SlideShare a Scribd company logo
1 of 12
Think In Innovation
Guest Innovation
Innovation Project Challenge
Idea Contest for Innovative Projects
Sustainability – July 2014
INTRODUCTION
•New Innovative approach to sustainability
•To link to the Vision for change & Core Values of the Lopesan
Group
•Formulation of a Strategic Plan to further improve the corporate
responsibilities
•To enhance existing sustainability projects
•To place environmental protection as a key corporate responsibility
of the Lopesan brand
Choose the challenge your project is related to:
1. New Technologies
Ideas with the aim of introducing improvements in Technologies of the
Information (TICs).
2. Sustainability
Ideas with the aim of introducing improvements in quality, corporate
responsibility, environmental protection, sustainability, energy saving,
recycling, etc.
3. Products and services
Ideas with the aim of introducing improvements in product/service
creation for our customers.
4. Food and Beverage
Ideas with the aim of introducing improvements in processes of the
food and beverage area.
5. Accommodation
Ideas with the aim of introducing improvements in processes and
services regarding our customers, in the frame of the accommodation
area:
a) Entertainment
b) Housekeeping
c) Reception
d) Public Relations
Which is your proposal for the project value? Describe it briefly (5 lines maximum).
Sustainability – To improve sustainability and to ensure all corporate sustainability
responsibilities are met across the Lopesan Group
What is the difference between your solution and the options already existing on
the market or in our company? Describe it briefly (5 lines maximum).
My solution offers a variety of initiatives which can be implemented or phased in
over a period of time to ensure long term sustainability of each hotel and the
Lopesan brand as a whole
Project Team
How many persons are needed to implement the project?
All staff need to embrace the proposals
Which professional profiles are needed? Describe briefly (5 lines maximum).
Some specialist support / advice may be needed, but essentially the project is about
ownership / empowerment and embracing the sustainability facing all individuals
and businesses in the 21st
century
Is there an investment of capital needed? Describe the estimated amount and
explain briefly (10 lines maximum).
Some significant investment will be required, but this can be phased in over a
number of years and full capital appraisals can be formulated
What time horizon does the project have? (The time needed for project implementation).
Explain shortly (5 lines maximum).
Some elements will be a ‘quick win’ scenario e.g Food waste management systems, other
elements of the project may need to be implemented over several years
Which benefit/profit do you expect from the project? Ponder each variant from 1 to 5:
Increase in invoicing: Cost reduction:
Improvement of customer satisfaction: Improvement in staff satisfaction:
Less staff absenteeism: Better staff rotation:
Brand awareness: Yes Brand prestige: Yes
Standardization of products, services, processes:
Security and hygiene at work: Yes
What kind of innovation do you want to introduce? (Tick one or more options which you
think correspond to the innovation.)
Product: Yes Service: Process: Yes
Impact of the innovation:
Can the resulting innovation be considered as disruptive or as incremental?*
All sustainability innovations are incremental
* It is considered as disruptive if it changes completely the current product, service or process which is going to
be improved. It is considered as incremental if it results in an evolution of the current product, service or
process which is going to be improved.
Reply and explain (10 lines maximum):
Please see detail of the proposals in the following slides
Rationale / Process
•Understand the need for environmental sustainability
•Understand the importance of the local population and key
stakeholders / suppliers
•Recognise the importance of continued sustainability
•Align the business to fulfill sustainability responsibilities
•Place sustainability at the heart of the organisation
Proposals
•Bio-diversity – Development of wildlife gardens and tree
planting projects at all Lopesan Hotels and surrounding
communities
•Food waste systems at all Lopesan hotels to eliminate
organic food waste to be returned into the eco-system as
water
Proposals Continued
• Engaging with the local community e.g. use of the hotel
facilities, training e.g. cooking and housekeeping which
could lead to future employment
• Solar Panels to help reduce Co2 emissions
• Heat recovery systems in cooler climates to heat hotels
and provide air conditioning
• Water consumption – reduce flow rates in rooms
• Water consumption – improve recycling in swimming
pools and spas
Anticipated Outcomes
•Long term reduction in overall costs
•More effective and efficient use of resources
•Fulfilment of corporate sustainability responsibilities
•The Customer is happy in the knowledge that they are
staying at a hotel which takes its sustainability
responsibilities seriously
•More effective control of waste management and water
efficiency to drive towards a ‘carbon neutral organisation’
•Enhanced reputation with stakeholders and the sector as a
whole
Measurable Results
Which means and parameters are you proposing to measure
the project results?
Benefits to the Lopesan Group:
• Competitive advantage over other hotel operators
• Could provide future marketing opportunities to enhance
the image of the Lopesan group
• All corporate sustainability responsibilities fulfilled
• Strengthens the brand image and marketing focus and
improves local and international reputation
• Provides a more sustainable experience for the
• customer

More Related Content

What's hot

Markku Koivisto: Technology overview. Suominen CMD 2017.
Markku Koivisto: Technology overview. Suominen CMD 2017.Markku Koivisto: Technology overview. Suominen CMD 2017.
Markku Koivisto: Technology overview. Suominen CMD 2017.Suominen Corporation
 
Ernesto Levy: Convenience business area overview. Suominen CMD 2017
Ernesto Levy: Convenience business area overview. Suominen CMD 2017Ernesto Levy: Convenience business area overview. Suominen CMD 2017
Ernesto Levy: Convenience business area overview. Suominen CMD 2017Suominen Corporation
 
UNDP: How Procurers Can Change the Global Health Sector
UNDP: How Procurers Can Change the Global Health Sector UNDP: How Procurers Can Change the Global Health Sector
UNDP: How Procurers Can Change the Global Health Sector UN SPHS
 
Just in Time, Lean & Agile
Just in Time, Lean & AgileJust in Time, Lean & Agile
Just in Time, Lean & AgileDaniel Renaldo
 
UNFPA's Approach to Green Procurement
UNFPA's Approach to Green ProcurementUNFPA's Approach to Green Procurement
UNFPA's Approach to Green ProcurementUN SPHS
 
Innovation and Learning of Promoting HWTS_Dr Alka,National Workshop on HWTS, ...
Innovation and Learning of Promoting HWTS_Dr Alka,National Workshop on HWTS, ...Innovation and Learning of Promoting HWTS_Dr Alka,National Workshop on HWTS, ...
Innovation and Learning of Promoting HWTS_Dr Alka,National Workshop on HWTS, ...India Water Portal
 
Sustainability scorecard training module 1
Sustainability scorecard training module 1Sustainability scorecard training module 1
Sustainability scorecard training module 1scmgreen
 
Tapio Engström: Financial implications of strategy. Suominen CMD 2017.
Tapio Engström: Financial implications of strategy. Suominen CMD 2017.Tapio Engström: Financial implications of strategy. Suominen CMD 2017.
Tapio Engström: Financial implications of strategy. Suominen CMD 2017.Suominen Corporation
 
Green & Clean - OAP Presentation
Green & Clean - OAP PresentationGreen & Clean - OAP Presentation
Green & Clean - OAP PresentationGreenClean
 
Paul Lilienthal - Pictura Graphics Sustainability
Paul Lilienthal - Pictura Graphics SustainabilityPaul Lilienthal - Pictura Graphics Sustainability
Paul Lilienthal - Pictura Graphics SustainabilityEnvironmental Initiative
 
Green supply chain management
Green supply chain management Green supply chain management
Green supply chain management POOJA GOYAL
 
Andrea Frenzel, BASF at SB'14 London
Andrea Frenzel, BASF at SB'14 LondonAndrea Frenzel, BASF at SB'14 London
Andrea Frenzel, BASF at SB'14 LondonSustainable Brands
 
Lean and Agile Manufacturing as productivity enhancement techniques - a compa...
Lean and Agile Manufacturing as productivity enhancement techniques - a compa...Lean and Agile Manufacturing as productivity enhancement techniques - a compa...
Lean and Agile Manufacturing as productivity enhancement techniques - a compa...IOSR Journals
 
What will drive future business performance
What will drive future business performanceWhat will drive future business performance
What will drive future business performanceJaspal Singh
 
Why Choose Andersen?
Why Choose Andersen? Why Choose Andersen?
Why Choose Andersen? guest161151
 

What's hot (19)

Markku Koivisto: Technology overview. Suominen CMD 2017.
Markku Koivisto: Technology overview. Suominen CMD 2017.Markku Koivisto: Technology overview. Suominen CMD 2017.
Markku Koivisto: Technology overview. Suominen CMD 2017.
 
Ernesto Levy: Convenience business area overview. Suominen CMD 2017
Ernesto Levy: Convenience business area overview. Suominen CMD 2017Ernesto Levy: Convenience business area overview. Suominen CMD 2017
Ernesto Levy: Convenience business area overview. Suominen CMD 2017
 
UNDP: How Procurers Can Change the Global Health Sector
UNDP: How Procurers Can Change the Global Health Sector UNDP: How Procurers Can Change the Global Health Sector
UNDP: How Procurers Can Change the Global Health Sector
 
Just in Time, Lean & Agile
Just in Time, Lean & AgileJust in Time, Lean & Agile
Just in Time, Lean & Agile
 
UNFPA's Approach to Green Procurement
UNFPA's Approach to Green ProcurementUNFPA's Approach to Green Procurement
UNFPA's Approach to Green Procurement
 
Innovation and Learning of Promoting HWTS_Dr Alka,National Workshop on HWTS, ...
Innovation and Learning of Promoting HWTS_Dr Alka,National Workshop on HWTS, ...Innovation and Learning of Promoting HWTS_Dr Alka,National Workshop on HWTS, ...
Innovation and Learning of Promoting HWTS_Dr Alka,National Workshop on HWTS, ...
 
Sustainability scorecard training module 1
Sustainability scorecard training module 1Sustainability scorecard training module 1
Sustainability scorecard training module 1
 
Tapio Engström: Financial implications of strategy. Suominen CMD 2017.
Tapio Engström: Financial implications of strategy. Suominen CMD 2017.Tapio Engström: Financial implications of strategy. Suominen CMD 2017.
Tapio Engström: Financial implications of strategy. Suominen CMD 2017.
 
GREEN BUILDING ONE STOP SERVICE
GREEN BUILDING  ONE STOP SERVICEGREEN BUILDING  ONE STOP SERVICE
GREEN BUILDING ONE STOP SERVICE
 
Green & Clean - OAP Presentation
Green & Clean - OAP PresentationGreen & Clean - OAP Presentation
Green & Clean - OAP Presentation
 
Paul Lilienthal - Pictura Graphics Sustainability
Paul Lilienthal - Pictura Graphics SustainabilityPaul Lilienthal - Pictura Graphics Sustainability
Paul Lilienthal - Pictura Graphics Sustainability
 
Green supply chain management
Green supply chain management Green supply chain management
Green supply chain management
 
Andrea Frenzel, BASF at SB'14 London
Andrea Frenzel, BASF at SB'14 LondonAndrea Frenzel, BASF at SB'14 London
Andrea Frenzel, BASF at SB'14 London
 
Lean and Agile Manufacturing as productivity enhancement techniques - a compa...
Lean and Agile Manufacturing as productivity enhancement techniques - a compa...Lean and Agile Manufacturing as productivity enhancement techniques - a compa...
Lean and Agile Manufacturing as productivity enhancement techniques - a compa...
 
Company Profile 3rd design
Company Profile 3rd designCompany Profile 3rd design
Company Profile 3rd design
 
What will drive future business performance
What will drive future business performanceWhat will drive future business performance
What will drive future business performance
 
Why Choose Andersen?
Why Choose Andersen? Why Choose Andersen?
Why Choose Andersen?
 
Sustainability through Biopharma Recycling
Sustainability through Biopharma RecyclingSustainability through Biopharma Recycling
Sustainability through Biopharma Recycling
 
Envirotech Company Profile
Envirotech Company ProfileEnvirotech Company Profile
Envirotech Company Profile
 

Viewers also liked

OpenHCI'14-Day2-鄭鎧尹-UX Culture in a Start-up Company
OpenHCI'14-Day2-鄭鎧尹-UX Culture in a Start-up Company OpenHCI'14-Day2-鄭鎧尹-UX Culture in a Start-up Company
OpenHCI'14-Day2-鄭鎧尹-UX Culture in a Start-up Company OpenHCI
 
少女のメガホン-マニュアル①キャンペーン作成
少女のメガホン-マニュアル①キャンペーン作成少女のメガホン-マニュアル①キャンペーン作成
少女のメガホン-マニュアル①キャンペーン作成chucklellc
 
Siyer-i Nebi 19. Sayı
Siyer-i Nebi 19. SayıSiyer-i Nebi 19. Sayı
Siyer-i Nebi 19. Sayısiyerinebi
 
Kindness, Pay it Forward
Kindness, Pay it ForwardKindness, Pay it Forward
Kindness, Pay it ForwardRobin Kemp
 
San Petersburgo
San  PetersburgoSan  Petersburgo
San Petersburgoarrute10
 
GRIN-Global Status, CIP 2016 February
GRIN-Global Status, CIP 2016 FebruaryGRIN-Global Status, CIP 2016 February
GRIN-Global Status, CIP 2016 FebruaryEdwin Rojas
 
Bazteach – minimal pairs
Bazteach – minimal pairsBazteach – minimal pairs
Bazteach – minimal pairsBazteach
 
SIVA project_Recommendations on the mapping and sharing of broadband physical...
SIVA project_Recommendations on the mapping and sharing of broadband physical...SIVA project_Recommendations on the mapping and sharing of broadband physical...
SIVA project_Recommendations on the mapping and sharing of broadband physical...Sivaul
 
Irkustk-Lago bai kal
Irkustk-Lago bai kalIrkustk-Lago bai kal
Irkustk-Lago bai kalarrute10
 
2015 drill-head vs piercing-plier
2015 drill-head vs piercing-plier2015 drill-head vs piercing-plier
2015 drill-head vs piercing-plierGerrie Leemput
 
Prezentacja esplorado z_trescia
Prezentacja esplorado z_tresciaPrezentacja esplorado z_trescia
Prezentacja esplorado z_tresciaEsplorado
 
GRIN-Global Status - I, CRI 2016 February
GRIN-Global Status - I, CRI 2016 FebruaryGRIN-Global Status - I, CRI 2016 February
GRIN-Global Status - I, CRI 2016 FebruaryEdwin Rojas
 

Viewers also liked (15)

Festa sammartini
Festa sammartiniFesta sammartini
Festa sammartini
 
OpenHCI'14-Day2-鄭鎧尹-UX Culture in a Start-up Company
OpenHCI'14-Day2-鄭鎧尹-UX Culture in a Start-up Company OpenHCI'14-Day2-鄭鎧尹-UX Culture in a Start-up Company
OpenHCI'14-Day2-鄭鎧尹-UX Culture in a Start-up Company
 
少女のメガホン-マニュアル①キャンペーン作成
少女のメガホン-マニュアル①キャンペーン作成少女のメガホン-マニュアル①キャンペーン作成
少女のメガホン-マニュアル①キャンペーン作成
 
Siyer-i Nebi 19. Sayı
Siyer-i Nebi 19. SayıSiyer-i Nebi 19. Sayı
Siyer-i Nebi 19. Sayı
 
Kindness, Pay it Forward
Kindness, Pay it ForwardKindness, Pay it Forward
Kindness, Pay it Forward
 
San Petersburgo
San  PetersburgoSan  Petersburgo
San Petersburgo
 
GRIN-Global Status, CIP 2016 February
GRIN-Global Status, CIP 2016 FebruaryGRIN-Global Status, CIP 2016 February
GRIN-Global Status, CIP 2016 February
 
Moscu
MoscuMoscu
Moscu
 
Bazteach – minimal pairs
Bazteach – minimal pairsBazteach – minimal pairs
Bazteach – minimal pairs
 
SIVA project_Recommendations on the mapping and sharing of broadband physical...
SIVA project_Recommendations on the mapping and sharing of broadband physical...SIVA project_Recommendations on the mapping and sharing of broadband physical...
SIVA project_Recommendations on the mapping and sharing of broadband physical...
 
Irkustk-Lago bai kal
Irkustk-Lago bai kalIrkustk-Lago bai kal
Irkustk-Lago bai kal
 
2015 drill-head vs piercing-plier
2015 drill-head vs piercing-plier2015 drill-head vs piercing-plier
2015 drill-head vs piercing-plier
 
Prezentacja esplorado z_trescia
Prezentacja esplorado z_tresciaPrezentacja esplorado z_trescia
Prezentacja esplorado z_trescia
 
GRIN-Global Status - I, CRI 2016 February
GRIN-Global Status - I, CRI 2016 FebruaryGRIN-Global Status - I, CRI 2016 February
GRIN-Global Status - I, CRI 2016 February
 
Quadrilatrals types -sum180
Quadrilatrals types -sum180Quadrilatrals types -sum180
Quadrilatrals types -sum180
 

Similar to Sustainability Project for Lopesan Group Hotels

Cp gp day04 session 14 - concept and assessment methodology of gp and compari...
Cp gp day04 session 14 - concept and assessment methodology of gp and compari...Cp gp day04 session 14 - concept and assessment methodology of gp and compari...
Cp gp day04 session 14 - concept and assessment methodology of gp and compari...zubeditufail
 
A Better Retail Climate launch 2008
A Better Retail Climate launch 2008A Better Retail Climate launch 2008
A Better Retail Climate launch 2008Jane Bevis
 
Speedy Supplier Conference Slides
Speedy Supplier Conference SlidesSpeedy Supplier Conference Slides
Speedy Supplier Conference Slidesspeedyservices
 
Product and service design
Product and service designProduct and service design
Product and service designsafaataamsah
 
Chosun Ilbo CSR Conference Seoul April 10 2013 Presentation
Chosun Ilbo CSR Conference Seoul April 10 2013 PresentationChosun Ilbo CSR Conference Seoul April 10 2013 Presentation
Chosun Ilbo CSR Conference Seoul April 10 2013 PresentationInnovation Forum Publishing
 
1 D3655 Participate in Environmentally Sustainable Wo.docx
1 D3655 Participate in Environmentally Sustainable Wo.docx1 D3655 Participate in Environmentally Sustainable Wo.docx
1 D3655 Participate in Environmentally Sustainable Wo.docxmercysuttle
 
New technologies Advices
New technologies AdvicesNew technologies Advices
New technologies Adviceslopesanthink
 
Sustainability Business Proposal Template PowerPoint Presentation Slides
Sustainability Business Proposal Template PowerPoint Presentation SlidesSustainability Business Proposal Template PowerPoint Presentation Slides
Sustainability Business Proposal Template PowerPoint Presentation SlidesSlideTeam
 
Environmental design i
Environmental  design  iEnvironmental  design  i
Environmental design isuprajagis
 
CSR trends, strategy, ethics and the business case
CSR trends, strategy, ethics and the business case CSR trends, strategy, ethics and the business case
CSR trends, strategy, ethics and the business case Innovation Forum Publishing
 
Charlie Henderson insetting guide
Charlie Henderson insetting guideCharlie Henderson insetting guide
Charlie Henderson insetting guidePlanVivo1
 
Localisation and the design and production of sustainable products
Localisation and the design and production of sustainable productsLocalisation and the design and production of sustainable products
Localisation and the design and production of sustainable productsmerve çopur
 
Brazil Procurement
Brazil ProcurementBrazil Procurement
Brazil ProcurementMervyn Jones
 
Itnesh -Low carbon supply chain management
Itnesh -Low carbon supply chain managementItnesh -Low carbon supply chain management
Itnesh -Low carbon supply chain managementItnesh Kumar
 
Sustainable circular economies
Sustainable circular economiesSustainable circular economies
Sustainable circular economiesEric A. Magada
 
Operation green
Operation greenOperation green
Operation greenDaime628
 
DRIVE | organising for the product that last
DRIVE | organising for the product that lastDRIVE | organising for the product that last
DRIVE | organising for the product that lastCLICKNL
 
Sustainability Metrics for Small-Mid size Enterprises
Sustainability Metrics for Small-Mid size EnterprisesSustainability Metrics for Small-Mid size Enterprises
Sustainability Metrics for Small-Mid size EnterprisesChris Yalonis
 

Similar to Sustainability Project for Lopesan Group Hotels (20)

Cp gp day04 session 14 - concept and assessment methodology of gp and compari...
Cp gp day04 session 14 - concept and assessment methodology of gp and compari...Cp gp day04 session 14 - concept and assessment methodology of gp and compari...
Cp gp day04 session 14 - concept and assessment methodology of gp and compari...
 
A Better Retail Climate launch 2008
A Better Retail Climate launch 2008A Better Retail Climate launch 2008
A Better Retail Climate launch 2008
 
Speedy Supplier Conference Slides
Speedy Supplier Conference SlidesSpeedy Supplier Conference Slides
Speedy Supplier Conference Slides
 
Product and service design
Product and service designProduct and service design
Product and service design
 
Chosun Ilbo CSR Conference Seoul April 10 2013 Presentation
Chosun Ilbo CSR Conference Seoul April 10 2013 PresentationChosun Ilbo CSR Conference Seoul April 10 2013 Presentation
Chosun Ilbo CSR Conference Seoul April 10 2013 Presentation
 
1 D3655 Participate in Environmentally Sustainable Wo.docx
1 D3655 Participate in Environmentally Sustainable Wo.docx1 D3655 Participate in Environmentally Sustainable Wo.docx
1 D3655 Participate in Environmentally Sustainable Wo.docx
 
New technologies Advices
New technologies AdvicesNew technologies Advices
New technologies Advices
 
Sustainability Business Proposal Template PowerPoint Presentation Slides
Sustainability Business Proposal Template PowerPoint Presentation SlidesSustainability Business Proposal Template PowerPoint Presentation Slides
Sustainability Business Proposal Template PowerPoint Presentation Slides
 
Environmental design i
Environmental  design  iEnvironmental  design  i
Environmental design i
 
H.Lumber.Group.Work
H.Lumber.Group.WorkH.Lumber.Group.Work
H.Lumber.Group.Work
 
CSR trends, strategy, ethics and the business case
CSR trends, strategy, ethics and the business case CSR trends, strategy, ethics and the business case
CSR trends, strategy, ethics and the business case
 
Charlie Henderson insetting guide
Charlie Henderson insetting guideCharlie Henderson insetting guide
Charlie Henderson insetting guide
 
Localisation and the design and production of sustainable products
Localisation and the design and production of sustainable productsLocalisation and the design and production of sustainable products
Localisation and the design and production of sustainable products
 
cleanerproduction.pdf
cleanerproduction.pdfcleanerproduction.pdf
cleanerproduction.pdf
 
Brazil Procurement
Brazil ProcurementBrazil Procurement
Brazil Procurement
 
Itnesh -Low carbon supply chain management
Itnesh -Low carbon supply chain managementItnesh -Low carbon supply chain management
Itnesh -Low carbon supply chain management
 
Sustainable circular economies
Sustainable circular economiesSustainable circular economies
Sustainable circular economies
 
Operation green
Operation greenOperation green
Operation green
 
DRIVE | organising for the product that last
DRIVE | organising for the product that lastDRIVE | organising for the product that last
DRIVE | organising for the product that last
 
Sustainability Metrics for Small-Mid size Enterprises
Sustainability Metrics for Small-Mid size EnterprisesSustainability Metrics for Small-Mid size Enterprises
Sustainability Metrics for Small-Mid size Enterprises
 

Recently uploaded

WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsMiki Katsuragi
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
Bluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfBluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfngoud9212
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024The Digital Insurer
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 

Recently uploaded (20)

WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
Bluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfBluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdf
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food Manufacturing
 
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptxVulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 

Sustainability Project for Lopesan Group Hotels

  • 1. Think In Innovation Guest Innovation Innovation Project Challenge Idea Contest for Innovative Projects
  • 2. Sustainability – July 2014 INTRODUCTION •New Innovative approach to sustainability •To link to the Vision for change & Core Values of the Lopesan Group •Formulation of a Strategic Plan to further improve the corporate responsibilities •To enhance existing sustainability projects •To place environmental protection as a key corporate responsibility of the Lopesan brand
  • 3. Choose the challenge your project is related to: 1. New Technologies Ideas with the aim of introducing improvements in Technologies of the Information (TICs). 2. Sustainability Ideas with the aim of introducing improvements in quality, corporate responsibility, environmental protection, sustainability, energy saving, recycling, etc. 3. Products and services Ideas with the aim of introducing improvements in product/service creation for our customers. 4. Food and Beverage Ideas with the aim of introducing improvements in processes of the food and beverage area. 5. Accommodation Ideas with the aim of introducing improvements in processes and services regarding our customers, in the frame of the accommodation area: a) Entertainment b) Housekeeping c) Reception d) Public Relations
  • 4. Which is your proposal for the project value? Describe it briefly (5 lines maximum). Sustainability – To improve sustainability and to ensure all corporate sustainability responsibilities are met across the Lopesan Group What is the difference between your solution and the options already existing on the market or in our company? Describe it briefly (5 lines maximum). My solution offers a variety of initiatives which can be implemented or phased in over a period of time to ensure long term sustainability of each hotel and the Lopesan brand as a whole
  • 5. Project Team How many persons are needed to implement the project? All staff need to embrace the proposals Which professional profiles are needed? Describe briefly (5 lines maximum). Some specialist support / advice may be needed, but essentially the project is about ownership / empowerment and embracing the sustainability facing all individuals and businesses in the 21st century Is there an investment of capital needed? Describe the estimated amount and explain briefly (10 lines maximum). Some significant investment will be required, but this can be phased in over a number of years and full capital appraisals can be formulated
  • 6. What time horizon does the project have? (The time needed for project implementation). Explain shortly (5 lines maximum). Some elements will be a ‘quick win’ scenario e.g Food waste management systems, other elements of the project may need to be implemented over several years Which benefit/profit do you expect from the project? Ponder each variant from 1 to 5: Increase in invoicing: Cost reduction: Improvement of customer satisfaction: Improvement in staff satisfaction: Less staff absenteeism: Better staff rotation: Brand awareness: Yes Brand prestige: Yes Standardization of products, services, processes: Security and hygiene at work: Yes What kind of innovation do you want to introduce? (Tick one or more options which you think correspond to the innovation.) Product: Yes Service: Process: Yes
  • 7. Impact of the innovation: Can the resulting innovation be considered as disruptive or as incremental?* All sustainability innovations are incremental * It is considered as disruptive if it changes completely the current product, service or process which is going to be improved. It is considered as incremental if it results in an evolution of the current product, service or process which is going to be improved. Reply and explain (10 lines maximum): Please see detail of the proposals in the following slides
  • 8. Rationale / Process •Understand the need for environmental sustainability •Understand the importance of the local population and key stakeholders / suppliers •Recognise the importance of continued sustainability •Align the business to fulfill sustainability responsibilities •Place sustainability at the heart of the organisation
  • 9. Proposals •Bio-diversity – Development of wildlife gardens and tree planting projects at all Lopesan Hotels and surrounding communities •Food waste systems at all Lopesan hotels to eliminate organic food waste to be returned into the eco-system as water
  • 10. Proposals Continued • Engaging with the local community e.g. use of the hotel facilities, training e.g. cooking and housekeeping which could lead to future employment • Solar Panels to help reduce Co2 emissions • Heat recovery systems in cooler climates to heat hotels and provide air conditioning • Water consumption – reduce flow rates in rooms • Water consumption – improve recycling in swimming pools and spas
  • 11. Anticipated Outcomes •Long term reduction in overall costs •More effective and efficient use of resources •Fulfilment of corporate sustainability responsibilities •The Customer is happy in the knowledge that they are staying at a hotel which takes its sustainability responsibilities seriously •More effective control of waste management and water efficiency to drive towards a ‘carbon neutral organisation’ •Enhanced reputation with stakeholders and the sector as a whole
  • 12. Measurable Results Which means and parameters are you proposing to measure the project results? Benefits to the Lopesan Group: • Competitive advantage over other hotel operators • Could provide future marketing opportunities to enhance the image of the Lopesan group • All corporate sustainability responsibilities fulfilled • Strengthens the brand image and marketing focus and improves local and international reputation • Provides a more sustainable experience for the • customer