Response to Accord comments
for
Fakir Knitwear Ltd
1. Main Office Building (RCC Structure)
Factory has provided consent letter to confirm that connection walkways will be
demolished.
Response: Has been provided.
2. Printing Building (RCC Structure)
Revise partition wall loading in the FEA model according to architectural as built
drawing. Provide detailed crack investigation report with locations of the cracks and
more of the pictures.
Response: Has been revised.
3. Shed 1 (Steel Structure)
Incorporate section size (RecC103, Ret 201, compression stud box) in both FEM and
structural drawing.
Response: Has been revised in structure & retrofit drawing.
Provide detail conclusion & recommendation in accordance with the remediation plan.
Response: Including in initial CAP.
4. Shed 2 (Steel Structure)
Revise mismatch in member section (grid 1 Rafter) between FEM model and as built
drawing.
Response: Has been revised.
Provide connection details for longitudinal members.
Response: Has been provided in drawing.
Provide connection details of jack beam -column, jack beam-rafter.
Response: Has been provided in drawing.
Assign wind load as per BNBC code.
Response: Has been calculated and assigned according to BNBC code.
Check seismic load as only self-weight has been added.
Response: Has been revised.
Check connection specification of vertical in FEM model. keep utility ratio of steel
member below one.
Response: Has been revised
5. Knitting Shed (Shedโ€4,5,6) (Steel Structure)
For retrofitting scheme make flange-web thickness ratio less than 2.5.
Response: Not applicable
Revise section assignment mismatch between FEM model and retrofitting drawing (grid-
12 FEM model).
Response: Has been revised in FEM model.
Provide proper reference with calculation regarding assigned line spring in FEM model.
Response: Has been Provided in calculation report.
Provide connection details of roof bracing and tie beam.
Response: Has been Provided in retrofit drawing.
Provide joint details for vertical bracing mentioning c/c distance of hole, plate size etc.
Response: Has been Provided in retrofit drawing.
Assign site soil coefficient as 1.5 instead of 1.2 in FEM model or otherwise provide
clarification.
Response: Has been revised in FEM model.
Provide proper reference with calculation regarding assigned line spring in FEM model.
Response: Has been Provided in calculation report.
6. Production Shed (Shedโ€7) (Steel Structure)
Comments: Not corrected. Still, mismatch found between FEM and structural drawing.
(For example, RC-106, 106a). Incorporate section size in FEM as per practical condition
and structural drawing.
Response: Has been revised.
Comments: No retrofit column schedule is found for the stair with lift core. Revise slab
thickness incorporating with the drawing.
Response: Has been revised.
Provide conclusion & recommendation in accordance with the remediation plan.

More Related Content

What's hot

CEE598_Gummaraj_Bharath_Final_Project
CEE598_Gummaraj_Bharath_Final_ProjectCEE598_Gummaraj_Bharath_Final_Project
CEE598_Gummaraj_Bharath_Final_Project
Bharath Gummaraj
ย 
Six week software training ppt at Tcc Ludhiana
Six week software training ppt at Tcc LudhianaSix week software training ppt at Tcc Ludhiana
Six week software training ppt at Tcc Ludhiana
Gurjant Singh
ย 
Design Proposal of a 5-Storey Steel Building with Cost Analysis
Design Proposal of a 5-Storey Steel Building with Cost AnalysisDesign Proposal of a 5-Storey Steel Building with Cost Analysis
Design Proposal of a 5-Storey Steel Building with Cost Analysis
Michael Masi, Jr. Eng.
ย 
Structural analysis and design of multi storey ppt
Structural analysis and design of multi storey pptStructural analysis and design of multi storey ppt
Structural analysis and design of multi storey ppt
SHIVUNAIKA B
ย 
column jacketing
 column jacketing column jacketing
column jacketing
mamilli
ย 

What's hot (19)

FYP Presentation
FYP PresentationFYP Presentation
FYP Presentation
ย 
Bsc
BscBsc
Bsc
ย 
CEE598_Gummaraj_Bharath_Final_Project
CEE598_Gummaraj_Bharath_Final_ProjectCEE598_Gummaraj_Bharath_Final_Project
CEE598_Gummaraj_Bharath_Final_Project
ย 
IRJET- A Study on Reinforced Concrete Beams Infilled with Light-Weight Materi...
IRJET- A Study on Reinforced Concrete Beams Infilled with Light-Weight Materi...IRJET- A Study on Reinforced Concrete Beams Infilled with Light-Weight Materi...
IRJET- A Study on Reinforced Concrete Beams Infilled with Light-Weight Materi...
ย 
Dynamic Analysis of Setback Steel Moment Resisting Frame on Sloping Ground wi...
Dynamic Analysis of Setback Steel Moment Resisting Frame on Sloping Ground wi...Dynamic Analysis of Setback Steel Moment Resisting Frame on Sloping Ground wi...
Dynamic Analysis of Setback Steel Moment Resisting Frame on Sloping Ground wi...
ย 
Six week software training ppt at Tcc Ludhiana
Six week software training ppt at Tcc LudhianaSix week software training ppt at Tcc Ludhiana
Six week software training ppt at Tcc Ludhiana
ย 
Design Proposal of a 5-Storey Steel Building with Cost Analysis
Design Proposal of a 5-Storey Steel Building with Cost AnalysisDesign Proposal of a 5-Storey Steel Building with Cost Analysis
Design Proposal of a 5-Storey Steel Building with Cost Analysis
ย 
Structural analysis and design of multi storey ppt
Structural analysis and design of multi storey pptStructural analysis and design of multi storey ppt
Structural analysis and design of multi storey ppt
ย 
Seismic design of multistoreyed rc building using various codes
Seismic design of multistoreyed rc building using various codesSeismic design of multistoreyed rc building using various codes
Seismic design of multistoreyed rc building using various codes
ย 
Analysis and Design of an Earthquake Resistant Structure using STADD. Pro
Analysis and Design of an Earthquake Resistant Structure using STADD. ProAnalysis and Design of an Earthquake Resistant Structure using STADD. Pro
Analysis and Design of an Earthquake Resistant Structure using STADD. Pro
ย 
ANALYSIS AND DESIGN OF MULTI STOREY (G+5) COMMERCIAL BUILDING BY STAAD PRO AN...
ANALYSIS AND DESIGN OF MULTI STOREY (G+5) COMMERCIAL BUILDING BY STAAD PRO AN...ANALYSIS AND DESIGN OF MULTI STOREY (G+5) COMMERCIAL BUILDING BY STAAD PRO AN...
ANALYSIS AND DESIGN OF MULTI STOREY (G+5) COMMERCIAL BUILDING BY STAAD PRO AN...
ย 
Steel Structural Design Manual for Engineers
Steel Structural Design Manual for EngineersSteel Structural Design Manual for Engineers
Steel Structural Design Manual for Engineers
ย 
column jacketing
 column jacketing column jacketing
column jacketing
ย 
Analysis of warehouse in staad pro.
Analysis of warehouse in staad pro. Analysis of warehouse in staad pro.
Analysis of warehouse in staad pro.
ย 
IRJET- Analysis of G+20 RCC Bare Framed Structures with Different Types o...
IRJET-  	  Analysis of G+20 RCC Bare Framed Structures with Different Types o...IRJET-  	  Analysis of G+20 RCC Bare Framed Structures with Different Types o...
IRJET- Analysis of G+20 RCC Bare Framed Structures with Different Types o...
ย 
IRJET- Analysis and Design of Multistorey Building (G+3) by using ETABS Software
IRJET- Analysis and Design of Multistorey Building (G+3) by using ETABS SoftwareIRJET- Analysis and Design of Multistorey Building (G+3) by using ETABS Software
IRJET- Analysis and Design of Multistorey Building (G+3) by using ETABS Software
ย 
Design steps of structure.
Design steps of structure.Design steps of structure.
Design steps of structure.
ย 
Design Procedure of Tabletop Foundations for Vibrating Machines
Design Procedure of Tabletop Foundations for Vibrating MachinesDesign Procedure of Tabletop Foundations for Vibrating Machines
Design Procedure of Tabletop Foundations for Vibrating Machines
ย 
Cube srl - Engineering Consulting
Cube srl - Engineering ConsultingCube srl - Engineering Consulting
Cube srl - Engineering Consulting
ย 

Similar to Response to accord comments 3rd

Concrete design
Concrete designConcrete design
Concrete design
manojtakila
ย 
Rcc design handbook
Rcc design  handbookRcc design  handbook
Rcc design handbook
Thomas Britto
ย 
TAT ACE SBS Failure Root Cause Analysis
TAT ACE SBS Failure Root Cause AnalysisTAT ACE SBS Failure Root Cause Analysis
TAT ACE SBS Failure Root Cause Analysis
Narender Bisht
ย 
D1 1 article201007
D1 1 article201007D1 1 article201007
D1 1 article201007
ayub2911
ย 

Similar to Response to accord comments 3rd (20)

Structural Performance of Cold Formed Steel Quadruple Built-up Box Column
Structural Performance of Cold Formed Steel Quadruple Built-up Box ColumnStructural Performance of Cold Formed Steel Quadruple Built-up Box Column
Structural Performance of Cold Formed Steel Quadruple Built-up Box Column
ย 
Concrete design
Concrete designConcrete design
Concrete design
ย 
M10l24
M10l24M10l24
M10l24
ย 
M10l24
M10l24M10l24
M10l24
ย 
Rcc design handbook
Rcc design  handbookRcc design  handbook
Rcc design handbook
ย 
Ip83 6
Ip83 6Ip83 6
Ip83 6
ย 
Concrete technology
Concrete technology Concrete technology
Concrete technology
ย 
Concrete
ConcreteConcrete
Concrete
ย 
Earthquake considiration on pier design
Earthquake considiration on pier designEarthquake considiration on pier design
Earthquake considiration on pier design
ย 
Methods for seismic retrofitting of structures comments
Methods for seismic retrofitting of structures commentsMethods for seismic retrofitting of structures comments
Methods for seismic retrofitting of structures comments
ย 
IRJET- Comparative Study on the Seismic Behaviour of RCC and Steel-Concrete C...
IRJET- Comparative Study on the Seismic Behaviour of RCC and Steel-Concrete C...IRJET- Comparative Study on the Seismic Behaviour of RCC and Steel-Concrete C...
IRJET- Comparative Study on the Seismic Behaviour of RCC and Steel-Concrete C...
ย 
TAT ACE SBS Failure Root Cause Analysis
TAT ACE SBS Failure Root Cause AnalysisTAT ACE SBS Failure Root Cause Analysis
TAT ACE SBS Failure Root Cause Analysis
ย 
Reinforced concrete Course assignments, 2019
Reinforced concrete Course assignments, 2019Reinforced concrete Course assignments, 2019
Reinforced concrete Course assignments, 2019
ย 
D1 1 article201007
D1 1 article201007D1 1 article201007
D1 1 article201007
ย 
Precast Concrete Specifications.doc
Precast Concrete Specifications.docPrecast Concrete Specifications.doc
Precast Concrete Specifications.doc
ย 
IRJET- Numerical Analysis of RC Beams Reinforced with CFRP Rods
IRJET- Numerical Analysis of RC Beams Reinforced with CFRP RodsIRJET- Numerical Analysis of RC Beams Reinforced with CFRP Rods
IRJET- Numerical Analysis of RC Beams Reinforced with CFRP Rods
ย 
Experimental Evaluation of Fatigue Performance of Steel Grid Composite Deck J...
Experimental Evaluation of Fatigue Performance of Steel Grid Composite Deck J...Experimental Evaluation of Fatigue Performance of Steel Grid Composite Deck J...
Experimental Evaluation of Fatigue Performance of Steel Grid Composite Deck J...
ย 
Experimental Study of Concrete Filled Tubular Short Columns
Experimental Study of Concrete Filled Tubular Short ColumnsExperimental Study of Concrete Filled Tubular Short Columns
Experimental Study of Concrete Filled Tubular Short Columns
ย 
ASEP Steel Handbook
ASEP Steel HandbookASEP Steel Handbook
ASEP Steel Handbook
ย 
Effect of Harp and Perimeter Bracing on PEB Subjected to Wind Loading
Effect of Harp and Perimeter Bracing on PEB Subjected to Wind LoadingEffect of Harp and Perimeter Bracing on PEB Subjected to Wind Loading
Effect of Harp and Perimeter Bracing on PEB Subjected to Wind Loading
ย 

Recently uploaded

Call Girls in Netaji Nagar, Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Netaji Nagar, Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort ServiceCall Girls in Netaji Nagar, Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Netaji Nagar, Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
ย 
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
ย 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
sivaprakash250
ย 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
ย 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
KreezheaRecto
ย 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
ย 
Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
dharasingh5698
ย 

Recently uploaded (20)

Call Girls in Netaji Nagar, Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Netaji Nagar, Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort ServiceCall Girls in Netaji Nagar, Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Netaji Nagar, Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
ย 
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
ย 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
ย 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
ย 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
ย 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
ย 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
ย 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
ย 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
ย 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
ย 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
ย 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
ย 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
ย 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
ย 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ย 
Top Rated Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
ย 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
ย 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
ย 
Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
ย 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
ย 

Response to accord comments 3rd

  • 1. Response to Accord comments for Fakir Knitwear Ltd
  • 2. 1. Main Office Building (RCC Structure) Factory has provided consent letter to confirm that connection walkways will be demolished. Response: Has been provided. 2. Printing Building (RCC Structure) Revise partition wall loading in the FEA model according to architectural as built drawing. Provide detailed crack investigation report with locations of the cracks and more of the pictures. Response: Has been revised. 3. Shed 1 (Steel Structure) Incorporate section size (RecC103, Ret 201, compression stud box) in both FEM and structural drawing. Response: Has been revised in structure & retrofit drawing. Provide detail conclusion & recommendation in accordance with the remediation plan. Response: Including in initial CAP. 4. Shed 2 (Steel Structure) Revise mismatch in member section (grid 1 Rafter) between FEM model and as built drawing. Response: Has been revised. Provide connection details for longitudinal members. Response: Has been provided in drawing. Provide connection details of jack beam -column, jack beam-rafter. Response: Has been provided in drawing. Assign wind load as per BNBC code. Response: Has been calculated and assigned according to BNBC code. Check seismic load as only self-weight has been added. Response: Has been revised. Check connection specification of vertical in FEM model. keep utility ratio of steel member below one. Response: Has been revised
  • 3. 5. Knitting Shed (Shedโ€4,5,6) (Steel Structure) For retrofitting scheme make flange-web thickness ratio less than 2.5. Response: Not applicable Revise section assignment mismatch between FEM model and retrofitting drawing (grid- 12 FEM model). Response: Has been revised in FEM model. Provide proper reference with calculation regarding assigned line spring in FEM model. Response: Has been Provided in calculation report. Provide connection details of roof bracing and tie beam. Response: Has been Provided in retrofit drawing. Provide joint details for vertical bracing mentioning c/c distance of hole, plate size etc. Response: Has been Provided in retrofit drawing. Assign site soil coefficient as 1.5 instead of 1.2 in FEM model or otherwise provide clarification. Response: Has been revised in FEM model. Provide proper reference with calculation regarding assigned line spring in FEM model. Response: Has been Provided in calculation report. 6. Production Shed (Shedโ€7) (Steel Structure) Comments: Not corrected. Still, mismatch found between FEM and structural drawing. (For example, RC-106, 106a). Incorporate section size in FEM as per practical condition and structural drawing. Response: Has been revised. Comments: No retrofit column schedule is found for the stair with lift core. Revise slab thickness incorporating with the drawing. Response: Has been revised. Provide conclusion & recommendation in accordance with the remediation plan.