SlideShare a Scribd company logo
1 of 21
Faculty of Engineering and the Built Environment
Department of … / CITSI
1
Faculty of Engineering and the Built Environment
Department of … / CITSI
WATER INFRASTRUCTURE
MANAGEMENT IN SOUTH AFRICA:
THE CASE OF HARDING
Author: Hlosokuhle Fuyana
Supervisor: Prof G. Ochieng
Co-supervisor: Dr J. Snyman
Faculty of Engineering and the Built Environment
Department of … / CITSI
INTRODUCTION
2
• Globally, the water sector faces noteworthy challenges in maintaining reliable
service provision, amidst varying challenges such as ageing infrastructure,
growing demands, meeting increasing complexity and skills shortages.
• As part of the on-going efforts to address these challenges, this research has
been undertaken to facilitate the dissemination of technological innovations
within the field of water infrastructure management.
• These innovations entail the integration of a Geographic Information Systems
(GIS) and a hydraulic modelling software with water Infrastructure Asset
Management (IAM).
• Using a GIS geodatabase, an Asset Register was developed; from which a
failure risk scoring of each feature classes i.e. level of deterioration was
undertaken. The risk scoring aided in the development of an Infrastructure
Replacement Plan (IRP) with associated cost estimates.
• The research was based on the Ugu District Municipality (UDM) town, Harding,
Kwa-Zulu Natal (KZN).
Faculty of Engineering and the Built Environment
Department of … / CITSI
3
STUDY AREA
Faculty of Engineering and the Built Environment
Department of … / CITSI
4
PROBLEM STATEMENT
• South Africa is facing grim challenges with regards to the dispersion of
sustainable basic services such as water, its quality and management, as well its
efficient use (van Zyl, Manus and Pensulo, 2008:3).
• The trials faced in the country emanate from ineffective IAM and maintenance and
very notably poor planning for new infrastructure or life cycle management (van
Zyl, Manus and Pensulo, 2008:3).
Faculty of Engineering and the Built Environment
Department of … / CITSI
5
RESEARCH OBJECTIVES
The purpose of the research is to develop an integrated GIS geodatabase, hydraulic
model and IRP for the water IAM of Harding, with the following specific objectives;
• Map the water infrastructure of Harding to aid in its IAM.
• Develop an Asset Register for the town's water network, including a failure risk
assessment for its assets (feature classes).
• Develop an operational hydraulic model for the network to enable system
modelling and analysis.
• Formulate an IRP with estimated costs for infrastructure replacement.
Faculty of Engineering and the Built Environment
Department of … / CITSI
6
LITERATURE REVIEW
To fulfil the objectives it was necessary to review research and case studies of water
IAM not only in South Africa, but globally. The literature review covered the following
sub-headings;
• Infrastructure Asset Management (IAM). This section touched on the key concepts
of water infrastructure management, national and international government
policies and regulations and the needs for effective water IAM.
• Literature on the IAM challenges such as Ageing infrastructure, Increasing
complexity, Growing demands, among others; both globally and in South Africa
was also reviewed.
• GIS and hydraulic modelling developments in recent years and an evaluation of
the most effective software package to use in aiding WSA in South Africa better
manage their water infrastructure.
• Water infrastructure replacement literature and research case studies were also
reviewed. This assisted in developing the methodology for Asset register
development, Risk management criteria formulation, Condition assessment
strategies and the drafting of an IRP.
Faculty of Engineering and the Built Environment
Department of … / CITSI
7
RESEARCH METHODOLOGY
Faculty of Engineering and the Built Environment
Department of … / CITSI
8
PHASE 1: Data collection
• Interviews of the various level UDM staff were conducted to assess the WSA’s
needs and gather crucial information on the town’s water network. The interviews
formed part of a Water Needs Assessment for the municipality town.
• Mapping water infrastructure using GIS was conducted once the municipality’s
needs were established. ArcGIS 10.1 was utilized for the mapping of the water
infrastructure. This stage of the research entailed the following;
– Collecting as-built drawings and reference data (Cadastral data and aerial
photographs),
– Data extraction and conversion, entailing the scanning hardcopy as-built
drawings and then “georeferencing” them using aerial photographs, cadastral
data and field GPS coordinates. Georeferencing enabled the as-built
infrastructure data to be assigned its correct “real life” geographical locations
within a GIS system.
Faculty of Engineering and the Built Environment
Department of … / CITSI
9
– Geodatabase design Prior to capturing the water infrastructure in the
georeferenced as-built drawings, there was a need to determine which
attributes or information of the water infrastructure features was to be
captured. The feature class attributes contained in the geodatabase are
summarised in the table below;
Feature
class
Attribute
data
Description Data type
Pipe Material Type of material from which the
feature class is manufactured
Text string
Size Diameter of pipe section (mm) Integer
Age Current age of feature class and
year of installation
Integer
Pipe class Pipe diameter (mm) Integer
Scheme
name
Water scheme or project under
which feature class was installed
Text string
Condition Current condition of feature
class as determined by a field
verification
Text string
Element Type
Naming
Convention
Pipe HAR-W-P-
Junction HAR-W-J-
Hydrant HAR-W-H-
Tank HAR-W-T-
Reservoir HAR-W-R-
Faculty of Engineering and the Built Environment
Department of … / CITSI
10
– Digitizing The last step in this exercise was the digitization of water
infrastructure which is the process of converting the geographic features on a
hardcopy map into digital format using a GIS software package. This was
done by tracing features, for example water reticulation pipes, bulk mains and
other water network features (reservoirs, isolation valves and hydrants) from
the scanned and georeferenced CAD drawings.
• Direct field observations One week was spent with the operations and
maintenance plumbers, observing their maintenance practices, processes and
data collection. The information gathered during this time included pipe burst
frequency, replacement practices, and system information tracking i.e. logging the
location and occurrence types of incidents.
Faculty of Engineering and the Built Environment
Department of … / CITSI
11
PHASE 2: Asset Register development
• Formulation of an AR To better manage Harding’s water network, the extent,
boundaries and quantity of its components had to be determined e.g. number of
reservoirs and the total length of pipes etc.
• Failure risk management A failure risk management score (criticality analysis)
ranging from 1-5 was assigned to the water network features as agreed with UDM
during the needs assessment. A score of ‘5’ represents a high feature class risk,
whereas a ‘0’ represents no risk.
Faculty of Engineering and the Built Environment
Department of … / CITSI
12
PHASE 3: Hydraulic model development
• Hydraulic model The following scenarios were run on in the hydraulic model to
compare its current performance against design standards:
– Scenario 1: Average water demand Single Period Analysis,
– Scenario 2: Peak water demand Single Period Analysis,
– Scenario 3: Pipe velocity demand + Fire flow Single Period Analysis, and
– Scenario 4: Extended period simulation.
• Condition Assessment The field verification or condition assessment was
deemed appropriate to confirm the accuracy of the data captured from scanned
and georeferenced CAD drawings.
• Development of an IAMP An IAMP is typically based on existing infrastructure
data and information, a main component of which should be derived from the
Asset Register. In this study the IAMP was limited to the development of an IRP
with associated costs, as an initial step in managing Harding’s water
infrastructure.
Faculty of Engineering and the Built Environment
Department of … / CITSI
13
RESULTS
Mapped water infrastructure model
Faculty of Engineering and the Built Environment
Department of … / CITSI
14
Pipe distribution by material Pipe distribution by size
Pipe distribution by age
Faculty of Engineering and the Built Environment
Department of … / CITSI
15
Comparison of system pressures with normal standards
100
150
200
250
300
350
400
450
500
550
600
650
700
750
800
850
900
950
PRESSUREKPA
Min allowable pressure = 245.1 kPa
Max allowable pressure = 343.1kPa
Faculty of Engineering and the Built Environment
Department of … / CITSI
16
Comparison of system velocities with normal standards
-0.70
0.00
0.70
1.40
2.10
2.80
3.50
VELOCITYM/S
Max allowable velocity = 2.5m/s
Min allowable velocity = 0.7m/s
Faculty of Engineering and the Built Environment
Department of … / CITSI
17
• Development of an IAMP
Existing pipe
diameter and material
Existing pipe age
and length (m)
Existing pipe to
be replaced (m)
Assumed replacement
pipe diameter and
material
300mm AC > 30yrs = 1600m 1600m 315 uPVC
250mm AC > 30yrs = 50m 50m 315 uPVC
200mm AC > 30yrs = 700m 700m 200 uPVC
150mm AC > 30yrs = 1800m 1800m 160 uPVC
100mm AC > 30yrs = 1200m 1200m 110 uPVC
40mm to 63mm CI > 30yrs = 1200m 1200m 63 HDPE
40mm to 63mm GI > 30yrs = 2000m 2000m 63 HDPE
Proposed replacement pipes
Faculty of Engineering and the Built Environment
Department of … / CITSI
18
Proposed infrastructure replacement cost estimates
Assumed replacement pipe diameter and material Unit Quantity Rate (m) Amount (R)
315mm uPVC m 1650 1,865.361 3,077,844.00
200mm uPVC m 700 564.031 394,821.00
160mm uPVC m 1800 361.601 650,880.00
110mm uPVC m 1200 73.731 208,476.00
63mm HDPE m 3200 70.90 226,880.00
Supply and Installation of pipe fittings Sum 1 200,000.002 200,000.00
Allow for transfer of house connections Sum 1 500,000.002 500,000.00
Isolation valves No. 57 1,108.28 63,171.96
Hydrants No. 52 5,000.002 260,000.00
Subtotal 5,582,072.96
Add: 14% Value Added Tax 781,490.21
Total 6,363,563.17
NB:
1 the pipe rate is based on a class 16 pressure pipe
2 these are estimated provisional sums and rates based on quotations received from suppliers. An exact figure
will be arrived at after a detailed field verification has been undertaken
Faculty of Engineering and the Built Environment
Department of … / CITSI
19
CONCLUSIONS
• Integration of computer technology such as GIS and hydraulic modelling with
water IAM, as discussed in this study, is a proven valuable solution for WSA to
meet their mandated responsibilities. This is especially true in South Africa’s
municipalities, which like many other developing countries, face a number of
challenges in effective water infrastructure management.
• The use of technology allows for the improvement of a number of these
challenges as outlined in the research. For example, automated infrastructure
mapping allows for better maintenance and lifecycle management, which in
turn allow WSA to plan adequately for their aging infrastructure.
• Once WSA are capable of monitoring and planning for its infrastructure
effectively, potential foreign investors can be more confident in investing in
water infrastructure. This will aid in alleviating challenges related to inadequate
funding and ease the burdens of poor revenue collection.
Faculty of Engineering and the Built Environment
Department of … / CITSI
20
QUESTIONS?
Faculty of Engineering and the Built Environment
Department of … / CITSI
21
Faculty of Engineering and the Built Environment
Department of … / CITSI
THANK YOU

More Related Content

What's hot

2 - MoWR - HP-III presentation-16th Sep
2 - MoWR - HP-III presentation-16th Sep2 - MoWR - HP-III presentation-16th Sep
2 - MoWR - HP-III presentation-16th Sepindiawrm
 
Download-manuals-surface water-manual-sw-volume1designmanualhis
 Download-manuals-surface water-manual-sw-volume1designmanualhis Download-manuals-surface water-manual-sw-volume1designmanualhis
Download-manuals-surface water-manual-sw-volume1designmanualhishydrologyproject001
 
Download-manuals-surface water-manual-sw-volume2designmanualsamplingprinciples
 Download-manuals-surface water-manual-sw-volume2designmanualsamplingprinciples Download-manuals-surface water-manual-sw-volume2designmanualsamplingprinciples
Download-manuals-surface water-manual-sw-volume2designmanualsamplingprincipleshydrologyproject001
 
Download-manuals-surface water-manual-sw-volume1fieldmanualhispartiii
 Download-manuals-surface water-manual-sw-volume1fieldmanualhispartiii Download-manuals-surface water-manual-sw-volume1fieldmanualhispartiii
Download-manuals-surface water-manual-sw-volume1fieldmanualhispartiiihydrologyproject001
 
HRD 897 SSRP
HRD 897 SSRPHRD 897 SSRP
HRD 897 SSRPmahansen
 
Easter Desert Project
Easter Desert ProjectEaster Desert Project
Easter Desert ProjectIwl Pcu
 
Probabilistic & Source Characterization Techniques in AERMOD Compliance
Probabilistic & Source Characterization Techniques in AERMOD ComplianceProbabilistic & Source Characterization Techniques in AERMOD Compliance
Probabilistic & Source Characterization Techniques in AERMOD ComplianceSergio A. Guerra
 
Using the IAQM guidance on assessing air quality impacts on nature conservati...
Using the IAQM guidance on assessing air quality impacts on nature conservati...Using the IAQM guidance on assessing air quality impacts on nature conservati...
Using the IAQM guidance on assessing air quality impacts on nature conservati...IES / IAQM
 
Complying with EPA's Guidance for SO2 Designations
Complying with EPA's Guidance for SO2 DesignationsComplying with EPA's Guidance for SO2 Designations
Complying with EPA's Guidance for SO2 DesignationsSergio A. Guerra
 
Adam Lewis–SPEDDEXES 2014
Adam Lewis–SPEDDEXES 2014Adam Lewis–SPEDDEXES 2014
Adam Lewis–SPEDDEXES 2014aceas13tern
 
Using Physical Modeling to Refine Downwash Inputs to AERMOD at a Food Process...
Using Physical Modeling to Refine Downwash Inputs to AERMOD at a Food Process...Using Physical Modeling to Refine Downwash Inputs to AERMOD at a Food Process...
Using Physical Modeling to Refine Downwash Inputs to AERMOD at a Food Process...Sergio A. Guerra
 
Underground Infastructure and Deep Foundation Conference
Underground Infastructure and Deep Foundation ConferenceUnderground Infastructure and Deep Foundation Conference
Underground Infastructure and Deep Foundation ConferenceStephen Olubunmi Fadeyi
 
Flood modeling of river godavari using hec ras
Flood modeling of river godavari using hec rasFlood modeling of river godavari using hec ras
Flood modeling of river godavari using hec raseSAT Publishing House
 
Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology...
 Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology... Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology...
Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology...hydrologyproject001
 
Download-manuals-hydrometeorology-data processing-20howtoreportonclimaticdata
 Download-manuals-hydrometeorology-data processing-20howtoreportonclimaticdata Download-manuals-hydrometeorology-data processing-20howtoreportonclimaticdata
Download-manuals-hydrometeorology-data processing-20howtoreportonclimaticdatahydrologyproject001
 

What's hot (17)

2 - MoWR - HP-III presentation-16th Sep
2 - MoWR - HP-III presentation-16th Sep2 - MoWR - HP-III presentation-16th Sep
2 - MoWR - HP-III presentation-16th Sep
 
Download-manuals-surface water-manual-sw-volume1designmanualhis
 Download-manuals-surface water-manual-sw-volume1designmanualhis Download-manuals-surface water-manual-sw-volume1designmanualhis
Download-manuals-surface water-manual-sw-volume1designmanualhis
 
Download-manuals-surface water-manual-sw-volume2designmanualsamplingprinciples
 Download-manuals-surface water-manual-sw-volume2designmanualsamplingprinciples Download-manuals-surface water-manual-sw-volume2designmanualsamplingprinciples
Download-manuals-surface water-manual-sw-volume2designmanualsamplingprinciples
 
Download-manuals-surface water-manual-sw-volume1fieldmanualhispartiii
 Download-manuals-surface water-manual-sw-volume1fieldmanualhispartiii Download-manuals-surface water-manual-sw-volume1fieldmanualhispartiii
Download-manuals-surface water-manual-sw-volume1fieldmanualhispartiii
 
Rehder, Gregor: Making Atmopheric measurements onboard SOOPs
Rehder, Gregor: Making Atmopheric measurements onboard SOOPsRehder, Gregor: Making Atmopheric measurements onboard SOOPs
Rehder, Gregor: Making Atmopheric measurements onboard SOOPs
 
HRD 897 SSRP
HRD 897 SSRPHRD 897 SSRP
HRD 897 SSRP
 
Easter Desert Project
Easter Desert ProjectEaster Desert Project
Easter Desert Project
 
Probabilistic & Source Characterization Techniques in AERMOD Compliance
Probabilistic & Source Characterization Techniques in AERMOD ComplianceProbabilistic & Source Characterization Techniques in AERMOD Compliance
Probabilistic & Source Characterization Techniques in AERMOD Compliance
 
Using the IAQM guidance on assessing air quality impacts on nature conservati...
Using the IAQM guidance on assessing air quality impacts on nature conservati...Using the IAQM guidance on assessing air quality impacts on nature conservati...
Using the IAQM guidance on assessing air quality impacts on nature conservati...
 
Complying with EPA's Guidance for SO2 Designations
Complying with EPA's Guidance for SO2 DesignationsComplying with EPA's Guidance for SO2 Designations
Complying with EPA's Guidance for SO2 Designations
 
Adam Lewis–SPEDDEXES 2014
Adam Lewis–SPEDDEXES 2014Adam Lewis–SPEDDEXES 2014
Adam Lewis–SPEDDEXES 2014
 
Using Physical Modeling to Refine Downwash Inputs to AERMOD at a Food Process...
Using Physical Modeling to Refine Downwash Inputs to AERMOD at a Food Process...Using Physical Modeling to Refine Downwash Inputs to AERMOD at a Food Process...
Using Physical Modeling to Refine Downwash Inputs to AERMOD at a Food Process...
 
Underground Infastructure and Deep Foundation Conference
Underground Infastructure and Deep Foundation ConferenceUnderground Infastructure and Deep Foundation Conference
Underground Infastructure and Deep Foundation Conference
 
Flood modeling of river godavari using hec ras
Flood modeling of river godavari using hec rasFlood modeling of river godavari using hec ras
Flood modeling of river godavari using hec ras
 
Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology...
 Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology... Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology...
Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology...
 
Final sw handbook 180514
Final sw handbook 180514Final sw handbook 180514
Final sw handbook 180514
 
Download-manuals-hydrometeorology-data processing-20howtoreportonclimaticdata
 Download-manuals-hydrometeorology-data processing-20howtoreportonclimaticdata Download-manuals-hydrometeorology-data processing-20howtoreportonclimaticdata
Download-manuals-hydrometeorology-data processing-20howtoreportonclimaticdata
 

Similar to H Fuyana_Research Presantation 2015

Fairfax County Wastewater Collection Asset Management Program Oct 2020
Fairfax County Wastewater Collection Asset Management Program  Oct 2020Fairfax County Wastewater Collection Asset Management Program  Oct 2020
Fairfax County Wastewater Collection Asset Management Program Oct 2020Fairfax County
 
HYDRAULIC MODELING OF A RURAL DRINKING WATER DISTRIBUTION {ju}.pptx
HYDRAULIC MODELING OF A RURAL DRINKING WATER DISTRIBUTION {ju}.pptxHYDRAULIC MODELING OF A RURAL DRINKING WATER DISTRIBUTION {ju}.pptx
HYDRAULIC MODELING OF A RURAL DRINKING WATER DISTRIBUTION {ju}.pptxINDRANIL BANERJEE
 
Design and Simulation of a Water Supply System for Eramala Panchayat
Design and Simulation of a Water Supply System for Eramala PanchayatDesign and Simulation of a Water Supply System for Eramala Panchayat
Design and Simulation of a Water Supply System for Eramala PanchayatIRJET Journal
 
Download-manuals-ground water-manual-standardsforg-wmonitoring
 Download-manuals-ground water-manual-standardsforg-wmonitoring Download-manuals-ground water-manual-standardsforg-wmonitoring
Download-manuals-ground water-manual-standardsforg-wmonitoringhydrologyproject001
 
Download-manuals-surface water-software-processingofstreamflowdata
 Download-manuals-surface water-software-processingofstreamflowdata Download-manuals-surface water-software-processingofstreamflowdata
Download-manuals-surface water-software-processingofstreamflowdatahydrologyproject0
 
SUSTAINABLE & COST-EFFECTIVE DRAINAGE DESIGN SOLUTION FOR AN URBAN ROAD SCENA...
SUSTAINABLE & COST-EFFECTIVE DRAINAGE DESIGN SOLUTION FOR AN URBAN ROAD SCENA...SUSTAINABLE & COST-EFFECTIVE DRAINAGE DESIGN SOLUTION FOR AN URBAN ROAD SCENA...
SUSTAINABLE & COST-EFFECTIVE DRAINAGE DESIGN SOLUTION FOR AN URBAN ROAD SCENA...IRJET Journal
 
Scheme for the construction of water channels
Scheme for the construction of water channelsScheme for the construction of water channels
Scheme for the construction of water channelsmirzaqadeer
 
An Economic Analysis of Green v. Grey Infrastructure
An Economic Analysis of Green v. Grey InfrastructureAn Economic Analysis of Green v. Grey Infrastructure
An Economic Analysis of Green v. Grey InfrastructureRobert Muir
 
IRJET- Watershed Delineation of Kumbhoj Nala Basin by using QGIS
IRJET-  	  Watershed Delineation of Kumbhoj Nala Basin by using QGISIRJET-  	  Watershed Delineation of Kumbhoj Nala Basin by using QGIS
IRJET- Watershed Delineation of Kumbhoj Nala Basin by using QGISIRJET Journal
 
Australia with a Drying Climate - Sustainable urban water management. By what...
Australia with a Drying Climate - Sustainable urban water management. By what...Australia with a Drying Climate - Sustainable urban water management. By what...
Australia with a Drying Climate - Sustainable urban water management. By what...SmartH2O
 
Results, calculations, and assumptions of the resilience.io WASH sector in GA...
Results, calculations, and assumptions of the resilience.io WASH sector in GA...Results, calculations, and assumptions of the resilience.io WASH sector in GA...
Results, calculations, and assumptions of the resilience.io WASH sector in GA...Ecological Sequestration Trust
 
An Economic Analysis of Green and Grey Infrastructure - TRIECA Conference 2019
An Economic Analysis of Green and Grey Infrastructure - TRIECA Conference 2019An Economic Analysis of Green and Grey Infrastructure - TRIECA Conference 2019
An Economic Analysis of Green and Grey Infrastructure - TRIECA Conference 2019Robert Muir
 
IRJET- A Study of Application of Qanat System using Modern Techniques for Oas...
IRJET- A Study of Application of Qanat System using Modern Techniques for Oas...IRJET- A Study of Application of Qanat System using Modern Techniques for Oas...
IRJET- A Study of Application of Qanat System using Modern Techniques for Oas...IRJET Journal
 
IRJET- Construction Approach and Schedule Technical for Treatment Plant
IRJET- Construction Approach and Schedule Technical for Treatment PlantIRJET- Construction Approach and Schedule Technical for Treatment Plant
IRJET- Construction Approach and Schedule Technical for Treatment PlantIRJET Journal
 
“WATER DEMAND FORECASTING AND DESIGN OF WATER DISTRIBUTION SYSTEM/NETWORK AT ...
“WATER DEMAND FORECASTING AND DESIGN OF WATER DISTRIBUTION SYSTEM/NETWORK AT ...“WATER DEMAND FORECASTING AND DESIGN OF WATER DISTRIBUTION SYSTEM/NETWORK AT ...
“WATER DEMAND FORECASTING AND DESIGN OF WATER DISTRIBUTION SYSTEM/NETWORK AT ...IRJET Journal
 
Selection of drains coverings type in eastern of egypt
Selection of drains coverings type in eastern of egyptSelection of drains coverings type in eastern of egypt
Selection of drains coverings type in eastern of egypteSAT Publishing House
 
ACCESS RESEARCH ARTICLE OPEN ACCES Wastewater Pipeline Design in Accordance w...
ACCESS RESEARCH ARTICLE OPEN ACCES Wastewater Pipeline Design in Accordance w...ACCESS RESEARCH ARTICLE OPEN ACCES Wastewater Pipeline Design in Accordance w...
ACCESS RESEARCH ARTICLE OPEN ACCES Wastewater Pipeline Design in Accordance w...IJERA Editor
 
The Object Detection Capabilities of the Bathymetry Systems Utilised for the ...
The Object Detection Capabilities of the Bathymetry Systems Utilised for the ...The Object Detection Capabilities of the Bathymetry Systems Utilised for the ...
The Object Detection Capabilities of the Bathymetry Systems Utilised for the ...Luke Elliott
 
Urban Flood Risk Mapping - Tiered Vulnerability Assessment in Risk Mitigation...
Urban Flood Risk Mapping - Tiered Vulnerability Assessment in Risk Mitigation...Urban Flood Risk Mapping - Tiered Vulnerability Assessment in Risk Mitigation...
Urban Flood Risk Mapping - Tiered Vulnerability Assessment in Risk Mitigation...Robert Muir
 
IRJET- Estimation of Intze Water Tank by User Graphical Interface
IRJET- Estimation of Intze Water Tank by User Graphical InterfaceIRJET- Estimation of Intze Water Tank by User Graphical Interface
IRJET- Estimation of Intze Water Tank by User Graphical InterfaceIRJET Journal
 

Similar to H Fuyana_Research Presantation 2015 (20)

Fairfax County Wastewater Collection Asset Management Program Oct 2020
Fairfax County Wastewater Collection Asset Management Program  Oct 2020Fairfax County Wastewater Collection Asset Management Program  Oct 2020
Fairfax County Wastewater Collection Asset Management Program Oct 2020
 
HYDRAULIC MODELING OF A RURAL DRINKING WATER DISTRIBUTION {ju}.pptx
HYDRAULIC MODELING OF A RURAL DRINKING WATER DISTRIBUTION {ju}.pptxHYDRAULIC MODELING OF A RURAL DRINKING WATER DISTRIBUTION {ju}.pptx
HYDRAULIC MODELING OF A RURAL DRINKING WATER DISTRIBUTION {ju}.pptx
 
Design and Simulation of a Water Supply System for Eramala Panchayat
Design and Simulation of a Water Supply System for Eramala PanchayatDesign and Simulation of a Water Supply System for Eramala Panchayat
Design and Simulation of a Water Supply System for Eramala Panchayat
 
Download-manuals-ground water-manual-standardsforg-wmonitoring
 Download-manuals-ground water-manual-standardsforg-wmonitoring Download-manuals-ground water-manual-standardsforg-wmonitoring
Download-manuals-ground water-manual-standardsforg-wmonitoring
 
Download-manuals-surface water-software-processingofstreamflowdata
 Download-manuals-surface water-software-processingofstreamflowdata Download-manuals-surface water-software-processingofstreamflowdata
Download-manuals-surface water-software-processingofstreamflowdata
 
SUSTAINABLE & COST-EFFECTIVE DRAINAGE DESIGN SOLUTION FOR AN URBAN ROAD SCENA...
SUSTAINABLE & COST-EFFECTIVE DRAINAGE DESIGN SOLUTION FOR AN URBAN ROAD SCENA...SUSTAINABLE & COST-EFFECTIVE DRAINAGE DESIGN SOLUTION FOR AN URBAN ROAD SCENA...
SUSTAINABLE & COST-EFFECTIVE DRAINAGE DESIGN SOLUTION FOR AN URBAN ROAD SCENA...
 
Scheme for the construction of water channels
Scheme for the construction of water channelsScheme for the construction of water channels
Scheme for the construction of water channels
 
An Economic Analysis of Green v. Grey Infrastructure
An Economic Analysis of Green v. Grey InfrastructureAn Economic Analysis of Green v. Grey Infrastructure
An Economic Analysis of Green v. Grey Infrastructure
 
IRJET- Watershed Delineation of Kumbhoj Nala Basin by using QGIS
IRJET-  	  Watershed Delineation of Kumbhoj Nala Basin by using QGISIRJET-  	  Watershed Delineation of Kumbhoj Nala Basin by using QGIS
IRJET- Watershed Delineation of Kumbhoj Nala Basin by using QGIS
 
Australia with a Drying Climate - Sustainable urban water management. By what...
Australia with a Drying Climate - Sustainable urban water management. By what...Australia with a Drying Climate - Sustainable urban water management. By what...
Australia with a Drying Climate - Sustainable urban water management. By what...
 
Results, calculations, and assumptions of the resilience.io WASH sector in GA...
Results, calculations, and assumptions of the resilience.io WASH sector in GA...Results, calculations, and assumptions of the resilience.io WASH sector in GA...
Results, calculations, and assumptions of the resilience.io WASH sector in GA...
 
An Economic Analysis of Green and Grey Infrastructure - TRIECA Conference 2019
An Economic Analysis of Green and Grey Infrastructure - TRIECA Conference 2019An Economic Analysis of Green and Grey Infrastructure - TRIECA Conference 2019
An Economic Analysis of Green and Grey Infrastructure - TRIECA Conference 2019
 
IRJET- A Study of Application of Qanat System using Modern Techniques for Oas...
IRJET- A Study of Application of Qanat System using Modern Techniques for Oas...IRJET- A Study of Application of Qanat System using Modern Techniques for Oas...
IRJET- A Study of Application of Qanat System using Modern Techniques for Oas...
 
IRJET- Construction Approach and Schedule Technical for Treatment Plant
IRJET- Construction Approach and Schedule Technical for Treatment PlantIRJET- Construction Approach and Schedule Technical for Treatment Plant
IRJET- Construction Approach and Schedule Technical for Treatment Plant
 
“WATER DEMAND FORECASTING AND DESIGN OF WATER DISTRIBUTION SYSTEM/NETWORK AT ...
“WATER DEMAND FORECASTING AND DESIGN OF WATER DISTRIBUTION SYSTEM/NETWORK AT ...“WATER DEMAND FORECASTING AND DESIGN OF WATER DISTRIBUTION SYSTEM/NETWORK AT ...
“WATER DEMAND FORECASTING AND DESIGN OF WATER DISTRIBUTION SYSTEM/NETWORK AT ...
 
Selection of drains coverings type in eastern of egypt
Selection of drains coverings type in eastern of egyptSelection of drains coverings type in eastern of egypt
Selection of drains coverings type in eastern of egypt
 
ACCESS RESEARCH ARTICLE OPEN ACCES Wastewater Pipeline Design in Accordance w...
ACCESS RESEARCH ARTICLE OPEN ACCES Wastewater Pipeline Design in Accordance w...ACCESS RESEARCH ARTICLE OPEN ACCES Wastewater Pipeline Design in Accordance w...
ACCESS RESEARCH ARTICLE OPEN ACCES Wastewater Pipeline Design in Accordance w...
 
The Object Detection Capabilities of the Bathymetry Systems Utilised for the ...
The Object Detection Capabilities of the Bathymetry Systems Utilised for the ...The Object Detection Capabilities of the Bathymetry Systems Utilised for the ...
The Object Detection Capabilities of the Bathymetry Systems Utilised for the ...
 
Urban Flood Risk Mapping - Tiered Vulnerability Assessment in Risk Mitigation...
Urban Flood Risk Mapping - Tiered Vulnerability Assessment in Risk Mitigation...Urban Flood Risk Mapping - Tiered Vulnerability Assessment in Risk Mitigation...
Urban Flood Risk Mapping - Tiered Vulnerability Assessment in Risk Mitigation...
 
IRJET- Estimation of Intze Water Tank by User Graphical Interface
IRJET- Estimation of Intze Water Tank by User Graphical InterfaceIRJET- Estimation of Intze Water Tank by User Graphical Interface
IRJET- Estimation of Intze Water Tank by User Graphical Interface
 

H Fuyana_Research Presantation 2015

  • 1. Faculty of Engineering and the Built Environment Department of … / CITSI 1 Faculty of Engineering and the Built Environment Department of … / CITSI WATER INFRASTRUCTURE MANAGEMENT IN SOUTH AFRICA: THE CASE OF HARDING Author: Hlosokuhle Fuyana Supervisor: Prof G. Ochieng Co-supervisor: Dr J. Snyman
  • 2. Faculty of Engineering and the Built Environment Department of … / CITSI INTRODUCTION 2 • Globally, the water sector faces noteworthy challenges in maintaining reliable service provision, amidst varying challenges such as ageing infrastructure, growing demands, meeting increasing complexity and skills shortages. • As part of the on-going efforts to address these challenges, this research has been undertaken to facilitate the dissemination of technological innovations within the field of water infrastructure management. • These innovations entail the integration of a Geographic Information Systems (GIS) and a hydraulic modelling software with water Infrastructure Asset Management (IAM). • Using a GIS geodatabase, an Asset Register was developed; from which a failure risk scoring of each feature classes i.e. level of deterioration was undertaken. The risk scoring aided in the development of an Infrastructure Replacement Plan (IRP) with associated cost estimates. • The research was based on the Ugu District Municipality (UDM) town, Harding, Kwa-Zulu Natal (KZN).
  • 3. Faculty of Engineering and the Built Environment Department of … / CITSI 3 STUDY AREA
  • 4. Faculty of Engineering and the Built Environment Department of … / CITSI 4 PROBLEM STATEMENT • South Africa is facing grim challenges with regards to the dispersion of sustainable basic services such as water, its quality and management, as well its efficient use (van Zyl, Manus and Pensulo, 2008:3). • The trials faced in the country emanate from ineffective IAM and maintenance and very notably poor planning for new infrastructure or life cycle management (van Zyl, Manus and Pensulo, 2008:3).
  • 5. Faculty of Engineering and the Built Environment Department of … / CITSI 5 RESEARCH OBJECTIVES The purpose of the research is to develop an integrated GIS geodatabase, hydraulic model and IRP for the water IAM of Harding, with the following specific objectives; • Map the water infrastructure of Harding to aid in its IAM. • Develop an Asset Register for the town's water network, including a failure risk assessment for its assets (feature classes). • Develop an operational hydraulic model for the network to enable system modelling and analysis. • Formulate an IRP with estimated costs for infrastructure replacement.
  • 6. Faculty of Engineering and the Built Environment Department of … / CITSI 6 LITERATURE REVIEW To fulfil the objectives it was necessary to review research and case studies of water IAM not only in South Africa, but globally. The literature review covered the following sub-headings; • Infrastructure Asset Management (IAM). This section touched on the key concepts of water infrastructure management, national and international government policies and regulations and the needs for effective water IAM. • Literature on the IAM challenges such as Ageing infrastructure, Increasing complexity, Growing demands, among others; both globally and in South Africa was also reviewed. • GIS and hydraulic modelling developments in recent years and an evaluation of the most effective software package to use in aiding WSA in South Africa better manage their water infrastructure. • Water infrastructure replacement literature and research case studies were also reviewed. This assisted in developing the methodology for Asset register development, Risk management criteria formulation, Condition assessment strategies and the drafting of an IRP.
  • 7. Faculty of Engineering and the Built Environment Department of … / CITSI 7 RESEARCH METHODOLOGY
  • 8. Faculty of Engineering and the Built Environment Department of … / CITSI 8 PHASE 1: Data collection • Interviews of the various level UDM staff were conducted to assess the WSA’s needs and gather crucial information on the town’s water network. The interviews formed part of a Water Needs Assessment for the municipality town. • Mapping water infrastructure using GIS was conducted once the municipality’s needs were established. ArcGIS 10.1 was utilized for the mapping of the water infrastructure. This stage of the research entailed the following; – Collecting as-built drawings and reference data (Cadastral data and aerial photographs), – Data extraction and conversion, entailing the scanning hardcopy as-built drawings and then “georeferencing” them using aerial photographs, cadastral data and field GPS coordinates. Georeferencing enabled the as-built infrastructure data to be assigned its correct “real life” geographical locations within a GIS system.
  • 9. Faculty of Engineering and the Built Environment Department of … / CITSI 9 – Geodatabase design Prior to capturing the water infrastructure in the georeferenced as-built drawings, there was a need to determine which attributes or information of the water infrastructure features was to be captured. The feature class attributes contained in the geodatabase are summarised in the table below; Feature class Attribute data Description Data type Pipe Material Type of material from which the feature class is manufactured Text string Size Diameter of pipe section (mm) Integer Age Current age of feature class and year of installation Integer Pipe class Pipe diameter (mm) Integer Scheme name Water scheme or project under which feature class was installed Text string Condition Current condition of feature class as determined by a field verification Text string Element Type Naming Convention Pipe HAR-W-P- Junction HAR-W-J- Hydrant HAR-W-H- Tank HAR-W-T- Reservoir HAR-W-R-
  • 10. Faculty of Engineering and the Built Environment Department of … / CITSI 10 – Digitizing The last step in this exercise was the digitization of water infrastructure which is the process of converting the geographic features on a hardcopy map into digital format using a GIS software package. This was done by tracing features, for example water reticulation pipes, bulk mains and other water network features (reservoirs, isolation valves and hydrants) from the scanned and georeferenced CAD drawings. • Direct field observations One week was spent with the operations and maintenance plumbers, observing their maintenance practices, processes and data collection. The information gathered during this time included pipe burst frequency, replacement practices, and system information tracking i.e. logging the location and occurrence types of incidents.
  • 11. Faculty of Engineering and the Built Environment Department of … / CITSI 11 PHASE 2: Asset Register development • Formulation of an AR To better manage Harding’s water network, the extent, boundaries and quantity of its components had to be determined e.g. number of reservoirs and the total length of pipes etc. • Failure risk management A failure risk management score (criticality analysis) ranging from 1-5 was assigned to the water network features as agreed with UDM during the needs assessment. A score of ‘5’ represents a high feature class risk, whereas a ‘0’ represents no risk.
  • 12. Faculty of Engineering and the Built Environment Department of … / CITSI 12 PHASE 3: Hydraulic model development • Hydraulic model The following scenarios were run on in the hydraulic model to compare its current performance against design standards: – Scenario 1: Average water demand Single Period Analysis, – Scenario 2: Peak water demand Single Period Analysis, – Scenario 3: Pipe velocity demand + Fire flow Single Period Analysis, and – Scenario 4: Extended period simulation. • Condition Assessment The field verification or condition assessment was deemed appropriate to confirm the accuracy of the data captured from scanned and georeferenced CAD drawings. • Development of an IAMP An IAMP is typically based on existing infrastructure data and information, a main component of which should be derived from the Asset Register. In this study the IAMP was limited to the development of an IRP with associated costs, as an initial step in managing Harding’s water infrastructure.
  • 13. Faculty of Engineering and the Built Environment Department of … / CITSI 13 RESULTS Mapped water infrastructure model
  • 14. Faculty of Engineering and the Built Environment Department of … / CITSI 14 Pipe distribution by material Pipe distribution by size Pipe distribution by age
  • 15. Faculty of Engineering and the Built Environment Department of … / CITSI 15 Comparison of system pressures with normal standards 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800 850 900 950 PRESSUREKPA Min allowable pressure = 245.1 kPa Max allowable pressure = 343.1kPa
  • 16. Faculty of Engineering and the Built Environment Department of … / CITSI 16 Comparison of system velocities with normal standards -0.70 0.00 0.70 1.40 2.10 2.80 3.50 VELOCITYM/S Max allowable velocity = 2.5m/s Min allowable velocity = 0.7m/s
  • 17. Faculty of Engineering and the Built Environment Department of … / CITSI 17 • Development of an IAMP Existing pipe diameter and material Existing pipe age and length (m) Existing pipe to be replaced (m) Assumed replacement pipe diameter and material 300mm AC > 30yrs = 1600m 1600m 315 uPVC 250mm AC > 30yrs = 50m 50m 315 uPVC 200mm AC > 30yrs = 700m 700m 200 uPVC 150mm AC > 30yrs = 1800m 1800m 160 uPVC 100mm AC > 30yrs = 1200m 1200m 110 uPVC 40mm to 63mm CI > 30yrs = 1200m 1200m 63 HDPE 40mm to 63mm GI > 30yrs = 2000m 2000m 63 HDPE Proposed replacement pipes
  • 18. Faculty of Engineering and the Built Environment Department of … / CITSI 18 Proposed infrastructure replacement cost estimates Assumed replacement pipe diameter and material Unit Quantity Rate (m) Amount (R) 315mm uPVC m 1650 1,865.361 3,077,844.00 200mm uPVC m 700 564.031 394,821.00 160mm uPVC m 1800 361.601 650,880.00 110mm uPVC m 1200 73.731 208,476.00 63mm HDPE m 3200 70.90 226,880.00 Supply and Installation of pipe fittings Sum 1 200,000.002 200,000.00 Allow for transfer of house connections Sum 1 500,000.002 500,000.00 Isolation valves No. 57 1,108.28 63,171.96 Hydrants No. 52 5,000.002 260,000.00 Subtotal 5,582,072.96 Add: 14% Value Added Tax 781,490.21 Total 6,363,563.17 NB: 1 the pipe rate is based on a class 16 pressure pipe 2 these are estimated provisional sums and rates based on quotations received from suppliers. An exact figure will be arrived at after a detailed field verification has been undertaken
  • 19. Faculty of Engineering and the Built Environment Department of … / CITSI 19 CONCLUSIONS • Integration of computer technology such as GIS and hydraulic modelling with water IAM, as discussed in this study, is a proven valuable solution for WSA to meet their mandated responsibilities. This is especially true in South Africa’s municipalities, which like many other developing countries, face a number of challenges in effective water infrastructure management. • The use of technology allows for the improvement of a number of these challenges as outlined in the research. For example, automated infrastructure mapping allows for better maintenance and lifecycle management, which in turn allow WSA to plan adequately for their aging infrastructure. • Once WSA are capable of monitoring and planning for its infrastructure effectively, potential foreign investors can be more confident in investing in water infrastructure. This will aid in alleviating challenges related to inadequate funding and ease the burdens of poor revenue collection.
  • 20. Faculty of Engineering and the Built Environment Department of … / CITSI 20 QUESTIONS?
  • 21. Faculty of Engineering and the Built Environment Department of … / CITSI 21 Faculty of Engineering and the Built Environment Department of … / CITSI THANK YOU