4. Mar-03
4
* Steaming
• Generally, I dont recomment conditioning Cop or Cone
• İf Necassary, ( your customer requested )
only CONE/Yarn package conditioning but we should do as below
1- Yarn PackageTube should has hole own surface
2- 2 cycle condition ; 5 min. 55 o
C
20 min. 58 o
C
3- Waiting time of Package at storehause should be minimum
( conditioned package should be use asap )
Soft winding
Tube Type
8. Mar-03
8
1 – If Filament production year less than 3 month
you can finish complete otherwise dont finished it
2 - Humidity ( Keeping of flament at humidity room )
* Filament + Tube
13. Mar-03
13
• Traveller speed must
be 25 max.
• Traveller life cycle
must be max. 7 day
* Tarveller
- Traveller Type
- Traveller Speed
- Traveller Life cycle
20. Mar-03
20
It is necessary a right adjustment of the blower.
•Other wise Roving will go out of roving stopper
•Will be reason of Yarn fault
•Will not clean filament package
•Will not keep to clean sensor roller
NOT too many
NOT too narrow
• BLOWER Position
21. Mar-03
21
• Front Roller speed of Machine
• Actual measurment speed should be
same speed with AMSLER’s display
• Lycra Roller speed
• Checking SET values with measurements
FORMULA ;
Front roller speed of machine / Lycra Roller speed = Lycra Draft
22. Mar-03
22
• OPERATOR CONTROL POINTS ON MACHİNE
• Filament / Lycra
1 - Winding
2 – Move on the Rollers
3 – Lycra should be inside of slot of Rollers
4 - Lapping on Rollers
24. Mar-03
24
• One of the roller of
Blower should be metal
or bearing
•Metal roller should touch
to rail for good grounding
•Additional grounding will be
better inside AMSLER control
box
* Grounding