcher
A.I. Bot Summit 3 Opening Keynote - Perry BelcherA.I. Bot Summit 3 Opening Keynote - Perry Belcher
A.I. Bot Summit 3 Opening Keynote - Perry Belcher
 
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiFULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 

Project management 2.0

  • 1. Project Management 2.0 Janardan Revuru, PMP 1/38
  • 2. About Me  Currently working as Project Manager @ HP  Last 7 years as Project Manager  Fifteen years in IT/Software  Worked for startups, SIEMENS, MOTOROLA, NORTEL  Interested in Open Source and Web 2.0  Blogger on topics - Productivity Software, Financial Management, Project Management  Academics: B.E, MBA, PMP and Certified Financial Manager 2/38 Project Management 2.0 01 Dec 2011
  • 3. Agenda  Objective  Traditional Project Management  What is Project Management 2.0?  Web 2.0 and Tools  Future Trends 3/38 Project Management 2.0 01 Dec 2011
  • 4. Central Theme Evolving and disruptive trends in enterprises and future role of Project Manager 4/38 Project Management 2.0 01 Dec 2011
  • 5. Objective  Awareness of emerging technologies and tools  Definitive way to choose communication tools  Contribution to PM 2.0 http://projectmanagement2dot0.blogger.com 5/38 Project Management 2.0 01 Dec 2011
  • 6. Business Context  Increased competition  Changing consumer preferences  Shorter time to market  Rapid technology changes 6/38 Project Management 2.0 01 Dec 2011
  • 7. Business Imperatives  Hiring and keeping best people  Driving innovation  Customers. Customers. Customers.  Sustain cost-reduction measures  Technology as strategic asset  Reaching global markets  Increased collaboration 7/38 Project Management 2.0 01 Dec 2011
  • 8. Top 3 Challenges for Project Managers 1. Distributed teams 2. Limitations with Traditional tools 3. Rigid Communication Channels 8/38 Project Management 2.0 01 Dec 2011
  • 9. Challenges – Distributed Teams  Different geography  Different time zones Communicati  Different cultures on  Virtual teams overheads or delays 9/38 Project Management 2.0 01 Dec 2011
  • 10. Challenges – Traditional Tools  Email overload/overuse  Workflow tool – create, review, approve  Document repository  For status tracking  Distribution list  Desktop Centered  Project Tracking applications  Documents  Email archives (PST) 10/38 Project Management 2.0 01 Dec 2011
  • 11. Challenges – Communication channels Control Top Down Imposed Stiffness 11/38 Project Management 2.0 01 Dec 2011
  • 12. The Next Gen Enterprise 12/38 Project Management 2.0 01 Dec 2011
  • 13. Enterprise 2.0 and Web 2.0 Web 2.0 Collaboration 2.0 Enterprise 2.0 Project Management 2.0 13/38 Project Management 2.0 01 Dec 2011
  • 14. Enterprise 2.0  Agility  Innovation  Team Productivity  Office 2.0  Social Media Enterprise Web 2.0 to hit $4.6B in 2013 14/38 Project Management 2.0 01 Dec 2011
  • 15. Project Management 2.0 Top Down Approach Bottom up Approach Inflexibility Flexibility Bureaucracy Agility Overall control Collaboration Imposed processes Team-driven process External motivation Internal motivation Project Management 2.0 Control and Collaboration Clarity of Project Goals Visibility of internal organizational processes Coordination and collective intelligence 15/38 Project Management 2.0 01 Dec 2011
  • 16. Web 2.0 Features  Post dot-com bust era  Tim O’Reilly coined the word  Web as a platform  Human Aspects  Made of people (not techies)  Wisdom of crowds (“crowdsourcing”)  Personalization  Community  Network Effect 16/38 Project Management 2.0 01 Dec 2011
  • 17. Web 2.0 Tools  Wiki  Blogs  RSS  Integrated Project Site  Mashups  Podcasts (audio, video)  Tagging  Social Bookmarking  Social Networking 17/38 Project Management 2.0 01 Dec 2011
  • 18. Application of Web 2.0 18/38 Project Management 2.0 01 Dec 2011
  • 19. Best use of Web 2.0 Tools  When report needs input from more than 3 people  When project contributors or stakeholders could change during life of the project  Your team/organization focus is on continuous improvement  When teams are in different geographies and time zones 19/38 Project Management 2.0 01 Dec 2011
  • 20. Project Communication Plan How (Typical Who (Responsible, When (Timing What (The Content) Why (Communication Purpose) Methods Audiences) or Periodicity) of Communication) A. Initial Communications Project Charter This is the foundation of approval and project Requestor, Sponsor; Executives, As early as possible, updated Discussion; Analysis, continuation Decision-Makers with changed and/or approved Informal or Formal Report status Initial High Level Plan Agree to high-level plan and commitments needs Sponsor, Leadership Team, Team As early as possible, updated Meeting; Structured to achieve it Members, Executives, Interested with change and/or approved Discussion; Formal Report parties status B. Recurring Communications Identify current status, planned end date and Leadership team; Team Weekly or in a cycle identified Formal report Status report cost; includes open issues; accomplishments members, Sponsors, Decision in plan and high level schedule makers Visually show progress in results and/or time or Leadership team, Sponsor, Monthly or identified in Graphic representation on Stoplight, cost used, to maintain excitement with those Interested Parties communication plan project room walls or in who prefer charts and numbers presentations Countdown, Burn down charts C. Close-out Communications Approve results to date, and approval to Sponsor, Decision-makers; At major milestones or stage Meeting, Formal report Milestone or Stage- proceed, revise or cancel Leadership team; Team members gate approvals gate reviews Capture and apply the most important lessons Leadership team, team members, End of each phase, stage or Solicitation, then Lessons Learned learned for later initiative Sponsor, Decision makers project discussion. Analysis and informal reporting Reward all stakeholders for phase and end Sponsor, Team Members, End of each phase, stage or Capture the celebration Team Celebration results Leadership team and interested project pictures 20/38 Project Management 2.0 parties 01 Dec 2011
  • 21. Web 2.0 Tools - Mashups 21/38 Project Management 2.0 01 Dec 2011
  • 22. Status Report – Mashups Example Project Name: PM2.0 Summary Statu Project Accomplishments: s Blogs 1. Milestone AX Schedule 2. Alpha Testing 3. Requirements Scope Management 4. Budget Budget Quality Tracking Top Risks KPI Index Defect 1. Procurement SPI 1.2 Tracking Tool stuck 2. Attrition 30% CPI 1.1 3. Project Tracker 22/38 Project Management 2.0 01 Dec 2011
  • 23. Mashups  Enterprise Mashups  Will enable situational applications to be built  Structured and unstructured data  Yahoo! Pipes for end users  JackBe Presto – for visually rich and interactive dashboards  Project Management Mashups  Serena Project and Portfolio Management (PPM)  Projects, People, Costs management 23/38 Project Management 2.0 01 Dec 2011
  • 24. Wiki in Projects Features Uses  Easy to create/edit  Minutes of the  Multiple simultaneous meeting users  Requirements  Versioning gathering  Access Control  Planning project design  Risk Analysis  User Stories and Use cases 24/38 Project Management 2.0  Project Tracking Dec 2011 01
  • 25. Wiki Products MindMap support. Fast. Flash support. Wiki rules like Wikipedia. Easy backup. Enterprise class. Calendar plugin. Spreadsheet plugin Wikipedia. Wider community. 25/38 Project Management 2.0 01 Dec 2011
  • 26. Blogs for Project Management Features Purpose  Short for web log  Project Updates  Replaced BBS, Email  Project Lists Announcements  Posts are listed  Exchange of ideas chronological order  Involvement of stakeholders  Get feedback  Connect with partners  Tacit Knowledge 26/38 Project Management 2.0 01 Dec 2011
  • 27. Blog Products Informal blogs. Lively look and feel. Facebook-like UI. Social Networking. Internet Forum. Good for interaction with multiple functions (outside R&D). 27/38 Project Management 2.0 01 Dec 2011
  • 28. RSS for Project Management Features Purpose  Web feed formats  Notify stakeholders  Notification of updates  User freedom to opt-  Many clients out  Aggregate many sources 28/38 Project Management 2.0 01 Dec 2011
  • 29. RSS Clients 29/38 Project Management 2.0 01 Dec 2011
  • 30. Integrated Project Site Features Purpose  Centralized  One Place for all Information and Project Information communication  Contact information  Manage workflows  RACI Chart  Secure through  Meeting calendar access control  Project goals and vision  Manage Auditing  Document repository  No client installation  Project schedule 30/38 Project Management 2.0  Status Reports 01 Dec 2011
  • 31. IPS Products Task Management with Email integr Office suite, CRM, Project Managem Rated as Top Project Management T Covers all Project Management Knowledge Areas 31/38 Project Management 2.0 01 Dec 2011
  • 32. Try Yourself! 1. Install 2. Download 4. Open 3. Unzip to C:xampphtdocs URL http://localost/<app> 32/38 Project Management 2.0 01 Dec 2011
  • 33. Project Management Software  Basic Project Management  Task, Team, Goal Management  Lighthouse, Basecamp  Wiki-based Project Management  Management of Tasks, Team, Goals, Documents and schedule  TracProject  Bug and Ticket Tracking  16bugs 33/38 Project Management 2.0 01 Dec 2011
  • 34. Project Management Software (2)  Collaboration and Conferencing  activeCollab  Vyew  Invoices  Simple Invoices  Less Accounting  Time Tracking  syncd  fourteenDayz 34/38 Project Management 2.0 01 Dec 2011
  • 35. Conclusion  Collaboration as way of life, than competitive advantage  Mashups to be used extensively  Open formats and tools for easy integration 35/38 Project Management 2.0 01 Dec 2011
  • 36. Comments Thoughts Q&A 36/38 Project Management 2.0 01 Dec 2011
  • 37. Connection ProjectManagement2dot0 Janardan@ Janardan.Revuru@ Janardan Revuru 37/38 Project Management 2.0 01 Dec 2011
  • 38. THANK YOU 38/38 Project Management 2.0 01 Dec 2011

Editor's Notes

  1. Awareness – Introduce you to the world of Project Management where Web 2.0 plays a major roleAdoption – How you can get started with Web 2.0 project starting tomorrowContribution – Project Management 2.0 is still evolving. Each of you can contribute to the topic by sharing experiences, experimentation, thoughts.