SlideShare a Scribd company logo
1 of 6
Download to read offline
Instructor Practical Case Study: CCNA Certification Skills
(Jaskaran Kalsi: jkalsi@cisco.com)
Case Study Introduction
BMW Motor Company has number of sites located around the globe. Their main offices are located in Europe &
Eastern Europe and it is your task to complete their network configuration. As things stand there are four main sites:
1) London HQ - this site is the Hub of the Frame Relay Circuit and it is also the main point of connection to the
public Internet.
2) Warsaw - this site contains the server farm for internal and external use. There are also some admin staff
located who manage/monitor the servers to which they have direct contact.
3) Munich - this site houses the main manufacturing and car assembly factory. The site at Building 2 now
contains the new modernised factory and Building 1 will be transformed into offices in the future. Within
Building 2 site there are two VLANs, one for Management Staff, and the other for Factory Staff. There is also
a Wireless Access Point from which management staff connect PDA’s whilst they are on the factory floor. As
things stand, there has been no development at Building 1 and it only houses the Frame Relay connection
back to London_HQ.
4) Paris - this site house most of the administration staff and various departments. Since team such as
Engineers, Marketing, & Factory Administrators are located here, then we must ensure 100% connectivity
and redundancy. The offices consist of four floors, with each department on their own individual VLAN.
Topology:
IP Addressing Table
Device Interface IP Address Subnet Mask
London_HQ
S0/0/0.100 192.168.10.1 255.255.255.252
S0/0/0.200 192.168.10.5 255.255.255.252
S0/0/0.300 192.168.10.9 255.255.255.252
S0/0/1 200.200.100.1 255.255.255.0
Warsaw
S0/0/0 192.168.10.2 255.255.255.252
Fa0/0 192.168.20.1 255.255.255.0
Munich_B1
S0/0/0 192.168.10.6 255.255.255.252
S0/0/1 192.168.30.1 255.255.255.252
Paris
S0/0/0 192.168.10.10 255.255.255.252
Fa0/0.10 192.168.10.33 255.255.255.224
Fa0/0.20 192.168.10.65 255.255.255.224
Fa0/0.30 192.168.10.97 255.255.255.224
Fa0/0.40 192.168.10.129 255.255.255.224
Fa0/0.99 192.168.10.161 255.255.255.224
Munich_B2
S0/0/1 192.168.30.2 255.255.255.252
Fa0/0.32 192.168.30.33 255.255.255.224
Fa0/0.64 192.168.30.65 255.255.255.224
Core Switch VLAN 99 192.168.10.162 255.255.255.224
Distribution Switch 1 VLAN 99 192.168.10.163 255.255.255.224
Distribution Switch 2 VLAN 99 192.168.10.164 255.255.255.224
Floor 1 Switch VLAN 99 192.168.10.165 255.255.255.224
Floor 2 Switch VLAN 99 192.168.10.166 255.255.255.224
Floor 3 Switch VLAN 99 192.168.10.167 255.255.255.224
Floor 4 Switch VLAN 99 192.168.10.168 255.255.255.224
VLAN Information Table
VLAN Number Network Address VLAN Name Port Mapping
10 192.168.10.32/27 ENGINEERING Floor 1 Switch Fa0/1-5
Floor 2 Switch Fa0/1-5
Floor 3 Switch Fa0/1-5
Floor 4 Switch Fa0/1-5
20 192.168.10.64/27 MARKETING Floor 1 Switch Fa0/6-10
Floor 2 Switch Fa0/6-10
Floor 3 Switch Fa0/6-10
Floor 4 Switch Fa0/6-10
30 192.168.10.96/27 FACTORY Floor 1 Switch Fa0/11-15
Floor 2 Switch Fa0/11-15
Floor 3 Switch Fa0/11-15
Floor 4 Switch Fa0/11-15
40 192.168.10.128/27 VOIP Floor 1 Switch Fa0/16-20
Floor 2 Switch Fa0/16-20
Floor 3 Switch Fa0/16-20
Floor 4 Switch Fa0/16-20
99 192.168.10.160/27 MANAGEMENT All trunks
Step 1: Configuring Frame Relay in a Hub-and-Spoke Topology.
a) Configure the Frame Relay core:
i. The PVC between London HQ and Warsaw uses DLCI 100
ii. The PVC between London HQ and Munich Building 1 uses DLCI 200
iii. The PVC between London HQ and Paris uses DLCI 300
b) Ensure that the Serial0/0/0 interfaces on Warsaw, Munich Building 1, & Paris have all been configured for
Frame Relay.
Step 2: Configure EIGRP routing within the Frame Relay Core.
a) Configure London HQ and all spoke routers with EIGRP using the following requirements:
i. Use AS 100.
ii. Configure using only one network statement to summarize all internal routes.
Step 3: Configure OSPF routing between Munich Building 1 and Munich Building 2.
a) Configure the WAN connection between Munich Building 1 & Munich Building 2 using the following
requirements:
i. Use process number as 1.
ii. Use single area OSPF (area 0).
iii. Configure the network statements according to the addressing table given.
b) Configure the WAN link to use PPP encapsulation and CHAP authentication. The CHAP password is cisco.
The username is the hostname of the router.
c) Redistribute EIGRP 100 subnets into OSPF 1 and vice versa.
Note: At times ‘redistribution’ within Packet Tracer does not work as planned; hence you may need to add
Static Routes on London_HQ &Munich Building 1 routers to advertise the necessary links.
Step 4: Configure Static & Default Routing on Munich Building 1 Router.
a) Configure a default route on Munich Building 1 router to forward any unrecognized traffic out of interface
S0/0/0.
b) Configure a default route on London_HQ router to forward and unrecognized traffic out of interface S0/0/1.
c) Configure a static route on London_HQ router pointing towards network 192.168.30.0/24 going out of
interface S0/0/0.200.
Step 5: Configure Warsaw router and LAN.
a) Configure & activate the FastEthernet0/0 interface using the IP address given in the addressing table.
b) Configure the Intranet Server with the following static IP addressing:
i. IP Address: 192.168.20.100
ii. Subnet Mask: 255.255.255.0
iii. Default Gateway: 192.168.20.1
iv. DNS Server Address: 192.168.20.101
Step 6: Configure VTP, Trunking, the VLAN Interface, and VLANs within the Paris LAN.
a) Configure all Paris LAN switches with VTP
i. Core Switch is the VTP Server (Domain Name: CATC / VTP Password: LISBON)
ii. Both Distribution Switches and Floor 1-4 Switches are VTP Clients within the same domain.
b) Configure the appropriate interfaces in trunking mode and assign VLAN 99 as the native VLAN.
i. Use 802.1Q encapsulation for all trunk ports.
ii. Configure the VLAN interfaces and default gateways.
c) Create and name the VLANs that are listed on the VLAN Information Table.
i. Create only the VLANs on the “Core Switch”.
ii. Ensure that all VLAN information propagates down to the access floor switches.
Step 7: Assign VLANs and Configure Port Security within the Paris LAN Switches.
a) Use the VLAN Information Table to complete the VLAN requirements on Access Floor Switches 1-4:
i. Manually configure all access floor switch interfaces to be access ports for VLANs 10; 20; & 30.
ii. Manually configure all access floor switch interfaces to be voice ports for VLAN 40.
iii. Ensure that you assign VLANs to each of these interface ports.
b) Use the following policy to establish port security on the access ports:
i. For Interfaces Fa0/1-5; Fa0/6-10; Fa0/11-15 for all access Floor 1-4 Switches:
a.Allow only one MAC address.
b.Configure the first learnt MAC address to ‘stick’ to the configuration.
c.Set all ports to shut down if there is any security violation.
Step 8: Configure Inter-VLAN Routing on Paris Router Fa0/0 interface.
a) Configure & activate the Paris LAN interface for Inter-VLAN routing.
b) VLAN 99 is the management & native VLAN.
c) Within each VLAN network address, use the first available address as the default-gateway for that subnet.
d) Ensure that the encapsulation is set to 802.1Q.
Step 9: Configure Spanning Tree (STP) for Paris LAN Switches.
a) Configure Spanning Tree so that Data and Voice traffic are separated and prioritized over the two
Distribution layer switches. Use the following criteria:
i. Make Distribution Switch 1 the Root for VLANS 1; 10; 20; 30; & 99 by configuring a priority level of
4096.
ii. Make Distribution Switch 2 the BACKUP Root for VLANS 1; 10; 20; 30; & 99 by configuring a priority
level of 8192.
iii. Make Distribution Switch 2 the Root for VLAN 40 by configuring a priority level of 4096.
iv. Make Distribution Switch 1 the BACKUP Root for VLAN 40 by configuring a priority level of 8192.
Step 10: Configure DHCP for the Paris LAN.
a) On the Paris Router configure four separate DHCP pools for the four access VLANs. Use the following criteria
when creating these pools:
i. For VLAN 10:
a.Use the pool name ENGINEERING.
b.Use the network 192.168.10.32/27.
c.Exclude the first 10 address of this network.
d.Include the DNS server that is attached to the Warsaw LAN as part of the DHCP config.
e.Configure the appropriate Gateway.
ii. For VLAN 20:
a.Use the pool name MARKETING.
b.Use the network 192.168.10.64/27.
c.Exclude the first 10 address of this network.
d.Include the DNS server that is attached to the Warsaw LAN as part of the DHCP config.
e.Configure the appropriate Gateway.
iii. For VLAN 30:
a.Use the pool name FACTORY.
b.Use the network 192.168.10.96/27.
c.Exclude the first 10 address of this network.
d.Include the DNS server that is attached to the Warsaw LAN as part of the DHCP config.
e.Configure the appropriate Gateway.
iv. For VLAN 40:
a.Use the pool name VOIP.
b.Use the network 192.168.10.128/27.
c.Exclude the first 10 address of this network.
d.Include the DNS server that is attached to the Warsaw LAN as part of the DHCP config.
e.Configure the appropriate Gateway.
Step 11: Configure the PC’s and IP Phones within Paris LAN.
a) Configure all PC’s & IP Phones within the Paris LAN. All devices should use DHCP.
b) Ensure that all PC’s & IP Phones receive and IP address information from within their own subnet.
c) Troubleshoot as necessary if devices do not receive the correct IP address information.
Step 12: Configure Static & Dynamic NAT on London_HQ Router.
a) Configure NAT on London_HQ router using the following requirements:
a. BMW owns the 200.200.200.240/29 address space. The pool uses the addresses 200.200.200.241
through to 200.200.200.245 with a /29 subnet mask.
b. Allow only the addresses in the 192.168.0.0/16 address space to be translated. Use 1 for the Access
List number.
c. The www.bmw.com website at 192.168.20.110 is registered with the public DNS system with an IP
address of 200.200.200.246. Configure the static mapping for this address.
b) Once the NAT configuration is applied, ensure that the “Outside PC” is able to ping the internal
www.bmw.com website; as well as accessing the page via http.
Step 13: Configure Wireless Connectivity for Munich Building 2 LAN.
a) Configure the Management Wireless AP so that it exists on the Management Staff VLAN within Munich
Building 2. Use the following requirements for the “Internet Connection Type”:
i. Use the Internet Connection Type as “Static”.
ii. IP Address: 192.168.30.34
iii. Subnet Mask: 255.255.255.224
iv. Default Gateway: 192.168.30.33
v. DNS Server 1: 192.168.20.101
b) Set the Wireless Credentials using the following:
i. Network Name SSID: MGMT-STAFF
ii. Security Mode: WEP
iii. Key: 1234567890
iv. Ensure you save all configuration.
c) Configure the “MGMT PDA 1” using the following requirements:
i. Set the SSID: MGMT-STAFF
ii. WEP key: 1234567890
iii. IP Configuration: DHCP
iv. Ensure that the PDA receives an IP Address from the 192.168.100.0 pool.
Step 14: Test Connectivity
a) From Paris LAN, all host PC’s should successfully ping intranet.server.com
b) From Paris LAN, all host PC’s should successfully access the web page http:// intranet.server.com
c) From Munich Building 2 LAN, all host PC’s and Management PDA’s should successfully ping
intranet.server.com and access the webpage using the browser.
d) All internal host devices should successfully ping one another.
e) Ping from ‘Outside PC’ to www.bmw.com server should be successful.
f) Ping from ‘Outside PC’ to any internal host device should fail. Why?

More Related Content

Viewers also liked

Completed project on BMW
Completed project on BMWCompleted project on BMW
Completed project on BMWRaj vardhan
 
Report on Change Management at Levis
Report on Change Management at LevisReport on Change Management at Levis
Report on Change Management at LevisDavid Thompson
 
Electronic Resource Management in 21st Century: Issues & Challenges
Electronic Resource Management in 21st Century: Issues & ChallengesElectronic Resource Management in 21st Century: Issues & Challenges
Electronic Resource Management in 21st Century: Issues & ChallengesKishor Satpathy
 
Anti-Brand Virtual Communities and Social Influence
Anti-Brand Virtual Communities and Social InfluenceAnti-Brand Virtual Communities and Social Influence
Anti-Brand Virtual Communities and Social InfluenceKhairunnissa Virani
 
Risk management of telecommunication and engineering laboratory
Risk management of telecommunication and engineering laboratoryRisk management of telecommunication and engineering laboratory
Risk management of telecommunication and engineering laboratorySalam Shah
 
Oracle EBS R12 Case Study India - Sidhartha Meka
Oracle EBS R12 Case Study   India - Sidhartha MekaOracle EBS R12 Case Study   India - Sidhartha Meka
Oracle EBS R12 Case Study India - Sidhartha MekaSidhartha Meka
 
Tipping Point on Emirate Airlines - Kaosarat Animashaun
Tipping Point on Emirate Airlines - Kaosarat AnimashaunTipping Point on Emirate Airlines - Kaosarat Animashaun
Tipping Point on Emirate Airlines - Kaosarat AnimashaunTitilola Animashaun
 
Supermarkets, Bangkok
Supermarkets, BangkokSupermarkets, Bangkok
Supermarkets, BangkokCorin Tan
 
De Beers Gartner e business case study
De Beers Gartner e business case studyDe Beers Gartner e business case study
De Beers Gartner e business case studyJames AH Campbell
 
Full paper technologies and strategies for providing education through (july 14)
Full paper technologies and strategies for providing education through (july 14)Full paper technologies and strategies for providing education through (july 14)
Full paper technologies and strategies for providing education through (july 14)Isdianto Isdianto
 
Psap 13-plk-blu-ver-ksap-final
Psap 13-plk-blu-ver-ksap-finalPsap 13-plk-blu-ver-ksap-final
Psap 13-plk-blu-ver-ksap-finalEnvaPya
 
Looking Beyond Cost Cutting Case Study
Looking Beyond Cost Cutting Case StudyLooking Beyond Cost Cutting Case Study
Looking Beyond Cost Cutting Case StudyTodd Biederman
 
Uniliver smart phone marketing new product devolopment
Uniliver smart phone marketing new product devolopmentUniliver smart phone marketing new product devolopment
Uniliver smart phone marketing new product devolopmentashik_imtiaz
 
National library case study
National library case studyNational library case study
National library case studyJoeyDorrington
 
PPPoE With Mikrotik and Radius
PPPoE With Mikrotik and RadiusPPPoE With Mikrotik and Radius
PPPoE With Mikrotik and RadiusDashamir Hoxha
 

Viewers also liked (20)

Completed project on BMW
Completed project on BMWCompleted project on BMW
Completed project on BMW
 
Report on Change Management at Levis
Report on Change Management at LevisReport on Change Management at Levis
Report on Change Management at Levis
 
Electronic Resource Management in 21st Century: Issues & Challenges
Electronic Resource Management in 21st Century: Issues & ChallengesElectronic Resource Management in 21st Century: Issues & Challenges
Electronic Resource Management in 21st Century: Issues & Challenges
 
Anti-Brand Virtual Communities and Social Influence
Anti-Brand Virtual Communities and Social InfluenceAnti-Brand Virtual Communities and Social Influence
Anti-Brand Virtual Communities and Social Influence
 
White Paper
White PaperWhite Paper
White Paper
 
Risk management of telecommunication and engineering laboratory
Risk management of telecommunication and engineering laboratoryRisk management of telecommunication and engineering laboratory
Risk management of telecommunication and engineering laboratory
 
Oracle EBS R12 Case Study India - Sidhartha Meka
Oracle EBS R12 Case Study   India - Sidhartha MekaOracle EBS R12 Case Study   India - Sidhartha Meka
Oracle EBS R12 Case Study India - Sidhartha Meka
 
LIBRARY CASE STUDY DRAFT
LIBRARY CASE STUDY DRAFTLIBRARY CASE STUDY DRAFT
LIBRARY CASE STUDY DRAFT
 
Tipping Point on Emirate Airlines - Kaosarat Animashaun
Tipping Point on Emirate Airlines - Kaosarat AnimashaunTipping Point on Emirate Airlines - Kaosarat Animashaun
Tipping Point on Emirate Airlines - Kaosarat Animashaun
 
Supermarkets, Bangkok
Supermarkets, BangkokSupermarkets, Bangkok
Supermarkets, Bangkok
 
De Beers Gartner e business case study
De Beers Gartner e business case studyDe Beers Gartner e business case study
De Beers Gartner e business case study
 
Case Study #5 Appple
Case Study #5 ApppleCase Study #5 Appple
Case Study #5 Appple
 
Full paper technologies and strategies for providing education through (july 14)
Full paper technologies and strategies for providing education through (july 14)Full paper technologies and strategies for providing education through (july 14)
Full paper technologies and strategies for providing education through (july 14)
 
Visiondocument
VisiondocumentVisiondocument
Visiondocument
 
Psap 13-plk-blu-ver-ksap-final
Psap 13-plk-blu-ver-ksap-finalPsap 13-plk-blu-ver-ksap-final
Psap 13-plk-blu-ver-ksap-final
 
UX Case Study
UX Case StudyUX Case Study
UX Case Study
 
Looking Beyond Cost Cutting Case Study
Looking Beyond Cost Cutting Case StudyLooking Beyond Cost Cutting Case Study
Looking Beyond Cost Cutting Case Study
 
Uniliver smart phone marketing new product devolopment
Uniliver smart phone marketing new product devolopmentUniliver smart phone marketing new product devolopment
Uniliver smart phone marketing new product devolopment
 
National library case study
National library case studyNational library case study
National library case study
 
PPPoE With Mikrotik and Radius
PPPoE With Mikrotik and RadiusPPPoE With Mikrotik and Radius
PPPoE With Mikrotik and Radius
 

Similar to Case study

Ccna 4 pretest exam answer v5
Ccna 4 pretest exam answer v5Ccna 4 pretest exam answer v5
Ccna 4 pretest exam answer v5friv4schoolgames
 
Ccna 1 chapter 11 v4.0 answers 2011
Ccna 1 chapter 11 v4.0 answers 2011Ccna 1 chapter 11 v4.0 answers 2011
Ccna 1 chapter 11 v4.0 answers 2011Dân Chơi
 
Switch inter vlan_routing
Switch inter vlan_routingSwitch inter vlan_routing
Switch inter vlan_routingRamesh Thumburu
 
Đề Thi Trắc Nghiệm CCNA Full
Đề Thi Trắc Nghiệm CCNA Full Đề Thi Trắc Nghiệm CCNA Full
Đề Thi Trắc Nghiệm CCNA Full nataliej4
 
ACME Corp 205110014302001DB8CAFE11564 2051.pdf
ACME Corp 205110014302001DB8CAFE11564 2051.pdfACME Corp 205110014302001DB8CAFE11564 2051.pdf
ACME Corp 205110014302001DB8CAFE11564 2051.pdfmail354931
 
640 802 exam
640 802 exam640 802 exam
640 802 examliemgpc2
 
Ccna 4 Final 2 Version 4.0 Answers
Ccna 4 Final 2 Version 4.0 AnswersCcna 4 Final 2 Version 4.0 Answers
Ccna 4 Final 2 Version 4.0 AnswersCCNA4Answers
 
Subnetting Properly subnet addressing blocks to accommodate the sit.pdf
Subnetting Properly subnet addressing blocks to accommodate the sit.pdfSubnetting Properly subnet addressing blocks to accommodate the sit.pdf
Subnetting Properly subnet addressing blocks to accommodate the sit.pdfebrahimbadushata00
 
Ccna 3 chapter 6 v4.0 answers 2011
Ccna 3 chapter 6 v4.0 answers 2011Ccna 3 chapter 6 v4.0 answers 2011
Ccna 3 chapter 6 v4.0 answers 2011Dân Chơi
 
Ccna 2 rse practice skills assessment
Ccna 2 rse practice skills assessmentCcna 2 rse practice skills assessment
Ccna 2 rse practice skills assessmentfriv4schoolgames
 
Implementation of cisco wireless lan controller (multiple wla ns)
Implementation of cisco wireless lan controller (multiple wla ns)Implementation of cisco wireless lan controller (multiple wla ns)
Implementation of cisco wireless lan controller (multiple wla ns)IT Tech
 
Ccna 3 chapter 3 v4.0 answers 2011
Ccna 3 chapter 3 v4.0 answers 2011Ccna 3 chapter 3 v4.0 answers 2011
Ccna 3 chapter 3 v4.0 answers 2011Dân Chơi
 
hadware networking
hadware networking hadware networking
hadware networking Student
 
3.4.6-lab---configure-vlans-and-trunking.pdf
3.4.6-lab---configure-vlans-and-trunking.pdf3.4.6-lab---configure-vlans-and-trunking.pdf
3.4.6-lab---configure-vlans-and-trunking.pdfarif hamidi
 
IP-Networks for Buses and Trams in Public Transport
IP-Networks for Buses and Trams in Public TransportIP-Networks for Buses and Trams in Public Transport
IP-Networks for Buses and Trams in Public TransportJuriMartinevski
 
Labpractice1 configuringbasicroutingandswitchingwithanswer-121214084802-phpapp02
Labpractice1 configuringbasicroutingandswitchingwithanswer-121214084802-phpapp02Labpractice1 configuringbasicroutingandswitchingwithanswer-121214084802-phpapp02
Labpractice1 configuringbasicroutingandswitchingwithanswer-121214084802-phpapp02Abhilash Kuniyil
 
SVR401: DirectAccess Technical Drilldown, Part 1 of 2: IPv6 and transition te...
SVR401: DirectAccess Technical Drilldown, Part 1 of 2: IPv6 and transition te...SVR401: DirectAccess Technical Drilldown, Part 1 of 2: IPv6 and transition te...
SVR401: DirectAccess Technical Drilldown, Part 1 of 2: IPv6 and transition te...Louis Göhl
 

Similar to Case study (20)

Ccna 4 pretest exam answer v5
Ccna 4 pretest exam answer v5Ccna 4 pretest exam answer v5
Ccna 4 pretest exam answer v5
 
Ccna 1 chapter 11 v4.0 answers 2011
Ccna 1 chapter 11 v4.0 answers 2011Ccna 1 chapter 11 v4.0 answers 2011
Ccna 1 chapter 11 v4.0 answers 2011
 
Switch inter vlan_routing
Switch inter vlan_routingSwitch inter vlan_routing
Switch inter vlan_routing
 
Đề Thi Trắc Nghiệm CCNA Full
Đề Thi Trắc Nghiệm CCNA Full Đề Thi Trắc Nghiệm CCNA Full
Đề Thi Trắc Nghiệm CCNA Full
 
ACME Corp 205110014302001DB8CAFE11564 2051.pdf
ACME Corp 205110014302001DB8CAFE11564 2051.pdfACME Corp 205110014302001DB8CAFE11564 2051.pdf
ACME Corp 205110014302001DB8CAFE11564 2051.pdf
 
640 802 exam
640 802 exam640 802 exam
640 802 exam
 
Ccna 4 Final 2 Version 4.0 Answers
Ccna 4 Final 2 Version 4.0 AnswersCcna 4 Final 2 Version 4.0 Answers
Ccna 4 Final 2 Version 4.0 Answers
 
Subnetting Properly subnet addressing blocks to accommodate the sit.pdf
Subnetting Properly subnet addressing blocks to accommodate the sit.pdfSubnetting Properly subnet addressing blocks to accommodate the sit.pdf
Subnetting Properly subnet addressing blocks to accommodate the sit.pdf
 
Ccna2 project
Ccna2 projectCcna2 project
Ccna2 project
 
Ccna 3 chapter 6 v4.0 answers 2011
Ccna 3 chapter 6 v4.0 answers 2011Ccna 3 chapter 6 v4.0 answers 2011
Ccna 3 chapter 6 v4.0 answers 2011
 
CCNA 1 Final v5.0 2014
CCNA 1 Final  v5.0 2014CCNA 1 Final  v5.0 2014
CCNA 1 Final v5.0 2014
 
Ccna 2 rse practice skills assessment
Ccna 2 rse practice skills assessmentCcna 2 rse practice skills assessment
Ccna 2 rse practice skills assessment
 
Implementation of cisco wireless lan controller (multiple wla ns)
Implementation of cisco wireless lan controller (multiple wla ns)Implementation of cisco wireless lan controller (multiple wla ns)
Implementation of cisco wireless lan controller (multiple wla ns)
 
Ccna 3 chapter 3 v4.0 answers 2011
Ccna 3 chapter 3 v4.0 answers 2011Ccna 3 chapter 3 v4.0 answers 2011
Ccna 3 chapter 3 v4.0 answers 2011
 
hadware networking
hadware networking hadware networking
hadware networking
 
3.4.6-lab---configure-vlans-and-trunking.pdf
3.4.6-lab---configure-vlans-and-trunking.pdf3.4.6-lab---configure-vlans-and-trunking.pdf
3.4.6-lab---configure-vlans-and-trunking.pdf
 
Nicholaus ufoakses
Nicholaus ufoaksesNicholaus ufoakses
Nicholaus ufoakses
 
IP-Networks for Buses and Trams in Public Transport
IP-Networks for Buses and Trams in Public TransportIP-Networks for Buses and Trams in Public Transport
IP-Networks for Buses and Trams in Public Transport
 
Labpractice1 configuringbasicroutingandswitchingwithanswer-121214084802-phpapp02
Labpractice1 configuringbasicroutingandswitchingwithanswer-121214084802-phpapp02Labpractice1 configuringbasicroutingandswitchingwithanswer-121214084802-phpapp02
Labpractice1 configuringbasicroutingandswitchingwithanswer-121214084802-phpapp02
 
SVR401: DirectAccess Technical Drilldown, Part 1 of 2: IPv6 and transition te...
SVR401: DirectAccess Technical Drilldown, Part 1 of 2: IPv6 and transition te...SVR401: DirectAccess Technical Drilldown, Part 1 of 2: IPv6 and transition te...
SVR401: DirectAccess Technical Drilldown, Part 1 of 2: IPv6 and transition te...
 

Recently uploaded

Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementmkooblal
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxDr.Ibrahim Hassaan
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfUjwalaBharambe
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
Planning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxPlanning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxLigayaBacuel1
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 

Recently uploaded (20)

Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of management
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
Rapple "Scholarly Communications and the Sustainable Development Goals"
Rapple "Scholarly Communications and the Sustainable Development Goals"Rapple "Scholarly Communications and the Sustainable Development Goals"
Rapple "Scholarly Communications and the Sustainable Development Goals"
 
Raw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptxRaw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptx
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptx
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
Planning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxPlanning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptx
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 

Case study

  • 1. Instructor Practical Case Study: CCNA Certification Skills (Jaskaran Kalsi: jkalsi@cisco.com) Case Study Introduction BMW Motor Company has number of sites located around the globe. Their main offices are located in Europe & Eastern Europe and it is your task to complete their network configuration. As things stand there are four main sites: 1) London HQ - this site is the Hub of the Frame Relay Circuit and it is also the main point of connection to the public Internet. 2) Warsaw - this site contains the server farm for internal and external use. There are also some admin staff located who manage/monitor the servers to which they have direct contact. 3) Munich - this site houses the main manufacturing and car assembly factory. The site at Building 2 now contains the new modernised factory and Building 1 will be transformed into offices in the future. Within Building 2 site there are two VLANs, one for Management Staff, and the other for Factory Staff. There is also a Wireless Access Point from which management staff connect PDA’s whilst they are on the factory floor. As things stand, there has been no development at Building 1 and it only houses the Frame Relay connection back to London_HQ. 4) Paris - this site house most of the administration staff and various departments. Since team such as Engineers, Marketing, & Factory Administrators are located here, then we must ensure 100% connectivity and redundancy. The offices consist of four floors, with each department on their own individual VLAN. Topology:
  • 2. IP Addressing Table Device Interface IP Address Subnet Mask London_HQ S0/0/0.100 192.168.10.1 255.255.255.252 S0/0/0.200 192.168.10.5 255.255.255.252 S0/0/0.300 192.168.10.9 255.255.255.252 S0/0/1 200.200.100.1 255.255.255.0 Warsaw S0/0/0 192.168.10.2 255.255.255.252 Fa0/0 192.168.20.1 255.255.255.0 Munich_B1 S0/0/0 192.168.10.6 255.255.255.252 S0/0/1 192.168.30.1 255.255.255.252 Paris S0/0/0 192.168.10.10 255.255.255.252 Fa0/0.10 192.168.10.33 255.255.255.224 Fa0/0.20 192.168.10.65 255.255.255.224 Fa0/0.30 192.168.10.97 255.255.255.224 Fa0/0.40 192.168.10.129 255.255.255.224 Fa0/0.99 192.168.10.161 255.255.255.224 Munich_B2 S0/0/1 192.168.30.2 255.255.255.252 Fa0/0.32 192.168.30.33 255.255.255.224 Fa0/0.64 192.168.30.65 255.255.255.224 Core Switch VLAN 99 192.168.10.162 255.255.255.224 Distribution Switch 1 VLAN 99 192.168.10.163 255.255.255.224 Distribution Switch 2 VLAN 99 192.168.10.164 255.255.255.224 Floor 1 Switch VLAN 99 192.168.10.165 255.255.255.224 Floor 2 Switch VLAN 99 192.168.10.166 255.255.255.224 Floor 3 Switch VLAN 99 192.168.10.167 255.255.255.224 Floor 4 Switch VLAN 99 192.168.10.168 255.255.255.224 VLAN Information Table VLAN Number Network Address VLAN Name Port Mapping 10 192.168.10.32/27 ENGINEERING Floor 1 Switch Fa0/1-5 Floor 2 Switch Fa0/1-5 Floor 3 Switch Fa0/1-5 Floor 4 Switch Fa0/1-5 20 192.168.10.64/27 MARKETING Floor 1 Switch Fa0/6-10 Floor 2 Switch Fa0/6-10 Floor 3 Switch Fa0/6-10 Floor 4 Switch Fa0/6-10 30 192.168.10.96/27 FACTORY Floor 1 Switch Fa0/11-15 Floor 2 Switch Fa0/11-15 Floor 3 Switch Fa0/11-15 Floor 4 Switch Fa0/11-15 40 192.168.10.128/27 VOIP Floor 1 Switch Fa0/16-20 Floor 2 Switch Fa0/16-20 Floor 3 Switch Fa0/16-20 Floor 4 Switch Fa0/16-20 99 192.168.10.160/27 MANAGEMENT All trunks
  • 3. Step 1: Configuring Frame Relay in a Hub-and-Spoke Topology. a) Configure the Frame Relay core: i. The PVC between London HQ and Warsaw uses DLCI 100 ii. The PVC between London HQ and Munich Building 1 uses DLCI 200 iii. The PVC between London HQ and Paris uses DLCI 300 b) Ensure that the Serial0/0/0 interfaces on Warsaw, Munich Building 1, & Paris have all been configured for Frame Relay. Step 2: Configure EIGRP routing within the Frame Relay Core. a) Configure London HQ and all spoke routers with EIGRP using the following requirements: i. Use AS 100. ii. Configure using only one network statement to summarize all internal routes. Step 3: Configure OSPF routing between Munich Building 1 and Munich Building 2. a) Configure the WAN connection between Munich Building 1 & Munich Building 2 using the following requirements: i. Use process number as 1. ii. Use single area OSPF (area 0). iii. Configure the network statements according to the addressing table given. b) Configure the WAN link to use PPP encapsulation and CHAP authentication. The CHAP password is cisco. The username is the hostname of the router. c) Redistribute EIGRP 100 subnets into OSPF 1 and vice versa. Note: At times ‘redistribution’ within Packet Tracer does not work as planned; hence you may need to add Static Routes on London_HQ &Munich Building 1 routers to advertise the necessary links. Step 4: Configure Static & Default Routing on Munich Building 1 Router. a) Configure a default route on Munich Building 1 router to forward any unrecognized traffic out of interface S0/0/0. b) Configure a default route on London_HQ router to forward and unrecognized traffic out of interface S0/0/1. c) Configure a static route on London_HQ router pointing towards network 192.168.30.0/24 going out of interface S0/0/0.200. Step 5: Configure Warsaw router and LAN. a) Configure & activate the FastEthernet0/0 interface using the IP address given in the addressing table. b) Configure the Intranet Server with the following static IP addressing: i. IP Address: 192.168.20.100 ii. Subnet Mask: 255.255.255.0 iii. Default Gateway: 192.168.20.1 iv. DNS Server Address: 192.168.20.101 Step 6: Configure VTP, Trunking, the VLAN Interface, and VLANs within the Paris LAN. a) Configure all Paris LAN switches with VTP
  • 4. i. Core Switch is the VTP Server (Domain Name: CATC / VTP Password: LISBON) ii. Both Distribution Switches and Floor 1-4 Switches are VTP Clients within the same domain. b) Configure the appropriate interfaces in trunking mode and assign VLAN 99 as the native VLAN. i. Use 802.1Q encapsulation for all trunk ports. ii. Configure the VLAN interfaces and default gateways. c) Create and name the VLANs that are listed on the VLAN Information Table. i. Create only the VLANs on the “Core Switch”. ii. Ensure that all VLAN information propagates down to the access floor switches. Step 7: Assign VLANs and Configure Port Security within the Paris LAN Switches. a) Use the VLAN Information Table to complete the VLAN requirements on Access Floor Switches 1-4: i. Manually configure all access floor switch interfaces to be access ports for VLANs 10; 20; & 30. ii. Manually configure all access floor switch interfaces to be voice ports for VLAN 40. iii. Ensure that you assign VLANs to each of these interface ports. b) Use the following policy to establish port security on the access ports: i. For Interfaces Fa0/1-5; Fa0/6-10; Fa0/11-15 for all access Floor 1-4 Switches: a.Allow only one MAC address. b.Configure the first learnt MAC address to ‘stick’ to the configuration. c.Set all ports to shut down if there is any security violation. Step 8: Configure Inter-VLAN Routing on Paris Router Fa0/0 interface. a) Configure & activate the Paris LAN interface for Inter-VLAN routing. b) VLAN 99 is the management & native VLAN. c) Within each VLAN network address, use the first available address as the default-gateway for that subnet. d) Ensure that the encapsulation is set to 802.1Q. Step 9: Configure Spanning Tree (STP) for Paris LAN Switches. a) Configure Spanning Tree so that Data and Voice traffic are separated and prioritized over the two Distribution layer switches. Use the following criteria: i. Make Distribution Switch 1 the Root for VLANS 1; 10; 20; 30; & 99 by configuring a priority level of 4096. ii. Make Distribution Switch 2 the BACKUP Root for VLANS 1; 10; 20; 30; & 99 by configuring a priority level of 8192. iii. Make Distribution Switch 2 the Root for VLAN 40 by configuring a priority level of 4096. iv. Make Distribution Switch 1 the BACKUP Root for VLAN 40 by configuring a priority level of 8192. Step 10: Configure DHCP for the Paris LAN. a) On the Paris Router configure four separate DHCP pools for the four access VLANs. Use the following criteria when creating these pools: i. For VLAN 10: a.Use the pool name ENGINEERING. b.Use the network 192.168.10.32/27. c.Exclude the first 10 address of this network. d.Include the DNS server that is attached to the Warsaw LAN as part of the DHCP config.
  • 5. e.Configure the appropriate Gateway. ii. For VLAN 20: a.Use the pool name MARKETING. b.Use the network 192.168.10.64/27. c.Exclude the first 10 address of this network. d.Include the DNS server that is attached to the Warsaw LAN as part of the DHCP config. e.Configure the appropriate Gateway. iii. For VLAN 30: a.Use the pool name FACTORY. b.Use the network 192.168.10.96/27. c.Exclude the first 10 address of this network. d.Include the DNS server that is attached to the Warsaw LAN as part of the DHCP config. e.Configure the appropriate Gateway. iv. For VLAN 40: a.Use the pool name VOIP. b.Use the network 192.168.10.128/27. c.Exclude the first 10 address of this network. d.Include the DNS server that is attached to the Warsaw LAN as part of the DHCP config. e.Configure the appropriate Gateway. Step 11: Configure the PC’s and IP Phones within Paris LAN. a) Configure all PC’s & IP Phones within the Paris LAN. All devices should use DHCP. b) Ensure that all PC’s & IP Phones receive and IP address information from within their own subnet. c) Troubleshoot as necessary if devices do not receive the correct IP address information. Step 12: Configure Static & Dynamic NAT on London_HQ Router. a) Configure NAT on London_HQ router using the following requirements: a. BMW owns the 200.200.200.240/29 address space. The pool uses the addresses 200.200.200.241 through to 200.200.200.245 with a /29 subnet mask. b. Allow only the addresses in the 192.168.0.0/16 address space to be translated. Use 1 for the Access List number. c. The www.bmw.com website at 192.168.20.110 is registered with the public DNS system with an IP address of 200.200.200.246. Configure the static mapping for this address. b) Once the NAT configuration is applied, ensure that the “Outside PC” is able to ping the internal www.bmw.com website; as well as accessing the page via http. Step 13: Configure Wireless Connectivity for Munich Building 2 LAN. a) Configure the Management Wireless AP so that it exists on the Management Staff VLAN within Munich Building 2. Use the following requirements for the “Internet Connection Type”: i. Use the Internet Connection Type as “Static”. ii. IP Address: 192.168.30.34 iii. Subnet Mask: 255.255.255.224 iv. Default Gateway: 192.168.30.33 v. DNS Server 1: 192.168.20.101 b) Set the Wireless Credentials using the following: i. Network Name SSID: MGMT-STAFF
  • 6. ii. Security Mode: WEP iii. Key: 1234567890 iv. Ensure you save all configuration. c) Configure the “MGMT PDA 1” using the following requirements: i. Set the SSID: MGMT-STAFF ii. WEP key: 1234567890 iii. IP Configuration: DHCP iv. Ensure that the PDA receives an IP Address from the 192.168.100.0 pool. Step 14: Test Connectivity a) From Paris LAN, all host PC’s should successfully ping intranet.server.com b) From Paris LAN, all host PC’s should successfully access the web page http:// intranet.server.com c) From Munich Building 2 LAN, all host PC’s and Management PDA’s should successfully ping intranet.server.com and access the webpage using the browser. d) All internal host devices should successfully ping one another. e) Ping from ‘Outside PC’ to www.bmw.com server should be successful. f) Ping from ‘Outside PC’ to any internal host device should fail. Why?