5-Continuous Process
Improvement
REFERENCE
Total Quality Management by Besterfield et al
Process
 Interaction of some combination of
people, materials, equipment, method to
produce an outcome.
INPUT
Materials
Money
Information
Data
OUTPUT
Product
Service
Information
OUTCOMES
PROCESS
People
Equipment
Environme
nt
Method
Materials
FEEDBACK
Improvement
 5 Ways to Improve
1. Reduce resource input
2. Reduce errors
3. Meet or exceed expectations of
customers
4. Make the process Safer
5. Make the process more satisfying for
the people doing it
Improvement Strategies:
Repair
 Anything Broken must be fixed
 Two levels of application
1. If a customer receives damaged
product: FIX IT (Temporary solution)
2. Eliminate the root cause of the
problem (long term solution)
Improvement Strategies:
Refine
 Continually improve the process that
is not broken
 Incremental improvements in
products, processes, services
 A strategy for both individuals & teams
 Doing things just a bit quicker, better,
easier or with less waste
 Benefit: Little resistance from
employees
 Drawback: Gradual change might not
be recognized or rewarded by
Improvement Strategies:
Renovate
 Major break through improvements
 Output may appear to be the same
 Innovation & technology
advancements are key factors in this
approach
 More expensive
Improvement Strategies:
Reinvent
 Most demanding strategy
 Thinking process: Current approach
will never satisfy customer
requirements
 A new output (product, service or
activity) might be developed
 Start with the imagination that
previous system does not exist
 Benefit: Potential competitive
advantage
Types of Problems
 Compliance (Specified by standards)
 Unstructured (Not specified by
standards)
 Efficiency (from operations viewpoint)
 Process Design
 Product Design
Problem Solving Method
1. Identify an Opportunity
2. Analyze the process
3. Develop optimal solution
4. Implement
5. Study the results
6. Standardize solution
7. Plan for future
1- Identify the Opportunity
 Pareto Analysis of external signals
(field failures, complaints, returns etc)
 Pareto Analysis of internal alarms
(scrap, rework, sorting and 100% test)
 Key Insiders (Managers, supervisors,
workers etc)
 Suggestion schemes
 Data on performance of competitors
 Comments of key people outside
organization (Customers, suppliers etc)
1- Identify the Opportunity Cont..
 Quality Counsel or work group
prioritize problems on three criteria
1. Is problem important & not
superficial?
2. Will problem solution contribute to
the attainment of goals?
3. Can problem be defined clearly using
objective measures
 Failures normally caused by poor
definition of problems
1- Identify the Opportunity:
Charter for Problem solving
Team
 Authority
 Objective & Scope (expected
outputs, specific areas to improve)
 Composition (team members and
sub-process owners)
 Direction & Control (Guide lines for
internal operations of team)
 General (methods to be used)
2- Analyze the current
Process
 Understand the current performance
 Define inputs, outputs, suppliers,
process flow & Determine the current
level of customer satisfaction
 Define target performance measures
w.r.t to customer requirements
 Define data required to manage the
2- Analyze the current Process:
Data Requirements
 Customer info (complaints, surveys
etc)
 Design info
(specifications, drawings, function, bill
s of materials, maintainability)
 Process info (routing, equipment, raw
material, component parts etc)
 Quality info (Pareto diagram, cause &
effect diagram, control charts etc)
 Supplier info ( Such as process
3- Develop optimal Solutions
 Search the best solution after
considering all available information
 Creativity plays an important role in
1. Creating new process
2. Combining different processes OR
3. Modifying the existing process
 Possible change areas: Bottle
necks, delays, equipment, timing, # of
inspections, rework, cycle
time, inventory levels etc
4- Implement Changes
 Implementation plan should describe
Why will it be done?
How will it be done?
When will it be done?
Who will do it?
Where will it be done?
 Also the critical info and details about
measurement of information
5- Study the results
 Track the effectiveness of the
improvement
 Important to Institutionalize meaningful
change
 Ensure ongoing measurement &
evaluation efforts to achieve continuous
improvement
 Project team should meet periodically
during this phase to evaluate the results
 Some phases to be repeated if team is
6- Standardize the solution
 Positive control specifies variables
that need to be kept under control
 What, who, how, where and when of
the process
 Standardizing the solution prevents
backsliding
7- Plan for the Future
 Improvement process continues
 TQM addresses the Quality of
management as well as Management
of Quality
 Every one in the organization is
involved in long term endeavor of
continuous improvement
KAIZEN
 Japanese philosophy that defines role
of management in continuous
improvement
 Process of continuous improvement in
small increments that make process
more efficient, effective, under control
and adaptable
 Accomplished with little or no expense
and without using sophisticated
techniques or expensive equipment.

More Related Content

Similar to continuousprocessimprovement4-120320054150-phpapp02.pdf

Ch02 total quality management
Ch02 total quality managementCh02 total quality management
Ch02 total quality managementSakib Anik
 
Iso Process Audit Training
Iso Process Audit TrainingIso Process Audit Training
Iso Process Audit Trainingsrmortensen
 
Week 4Quality ManagementOPERATIONS MANAGEMENT.docx
Week 4Quality ManagementOPERATIONS MANAGEMENT.docxWeek 4Quality ManagementOPERATIONS MANAGEMENT.docx
Week 4Quality ManagementOPERATIONS MANAGEMENT.docxmelbruce90096
 
TOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENTTOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENTReaz Uddin
 
Continous process improvement
Continous process improvementContinous process improvement
Continous process improvementSarfraz Ashraf
 
Quality and control Management
Quality and control Management Quality and control Management
Quality and control Management sharyarnawaz
 
8D Training Material From VDiversify.com | 8D Training Material PDF Free Down...
8D Training Material From VDiversify.com | 8D Training Material PDF Free Down...8D Training Material From VDiversify.com | 8D Training Material PDF Free Down...
8D Training Material From VDiversify.com | 8D Training Material PDF Free Down...VDiversify
 
Quality Course 1
Quality Course 1Quality Course 1
Quality Course 1Fin1
 
Self inspection
Self inspectionSelf inspection
Self inspectionBangaluru
 
QM-015-Introduction to Statistical Quality Control
QM-015-Introduction to Statistical Quality ControlQM-015-Introduction to Statistical Quality Control
QM-015-Introduction to Statistical Quality Controlhandbook
 
Use the Windshield, Not the Mirror Predictive Metrics that Drive Successful ...
 Use the Windshield, Not the Mirror Predictive Metrics that Drive Successful ... Use the Windshield, Not the Mirror Predictive Metrics that Drive Successful ...
Use the Windshield, Not the Mirror Predictive Metrics that Drive Successful ...Seapine Software
 
Metohod for Quality Imrovement Project
Metohod for Quality Imrovement ProjectMetohod for Quality Imrovement Project
Metohod for Quality Imrovement ProjectMaged Shaheen
 
2 anton muzhailo - formal test process improvement. how to invest to the te...
2   anton muzhailo - formal test process improvement. how to invest to the te...2   anton muzhailo - formal test process improvement. how to invest to the te...
2 anton muzhailo - formal test process improvement. how to invest to the te...Ievgenii Katsan
 

Similar to continuousprocessimprovement4-120320054150-phpapp02.pdf (20)

Ch02 total quality management
Ch02 total quality managementCh02 total quality management
Ch02 total quality management
 
Ch03 total quality management
Ch03 total quality managementCh03 total quality management
Ch03 total quality management
 
Iso Process Audit Training
Iso Process Audit TrainingIso Process Audit Training
Iso Process Audit Training
 
June2008 Hdi Quality Presentation
June2008   Hdi Quality PresentationJune2008   Hdi Quality Presentation
June2008 Hdi Quality Presentation
 
Week 4Quality ManagementOPERATIONS MANAGEMENT.docx
Week 4Quality ManagementOPERATIONS MANAGEMENT.docxWeek 4Quality ManagementOPERATIONS MANAGEMENT.docx
Week 4Quality ManagementOPERATIONS MANAGEMENT.docx
 
TOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENTTOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENT
 
Continous process improvement
Continous process improvementContinous process improvement
Continous process improvement
 
Quality and control Management
Quality and control Management Quality and control Management
Quality and control Management
 
8D Training Material From VDiversify.com | 8D Training Material PDF Free Down...
8D Training Material From VDiversify.com | 8D Training Material PDF Free Down...8D Training Material From VDiversify.com | 8D Training Material PDF Free Down...
8D Training Material From VDiversify.com | 8D Training Material PDF Free Down...
 
Quality Course 1
Quality Course 1Quality Course 1
Quality Course 1
 
Self inspection
Self inspectionSelf inspection
Self inspection
 
QM-015-Introduction to Statistical Quality Control
QM-015-Introduction to Statistical Quality ControlQM-015-Introduction to Statistical Quality Control
QM-015-Introduction to Statistical Quality Control
 
Use the Windshield, Not the Mirror Predictive Metrics that Drive Successful ...
 Use the Windshield, Not the Mirror Predictive Metrics that Drive Successful ... Use the Windshield, Not the Mirror Predictive Metrics that Drive Successful ...
Use the Windshield, Not the Mirror Predictive Metrics that Drive Successful ...
 
Metohod for Quality Imrovement Project
Metohod for Quality Imrovement ProjectMetohod for Quality Imrovement Project
Metohod for Quality Imrovement Project
 
Ch28
Ch28Ch28
Ch28
 
file000241.pdf
file000241.pdffile000241.pdf
file000241.pdf
 
2 anton muzhailo - formal test process improvement. how to invest to the te...
2   anton muzhailo - formal test process improvement. how to invest to the te...2   anton muzhailo - formal test process improvement. how to invest to the te...
2 anton muzhailo - formal test process improvement. how to invest to the te...
 
Controlling 2
Controlling 2Controlling 2
Controlling 2
 
Techniques & qc
Techniques & qcTechniques & qc
Techniques & qc
 
FOCUS PDCA
FOCUS PDCAFOCUS PDCA
FOCUS PDCA
 

Recently uploaded

VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...Call Girls in Nagpur High Profile
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 

Recently uploaded (20)

VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 

continuousprocessimprovement4-120320054150-phpapp02.pdf

  • 2. Process  Interaction of some combination of people, materials, equipment, method to produce an outcome. INPUT Materials Money Information Data OUTPUT Product Service Information OUTCOMES PROCESS People Equipment Environme nt Method Materials FEEDBACK
  • 3. Improvement  5 Ways to Improve 1. Reduce resource input 2. Reduce errors 3. Meet or exceed expectations of customers 4. Make the process Safer 5. Make the process more satisfying for the people doing it
  • 4. Improvement Strategies: Repair  Anything Broken must be fixed  Two levels of application 1. If a customer receives damaged product: FIX IT (Temporary solution) 2. Eliminate the root cause of the problem (long term solution)
  • 5. Improvement Strategies: Refine  Continually improve the process that is not broken  Incremental improvements in products, processes, services  A strategy for both individuals & teams  Doing things just a bit quicker, better, easier or with less waste  Benefit: Little resistance from employees  Drawback: Gradual change might not be recognized or rewarded by
  • 6. Improvement Strategies: Renovate  Major break through improvements  Output may appear to be the same  Innovation & technology advancements are key factors in this approach  More expensive
  • 7. Improvement Strategies: Reinvent  Most demanding strategy  Thinking process: Current approach will never satisfy customer requirements  A new output (product, service or activity) might be developed  Start with the imagination that previous system does not exist  Benefit: Potential competitive advantage
  • 8. Types of Problems  Compliance (Specified by standards)  Unstructured (Not specified by standards)  Efficiency (from operations viewpoint)  Process Design  Product Design
  • 9.
  • 10. Problem Solving Method 1. Identify an Opportunity 2. Analyze the process 3. Develop optimal solution 4. Implement 5. Study the results 6. Standardize solution 7. Plan for future
  • 11. 1- Identify the Opportunity  Pareto Analysis of external signals (field failures, complaints, returns etc)  Pareto Analysis of internal alarms (scrap, rework, sorting and 100% test)  Key Insiders (Managers, supervisors, workers etc)  Suggestion schemes  Data on performance of competitors  Comments of key people outside organization (Customers, suppliers etc)
  • 12. 1- Identify the Opportunity Cont..  Quality Counsel or work group prioritize problems on three criteria 1. Is problem important & not superficial? 2. Will problem solution contribute to the attainment of goals? 3. Can problem be defined clearly using objective measures  Failures normally caused by poor definition of problems
  • 13. 1- Identify the Opportunity: Charter for Problem solving Team  Authority  Objective & Scope (expected outputs, specific areas to improve)  Composition (team members and sub-process owners)  Direction & Control (Guide lines for internal operations of team)  General (methods to be used)
  • 14. 2- Analyze the current Process  Understand the current performance  Define inputs, outputs, suppliers, process flow & Determine the current level of customer satisfaction  Define target performance measures w.r.t to customer requirements  Define data required to manage the
  • 15. 2- Analyze the current Process: Data Requirements  Customer info (complaints, surveys etc)  Design info (specifications, drawings, function, bill s of materials, maintainability)  Process info (routing, equipment, raw material, component parts etc)  Quality info (Pareto diagram, cause & effect diagram, control charts etc)  Supplier info ( Such as process
  • 16. 3- Develop optimal Solutions  Search the best solution after considering all available information  Creativity plays an important role in 1. Creating new process 2. Combining different processes OR 3. Modifying the existing process  Possible change areas: Bottle necks, delays, equipment, timing, # of inspections, rework, cycle time, inventory levels etc
  • 17. 4- Implement Changes  Implementation plan should describe Why will it be done? How will it be done? When will it be done? Who will do it? Where will it be done?  Also the critical info and details about measurement of information
  • 18. 5- Study the results  Track the effectiveness of the improvement  Important to Institutionalize meaningful change  Ensure ongoing measurement & evaluation efforts to achieve continuous improvement  Project team should meet periodically during this phase to evaluate the results  Some phases to be repeated if team is
  • 19. 6- Standardize the solution  Positive control specifies variables that need to be kept under control  What, who, how, where and when of the process  Standardizing the solution prevents backsliding
  • 20. 7- Plan for the Future  Improvement process continues  TQM addresses the Quality of management as well as Management of Quality  Every one in the organization is involved in long term endeavor of continuous improvement
  • 21. KAIZEN  Japanese philosophy that defines role of management in continuous improvement  Process of continuous improvement in small increments that make process more efficient, effective, under control and adaptable  Accomplished with little or no expense and without using sophisticated techniques or expensive equipment.