SlideShare a Scribd company logo
1 of 4
CURRICULAM VITAE
LEELACHANDRA JAGAN MARATHE,
Plot No 36, Yogeshwar krupa, Shreeji Park,
Dupkeshwar Mandir Road, Nandurbar,
Dist – Nandurbar. – 425 412
State – Maharashtra, INDIA
Mobile : +91 81 3073 9494
Email : leelachandramarathe@yahoo.co.in
ljmarathe@gmail.com
Leelachandra.marathe@leighton.co.in
PERSONAL DETAILS:
Date of birth : 20-06-1979
Gender : Male
Religion : Hindu
Nationality : Indian
Marital Status : Married
Passport Status : J 5610659 (Expiry Date: 06-02-2021)
Language Known : Hindi, English & Marathi.
Present Address : Leighton India Contractors Pvt. Ltd.,
3/F, Tower-A, Ocus Technopolis, Golf Course Road,
Sector 54, Gurgaon, 122002 Haryana, India
EDUCATIONAL DETAILS:
• Complete Secondary Education (SSC) from D.R High School – Nandurbar
Maharashtra (Year 1994 -1995)
• Complete Carpentry Trade from Govt. Industrial Training Institute (ITI)
Nandurbar, Maharashtra (Year 1995 -1996)
• Diploma in civil, Sunrise university Alwar, Rajasthan (Year 2012 to 2014)
• TAE40110 Certificate IV in Training for Trainer & assessor, Kagan Institute, Australia
(Year 2014)
• Construction Skill Development Council of India, Certified Trainer & Assessor for
Shuttering & Scaffolding Level- I (November 2015)
OTHER TRAINING : MS Office (CCC) + Auto-cad (2D & 3D)
EXPERIENCE SUMMARY:
• More than 18+ Years of Experience in All type of Civil work, Auto CAD, form work
Design, Steel reinforcement and also in Civil and Structural Formwork.
WORK EXPERIENCE:
Leighton India Contractors Pvt. Ltd
Year : From May 2013 to Till Date
Designation : Manager- Civil
Work Nature : Training center In charge
Area manager for A4 area, all civil activity
Project : DLF the Camellias Building Project
Gurgaon, Haryana.
Year : From 20th
April 2012 to May 2013
Designation : Assistant Manager- Civil
Work Nature : Supervising the work for Plate Mill & RMHS Area for Peri formwork
Project : Jindal Steel & Power Limited
6 MTPA Steel Plant Project,
Chhendipada road,
SH, 63, AT/P.O:- Jindal Nagar,
Angual, Orissa, India
Year : From 13th
Jan 2011 to 20th
April 2012
Designation : Supervisor civil
Work Nature : As advised by the line Managers which is ultimately helpful to
Prepare proposals for upcoming projects.
List of projects – Bid Proposal Submitted
Project : 380 – 425 MW Pioneer Gas Power Limited. (Submitted)
Project : 240 MW Kutehr Hydro Power Limited. (Submitted)
Project : 810 MW Ratle Hydroelectric Powers, Jammu & Kashmir (Submitted)
Project : 125 MW Areva Solar Powers in Rajasthan (Submitted)
Belhasa Six Construct LLC – Dubai, UAE
Year : From 20th
October 2008 to 16th
October 2009
Designation : Section Leader
Work Nature : 1. Executing the entire Project shuttering, detailing works as per
Peri formwork with the BS specification (Column, Beam, Slab,
Precast Segment, Pier & Retaining wall etc.)
2. Handling the Precast yard & supervision of Foreman’s &
Gang leaders
Project : Palm water sewage treatment plant, Dubai, UAE
Project : AL Safooh Transit System Project, Dubai, UAE
Leighton International Pvt. Ltd. - INDIA
Year : From 2nd
Jan 2007 to 10th
October 2008
Designation : Senior Shuttering Foreman
Work Nature : 1. executing the shuttering works (Column, Beam, Slab,
Core wall, Retaining wall and Stair case etc.)
2. Handling the Carpentry work shop
Project : Residence Antilia, Mumbai – From Jan 2007 to May 2007
Project : Palm Springs, Gurgaon, India – From May 2007 to Nov 2007
Project : Mumbai Domestic & International Airport Redevelopment Project-
From Nov 2007 to October 2008
Larson & Toubro Limited (ECC) Division – INDIA
Year : From 2nd
Jan 2006 to Jan 2007
Designation : Formwork Demonstrator
Work Nature : Demonstrating the Doka Formwork and Mivan Systems
Project : CSTI (Construction Skill Training Institute) Mumbai, India
Larson & Toubro Limited (ECC) Division – Jordan
Year : From 08th
Feb 2004 to 22 Aug 2005
Designation : Formwork Charge hand
Work Nature : Executing Pylon Shuttering work
Project : Wadi Abdoun Cable Stay Bridge, Amman, Jordon
Larson & Toubro Limited (ECC) Division – INDIA
Year : From 29th
Dec 2000 to 5th
Jan 2004
Designation : Formwork Charge hand
Work Nature : Handling the Carpentry work shop, precast yard & Doka Yard
Project : Surat – Manohar Toll way – Talasari, Maharashtra.
Year : From 6th
Oct 1998 to 23rd
Dec 2000
Designation : Formwork Charge hand
Work Nature : Handling the Carpentry work shop and Doka Yard
Project : Mumbai – Pune Express way - Pune
Year : From 1st
May 1998 to 22nd
Sep 1998
Designation : Formwork Charge hand
Work Nature : Handling the Formwork Shuttering
Project : Reliance Salgoankar Power Project – Goa.
Year : From 20th
Aug 1997 to 19th
Nov 1997
Complete Training for Doka Formwork Technician (CSTI) Panvel,
Mumbai.
ACHIEVEMENTS: -
 Recognized and Rewarded for carrying out new implementation, methodology in
Shuttering design & consistently achieved concrete target in time without major/minor
NCR in Angul project for Jindal Steel and Power at Angul, Orissa.
 Received “GOLD STAR QUALITY AWARD” from ‘Leighton International Pvt. Ltd,
India’ for maintaining the daily checklist, Concrete delivery report & Work conformance
report as per the item works for Mumbai International airport site (2C Terminal)
Yours Sincerely,
(Leelachandra J. Marathe) Date :
Place :

More Related Content

What's hot

What's hot (7)

Resume (21-02-17)
Resume (21-02-17)Resume (21-02-17)
Resume (21-02-17)
 
resume hilmi 2015
resume hilmi 2015resume hilmi 2015
resume hilmi 2015
 
NP Geotechnical Engineer
NP Geotechnical EngineerNP Geotechnical Engineer
NP Geotechnical Engineer
 
cv ibrahim (edited)
cv ibrahim (edited)cv ibrahim (edited)
cv ibrahim (edited)
 
satya
satyasatya
satya
 
Curriculum Vitae Ari
Curriculum Vitae AriCurriculum Vitae Ari
Curriculum Vitae Ari
 
Sathisha MR Project
Sathisha MR ProjectSathisha MR Project
Sathisha MR Project
 

Similar to Leelachandra marathe

SANKAR STRUCTURAL DRAFTSMAN WITH 6 YEARS EXPIRENCE
SANKAR STRUCTURAL DRAFTSMAN WITH 6 YEARS EXPIRENCESANKAR STRUCTURAL DRAFTSMAN WITH 6 YEARS EXPIRENCE
SANKAR STRUCTURAL DRAFTSMAN WITH 6 YEARS EXPIRENCESANKAR SAKKARAPANI
 
RESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpRESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpSURENDRA BABU
 
Indian Bio-data Simon Dgr Final - WITHOUT MBA CERITIFICATE
Indian Bio-data Simon Dgr Final - WITHOUT MBA CERITIFICATEIndian Bio-data Simon Dgr Final - WITHOUT MBA CERITIFICATE
Indian Bio-data Simon Dgr Final - WITHOUT MBA CERITIFICATEDr Simon Samuel
 
Indian Bio-data Simon Dgr Final - WITHOUT MBA CERITIFICATE
Indian Bio-data Simon Dgr Final - WITHOUT MBA CERITIFICATEIndian Bio-data Simon Dgr Final - WITHOUT MBA CERITIFICATE
Indian Bio-data Simon Dgr Final - WITHOUT MBA CERITIFICATEDr Simon Samuel
 
CV-Basu Sujit 6th July 2016
CV-Basu Sujit 6th July 2016CV-Basu Sujit 6th July 2016
CV-Basu Sujit 6th July 2016Sujit Basu
 
Hitendra resume (civil engineer)
Hitendra resume (civil engineer)Hitendra resume (civil engineer)
Hitendra resume (civil engineer)Hitendra Parmar
 
Updated Resume (1)
Updated Resume (1)Updated Resume (1)
Updated Resume (1)rakesh Singh
 
Shabbir - Curriculum Vitae
Shabbir - Curriculum VitaeShabbir - Curriculum Vitae
Shabbir - Curriculum VitaeShabbir Toor
 
Vignesh H (Bio-Data)
Vignesh H (Bio-Data)Vignesh H (Bio-Data)
Vignesh H (Bio-Data)Vignesh H
 
Khurram Mahmood Gondal 6-7-2014
Khurram Mahmood Gondal 6-7-2014Khurram Mahmood Gondal 6-7-2014
Khurram Mahmood Gondal 6-7-2014khurram gondal
 

Similar to Leelachandra marathe (20)

CV
CVCV
CV
 
New CV of VRB
New CV of VRBNew CV of VRB
New CV of VRB
 
Rahul Resume
Rahul ResumeRahul Resume
Rahul Resume
 
Nitin Patekar Rsume
Nitin Patekar RsumeNitin Patekar Rsume
Nitin Patekar Rsume
 
SANKAR STRUCTURAL DRAFTSMAN WITH 6 YEARS EXPIRENCE
SANKAR STRUCTURAL DRAFTSMAN WITH 6 YEARS EXPIRENCESANKAR STRUCTURAL DRAFTSMAN WITH 6 YEARS EXPIRENCE
SANKAR STRUCTURAL DRAFTSMAN WITH 6 YEARS EXPIRENCE
 
Current CV Akhil
Current CV Akhil    Current CV Akhil
Current CV Akhil
 
RESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpRESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years Exp
 
DPS - Copy
DPS - CopyDPS - Copy
DPS - Copy
 
Vaibhav Dhumal-Resume
Vaibhav Dhumal-ResumeVaibhav Dhumal-Resume
Vaibhav Dhumal-Resume
 
Indian Bio-data Simon Dgr Final - WITHOUT MBA CERITIFICATE
Indian Bio-data Simon Dgr Final - WITHOUT MBA CERITIFICATEIndian Bio-data Simon Dgr Final - WITHOUT MBA CERITIFICATE
Indian Bio-data Simon Dgr Final - WITHOUT MBA CERITIFICATE
 
Indian Bio-data Simon Dgr Final - WITHOUT MBA CERITIFICATE
Indian Bio-data Simon Dgr Final - WITHOUT MBA CERITIFICATEIndian Bio-data Simon Dgr Final - WITHOUT MBA CERITIFICATE
Indian Bio-data Simon Dgr Final - WITHOUT MBA CERITIFICATE
 
CV-Basu Sujit 6th July 2016
CV-Basu Sujit 6th July 2016CV-Basu Sujit 6th July 2016
CV-Basu Sujit 6th July 2016
 
Resume
ResumeResume
Resume
 
Hitendra resume (civil engineer)
Hitendra resume (civil engineer)Hitendra resume (civil engineer)
Hitendra resume (civil engineer)
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 
Updated Resume (1)
Updated Resume (1)Updated Resume (1)
Updated Resume (1)
 
Shabbir - Curriculum Vitae
Shabbir - Curriculum VitaeShabbir - Curriculum Vitae
Shabbir - Curriculum Vitae
 
Vignesh H (Bio-Data)
Vignesh H (Bio-Data)Vignesh H (Bio-Data)
Vignesh H (Bio-Data)
 
Khurram Mahmood Gondal 6-7-2014
Khurram Mahmood Gondal 6-7-2014Khurram Mahmood Gondal 6-7-2014
Khurram Mahmood Gondal 6-7-2014
 

Recently uploaded

DBMS-Report on Student management system.pptx
DBMS-Report on Student management system.pptxDBMS-Report on Student management system.pptx
DBMS-Report on Student management system.pptxrajjais1221
 
Independent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging StationIndependent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging Stationsiddharthteach18
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Ramkumar k
 
Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfKira Dess
 
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxSLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxCHAIRMAN M
 
analog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxanalog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxKarpagam Institute of Teechnology
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...ronahami
 
Databricks Generative AI FoundationCertified.pdf
Databricks Generative AI FoundationCertified.pdfDatabricks Generative AI FoundationCertified.pdf
Databricks Generative AI FoundationCertified.pdfVinayVadlagattu
 
CLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference ModalCLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference ModalSwarnaSLcse
 
Circuit Breakers for Engineering Students
Circuit Breakers for Engineering StudentsCircuit Breakers for Engineering Students
Circuit Breakers for Engineering Studentskannan348865
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...josephjonse
 
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024EMMANUELLEFRANCEHELI
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxMustafa Ahmed
 
handbook on reinforce concrete and detailing
handbook on reinforce concrete and detailinghandbook on reinforce concrete and detailing
handbook on reinforce concrete and detailingAshishSingh1301
 
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfJNTUA
 
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdflitvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdfAlexander Litvinenko
 
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样A
 
History of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & ModernizationHistory of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & ModernizationEmaan Sharma
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docxrahulmanepalli02
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisDr.Costas Sachpazis
 

Recently uploaded (20)

DBMS-Report on Student management system.pptx
DBMS-Report on Student management system.pptxDBMS-Report on Student management system.pptx
DBMS-Report on Student management system.pptx
 
Independent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging StationIndependent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging Station
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdf
 
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxSLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
 
analog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxanalog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptx
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
Databricks Generative AI FoundationCertified.pdf
Databricks Generative AI FoundationCertified.pdfDatabricks Generative AI FoundationCertified.pdf
Databricks Generative AI FoundationCertified.pdf
 
CLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference ModalCLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference Modal
 
Circuit Breakers for Engineering Students
Circuit Breakers for Engineering StudentsCircuit Breakers for Engineering Students
Circuit Breakers for Engineering Students
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
handbook on reinforce concrete and detailing
handbook on reinforce concrete and detailinghandbook on reinforce concrete and detailing
handbook on reinforce concrete and detailing
 
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
 
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdflitvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
 
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
 
History of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & ModernizationHistory of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & Modernization
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
 

Leelachandra marathe

  • 1. CURRICULAM VITAE LEELACHANDRA JAGAN MARATHE, Plot No 36, Yogeshwar krupa, Shreeji Park, Dupkeshwar Mandir Road, Nandurbar, Dist – Nandurbar. – 425 412 State – Maharashtra, INDIA Mobile : +91 81 3073 9494 Email : leelachandramarathe@yahoo.co.in ljmarathe@gmail.com Leelachandra.marathe@leighton.co.in PERSONAL DETAILS: Date of birth : 20-06-1979 Gender : Male Religion : Hindu Nationality : Indian Marital Status : Married Passport Status : J 5610659 (Expiry Date: 06-02-2021) Language Known : Hindi, English & Marathi. Present Address : Leighton India Contractors Pvt. Ltd., 3/F, Tower-A, Ocus Technopolis, Golf Course Road, Sector 54, Gurgaon, 122002 Haryana, India EDUCATIONAL DETAILS: • Complete Secondary Education (SSC) from D.R High School – Nandurbar Maharashtra (Year 1994 -1995) • Complete Carpentry Trade from Govt. Industrial Training Institute (ITI) Nandurbar, Maharashtra (Year 1995 -1996) • Diploma in civil, Sunrise university Alwar, Rajasthan (Year 2012 to 2014) • TAE40110 Certificate IV in Training for Trainer & assessor, Kagan Institute, Australia (Year 2014) • Construction Skill Development Council of India, Certified Trainer & Assessor for Shuttering & Scaffolding Level- I (November 2015) OTHER TRAINING : MS Office (CCC) + Auto-cad (2D & 3D)
  • 2. EXPERIENCE SUMMARY: • More than 18+ Years of Experience in All type of Civil work, Auto CAD, form work Design, Steel reinforcement and also in Civil and Structural Formwork. WORK EXPERIENCE: Leighton India Contractors Pvt. Ltd Year : From May 2013 to Till Date Designation : Manager- Civil Work Nature : Training center In charge Area manager for A4 area, all civil activity Project : DLF the Camellias Building Project Gurgaon, Haryana. Year : From 20th April 2012 to May 2013 Designation : Assistant Manager- Civil Work Nature : Supervising the work for Plate Mill & RMHS Area for Peri formwork Project : Jindal Steel & Power Limited 6 MTPA Steel Plant Project, Chhendipada road, SH, 63, AT/P.O:- Jindal Nagar, Angual, Orissa, India Year : From 13th Jan 2011 to 20th April 2012 Designation : Supervisor civil Work Nature : As advised by the line Managers which is ultimately helpful to Prepare proposals for upcoming projects. List of projects – Bid Proposal Submitted Project : 380 – 425 MW Pioneer Gas Power Limited. (Submitted) Project : 240 MW Kutehr Hydro Power Limited. (Submitted) Project : 810 MW Ratle Hydroelectric Powers, Jammu & Kashmir (Submitted) Project : 125 MW Areva Solar Powers in Rajasthan (Submitted)
  • 3. Belhasa Six Construct LLC – Dubai, UAE Year : From 20th October 2008 to 16th October 2009 Designation : Section Leader Work Nature : 1. Executing the entire Project shuttering, detailing works as per Peri formwork with the BS specification (Column, Beam, Slab, Precast Segment, Pier & Retaining wall etc.) 2. Handling the Precast yard & supervision of Foreman’s & Gang leaders Project : Palm water sewage treatment plant, Dubai, UAE Project : AL Safooh Transit System Project, Dubai, UAE Leighton International Pvt. Ltd. - INDIA Year : From 2nd Jan 2007 to 10th October 2008 Designation : Senior Shuttering Foreman Work Nature : 1. executing the shuttering works (Column, Beam, Slab, Core wall, Retaining wall and Stair case etc.) 2. Handling the Carpentry work shop Project : Residence Antilia, Mumbai – From Jan 2007 to May 2007 Project : Palm Springs, Gurgaon, India – From May 2007 to Nov 2007 Project : Mumbai Domestic & International Airport Redevelopment Project- From Nov 2007 to October 2008 Larson & Toubro Limited (ECC) Division – INDIA Year : From 2nd Jan 2006 to Jan 2007 Designation : Formwork Demonstrator Work Nature : Demonstrating the Doka Formwork and Mivan Systems Project : CSTI (Construction Skill Training Institute) Mumbai, India Larson & Toubro Limited (ECC) Division – Jordan Year : From 08th Feb 2004 to 22 Aug 2005 Designation : Formwork Charge hand Work Nature : Executing Pylon Shuttering work Project : Wadi Abdoun Cable Stay Bridge, Amman, Jordon Larson & Toubro Limited (ECC) Division – INDIA
  • 4. Year : From 29th Dec 2000 to 5th Jan 2004 Designation : Formwork Charge hand Work Nature : Handling the Carpentry work shop, precast yard & Doka Yard Project : Surat – Manohar Toll way – Talasari, Maharashtra. Year : From 6th Oct 1998 to 23rd Dec 2000 Designation : Formwork Charge hand Work Nature : Handling the Carpentry work shop and Doka Yard Project : Mumbai – Pune Express way - Pune Year : From 1st May 1998 to 22nd Sep 1998 Designation : Formwork Charge hand Work Nature : Handling the Formwork Shuttering Project : Reliance Salgoankar Power Project – Goa. Year : From 20th Aug 1997 to 19th Nov 1997 Complete Training for Doka Formwork Technician (CSTI) Panvel, Mumbai. ACHIEVEMENTS: -  Recognized and Rewarded for carrying out new implementation, methodology in Shuttering design & consistently achieved concrete target in time without major/minor NCR in Angul project for Jindal Steel and Power at Angul, Orissa.  Received “GOLD STAR QUALITY AWARD” from ‘Leighton International Pvt. Ltd, India’ for maintaining the daily checklist, Concrete delivery report & Work conformance report as per the item works for Mumbai International airport site (2C Terminal) Yours Sincerely, (Leelachandra J. Marathe) Date : Place :