Contract Management Consultant Module 1020 R1 2020
RED FIDIC 2nd Edition, 2017
CMC Program
By: Moustafa I. Abu
Dief
1
Contracts Management Consultant Program Module 1020 R1 2020- by Dr. Moustafa Ismail
https://www.linkedin.com/in/moustafa-ismail-ph-d-cfcc-mcinstces-mciob-
rmp-pmp-ficcp-ccp-
93798a16/?lipi=urn%3Ali%3Apage%3Ad_flagship3_feed%3B%2FO66nFaKT1i
pcA42cdbalw%3D%3D&licu=urn%3Ali%3Acontrol%3Ad_flagship3_feed-
identity_welcome_message
CMC Module 1020–R1 2021
Contract Management Consultant
Red FIDIC 2nd Edition, 2017
FIDIC Suit of Contracts Module 1020 R1 2021 2
FIDIC Suit of Contracts 1020 R1 2021
By: Dr. Eng. Moustafa I. Abu Dief
@moustafaabudief
Module I FIDIC RED BOOK 2017
FIDIC Suit of Contracts 1020 R1 2021 Module I
3
 Contracts and Claims Manager, Moustafa has Experience in Construction
Projects, Engineering, Contracts, Claims, Dispute Resolution, and Training for 30
Years In Egypt, Qatar, Kuwait, KSA. Since 2005 he is a member and certification
grader, reviewer in different professional organizations
Moustafa I. Abu Dief, Ph.D, CFCC™, PMP®, CCP, PMI-RMP, FCIOB, Fcinst.CES
 Dr. Moustafa is Certified Forensic Claims (CFCC
Consultant In Addition To:
• Associate Prof. ABMS University- Switzerland
• Consultant engineer, Saudi Council of Engineers, Certified
ARBITRATOR
• Fellow Institute of Civil Engineers Surveyors,
• Fellow , Chartered Institute Of Building, UK.
• Certified Arbitrator, Egypt, Kuwait, Bahrain, and KSA
• Fellow and A Prof. Justice Academy for Legal and economics.
• Fellow, Institute Of Construction Claims Practitioner, US, 2016
• PMI-RMP, CCP, QMS/ Qa Management IRCA Certification.
• PMP, ARICS, PMOC certification, CFCC Exam Grader.
FIDIC Suit of Contracts Module 1020 R1 2021
4
•
‫مصطفى‬ ‫دكتورمهندس‬
‫إسماعٌل‬
‫أبوضٌف‬
•
‫هندسى‬ ‫ومستشار‬ ‫للمهندسٌن‬ ‫السعودٌة‬ ‫بالهٌئة‬ ‫معتمد‬ ‫محكم‬
(
‫عضوٌة‬
27
‫سنة‬
)
•
‫أستاذ‬
‫بالجامعة‬ ‫مساعد‬
‫السوٌسرٌة‬
(
‫المشروعات‬ ‫وإدارة‬ ‫العقود‬
.)
•
‫ممتحن‬
‫لشهادات‬ ‫معتمد‬
‫التكالٌف‬ ‫دولٌة‬
‫و‬
‫المطالبات‬
‫وعضوٌة‬
‫منظمات‬
‫الدولى‬ ‫اإلعتماد‬
•
‫اإلزهر‬ ‫جامعة‬ ‫ودكتوراه‬ ‫ماجستٌر‬
(
‫والمطالبات‬ ‫العقود‬
.)
•
‫زمٌل‬
‫المعهد‬
‫للبناء‬ ‫البرٌطانى‬
FCIOB –
•
‫زمٌل‬
‫المعهد‬
‫المساحٌٌن‬ ‫للمهندسٌن‬ ‫البرٌطانى‬
FInstCES
•
‫المهنى‬ ‫اإلعتماد‬ ‫على‬ ‫حاصل‬
CFCC™- AACE- USA
‫العقود‬ ‫لمطالبات‬
.
•
‫معتمد‬ ‫مهندس‬
PMP® - PMI-RMP® - CCP®
AACE- PMOC ,
SSGB, and
•
‫ومشروعات‬ ‫عقود‬ ‫معتمد‬ ‫مراجع‬
IRCA-UK Certification
(L-Auditor)
•
‫العدالة‬ ‫ٌأكادٌمٌة‬ ‫العقود‬ ‫مساعد‬ ‫أستاذ‬
•
‫مدنى‬ ‫مهندس‬
-
‫إنشاءات‬
–
‫شمس‬ ‫عٌن‬ ‫هـندسة‬
1988
FIDIC Suit of Contracts Module 1020 R1
2021
‫بالمحاضر‬ ‫التعرٌف‬
FIDIC Suit of Contracts Module 1020 R1 2021 5
FIDIC Suit of Contracts 1020 R1 2021
Contact details
moustafa1_ismail@yahoo.com
https://www.linkedin.com/in/moustafa-ismail-abu-dief-93798a16/
https://twitter.com/moustafaabudief
https://www.slideshare.net/moustafismail
00966508297971- 00966560074207 KSA
Moustafa I. Abu Dief, Ph.D, CFCC™, PMP®, CCP, PMI-RMP, FCIOB, FCInstCES
FIDIC Suit of Contracts Module 1020 R1 2021 6
FIDIC 2017 RED BBOOK
Our New Approach
Proactive
1.Zero Failed Project %
2. Continuous Business Relationship
0
FIDIC Suit of Contracts Module 1020 R1 2021 7
FIDIC Suit of Contracts 1020 R1 2021
FIDIC Suit of Contracts Modules
Subject Module
Practical Use of the FIDIC
Contracts
I
FIDIC Contracts Management and
Administration
I
Claims and Disputes Resolution II
Dispute Adjudication Boards
Arbitration, Saudi SCCA, UK.
CI.arb Chartered Membership
II
FIDIC Suit of Contracts Module 1020 R1 2021 8
Contract Administration Training course
Contracts Management
Consultant CMC
Program- CMC Module 1010 – M 1020-
M 1030- Module 1040
Contract Management Consultant
Programme.
An integrated contracts and claims
management competencies development
Programme Comprises Module 1010 –
Module 1020- Module 1030- Module 1040
The participants shall achieve a
professional level of competencies, skills,
and they will be accredited as:
Contracts Management Consultant CMC.
FIDIC Suit of Contracts Module 1020 R1 2021 9
 Introduction.
• The construction project should be a beneficial endeavor to the
project stakeholders,
The FIDIC RED book is drafted for the contract Between An
Employer And The Contractor for the Construction For Building
And Engineering Works Designed By The Employer
FIDIC Suit of Contracts Module 1020 R1 2021
FIDIC Suit of Contracts Module 1020 R1 2021 10
FIDIC Suit of Contracts Module 1020 R1 2021
‫ما‬
‫ھو‬
‫الفيديك‬
‫؟‬
•
‫اتحاد‬
‫يضم‬
“
‫جمعيات‬
‫المھندسين‬
‫االستشاريين‬
“
‫فى‬
‫الدول‬
‫االعضاء‬
‫أكثر‬
‫من‬
69
‫جمعية‬
‫ويتحدث‬
‫بلسان‬
600,000
‫من‬
‫المھندسين‬
‫االستشاريين‬
‫فى‬
‫العالم‬
•
‫مطالبة‬
‫أى‬
‫جھة‬
‫فى‬
‫أى‬
‫دولة‬
‫للمھندس‬
‫االستشارى‬
‫أو‬
‫المكتب‬
‫االستشارى‬
‫بإثبات‬
‫عضويته‬
‫فى‬
‫الفيديك‬
‫يعتبر‬
‫طلبا‬
‫غير‬
‫جائز‬
–
‫انما‬
‫يمكن‬
‫مطالبة‬
‫أى‬
‫منھما‬
‫بإثبات‬
‫عضويته‬
‫بجمعية‬
‫المھندسين‬
‫االستشاريين‬
‫للبلد‬
‫الذى‬
‫ينتمى‬
‫اليه‬
‫وأن‬
‫تكون‬
‫ھذه‬
‫الجمعية‬
‫عضو‬
‫بالفيديك‬
•
‫تم‬
‫تأسيس‬
‫الفيديك‬
‫أول‬
‫مرة‬
‫عام‬
1913
‫بمساھمة‬
‫ثالث‬
‫جمعيات‬
‫أوروبية‬
‫للمھندسين‬
‫االستشاريين‬
‫ھى‬
:
(CICB) -1
‫جمعٌة‬
‫المهندسٌن‬
‫االستشارٌٌن‬
‫البلجٌكٌة‬
(CICF) -2
‫الجمعٌة‬
‫الفرنسٌة‬
‫للمهندسٌن‬
‫االستشارٌٌن‬
(ASIC) -3
‫الجمعٌة‬
‫السوسرٌة‬
‫للمهندسٌن‬
‫االستشارٌٌن‬
FIDIC Suit of Contracts Module 1020 R1 2021 11
FIDIC Suit of Contracts Module 1020 R1 2021
‫؟‬ ‫الفٌدٌك‬ ‫هو‬ ‫ما‬
•
‫بلجيكا‬ ‫فى‬
1913
(Ghent)
‫جنت‬ ‫مدينة‬ ‫فى‬ ‫عقد‬ ‫مؤتمر‬ ‫أول‬
‫المھندس‬ ‫تعريف‬ ‫تم‬ ‫وفيه‬
•
‫بسويسرا‬ ‫بيرن‬ ‫مدينة‬ ‫وفى‬
Berne)
)
‫عام‬ ‫فى‬
1914
‫للفيديك‬ ‫الثانى‬ ‫المؤتمر‬ ‫عقد‬ ‫تم‬

‫الفيديك‬ ‫لرؤية‬ ‫وفقا‬ ‫االستشارى‬ ‫المھندس‬
:
“
‫باسمه‬ ‫المھنة‬ ‫يمارس‬ ‫والذى‬ ‫العملية‬ ‫والخبرة‬ ‫والمھنية‬ ‫والتقنية‬ ‫العلمية‬ ‫المعارف‬ ‫يمتلك‬ ‫الذى‬ ‫الشخص‬
‫الخاص‬
‫عميله‬ ‫لصالح‬ ‫حكومية‬ ‫أو‬ ‫تجارية‬ ‫مؤسسة‬ ‫أى‬ ‫عن‬ ‫مستقال‬
–
‫تامة‬ ‫بحيدة‬ ‫ويتصرف‬
–
‫اال‬ ‫نقود‬ ‫أى‬ ‫يتلقى‬ ‫وال‬
‫من‬
‫عميله‬
‫أو‬
‫منه‬ ‫بإذن‬
”
‫الفيديك‬
‫األبيض‬
‫وھذا‬ ‫الماللك‬ ‫بين‬ ‫عقد‬ ‫نموذج‬ ‫ھو‬
‫االستشارى‬ ‫المھندس‬
.
‫الفٌدٌك‬
‫األحمر‬
‫صاحب‬ ‫بٌن‬ ‫عقد‬ ‫نموذج‬ ‫هو‬
/
‫التصمٌم‬ ‫بنظام‬ ‫والمقاول‬ ‫العمل‬ ‫رب‬
–
‫العطاء‬ ‫طرح‬
-
‫التنفٌذ‬
/
‫البناء‬
FIDIC Suit of Contracts Module 1020 R1 2021 12
FIDIC Suit of Contracts Module 1020 R1 2021
‫؟‬ ‫الفيديك‬ ‫عقود‬ ‫نماذج‬
•
‫عام‬ ‫من‬ ‫الفٌدٌك‬
1913
‫عام‬ ‫وحتى‬
1957
‫ٌذكر‬ ‫بنشاط‬ ‫ٌقم‬ ‫لم‬
,
‫عام‬ ‫فى‬
1957
‫من‬ ‫االولى‬ ‫الطبعة‬ ‫أصدر‬
‫نموذج‬
“
‫المدنٌة‬ ‫الهندسة‬ ‫أعمال‬ ‫مقاوالت‬ ‫عقد‬ ‫شروط‬
”
‫الغالف‬ ‫واختار‬
‫االحمر‬ ‫باللون‬
Conditions of Contract For Works Of Civil Engineering Construction”
-
‫عام‬ ‫فى‬
1969
‫على‬ ‫وأبقى‬ ‫هذاالنموذج‬ ‫من‬ ‫الثانٌة‬ ‫الطبعة‬ ‫أصدر‬
‫االحمر‬ ‫الغالف‬
-
‫عام‬ ‫فى‬
1977
‫االراضى‬ ‫واستصالح‬ ‫التكرٌك‬ ‫بأعمال‬ ‫خاصا‬ ‫جزءا‬ ‫الٌه‬ ‫وأضاف‬ ‫النموذج‬ ‫هذا‬ ‫من‬ ‫الثالثة‬ ‫الطبعة‬ ‫أصدر‬
‫االحمر‬ ‫الغالف‬ ‫على‬ ‫وأبقى‬
-
‫عام‬ ‫فى‬
1987
‫هذا‬ ‫من‬ ‫الرابعة‬ ‫الطبعة‬ ‫أصدر‬
‫األحمر‬ ‫النموذج‬
-
‫عام‬ ‫فى‬
1995
‫كٌفٌة‬ ‫فى‬ ‫ملحق‬ ‫فأصدر‬ ‫المنازعات‬ ‫لتسوٌة‬ ‫جدٌدا‬ ‫نظاما‬ ‫ٌصدرها‬ ‫التى‬ ‫العقود‬ ‫نماذج‬ ‫على‬ ‫الفٌدٌك‬ ‫أدخل‬
‫تطبٌقه‬
‫االحمر‬ ‫الكتاب‬ ‫فى‬
•
‫عام‬ ‫فى‬
1963
‫وهو‬ ‫أخر‬ ‫لنموذج‬ ‫االولى‬ ‫الطبعة‬ ‫الفٌدٌك‬ ‫أصدر‬
“
‫والكهربائٌة‬ ‫المٌكانٌكٌة‬ ‫األعمال‬ ‫مقاوالت‬ ‫عقد‬ ‫شروط‬
–
‫بالموقع‬ ‫التركٌبات‬ ‫أعمال‬ ‫شاملة‬
“
‫وأختار‬
‫الغالف‬
‫االصفر‬
Conditions Of Contract For Electrical And Mechanical Works –Including Erection On Site”
•
‫عام‬ ‫فى‬
1980
‫المٌكٌانٌكٌة‬ ‫االعمال‬ ‫عقود‬ ‫مستندات‬ ‫بشأن‬ ‫مالحظات‬ ‫الٌه‬ ‫وأضاف‬ ‫النموذج‬ ‫هذا‬ ‫من‬ ‫الثانٌة‬ ‫الطبعة‬
‫بنفس‬ ‫والكهربائٌة‬
‫االصفر‬ ‫اللون‬
•
‫عام‬ ‫فى‬
1987
‫واحتفظ‬ ‫النموذج‬ ‫هذا‬ ‫من‬ ‫الثالثة‬ ‫الطبعة‬ ‫أصدر‬
‫االصفر‬ ‫باللون‬
•
‫عام‬ ‫فى‬
1995
‫ملحق‬ ‫فأصدر‬ ‫المنازعات‬ ‫لتسوٌة‬ ‫جدٌدا‬ ‫نظاما‬ ‫ٌصدرها‬ ‫التى‬ ‫العقود‬ ‫نماذج‬ ‫على‬ ‫الفٌدٌك‬ ‫أدخل‬
‫كٌفٌة‬ ‫فى‬
‫تطبٌقه‬
‫فى‬
‫االصفر‬ ‫الكتاب‬
FIDIC Suit of Contracts Module 1020 R1 2021 13
FIDIC Suit of Contracts Module 1020 R1 2021
‫أصدر‬
‫الفٌدٌك‬
‫فى‬
‫سبتمبر‬
1999
‫أربع‬
‫نماذج‬
‫جدٌدة‬
–
‫بفكر‬
‫جدٌد‬
-
‫أسس‬
‫صٌاغة‬
‫جدٌدة‬
“
‫شروط‬
‫عقد‬
‫االعمال‬
‫المختصر‬
”
‫الكتاب‬
‫االخضر‬
‫الطبعة‬
‫االولى‬
–
‫سبتمبر‬
1999
“
‫عقد‬
‫مقاوالت‬
‫أعمال‬
‫متكاملة‬
”
‫الكتاب‬
‫الفضى‬
‫الطبعة‬
‫االولى‬
–
‫سبتمبر‬
1999
“
‫عقد‬
‫مقاوالت‬
‫أعمال‬
‫صناعٌة‬
”
‫الكتاب‬
‫االصفر‬
‫الجدٌد‬
‫الطبعة‬
‫االولى‬
–
‫سبتمبر‬
1999
“
‫عقد‬
‫مقاوالت‬
‫أعمال‬
‫التشٌٌد‬
”
‫الكتاب‬
‫االحمر‬
‫الجدٌد‬
‫الطبعة‬
‫االولى‬
–
‫سبتمبر‬
1999
“Conditions of Contract for CONSTRUCTION Works” –New Red Book
“Conditions of Contract for PLANT and DESIGN-BUILD” -New Yellow Book
“Conditions of Contract for EPC / Turnkey Projects” –Silver Book
“Short Form of Contract” -Green Book
Special: The Fidic Golden Principles First Edition 2019
FIDIC Suit of Contracts Module 1020 R1 2021 14
FIDIC Suit of Contracts Module 1020 R1 2021
‫نشر‬
‫إتحاد‬
‫الفٌدٌك‬
‫اإلصدار‬
‫الثانٌة‬
‫من‬
‫مجموعة‬
‫كتبه‬
‫األحمر‬
‫واألصفر‬
‫والفضى‬
،
‫حٌث‬
‫كان‬
‫قد‬
‫وضع‬
‫إتحاد‬
‫الفٌدٌك‬
‫معٌارا‬
‫لعقود‬
‫وأعمال‬
‫البناء‬
‫والهندسة‬
‫الدولٌة‬
‫منذ‬
‫عام‬
1999
.
‫وٌأتى‬
‫اإلصدار‬
‫الثانى‬
‫بتغٌٌرات‬
‫ملحوظة‬
‫ومؤثرة‬
‫قد‬
‫تؤدى‬
‫إلى‬
‫إدارة‬
‫أكثر‬
‫فعالٌة‬
‫للعقود‬
.
 ‫ف‬ ‫الفيديك‬ ‫إصدار‬
‫ى‬
5
‫ديسمبر‬
2017
15
Changes
In
2
nd
Edition
2017
Improved C
management
Dispute
Avoid.
Claims
Process
Engineer
Role
LoL
Reimburs
ement
EOT
Main
Changes
16
FIDIC Suit of Contracts Module 1020 R1 2021
Red FIDIC 2nd Edition 2017
Agree
ment
General
Conditions
Particular
Conditions
Specifications
Any other
document
Part A
Contract
Data
Part B
Special
Provisions
The
Schedul
es
JV
undertaking
Conditions of Contract for Construction
LOA Drawings
FIDIC Suit of Contracts Module 1020 R1 2021 17
FIDIC Suit of Contracts “Red Book”
Fidic Second Edition 2017 Principles.
• These Conditions of Contract for Construction include the conditions, which are
likely to apply to the majority of such contracts.
• FOR Essential items of information which are particular to each individual
contract are to be included in P Conditions (customize) Part A – Contract Data.
(CD), periods such as: .. quantities consumed during the period in CD. Time for C.
• In addition, it is recognized that many Employers, especially governmental
agencies, may require special conditions of contract, or particular procedures,
which differ from those included in the General Conditions. These should be
included in Part B – Special Provisions, such as:
“the Contractor’s entitlement to EOT shall be assessed in accordance with the rules
and procedures stated in the Special Provisions (if not stated, as appropriate taking
due regard of all relevant circumstances)”. S.Cl. 8.5 Extension of Time for Completion
18
FIDIC Suit of Contracts Module 1020 R1 2021
Conditions of Contract for Construction
1.5 Priority of Documents The documents forming the Contract are to
be taken as mutually explanatory of one
another. If there is any conflict, ambiguity
or discrepancy, the priority of the
documents shall be in accordance with the
following sequence:
(a) the Contract Agreement; (f) these General Conditions;
(b) the Letter of Acceptance; (g) the Specification;
(c) the Letter of Tender; (h) the Drawings;
19
FIDIC Suit of Contracts Module 1020 R1 2021
Conditions of Contract for Construction
1.5 Priority of Documents
• If a Party finds an ambiguity or discrepancy in the documents,
that Party shall promptly give a Notice to the Engineer,
describing the ambiguity or discrepancy.
• After receiving such Notice, or if the Engineer finds an
ambiguity or discrepancy in the documents, the Engineer shall
issue the necessary clarification or instruction.
20
FIDIC Suit of Contracts Module 1020 R1 2021
Conditions of Contract for Construction
Q. What is your proper decision? Discrepancy situation
7 cm Drawings/ Specs
10 cm
BOQ
Knowing that:
1. The technical needs is 10 cm (after due clarification)
2. Priority of document is for
Specs& Drawings
3. The Quantities are significant.
What is your contractual expert decision?
FIDIC Suit of Contracts Module 1020 R1 2021 21
FIDIC Suit of Contracts “Red Book”
Fidic Second Edition 2017 Principles.
• Red Book Continues FIDIC’s fundamental principles of balanced risk sharing
while seeking to build on the substantial experience gained from its use over the
past 18 years. (1999-2017).
• For example, this 2nd edition provides:
1) greater detail and clarity on the requirements for notices and other
communications;
2) provisions to address Employers’ and Contractors’ claims treated equally and
separated from disputes;
3) mechanisms for dispute avoidance and
4) detailed provisions for quality management, and verification of Contractor’s
contractual compliance.
FIDIC Suit of Contracts Module 1020 R1 2021 22
FIDIC Suit of Contracts “Red Book”
‫التغٌٌرات‬
‫الرئٌسٌة‬
‫التى‬
‫أدخلت‬
‫على‬
‫اإلصدار‬
‫الثانى‬
‫للفٌدٌك‬
2017
‫أمثلة‬
:

‫تعد‬
‫النماذج‬
‫الجدٌدة‬
‫أطول‬
‫بكثٌر‬
‫وتحتوي‬
‫على‬
ً‫حوال‬
50
%
‫من‬
‫الكلمات‬
‫زٌادة‬
‫عن‬
‫السابق‬
.

‫وأسباب‬
‫هذه‬
‫الزٌادة‬
ً‫ه‬
‫إدراج‬
‫المزٌد‬
‫من‬
‫أحكام‬
‫إدارة‬
‫العقود‬
.
1
-
‫تحسٌنات‬
‫للشروط‬
‫واألحكام‬
‫المتعلقة‬
‫بإدارة‬
‫العقد‬
:

‫زٌادة‬
‫التوضٌح‬
‫بشأن‬
‫إلتزامات‬
‫طرفى‬
‫العقد‬
‫والنص‬
‫على‬
‫ضرورة‬
‫اإللتزام‬
‫باإلطار‬
‫الرسمى‬
‫فى‬
‫مواعٌد‬
‫محددة‬
Time Bar
‫وتقدٌم‬
‫اإلرشادات‬
‫والتوجٌهات‬
،‫العملٌة‬
‫على‬
‫سبٌل‬
‫المثال‬
:

-
‫النص‬
‫على‬
‫نتائج‬
‫ملزمة‬
‫فى‬
‫حالة‬
‫عدم‬
‫اإللتزام‬
‫ومراعاة‬
‫األحكام‬
‫مثل‬
‫البند‬
14.13
‫من‬
‫الفٌدٌك‬
‫األحمر‬
‫حالة‬
‫عدم‬
‫إعتراض‬
‫المقاول‬
‫على‬
‫شهادة‬
‫الدفع‬
‫النهائٌة‬
.
----
‫ٌعتد‬
‫بتقدٌرات‬
‫المهندس‬
.
If the Contractor has not submitted a draft final Statement within the time specified under Sub-
Clause 14.11.1 [Draft Final Statement], the Engineer shall request the Contractor to do so.
Thereafter, if the Contractor fails to …………. within a period of 28 days, the Engineer shall issue the
FPC for such an amount as the Engineer fairly considers to be due.
IF:
ii) no Partially Agreed Final Statement ……submitted by the Contractor but, to the extent that a draft
final Statement submitted by the Contractor is deemed by the Engineer to be a Partially Agreed
Final Statement .
“the Engineer shall proceed in accordance with S.CL 14.6 [Issue of IPC] to issue an IPC”.
I
II
III
23
FIDIC Suit of Contracts Module 1020 R1 2021
Conditions of Contract for Construction
FIDIC Suit of Contracts Module 1020 R1 2021 24
FIDIC Suit of Contracts “Red Book”
‫التغٌٌرات‬
‫الرئٌسٌة‬
‫التى‬
‫أدخلت‬
‫على‬
‫اإلصدار‬
‫الثانى‬
‫للفٌدٌك‬
2017
1
-
‫تحسٌنات‬
‫للشروط‬
‫واألحكام‬
‫المتعلقة‬
‫بإدارة‬
‫العقد‬
:

‫إضافة‬
‫شروط‬
‫جدٌدة‬
‫بشأن‬
‫اإلشعار‬
‫المبكر‬
‫عن‬
‫مشكلة‬
‫محتملة‬
Notice
،
‫لٌقوم‬
‫أطراف‬
‫العقد‬
‫بحل‬
‫المشكلة‬
‫مبكرا‬
(
‫اآلداء‬
‫اإلستباقى‬
-
‫المبادرة‬
-
Proactive
)
.
2
-
‫توجٌه‬
‫األطراف‬
‫نحو‬
‫العمل‬
‫على‬
‫التركٌز‬
‫على‬
‫تجنب‬
‫المنازعات‬
Avoidance
‫أوال‬
‫ثم‬
‫المضى‬
‫قدما‬
‫فى‬
‫إجراءات‬
‫فض‬
‫المنازعات‬
:

‫أضاف‬
‫اإلصدار‬
‫الثانى‬
2017
‫التأكٌد‬
‫على‬
‫تجنب‬
‫النزاعات‬
‫وإدارة‬
‫المطالبات‬
‫لكى‬
‫التطور‬
‫إلى‬
‫منازعات‬
.

‫علٌه‬
‫فإن‬
‫مجلس‬
‫فض‬
‫المنازعات‬
‫السابق‬
‫والمسمى‬
Dispute Adjudication Board (DAB)
‫تغٌر‬
‫مسماه‬
‫إلى‬
‫مجلس‬
‫تجنب‬
‫المنازعات‬
/
‫الفض‬
(
Dispute Avoidance/Adjudication Board (DAAB

‫وٌكون‬
‫تعٌٌن‬
‫المجلس‬
‫طوال‬
‫فترة‬
‫المشروع‬
‫مع‬
‫إجتماع‬
‫األطراف‬
‫على‬
‫فترات‬
،‫محددة‬
‫وتقدٌم‬
‫المساعدات‬
‫الغٌر‬
‫رسمٌة‬
‫والغٌر‬
‫ملزمة‬
‫ولٌس‬
‫لغرض‬
‫معٌن‬
–
Add hoc
‫كما‬
‫هو‬
‫الحال‬
‫فى‬
‫نسخة‬
1999
.
FIDIC Suit of Contracts Module 1020 R1 2021 25
FIDIC Suit of Contracts “Red Book”
‫شاد‬١١‫اٌزغ‬
‫خ‬١‫غ‬١‫اٌشئ‬
ٝ‫اٌز‬
‫أدخٍذ‬
ٍٝ‫ػ‬
‫اإلطذاس‬
ٝٔ‫اٌضب‬
‫ه‬٠‫ذ‬١‫ٌٍف‬
2017
3
-
‫إجشاء‬
‫اٌّطبٌجبد‬
:
‫جت‬ّٛ‫ث‬
‫ػمذ‬
‫ه‬٠‫ذ‬١‫اٌف‬
‫ٔغخخ‬
َ‫ػب‬
1999
،
‫وبٔذ‬
‫ِطبٌجبد‬
‫اٌّبٌه‬
‫ٌخ‬ٛ‫ِفظ‬
ٓ‫ػ‬
‫ِطبٌجبد‬
‫ي‬ٚ‫اٌّمب‬
(
20.1
‫اٌجٕذ‬ٚ
2.5
)
،
‫إخزالف‬ٚ
َ‫إٌزضا‬
ً‫و‬
‫ؽشف‬
ُ٠‫ٌزمذ‬
‫إصجبد‬ٚ
‫اٌّطبٌجخ‬
(
ً١ٙ‫اٌزغ‬
‫اػح‬ٌٛ‫ا‬
‫ٌظبٌح‬
‫اٌّبٌه‬
)
‫إٌمبء‬ٚ
‫اٌؼتء‬
ٍٝ‫ػ‬
‫ي‬ٚ‫اٌّمب‬
.
‫ػّال‬ٚ
ٍٝ‫ػ‬
‫ك‬١‫رحم‬
‫ِجذأ‬
‫اح‬ٚ‫اٌّغب‬
Equity
ٓ١‫ث‬
‫األؽشاف‬
ٝ‫ف‬
‫ٔغخخ‬
2017
ُ‫فز‬
‫ي‬ٚ‫رٕب‬
‫إجشاء‬
‫اٌّطبٌجبد‬
‫فمؾ‬
ٝ‫ف‬
‫اٌّبدح‬
20
،
‫ب‬ٙ١‫ف‬ٚ
ْٛ‫رى‬
‫اإلٌزضاِبد‬
ٍٝ‫ػ‬
‫اإلؽشاف‬
(
‫طبحت‬
ًّ‫اٌؼ‬
‫ي‬ٚ‫اٌّمب‬ٚ
)
‫ِزجبدٌخ‬
،
ٍٝ‫فؼ‬
ً١‫عج‬
‫اٌّضبي‬
‫أطجح‬
‫ثب‬ٍٛ‫ِط‬
ِٓ
‫اٌّبٌه‬
‫إطذاس‬
‫إشؼبس‬
‫ِطبٌجخ‬
ٝ‫ف‬
‫خالي‬
‫ِذح‬
‫ٕخ‬١‫ِؼ‬
‫إالعمؾ‬ٚ
ٗ‫حم‬
ٝ‫ف‬
‫اٌّطبٌجخ‬
‫ب‬٠ٚ‫ِزغب‬
‫ِغ‬
‫ي‬ٚ‫اٌّمب‬
ٝ‫ف‬
َ‫إٌزضا‬
‫اسعبي‬
‫اإلشؼبس‬
.
4
-
‫ض‬٠‫رؼض‬
‫س‬ٚ‫د‬
‫ٕذط‬ٌّٙ‫ا‬
(
‫اٌىزبة‬
‫األحّش‬
‫األطفش‬ٚ
)
:
ُ‫ر‬
‫غ‬١‫ع‬ٛ‫ر‬
‫س‬ٚ‫د‬
‫ٕذط‬ٌّٙ‫ا‬
ًّ‫ش‬١ٌ
‫ذا‬٠‫ِض‬
ِٓ
ً١‫اٌزفبط‬
‫خ‬١‫اإلجشائ‬
‫د‬ٚ‫اٌحذ‬ٚ
‫خ‬١ِٕ‫اٌض‬
‫داء‬٢
ِٗ‫ب‬ِٙ
‫وّضبي‬ٚ
ٍٝ‫ػ‬
‫رٌه‬
‫اٌجٕذ‬
ٝ‫اٌفشػ‬
3.7
Agreement or Determination
-
3.7.1 Consultation to reach agreement-3.7.2 Engineer’s Determination-
FIDIC Suit of Contracts Module 1020 R1 2021 26
FIDIC Suit of Contracts “Red Book”
‫شاد‬١١‫اٌزغ‬
‫خ‬١‫غ‬١‫اٌشئ‬
ٝ‫اٌز‬
‫أدخٍذ‬
ٍٝ‫ػ‬
‫اإلطذاس‬
ٝٔ‫اٌضب‬
‫ه‬٠‫ذ‬١‫ٌٍف‬
2017
5
-
‫د‬ٚ‫حذ‬
‫خ‬١ٌٛ‫اٌّغئ‬
Limitation of Liability
:
‫خ‬١‫اٌزجؼ‬ ٚ‫أ‬ ‫اٌّجبششح‬ ‫ش‬١‫غ‬ ‫اٌخغبئش‬ ‫إعزجؼبد‬
ٝ‫ف‬
‫ٔغخخ‬
2017
‫د‬ٚ‫حذ‬ ِٓ
، ‫خ‬١ٌٛ‫اٌّغئ‬
to the other Party for loss of use of any Works,
Neither Party shall be liable
loss of profit, loss of any contract or for any indirect or consequential loss or damage which
may be suffered by the other Party in connection with the Contract
‫ِغ‬
‫ثؼغ‬
‫اإلعزضبءاد‬
:
‫إللظبء‬
‫أػشاس‬
‫ش‬١‫اٌزأخ‬
‫إٌزضاِبد‬ٚ
‫غ‬٠ٛ‫اٌزؼ‬
ٓ‫ػ‬
‫بوبد‬ٙ‫إٔز‬
‫ق‬ٛ‫حم‬
‫خ‬١‫اٌٍّى‬
‫خ‬٠‫اٌفىش‬
‫اإلّ٘بي‬ٚ
ُ١‫اٌجغ‬
ِٓ
‫ِظٍخ‬
‫خ‬١ٌٛ‫اٌّغئ‬
.
6
-
‫غ‬٠ٛ‫اٌزؼ‬
‫اٌّغزحك‬
‫ٌألؽشاف‬
:
ُ‫ر‬
‫غ‬١‫ع‬ٛ‫ر‬
‫ٔطبق‬
‫ؼبد‬٠ٛ‫اٌزؼ‬
‫اٌّغزحمخ‬
‫ألؽشاف‬
‫اٌؼمذ‬
(
‫طبحت‬
ًّ‫اٌؼ‬
‫ي‬ٚ‫اٌّمب‬ٚ
)
،
ٍٝ‫فؼ‬
ً١‫عج‬
‫اٌّضبي‬
،
َ‫مذ‬٠
‫ي‬ٚ‫اٌّمب‬
ْ٢‫ا‬
‫ؼب‬٠ٛ‫رؼ‬
ْ‫ٌؼّب‬
ْ‫أ‬
‫األػّبي‬
ْٛ‫عزى‬
‫ِٕبعجخ‬
‫ٌٍغشع‬
ٜ‫اٌز‬
‫طّّذ‬
ِٓ
ٍٗ‫أج‬
.
‫وّب‬
‫ذ‬ٙ‫زؼ‬٠
‫طبحت‬
ًّ‫اٌؼ‬
‫غ‬٠ٛ‫ثبٌزؼ‬
ٓ‫ػ‬
‫اٌخغبئش‬
ٚ‫أ‬
‫األػشاس‬
ٝ‫اٌز‬
‫رٍحك‬
‫ثّّزٍىبد‬
ٗ١‫ظف‬ِٛ
ٚ‫أ‬
‫والء‬ٌٛ‫ا‬
ٓ١١ٕ‫اٌّؼ‬
7
-
‫ذ‬٠‫رّذ‬
‫ِذح‬
‫ع‬ٚ‫اٌّشش‬
:
ُ‫ر‬
‫عؼخ‬ٛ‫ر‬
‫ٔطبق‬
‫ذ‬٠‫اٌزّذ‬
ًّ‫ش‬١ٌ
‫أعجبة‬
‫خ‬١‫إػبف‬
ً‫ِض‬
‫شاد‬١‫اٌزأخ‬
‫إٌبجّخ‬
ٓ‫ػ‬
ً‫رذخ‬
‫ش‬١‫رأص‬ٚ
‫بٔبد‬١‫و‬
‫اٌّشافك‬
‫اٌخبطخ‬
‫خ‬١ٕ‫اٌّؼ‬
‫ع‬ٚ‫ثبٌّشش‬
.
FIDIC Suit of Contracts Module 1020 R1 2021 27
FIDIC Suit of Contracts “Red Book”
‫شاد‬١١‫اٌزغ‬
‫خ‬١‫غ‬١‫اٌشئ‬
ٝ‫اٌز‬
‫أدخٍذ‬
ٍٝ‫ػ‬
‫اإلطذاس‬
ٝٔ‫اٌضب‬
‫ه‬٠‫ذ‬١‫ٌٍف‬
2017
8
-
‫اإلشؼبساد‬
•
ُ‫ر‬
‫ح‬١‫ػ‬ٛ‫ر‬
‫ف‬٠‫رؼش‬
‫اإلشؼبس‬
َ‫اٌّمذ‬
‫جت‬ّٛ‫ث‬
‫اٌؼمذ‬
.
‫ػٕذِب‬
َٛ‫م‬٠
‫ؽشف‬
‫ثئطذاس‬
‫إشؼبس‬
‫جت‬ّٛ‫ث‬
‫اٌؼمذ‬
،
‫جت‬٠
ٗ١ٍ‫ػ‬
ْ‫أ‬
‫زوش‬٠
ٗٔ‫أ‬
"
‫إشؼبس‬
"
.
‫وّب‬
‫جت‬٠
‫روش‬
ُ‫سل‬
‫ششؽ‬
‫اٌؼمذ‬
ٞ‫اٌز‬
‫طذس‬
ٗ‫جج‬ّٛ‫ث‬
‫اإلشؼبس‬
،
‫ثمظذ‬
‫اٌّغبػذح‬
ٟ‫ف‬
‫خ‬١ٍّ‫ػ‬
‫إداسح‬
‫د‬ٛ‫اٌؼم‬
.
9
-
‫الد‬٠‫رؼذ‬
ٜ‫أخش‬
•
‫ش‬١١‫رغ‬
‫آخش‬
ٛ٘
َ‫ألحىب‬
‫ح‬ٛ‫اٌم‬
‫اٌمب٘شح‬
،
‫ِغ‬
‫ب‬ٌٙ‫اعزجذا‬
ًِ‫ثبٌىب‬
‫ثؼجبسح‬
‫ذح‬٠‫جذ‬
ْ‫ا‬ٕٛ‫ثؼ‬
"
‫أحذاس‬
‫خ‬١‫اعزضٕبئ‬
"
(
‫ص‬ٛ‫إٌّظ‬
‫ب‬ٙ١ٍ‫ػ‬
ٟ‫ف‬
‫اٌفمشح‬
18
‫ذح‬٠‫اٌجذ‬
)
.
ٟ‫ف‬
ٓ١‫ح‬
ْ‫أ‬
‫ف‬٠‫رؼش‬
‫أحذاس‬
‫خ‬١‫اعزضٕبئ‬
ٛ٘
ٌٝ‫إ‬
‫حذ‬
‫ش‬١‫وج‬
‫ٔفظ‬
َ‫أحىب‬
‫ح‬ٛ‫اٌم‬
‫اٌمب٘شح‬
ٟ‫ف‬
‫اٌطجؼخ‬
1999
.
FIDIC Suit of Contracts Module 1020 R1 2021 28
FIDIC Suit of Contracts “Red Book”
‫شاد‬١١‫اٌزغ‬
‫خ‬١‫غ‬١‫اٌشئ‬
ٝ‫اٌز‬
‫أدخٍذ‬
ٍٝ‫ػ‬
‫اإلطذاس‬
ٝٔ‫اٌضب‬
‫ه‬٠‫ذ‬١‫ٌٍف‬
2017
ّٓ‫رزؼ‬
‫الد‬٠‫اٌزؼذ‬
ٝ‫اٌز‬
‫سدد‬ٚ
‫ثبإلطذاساد‬
‫خ‬١ٔ‫اٌضب‬
‫ب‬‫ؼ‬٠‫أ‬
‫ا‬‫ش‬١١‫رغ‬
ٟ‫ف‬
‫اٌّالحظبد‬
‫خ‬٠‫اإلسشبد‬
‫ش‬١‫ح‬
ٟ‫ط‬ٛ‫ر‬
FIDIC
‫ثشذح‬
‫طبحت‬
ًّ‫اٌؼ‬
‫ي‬ٚ‫اٌّمب‬ٚ
‫غ‬١ّ‫ج‬ٚ
ٓ١ّ‫اٌمبئ‬
ُ١ّ‫ثبٌزظ‬
ٍٝ‫ػ‬
‫ِشاػبح‬
"
‫اٌّجبدا‬
‫خ‬١‫اٌز٘ج‬
"
‫اٌخّغخ‬
‫د‬ٛ‫ٌؼم‬
‫ه‬٠‫ذ‬١‫اٌف‬
.

‫رجشسِٕظّخ‬
‫ه‬٠‫ذ‬١‫اٌف‬
‫٘زا‬
‫لف‬ٌّٛ‫ا‬
ٍٝ‫ػ‬
‫أعبط‬
‫بدح‬٠‫ص‬
َ‫اإل٘زّب‬
‫غ‬٠‫ص‬ٛ‫ثز‬
‫اٌّخبؽش‬
ٓ١‫ث‬
‫األؽشاف‬
ٗ١ٍ‫ػ‬ٚ
ٟٙ‫ف‬
ٍ‫تثن‬
‫األؽشاف‬
ٓ‫ػ‬
َ‫اعزخذا‬
‫ؽ‬ٚ‫شش‬
‫اٌؼمذ‬
‫اٌخبطخ‬
‫ش‬١١‫ٌزغ‬
ٌ‫جىهش‬
‫إلػبدح‬
‫غ‬٠‫ص‬ٛ‫ر‬
‫اٌّخبؽش‬
ٌٟ‫ثبٌزب‬ٚ
‫ش‬١١‫رغ‬
‫ؼخ‬١‫ؽج‬
‫ػمذ‬
‫ه‬٠‫ذ‬١‫اٌف‬
ِٓ
‫ش‬١‫ح‬
:

‫إٌمبؽ‬
ُ٘‫األ‬
ٝ‫ف‬
‫ػمذ‬
‫ه‬٠‫ذ‬١‫اٌف‬

‫اٌّجبدا‬
‫خ‬١‫اٌز٘ج‬
FIDIC Suit of Contracts Module 1020 R1 2021 29
FIDIC Suit of Contracts “Red Book”

‫النقاط‬
‫االهامح‬
‫تعقىد‬
‫الفُذَك‬

‫ممُزاخ‬
‫إ‬
َ‫عزخذا‬
‫ه‬٠‫ذ‬١‫داٌف‬ٛ‫ػم‬
•
‫فش‬ٛ‫ر‬
‫لذ‬ٌٛ‫ا‬
ًٍ‫رم‬ٚ
‫ف‬١ٌ‫رىب‬
‫اٌّؼبِالد‬
•
‫ِؼزشف‬
‫ب‬ٙ‫ث‬
ٝ‫ف‬
‫طٕبػخ‬
‫ذ‬١١‫اٌزش‬
‫ب‬١ٌٚ‫د‬
•
‫غ‬٠‫ص‬ٛ‫ر‬
ٚ
‫ض‬١‫رخظ‬
‫اٌّخبؽش‬
‫ثٕبء‬
ٍٝ‫ػ‬
‫خجشاد‬
‫ِزشاوّخ‬
•
‫عبثمخ‬
َ‫اإلعزخذا‬
ٝ‫ف‬
‫ػبد‬ٚ‫ِشش‬
‫ػخ‬ٕٛ‫ِز‬
‫اإلعزفبدح‬ٚ
ِٓ
ٕٝ‫ِٕح‬
ٍُ‫اٌزؼ‬
‫بغخ‬١‫ٌٍظ‬
‫ك‬١‫اٌزطج‬ٚ
.
FIDIC Suit of Contracts Module 1020 R1 2021 30
FIDIC Suit of Contracts “Red Book”

‫النقاط‬
‫االهامح‬
‫تعقىد‬
‫الفُذَك‬

‫أستشاتُجُاخ‬
‫التعاقذ‬
•
‫اختُاس‬
‫نمىرج‬
‫العقذ‬
‫المناسة‬
o
‫َتىقف‬
‫نمىرج‬
‫العقذ‬
‫المناسة‬
‫حسة‬
‫المششوع‬
‫مثل‬
:
o
‫طثُعح‬
‫المششوع‬
o
‫الخثشاخ‬
‫المتىفشج‬
‫إلداسج‬
‫المششوع‬
o
‫مستىي‬
‫المعلىماخ‬
‫المتىفش‬
o
‫إسلىب‬
‫الذفغ‬
‫المتىفش‬
‫لذي‬
‫المالك‬
o
‫الزمن‬
‫المتاح‬
‫للتصمُم‬
/
‫والتنفُز‬
o
..........................
o
...............
31
FIDIC Suit of Contracts Module 1020 R1 2021

‫تغُُشاخ‬
‫المالحظاخ‬
‫اإلسشادَح‬
ً‫ف‬
‫الطثعح‬
‫الثانُح‬
.

ٟ‫ط‬ٛ‫ر‬
‫ه‬٠‫ذ‬١‫اٌف‬
‫ثشذح‬
‫طبحت‬
ًّ‫اٌؼ‬
‫ي‬ٚ‫اٌّمب‬ٚ
‫غ‬١ّ‫ج‬ٚ
ٓ١ّ‫اٌمبئ‬
ُ١ّ‫ثبٌزظ‬
ٍٝ‫ػ‬
‫ِشاػبح‬
"
‫اٌّجبدا‬
‫خ‬١‫اٌز٘ج‬
"
‫اٌخّغخ‬
‫خ‬١ٌ‫اٌزب‬
:
Fidic Golden Principle
1
.
،‫اججبد‬ٌٛ‫ا‬
،‫ق‬ٛ‫اٌحم‬
،‫اججبد‬ٌٛ‫ا‬
‫اس‬ٚ‫األد‬
‫بد‬١ٌٚ‫اٌّغؤ‬ٚ
ً‫ثشى‬
َ‫ػب‬
‫ِزٕبعمخ‬
ٟ‫ف‬
‫ؽ‬ٚ‫اٌشش‬
‫اٌؼبِخ‬
.
2
.
‫بغخ‬١‫ط‬
‫اػحخ‬ٚ
‫ال‬
‫ٌجظ‬
‫ب‬ٙ١‫ف‬
.
3
.
‫غ‬٠‫ص‬ٛ‫ر‬
‫اٌّخبؽش‬
ً‫ثشى‬
‫ػبدي‬
ْ‫اص‬ٛ‫ِز‬ٚ
.
4
.
ْ‫أ‬
ْٛ‫ى‬٠
ٜ‫ٌذ‬
‫األؽشاف‬
‫لذ‬ٚ
‫ي‬ٛ‫ِؼم‬
‫ز‬١‫ٌزٕف‬
ُٙ‫اٌزضاِبر‬
‫ِّبسعخ‬ٚ
ُٙ‫ل‬ٛ‫حم‬
‫؛‬
5
-
‫جت‬٠
‫إحبٌخ‬
‫إٌّبصػبد‬
ٌٝ‫إ‬
‫ِجٍظ‬
DAAB
‫إٌّبصػبد‬
‫ي‬ٛ‫ٌٍحظ‬
ٍٝ‫ػ‬
‫لشاس‬
َ‫ٍِض‬
‫ثظفخ‬
‫ِؤلزخ‬
‫وششؽ‬
‫عبثك‬
ُ١‫ٌٍزحى‬
ٚ‫أ‬
ٟ‫اٌزمبػ‬
.
‫رجشس‬
FIDIC
‫٘زا‬
‫لف‬ٌّٛ‫ا‬
ٍٝ‫ػ‬
‫أعبط‬
‫ب‬ٙٔ‫أ‬
‫ا٘زّذ‬
ً‫ثشى‬
‫ش‬١‫وج‬
‫غ‬٠‫ص‬ٛ‫ثز‬
‫اٌّخبؽش‬
ٓ١‫ث‬
‫األؽشاف‬
ٌٟ‫ثبٌزب‬ٚ
ٟٙ‫ف‬
ٟٕ‫رض‬
‫األؽشاف‬
ٓ‫ػ‬
َ‫اعزخذا‬
‫ؽ‬ٚ‫شش‬
‫اٌؼمذ‬
‫اٌخبطخ‬
‫ش‬١١‫ٌزغ‬
ٞ‫٘ش‬ٛ‫ج‬
‫غ‬٠‫ص‬ٛ‫ٌز‬
‫اٌّخبؽش‬
ٌٟ‫ثبٌزب‬ٚ
‫ؼخ‬١‫ؽج‬
‫ػمذ‬
FIDIC.
ٍٝ‫ػ‬
ُ‫اٌشغ‬
‫ِّب‬
‫روش‬
ٖ‫أػال‬
.
Conditions of Contract for Construction
32
FIDIC Suit of Contracts Module 1020 R1 2021

‫تغُُشاخ‬
‫المالحظاخ‬
‫اإلسشادَح‬
ً‫ف‬
‫الطثعح‬
‫الثانُح‬
.

ٟ‫ط‬ٛ‫ر‬
‫ه‬٠‫ذ‬١‫اٌف‬
‫ثشذح‬
‫طبحت‬
ًّ‫اٌؼ‬
‫ي‬ٚ‫اٌّمب‬ٚ
‫غ‬١ّ‫ج‬ٚ
ٓ١ّ‫اٌمبئ‬
ُ١ّ‫ثبٌزظ‬
ٍٝ‫ػ‬
‫ِشاػبح‬
"
‫اٌّجبدا‬
‫خ‬١‫اٌز٘ج‬
"
‫اٌخّغخ‬
‫خ‬١ٌ‫اٌزب‬
:
Fidic Golden Principle
1
.
،‫اججبد‬ٌٛ‫ا‬
،‫ق‬ٛ‫اٌحم‬
،‫اججبد‬ٌٛ‫ا‬
‫اس‬ٚ‫األد‬
‫بد‬١ٌٚ‫اٌّغؤ‬ٚ
ً‫ثشى‬
َ‫ػب‬
‫ِزٕبعمخ‬
ٟ‫ف‬
‫ؽ‬ٚ‫اٌشش‬
‫اٌؼبِخ‬
.
o
‫زطٍت‬٠
‫٘زا‬
‫اٌّجذأ‬
ْ‫أ‬
‫اس‬ٚ‫األد‬
‫اججبد‬ٌٛ‫ا‬ٚ
‫االٌزضاِبد‬ٚ
ً‫ٌى‬
ٓ١‫اٌّشبسو‬
‫الرزؼذي‬
ً‫ثشى‬
ٜ‫٘ش‬ٛ‫ج‬
‫ػّب‬
‫سد‬ٚ
‫ؽ‬ٚ‫ثبٌشش‬
‫اٌؼبِخ‬
ٚ
‫رٕبعت‬
‫ِزطٍجبد‬
‫ع‬ٚ‫اٌّشش‬
–
‫٘زا‬ٚ
‫زحمك‬٠
‫جت‬ّٛ‫ث‬
‫بس‬١‫اإلخز‬
ً‫األِض‬
‫رط‬ٌّٕٛ
‫اٌؼمذ‬
ٜ‫اٌز‬
ُ‫الئ‬٠
‫ع‬ٚ‫اٌّشش‬
.
Conditions of Contract for Construction
FIDIC Suit of Contracts Module 1020 R1 2021 33
The Fidic Golden Principles First Edition 2019
Fidic Golden PrinciplesGPs:2019
GP1: The duties, rights, obligations, roles and responsibilities of all the Contract
Participants must be generally as implied in the General Conditions, and appropriate to the
requirements of the project.
GP2: The Particular Conditions must be drafted clearly and unambiguously.
GP3: The Particular Conditions must not change the balance of risk/reward allocation
provided for in the General Conditions.
GP4: All time periods specified in the Contract for Contract Participants to perform their
obligations must be of reasonable duration.
GP5: Unless there is a conflict with the governing law of the Contract, all formal disputes
must be referred to a Dispute Avoidance/Adjudication Board (or a Dispute Adjudication
Board, if applicable) for a provisionally binding decision as a condition precedent to
arbitration. ) Or final and binding).
FIDIC Suit of Contracts Module 1020 R1 2021 34
FIDIC Suit of Contracts “Red Book”
‫دوس‬
‫المهنذس‬
ٟ‫ف‬
‫إٌغخخ‬
۲۰۱۷
‫ٕ٘بن‬
‫ض‬١‫رشو‬
‫أوجش‬
ٍٝ‫ػ‬
‫س‬ٚ‫د‬
‫ٕذط‬ٌّٙ‫ا‬
ٜ‫اٌز‬ٚ
‫ثب‬ٍٛ‫ِط‬
ِٕٗ
:
1
-
‫ٌغخ‬
‫اٌؼمذ‬
2
-
ْ‫أ‬
ًّ‫ح‬٠
‫اٌذسجبد‬
‫بداد‬ٙ‫اٌش‬ٚ
‫إٌّبعجخ‬
ً١٘‫اٌزأ‬ٚ
‫إٌّبعت‬
3
-
ْ‫أ‬
ًّ‫ؼ‬٠
‫بد‬١‫ثح‬
ٟ‫ف‬
ٖ‫س‬ٚ‫د‬
‫ؾ‬١‫ع‬ٛ‫و‬
ٓ١‫ث‬
ٟ‫ؽشف‬
‫اٌؼمذ‬
‫ػٕذِب‬
‫ظذس‬٠
ٖ‫لشاس‬
‫اٌخبص‬
‫ثبٌٕضاػبد‬
(
ّ‫ػ‬
ٕ
‫جب‬
‫ش‬١‫ح‬
ٌُ
‫رؼشف‬
‫وٍّخ‬
‫ذ‬٠‫ِحب‬
)
.
‫فذ‬١‫أػ‬ٚ
(
‫ؼزجش‬٠
ْ٢‫ا‬
‫ٕذط‬ٌّٙ‫ا‬
‫ال‬
ًّ‫ؼ‬٠
‫ٌظبٌح‬
‫اٌّبٌه‬
‫ػٕذِب‬
‫مشس‬٠
ٟ‫ف‬
ً‫ِغبئ‬
‫إٌضاػبد‬
)
.
35
FIDIC Suit of Contracts Module 1020 R1 2021
Conditions of Contract for Construction
Important Changes in the Contract Structure/Clauses:
1. LoL moved from CL 17 to the last sub-clause of Clause 1.
2. Former “Force Majeure” renamed “Exceptional Event” & is dealt with in clause 18.
3. Insurance has been moved to clause 19.
4. Total no. of Clauses 21 instead of 20.
5. Former clause 20 is split in two parts to deal first with claims (new clause 20, also
covering Employer’s Claims).
6. then only with disputes (new clause 21).
36
FIDIC Suit of Contracts Module 1020 R1 2021
Conditions of Contract for Construction
Important Changes in the Contract Structure/Clauses:
 Conflict/Dispute avoidance: FIDIC encourages to reach agreements between Parties.
 The role of the Engineer or Employer’s Representative is clarified in order to “act
neutrally between the Parties” on certain issues and “to fairly consider the amount of
interim payment due” )sub-clause 14.6).
 FIDIC favors standing Dispute Avoidance/Adjudication Boards (now DAAB instead
of former DAB) under clause 21.
 Step-by-step approaches also adopted, reflect this.
 The parties will know where they are in the process on the following subjects:
- Claims and determinations (sub-clause 3.7). - Unforeseeable conditions (S.CL 4.12).
- Review of Contractor’s design )sub-clause 5.2). -Advance payment (sub-clause 14.2),
- interim payments (S.CL 14.6) and Final Statement (sub-clause 14.11/14.13).
-Termination by Employer (clause 15) and Contractor (clause 16).
-Employer’s and Contractor’s claims )sub-clause 20.2). - Disputes (sub-clause 21.4)
37
FIDIC Suit of Contracts Module 1020 R1 2021
Conditions of Contract for Construction
Important Changes in the Contract Structure/Clauses:
o 2nd edition added some details for Variation procedure as it is rich source of conflict:
o Employer to show financial arrangements are in place for Variations (S.CL 2.4).
o Mechanism to recover in case instruction not state that it is a variation S.Cl 3.4 /3.5
o Determination does not just apply to claims but also to issues like: variations, payments,
EOTs, day-works etc.
o Contractor’s right to object to an instructed variation (S.CL. 13.1).
o Additional entitlement for changes to permits/permissions/licenses/approvals obtained
for the Works (S.CL.13.6).
38
FIDIC Suit of Contracts Module 1020 R1 2021
Conditions of Contract for Construction
Important Changes in the Contract Structure/Clauses:
 Project Management best practices are incorporated:
 Regular management meetings (S.CL.3.6/3.8).
 Detailed requirements for initial programme and updates (S.CL. 8.3). For example,
the requirement for a supporting report to overcome effects of any delay.
 Detailed test programme (S.CL. 9.1) and repeat testing (S.CL. 11.6). ITP
 Equal time bar for claims from the Employer and the Contractor (S.CL. 20.2).
Equity.
39
FIDIC Suit of Contracts Module 1020 R1 2021
Conditions of Contract for Construction
Typical Sequence of Principal Events During Contracts for Construction
1. The Time for Completion is to be stated (in the Contract Data) as a number
of days, to which is added any extensions of time under Sub-Clause 8.5.
2. In order to indicate the sequence of events, the following diagram is based
upon the example of the Contractor failing to comply with S.CL. 8.2. time for C.
3. The Defects Notification Period is to be stated (in the Contract Data) as a
number of days, to which is added any extensions under Sub-Clause 11.3.
4. Depending on the type of Works, Tests after Completion may also be
required.
40
FIDIC Suit of Contracts Module 1020 R1 2021
Typical Sequence of Principal Events During
Contracts for Construction
????
41
FIDIC Suit of Contracts Module 1020 R1 2021
Conditions of Contract for Construction
 DAAB
1.1.22 “DAAB” or “Dispute Avoidance/Adjudication Board” means the sole
member or three members (as the case may be) so named in the Contract, or
appointed under S.CL. 21.1 Constitution of the DAAB] or S.CL 21.2 [Failure to
Appoint DAAB Member(s)].
1.1.23 “DAAB Agreement” means the agreement signed or deemed to have been
signed by both Parties and the sole member or each of the three members of the
DAAB in accordance with S.CL. 21.1 [Constitution of the DAAB] or S.CL. 21.2
[Failure to Appoint DAAB Member(s)], incorporating by reference the General
Conditions of Dispute Avoidance/Adjudication Agreement contained in the
Appendix to these General Conditions with such amendments as are agreed.
Tripartite
42
FIDIC Suit of Contracts Module 1020 R1 2021
Conditions of Contract for Construction
 DAAB
21. DISPUTES AND ARBITRATION. . . . . . . . . . . . . . . . . . . . . . . . 100
21.1 Constitution of the DAAB
21.2 Failure to Appoint DAAB Member(s)
21.3 Avoidance of Disputes
21.4 Obtaining DAAB’s Decision
21.5 Amicable Settlement
21.6 Arbitration
21.7 Failure to Comply with DAAB’s Decision
21.8 No DAAB In Place
43
FIDIC Suit of Contracts Module 1020 R1 2021
Conditions of Contract for Construction
44
FIDIC Suit of Contracts Module 1020 R1 2021
Conditions of Contract for Construction
21.1 Constitution of the DAAB
1. Disputes shall be decided by a DAAB in accordance with S.CL. 21.4
[Obtaining DAAB’s Decision].
2. The Parties shall jointly appoint member(s) of the DAAB within 28d or/
3. The DAAB shall comprise, as stated in the Contract Data, 1 OR 3.
4. The member(s) shall be selected from named list in CD.
5. If DAAB is 3, each Party shall select one member for agreement of other
Party. Parties shall consult both these members/agree for the chairperson
45
FIDIC Suit of Contracts Module 1020 R1 2021
Conditions of Contract for Construction
21.1 Constitution of the DAAB
6. DAAB deemed to be constituted on the date Parties and 3 signed DAAB agreement
7. Remuneration for DAAB & expert mutually agreed by both in the agreement -50%
8. If at any time the Parities may agree/ replace any one or more members of the DAAB.
9. Unless Parties agree otherwise, a replacement if a member declines to act or is unable
to act, death,…, resignation or termination of appointment (appointment same manner) .
10. Termination for any member shall be agreed NOT by ONE Party alone.
46
FIDIC Suit of Contracts Module 1020 R1 2021
Conditions of Contract for Construction
21.1 Constitution of the DAAB
11- Unless otherwise agreed, the term of the DAAB (including the appointment of each
member) shall expire either (whichever is later) :
(a) on the date the discharge become, effective under S.CL. 14.12 [Discharge]‫اٌإلثشاء‬ ; or
(b) 28 d after DAAB decision on all Disputes, referred to it under S.CL. 21.4 [Obtaining
DAAB’s Decision] before such discharge has become effective, whichever is later.
NOTE:
 if the Contract is terminated, the term of the DAAB (including member) expire 28 d :
(i) the DAAB has given its decision on all Disputes, referred to it (S.CL.) 21.4 within
224 days after the date of termination; or Term+224 then 28
(ii) the date that the Parties reach a final agreement on all matters (payment) in
connection with the termination All agreed + 28
whichever is earlier.
47
FIDIC Suit of Contracts Module 1020 R1 2021
Conditions of Contract for Construction
21.2 Failure to Appoint DAAB Member(s)
If any of the following conditions apply, namely:
(a) if DAAB is 1 member, the Parties fail to agree of this member 28d or
(b) if the DAAB is 3, and in 28 d:
(i) either Party fails to select a member (for agreement by the other Party);
(ii) either Party fails to agree a member selected by the other Party;
(iii) the Parties fail to agree the appointment of the third member (chair of DAAB);
‫ء‬ ‫أعضا‬ ‫وإختٌار‬ ‫ترشٌح‬
‫وفض‬ ‫تجنب‬ ‫مجلس‬
‫النزاع‬
48
FIDIC Suit of Contracts Module 1020 R1 2021
Conditions of Contract for Construction
21.2 Failure to Appoint DAAB Member(s)
(c) the Parties fail to agree the appointment of a replacement within 42d (a member
unable) or termination of appointment; or
(d) if, an appointment (a member) cannot be effected- signature declined by any in14d.
then the appointing entity or official named in the Contract Data shall, at the request of
either or both Parties and after due consultation with both Parties, appoint the
member(s) of the DAAB (who, in case of sub-paragraph (d) (will be final& conclusive).
49
FIDIC Suit of Contracts Module 1020 R1 2021
Conditions of Contract for Construction
21.2 Failure to Appoint DAAB Member(s)
Thereafter, Parties and the member(s) signed, bound by DAAB Agreement under which:
(i) monthly, daily services fee, shall be as stated in the terms of the appointment; and
(ii) law governing DAAB Agreement is the governing law of the Contract S.CL. 1.4.
 Each Party 50% of the remuneration of the appointing entity or official.
 If 100% paid by Contractor, Contractor shall recover and so if the Employer/ D-IPC.
 include one-half of the amount of such remuneration in
50
FIDIC Suit of Contracts Module 1020 R1 2021
Conditions of Contract for Construction
21.3 Avoidance of Disputes
-If Parties so agree, they may jointly request DAAB to assist/informally discuss an issue
-If DAAB becomes aware of an issue, it may invite Parties to make such a joint request.
-Such joint request at any time, except during Engineer Determination-3.7 of the matter.
-informal assistance may be during meeting, Site visit. …., both Parties shall be present.
-Parties not bound to act, DAAB not bound in future resolution process(even in writing)
51
FIDIC Suit of Contracts Module 1020 R1 2021
Conditions of Contract for Construction
21.4 Obtaining DAAB’s Decision
• If a Dispute arise, either Party may refer Dispute to DAAB for decision as follows:
21.4.1 Reference of a Dispute to the DAAB
(a) if S.CL. 3.7 applied to the matter, be made within 42 d of giving or receiving a NOD
under S.CL. 3.7.5 [Dissatisfaction with Engineer’s determination].
 If the Dispute is not referred to the DAAB within this 42 d, such NOD shall
be deemed to have lapsed and no longer be valid;
(b) state that it is given under this Sub-Clause;21.4.1
(c) set out the referring Party’s case relating to the Dispute;
Refer to DAAB
52
FIDIC Suit of Contracts Module 1020 R1 2021
Conditions of Contract for Construction
21.4.1 Reference of a Dispute to the DAAB
(d) be in writing, with copies to the other Party and the Engineer; and
(e) for a DAAB of three persons, (deemed received when by the chairperson).
 The reference of a Dispute to DAAB shall, unless prohibited by law, be deemed to
interrupt the running of any applicable statute of limitation or prescription period.
21.4.2 The Parties’ obligations after the reference
 Parties shall promptly make available to DAAB all information, access to Site,.....
 Unless the Contract abandoned or terminated, the Parties shall continue to perform.
‫التقادم‬ ‫فترة‬ ‫أو‬ ‫التقادم‬ ‫توقف‬
53
FIDIC Suit of Contracts Module 1020 R1 2021
Conditions of Contract for Construction
21.4.3 The DAAB’s decision
The DAAB shall complete and give its decision within:
(a) 84 days after receiving the reference; or
(b) such period proposed by the DAAB and agreed by Parties.
 DAAB Payments are due and decision may be suspended and to be given ASA
practicable/ payment.
 In writing to Parties, a copy Engineer, reasoned, state that it is given under this S.CL.
 binding on both Parties, who shall promptly comply with it whether or not a Party
gives a NOD with respect to such decision.
54
FIDIC Suit of Contracts Module 1020 R1 2021
Conditions of Contract for Construction
21.4.3 The DAAB’s decision
The DAAB shall complete and give its decision within:
(a) 84 days after receiving the reference; or
(b) such period proposed by the DAAB and agreed by Parties.
 DAAB Payments are due and decision may be
suspended & be given ASA practicable/ receiving payment.
 In writing to Parties, a copy Engineer,
 reasoned, state that it is given under this S.CL.
 binding on both Parties, promptly comply with it
Whether/not a Party gives a NOD wrt to such decision.
DAAB Decision
Employer
responsible
for ENG. To
comply
Parties
comply
promptly
Binding not
final
A Party may issue NOD
Pay to the other
party/no notice
/no certificate
55
FIDIC Suit of Contracts Module 1020 R1 2021
Conditions of Contract for Construction
21.4.3 The DAAB’s decision
If the decision requires a payment of an amount by one Party to the other Party
(i) as(ii) below, the amount, immediately due &payable without certification/Notice
(ii) the DAAB may (as part of the decision), at the request of a Party (with grounds)
to believe that payee will be unable to repay (if reversed under S.CL. 21.6 ARB.
 Then require the payee to provide an appropriate security for such amount.
 DAAB proceeding shall not be deemed arbitration && DAAB not act as arbitrator.
56
FIDIC Suit of Contracts Module 1020 R1 2021
Conditions of Contract for Construction
21.4.4 Dissatisfaction with DAAB’s decision
If either Party is dissatisfied with the DAAB’s decision:
(a) may give a NOD to the other Party, with a copy to the DAAB & Engineer;
(b) this NOD state it is “Notice of Dissatisfaction with DAAB’s Decision” /reasons.
(c) NOD within 28 days after receiving the DAAB’s decision.
 If the DAAB fails to give its decision ( 84 d), then either Party may, within 28 d
give a NOD to the other Party as (a) and (b) above. (84+28= 112d) (conditional
precedence to ARB).
 neither Party shall be entitled to commence arbitration of a Dispute unless a NOD in
respect of that Dispute has been given in accordance with this Sub-Clause 21.4.4.
57
FIDIC Suit of Contracts Module 1020 R1 2021
Conditions of Contract for Construction
21.4.4 Dissatisfaction with DAAB’s decision
-If no NOD for DAAB decision by either Party 28 d then it becomes final, binding.
-If partially dissatisfied of the DAAB’s decision:
(i) this part(s) shall be clearly identified in the NOD;
(ii) this part(s), other parts of the decision, deemed severable from the decision;
(iii) the remainder of the decision shall become final and binding on both Parties.
58
FIDIC Suit of Contracts Module 1020 R1 2021
Conditions of Contract for Construction
21.5 Amicable Settlement
Where a NOD has been given under Sub-Clause 21.4 [Obtaining DAAB’s
Decision], both Parties shall attempt to settle the Dispute amicably before the
commencement of arbitration. However, unless both Parties agree otherwise,
arbitration may be commenced on or after the twenty-eighth (28th) day after the
day on which this NOD was given, even if no attempt at amicable settlement has
been made.
59
FIDIC Suit of Contracts Module 1020 R1 2021
Conditions of Contract for Construction
21.6 Arbitration
Unless settled amicably, and subject to S.CL. 3.7.5 [Dissatisfaction with Engineer’s
determination], S.CL. 21.4.4 [Dissatisfaction with DAAB’s decision], S.CL. 21.7
[Failure to Comply with DAAB’s Decision]and Sub-Clause 21.8 [No DAAB In
Place],
any Dispute in respect of which DAAB’s decision (if any) has not become final &
binding shall be settled by international arbitration, unless other agreed by both:
(a) be settled under Rules of Arbitration of International Chamber of Commerce ICC
(b) one or three arbitrators appointed in accordance with these Rules; and
(c) the arbitration shall be conducted in ruling language S.CL. 1.4 [Law and Language].
‫اٌزجبسح‬ ‫غشفخ‬ ‫إجشاءاد‬
-
ُ١‫اٌزحى‬ ‫ِمش‬
-
‫ثبٌٕضاع‬ ‫اٌّخزظخ‬ ‫اٌّحىّخ‬
-
‫ز‬١‫اٌزٕف‬
.
60
FIDIC Suit of Contracts Module 1020 R1 2021
Conditions of Contract for Construction
21.7 Failure to Comply with DAAB’s Decision
-In the event that a Party fails to comply with any DAAB decision, then other Party
may, w prejudice …, refer the failure itself directly to arbitration S.CL. 21.6
-arbitral tribunal shall have the power, to order, award interim or provisional to or
an award enforce that decision and may include award of damages. ‫ؼبف‬٠
‫غ‬٠ٛ‫رؼ‬
‫ٌٍّزؼشس‬
-In the case of a binding, not final decision, such interim award (may be reserved).
61
FIDIC Suit of Contracts Module 1020 R1 2021
Conditions of Contract for Construction
21.8 No DAAB In Place
If a Dispute arises between the Parties in connection with, or arising out of, the
Contract or execution of the Works && no DAAB in place (or no DAAB is being
constituted), whether by reason of expiry of DAAB’s appointment or otherwise:
(a) S.CL 21.4 [Obtaining DAAB’s Decision] and S.CL. 21.5 [Amicable Settlement]
shall not apply; and
(b) the Dispute may be referred by either Party directly to arbitration under Sub-
Clause 21.6 [Arbitration] without prejudice to any other rights the Party may have.
62
FIDIC Suit of Contracts Module 1020 R1 2021
Conditions of Contract for Construction
63
FIDIC Suit of Contracts Module 1020 R1 2021
Conditions of Contract for Construction
64
FIDIC Suit of Contracts Module 1020 R1 2021
Conditions of Contract for Construction
65
FIDIC Suit of Contracts Module 1020 R1 2021
Conditions of Contract for Construction
The Fidic Golden Principles First Edition 2019
66
FIDIC Suit of Contracts Module 1020 R1 2021
Conditions of Contract for Construction
‫هللا‬ ‫بحمد‬ ‫تم‬
‫هللا‬ ‫ورحمة‬ ‫علٌكم‬ ‫السالم‬
‫وبركاته‬

More Related Content

What's hot

FIDIC-Relevant to Time Management
FIDIC-Relevant to Time ManagementFIDIC-Relevant to Time Management
FIDIC-Relevant to Time ManagementASHISH KUMAR SINGH
 
Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...
Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...
Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...Divyanshu Dayal
 
#FIDIC Understanding Basics# By SN Panigrahi
#FIDIC Understanding Basics# By SN Panigrahi#FIDIC Understanding Basics# By SN Panigrahi
#FIDIC Understanding Basics# By SN PanigrahiSN Panigrahi, PMP
 
# FIDIC Payment Flow Charts # By SN Panigrahi
# FIDIC Payment Flow Charts # By SN Panigrahi# FIDIC Payment Flow Charts # By SN Panigrahi
# FIDIC Payment Flow Charts # By SN PanigrahiSN Panigrahi, PMP
 
110801Proposed Fidic Contract Framework For Complex Epc Projects
110801Proposed Fidic Contract Framework For Complex Epc Projects110801Proposed Fidic Contract Framework For Complex Epc Projects
110801Proposed Fidic Contract Framework For Complex Epc ProjectsMy own
 
fidic-flow-chart.pptx
fidic-flow-chart.pptxfidic-flow-chart.pptx
fidic-flow-chart.pptxssuserb337ce1
 
Claims 20.1 (Flow chart)
Claims 20.1 (Flow chart)Claims 20.1 (Flow chart)
Claims 20.1 (Flow chart)Fakhar-un -Nisa
 
Fidic contracts 2017 - Notable Changes
Fidic contracts 2017 - Notable ChangesFidic contracts 2017 - Notable Changes
Fidic contracts 2017 - Notable ChangesCNC
 
Clause 4.2 Performance Security-Understanding Clauses in FIDIC ‘Conditions of...
Clause 4.2 Performance Security-Understanding Clauses in FIDIC ‘Conditions of...Clause 4.2 Performance Security-Understanding Clauses in FIDIC ‘Conditions of...
Clause 4.2 Performance Security-Understanding Clauses in FIDIC ‘Conditions of...Divyanshu Dayal
 
Ss 06 training fidic moustafa ismail 2018 _ lec 6
Ss 06 training fidic moustafa ismail  2018 _ lec 6Ss 06 training fidic moustafa ismail  2018 _ lec 6
Ss 06 training fidic moustafa ismail 2018 _ lec 6Moustafa Ismail Abu Dief
 
FIDIC Red Book (PEC 2019).pdf
FIDIC Red Book (PEC 2019).pdfFIDIC Red Book (PEC 2019).pdf
FIDIC Red Book (PEC 2019).pdfsajidkhan82714
 
Contract payment and variation
Contract payment and variationContract payment and variation
Contract payment and variationVj NiroSh
 
Fidic contract
Fidic contract Fidic contract
Fidic contract Yash Patel
 

What's hot (20)

FIDIC-Relevant to Time Management
FIDIC-Relevant to Time ManagementFIDIC-Relevant to Time Management
FIDIC-Relevant to Time Management
 
An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activi...
An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activi...An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activi...
An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activi...
 
Standard Forms of Construction Contracts
Standard Forms of Construction ContractsStandard Forms of Construction Contracts
Standard Forms of Construction Contracts
 
Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...
Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...
Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...
 
#FIDIC Understanding Basics# By SN Panigrahi
#FIDIC Understanding Basics# By SN Panigrahi#FIDIC Understanding Basics# By SN Panigrahi
#FIDIC Understanding Basics# By SN Panigrahi
 
FIDIC 2017 Yellow and Silver in EPC and PPP Contracts
FIDIC 2017 Yellow and Silver in EPC and PPP ContractsFIDIC 2017 Yellow and Silver in EPC and PPP Contracts
FIDIC 2017 Yellow and Silver in EPC and PPP Contracts
 
# FIDIC Payment Flow Charts # By SN Panigrahi
# FIDIC Payment Flow Charts # By SN Panigrahi# FIDIC Payment Flow Charts # By SN Panigrahi
# FIDIC Payment Flow Charts # By SN Panigrahi
 
110801Proposed Fidic Contract Framework For Complex Epc Projects
110801Proposed Fidic Contract Framework For Complex Epc Projects110801Proposed Fidic Contract Framework For Complex Epc Projects
110801Proposed Fidic Contract Framework For Complex Epc Projects
 
fidic-flow-chart.pptx
fidic-flow-chart.pptxfidic-flow-chart.pptx
fidic-flow-chart.pptx
 
Claims 20.1 (Flow chart)
Claims 20.1 (Flow chart)Claims 20.1 (Flow chart)
Claims 20.1 (Flow chart)
 
Ppt on fidic claims
Ppt on fidic claimsPpt on fidic claims
Ppt on fidic claims
 
Fidic contracts 2017 - Notable Changes
Fidic contracts 2017 - Notable ChangesFidic contracts 2017 - Notable Changes
Fidic contracts 2017 - Notable Changes
 
Clause 4.2 Performance Security-Understanding Clauses in FIDIC ‘Conditions of...
Clause 4.2 Performance Security-Understanding Clauses in FIDIC ‘Conditions of...Clause 4.2 Performance Security-Understanding Clauses in FIDIC ‘Conditions of...
Clause 4.2 Performance Security-Understanding Clauses in FIDIC ‘Conditions of...
 
Fidic law1
Fidic law1Fidic law1
Fidic law1
 
Fidic
FidicFidic
Fidic
 
Ss 06 training fidic moustafa ismail 2018 _ lec 6
Ss 06 training fidic moustafa ismail  2018 _ lec 6Ss 06 training fidic moustafa ismail  2018 _ lec 6
Ss 06 training fidic moustafa ismail 2018 _ lec 6
 
FIDIC Red Book (PEC 2019).pdf
FIDIC Red Book (PEC 2019).pdfFIDIC Red Book (PEC 2019).pdf
FIDIC Red Book (PEC 2019).pdf
 
Extension of time (E.O.T) By Ahmed Ibarhim
Extension of time (E.O.T) By Ahmed IbarhimExtension of time (E.O.T) By Ahmed Ibarhim
Extension of time (E.O.T) By Ahmed Ibarhim
 
Contract payment and variation
Contract payment and variationContract payment and variation
Contract payment and variation
 
Fidic contract
Fidic contract Fidic contract
Fidic contract
 

Similar to Bim arabia red fidic

BIM and the FIDIC family of contracts: a status report - Bernd Kordes at OICE...
BIM and the FIDIC family of contracts: a status report - Bernd Kordes at OICE...BIM and the FIDIC family of contracts: a status report - Bernd Kordes at OICE...
BIM and the FIDIC family of contracts: a status report - Bernd Kordes at OICE...Giacomo Bergonzoni
 
م.35- مبادرة#تواصل_تطوير- د.مصطفى إسماعيل - التخفيف من مطالبات مشروعات التشيد...
م.35- مبادرة#تواصل_تطوير- د.مصطفى إسماعيل - التخفيف من مطالبات مشروعات التشيد...م.35- مبادرة#تواصل_تطوير- د.مصطفى إسماعيل - التخفيف من مطالبات مشروعات التشيد...
م.35- مبادرة#تواصل_تطوير- د.مصطفى إسماعيل - التخفيف من مطالبات مشروعات التشيد...Egyptian Engineers Association
 
FIDIC Presentation-2016.pdf
FIDIC Presentation-2016.pdfFIDIC Presentation-2016.pdf
FIDIC Presentation-2016.pdfPachyCarmona1
 
Presentation eci dr moustafa ismail 20 july 2020
Presentation eci dr moustafa ismail 20 july 2020Presentation eci dr moustafa ismail 20 july 2020
Presentation eci dr moustafa ismail 20 july 2020Moustafa Ismail Abu Dief
 
Medium Density Fiberboard (MDF) - Market Survey cum Detailed Techno Economic ...
Medium Density Fiberboard (MDF) - Market Survey cum Detailed Techno Economic ...Medium Density Fiberboard (MDF) - Market Survey cum Detailed Techno Economic ...
Medium Density Fiberboard (MDF) - Market Survey cum Detailed Techno Economic ...Ajjay Kumar Gupta
 
Training fidic moustafa ismail 2018 _ lec 8
Training fidic moustafa ismail  2018 _ lec 8Training fidic moustafa ismail  2018 _ lec 8
Training fidic moustafa ismail 2018 _ lec 8Moustafa Ismail Abu Dief
 
Webinar Critical Chain Project Management - Marris Consulting - June 2020
Webinar Critical Chain Project Management  - Marris Consulting - June 2020Webinar Critical Chain Project Management  - Marris Consulting - June 2020
Webinar Critical Chain Project Management - Marris Consulting - June 2020MARRIS Consulting
 
EU Non-Financial Reporting Directive: How companies can make the most of it!
EU Non-Financial Reporting Directive: How companies can make the most of it!EU Non-Financial Reporting Directive: How companies can make the most of it!
EU Non-Financial Reporting Directive: How companies can make the most of it!CDSB
 
An incentive mechanism for Industrial CCS? Exploring the findings of the Tees...
An incentive mechanism for Industrial CCS? Exploring the findings of the Tees...An incentive mechanism for Industrial CCS? Exploring the findings of the Tees...
An incentive mechanism for Industrial CCS? Exploring the findings of the Tees...Global CCS Institute
 
2017 Tunnel Journal on Emerald Book and GBR
2017 Tunnel Journal on Emerald Book and GBR2017 Tunnel Journal on Emerald Book and GBR
2017 Tunnel Journal on Emerald Book and GBRandrewng540722
 
26 مؤتمر ادارة المشروعات contract relations management
26 مؤتمر ادارة المشروعات contract relations management26 مؤتمر ادارة المشروعات contract relations management
26 مؤتمر ادارة المشروعات contract relations managementM Maged Hegazy, LLM, MBA, CCP, P3O
 
National BIM Conference 2015 - JHunt
National BIM Conference 2015 - JHuntNational BIM Conference 2015 - JHunt
National BIM Conference 2015 - JHuntJohn Hunt
 
BEXEL Manager - BEXEL Consulting
BEXEL Manager - BEXEL ConsultingBEXEL Manager - BEXEL Consulting
BEXEL Manager - BEXEL ConsultingN.A. Tecnologia
 
The Future of BIM
The Future of BIMThe Future of BIM
The Future of BIMThe NBS
 
DCEU 18: Designing a Global Centralized Container Platform for a Multi-Cluste...
DCEU 18: Designing a Global Centralized Container Platform for a Multi-Cluste...DCEU 18: Designing a Global Centralized Container Platform for a Multi-Cluste...
DCEU 18: Designing a Global Centralized Container Platform for a Multi-Cluste...Docker, Inc.
 
5th Qatar BIM User Day, Understanding stakeholder roles in BIM
5th Qatar BIM User Day, Understanding stakeholder roles in BIM5th Qatar BIM User Day, Understanding stakeholder roles in BIM
5th Qatar BIM User Day, Understanding stakeholder roles in BIMBIM User Day
 

Similar to Bim arabia red fidic (20)

BIM and the FIDIC family of contracts: a status report - Bernd Kordes at OICE...
BIM and the FIDIC family of contracts: a status report - Bernd Kordes at OICE...BIM and the FIDIC family of contracts: a status report - Bernd Kordes at OICE...
BIM and the FIDIC family of contracts: a status report - Bernd Kordes at OICE...
 
م.35- مبادرة#تواصل_تطوير- د.مصطفى إسماعيل - التخفيف من مطالبات مشروعات التشيد...
م.35- مبادرة#تواصل_تطوير- د.مصطفى إسماعيل - التخفيف من مطالبات مشروعات التشيد...م.35- مبادرة#تواصل_تطوير- د.مصطفى إسماعيل - التخفيف من مطالبات مشروعات التشيد...
م.35- مبادرة#تواصل_تطوير- د.مصطفى إسماعيل - التخفيف من مطالبات مشروعات التشيد...
 
FIDIC Presentation-2016.pdf
FIDIC Presentation-2016.pdfFIDIC Presentation-2016.pdf
FIDIC Presentation-2016.pdf
 
Presentation eci dr moustafa ismail 20 july 2020
Presentation eci dr moustafa ismail 20 july 2020Presentation eci dr moustafa ismail 20 july 2020
Presentation eci dr moustafa ismail 20 july 2020
 
Fidic
FidicFidic
Fidic
 
Medium Density Fiberboard (MDF) - Market Survey cum Detailed Techno Economic ...
Medium Density Fiberboard (MDF) - Market Survey cum Detailed Techno Economic ...Medium Density Fiberboard (MDF) - Market Survey cum Detailed Techno Economic ...
Medium Density Fiberboard (MDF) - Market Survey cum Detailed Techno Economic ...
 
Training fidic moustafa ismail 2018 _ lec 8
Training fidic moustafa ismail  2018 _ lec 8Training fidic moustafa ismail  2018 _ lec 8
Training fidic moustafa ismail 2018 _ lec 8
 
Webinar Critical Chain Project Management - Marris Consulting - June 2020
Webinar Critical Chain Project Management  - Marris Consulting - June 2020Webinar Critical Chain Project Management  - Marris Consulting - June 2020
Webinar Critical Chain Project Management - Marris Consulting - June 2020
 
EU Non-Financial Reporting Directive: How companies can make the most of it!
EU Non-Financial Reporting Directive: How companies can make the most of it!EU Non-Financial Reporting Directive: How companies can make the most of it!
EU Non-Financial Reporting Directive: How companies can make the most of it!
 
PRESENTATION MGMI.pptx
PRESENTATION MGMI.pptxPRESENTATION MGMI.pptx
PRESENTATION MGMI.pptx
 
An incentive mechanism for Industrial CCS? Exploring the findings of the Tees...
An incentive mechanism for Industrial CCS? Exploring the findings of the Tees...An incentive mechanism for Industrial CCS? Exploring the findings of the Tees...
An incentive mechanism for Industrial CCS? Exploring the findings of the Tees...
 
2017 Tunnel Journal on Emerald Book and GBR
2017 Tunnel Journal on Emerald Book and GBR2017 Tunnel Journal on Emerald Book and GBR
2017 Tunnel Journal on Emerald Book and GBR
 
26 مؤتمر ادارة المشروعات contract relations management
26 مؤتمر ادارة المشروعات contract relations management26 مؤتمر ادارة المشروعات contract relations management
26 مؤتمر ادارة المشروعات contract relations management
 
12953021.ppt
12953021.ppt12953021.ppt
12953021.ppt
 
National BIM Conference 2015 - JHunt
National BIM Conference 2015 - JHuntNational BIM Conference 2015 - JHunt
National BIM Conference 2015 - JHunt
 
17 10 16
17 10 1617 10 16
17 10 16
 
BEXEL Manager - BEXEL Consulting
BEXEL Manager - BEXEL ConsultingBEXEL Manager - BEXEL Consulting
BEXEL Manager - BEXEL Consulting
 
The Future of BIM
The Future of BIMThe Future of BIM
The Future of BIM
 
DCEU 18: Designing a Global Centralized Container Platform for a Multi-Cluste...
DCEU 18: Designing a Global Centralized Container Platform for a Multi-Cluste...DCEU 18: Designing a Global Centralized Container Platform for a Multi-Cluste...
DCEU 18: Designing a Global Centralized Container Platform for a Multi-Cluste...
 
5th Qatar BIM User Day, Understanding stakeholder roles in BIM
5th Qatar BIM User Day, Understanding stakeholder roles in BIM5th Qatar BIM User Day, Understanding stakeholder roles in BIM
5th Qatar BIM User Day, Understanding stakeholder roles in BIM
 

More from Moustafa Ismail Abu Dief

Ss 10 cost engineering management training- moustafa sec 5 part iii ch 2...
Ss 10   cost engineering management  training-   moustafa sec 5 part iii ch 2...Ss 10   cost engineering management  training-   moustafa sec 5 part iii ch 2...
Ss 10 cost engineering management training- moustafa sec 5 part iii ch 2...Moustafa Ismail Abu Dief
 
Ss 07 training fidic moustafa ismail 2018 _ lec 7_a
Ss 07 training fidic moustafa ismail  2018 _ lec 7_aSs 07 training fidic moustafa ismail  2018 _ lec 7_a
Ss 07 training fidic moustafa ismail 2018 _ lec 7_aMoustafa Ismail Abu Dief
 
Ss 07 training fidic moustafa ismail 2018__ lec 7B
Ss 07 training fidic moustafa ismail  2018__ lec 7BSs 07 training fidic moustafa ismail  2018__ lec 7B
Ss 07 training fidic moustafa ismail 2018__ lec 7BMoustafa Ismail Abu Dief
 
Ss 09 cost engineering management training- nov 2017 moustafa sec 5 part ii...
Ss 09 cost engineering management  training- nov 2017  moustafa sec 5 part ii...Ss 09 cost engineering management  training- nov 2017  moustafa sec 5 part ii...
Ss 09 cost engineering management training- nov 2017 moustafa sec 5 part ii...Moustafa Ismail Abu Dief
 
07 b cost engineering management training- nov 2017 moustafa sec 5 part ii...
07 b  cost engineering management  training- nov 2017  moustafa sec 5 part ii...07 b  cost engineering management  training- nov 2017  moustafa sec 5 part ii...
07 b cost engineering management training- nov 2017 moustafa sec 5 part ii...Moustafa Ismail Abu Dief
 
07A cost engineering management training- nov 2017 moustafa sec 5 part iii...
07A  cost engineering management  training- nov 2017  moustafa sec 5 part iii...07A  cost engineering management  training- nov 2017  moustafa sec 5 part iii...
07A cost engineering management training- nov 2017 moustafa sec 5 part iii...Moustafa Ismail Abu Dief
 
Ss 07 training fidic moustafa ismail 2018 _ lec 7_a
Ss 07 training fidic moustafa ismail  2018 _ lec 7_aSs 07 training fidic moustafa ismail  2018 _ lec 7_a
Ss 07 training fidic moustafa ismail 2018 _ lec 7_aMoustafa Ismail Abu Dief
 
Ss 07 cost engineering management training- nov 2017 moustafa part ii ch 14...
Ss 07 cost engineering management  training- nov 2017  moustafa part ii ch 14...Ss 07 cost engineering management  training- nov 2017  moustafa part ii ch 14...
Ss 07 cost engineering management training- nov 2017 moustafa part ii ch 14...Moustafa Ismail Abu Dief
 
Ss 06 cost engineering management training- nov 2017 - moustafa part ii ch 1...
Ss 06 cost engineering management  training- nov 2017 - moustafa part ii ch 1...Ss 06 cost engineering management  training- nov 2017 - moustafa part ii ch 1...
Ss 06 cost engineering management training- nov 2017 - moustafa part ii ch 1...Moustafa Ismail Abu Dief
 
SCE 1 2018 claims management-in-construction-projects-seminar-.-2017 dr mous...
SCE 1 2018 claims management-in-construction-projects-seminar-.-2017  dr mous...SCE 1 2018 claims management-in-construction-projects-seminar-.-2017  dr mous...
SCE 1 2018 claims management-in-construction-projects-seminar-.-2017 dr mous...Moustafa Ismail Abu Dief
 
Ss 05 Cost engineering management training- nov 2017 - moustafa part ii ch 10
 Ss 05 Cost engineering management  training- nov 2017 - moustafa part ii ch 10 Ss 05 Cost engineering management  training- nov 2017 - moustafa part ii ch 10
Ss 05 Cost engineering management training- nov 2017 - moustafa part ii ch 10Moustafa Ismail Abu Dief
 
Ss 04 cost engineering management training- nov 2017 - moustafa part ii- ch 9
Ss 04 cost engineering management  training- nov 2017 - moustafa part ii- ch 9Ss 04 cost engineering management  training- nov 2017 - moustafa part ii- ch 9
Ss 04 cost engineering management training- nov 2017 - moustafa part ii- ch 9Moustafa Ismail Abu Dief
 
Ss 03 CCP- AACE.org cost engineering management training- 2017 - dr. mousta...
Ss 03 CCP- AACE.org  cost engineering management  training- 2017 - dr. mousta...Ss 03 CCP- AACE.org  cost engineering management  training- 2017 - dr. mousta...
Ss 03 CCP- AACE.org cost engineering management training- 2017 - dr. mousta...Moustafa Ismail Abu Dief
 
Ss 2 cost engineering management training- 2017 -dr moustafa ismail ch 5-6
Ss 2 cost engineering management  training- 2017 -dr  moustafa ismail  ch  5-6Ss 2 cost engineering management  training- 2017 -dr  moustafa ismail  ch  5-6
Ss 2 cost engineering management training- 2017 -dr moustafa ismail ch 5-6Moustafa Ismail Abu Dief
 
Cfcc certified forensic claims consultant lecture one 2017- dr moustafa ismail
Cfcc certified forensic claims consultant  lecture one  2017- dr moustafa ismailCfcc certified forensic claims consultant  lecture one  2017- dr moustafa ismail
Cfcc certified forensic claims consultant lecture one 2017- dr moustafa ismailMoustafa Ismail Abu Dief
 

More from Moustafa Ismail Abu Dief (20)

Fidic 2017 engineering
Fidic 2017 engineeringFidic 2017 engineering
Fidic 2017 engineering
 
Yellow book session bimarabia
Yellow book session bimarabiaYellow book session bimarabia
Yellow book session bimarabia
 
CMC certification
CMC certificationCMC certification
CMC certification
 
Ss 10 cost engineering management training- moustafa sec 5 part iii ch 2...
Ss 10   cost engineering management  training-   moustafa sec 5 part iii ch 2...Ss 10   cost engineering management  training-   moustafa sec 5 part iii ch 2...
Ss 10 cost engineering management training- moustafa sec 5 part iii ch 2...
 
Ss 07 training fidic moustafa ismail 2018 _ lec 7_a
Ss 07 training fidic moustafa ismail  2018 _ lec 7_aSs 07 training fidic moustafa ismail  2018 _ lec 7_a
Ss 07 training fidic moustafa ismail 2018 _ lec 7_a
 
Construction Claims Training Course 2019
Construction Claims Training Course 2019Construction Claims Training Course 2019
Construction Claims Training Course 2019
 
Construction Claims Training Course 2019
Construction Claims Training Course 2019Construction Claims Training Course 2019
Construction Claims Training Course 2019
 
Ss 07 training fidic moustafa ismail 2018__ lec 7B
Ss 07 training fidic moustafa ismail  2018__ lec 7BSs 07 training fidic moustafa ismail  2018__ lec 7B
Ss 07 training fidic moustafa ismail 2018__ lec 7B
 
Ss 09 cost engineering management training- nov 2017 moustafa sec 5 part ii...
Ss 09 cost engineering management  training- nov 2017  moustafa sec 5 part ii...Ss 09 cost engineering management  training- nov 2017  moustafa sec 5 part ii...
Ss 09 cost engineering management training- nov 2017 moustafa sec 5 part ii...
 
07 b cost engineering management training- nov 2017 moustafa sec 5 part ii...
07 b  cost engineering management  training- nov 2017  moustafa sec 5 part ii...07 b  cost engineering management  training- nov 2017  moustafa sec 5 part ii...
07 b cost engineering management training- nov 2017 moustafa sec 5 part ii...
 
07A cost engineering management training- nov 2017 moustafa sec 5 part iii...
07A  cost engineering management  training- nov 2017  moustafa sec 5 part iii...07A  cost engineering management  training- nov 2017  moustafa sec 5 part iii...
07A cost engineering management training- nov 2017 moustafa sec 5 part iii...
 
Ss 07 training fidic moustafa ismail 2018 _ lec 7_a
Ss 07 training fidic moustafa ismail  2018 _ lec 7_aSs 07 training fidic moustafa ismail  2018 _ lec 7_a
Ss 07 training fidic moustafa ismail 2018 _ lec 7_a
 
Ss 07 cost engineering management training- nov 2017 moustafa part ii ch 14...
Ss 07 cost engineering management  training- nov 2017  moustafa part ii ch 14...Ss 07 cost engineering management  training- nov 2017  moustafa part ii ch 14...
Ss 07 cost engineering management training- nov 2017 moustafa part ii ch 14...
 
Ss 06 cost engineering management training- nov 2017 - moustafa part ii ch 1...
Ss 06 cost engineering management  training- nov 2017 - moustafa part ii ch 1...Ss 06 cost engineering management  training- nov 2017 - moustafa part ii ch 1...
Ss 06 cost engineering management training- nov 2017 - moustafa part ii ch 1...
 
SCE 1 2018 claims management-in-construction-projects-seminar-.-2017 dr mous...
SCE 1 2018 claims management-in-construction-projects-seminar-.-2017  dr mous...SCE 1 2018 claims management-in-construction-projects-seminar-.-2017  dr mous...
SCE 1 2018 claims management-in-construction-projects-seminar-.-2017 dr mous...
 
Ss 05 Cost engineering management training- nov 2017 - moustafa part ii ch 10
 Ss 05 Cost engineering management  training- nov 2017 - moustafa part ii ch 10 Ss 05 Cost engineering management  training- nov 2017 - moustafa part ii ch 10
Ss 05 Cost engineering management training- nov 2017 - moustafa part ii ch 10
 
Ss 04 cost engineering management training- nov 2017 - moustafa part ii- ch 9
Ss 04 cost engineering management  training- nov 2017 - moustafa part ii- ch 9Ss 04 cost engineering management  training- nov 2017 - moustafa part ii- ch 9
Ss 04 cost engineering management training- nov 2017 - moustafa part ii- ch 9
 
Ss 03 CCP- AACE.org cost engineering management training- 2017 - dr. mousta...
Ss 03 CCP- AACE.org  cost engineering management  training- 2017 - dr. mousta...Ss 03 CCP- AACE.org  cost engineering management  training- 2017 - dr. mousta...
Ss 03 CCP- AACE.org cost engineering management training- 2017 - dr. mousta...
 
Ss 2 cost engineering management training- 2017 -dr moustafa ismail ch 5-6
Ss 2 cost engineering management  training- 2017 -dr  moustafa ismail  ch  5-6Ss 2 cost engineering management  training- 2017 -dr  moustafa ismail  ch  5-6
Ss 2 cost engineering management training- 2017 -dr moustafa ismail ch 5-6
 
Cfcc certified forensic claims consultant lecture one 2017- dr moustafa ismail
Cfcc certified forensic claims consultant  lecture one  2017- dr moustafa ismailCfcc certified forensic claims consultant  lecture one  2017- dr moustafa ismail
Cfcc certified forensic claims consultant lecture one 2017- dr moustafa ismail
 

Recently uploaded

Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture designssuser87fa0c1
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage examplePragyanshuParadkar1
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 

Recently uploaded (20)

young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture design
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage example
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 

Bim arabia red fidic

  • 1. Contract Management Consultant Module 1020 R1 2020 RED FIDIC 2nd Edition, 2017 CMC Program By: Moustafa I. Abu Dief 1 Contracts Management Consultant Program Module 1020 R1 2020- by Dr. Moustafa Ismail https://www.linkedin.com/in/moustafa-ismail-ph-d-cfcc-mcinstces-mciob- rmp-pmp-ficcp-ccp- 93798a16/?lipi=urn%3Ali%3Apage%3Ad_flagship3_feed%3B%2FO66nFaKT1i pcA42cdbalw%3D%3D&licu=urn%3Ali%3Acontrol%3Ad_flagship3_feed- identity_welcome_message CMC Module 1020–R1 2021 Contract Management Consultant Red FIDIC 2nd Edition, 2017
  • 2. FIDIC Suit of Contracts Module 1020 R1 2021 2 FIDIC Suit of Contracts 1020 R1 2021 By: Dr. Eng. Moustafa I. Abu Dief @moustafaabudief Module I FIDIC RED BOOK 2017 FIDIC Suit of Contracts 1020 R1 2021 Module I
  • 3. 3  Contracts and Claims Manager, Moustafa has Experience in Construction Projects, Engineering, Contracts, Claims, Dispute Resolution, and Training for 30 Years In Egypt, Qatar, Kuwait, KSA. Since 2005 he is a member and certification grader, reviewer in different professional organizations Moustafa I. Abu Dief, Ph.D, CFCC™, PMP®, CCP, PMI-RMP, FCIOB, Fcinst.CES  Dr. Moustafa is Certified Forensic Claims (CFCC Consultant In Addition To: • Associate Prof. ABMS University- Switzerland • Consultant engineer, Saudi Council of Engineers, Certified ARBITRATOR • Fellow Institute of Civil Engineers Surveyors, • Fellow , Chartered Institute Of Building, UK. • Certified Arbitrator, Egypt, Kuwait, Bahrain, and KSA • Fellow and A Prof. Justice Academy for Legal and economics. • Fellow, Institute Of Construction Claims Practitioner, US, 2016 • PMI-RMP, CCP, QMS/ Qa Management IRCA Certification. • PMP, ARICS, PMOC certification, CFCC Exam Grader. FIDIC Suit of Contracts Module 1020 R1 2021
  • 4. 4 • ‫مصطفى‬ ‫دكتورمهندس‬ ‫إسماعٌل‬ ‫أبوضٌف‬ • ‫هندسى‬ ‫ومستشار‬ ‫للمهندسٌن‬ ‫السعودٌة‬ ‫بالهٌئة‬ ‫معتمد‬ ‫محكم‬ ( ‫عضوٌة‬ 27 ‫سنة‬ ) • ‫أستاذ‬ ‫بالجامعة‬ ‫مساعد‬ ‫السوٌسرٌة‬ ( ‫المشروعات‬ ‫وإدارة‬ ‫العقود‬ .) • ‫ممتحن‬ ‫لشهادات‬ ‫معتمد‬ ‫التكالٌف‬ ‫دولٌة‬ ‫و‬ ‫المطالبات‬ ‫وعضوٌة‬ ‫منظمات‬ ‫الدولى‬ ‫اإلعتماد‬ • ‫اإلزهر‬ ‫جامعة‬ ‫ودكتوراه‬ ‫ماجستٌر‬ ( ‫والمطالبات‬ ‫العقود‬ .) • ‫زمٌل‬ ‫المعهد‬ ‫للبناء‬ ‫البرٌطانى‬ FCIOB – • ‫زمٌل‬ ‫المعهد‬ ‫المساحٌٌن‬ ‫للمهندسٌن‬ ‫البرٌطانى‬ FInstCES • ‫المهنى‬ ‫اإلعتماد‬ ‫على‬ ‫حاصل‬ CFCC™- AACE- USA ‫العقود‬ ‫لمطالبات‬ . • ‫معتمد‬ ‫مهندس‬ PMP® - PMI-RMP® - CCP® AACE- PMOC , SSGB, and • ‫ومشروعات‬ ‫عقود‬ ‫معتمد‬ ‫مراجع‬ IRCA-UK Certification (L-Auditor) • ‫العدالة‬ ‫ٌأكادٌمٌة‬ ‫العقود‬ ‫مساعد‬ ‫أستاذ‬ • ‫مدنى‬ ‫مهندس‬ - ‫إنشاءات‬ – ‫شمس‬ ‫عٌن‬ ‫هـندسة‬ 1988 FIDIC Suit of Contracts Module 1020 R1 2021 ‫بالمحاضر‬ ‫التعرٌف‬
  • 5. FIDIC Suit of Contracts Module 1020 R1 2021 5 FIDIC Suit of Contracts 1020 R1 2021 Contact details moustafa1_ismail@yahoo.com https://www.linkedin.com/in/moustafa-ismail-abu-dief-93798a16/ https://twitter.com/moustafaabudief https://www.slideshare.net/moustafismail 00966508297971- 00966560074207 KSA Moustafa I. Abu Dief, Ph.D, CFCC™, PMP®, CCP, PMI-RMP, FCIOB, FCInstCES
  • 6. FIDIC Suit of Contracts Module 1020 R1 2021 6 FIDIC 2017 RED BBOOK Our New Approach Proactive 1.Zero Failed Project % 2. Continuous Business Relationship 0
  • 7. FIDIC Suit of Contracts Module 1020 R1 2021 7 FIDIC Suit of Contracts 1020 R1 2021 FIDIC Suit of Contracts Modules Subject Module Practical Use of the FIDIC Contracts I FIDIC Contracts Management and Administration I Claims and Disputes Resolution II Dispute Adjudication Boards Arbitration, Saudi SCCA, UK. CI.arb Chartered Membership II
  • 8. FIDIC Suit of Contracts Module 1020 R1 2021 8 Contract Administration Training course Contracts Management Consultant CMC Program- CMC Module 1010 – M 1020- M 1030- Module 1040 Contract Management Consultant Programme. An integrated contracts and claims management competencies development Programme Comprises Module 1010 – Module 1020- Module 1030- Module 1040 The participants shall achieve a professional level of competencies, skills, and they will be accredited as: Contracts Management Consultant CMC.
  • 9. FIDIC Suit of Contracts Module 1020 R1 2021 9  Introduction. • The construction project should be a beneficial endeavor to the project stakeholders, The FIDIC RED book is drafted for the contract Between An Employer And The Contractor for the Construction For Building And Engineering Works Designed By The Employer FIDIC Suit of Contracts Module 1020 R1 2021
  • 10. FIDIC Suit of Contracts Module 1020 R1 2021 10 FIDIC Suit of Contracts Module 1020 R1 2021 ‫ما‬ ‫ھو‬ ‫الفيديك‬ ‫؟‬ • ‫اتحاد‬ ‫يضم‬ “ ‫جمعيات‬ ‫المھندسين‬ ‫االستشاريين‬ “ ‫فى‬ ‫الدول‬ ‫االعضاء‬ ‫أكثر‬ ‫من‬ 69 ‫جمعية‬ ‫ويتحدث‬ ‫بلسان‬ 600,000 ‫من‬ ‫المھندسين‬ ‫االستشاريين‬ ‫فى‬ ‫العالم‬ • ‫مطالبة‬ ‫أى‬ ‫جھة‬ ‫فى‬ ‫أى‬ ‫دولة‬ ‫للمھندس‬ ‫االستشارى‬ ‫أو‬ ‫المكتب‬ ‫االستشارى‬ ‫بإثبات‬ ‫عضويته‬ ‫فى‬ ‫الفيديك‬ ‫يعتبر‬ ‫طلبا‬ ‫غير‬ ‫جائز‬ – ‫انما‬ ‫يمكن‬ ‫مطالبة‬ ‫أى‬ ‫منھما‬ ‫بإثبات‬ ‫عضويته‬ ‫بجمعية‬ ‫المھندسين‬ ‫االستشاريين‬ ‫للبلد‬ ‫الذى‬ ‫ينتمى‬ ‫اليه‬ ‫وأن‬ ‫تكون‬ ‫ھذه‬ ‫الجمعية‬ ‫عضو‬ ‫بالفيديك‬ • ‫تم‬ ‫تأسيس‬ ‫الفيديك‬ ‫أول‬ ‫مرة‬ ‫عام‬ 1913 ‫بمساھمة‬ ‫ثالث‬ ‫جمعيات‬ ‫أوروبية‬ ‫للمھندسين‬ ‫االستشاريين‬ ‫ھى‬ : (CICB) -1 ‫جمعٌة‬ ‫المهندسٌن‬ ‫االستشارٌٌن‬ ‫البلجٌكٌة‬ (CICF) -2 ‫الجمعٌة‬ ‫الفرنسٌة‬ ‫للمهندسٌن‬ ‫االستشارٌٌن‬ (ASIC) -3 ‫الجمعٌة‬ ‫السوسرٌة‬ ‫للمهندسٌن‬ ‫االستشارٌٌن‬
  • 11. FIDIC Suit of Contracts Module 1020 R1 2021 11 FIDIC Suit of Contracts Module 1020 R1 2021 ‫؟‬ ‫الفٌدٌك‬ ‫هو‬ ‫ما‬ • ‫بلجيكا‬ ‫فى‬ 1913 (Ghent) ‫جنت‬ ‫مدينة‬ ‫فى‬ ‫عقد‬ ‫مؤتمر‬ ‫أول‬ ‫المھندس‬ ‫تعريف‬ ‫تم‬ ‫وفيه‬ • ‫بسويسرا‬ ‫بيرن‬ ‫مدينة‬ ‫وفى‬ Berne) ) ‫عام‬ ‫فى‬ 1914 ‫للفيديك‬ ‫الثانى‬ ‫المؤتمر‬ ‫عقد‬ ‫تم‬  ‫الفيديك‬ ‫لرؤية‬ ‫وفقا‬ ‫االستشارى‬ ‫المھندس‬ : “ ‫باسمه‬ ‫المھنة‬ ‫يمارس‬ ‫والذى‬ ‫العملية‬ ‫والخبرة‬ ‫والمھنية‬ ‫والتقنية‬ ‫العلمية‬ ‫المعارف‬ ‫يمتلك‬ ‫الذى‬ ‫الشخص‬ ‫الخاص‬ ‫عميله‬ ‫لصالح‬ ‫حكومية‬ ‫أو‬ ‫تجارية‬ ‫مؤسسة‬ ‫أى‬ ‫عن‬ ‫مستقال‬ – ‫تامة‬ ‫بحيدة‬ ‫ويتصرف‬ – ‫اال‬ ‫نقود‬ ‫أى‬ ‫يتلقى‬ ‫وال‬ ‫من‬ ‫عميله‬ ‫أو‬ ‫منه‬ ‫بإذن‬ ” ‫الفيديك‬ ‫األبيض‬ ‫وھذا‬ ‫الماللك‬ ‫بين‬ ‫عقد‬ ‫نموذج‬ ‫ھو‬ ‫االستشارى‬ ‫المھندس‬ . ‫الفٌدٌك‬ ‫األحمر‬ ‫صاحب‬ ‫بٌن‬ ‫عقد‬ ‫نموذج‬ ‫هو‬ / ‫التصمٌم‬ ‫بنظام‬ ‫والمقاول‬ ‫العمل‬ ‫رب‬ – ‫العطاء‬ ‫طرح‬ - ‫التنفٌذ‬ / ‫البناء‬
  • 12. FIDIC Suit of Contracts Module 1020 R1 2021 12 FIDIC Suit of Contracts Module 1020 R1 2021 ‫؟‬ ‫الفيديك‬ ‫عقود‬ ‫نماذج‬ • ‫عام‬ ‫من‬ ‫الفٌدٌك‬ 1913 ‫عام‬ ‫وحتى‬ 1957 ‫ٌذكر‬ ‫بنشاط‬ ‫ٌقم‬ ‫لم‬ , ‫عام‬ ‫فى‬ 1957 ‫من‬ ‫االولى‬ ‫الطبعة‬ ‫أصدر‬ ‫نموذج‬ “ ‫المدنٌة‬ ‫الهندسة‬ ‫أعمال‬ ‫مقاوالت‬ ‫عقد‬ ‫شروط‬ ” ‫الغالف‬ ‫واختار‬ ‫االحمر‬ ‫باللون‬ Conditions of Contract For Works Of Civil Engineering Construction” - ‫عام‬ ‫فى‬ 1969 ‫على‬ ‫وأبقى‬ ‫هذاالنموذج‬ ‫من‬ ‫الثانٌة‬ ‫الطبعة‬ ‫أصدر‬ ‫االحمر‬ ‫الغالف‬ - ‫عام‬ ‫فى‬ 1977 ‫االراضى‬ ‫واستصالح‬ ‫التكرٌك‬ ‫بأعمال‬ ‫خاصا‬ ‫جزءا‬ ‫الٌه‬ ‫وأضاف‬ ‫النموذج‬ ‫هذا‬ ‫من‬ ‫الثالثة‬ ‫الطبعة‬ ‫أصدر‬ ‫االحمر‬ ‫الغالف‬ ‫على‬ ‫وأبقى‬ - ‫عام‬ ‫فى‬ 1987 ‫هذا‬ ‫من‬ ‫الرابعة‬ ‫الطبعة‬ ‫أصدر‬ ‫األحمر‬ ‫النموذج‬ - ‫عام‬ ‫فى‬ 1995 ‫كٌفٌة‬ ‫فى‬ ‫ملحق‬ ‫فأصدر‬ ‫المنازعات‬ ‫لتسوٌة‬ ‫جدٌدا‬ ‫نظاما‬ ‫ٌصدرها‬ ‫التى‬ ‫العقود‬ ‫نماذج‬ ‫على‬ ‫الفٌدٌك‬ ‫أدخل‬ ‫تطبٌقه‬ ‫االحمر‬ ‫الكتاب‬ ‫فى‬ • ‫عام‬ ‫فى‬ 1963 ‫وهو‬ ‫أخر‬ ‫لنموذج‬ ‫االولى‬ ‫الطبعة‬ ‫الفٌدٌك‬ ‫أصدر‬ “ ‫والكهربائٌة‬ ‫المٌكانٌكٌة‬ ‫األعمال‬ ‫مقاوالت‬ ‫عقد‬ ‫شروط‬ – ‫بالموقع‬ ‫التركٌبات‬ ‫أعمال‬ ‫شاملة‬ “ ‫وأختار‬ ‫الغالف‬ ‫االصفر‬ Conditions Of Contract For Electrical And Mechanical Works –Including Erection On Site” • ‫عام‬ ‫فى‬ 1980 ‫المٌكٌانٌكٌة‬ ‫االعمال‬ ‫عقود‬ ‫مستندات‬ ‫بشأن‬ ‫مالحظات‬ ‫الٌه‬ ‫وأضاف‬ ‫النموذج‬ ‫هذا‬ ‫من‬ ‫الثانٌة‬ ‫الطبعة‬ ‫بنفس‬ ‫والكهربائٌة‬ ‫االصفر‬ ‫اللون‬ • ‫عام‬ ‫فى‬ 1987 ‫واحتفظ‬ ‫النموذج‬ ‫هذا‬ ‫من‬ ‫الثالثة‬ ‫الطبعة‬ ‫أصدر‬ ‫االصفر‬ ‫باللون‬ • ‫عام‬ ‫فى‬ 1995 ‫ملحق‬ ‫فأصدر‬ ‫المنازعات‬ ‫لتسوٌة‬ ‫جدٌدا‬ ‫نظاما‬ ‫ٌصدرها‬ ‫التى‬ ‫العقود‬ ‫نماذج‬ ‫على‬ ‫الفٌدٌك‬ ‫أدخل‬ ‫كٌفٌة‬ ‫فى‬ ‫تطبٌقه‬ ‫فى‬ ‫االصفر‬ ‫الكتاب‬
  • 13. FIDIC Suit of Contracts Module 1020 R1 2021 13 FIDIC Suit of Contracts Module 1020 R1 2021 ‫أصدر‬ ‫الفٌدٌك‬ ‫فى‬ ‫سبتمبر‬ 1999 ‫أربع‬ ‫نماذج‬ ‫جدٌدة‬ – ‫بفكر‬ ‫جدٌد‬ - ‫أسس‬ ‫صٌاغة‬ ‫جدٌدة‬ “ ‫شروط‬ ‫عقد‬ ‫االعمال‬ ‫المختصر‬ ” ‫الكتاب‬ ‫االخضر‬ ‫الطبعة‬ ‫االولى‬ – ‫سبتمبر‬ 1999 “ ‫عقد‬ ‫مقاوالت‬ ‫أعمال‬ ‫متكاملة‬ ” ‫الكتاب‬ ‫الفضى‬ ‫الطبعة‬ ‫االولى‬ – ‫سبتمبر‬ 1999 “ ‫عقد‬ ‫مقاوالت‬ ‫أعمال‬ ‫صناعٌة‬ ” ‫الكتاب‬ ‫االصفر‬ ‫الجدٌد‬ ‫الطبعة‬ ‫االولى‬ – ‫سبتمبر‬ 1999 “ ‫عقد‬ ‫مقاوالت‬ ‫أعمال‬ ‫التشٌٌد‬ ” ‫الكتاب‬ ‫االحمر‬ ‫الجدٌد‬ ‫الطبعة‬ ‫االولى‬ – ‫سبتمبر‬ 1999 “Conditions of Contract for CONSTRUCTION Works” –New Red Book “Conditions of Contract for PLANT and DESIGN-BUILD” -New Yellow Book “Conditions of Contract for EPC / Turnkey Projects” –Silver Book “Short Form of Contract” -Green Book Special: The Fidic Golden Principles First Edition 2019
  • 14. FIDIC Suit of Contracts Module 1020 R1 2021 14 FIDIC Suit of Contracts Module 1020 R1 2021 ‫نشر‬ ‫إتحاد‬ ‫الفٌدٌك‬ ‫اإلصدار‬ ‫الثانٌة‬ ‫من‬ ‫مجموعة‬ ‫كتبه‬ ‫األحمر‬ ‫واألصفر‬ ‫والفضى‬ ، ‫حٌث‬ ‫كان‬ ‫قد‬ ‫وضع‬ ‫إتحاد‬ ‫الفٌدٌك‬ ‫معٌارا‬ ‫لعقود‬ ‫وأعمال‬ ‫البناء‬ ‫والهندسة‬ ‫الدولٌة‬ ‫منذ‬ ‫عام‬ 1999 . ‫وٌأتى‬ ‫اإلصدار‬ ‫الثانى‬ ‫بتغٌٌرات‬ ‫ملحوظة‬ ‫ومؤثرة‬ ‫قد‬ ‫تؤدى‬ ‫إلى‬ ‫إدارة‬ ‫أكثر‬ ‫فعالٌة‬ ‫للعقود‬ .  ‫ف‬ ‫الفيديك‬ ‫إصدار‬ ‫ى‬ 5 ‫ديسمبر‬ 2017
  • 16. 16 FIDIC Suit of Contracts Module 1020 R1 2021 Red FIDIC 2nd Edition 2017 Agree ment General Conditions Particular Conditions Specifications Any other document Part A Contract Data Part B Special Provisions The Schedul es JV undertaking Conditions of Contract for Construction LOA Drawings
  • 17. FIDIC Suit of Contracts Module 1020 R1 2021 17 FIDIC Suit of Contracts “Red Book” Fidic Second Edition 2017 Principles. • These Conditions of Contract for Construction include the conditions, which are likely to apply to the majority of such contracts. • FOR Essential items of information which are particular to each individual contract are to be included in P Conditions (customize) Part A – Contract Data. (CD), periods such as: .. quantities consumed during the period in CD. Time for C. • In addition, it is recognized that many Employers, especially governmental agencies, may require special conditions of contract, or particular procedures, which differ from those included in the General Conditions. These should be included in Part B – Special Provisions, such as: “the Contractor’s entitlement to EOT shall be assessed in accordance with the rules and procedures stated in the Special Provisions (if not stated, as appropriate taking due regard of all relevant circumstances)”. S.Cl. 8.5 Extension of Time for Completion
  • 18. 18 FIDIC Suit of Contracts Module 1020 R1 2021 Conditions of Contract for Construction 1.5 Priority of Documents The documents forming the Contract are to be taken as mutually explanatory of one another. If there is any conflict, ambiguity or discrepancy, the priority of the documents shall be in accordance with the following sequence: (a) the Contract Agreement; (f) these General Conditions; (b) the Letter of Acceptance; (g) the Specification; (c) the Letter of Tender; (h) the Drawings;
  • 19. 19 FIDIC Suit of Contracts Module 1020 R1 2021 Conditions of Contract for Construction 1.5 Priority of Documents • If a Party finds an ambiguity or discrepancy in the documents, that Party shall promptly give a Notice to the Engineer, describing the ambiguity or discrepancy. • After receiving such Notice, or if the Engineer finds an ambiguity or discrepancy in the documents, the Engineer shall issue the necessary clarification or instruction.
  • 20. 20 FIDIC Suit of Contracts Module 1020 R1 2021 Conditions of Contract for Construction Q. What is your proper decision? Discrepancy situation 7 cm Drawings/ Specs 10 cm BOQ Knowing that: 1. The technical needs is 10 cm (after due clarification) 2. Priority of document is for Specs& Drawings 3. The Quantities are significant. What is your contractual expert decision?
  • 21. FIDIC Suit of Contracts Module 1020 R1 2021 21 FIDIC Suit of Contracts “Red Book” Fidic Second Edition 2017 Principles. • Red Book Continues FIDIC’s fundamental principles of balanced risk sharing while seeking to build on the substantial experience gained from its use over the past 18 years. (1999-2017). • For example, this 2nd edition provides: 1) greater detail and clarity on the requirements for notices and other communications; 2) provisions to address Employers’ and Contractors’ claims treated equally and separated from disputes; 3) mechanisms for dispute avoidance and 4) detailed provisions for quality management, and verification of Contractor’s contractual compliance.
  • 22. FIDIC Suit of Contracts Module 1020 R1 2021 22 FIDIC Suit of Contracts “Red Book” ‫التغٌٌرات‬ ‫الرئٌسٌة‬ ‫التى‬ ‫أدخلت‬ ‫على‬ ‫اإلصدار‬ ‫الثانى‬ ‫للفٌدٌك‬ 2017 ‫أمثلة‬ :  ‫تعد‬ ‫النماذج‬ ‫الجدٌدة‬ ‫أطول‬ ‫بكثٌر‬ ‫وتحتوي‬ ‫على‬ ً‫حوال‬ 50 % ‫من‬ ‫الكلمات‬ ‫زٌادة‬ ‫عن‬ ‫السابق‬ .  ‫وأسباب‬ ‫هذه‬ ‫الزٌادة‬ ً‫ه‬ ‫إدراج‬ ‫المزٌد‬ ‫من‬ ‫أحكام‬ ‫إدارة‬ ‫العقود‬ . 1 - ‫تحسٌنات‬ ‫للشروط‬ ‫واألحكام‬ ‫المتعلقة‬ ‫بإدارة‬ ‫العقد‬ :  ‫زٌادة‬ ‫التوضٌح‬ ‫بشأن‬ ‫إلتزامات‬ ‫طرفى‬ ‫العقد‬ ‫والنص‬ ‫على‬ ‫ضرورة‬ ‫اإللتزام‬ ‫باإلطار‬ ‫الرسمى‬ ‫فى‬ ‫مواعٌد‬ ‫محددة‬ Time Bar ‫وتقدٌم‬ ‫اإلرشادات‬ ‫والتوجٌهات‬ ،‫العملٌة‬ ‫على‬ ‫سبٌل‬ ‫المثال‬ :  - ‫النص‬ ‫على‬ ‫نتائج‬ ‫ملزمة‬ ‫فى‬ ‫حالة‬ ‫عدم‬ ‫اإللتزام‬ ‫ومراعاة‬ ‫األحكام‬ ‫مثل‬ ‫البند‬ 14.13 ‫من‬ ‫الفٌدٌك‬ ‫األحمر‬ ‫حالة‬ ‫عدم‬ ‫إعتراض‬ ‫المقاول‬ ‫على‬ ‫شهادة‬ ‫الدفع‬ ‫النهائٌة‬ . ---- ‫ٌعتد‬ ‫بتقدٌرات‬ ‫المهندس‬ . If the Contractor has not submitted a draft final Statement within the time specified under Sub- Clause 14.11.1 [Draft Final Statement], the Engineer shall request the Contractor to do so. Thereafter, if the Contractor fails to …………. within a period of 28 days, the Engineer shall issue the FPC for such an amount as the Engineer fairly considers to be due. IF: ii) no Partially Agreed Final Statement ……submitted by the Contractor but, to the extent that a draft final Statement submitted by the Contractor is deemed by the Engineer to be a Partially Agreed Final Statement . “the Engineer shall proceed in accordance with S.CL 14.6 [Issue of IPC] to issue an IPC”. I II III
  • 23. 23 FIDIC Suit of Contracts Module 1020 R1 2021 Conditions of Contract for Construction
  • 24. FIDIC Suit of Contracts Module 1020 R1 2021 24 FIDIC Suit of Contracts “Red Book” ‫التغٌٌرات‬ ‫الرئٌسٌة‬ ‫التى‬ ‫أدخلت‬ ‫على‬ ‫اإلصدار‬ ‫الثانى‬ ‫للفٌدٌك‬ 2017 1 - ‫تحسٌنات‬ ‫للشروط‬ ‫واألحكام‬ ‫المتعلقة‬ ‫بإدارة‬ ‫العقد‬ :  ‫إضافة‬ ‫شروط‬ ‫جدٌدة‬ ‫بشأن‬ ‫اإلشعار‬ ‫المبكر‬ ‫عن‬ ‫مشكلة‬ ‫محتملة‬ Notice ، ‫لٌقوم‬ ‫أطراف‬ ‫العقد‬ ‫بحل‬ ‫المشكلة‬ ‫مبكرا‬ ( ‫اآلداء‬ ‫اإلستباقى‬ - ‫المبادرة‬ - Proactive ) . 2 - ‫توجٌه‬ ‫األطراف‬ ‫نحو‬ ‫العمل‬ ‫على‬ ‫التركٌز‬ ‫على‬ ‫تجنب‬ ‫المنازعات‬ Avoidance ‫أوال‬ ‫ثم‬ ‫المضى‬ ‫قدما‬ ‫فى‬ ‫إجراءات‬ ‫فض‬ ‫المنازعات‬ :  ‫أضاف‬ ‫اإلصدار‬ ‫الثانى‬ 2017 ‫التأكٌد‬ ‫على‬ ‫تجنب‬ ‫النزاعات‬ ‫وإدارة‬ ‫المطالبات‬ ‫لكى‬ ‫التطور‬ ‫إلى‬ ‫منازعات‬ .  ‫علٌه‬ ‫فإن‬ ‫مجلس‬ ‫فض‬ ‫المنازعات‬ ‫السابق‬ ‫والمسمى‬ Dispute Adjudication Board (DAB) ‫تغٌر‬ ‫مسماه‬ ‫إلى‬ ‫مجلس‬ ‫تجنب‬ ‫المنازعات‬ / ‫الفض‬ ( Dispute Avoidance/Adjudication Board (DAAB  ‫وٌكون‬ ‫تعٌٌن‬ ‫المجلس‬ ‫طوال‬ ‫فترة‬ ‫المشروع‬ ‫مع‬ ‫إجتماع‬ ‫األطراف‬ ‫على‬ ‫فترات‬ ،‫محددة‬ ‫وتقدٌم‬ ‫المساعدات‬ ‫الغٌر‬ ‫رسمٌة‬ ‫والغٌر‬ ‫ملزمة‬ ‫ولٌس‬ ‫لغرض‬ ‫معٌن‬ – Add hoc ‫كما‬ ‫هو‬ ‫الحال‬ ‫فى‬ ‫نسخة‬ 1999 .
  • 25. FIDIC Suit of Contracts Module 1020 R1 2021 25 FIDIC Suit of Contracts “Red Book” ‫شاد‬١١‫اٌزغ‬ ‫خ‬١‫غ‬١‫اٌشئ‬ ٝ‫اٌز‬ ‫أدخٍذ‬ ٍٝ‫ػ‬ ‫اإلطذاس‬ ٝٔ‫اٌضب‬ ‫ه‬٠‫ذ‬١‫ٌٍف‬ 2017 3 - ‫إجشاء‬ ‫اٌّطبٌجبد‬ : ‫جت‬ّٛ‫ث‬ ‫ػمذ‬ ‫ه‬٠‫ذ‬١‫اٌف‬ ‫ٔغخخ‬ َ‫ػب‬ 1999 ، ‫وبٔذ‬ ‫ِطبٌجبد‬ ‫اٌّبٌه‬ ‫ٌخ‬ٛ‫ِفظ‬ ٓ‫ػ‬ ‫ِطبٌجبد‬ ‫ي‬ٚ‫اٌّمب‬ ( 20.1 ‫اٌجٕذ‬ٚ 2.5 ) ، ‫إخزالف‬ٚ َ‫إٌزضا‬ ً‫و‬ ‫ؽشف‬ ُ٠‫ٌزمذ‬ ‫إصجبد‬ٚ ‫اٌّطبٌجخ‬ ( ً١ٙ‫اٌزغ‬ ‫اػح‬ٌٛ‫ا‬ ‫ٌظبٌح‬ ‫اٌّبٌه‬ ) ‫إٌمبء‬ٚ ‫اٌؼتء‬ ٍٝ‫ػ‬ ‫ي‬ٚ‫اٌّمب‬ . ‫ػّال‬ٚ ٍٝ‫ػ‬ ‫ك‬١‫رحم‬ ‫ِجذأ‬ ‫اح‬ٚ‫اٌّغب‬ Equity ٓ١‫ث‬ ‫األؽشاف‬ ٝ‫ف‬ ‫ٔغخخ‬ 2017 ُ‫فز‬ ‫ي‬ٚ‫رٕب‬ ‫إجشاء‬ ‫اٌّطبٌجبد‬ ‫فمؾ‬ ٝ‫ف‬ ‫اٌّبدح‬ 20 ، ‫ب‬ٙ١‫ف‬ٚ ْٛ‫رى‬ ‫اإلٌزضاِبد‬ ٍٝ‫ػ‬ ‫اإلؽشاف‬ ( ‫طبحت‬ ًّ‫اٌؼ‬ ‫ي‬ٚ‫اٌّمب‬ٚ ) ‫ِزجبدٌخ‬ ، ٍٝ‫فؼ‬ ً١‫عج‬ ‫اٌّضبي‬ ‫أطجح‬ ‫ثب‬ٍٛ‫ِط‬ ِٓ ‫اٌّبٌه‬ ‫إطذاس‬ ‫إشؼبس‬ ‫ِطبٌجخ‬ ٝ‫ف‬ ‫خالي‬ ‫ِذح‬ ‫ٕخ‬١‫ِؼ‬ ‫إالعمؾ‬ٚ ٗ‫حم‬ ٝ‫ف‬ ‫اٌّطبٌجخ‬ ‫ب‬٠ٚ‫ِزغب‬ ‫ِغ‬ ‫ي‬ٚ‫اٌّمب‬ ٝ‫ف‬ َ‫إٌزضا‬ ‫اسعبي‬ ‫اإلشؼبس‬ . 4 - ‫ض‬٠‫رؼض‬ ‫س‬ٚ‫د‬ ‫ٕذط‬ٌّٙ‫ا‬ ( ‫اٌىزبة‬ ‫األحّش‬ ‫األطفش‬ٚ ) : ُ‫ر‬ ‫غ‬١‫ع‬ٛ‫ر‬ ‫س‬ٚ‫د‬ ‫ٕذط‬ٌّٙ‫ا‬ ًّ‫ش‬١ٌ ‫ذا‬٠‫ِض‬ ِٓ ً١‫اٌزفبط‬ ‫خ‬١‫اإلجشائ‬ ‫د‬ٚ‫اٌحذ‬ٚ ‫خ‬١ِٕ‫اٌض‬ ‫داء‬٢ ِٗ‫ب‬ِٙ ‫وّضبي‬ٚ ٍٝ‫ػ‬ ‫رٌه‬ ‫اٌجٕذ‬ ٝ‫اٌفشػ‬ 3.7 Agreement or Determination - 3.7.1 Consultation to reach agreement-3.7.2 Engineer’s Determination-
  • 26. FIDIC Suit of Contracts Module 1020 R1 2021 26 FIDIC Suit of Contracts “Red Book” ‫شاد‬١١‫اٌزغ‬ ‫خ‬١‫غ‬١‫اٌشئ‬ ٝ‫اٌز‬ ‫أدخٍذ‬ ٍٝ‫ػ‬ ‫اإلطذاس‬ ٝٔ‫اٌضب‬ ‫ه‬٠‫ذ‬١‫ٌٍف‬ 2017 5 - ‫د‬ٚ‫حذ‬ ‫خ‬١ٌٛ‫اٌّغئ‬ Limitation of Liability : ‫خ‬١‫اٌزجؼ‬ ٚ‫أ‬ ‫اٌّجبششح‬ ‫ش‬١‫غ‬ ‫اٌخغبئش‬ ‫إعزجؼبد‬ ٝ‫ف‬ ‫ٔغخخ‬ 2017 ‫د‬ٚ‫حذ‬ ِٓ ، ‫خ‬١ٌٛ‫اٌّغئ‬ to the other Party for loss of use of any Works, Neither Party shall be liable loss of profit, loss of any contract or for any indirect or consequential loss or damage which may be suffered by the other Party in connection with the Contract ‫ِغ‬ ‫ثؼغ‬ ‫اإلعزضبءاد‬ : ‫إللظبء‬ ‫أػشاس‬ ‫ش‬١‫اٌزأخ‬ ‫إٌزضاِبد‬ٚ ‫غ‬٠ٛ‫اٌزؼ‬ ٓ‫ػ‬ ‫بوبد‬ٙ‫إٔز‬ ‫ق‬ٛ‫حم‬ ‫خ‬١‫اٌٍّى‬ ‫خ‬٠‫اٌفىش‬ ‫اإلّ٘بي‬ٚ ُ١‫اٌجغ‬ ِٓ ‫ِظٍخ‬ ‫خ‬١ٌٛ‫اٌّغئ‬ . 6 - ‫غ‬٠ٛ‫اٌزؼ‬ ‫اٌّغزحك‬ ‫ٌألؽشاف‬ : ُ‫ر‬ ‫غ‬١‫ع‬ٛ‫ر‬ ‫ٔطبق‬ ‫ؼبد‬٠ٛ‫اٌزؼ‬ ‫اٌّغزحمخ‬ ‫ألؽشاف‬ ‫اٌؼمذ‬ ( ‫طبحت‬ ًّ‫اٌؼ‬ ‫ي‬ٚ‫اٌّمب‬ٚ ) ، ٍٝ‫فؼ‬ ً١‫عج‬ ‫اٌّضبي‬ ، َ‫مذ‬٠ ‫ي‬ٚ‫اٌّمب‬ ْ٢‫ا‬ ‫ؼب‬٠ٛ‫رؼ‬ ْ‫ٌؼّب‬ ْ‫أ‬ ‫األػّبي‬ ْٛ‫عزى‬ ‫ِٕبعجخ‬ ‫ٌٍغشع‬ ٜ‫اٌز‬ ‫طّّذ‬ ِٓ ٍٗ‫أج‬ . ‫وّب‬ ‫ذ‬ٙ‫زؼ‬٠ ‫طبحت‬ ًّ‫اٌؼ‬ ‫غ‬٠ٛ‫ثبٌزؼ‬ ٓ‫ػ‬ ‫اٌخغبئش‬ ٚ‫أ‬ ‫األػشاس‬ ٝ‫اٌز‬ ‫رٍحك‬ ‫ثّّزٍىبد‬ ٗ١‫ظف‬ِٛ ٚ‫أ‬ ‫والء‬ٌٛ‫ا‬ ٓ١١ٕ‫اٌّؼ‬ 7 - ‫ذ‬٠‫رّذ‬ ‫ِذح‬ ‫ع‬ٚ‫اٌّشش‬ : ُ‫ر‬ ‫عؼخ‬ٛ‫ر‬ ‫ٔطبق‬ ‫ذ‬٠‫اٌزّذ‬ ًّ‫ش‬١ٌ ‫أعجبة‬ ‫خ‬١‫إػبف‬ ً‫ِض‬ ‫شاد‬١‫اٌزأخ‬ ‫إٌبجّخ‬ ٓ‫ػ‬ ً‫رذخ‬ ‫ش‬١‫رأص‬ٚ ‫بٔبد‬١‫و‬ ‫اٌّشافك‬ ‫اٌخبطخ‬ ‫خ‬١ٕ‫اٌّؼ‬ ‫ع‬ٚ‫ثبٌّشش‬ .
  • 27. FIDIC Suit of Contracts Module 1020 R1 2021 27 FIDIC Suit of Contracts “Red Book” ‫شاد‬١١‫اٌزغ‬ ‫خ‬١‫غ‬١‫اٌشئ‬ ٝ‫اٌز‬ ‫أدخٍذ‬ ٍٝ‫ػ‬ ‫اإلطذاس‬ ٝٔ‫اٌضب‬ ‫ه‬٠‫ذ‬١‫ٌٍف‬ 2017 8 - ‫اإلشؼبساد‬ • ُ‫ر‬ ‫ح‬١‫ػ‬ٛ‫ر‬ ‫ف‬٠‫رؼش‬ ‫اإلشؼبس‬ َ‫اٌّمذ‬ ‫جت‬ّٛ‫ث‬ ‫اٌؼمذ‬ . ‫ػٕذِب‬ َٛ‫م‬٠ ‫ؽشف‬ ‫ثئطذاس‬ ‫إشؼبس‬ ‫جت‬ّٛ‫ث‬ ‫اٌؼمذ‬ ، ‫جت‬٠ ٗ١ٍ‫ػ‬ ْ‫أ‬ ‫زوش‬٠ ٗٔ‫أ‬ " ‫إشؼبس‬ " . ‫وّب‬ ‫جت‬٠ ‫روش‬ ُ‫سل‬ ‫ششؽ‬ ‫اٌؼمذ‬ ٞ‫اٌز‬ ‫طذس‬ ٗ‫جج‬ّٛ‫ث‬ ‫اإلشؼبس‬ ، ‫ثمظذ‬ ‫اٌّغبػذح‬ ٟ‫ف‬ ‫خ‬١ٍّ‫ػ‬ ‫إداسح‬ ‫د‬ٛ‫اٌؼم‬ . 9 - ‫الد‬٠‫رؼذ‬ ٜ‫أخش‬ • ‫ش‬١١‫رغ‬ ‫آخش‬ ٛ٘ َ‫ألحىب‬ ‫ح‬ٛ‫اٌم‬ ‫اٌمب٘شح‬ ، ‫ِغ‬ ‫ب‬ٌٙ‫اعزجذا‬ ًِ‫ثبٌىب‬ ‫ثؼجبسح‬ ‫ذح‬٠‫جذ‬ ْ‫ا‬ٕٛ‫ثؼ‬ " ‫أحذاس‬ ‫خ‬١‫اعزضٕبئ‬ " ( ‫ص‬ٛ‫إٌّظ‬ ‫ب‬ٙ١ٍ‫ػ‬ ٟ‫ف‬ ‫اٌفمشح‬ 18 ‫ذح‬٠‫اٌجذ‬ ) . ٟ‫ف‬ ٓ١‫ح‬ ْ‫أ‬ ‫ف‬٠‫رؼش‬ ‫أحذاس‬ ‫خ‬١‫اعزضٕبئ‬ ٛ٘ ٌٝ‫إ‬ ‫حذ‬ ‫ش‬١‫وج‬ ‫ٔفظ‬ َ‫أحىب‬ ‫ح‬ٛ‫اٌم‬ ‫اٌمب٘شح‬ ٟ‫ف‬ ‫اٌطجؼخ‬ 1999 .
  • 28. FIDIC Suit of Contracts Module 1020 R1 2021 28 FIDIC Suit of Contracts “Red Book” ‫شاد‬١١‫اٌزغ‬ ‫خ‬١‫غ‬١‫اٌشئ‬ ٝ‫اٌز‬ ‫أدخٍذ‬ ٍٝ‫ػ‬ ‫اإلطذاس‬ ٝٔ‫اٌضب‬ ‫ه‬٠‫ذ‬١‫ٌٍف‬ 2017 ّٓ‫رزؼ‬ ‫الد‬٠‫اٌزؼذ‬ ٝ‫اٌز‬ ‫سدد‬ٚ ‫ثبإلطذاساد‬ ‫خ‬١ٔ‫اٌضب‬ ‫ب‬‫ؼ‬٠‫أ‬ ‫ا‬‫ش‬١١‫رغ‬ ٟ‫ف‬ ‫اٌّالحظبد‬ ‫خ‬٠‫اإلسشبد‬ ‫ش‬١‫ح‬ ٟ‫ط‬ٛ‫ر‬ FIDIC ‫ثشذح‬ ‫طبحت‬ ًّ‫اٌؼ‬ ‫ي‬ٚ‫اٌّمب‬ٚ ‫غ‬١ّ‫ج‬ٚ ٓ١ّ‫اٌمبئ‬ ُ١ّ‫ثبٌزظ‬ ٍٝ‫ػ‬ ‫ِشاػبح‬ " ‫اٌّجبدا‬ ‫خ‬١‫اٌز٘ج‬ " ‫اٌخّغخ‬ ‫د‬ٛ‫ٌؼم‬ ‫ه‬٠‫ذ‬١‫اٌف‬ .  ‫رجشسِٕظّخ‬ ‫ه‬٠‫ذ‬١‫اٌف‬ ‫٘زا‬ ‫لف‬ٌّٛ‫ا‬ ٍٝ‫ػ‬ ‫أعبط‬ ‫بدح‬٠‫ص‬ َ‫اإل٘زّب‬ ‫غ‬٠‫ص‬ٛ‫ثز‬ ‫اٌّخبؽش‬ ٓ١‫ث‬ ‫األؽشاف‬ ٗ١ٍ‫ػ‬ٚ ٟٙ‫ف‬ ٍ‫تثن‬ ‫األؽشاف‬ ٓ‫ػ‬ َ‫اعزخذا‬ ‫ؽ‬ٚ‫شش‬ ‫اٌؼمذ‬ ‫اٌخبطخ‬ ‫ش‬١١‫ٌزغ‬ ٌ‫جىهش‬ ‫إلػبدح‬ ‫غ‬٠‫ص‬ٛ‫ر‬ ‫اٌّخبؽش‬ ٌٟ‫ثبٌزب‬ٚ ‫ش‬١١‫رغ‬ ‫ؼخ‬١‫ؽج‬ ‫ػمذ‬ ‫ه‬٠‫ذ‬١‫اٌف‬ ِٓ ‫ش‬١‫ح‬ :  ‫إٌمبؽ‬ ُ٘‫األ‬ ٝ‫ف‬ ‫ػمذ‬ ‫ه‬٠‫ذ‬١‫اٌف‬  ‫اٌّجبدا‬ ‫خ‬١‫اٌز٘ج‬
  • 29. FIDIC Suit of Contracts Module 1020 R1 2021 29 FIDIC Suit of Contracts “Red Book”  ‫النقاط‬ ‫االهامح‬ ‫تعقىد‬ ‫الفُذَك‬  ‫ممُزاخ‬ ‫إ‬ َ‫عزخذا‬ ‫ه‬٠‫ذ‬١‫داٌف‬ٛ‫ػم‬ • ‫فش‬ٛ‫ر‬ ‫لذ‬ٌٛ‫ا‬ ًٍ‫رم‬ٚ ‫ف‬١ٌ‫رىب‬ ‫اٌّؼبِالد‬ • ‫ِؼزشف‬ ‫ب‬ٙ‫ث‬ ٝ‫ف‬ ‫طٕبػخ‬ ‫ذ‬١١‫اٌزش‬ ‫ب‬١ٌٚ‫د‬ • ‫غ‬٠‫ص‬ٛ‫ر‬ ٚ ‫ض‬١‫رخظ‬ ‫اٌّخبؽش‬ ‫ثٕبء‬ ٍٝ‫ػ‬ ‫خجشاد‬ ‫ِزشاوّخ‬ • ‫عبثمخ‬ َ‫اإلعزخذا‬ ٝ‫ف‬ ‫ػبد‬ٚ‫ِشش‬ ‫ػخ‬ٕٛ‫ِز‬ ‫اإلعزفبدح‬ٚ ِٓ ٕٝ‫ِٕح‬ ٍُ‫اٌزؼ‬ ‫بغخ‬١‫ٌٍظ‬ ‫ك‬١‫اٌزطج‬ٚ .
  • 30. FIDIC Suit of Contracts Module 1020 R1 2021 30 FIDIC Suit of Contracts “Red Book”  ‫النقاط‬ ‫االهامح‬ ‫تعقىد‬ ‫الفُذَك‬  ‫أستشاتُجُاخ‬ ‫التعاقذ‬ • ‫اختُاس‬ ‫نمىرج‬ ‫العقذ‬ ‫المناسة‬ o ‫َتىقف‬ ‫نمىرج‬ ‫العقذ‬ ‫المناسة‬ ‫حسة‬ ‫المششوع‬ ‫مثل‬ : o ‫طثُعح‬ ‫المششوع‬ o ‫الخثشاخ‬ ‫المتىفشج‬ ‫إلداسج‬ ‫المششوع‬ o ‫مستىي‬ ‫المعلىماخ‬ ‫المتىفش‬ o ‫إسلىب‬ ‫الذفغ‬ ‫المتىفش‬ ‫لذي‬ ‫المالك‬ o ‫الزمن‬ ‫المتاح‬ ‫للتصمُم‬ / ‫والتنفُز‬ o .......................... o ...............
  • 31. 31 FIDIC Suit of Contracts Module 1020 R1 2021  ‫تغُُشاخ‬ ‫المالحظاخ‬ ‫اإلسشادَح‬ ً‫ف‬ ‫الطثعح‬ ‫الثانُح‬ .  ٟ‫ط‬ٛ‫ر‬ ‫ه‬٠‫ذ‬١‫اٌف‬ ‫ثشذح‬ ‫طبحت‬ ًّ‫اٌؼ‬ ‫ي‬ٚ‫اٌّمب‬ٚ ‫غ‬١ّ‫ج‬ٚ ٓ١ّ‫اٌمبئ‬ ُ١ّ‫ثبٌزظ‬ ٍٝ‫ػ‬ ‫ِشاػبح‬ " ‫اٌّجبدا‬ ‫خ‬١‫اٌز٘ج‬ " ‫اٌخّغخ‬ ‫خ‬١ٌ‫اٌزب‬ : Fidic Golden Principle 1 . ،‫اججبد‬ٌٛ‫ا‬ ،‫ق‬ٛ‫اٌحم‬ ،‫اججبد‬ٌٛ‫ا‬ ‫اس‬ٚ‫األد‬ ‫بد‬١ٌٚ‫اٌّغؤ‬ٚ ً‫ثشى‬ َ‫ػب‬ ‫ِزٕبعمخ‬ ٟ‫ف‬ ‫ؽ‬ٚ‫اٌشش‬ ‫اٌؼبِخ‬ . 2 . ‫بغخ‬١‫ط‬ ‫اػحخ‬ٚ ‫ال‬ ‫ٌجظ‬ ‫ب‬ٙ١‫ف‬ . 3 . ‫غ‬٠‫ص‬ٛ‫ر‬ ‫اٌّخبؽش‬ ً‫ثشى‬ ‫ػبدي‬ ْ‫اص‬ٛ‫ِز‬ٚ . 4 . ْ‫أ‬ ْٛ‫ى‬٠ ٜ‫ٌذ‬ ‫األؽشاف‬ ‫لذ‬ٚ ‫ي‬ٛ‫ِؼم‬ ‫ز‬١‫ٌزٕف‬ ُٙ‫اٌزضاِبر‬ ‫ِّبسعخ‬ٚ ُٙ‫ل‬ٛ‫حم‬ ‫؛‬ 5 - ‫جت‬٠ ‫إحبٌخ‬ ‫إٌّبصػبد‬ ٌٝ‫إ‬ ‫ِجٍظ‬ DAAB ‫إٌّبصػبد‬ ‫ي‬ٛ‫ٌٍحظ‬ ٍٝ‫ػ‬ ‫لشاس‬ َ‫ٍِض‬ ‫ثظفخ‬ ‫ِؤلزخ‬ ‫وششؽ‬ ‫عبثك‬ ُ١‫ٌٍزحى‬ ٚ‫أ‬ ٟ‫اٌزمبػ‬ . ‫رجشس‬ FIDIC ‫٘زا‬ ‫لف‬ٌّٛ‫ا‬ ٍٝ‫ػ‬ ‫أعبط‬ ‫ب‬ٙٔ‫أ‬ ‫ا٘زّذ‬ ً‫ثشى‬ ‫ش‬١‫وج‬ ‫غ‬٠‫ص‬ٛ‫ثز‬ ‫اٌّخبؽش‬ ٓ١‫ث‬ ‫األؽشاف‬ ٌٟ‫ثبٌزب‬ٚ ٟٙ‫ف‬ ٟٕ‫رض‬ ‫األؽشاف‬ ٓ‫ػ‬ َ‫اعزخذا‬ ‫ؽ‬ٚ‫شش‬ ‫اٌؼمذ‬ ‫اٌخبطخ‬ ‫ش‬١١‫ٌزغ‬ ٞ‫٘ش‬ٛ‫ج‬ ‫غ‬٠‫ص‬ٛ‫ٌز‬ ‫اٌّخبؽش‬ ٌٟ‫ثبٌزب‬ٚ ‫ؼخ‬١‫ؽج‬ ‫ػمذ‬ FIDIC. ٍٝ‫ػ‬ ُ‫اٌشغ‬ ‫ِّب‬ ‫روش‬ ٖ‫أػال‬ . Conditions of Contract for Construction
  • 32. 32 FIDIC Suit of Contracts Module 1020 R1 2021  ‫تغُُشاخ‬ ‫المالحظاخ‬ ‫اإلسشادَح‬ ً‫ف‬ ‫الطثعح‬ ‫الثانُح‬ .  ٟ‫ط‬ٛ‫ر‬ ‫ه‬٠‫ذ‬١‫اٌف‬ ‫ثشذح‬ ‫طبحت‬ ًّ‫اٌؼ‬ ‫ي‬ٚ‫اٌّمب‬ٚ ‫غ‬١ّ‫ج‬ٚ ٓ١ّ‫اٌمبئ‬ ُ١ّ‫ثبٌزظ‬ ٍٝ‫ػ‬ ‫ِشاػبح‬ " ‫اٌّجبدا‬ ‫خ‬١‫اٌز٘ج‬ " ‫اٌخّغخ‬ ‫خ‬١ٌ‫اٌزب‬ : Fidic Golden Principle 1 . ،‫اججبد‬ٌٛ‫ا‬ ،‫ق‬ٛ‫اٌحم‬ ،‫اججبد‬ٌٛ‫ا‬ ‫اس‬ٚ‫األد‬ ‫بد‬١ٌٚ‫اٌّغؤ‬ٚ ً‫ثشى‬ َ‫ػب‬ ‫ِزٕبعمخ‬ ٟ‫ف‬ ‫ؽ‬ٚ‫اٌشش‬ ‫اٌؼبِخ‬ . o ‫زطٍت‬٠ ‫٘زا‬ ‫اٌّجذأ‬ ْ‫أ‬ ‫اس‬ٚ‫األد‬ ‫اججبد‬ٌٛ‫ا‬ٚ ‫االٌزضاِبد‬ٚ ً‫ٌى‬ ٓ١‫اٌّشبسو‬ ‫الرزؼذي‬ ً‫ثشى‬ ٜ‫٘ش‬ٛ‫ج‬ ‫ػّب‬ ‫سد‬ٚ ‫ؽ‬ٚ‫ثبٌشش‬ ‫اٌؼبِخ‬ ٚ ‫رٕبعت‬ ‫ِزطٍجبد‬ ‫ع‬ٚ‫اٌّشش‬ – ‫٘زا‬ٚ ‫زحمك‬٠ ‫جت‬ّٛ‫ث‬ ‫بس‬١‫اإلخز‬ ً‫األِض‬ ‫رط‬ٌّٕٛ ‫اٌؼمذ‬ ٜ‫اٌز‬ ُ‫الئ‬٠ ‫ع‬ٚ‫اٌّشش‬ . Conditions of Contract for Construction
  • 33. FIDIC Suit of Contracts Module 1020 R1 2021 33 The Fidic Golden Principles First Edition 2019 Fidic Golden PrinciplesGPs:2019 GP1: The duties, rights, obligations, roles and responsibilities of all the Contract Participants must be generally as implied in the General Conditions, and appropriate to the requirements of the project. GP2: The Particular Conditions must be drafted clearly and unambiguously. GP3: The Particular Conditions must not change the balance of risk/reward allocation provided for in the General Conditions. GP4: All time periods specified in the Contract for Contract Participants to perform their obligations must be of reasonable duration. GP5: Unless there is a conflict with the governing law of the Contract, all formal disputes must be referred to a Dispute Avoidance/Adjudication Board (or a Dispute Adjudication Board, if applicable) for a provisionally binding decision as a condition precedent to arbitration. ) Or final and binding).
  • 34. FIDIC Suit of Contracts Module 1020 R1 2021 34 FIDIC Suit of Contracts “Red Book” ‫دوس‬ ‫المهنذس‬ ٟ‫ف‬ ‫إٌغخخ‬ ۲۰۱۷ ‫ٕ٘بن‬ ‫ض‬١‫رشو‬ ‫أوجش‬ ٍٝ‫ػ‬ ‫س‬ٚ‫د‬ ‫ٕذط‬ٌّٙ‫ا‬ ٜ‫اٌز‬ٚ ‫ثب‬ٍٛ‫ِط‬ ِٕٗ : 1 - ‫ٌغخ‬ ‫اٌؼمذ‬ 2 - ْ‫أ‬ ًّ‫ح‬٠ ‫اٌذسجبد‬ ‫بداد‬ٙ‫اٌش‬ٚ ‫إٌّبعجخ‬ ً١٘‫اٌزأ‬ٚ ‫إٌّبعت‬ 3 - ْ‫أ‬ ًّ‫ؼ‬٠ ‫بد‬١‫ثح‬ ٟ‫ف‬ ٖ‫س‬ٚ‫د‬ ‫ؾ‬١‫ع‬ٛ‫و‬ ٓ١‫ث‬ ٟ‫ؽشف‬ ‫اٌؼمذ‬ ‫ػٕذِب‬ ‫ظذس‬٠ ٖ‫لشاس‬ ‫اٌخبص‬ ‫ثبٌٕضاػبد‬ ( ّ‫ػ‬ ٕ ‫جب‬ ‫ش‬١‫ح‬ ٌُ ‫رؼشف‬ ‫وٍّخ‬ ‫ذ‬٠‫ِحب‬ ) . ‫فذ‬١‫أػ‬ٚ ( ‫ؼزجش‬٠ ْ٢‫ا‬ ‫ٕذط‬ٌّٙ‫ا‬ ‫ال‬ ًّ‫ؼ‬٠ ‫ٌظبٌح‬ ‫اٌّبٌه‬ ‫ػٕذِب‬ ‫مشس‬٠ ٟ‫ف‬ ً‫ِغبئ‬ ‫إٌضاػبد‬ ) .
  • 35. 35 FIDIC Suit of Contracts Module 1020 R1 2021 Conditions of Contract for Construction Important Changes in the Contract Structure/Clauses: 1. LoL moved from CL 17 to the last sub-clause of Clause 1. 2. Former “Force Majeure” renamed “Exceptional Event” & is dealt with in clause 18. 3. Insurance has been moved to clause 19. 4. Total no. of Clauses 21 instead of 20. 5. Former clause 20 is split in two parts to deal first with claims (new clause 20, also covering Employer’s Claims). 6. then only with disputes (new clause 21).
  • 36. 36 FIDIC Suit of Contracts Module 1020 R1 2021 Conditions of Contract for Construction Important Changes in the Contract Structure/Clauses:  Conflict/Dispute avoidance: FIDIC encourages to reach agreements between Parties.  The role of the Engineer or Employer’s Representative is clarified in order to “act neutrally between the Parties” on certain issues and “to fairly consider the amount of interim payment due” )sub-clause 14.6).  FIDIC favors standing Dispute Avoidance/Adjudication Boards (now DAAB instead of former DAB) under clause 21.  Step-by-step approaches also adopted, reflect this.  The parties will know where they are in the process on the following subjects: - Claims and determinations (sub-clause 3.7). - Unforeseeable conditions (S.CL 4.12). - Review of Contractor’s design )sub-clause 5.2). -Advance payment (sub-clause 14.2), - interim payments (S.CL 14.6) and Final Statement (sub-clause 14.11/14.13). -Termination by Employer (clause 15) and Contractor (clause 16). -Employer’s and Contractor’s claims )sub-clause 20.2). - Disputes (sub-clause 21.4)
  • 37. 37 FIDIC Suit of Contracts Module 1020 R1 2021 Conditions of Contract for Construction Important Changes in the Contract Structure/Clauses: o 2nd edition added some details for Variation procedure as it is rich source of conflict: o Employer to show financial arrangements are in place for Variations (S.CL 2.4). o Mechanism to recover in case instruction not state that it is a variation S.Cl 3.4 /3.5 o Determination does not just apply to claims but also to issues like: variations, payments, EOTs, day-works etc. o Contractor’s right to object to an instructed variation (S.CL. 13.1). o Additional entitlement for changes to permits/permissions/licenses/approvals obtained for the Works (S.CL.13.6).
  • 38. 38 FIDIC Suit of Contracts Module 1020 R1 2021 Conditions of Contract for Construction Important Changes in the Contract Structure/Clauses:  Project Management best practices are incorporated:  Regular management meetings (S.CL.3.6/3.8).  Detailed requirements for initial programme and updates (S.CL. 8.3). For example, the requirement for a supporting report to overcome effects of any delay.  Detailed test programme (S.CL. 9.1) and repeat testing (S.CL. 11.6). ITP  Equal time bar for claims from the Employer and the Contractor (S.CL. 20.2). Equity.
  • 39. 39 FIDIC Suit of Contracts Module 1020 R1 2021 Conditions of Contract for Construction Typical Sequence of Principal Events During Contracts for Construction 1. The Time for Completion is to be stated (in the Contract Data) as a number of days, to which is added any extensions of time under Sub-Clause 8.5. 2. In order to indicate the sequence of events, the following diagram is based upon the example of the Contractor failing to comply with S.CL. 8.2. time for C. 3. The Defects Notification Period is to be stated (in the Contract Data) as a number of days, to which is added any extensions under Sub-Clause 11.3. 4. Depending on the type of Works, Tests after Completion may also be required.
  • 40. 40 FIDIC Suit of Contracts Module 1020 R1 2021 Typical Sequence of Principal Events During Contracts for Construction ????
  • 41. 41 FIDIC Suit of Contracts Module 1020 R1 2021 Conditions of Contract for Construction  DAAB 1.1.22 “DAAB” or “Dispute Avoidance/Adjudication Board” means the sole member or three members (as the case may be) so named in the Contract, or appointed under S.CL. 21.1 Constitution of the DAAB] or S.CL 21.2 [Failure to Appoint DAAB Member(s)]. 1.1.23 “DAAB Agreement” means the agreement signed or deemed to have been signed by both Parties and the sole member or each of the three members of the DAAB in accordance with S.CL. 21.1 [Constitution of the DAAB] or S.CL. 21.2 [Failure to Appoint DAAB Member(s)], incorporating by reference the General Conditions of Dispute Avoidance/Adjudication Agreement contained in the Appendix to these General Conditions with such amendments as are agreed. Tripartite
  • 42. 42 FIDIC Suit of Contracts Module 1020 R1 2021 Conditions of Contract for Construction  DAAB 21. DISPUTES AND ARBITRATION. . . . . . . . . . . . . . . . . . . . . . . . 100 21.1 Constitution of the DAAB 21.2 Failure to Appoint DAAB Member(s) 21.3 Avoidance of Disputes 21.4 Obtaining DAAB’s Decision 21.5 Amicable Settlement 21.6 Arbitration 21.7 Failure to Comply with DAAB’s Decision 21.8 No DAAB In Place
  • 43. 43 FIDIC Suit of Contracts Module 1020 R1 2021 Conditions of Contract for Construction
  • 44. 44 FIDIC Suit of Contracts Module 1020 R1 2021 Conditions of Contract for Construction 21.1 Constitution of the DAAB 1. Disputes shall be decided by a DAAB in accordance with S.CL. 21.4 [Obtaining DAAB’s Decision]. 2. The Parties shall jointly appoint member(s) of the DAAB within 28d or/ 3. The DAAB shall comprise, as stated in the Contract Data, 1 OR 3. 4. The member(s) shall be selected from named list in CD. 5. If DAAB is 3, each Party shall select one member for agreement of other Party. Parties shall consult both these members/agree for the chairperson
  • 45. 45 FIDIC Suit of Contracts Module 1020 R1 2021 Conditions of Contract for Construction 21.1 Constitution of the DAAB 6. DAAB deemed to be constituted on the date Parties and 3 signed DAAB agreement 7. Remuneration for DAAB & expert mutually agreed by both in the agreement -50% 8. If at any time the Parities may agree/ replace any one or more members of the DAAB. 9. Unless Parties agree otherwise, a replacement if a member declines to act or is unable to act, death,…, resignation or termination of appointment (appointment same manner) . 10. Termination for any member shall be agreed NOT by ONE Party alone.
  • 46. 46 FIDIC Suit of Contracts Module 1020 R1 2021 Conditions of Contract for Construction 21.1 Constitution of the DAAB 11- Unless otherwise agreed, the term of the DAAB (including the appointment of each member) shall expire either (whichever is later) : (a) on the date the discharge become, effective under S.CL. 14.12 [Discharge]‫اٌإلثشاء‬ ; or (b) 28 d after DAAB decision on all Disputes, referred to it under S.CL. 21.4 [Obtaining DAAB’s Decision] before such discharge has become effective, whichever is later. NOTE:  if the Contract is terminated, the term of the DAAB (including member) expire 28 d : (i) the DAAB has given its decision on all Disputes, referred to it (S.CL.) 21.4 within 224 days after the date of termination; or Term+224 then 28 (ii) the date that the Parties reach a final agreement on all matters (payment) in connection with the termination All agreed + 28 whichever is earlier.
  • 47. 47 FIDIC Suit of Contracts Module 1020 R1 2021 Conditions of Contract for Construction 21.2 Failure to Appoint DAAB Member(s) If any of the following conditions apply, namely: (a) if DAAB is 1 member, the Parties fail to agree of this member 28d or (b) if the DAAB is 3, and in 28 d: (i) either Party fails to select a member (for agreement by the other Party); (ii) either Party fails to agree a member selected by the other Party; (iii) the Parties fail to agree the appointment of the third member (chair of DAAB); ‫ء‬ ‫أعضا‬ ‫وإختٌار‬ ‫ترشٌح‬ ‫وفض‬ ‫تجنب‬ ‫مجلس‬ ‫النزاع‬
  • 48. 48 FIDIC Suit of Contracts Module 1020 R1 2021 Conditions of Contract for Construction 21.2 Failure to Appoint DAAB Member(s) (c) the Parties fail to agree the appointment of a replacement within 42d (a member unable) or termination of appointment; or (d) if, an appointment (a member) cannot be effected- signature declined by any in14d. then the appointing entity or official named in the Contract Data shall, at the request of either or both Parties and after due consultation with both Parties, appoint the member(s) of the DAAB (who, in case of sub-paragraph (d) (will be final& conclusive).
  • 49. 49 FIDIC Suit of Contracts Module 1020 R1 2021 Conditions of Contract for Construction 21.2 Failure to Appoint DAAB Member(s) Thereafter, Parties and the member(s) signed, bound by DAAB Agreement under which: (i) monthly, daily services fee, shall be as stated in the terms of the appointment; and (ii) law governing DAAB Agreement is the governing law of the Contract S.CL. 1.4.  Each Party 50% of the remuneration of the appointing entity or official.  If 100% paid by Contractor, Contractor shall recover and so if the Employer/ D-IPC.  include one-half of the amount of such remuneration in
  • 50. 50 FIDIC Suit of Contracts Module 1020 R1 2021 Conditions of Contract for Construction 21.3 Avoidance of Disputes -If Parties so agree, they may jointly request DAAB to assist/informally discuss an issue -If DAAB becomes aware of an issue, it may invite Parties to make such a joint request. -Such joint request at any time, except during Engineer Determination-3.7 of the matter. -informal assistance may be during meeting, Site visit. …., both Parties shall be present. -Parties not bound to act, DAAB not bound in future resolution process(even in writing)
  • 51. 51 FIDIC Suit of Contracts Module 1020 R1 2021 Conditions of Contract for Construction 21.4 Obtaining DAAB’s Decision • If a Dispute arise, either Party may refer Dispute to DAAB for decision as follows: 21.4.1 Reference of a Dispute to the DAAB (a) if S.CL. 3.7 applied to the matter, be made within 42 d of giving or receiving a NOD under S.CL. 3.7.5 [Dissatisfaction with Engineer’s determination].  If the Dispute is not referred to the DAAB within this 42 d, such NOD shall be deemed to have lapsed and no longer be valid; (b) state that it is given under this Sub-Clause;21.4.1 (c) set out the referring Party’s case relating to the Dispute; Refer to DAAB
  • 52. 52 FIDIC Suit of Contracts Module 1020 R1 2021 Conditions of Contract for Construction 21.4.1 Reference of a Dispute to the DAAB (d) be in writing, with copies to the other Party and the Engineer; and (e) for a DAAB of three persons, (deemed received when by the chairperson).  The reference of a Dispute to DAAB shall, unless prohibited by law, be deemed to interrupt the running of any applicable statute of limitation or prescription period. 21.4.2 The Parties’ obligations after the reference  Parties shall promptly make available to DAAB all information, access to Site,.....  Unless the Contract abandoned or terminated, the Parties shall continue to perform. ‫التقادم‬ ‫فترة‬ ‫أو‬ ‫التقادم‬ ‫توقف‬
  • 53. 53 FIDIC Suit of Contracts Module 1020 R1 2021 Conditions of Contract for Construction 21.4.3 The DAAB’s decision The DAAB shall complete and give its decision within: (a) 84 days after receiving the reference; or (b) such period proposed by the DAAB and agreed by Parties.  DAAB Payments are due and decision may be suspended and to be given ASA practicable/ payment.  In writing to Parties, a copy Engineer, reasoned, state that it is given under this S.CL.  binding on both Parties, who shall promptly comply with it whether or not a Party gives a NOD with respect to such decision.
  • 54. 54 FIDIC Suit of Contracts Module 1020 R1 2021 Conditions of Contract for Construction 21.4.3 The DAAB’s decision The DAAB shall complete and give its decision within: (a) 84 days after receiving the reference; or (b) such period proposed by the DAAB and agreed by Parties.  DAAB Payments are due and decision may be suspended & be given ASA practicable/ receiving payment.  In writing to Parties, a copy Engineer,  reasoned, state that it is given under this S.CL.  binding on both Parties, promptly comply with it Whether/not a Party gives a NOD wrt to such decision. DAAB Decision Employer responsible for ENG. To comply Parties comply promptly Binding not final A Party may issue NOD Pay to the other party/no notice /no certificate
  • 55. 55 FIDIC Suit of Contracts Module 1020 R1 2021 Conditions of Contract for Construction 21.4.3 The DAAB’s decision If the decision requires a payment of an amount by one Party to the other Party (i) as(ii) below, the amount, immediately due &payable without certification/Notice (ii) the DAAB may (as part of the decision), at the request of a Party (with grounds) to believe that payee will be unable to repay (if reversed under S.CL. 21.6 ARB.  Then require the payee to provide an appropriate security for such amount.  DAAB proceeding shall not be deemed arbitration && DAAB not act as arbitrator.
  • 56. 56 FIDIC Suit of Contracts Module 1020 R1 2021 Conditions of Contract for Construction 21.4.4 Dissatisfaction with DAAB’s decision If either Party is dissatisfied with the DAAB’s decision: (a) may give a NOD to the other Party, with a copy to the DAAB & Engineer; (b) this NOD state it is “Notice of Dissatisfaction with DAAB’s Decision” /reasons. (c) NOD within 28 days after receiving the DAAB’s decision.  If the DAAB fails to give its decision ( 84 d), then either Party may, within 28 d give a NOD to the other Party as (a) and (b) above. (84+28= 112d) (conditional precedence to ARB).  neither Party shall be entitled to commence arbitration of a Dispute unless a NOD in respect of that Dispute has been given in accordance with this Sub-Clause 21.4.4.
  • 57. 57 FIDIC Suit of Contracts Module 1020 R1 2021 Conditions of Contract for Construction 21.4.4 Dissatisfaction with DAAB’s decision -If no NOD for DAAB decision by either Party 28 d then it becomes final, binding. -If partially dissatisfied of the DAAB’s decision: (i) this part(s) shall be clearly identified in the NOD; (ii) this part(s), other parts of the decision, deemed severable from the decision; (iii) the remainder of the decision shall become final and binding on both Parties.
  • 58. 58 FIDIC Suit of Contracts Module 1020 R1 2021 Conditions of Contract for Construction 21.5 Amicable Settlement Where a NOD has been given under Sub-Clause 21.4 [Obtaining DAAB’s Decision], both Parties shall attempt to settle the Dispute amicably before the commencement of arbitration. However, unless both Parties agree otherwise, arbitration may be commenced on or after the twenty-eighth (28th) day after the day on which this NOD was given, even if no attempt at amicable settlement has been made.
  • 59. 59 FIDIC Suit of Contracts Module 1020 R1 2021 Conditions of Contract for Construction 21.6 Arbitration Unless settled amicably, and subject to S.CL. 3.7.5 [Dissatisfaction with Engineer’s determination], S.CL. 21.4.4 [Dissatisfaction with DAAB’s decision], S.CL. 21.7 [Failure to Comply with DAAB’s Decision]and Sub-Clause 21.8 [No DAAB In Place], any Dispute in respect of which DAAB’s decision (if any) has not become final & binding shall be settled by international arbitration, unless other agreed by both: (a) be settled under Rules of Arbitration of International Chamber of Commerce ICC (b) one or three arbitrators appointed in accordance with these Rules; and (c) the arbitration shall be conducted in ruling language S.CL. 1.4 [Law and Language]. ‫اٌزجبسح‬ ‫غشفخ‬ ‫إجشاءاد‬ - ُ١‫اٌزحى‬ ‫ِمش‬ - ‫ثبٌٕضاع‬ ‫اٌّخزظخ‬ ‫اٌّحىّخ‬ - ‫ز‬١‫اٌزٕف‬ .
  • 60. 60 FIDIC Suit of Contracts Module 1020 R1 2021 Conditions of Contract for Construction 21.7 Failure to Comply with DAAB’s Decision -In the event that a Party fails to comply with any DAAB decision, then other Party may, w prejudice …, refer the failure itself directly to arbitration S.CL. 21.6 -arbitral tribunal shall have the power, to order, award interim or provisional to or an award enforce that decision and may include award of damages. ‫ؼبف‬٠ ‫غ‬٠ٛ‫رؼ‬ ‫ٌٍّزؼشس‬ -In the case of a binding, not final decision, such interim award (may be reserved).
  • 61. 61 FIDIC Suit of Contracts Module 1020 R1 2021 Conditions of Contract for Construction 21.8 No DAAB In Place If a Dispute arises between the Parties in connection with, or arising out of, the Contract or execution of the Works && no DAAB in place (or no DAAB is being constituted), whether by reason of expiry of DAAB’s appointment or otherwise: (a) S.CL 21.4 [Obtaining DAAB’s Decision] and S.CL. 21.5 [Amicable Settlement] shall not apply; and (b) the Dispute may be referred by either Party directly to arbitration under Sub- Clause 21.6 [Arbitration] without prejudice to any other rights the Party may have.
  • 62. 62 FIDIC Suit of Contracts Module 1020 R1 2021 Conditions of Contract for Construction
  • 63. 63 FIDIC Suit of Contracts Module 1020 R1 2021 Conditions of Contract for Construction
  • 64. 64 FIDIC Suit of Contracts Module 1020 R1 2021 Conditions of Contract for Construction
  • 65. 65 FIDIC Suit of Contracts Module 1020 R1 2021 Conditions of Contract for Construction The Fidic Golden Principles First Edition 2019
  • 66. 66 FIDIC Suit of Contracts Module 1020 R1 2021 Conditions of Contract for Construction ‫هللا‬ ‫بحمد‬ ‫تم‬ ‫هللا‬ ‫ورحمة‬ ‫علٌكم‬ ‫السالم‬ ‫وبركاته‬