Variations and Adjustments
• Cl.13.1 Engineer has the right to vary
o Prior to issue of TO certificate
o List of variation inclusions
• Value Engineering Cl.13.2
o Development risk with Contractor
o Savings 50/50 after deductions.
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 2March 2018
Variation Procedure
• Engineer requests proposal from Contractor
o Contractor responds with:
• Description
• Programme
• Evaluation
o Work proceeds without delay
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 3March 2018
Variation due to Legislation
• Local law at Base Date/ 28 days
• Cl.20.1 claim
o Extension of time
o Payment of cost
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018
LEC- V
4March 2018
Contract Price & Payment
• Considerations:
o Payment schedules
o Disbursement approval
o Particular Conditions
o Budgeting
• Funding availability
• Additional Costs / Variations
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 5March 2018
Variations and Adjustments
13.1 Right to Vary
• Initiated by Engineer at any time prior to TOC either by:
• Instruction/request for Contractor to submit a proposal.
• Contractor execute and be bound, unless the Contractor
promptly gives notice stating that the Contractor cannot
readily obtain the Goods required for the Variation.
• Upon receiving this notice. the Engineer shall cancel.
confirm or vary the instruction.
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 6March 2018
Variations and Adjustments
13.1 Right to Vary - continue
• Each Variation may include:
a. changes of quantities in the BOQ.
b. changes to quality, other characteristics of item
c. changes to levels. positions and/or dimensions.
d. omission of any work unless it is to be carried out by others.
e. any additional work. Plant. Materials for Permanent Works.
including any associated Tests on Completion. Boreholes,
other testing, exploratory work. or
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 7March 2018
Special Case for changes Work carried by others
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 8March 2018
Variations and Adjustments
13.1 Right to Vary - continue
Each Variation may include:
f) changes to the sequence or timing.
The Contractor shall not alter and/or modify the Permanent
Works. unless and until the Engineer instructs a variation.
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 9March 2018
Variations and Adjustments
13.2 Value Engineering
The Contractor may. submit to the Engineer a written proposal. if
adopted.
(i) accelerate completion. (ii) reduce the cost to the Employer
(iii) improve efficiency or value to the Employer of Works. or
(iv) otherwise be of benefit to the Employer.
 proposal at the cost of the Contractor and comply with 13.3
 If a proposal. which is approved by the Engineer. includes a
change in the design then:
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018
LEC- V
10March 2018
Variations and Adjustments
13.2 Value Engineering - continue
a) the Contractor shall design this part.
b) sub-paragraphs (a) to (d) of Sub-Clause 4.1
[Contractor's General Obligations] shall apply.
c) if a reduction in the contract value of this part. the
Engineer shall Proceed to [Determinations] to
• agree or determine a fee. This fee shall be half (50%) of:
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 11March 2018
Variations and Adjustments
13.2 Value Engineering - continue
i. such reduction in contract value. Excluding
adjustments under S Cl. 13.7 [Adjustments for
Changes in Legislation] and S Cl. 13.8 [Adjustments
for Changes in Cost].and
ii. the reduction in the value to the Employer for varied
works. consider reductions in quality, life or
operational efficiencies.
• However. if amount (i) ˂ than (ii). there shall not be a fee.
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018
LEC- V
12March 2018
Variations and Adjustments
13.3 Variation Procedure
• If the E requests a proposal. prior to Variation. the
Contractor in writing ASAP. Cannot/why or
submitting:
a) a description of the proposed work and a program
b) Contractor's proposal for modifications to the
program(TIA).
c) Cost break down, Justified and auditable.
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 13March 2018
Variations and Adjustments
13.3 Variation Procedure continued
• The Engineer Promptly (under S. Cl. 13.2 [VE] respond with
approval. disapproval or comments.
• The Contractor shall not delay
any work whilst awaiting a
response.
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 14March 2018
Variations and Adjustments
13.3 Variation Procedure continued
REPEAT
• The Contractor shall not delay
any work whilst awaiting a
response.
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018
LEC- V
15March 2018
Variations and Adjustments
13.3 Variation Procedure continued
 requirements for the recording of Costs of
variation . shall be issued by the Engineer,
contractor acknowledge receipt.
 Each Variation shall be evaluated in accordance
with Cl. 12], unless the Engineer instructs or
approves otherwise as per with this Clause.
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC-
V
16March 2018
Variations and Adjustments
13.4 Payment in Applicable Currencies
• If stated in Contract/ payment in more than a
currency:
o Any agreed adjustment to the contract price the
amount to be specified in each applicable currency.
o For this purpose. reference shall be made to the actual
or expected currency proportions. SAR- $ - Pounds
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 17March 2018
Variations and Adjustments
Definition:
"Provisional Sum" means a sum (if any) which is
specified in the Contract as a provisional sum, for the
execution of any part of the Works or for the supply of
Plant. Materials or services under S. Cl. 13.5
[Provisional Sums].
13.5 Provisional Sums
Each Provisional Sum shall only be used. As per the Engineer's
instructions. and the Contract Price shall be adjusted accordingly.
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 18March 2018
Variations and Adjustments
13.5 Provisional Sums - continued
 The total sum paid to the Contractor shall include only such
amounts. for the work. supplies or services to which the
Provisional Sum relates. as the Engineer shall have instructed.
For each Provisional Sum. the Engineer may instruct:
a) work to be executed by the Contractor and valued under S.
Cl. 13.3 and/or
b) Plant. Materials or services to be purchased by the Contractor.
from a nominated Subcontractor
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC-
V
19March 2018
Variations and Adjustments
13.5 Provisional Sums - continued
Or otherwise: and for which there shall be included in the
Contract Price:
(i) the actual amounts paid / due to be paid by the Contractor.
PLUS
(ii) a sum for overhead charges and profit. as a % actual amounts
by applying the relevant percentage rate (if any) stated in the a
schedule or in the Appendix to Tender shall be applied.
The Contractor shall produce quotations. invoices.
vouchers and accounts or receipts in substantiation
(justified, auditable).
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018
LEC- V
20March 2018
Reserves Vs Provisional sum
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018
LEC- V
21March 2018
• Contingency reserve
• Management Reserve
• Provisional sum
Variations and Adjustments
13.6 Day work (only if a day work schedule is available)
For work of a minor or incidental nature. Engineer instructs
a Variation on a day work basis, the value is estimated in
accordance with Day work Schedule included in Contract.
If none
this Sub-Clause shall not apply.
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 22March 2018
Variations and Adjustments
13.7 Adjustments for Changes in Legislation
• Contract Price adjusted for:
• any increase or decrease in Cost resulting from a change in
the Laws of the Country
• or in the judicial or official governmental interpretation of
such Laws. made after the Base Date. which affect the
Contractor performing his obligations under the Contract.
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 23March 2018
Variations and Adjustments
• 13.8 Adjustments for Changes in Cost
• In this S.Cl. ··table of adjustment data·· means the completed
table in Appendix to Tender. If there is no such table of
adjustment data. this S. Cl. Shall not apply.
 the amounts payable to the Contractor shall be adjusted for
change in the cost of labor. Goods and others.
• by the addition or deduction of the amounts determined by the
formulae prescribed in this Sub-Clause.
• If not satisfyable, then the Accepted Contract Amount shall be
deemed include amounts to cover such rises and falls in costs.
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 24March 2018
Clause 14 Contract Price & Payment
• Advance payment
o Design
o Mobilisation
o Funding facilitation
• Interim payments
o 56 days
• Final Payment
o 84 days
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 25March 2018
Contract Price & Payment
• Aid funding requires:
o Authority approval
o Timing
o Variations
o Routine audit checks
o Time to transfer funds
o Advance notice of change
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 26March 2018
Contract Price & Payment
• Cl.14 requires prompt action within time constraints
• Finance costs will lead to claims
• Alter Cl.14 by Particular Conditions to suit funding
authority
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 27March 2018
Contract Price & Payment
• Financial planning:
o Check estimates & budgets
o Prepare draft payment schedules
o Update estimates & programme
o Check funding
o Cl.14.4 estimates each 90 days
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 28March 2018
Budget Forecast
• Engineer prepares for Employer
o Regular intervals
o Updated budget
o Report of changes
• Data for report:
o Cl.2.4, 2.5, 3.5, 4.21, 8.3, 13.1, 13.3, 14.3, 13.8, 14.3,
14.6, 20.1, 20.4
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 29March 2018
END OF
LECTURE SEVEN- A
Thank You
‫هللا‬ ‫ورحوة‬ ‫عليكن‬ ‫السالم‬
‫هللا‬ ‫أهاى‬ ‫فى‬
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 30March 2018

More Related Content

What's hot

Ss 07 cost engineering management training- nov 2017 moustafa part ii ch 14...
Ss 07 cost engineering management  training- nov 2017  moustafa part ii ch 14...Ss 07 cost engineering management  training- nov 2017  moustafa part ii ch 14...
Ss 07 cost engineering management training- nov 2017 moustafa part ii ch 14...Moustafa Ismail Abu Dief
 
Ss training fidic moustafa ismail 2017 _ lec. 1
Ss training fidic moustafa ismail  2017 _ lec. 1Ss training fidic moustafa ismail  2017 _ lec. 1
Ss training fidic moustafa ismail 2017 _ lec. 1Moustafa Ismail Abu Dief
 
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias TanFIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias TanAdrias TAN
 
Fidic comparison red yellow - silver book
Fidic comparison red   yellow - silver bookFidic comparison red   yellow - silver book
Fidic comparison red yellow - silver bookHani Saad
 
FIDIC-Relevant to Time Management
FIDIC-Relevant to Time ManagementFIDIC-Relevant to Time Management
FIDIC-Relevant to Time ManagementASHISH KUMAR SINGH
 
Ss 2 cost engineering management training- 2017 -dr moustafa ismail ch 5-6
Ss 2 cost engineering management  training- 2017 -dr  moustafa ismail  ch  5-6Ss 2 cost engineering management  training- 2017 -dr  moustafa ismail  ch  5-6
Ss 2 cost engineering management training- 2017 -dr moustafa ismail ch 5-6Moustafa Ismail Abu Dief
 
Cfcc certified forensic claims consultant lecture one 2017- dr moustafa ismail
Cfcc certified forensic claims consultant  lecture one  2017- dr moustafa ismailCfcc certified forensic claims consultant  lecture one  2017- dr moustafa ismail
Cfcc certified forensic claims consultant lecture one 2017- dr moustafa ismailMoustafa Ismail Abu Dief
 
Time management in fidic red book 2017(prmg080 project)
Time management in fidic red book 2017(prmg080 project)Time management in fidic red book 2017(prmg080 project)
Time management in fidic red book 2017(prmg080 project)mohamed Ismail
 
# FIDIC Payment Flow Charts # By SN Panigrahi
# FIDIC Payment Flow Charts # By SN Panigrahi# FIDIC Payment Flow Charts # By SN Panigrahi
# FIDIC Payment Flow Charts # By SN PanigrahiSN Panigrahi, PMP
 
FIDIC 2016 Day02-1010 Variations Under FIDIC Forms, Adrias Tan
FIDIC 2016 Day02-1010 Variations Under FIDIC Forms, Adrias TanFIDIC 2016 Day02-1010 Variations Under FIDIC Forms, Adrias Tan
FIDIC 2016 Day02-1010 Variations Under FIDIC Forms, Adrias TanAdrias TAN
 
Suspensions and Delays in Construction Contract
Suspensions and Delays in Construction ContractSuspensions and Delays in Construction Contract
Suspensions and Delays in Construction ContractAvinash Kumar Gupta
 
Site Instruction Provision
Site Instruction ProvisionSite Instruction Provision
Site Instruction ProvisionRichard Retita
 
Ss ccp course cost engineering management training- 2017 - moustafa ch 1-4
Ss ccp course cost engineering management  training- 2017 - moustafa  ch  1-4Ss ccp course cost engineering management  training- 2017 - moustafa  ch  1-4
Ss ccp course cost engineering management training- 2017 - moustafa ch 1-4Moustafa Ismail Abu Dief
 
FIDIC Lecture - Joint operation of multiple Fidic Forms - A Case Study
FIDIC Lecture - Joint operation of multiple Fidic Forms - A Case StudyFIDIC Lecture - Joint operation of multiple Fidic Forms - A Case Study
FIDIC Lecture - Joint operation of multiple Fidic Forms - A Case StudyKhalil Hasan
 
Day-01_1025 Engineer's Roles and Risks - Adrias Tan
Day-01_1025 Engineer's Roles and Risks - Adrias TanDay-01_1025 Engineer's Roles and Risks - Adrias Tan
Day-01_1025 Engineer's Roles and Risks - Adrias TanAdrias TAN
 
Ss 04 cost engineering management training- nov 2017 - moustafa part ii- ch 9
Ss 04 cost engineering management  training- nov 2017 - moustafa part ii- ch 9Ss 04 cost engineering management  training- nov 2017 - moustafa part ii- ch 9
Ss 04 cost engineering management training- nov 2017 - moustafa part ii- ch 9Moustafa Ismail Abu Dief
 
Fidic contract administration
Fidic contract administrationFidic contract administration
Fidic contract administrationZabeel Institute
 
DEFECTS LIABILITY AND TAKING OVER CLAUSES
DEFECTS LIABILITY AND TAKING OVER CLAUSESDEFECTS LIABILITY AND TAKING OVER CLAUSES
DEFECTS LIABILITY AND TAKING OVER CLAUSESShivam Sood
 
Fidic conditions of contract presentation
Fidic conditions of contract presentationFidic conditions of contract presentation
Fidic conditions of contract presentationJeff B
 

What's hot (20)

Ss 07 cost engineering management training- nov 2017 moustafa part ii ch 14...
Ss 07 cost engineering management  training- nov 2017  moustafa part ii ch 14...Ss 07 cost engineering management  training- nov 2017  moustafa part ii ch 14...
Ss 07 cost engineering management training- nov 2017 moustafa part ii ch 14...
 
Ppt on fidic claims
Ppt on fidic claimsPpt on fidic claims
Ppt on fidic claims
 
Ss training fidic moustafa ismail 2017 _ lec. 1
Ss training fidic moustafa ismail  2017 _ lec. 1Ss training fidic moustafa ismail  2017 _ lec. 1
Ss training fidic moustafa ismail 2017 _ lec. 1
 
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias TanFIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
 
Fidic comparison red yellow - silver book
Fidic comparison red   yellow - silver bookFidic comparison red   yellow - silver book
Fidic comparison red yellow - silver book
 
FIDIC-Relevant to Time Management
FIDIC-Relevant to Time ManagementFIDIC-Relevant to Time Management
FIDIC-Relevant to Time Management
 
Ss 2 cost engineering management training- 2017 -dr moustafa ismail ch 5-6
Ss 2 cost engineering management  training- 2017 -dr  moustafa ismail  ch  5-6Ss 2 cost engineering management  training- 2017 -dr  moustafa ismail  ch  5-6
Ss 2 cost engineering management training- 2017 -dr moustafa ismail ch 5-6
 
Cfcc certified forensic claims consultant lecture one 2017- dr moustafa ismail
Cfcc certified forensic claims consultant  lecture one  2017- dr moustafa ismailCfcc certified forensic claims consultant  lecture one  2017- dr moustafa ismail
Cfcc certified forensic claims consultant lecture one 2017- dr moustafa ismail
 
Time management in fidic red book 2017(prmg080 project)
Time management in fidic red book 2017(prmg080 project)Time management in fidic red book 2017(prmg080 project)
Time management in fidic red book 2017(prmg080 project)
 
# FIDIC Payment Flow Charts # By SN Panigrahi
# FIDIC Payment Flow Charts # By SN Panigrahi# FIDIC Payment Flow Charts # By SN Panigrahi
# FIDIC Payment Flow Charts # By SN Panigrahi
 
FIDIC 2016 Day02-1010 Variations Under FIDIC Forms, Adrias Tan
FIDIC 2016 Day02-1010 Variations Under FIDIC Forms, Adrias TanFIDIC 2016 Day02-1010 Variations Under FIDIC Forms, Adrias Tan
FIDIC 2016 Day02-1010 Variations Under FIDIC Forms, Adrias Tan
 
Suspensions and Delays in Construction Contract
Suspensions and Delays in Construction ContractSuspensions and Delays in Construction Contract
Suspensions and Delays in Construction Contract
 
Site Instruction Provision
Site Instruction ProvisionSite Instruction Provision
Site Instruction Provision
 
Ss ccp course cost engineering management training- 2017 - moustafa ch 1-4
Ss ccp course cost engineering management  training- 2017 - moustafa  ch  1-4Ss ccp course cost engineering management  training- 2017 - moustafa  ch  1-4
Ss ccp course cost engineering management training- 2017 - moustafa ch 1-4
 
FIDIC Lecture - Joint operation of multiple Fidic Forms - A Case Study
FIDIC Lecture - Joint operation of multiple Fidic Forms - A Case StudyFIDIC Lecture - Joint operation of multiple Fidic Forms - A Case Study
FIDIC Lecture - Joint operation of multiple Fidic Forms - A Case Study
 
Day-01_1025 Engineer's Roles and Risks - Adrias Tan
Day-01_1025 Engineer's Roles and Risks - Adrias TanDay-01_1025 Engineer's Roles and Risks - Adrias Tan
Day-01_1025 Engineer's Roles and Risks - Adrias Tan
 
Ss 04 cost engineering management training- nov 2017 - moustafa part ii- ch 9
Ss 04 cost engineering management  training- nov 2017 - moustafa part ii- ch 9Ss 04 cost engineering management  training- nov 2017 - moustafa part ii- ch 9
Ss 04 cost engineering management training- nov 2017 - moustafa part ii- ch 9
 
Fidic contract administration
Fidic contract administrationFidic contract administration
Fidic contract administration
 
DEFECTS LIABILITY AND TAKING OVER CLAUSES
DEFECTS LIABILITY AND TAKING OVER CLAUSESDEFECTS LIABILITY AND TAKING OVER CLAUSES
DEFECTS LIABILITY AND TAKING OVER CLAUSES
 
Fidic conditions of contract presentation
Fidic conditions of contract presentationFidic conditions of contract presentation
Fidic conditions of contract presentation
 

Similar to FIDIC Training Presentation on Variations and Contract Payments

Construction - Accounting and Tax Aspects
Construction - Accounting and Tax AspectsConstruction - Accounting and Tax Aspects
Construction - Accounting and Tax Aspectssandesh mundra
 
Bcd4 standard building_contract_(without_quantities)_and_schedule_of_contract...
Bcd4 standard building_contract_(without_quantities)_and_schedule_of_contract...Bcd4 standard building_contract_(without_quantities)_and_schedule_of_contract...
Bcd4 standard building_contract_(without_quantities)_and_schedule_of_contract...tdartnell
 
Commercial aspects of civil construction
Commercial aspects of civil constructionCommercial aspects of civil construction
Commercial aspects of civil constructionsandesh mundra
 
Project Controls Expo, 18th Nov 2014 - "NEC3 Contracts – Managing Risk and Ch...
Project Controls Expo, 18th Nov 2014 - "NEC3 Contracts – Managing Risk and Ch...Project Controls Expo, 18th Nov 2014 - "NEC3 Contracts – Managing Risk and Ch...
Project Controls Expo, 18th Nov 2014 - "NEC3 Contracts – Managing Risk and Ch...Project Controls Expo
 
Contract payment and variation
Contract payment and variationContract payment and variation
Contract payment and variationVj NiroSh
 
Pp2 assignment
Pp2 assignmentPp2 assignment
Pp2 assignmentfareezsham
 
Key terms to consider when negotiating cm at-risk agreements + gmp amendments
Key terms to consider when negotiating cm at-risk agreements + gmp amendmentsKey terms to consider when negotiating cm at-risk agreements + gmp amendments
Key terms to consider when negotiating cm at-risk agreements + gmp amendmentsKegler Brown Hill + Ritter
 
FIDIC delay damages –v- Liquidated damages ( PDFDrive ).pdf
FIDIC delay damages –v- Liquidated damages ( PDFDrive ).pdfFIDIC delay damages –v- Liquidated damages ( PDFDrive ).pdf
FIDIC delay damages –v- Liquidated damages ( PDFDrive ).pdfBayuDarma4
 
Pre qualification stages and tender selection
Pre qualification stages and tender selectionPre qualification stages and tender selection
Pre qualification stages and tender selectionanojan kanagarathnam
 
Chartered Institute of Building - Launch of Complex Projects Contract 2013 - ...
Chartered Institute of Building - Launch of Complex Projects Contract 2013 - ...Chartered Institute of Building - Launch of Complex Projects Contract 2013 - ...
Chartered Institute of Building - Launch of Complex Projects Contract 2013 - ...Francis Ho
 
Professional practice 2
Professional practice 2Professional practice 2
Professional practice 2Shze Hwa Lee
 
Real estate guidance note 2012 (drti)
Real estate guidance note 2012 (drti)Real estate guidance note 2012 (drti)
Real estate guidance note 2012 (drti)Dhruv Seth
 
How to Build Successful Projects: A Guide for Owners and Developers
How to Build Successful Projects: A Guide for Owners and DevelopersHow to Build Successful Projects: A Guide for Owners and Developers
How to Build Successful Projects: A Guide for Owners and DevelopersKegler Brown Hill + Ritter
 
Mode of Tendering.pptx
 Mode of Tendering.pptx Mode of Tendering.pptx
Mode of Tendering.pptxssuser4ae21a
 

Similar to FIDIC Training Presentation on Variations and Contract Payments (20)

Cl report final
Cl report finalCl report final
Cl report final
 
Construction - Accounting and Tax Aspects
Construction - Accounting and Tax AspectsConstruction - Accounting and Tax Aspects
Construction - Accounting and Tax Aspects
 
Bcd4 standard building_contract_(without_quantities)_and_schedule_of_contract...
Bcd4 standard building_contract_(without_quantities)_and_schedule_of_contract...Bcd4 standard building_contract_(without_quantities)_and_schedule_of_contract...
Bcd4 standard building_contract_(without_quantities)_and_schedule_of_contract...
 
Commercial aspects of civil construction
Commercial aspects of civil constructionCommercial aspects of civil construction
Commercial aspects of civil construction
 
Project Controls Expo, 18th Nov 2014 - "NEC3 Contracts – Managing Risk and Ch...
Project Controls Expo, 18th Nov 2014 - "NEC3 Contracts – Managing Risk and Ch...Project Controls Expo, 18th Nov 2014 - "NEC3 Contracts – Managing Risk and Ch...
Project Controls Expo, 18th Nov 2014 - "NEC3 Contracts – Managing Risk and Ch...
 
Contract payment and variation
Contract payment and variationContract payment and variation
Contract payment and variation
 
Ak contract management
Ak contract managementAk contract management
Ak contract management
 
Pp2 assignment
Pp2 assignmentPp2 assignment
Pp2 assignment
 
Key terms to consider when negotiating cm at-risk agreements + gmp amendments
Key terms to consider when negotiating cm at-risk agreements + gmp amendmentsKey terms to consider when negotiating cm at-risk agreements + gmp amendments
Key terms to consider when negotiating cm at-risk agreements + gmp amendments
 
FIDIC delay damages –v- Liquidated damages ( PDFDrive ).pdf
FIDIC delay damages –v- Liquidated damages ( PDFDrive ).pdfFIDIC delay damages –v- Liquidated damages ( PDFDrive ).pdf
FIDIC delay damages –v- Liquidated damages ( PDFDrive ).pdf
 
Pre qualification stages and tender selection
Pre qualification stages and tender selectionPre qualification stages and tender selection
Pre qualification stages and tender selection
 
Cl presentation
Cl presentationCl presentation
Cl presentation
 
Chartered Institute of Building - Launch of Complex Projects Contract 2013 - ...
Chartered Institute of Building - Launch of Complex Projects Contract 2013 - ...Chartered Institute of Building - Launch of Complex Projects Contract 2013 - ...
Chartered Institute of Building - Launch of Complex Projects Contract 2013 - ...
 
FIDIC variation, claim & dispute - CYLFEx workshop
FIDIC variation, claim & dispute - CYLFEx workshopFIDIC variation, claim & dispute - CYLFEx workshop
FIDIC variation, claim & dispute - CYLFEx workshop
 
Professional practice 2
Professional practice 2Professional practice 2
Professional practice 2
 
PP2 COMPILCATION
PP2 COMPILCATIONPP2 COMPILCATION
PP2 COMPILCATION
 
Prebid-Part-1-C.pdf
Prebid-Part-1-C.pdfPrebid-Part-1-C.pdf
Prebid-Part-1-C.pdf
 
Real estate guidance note 2012 (drti)
Real estate guidance note 2012 (drti)Real estate guidance note 2012 (drti)
Real estate guidance note 2012 (drti)
 
How to Build Successful Projects: A Guide for Owners and Developers
How to Build Successful Projects: A Guide for Owners and DevelopersHow to Build Successful Projects: A Guide for Owners and Developers
How to Build Successful Projects: A Guide for Owners and Developers
 
Mode of Tendering.pptx
 Mode of Tendering.pptx Mode of Tendering.pptx
Mode of Tendering.pptx
 

More from Moustafa Ismail Abu Dief

Ss 07 training fidic moustafa ismail 2018 _ lec 7_a
Ss 07 training fidic moustafa ismail  2018 _ lec 7_aSs 07 training fidic moustafa ismail  2018 _ lec 7_a
Ss 07 training fidic moustafa ismail 2018 _ lec 7_aMoustafa Ismail Abu Dief
 
Ss 09 cost engineering management training- nov 2017 moustafa sec 5 part ii...
Ss 09 cost engineering management  training- nov 2017  moustafa sec 5 part ii...Ss 09 cost engineering management  training- nov 2017  moustafa sec 5 part ii...
Ss 09 cost engineering management training- nov 2017 moustafa sec 5 part ii...Moustafa Ismail Abu Dief
 
07 b cost engineering management training- nov 2017 moustafa sec 5 part ii...
07 b  cost engineering management  training- nov 2017  moustafa sec 5 part ii...07 b  cost engineering management  training- nov 2017  moustafa sec 5 part ii...
07 b cost engineering management training- nov 2017 moustafa sec 5 part ii...Moustafa Ismail Abu Dief
 
07A cost engineering management training- nov 2017 moustafa sec 5 part iii...
07A  cost engineering management  training- nov 2017  moustafa sec 5 part iii...07A  cost engineering management  training- nov 2017  moustafa sec 5 part iii...
07A cost engineering management training- nov 2017 moustafa sec 5 part iii...Moustafa Ismail Abu Dief
 
Ss 06 cost engineering management training- nov 2017 - moustafa part ii ch 1...
Ss 06 cost engineering management  training- nov 2017 - moustafa part ii ch 1...Ss 06 cost engineering management  training- nov 2017 - moustafa part ii ch 1...
Ss 06 cost engineering management training- nov 2017 - moustafa part ii ch 1...Moustafa Ismail Abu Dief
 
SCE 1 2018 claims management-in-construction-projects-seminar-.-2017 dr mous...
SCE 1 2018 claims management-in-construction-projects-seminar-.-2017  dr mous...SCE 1 2018 claims management-in-construction-projects-seminar-.-2017  dr mous...
SCE 1 2018 claims management-in-construction-projects-seminar-.-2017 dr mous...Moustafa Ismail Abu Dief
 
Ss 05 Cost engineering management training- nov 2017 - moustafa part ii ch 10
 Ss 05 Cost engineering management  training- nov 2017 - moustafa part ii ch 10 Ss 05 Cost engineering management  training- nov 2017 - moustafa part ii ch 10
Ss 05 Cost engineering management training- nov 2017 - moustafa part ii ch 10Moustafa Ismail Abu Dief
 
Ss 03 CCP- AACE.org cost engineering management training- 2017 - dr. mousta...
Ss 03 CCP- AACE.org  cost engineering management  training- 2017 - dr. mousta...Ss 03 CCP- AACE.org  cost engineering management  training- 2017 - dr. mousta...
Ss 03 CCP- AACE.org cost engineering management training- 2017 - dr. mousta...Moustafa Ismail Abu Dief
 

More from Moustafa Ismail Abu Dief (14)

Bim arabia red fidic
Bim arabia red fidicBim arabia red fidic
Bim arabia red fidic
 
Fidic 2017 engineering
Fidic 2017 engineeringFidic 2017 engineering
Fidic 2017 engineering
 
Yellow book session bimarabia
Yellow book session bimarabiaYellow book session bimarabia
Yellow book session bimarabia
 
CMC certification
CMC certificationCMC certification
CMC certification
 
Ss 07 training fidic moustafa ismail 2018 _ lec 7_a
Ss 07 training fidic moustafa ismail  2018 _ lec 7_aSs 07 training fidic moustafa ismail  2018 _ lec 7_a
Ss 07 training fidic moustafa ismail 2018 _ lec 7_a
 
Construction Claims Training Course 2019
Construction Claims Training Course 2019Construction Claims Training Course 2019
Construction Claims Training Course 2019
 
Construction Claims Training Course 2019
Construction Claims Training Course 2019Construction Claims Training Course 2019
Construction Claims Training Course 2019
 
Ss 09 cost engineering management training- nov 2017 moustafa sec 5 part ii...
Ss 09 cost engineering management  training- nov 2017  moustafa sec 5 part ii...Ss 09 cost engineering management  training- nov 2017  moustafa sec 5 part ii...
Ss 09 cost engineering management training- nov 2017 moustafa sec 5 part ii...
 
07 b cost engineering management training- nov 2017 moustafa sec 5 part ii...
07 b  cost engineering management  training- nov 2017  moustafa sec 5 part ii...07 b  cost engineering management  training- nov 2017  moustafa sec 5 part ii...
07 b cost engineering management training- nov 2017 moustafa sec 5 part ii...
 
07A cost engineering management training- nov 2017 moustafa sec 5 part iii...
07A  cost engineering management  training- nov 2017  moustafa sec 5 part iii...07A  cost engineering management  training- nov 2017  moustafa sec 5 part iii...
07A cost engineering management training- nov 2017 moustafa sec 5 part iii...
 
Ss 06 cost engineering management training- nov 2017 - moustafa part ii ch 1...
Ss 06 cost engineering management  training- nov 2017 - moustafa part ii ch 1...Ss 06 cost engineering management  training- nov 2017 - moustafa part ii ch 1...
Ss 06 cost engineering management training- nov 2017 - moustafa part ii ch 1...
 
SCE 1 2018 claims management-in-construction-projects-seminar-.-2017 dr mous...
SCE 1 2018 claims management-in-construction-projects-seminar-.-2017  dr mous...SCE 1 2018 claims management-in-construction-projects-seminar-.-2017  dr mous...
SCE 1 2018 claims management-in-construction-projects-seminar-.-2017 dr mous...
 
Ss 05 Cost engineering management training- nov 2017 - moustafa part ii ch 10
 Ss 05 Cost engineering management  training- nov 2017 - moustafa part ii ch 10 Ss 05 Cost engineering management  training- nov 2017 - moustafa part ii ch 10
Ss 05 Cost engineering management training- nov 2017 - moustafa part ii ch 10
 
Ss 03 CCP- AACE.org cost engineering management training- 2017 - dr. mousta...
Ss 03 CCP- AACE.org  cost engineering management  training- 2017 - dr. mousta...Ss 03 CCP- AACE.org  cost engineering management  training- 2017 - dr. mousta...
Ss 03 CCP- AACE.org cost engineering management training- 2017 - dr. mousta...
 

Recently uploaded

the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 

Recently uploaded (20)

the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 

FIDIC Training Presentation on Variations and Contract Payments

  • 1. international federation of national associations of independent consulting Engineers FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 1 FIDIC Forms of Contracts Training Course: Saudi Arabian Arena Engineers March 2018 LECTURE 07A ‫وبركاته‬ ‫هللا‬ ‫ورحوة‬ ‫عليكن‬ 2018 .
  • 2. Variations and Adjustments • Cl.13.1 Engineer has the right to vary o Prior to issue of TO certificate o List of variation inclusions • Value Engineering Cl.13.2 o Development risk with Contractor o Savings 50/50 after deductions. FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 2March 2018
  • 3. Variation Procedure • Engineer requests proposal from Contractor o Contractor responds with: • Description • Programme • Evaluation o Work proceeds without delay FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 3March 2018
  • 4. Variation due to Legislation • Local law at Base Date/ 28 days • Cl.20.1 claim o Extension of time o Payment of cost FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 4March 2018
  • 5. Contract Price & Payment • Considerations: o Payment schedules o Disbursement approval o Particular Conditions o Budgeting • Funding availability • Additional Costs / Variations FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 5March 2018
  • 6. Variations and Adjustments 13.1 Right to Vary • Initiated by Engineer at any time prior to TOC either by: • Instruction/request for Contractor to submit a proposal. • Contractor execute and be bound, unless the Contractor promptly gives notice stating that the Contractor cannot readily obtain the Goods required for the Variation. • Upon receiving this notice. the Engineer shall cancel. confirm or vary the instruction. FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 6March 2018
  • 7. Variations and Adjustments 13.1 Right to Vary - continue • Each Variation may include: a. changes of quantities in the BOQ. b. changes to quality, other characteristics of item c. changes to levels. positions and/or dimensions. d. omission of any work unless it is to be carried out by others. e. any additional work. Plant. Materials for Permanent Works. including any associated Tests on Completion. Boreholes, other testing, exploratory work. or FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 7March 2018
  • 8. Special Case for changes Work carried by others FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 8March 2018
  • 9. Variations and Adjustments 13.1 Right to Vary - continue Each Variation may include: f) changes to the sequence or timing. The Contractor shall not alter and/or modify the Permanent Works. unless and until the Engineer instructs a variation. FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 9March 2018
  • 10. Variations and Adjustments 13.2 Value Engineering The Contractor may. submit to the Engineer a written proposal. if adopted. (i) accelerate completion. (ii) reduce the cost to the Employer (iii) improve efficiency or value to the Employer of Works. or (iv) otherwise be of benefit to the Employer.  proposal at the cost of the Contractor and comply with 13.3  If a proposal. which is approved by the Engineer. includes a change in the design then: FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 10March 2018
  • 11. Variations and Adjustments 13.2 Value Engineering - continue a) the Contractor shall design this part. b) sub-paragraphs (a) to (d) of Sub-Clause 4.1 [Contractor's General Obligations] shall apply. c) if a reduction in the contract value of this part. the Engineer shall Proceed to [Determinations] to • agree or determine a fee. This fee shall be half (50%) of: FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 11March 2018
  • 12. Variations and Adjustments 13.2 Value Engineering - continue i. such reduction in contract value. Excluding adjustments under S Cl. 13.7 [Adjustments for Changes in Legislation] and S Cl. 13.8 [Adjustments for Changes in Cost].and ii. the reduction in the value to the Employer for varied works. consider reductions in quality, life or operational efficiencies. • However. if amount (i) ˂ than (ii). there shall not be a fee. FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 12March 2018
  • 13. Variations and Adjustments 13.3 Variation Procedure • If the E requests a proposal. prior to Variation. the Contractor in writing ASAP. Cannot/why or submitting: a) a description of the proposed work and a program b) Contractor's proposal for modifications to the program(TIA). c) Cost break down, Justified and auditable. FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 13March 2018
  • 14. Variations and Adjustments 13.3 Variation Procedure continued • The Engineer Promptly (under S. Cl. 13.2 [VE] respond with approval. disapproval or comments. • The Contractor shall not delay any work whilst awaiting a response. FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 14March 2018
  • 15. Variations and Adjustments 13.3 Variation Procedure continued REPEAT • The Contractor shall not delay any work whilst awaiting a response. FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 15March 2018
  • 16. Variations and Adjustments 13.3 Variation Procedure continued  requirements for the recording of Costs of variation . shall be issued by the Engineer, contractor acknowledge receipt.  Each Variation shall be evaluated in accordance with Cl. 12], unless the Engineer instructs or approves otherwise as per with this Clause. FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 16March 2018
  • 17. Variations and Adjustments 13.4 Payment in Applicable Currencies • If stated in Contract/ payment in more than a currency: o Any agreed adjustment to the contract price the amount to be specified in each applicable currency. o For this purpose. reference shall be made to the actual or expected currency proportions. SAR- $ - Pounds FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 17March 2018
  • 18. Variations and Adjustments Definition: "Provisional Sum" means a sum (if any) which is specified in the Contract as a provisional sum, for the execution of any part of the Works or for the supply of Plant. Materials or services under S. Cl. 13.5 [Provisional Sums]. 13.5 Provisional Sums Each Provisional Sum shall only be used. As per the Engineer's instructions. and the Contract Price shall be adjusted accordingly. FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 18March 2018
  • 19. Variations and Adjustments 13.5 Provisional Sums - continued  The total sum paid to the Contractor shall include only such amounts. for the work. supplies or services to which the Provisional Sum relates. as the Engineer shall have instructed. For each Provisional Sum. the Engineer may instruct: a) work to be executed by the Contractor and valued under S. Cl. 13.3 and/or b) Plant. Materials or services to be purchased by the Contractor. from a nominated Subcontractor FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 19March 2018
  • 20. Variations and Adjustments 13.5 Provisional Sums - continued Or otherwise: and for which there shall be included in the Contract Price: (i) the actual amounts paid / due to be paid by the Contractor. PLUS (ii) a sum for overhead charges and profit. as a % actual amounts by applying the relevant percentage rate (if any) stated in the a schedule or in the Appendix to Tender shall be applied. The Contractor shall produce quotations. invoices. vouchers and accounts or receipts in substantiation (justified, auditable). FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 20March 2018
  • 21. Reserves Vs Provisional sum FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 21March 2018 • Contingency reserve • Management Reserve • Provisional sum
  • 22. Variations and Adjustments 13.6 Day work (only if a day work schedule is available) For work of a minor or incidental nature. Engineer instructs a Variation on a day work basis, the value is estimated in accordance with Day work Schedule included in Contract. If none this Sub-Clause shall not apply. FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 22March 2018
  • 23. Variations and Adjustments 13.7 Adjustments for Changes in Legislation • Contract Price adjusted for: • any increase or decrease in Cost resulting from a change in the Laws of the Country • or in the judicial or official governmental interpretation of such Laws. made after the Base Date. which affect the Contractor performing his obligations under the Contract. FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 23March 2018
  • 24. Variations and Adjustments • 13.8 Adjustments for Changes in Cost • In this S.Cl. ··table of adjustment data·· means the completed table in Appendix to Tender. If there is no such table of adjustment data. this S. Cl. Shall not apply.  the amounts payable to the Contractor shall be adjusted for change in the cost of labor. Goods and others. • by the addition or deduction of the amounts determined by the formulae prescribed in this Sub-Clause. • If not satisfyable, then the Accepted Contract Amount shall be deemed include amounts to cover such rises and falls in costs. FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 24March 2018
  • 25. Clause 14 Contract Price & Payment • Advance payment o Design o Mobilisation o Funding facilitation • Interim payments o 56 days • Final Payment o 84 days FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 25March 2018
  • 26. Contract Price & Payment • Aid funding requires: o Authority approval o Timing o Variations o Routine audit checks o Time to transfer funds o Advance notice of change FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 26March 2018
  • 27. Contract Price & Payment • Cl.14 requires prompt action within time constraints • Finance costs will lead to claims • Alter Cl.14 by Particular Conditions to suit funding authority FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 27March 2018
  • 28. Contract Price & Payment • Financial planning: o Check estimates & budgets o Prepare draft payment schedules o Update estimates & programme o Check funding o Cl.14.4 estimates each 90 days FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 28March 2018
  • 29. Budget Forecast • Engineer prepares for Employer o Regular intervals o Updated budget o Report of changes • Data for report: o Cl.2.4, 2.5, 3.5, 4.21, 8.3, 13.1, 13.3, 14.3, 13.8, 14.3, 14.6, 20.1, 20.4 FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 29March 2018
  • 30. END OF LECTURE SEVEN- A Thank You ‫هللا‬ ‫ورحوة‬ ‫عليكن‬ ‫السالم‬ ‫هللا‬ ‫أهاى‬ ‫فى‬ FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 30March 2018