3. OUT LINE
• Definition
• Decisions process
• Flow chart of planning
• Customer order sample
• Calculation
4. PRODUCTION PLANNING
Definition
Production planning is the process of forecasting required
resources like material, machines, manpower and time to meet
final product based on customer demand.
6. PRODUCTION PLANNING FLOW CHART
Marketing
Central
Planning
Warping Sizing Weaving
Customer
Planning
7. CUSTOMER ORDER SAMPLE (WEAVING)
Fabric construction
Material type
Design
Total length
Fabric width
Density
Selvedge type
Selvedge width
Sample
Construction =
40 ×40
100 ×90
× 116“
Length = 5000 m
Material type = 100% Cotton
Design = Plain
Selvedge type = Leno
Count of warp and weft
EPI
PPI
8. CALCULATION IN WEAVING PROCESS
Fabric Length = 5000 m
Fabric width = 116”
WARP YARN WEFT YARN