3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION1
NVF Annual Bridge Conference 2014
Unique bridges in Qatar
Jesber Rasmussen, Chief Project Manager, COWI A/S
Agenda:
• Client's Expectations
• COWI's design
• Contractors
construction sequence
• Photos from the
construction
3 AEPTEMBER 2014
COWI POWERPOINT PRESENTATION2
Client's expectations
› New township in Doha in Qatar to
200.000 residents
› Marinas
› Business center
› Entertainment
› Beaches
› Hotels
› 5 billion dollar projects
› 9 marine bridges
› Two of the bridges needed to be very
unique
Project description
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION3
Client's expectations
› Cable Stayed landmark
› Arch bridge landmark
› Suspension bridge landmark
Client chose the suspension bridge
Because:
› First of its kind in the world
› A true landmark for Lusail
› Circle could resemble the Q in Qutar
› Circle represent the sun as the
source of life
Concepts developed together with
Dissing+Weitling
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION4
Design concept
› Form and functionality unique
› Fantasy concept
› Like art
› Lighting and illustration to become
landmark for Lusail in Qatar
= The challenge was set
3 SEPYEMBER 2014
COWI POWERPOINT PRESENTATION5
Design
› Suspension bridge concept with app.
200m bridge lengths
› Self anchored suspension bridges with
one cable plan
› Cross girders and hangers per 6m
› Ring diameter of 50m produced in high
strength steel over the deck and high
strength concrete under the deck
Self anchored suspension bridges
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION6
Design
› Composite bridge deck with closed steel box
› Steel box and main cable corrosion
protected by dehumidification system
Self anchored suspension bridges
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION7
Design
› Mono cable
› Cable anchored at ring and at bridge
ends and down to the anchor block
› Like a two tower suspension bridge with
double length
Main cable
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION8
Design
› Main cable 7 locked coil strands Ø140,
13900mm^2, min 18,7MN
› Main cable Ø424 dehumidification system
Cable system
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION9
Design
› Bridge self anchored partly
› Main span fully anchored for main span
› Side span anchored at bridge deck and
at the anchor block
Anchor of Main cable at bridge ends
Anchored
down due to
uplift
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION10
Design
› Cables are anchored at pylon ring.
› Anchor saddle would be long is not
anchored individual
Anchor of Main cable at pylon
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION11
Design
› Hangers pre-fabricated locked coil
strands Ø70, 3390mm^2 and min.
strength of 4.8MN
› Hangers protected by HDPE pipe
Hangers
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION12
Design
› Cable clamps design very compact and
unique visual from the road.
Cable clamps
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION13
Design
› Composite bridge deck with 250mm
concrete deck for weight and stiffness for
cable system
› Max deformation 1/400*span
› Single cable plan require torsion stiffness
= closed box girder
› Pre-fab + insitu deck
Bridge deck
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION14
Design
› Two precast elements used
› Between the pylon legs insitu
concrete steel plate under for
strengthening
› At bridge end in situ concrete
because of joints and steel plate
under the deck for strengthening
Bridge deck
side span
abutment
Pylon leg Pylon leg
main span
abutment
insitu
insitupre-fab
pre-fab insitu
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION15
Design
› Box girder closed
› small cross girders per 6m max height 2,74m and width 1.0m
Steel girder
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION16
Design
› Utilities running in the girders
› hence relative large opening
Steel girder
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION17
Design
› Cross girder per 6m for the hangers
› No cross girders between the pylon legs
Cross girder
no cross girders
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION18
Design
› Hammerhead in concrete
› Connecting bridge deck with pylon legs
and with the pylon ring
Connection bridge deck and pylon
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION19
Design
› Pylon ring 50m dia.
› Pylon in high strength steel
above bridge deck and pre
stressing high strength
concrete below bridge deck
› Foundation on bored piles
Pylon ring
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION20
Design
› Pylon steel strengthened with stiffeners
Pylon ring
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION21
Design
› 6+8 cables between the pylon steel ring
and pylon pier
Concrete part of pylon ring
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION22
Design
› Post-tensioned anchor block
› 5 strands from main anchored in anchor block 2 strands anchored in the
superstructure girder
› 7 strands anchored in the superstructure at the abutment
Anchor block and abutment
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION23
Design
› All closed steel areas will
corrosion protected by
dehumidification
› One system for bridge
girder, pylon and main
cable
Dehumidification system
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION24
Construction sequence
1. Widen earth
bridge/excavation
2. Piling and pile cap
construction
3. Substructure construction
4. Backfill and gantry crane
installation
5. Bent system-side span
construction
6. Pylon & main span erection
7. CIP deck cast
8. Cable Erection
Construction
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION25
Photos
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION26
Photos
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION27
Photos
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION28
Photos
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION29
Photos
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION30
Photos
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION31
Photos
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION32
Photos
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION33
Photos
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION34
Photos
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION35
Photos
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION36
Photos
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION37
Photos
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION38
Photos
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION39
Photos
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION40
Photos
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION41
Photos
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION42
Photos
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION43
Photos
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION44
Photos
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION45
Photos
30 AUGUST 2014
COWI POWERPOINT PRESENTATION46
Completed bridge
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION47
Thank you

More Related Content

What's hot

What's hot (17)

The Trump International Hotel & Tower
The Trump International Hotel & TowerThe Trump International Hotel & Tower
The Trump International Hotel & Tower
 
Dr. ar. david h. fisher
Dr. ar. david h. fisherDr. ar. david h. fisher
Dr. ar. david h. fisher
 
Marquette plaza agresh & snehansu
Marquette plaza agresh & snehansuMarquette plaza agresh & snehansu
Marquette plaza agresh & snehansu
 
Emergency Vehicle Operator Course (EVOC)
Emergency Vehicle Operator Course (EVOC)Emergency Vehicle Operator Course (EVOC)
Emergency Vehicle Operator Course (EVOC)
 
San-Francisco-Oakland Bay Bridge New East Span: Skyway
San-Francisco-Oakland Bay Bridge New East Span: SkywaySan-Francisco-Oakland Bay Bridge New East Span: Skyway
San-Francisco-Oakland Bay Bridge New East Span: Skyway
 
High rise building case study
High rise building case study High rise building case study
High rise building case study
 
Trump Tower Chicago
Trump Tower ChicagoTrump Tower Chicago
Trump Tower Chicago
 
Wincobank Presentation
Wincobank PresentationWincobank Presentation
Wincobank Presentation
 
Veterans' Glass City Skyway Bridge
Veterans' Glass City Skyway BridgeVeterans' Glass City Skyway Bridge
Veterans' Glass City Skyway Bridge
 
2010 Marina Bay Sands
2010 Marina Bay Sands2010 Marina Bay Sands
2010 Marina Bay Sands
 
Burj al arab (Cofferdam&Rigging)
Burj al arab (Cofferdam&Rigging)Burj al arab (Cofferdam&Rigging)
Burj al arab (Cofferdam&Rigging)
 
Reinforcement of Driscoll Bridge
Reinforcement of Driscoll BridgeReinforcement of Driscoll Bridge
Reinforcement of Driscoll Bridge
 
Wacker Drive Viaduct Reconstruction
Wacker Drive Viaduct ReconstructionWacker Drive Viaduct Reconstruction
Wacker Drive Viaduct Reconstruction
 
Aqua towers
Aqua towersAqua towers
Aqua towers
 
Theng portfolio 2015 MAY 25
Theng portfolio 2015 MAY 25Theng portfolio 2015 MAY 25
Theng portfolio 2015 MAY 25
 
Vidalta Bridge
Vidalta BridgeVidalta Bridge
Vidalta Bridge
 
برج العرب
برج العرببرج العرب
برج العرب
 

Viewers also liked

Script for assignment 2
Script for assignment 2Script for assignment 2
Script for assignment 2lelaina_smile
 
Sunit resume uae ++
Sunit resume uae ++Sunit resume uae ++
Sunit resume uae ++Sunit E
 
гепаназе
гепаназегепаназе
гепаназеanfoacademy
 
Types_and_Causes_of_Cracks_and_Cracking
Types_and_Causes_of_Cracks_and_CrackingTypes_and_Causes_of_Cracks_and_Cracking
Types_and_Causes_of_Cracks_and_CrackingMukilavan Pandiselvam
 
CaprioResume 2015U
CaprioResume 2015UCaprioResume 2015U
CaprioResume 2015UMarc Caprio
 
Презентация Декатилен
Презентация ДекатиленПрезентация Декатилен
Презентация Декатиленanfoacademy
 

Viewers also liked (10)

Script for assignment 2
Script for assignment 2Script for assignment 2
Script for assignment 2
 
Sunit resume uae ++
Sunit resume uae ++Sunit resume uae ++
Sunit resume uae ++
 
гепаназе
гепаназегепаназе
гепаназе
 
Types_and_Causes_of_Cracks_and_Cracking
Types_and_Causes_of_Cracks_and_CrackingTypes_and_Causes_of_Cracks_and_Cracking
Types_and_Causes_of_Cracks_and_Cracking
 
keshav resume 01
keshav resume 01keshav resume 01
keshav resume 01
 
CaprioResume 2015U
CaprioResume 2015UCaprioResume 2015U
CaprioResume 2015U
 
Viks
ViksViks
Viks
 
Презентация Декатилен
Презентация ДекатиленПрезентация Декатилен
Презентация Декатилен
 
burçin - iskelet sistemi
burçin - iskelet sistemiburçin - iskelet sistemi
burçin - iskelet sistemi
 
Gastroenteritis
GastroenteritisGastroenteritis
Gastroenteritis
 

Similar to 16_Presentation - NVF Annual Bridge Confererence 2014

Bandra Worli sea link
Bandra Worli sea linkBandra Worli sea link
Bandra Worli sea linkKAVYA H
 
Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Rajesh Prasad
 
Proposed Bridge over the Preston River in East Bunbury, Western Australia
Proposed Bridge over the Preston River in East Bunbury, Western AustraliaProposed Bridge over the Preston River in East Bunbury, Western Australia
Proposed Bridge over the Preston River in East Bunbury, Western AustraliaToe Myint Naing
 
Steel Composite Bridge Construction R1
Steel Composite Bridge Construction R1Steel Composite Bridge Construction R1
Steel Composite Bridge Construction R1Suhas Khedkar
 
Nikhil Gopi.doc.pptx
Nikhil Gopi.doc.pptxNikhil Gopi.doc.pptx
Nikhil Gopi.doc.pptxitech2017
 
Design of Foot Over Bridge
Design of Foot Over BridgeDesign of Foot Over Bridge
Design of Foot Over Bridgejupallipavan2911
 
Introduction to Bridges.pdf
Introduction to Bridges.pdfIntroduction to Bridges.pdf
Introduction to Bridges.pdfkarthik sampath
 
bridges-140101030123-phpapp02.pdf
bridges-140101030123-phpapp02.pdfbridges-140101030123-phpapp02.pdf
bridges-140101030123-phpapp02.pdfabhinavbharat9
 
Bstructure report
Bstructure reportBstructure report
Bstructure reportMegan Chung
 
Munger rail cum road bridge
Munger rail cum road bridgeMunger rail cum road bridge
Munger rail cum road bridgejaiveer singh
 
Innovative_Bridge_Design_Handbook_Construction,_Rehabilitation_and.pdf
Innovative_Bridge_Design_Handbook_Construction,_Rehabilitation_and.pdfInnovative_Bridge_Design_Handbook_Construction,_Rehabilitation_and.pdf
Innovative_Bridge_Design_Handbook_Construction,_Rehabilitation_and.pdfsandipanpaul16
 
JH Company catalog(English version) 20151109
JH Company catalog(English version) 20151109JH Company catalog(English version) 20151109
JH Company catalog(English version) 20151109Trade Marketing Inc.
 
0410_Paddington-Brunel LoBEG-Oct04-Presentation_Javad_Akhtar
0410_Paddington-Brunel LoBEG-Oct04-Presentation_Javad_Akhtar0410_Paddington-Brunel LoBEG-Oct04-Presentation_Javad_Akhtar
0410_Paddington-Brunel LoBEG-Oct04-Presentation_Javad_AkhtarJavad Akhtar
 
Seminar on cable stayed bridge
Seminar on cable stayed bridgeSeminar on cable stayed bridge
Seminar on cable stayed bridgeSujeet Rajput
 
AEPL Presentation Rev_2 -O&G.pdf
AEPL Presentation Rev_2 -O&G.pdfAEPL Presentation Rev_2 -O&G.pdf
AEPL Presentation Rev_2 -O&G.pdfAayoghEngineering
 
Bandra+worli+sea+link
Bandra+worli+sea+linkBandra+worli+sea+link
Bandra+worli+sea+linkASHOK KUMAR
 
Acrow big steel panel (formwork)
Acrow big steel panel (formwork)Acrow big steel panel (formwork)
Acrow big steel panel (formwork)yasser mohsen
 

Similar to 16_Presentation - NVF Annual Bridge Confererence 2014 (20)

Bandra Worli sea link
Bandra Worli sea linkBandra Worli sea link
Bandra Worli sea link
 
Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...
 
Proposed Bridge over the Preston River in East Bunbury, Western Australia
Proposed Bridge over the Preston River in East Bunbury, Western AustraliaProposed Bridge over the Preston River in East Bunbury, Western Australia
Proposed Bridge over the Preston River in East Bunbury, Western Australia
 
Steel Composite Bridge Construction R1
Steel Composite Bridge Construction R1Steel Composite Bridge Construction R1
Steel Composite Bridge Construction R1
 
Nikhil Gopi.doc.pptx
Nikhil Gopi.doc.pptxNikhil Gopi.doc.pptx
Nikhil Gopi.doc.pptx
 
Design of Foot Over Bridge
Design of Foot Over BridgeDesign of Foot Over Bridge
Design of Foot Over Bridge
 
Introduction to Bridges.pdf
Introduction to Bridges.pdfIntroduction to Bridges.pdf
Introduction to Bridges.pdf
 
Bridges
BridgesBridges
Bridges
 
bridges-140101030123-phpapp02.pdf
bridges-140101030123-phpapp02.pdfbridges-140101030123-phpapp02.pdf
bridges-140101030123-phpapp02.pdf
 
Bstructure report
Bstructure reportBstructure report
Bstructure report
 
Bstructure report
Bstructure reportBstructure report
Bstructure report
 
Munger rail cum road bridge
Munger rail cum road bridgeMunger rail cum road bridge
Munger rail cum road bridge
 
Innovative_Bridge_Design_Handbook_Construction,_Rehabilitation_and.pdf
Innovative_Bridge_Design_Handbook_Construction,_Rehabilitation_and.pdfInnovative_Bridge_Design_Handbook_Construction,_Rehabilitation_and.pdf
Innovative_Bridge_Design_Handbook_Construction,_Rehabilitation_and.pdf
 
JH Company catalog(English version) 20151109
JH Company catalog(English version) 20151109JH Company catalog(English version) 20151109
JH Company catalog(English version) 20151109
 
0410_Paddington-Brunel LoBEG-Oct04-Presentation_Javad_Akhtar
0410_Paddington-Brunel LoBEG-Oct04-Presentation_Javad_Akhtar0410_Paddington-Brunel LoBEG-Oct04-Presentation_Javad_Akhtar
0410_Paddington-Brunel LoBEG-Oct04-Presentation_Javad_Akhtar
 
Seminar on cable stayed bridge
Seminar on cable stayed bridgeSeminar on cable stayed bridge
Seminar on cable stayed bridge
 
Bandra worli sea link
Bandra worli sea linkBandra worli sea link
Bandra worli sea link
 
AEPL Presentation Rev_2 -O&G.pdf
AEPL Presentation Rev_2 -O&G.pdfAEPL Presentation Rev_2 -O&G.pdf
AEPL Presentation Rev_2 -O&G.pdf
 
Bandra+worli+sea+link
Bandra+worli+sea+linkBandra+worli+sea+link
Bandra+worli+sea+link
 
Acrow big steel panel (formwork)
Acrow big steel panel (formwork)Acrow big steel panel (formwork)
Acrow big steel panel (formwork)
 

16_Presentation - NVF Annual Bridge Confererence 2014

  • 1. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION1 NVF Annual Bridge Conference 2014 Unique bridges in Qatar Jesber Rasmussen, Chief Project Manager, COWI A/S Agenda: • Client's Expectations • COWI's design • Contractors construction sequence • Photos from the construction
  • 2. 3 AEPTEMBER 2014 COWI POWERPOINT PRESENTATION2 Client's expectations › New township in Doha in Qatar to 200.000 residents › Marinas › Business center › Entertainment › Beaches › Hotels › 5 billion dollar projects › 9 marine bridges › Two of the bridges needed to be very unique Project description
  • 3. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION3 Client's expectations › Cable Stayed landmark › Arch bridge landmark › Suspension bridge landmark Client chose the suspension bridge Because: › First of its kind in the world › A true landmark for Lusail › Circle could resemble the Q in Qutar › Circle represent the sun as the source of life Concepts developed together with Dissing+Weitling
  • 4. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION4 Design concept › Form and functionality unique › Fantasy concept › Like art › Lighting and illustration to become landmark for Lusail in Qatar = The challenge was set
  • 5. 3 SEPYEMBER 2014 COWI POWERPOINT PRESENTATION5 Design › Suspension bridge concept with app. 200m bridge lengths › Self anchored suspension bridges with one cable plan › Cross girders and hangers per 6m › Ring diameter of 50m produced in high strength steel over the deck and high strength concrete under the deck Self anchored suspension bridges
  • 6. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION6 Design › Composite bridge deck with closed steel box › Steel box and main cable corrosion protected by dehumidification system Self anchored suspension bridges
  • 7. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION7 Design › Mono cable › Cable anchored at ring and at bridge ends and down to the anchor block › Like a two tower suspension bridge with double length Main cable
  • 8. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION8 Design › Main cable 7 locked coil strands Ø140, 13900mm^2, min 18,7MN › Main cable Ø424 dehumidification system Cable system
  • 9. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION9 Design › Bridge self anchored partly › Main span fully anchored for main span › Side span anchored at bridge deck and at the anchor block Anchor of Main cable at bridge ends Anchored down due to uplift
  • 10. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION10 Design › Cables are anchored at pylon ring. › Anchor saddle would be long is not anchored individual Anchor of Main cable at pylon
  • 11. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION11 Design › Hangers pre-fabricated locked coil strands Ø70, 3390mm^2 and min. strength of 4.8MN › Hangers protected by HDPE pipe Hangers
  • 12. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION12 Design › Cable clamps design very compact and unique visual from the road. Cable clamps
  • 13. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION13 Design › Composite bridge deck with 250mm concrete deck for weight and stiffness for cable system › Max deformation 1/400*span › Single cable plan require torsion stiffness = closed box girder › Pre-fab + insitu deck Bridge deck
  • 14. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION14 Design › Two precast elements used › Between the pylon legs insitu concrete steel plate under for strengthening › At bridge end in situ concrete because of joints and steel plate under the deck for strengthening Bridge deck side span abutment Pylon leg Pylon leg main span abutment insitu insitupre-fab pre-fab insitu
  • 15. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION15 Design › Box girder closed › small cross girders per 6m max height 2,74m and width 1.0m Steel girder
  • 16. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION16 Design › Utilities running in the girders › hence relative large opening Steel girder
  • 17. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION17 Design › Cross girder per 6m for the hangers › No cross girders between the pylon legs Cross girder no cross girders
  • 18. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION18 Design › Hammerhead in concrete › Connecting bridge deck with pylon legs and with the pylon ring Connection bridge deck and pylon
  • 19. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION19 Design › Pylon ring 50m dia. › Pylon in high strength steel above bridge deck and pre stressing high strength concrete below bridge deck › Foundation on bored piles Pylon ring
  • 20. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION20 Design › Pylon steel strengthened with stiffeners Pylon ring
  • 21. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION21 Design › 6+8 cables between the pylon steel ring and pylon pier Concrete part of pylon ring
  • 22. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION22 Design › Post-tensioned anchor block › 5 strands from main anchored in anchor block 2 strands anchored in the superstructure girder › 7 strands anchored in the superstructure at the abutment Anchor block and abutment
  • 23. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION23 Design › All closed steel areas will corrosion protected by dehumidification › One system for bridge girder, pylon and main cable Dehumidification system
  • 24. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION24 Construction sequence 1. Widen earth bridge/excavation 2. Piling and pile cap construction 3. Substructure construction 4. Backfill and gantry crane installation 5. Bent system-side span construction 6. Pylon & main span erection 7. CIP deck cast 8. Cable Erection Construction
  • 25. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION25 Photos
  • 26. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION26 Photos
  • 27. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION27 Photos
  • 28. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION28 Photos
  • 29. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION29 Photos
  • 30. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION30 Photos
  • 31. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION31 Photos
  • 32. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION32 Photos
  • 33. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION33 Photos
  • 34. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION34 Photos
  • 35. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION35 Photos
  • 36. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION36 Photos
  • 37. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION37 Photos
  • 38. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION38 Photos
  • 39. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION39 Photos
  • 40. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION40 Photos
  • 41. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION41 Photos
  • 42. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION42 Photos
  • 43. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION43 Photos
  • 44. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION44 Photos
  • 45. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION45 Photos
  • 46. 30 AUGUST 2014 COWI POWERPOINT PRESENTATION46 Completed bridge
  • 47. 3 SEPTEMBER 2014 COWI POWERPOINT PRESENTATION47 Thank you