Rakesh Kumar Singh is seeking a position that allows him to utilize his 19+ years of experience in structural steel fabrication and erection. He has worked on numerous power and industrial projects in India, holding roles from Assistant Engineer to Senior Manager. His technical background includes a diploma in mechanical engineering and expertise in AutoCAD, Excel, and Word. He aims to contribute to organizational and self growth through successful project delivery while maintaining safety and quality standards.
1. PROJECTS EXECUTED: OIL & GAS AS WELL AS BUILDING CONSTRUCTION PROJECTS ( AS A SUPERVISOR CIVIL)
1- Acting as a link between Civil Engineers and the Foreman & charge hand.
2- Execution of storm water trench, hot oil trench, electrical trench, post padding by sand for all pipelines, grade slab, paving, shim plate installation, anchor bolt installation in various foundations, pedestal casting and installation,
Manhole casting and installation, grouting of vessels and sewer pipe, fencing foundation casting and its installation.
3- Conducting Tool Box Talk on everyday basis on starting work Activity at site.
4- I can take permit of any work as per client specified specification and requirements.
5- I can execute any work in safe and in well-disciplined manners to give better output towards to achieve organization goals.
6- I can also execute more than 5 activities at a time on site by providing better output.
7- Assisting the site Foreman and charge hand in all site civil construction activities from foundation up to final finishing stage 8- Supervising all construction activities and providing technical inputs for construction and coordination with the site management.
9- Anchoring on-site construction activities to ensure completion of project within the time and cost parameters and effective resource utilization to maximize the output.
10- Checking the physical and chemical composition of materials such as concrete, brick, Block, Cement, aggregates (fine as well as coarse), Steel and plywood.
11- Calculation of materials for construction works at site.
12- Giving detailed notes on daily progress report to me superior about every day work.
13- Preparation of BBS, Supervision and Execution of Entire Civil works like Excavation, Backfilling, Compaction, Surface protection, Form work, Rebar work, Concreting Masonry work, Block work, plastering, Water proofing work Painting, Plumbing, Tiling and Flooring work.
• Well pad development and installation of foundation for pipelines.
1. PROJECTS EXECUTED: OIL & GAS AS WELL AS BUILDING CONSTRUCTION PROJECTS ( AS A SUPERVISOR CIVIL)
1- Acting as a link between Civil Engineers and the Foreman & charge hand.
2- Execution of storm water trench, hot oil trench, electrical trench, post padding by sand for all pipelines, grade slab, paving, shim plate installation, anchor bolt installation in various foundations, pedestal casting and installation,
Manhole casting and installation, grouting of vessels and sewer pipe, fencing foundation casting and its installation.
3- Conducting Tool Box Talk on everyday basis on starting work Activity at site.
4- I can take permit of any work as per client specified specification and requirements.
5- I can execute any work in safe and in well-disciplined manners to give better output towards to achieve organization goals.
6- I can also execute more than 5 activities at a time on site by providing better output.
7- Assisting the site Foreman and charge hand in all site civil construction activities from foundation up to final finishing stage 8- Supervising all construction activities and providing technical inputs for construction and coordination with the site management.
9- Anchoring on-site construction activities to ensure completion of project within the time and cost parameters and effective resource utilization to maximize the output.
10- Checking the physical and chemical composition of materials such as concrete, brick, Block, Cement, aggregates (fine as well as coarse), Steel and plywood.
11- Calculation of materials for construction works at site.
12- Giving detailed notes on daily progress report to me superior about every day work.
13- Preparation of BBS, Supervision and Execution of Entire Civil works like Excavation, Backfilling, Compaction, Surface protection, Form work, Rebar work, Concreting Masonry work, Block work, plastering, Water proofing work Painting, Plumbing, Tiling and Flooring work.
• Well pad development and installation of foundation for pipelines.
My presentation on a new Oracle Database feature called "Row Pattern Matching". I presented on 9 December 2014 at UKOUG Tech 14. Be sure to download for the animations.
Having 10 Years Of Professional Experience In The Field Of Construction Of Different Projects Which Includes Major Experience In Construction Of Petrochemical Refinery Plants & Building construction With International Standards & Specifications.
1. RESUME
RAKESH KUMAR SINGH
Saraswati Nagar, Parmanandpur
Shivpur, Distt. – Varanasi, Uttar Pradesh
Email- rakesh_singh2550@rediffmail.com
Mobile No- 08128993972, +919712252479
CAREER OBJECTIVE
To work for the growth of organization as well as mine by utilization my technical efforts to achieve
the goal successful person and good human being in the life.
PERSONALITYSTRENGTHS:
I have an optimistic approach towards taking up any project or work in synergism with other team
members to meet project deadlines.
My biggest asset lies as a team player to develop a healthy work environment that team members
feel comfortable in working with me
.
19+ YEARS EXPERIENCEINSTRUCTURALSTEELFABRICATION / ERECTION WORK
01) Strategizing techniques for maximum utilization of man, material and machine
Material Estimation, Fabrication & Erection
02) Lead in preparation of site deliverables list duly considering applicable codes & standards &
approved methods.
03) Interface with Leads of other deportments for smooth co ordination of various construction
activities.
04) Lead the execution to meet the project requirements with respect to schedule, quality and safety
guide lines.
05) Guide Site Engineers to supervise mechanical contractor’s execution for construction activities as
per the drawings, specifications and relevant codes/standards.
06) Study the drawings issue for construction in detail well in advance and identify if there is any
mismatch between drawing and specification /BOQ description /construction already carried out as
well as any missing details and raise RFI to project to get required details in time.
07) Review and approved the quality plan, ITP and work procedures submitted by the contractors
and insure contractor is executing the work according to them.
08) Actively participate in successful implementation of safety as per contractual requirements.
09) Working out of quantities from the drawings and verifying the materials with the BOQ.
10) Verification and certification of quantities of RA bills /Final bills submitted by contractors.
11) Maintain joint Records /documents for the deviations from the drawings, dismantling quantities.
12) Measurement and Reconciliation of material.
2. TECHNICALBACKGROUND:
Successfully completed 3 years Diploma in Mech Engineering (specialization in production) with First
Division (73.27%) from Maharana Pratap Polytechnic, Gorakhpur (U.P.) in 1992-95.
High school with Fist Div. (67.5%) from Govt. Secondary Tech. School. Gazipur (U.P.) in 1992.
Average Knowledge in AutoCAD, Excel & Word.
Project Title # 1
Company: M/S Reliance Industries Limited
Site Name: Expansion of Jamnagar refinery, J-3 Project of Reliance Industries Ltd.
Job Profile: SR. Manager Mechanical Construction, Erection of structure steel and Static / Rotary
Equipment.
Duration: Nov. 2013 to till date
Project Title # 2
Company: M/S Simplex infrastructure ltd.
Site Name: Kudgi Super Thermal Power Project (3x500MW) , Kudgi, Karnataka.
Job Profile: Asst. Manager Structural steel work. (Fabrication/Erection of MPH Column, Crane
girder, floor beams, truss, cladding of TG Building etc)
Duration: April 2012 to Nov 2013
Project Title # 3
Company: M/S Simplex infrastructure ltd.
Site Name: GMR Thermal Power Project (2x685MW) Raipur, Chhattisgarh
Job Profile: Asst. Manager Structural steel work 8000MT. (Fabrication & Erection of MPH Column,
Crane girder, floor beams, truss, cladding sheeting of TG Building etc)
Duration: June 2012 to April 2013
Project Title # 4
Company: M/S Simplex infrastructure ltd.
Site Name: Rihand Super Thermal Power Project, Rihand nagar Distt. – Sonebhadra (U.P.)
Job Profile: Asst. Manager Structural steel work 26000MT. (Fabrication of mill Bunker and MPH
Column, Truss, Crane girder, Bunker Shell and Hopper) and cladding sheeting of TG Building
Duration: July 2010 to June 2012
Project Title # 5
Company: Petron Civil Engineering Pvt. Ltd.
Site Name: Guru Govind Singh Refinery, Bathinda, Punjab.
Job Profile: Executive Engineer,structural steel work. (Reconciliation)
Duration: Jan. 2010 to June 2010
Project Title # 6
Company : Nagarjuna Construction Company Limited
Site Name: Weight Lifting Auditorium, J.L.N. Stadium, Lodhi Road, New Delhi.
Job Profile: Structural steel work (Fabrication, erection, and billing to client)
Duration: April 08 to Dec.2009
Project Title # 7
Company: Nagarjuna Construction Company Limited
Site Name: Expansion of New HDPE project, Gail India Limited Pata.
Job Profile: Assistant Engineer, Fabrication and erection of pipe rack, Extrusion
Building.
3. Project Title # 8
Company: Mandi Perished (U.P.)
Site Name: Mandi Perished Lucknow (U.P.)
Job Profile : Junior Engineer Engineer (Fabrication and Erection of Light Structural Steel &
sheeting of ware house)
Duration : Aug 2000 to Dec.2005
Project Title # 9
Company: Aircon Fabricator
Site Name: Anpara Thermal Power
Job Profile: Engineer, Fabrication and erection.
Duration : April 1999 to Aug 2000
Project Title # 10
Company: Mandi Perished (U.P.)
Site Name: Mandi Perished Lucknow (U.P.)
Job Profile: Junior Engineer Engineer (Fabrication and Erection of Light Structural Steel &
sheeting of ware house)
Duration : April 1996 to March 1999
PERSONAL DETAILS:
Father’s Name : Sri Rajendra Singh
Date of Birth : 26 July 1975
Marital Status : Married
Permanent Add : Saraswati Nagar, Parmanand pur
P.O. Shivpur, Distt: - Varanasi (U.P.)
Languages Known : Hindi & English
Date:
Place:
Signature
(Rakesh Kumar Singh)
.