NO Uraian Pekerjaan
I PEKERJAAN PENDAHULUAN 366,680.000
II PEKERJAAN TANAH DAN PASIR 1,776,867.800
III PEKERJAAN PASANGAN BATU BELAH 5,465,344.000
IV PEKERJAAN STRUKTUR BETON BERTULANG 6,372,407.200
V PEKERJAAN PASANGAN DAN PLESTERAN 15,414,624.400
VI PEKERJAAN LANTAI DAN PLAFOND PENUTUP ATAP 27,614,382.470
VII PEKERJAAN FINISHING 4,833,895.000
VIII SALURAN KELILING AIR HUJAN 745,920.000
IX PEKERJAAN PINTU JENDELA DAN KANOPI 15,521,000.000
X PEKERJAAN MEKANIKAL & ELEKTRIKAL
Pekerjaan elektrikal 3,757,500.000
Pekerjaan Mekanikal 5,518,088.500
Jumlah Total 87,386,709.370
REKAPITULASI
Jumlah Harga
( Rp )
Page 1 of 3
Volume Satuan
Jumlah Harga
( Rp ) ( Rp )
I PEKERJAAN PENDAHULUAN
1 Uniset dan bouwplank 4.00 m' 39,920.00 159,680.00
2 Pembersihan lokasi 60.00 m2 3,450.00 207,000.00
Sub Jumlah 366,680.00
II PEKERJAAN TANAH DAN PASIR
1 Galian tanah 38.84 m3 19,170.00 744,562.80
2 Urug tanah kembali 24.05 m3 7,000.00 168,350.00
3 Urug pasir bawah pondasi & lantai 7.89 m3 109,500.00 863,955.00
Sub Jumlah 1,776,867.80
III PEKERJAAN PASANGAN BATU BELAH
1 Pasangan batu belah camp 1pc:5psr 14.80 m3 369,280.00 5,465,344.00
Sub Jumlah 5,465,344.00
IV PEKERJAAN STRUKTUR BETON BERTULANG
Catatan :
Mutu beton : fc' = 22,5 Mpa (camp. 1: 2: 3)
1 Betom sloof 15x20cm & ring balk 1.18 m 3 2,701,360.00 3,187,604.80
2 Beton kolom praktis 15x15cm 1.56 m³ 2,041,540.00 3,184,802.40
Sub Jumlah 6,372,407.20
V PEKERJAAN PASANGAN DAN PLESTERAN
1 Pasang dinding bata camp. 1pc:5psr 24.06 m³ 395,710.00 9,520,782.60
2 Plesteran dinding camp. 1pc:5psr 343.08 m² 15,040.00 5,159,923.20
3 Sponengan 217.78 m1 3,370.00 733,918.60
Sub Jumlah 15,414,624.40
VI PEKERJAAN LANTAI DAN PLAFOND PENUTUP ATAP
1 Keramik lantai 30x30 cm (setara platinum) 41.90 m² 75,730.00 3,173,087.00
2 Keramik lantai km 20x20 (setara platinum) 2.25 m² 65,230.00 146,767.50
3 Keramik dinding km 20x25 cm (setara platinum) 9.00 m² 73,480.00 661,320.00
4 Plin keramik 10x30cm (setara platinum) 44.99 m1 25,243.33 1,135,697.57
5 Plafond gypsumboard t=9mm rangka kayu 57.41 m² 72,500.00 4,162,225.00
6 List plafond gypsum 63.44 m' 17,500.00 1,110,200.00
6 List plank kayu (25 tebal 2cm) 14.86 m' 28,870.00 429,008.20
7 Rangka atap (kuda2, usuk, reng kayu kalimantan) 64.08 m² 142,940.00 9,159,595.20
7 Penutup atap(genteng keramik KIA) 64.08 m² 90,750.00 5,815,260.00
8 Bubungan 25.80 m' 70,590.00 1,821,222.00
Sub Jumlah 27,614,382.47
VII PEKERJAAN FINISHING
1 Cat dinding tembok dalam catylac 343.08 m² 12,500.00 4,288,500.00
2 Cat langit-langit 57.41 m² 9,500.00 545,395.00
Sub Jumlah 4,833,895.00
VIII SALURAN KELILING AIR HUJAN
1 Saluran air hujan U 20 6.00 m' 124,320.00 745,920.00
Sub Jumlah 745,920.00
RENCANA ANGGARAN BIAYA
No Uraian Pekerjaan
Harga
Page 2 of 3
Volume Satuan
Jumlah Harga
( Rp ) ( Rp )
No Uraian Pekerjaan
Harga
IX PEKERJAAN PINTU JENDELA DAN KANOPI
1 Pek. Pintu P1 kayu jati finishing melamin 3.000 unit 1,749,000.00 5,247,000.00
2 Pek. Pintu P2 kayu jati finishing melamin 1.000 unit 1,749,000.00 1,749,000.00
3 Pek. Pintu PVC P3 murico 1.000 unit 225,000.00 225,000.00
4 Jendela J1 kayu jati finishing melamin 5.000 unit 895,000.00 4,475,000.00
5 Kanopi polycarbonate (rangka hollow stainless stell) 9.000 m² 425,000.00 3,825,000.00
Sub Jumlah 15,521,000.00
X PEKERJAAN MEKANIKAL & ELEKTRIKAL
A Pekerjaan elektrikal
1 Lampu SL 23 watt philip (termasuk fitting) 6.00 unit 55,000.00 330,000.00
2 Down light swillite DL 5 KBF 4.00 unit 85,000.00 340,000.00
2 Lampu dinding luar 2.00 unit 145,000.00 290,000.00
3 Lampu taman 1.00 unit 220,000.00 220,000.00
3 Instalasi penerangan & stok kontak 26.00 ttk 90,000.00 2,340,000.00
4 Saklar tunggal broco 4.00 bh 17,500.00 70,000.00
4 Saklar double broco 4.00 bh 20,000.00 80,000.00
5 Stop kontak broco 5.00 bh 17,500.00 87,500.00
Sub Jumlah 3,757,500.00
B Pekerjaan Mekanikal
a. Pemipaan & sanitary
- Pipa air bersih 3/4" wavin AW 14.93 m1 26,700.00 398,631.00
- Pipa air bersih 1/2" wavin AW 7.05 m1 21,550.00 151,927.50
- Pipa air bekas 3" wavin AW 10.93 m1 38,500.00 420,805.00
- Pipa air kotor 4" wavin AW 7.23 m1 57,500.00 415,725.00
- Kran air bersih merk TOTO 4.00 m1 125,000.00 500,000.00
- Washtafel merk TOTO 1.00 m1 850,000.00 850,000.00
- Shower tray merk TOTO 1.00 m1 356,000.00 356,000.00
- Closet jongkok merk TOTO 1.00 m1 1,325,000.00 1,325,000.00
b. Septik tank kapasitas 1,5m3 1.00 unit 1,100,000.00 1,100,000.00
Sub Jumlah 5,518,088.50
Page 3 of 3

More Related Content

Viewers also liked

Diego vega actividad1_2mapac
Diego vega actividad1_2mapacDiego vega actividad1_2mapac
Diego vega actividad1_2mapacDiego Vega Parra
 
Topologi bts tanpa router
Topologi bts tanpa routerTopologi bts tanpa router
Topologi bts tanpa routerArif Scooters
 
Guide créer sa junior association
Guide créer sa junior associationGuide créer sa junior association
Guide créer sa junior associationJA33
 
Tabla del tamaño de los zapatos de bebé- simple y funcional
Tabla del tamaño de los zapatos de bebé- simple y funcionalTabla del tamaño de los zapatos de bebé- simple y funcional
Tabla del tamaño de los zapatos de bebé- simple y funcionalmilton_sss
 
국내카지노 온라인 『OX600』。『COM』 빙고룰 노하우
국내카지노 온라인 『OX600』。『COM』 빙고룰 노하우국내카지노 온라인 『OX600』。『COM』 빙고룰 노하우
국내카지노 온라인 『OX600』。『COM』 빙고룰 노하우hkspodf
 
Presentacion
PresentacionPresentacion
Presentacionariday21
 
портфоліо рудницький
портфоліо рудницькийпортфоліо рудницький
портфоліо рудницькийmarchevska
 
Портфоліо Шпінь
Портфоліо ШпіньПортфоліо Шпінь
Портфоліо Шпіньmarchevska
 
PuppetConf 2016: How You Actually Get Hacked – Ben Hughes, Etsy
PuppetConf 2016: How You Actually Get Hacked – Ben Hughes, EtsyPuppetConf 2016: How You Actually Get Hacked – Ben Hughes, Etsy
PuppetConf 2016: How You Actually Get Hacked – Ben Hughes, EtsyPuppet
 
Desarrollo de la propuesta de financiamiento.
Desarrollo de la propuesta de financiamiento.Desarrollo de la propuesta de financiamiento.
Desarrollo de la propuesta de financiamiento.Wenceslao Verdugo Rojas
 
Media Evaluation Question 3
Media Evaluation Question 3Media Evaluation Question 3
Media Evaluation Question 3sabirilyasov
 

Viewers also liked (14)

Diego vega actividad1_2mapac
Diego vega actividad1_2mapacDiego vega actividad1_2mapac
Diego vega actividad1_2mapac
 
Topologi bts tanpa router
Topologi bts tanpa routerTopologi bts tanpa router
Topologi bts tanpa router
 
Olivia 3
Olivia 3Olivia 3
Olivia 3
 
Guide créer sa junior association
Guide créer sa junior associationGuide créer sa junior association
Guide créer sa junior association
 
Tabla del tamaño de los zapatos de bebé- simple y funcional
Tabla del tamaño de los zapatos de bebé- simple y funcionalTabla del tamaño de los zapatos de bebé- simple y funcional
Tabla del tamaño de los zapatos de bebé- simple y funcional
 
국내카지노 온라인 『OX600』。『COM』 빙고룰 노하우
국내카지노 온라인 『OX600』。『COM』 빙고룰 노하우국내카지노 온라인 『OX600』。『COM』 빙고룰 노하우
국내카지노 온라인 『OX600』。『COM』 빙고룰 노하우
 
Dhanushka-CV (2)
Dhanushka-CV (2)Dhanushka-CV (2)
Dhanushka-CV (2)
 
Presentacion
PresentacionPresentacion
Presentacion
 
портфоліо рудницький
портфоліо рудницькийпортфоліо рудницький
портфоліо рудницький
 
Портфоліо Шпінь
Портфоліо ШпіньПортфоліо Шпінь
Портфоліо Шпінь
 
PuppetConf 2016: How You Actually Get Hacked – Ben Hughes, Etsy
PuppetConf 2016: How You Actually Get Hacked – Ben Hughes, EtsyPuppetConf 2016: How You Actually Get Hacked – Ben Hughes, Etsy
PuppetConf 2016: How You Actually Get Hacked – Ben Hughes, Etsy
 
Desarrollo de la propuesta de financiamiento.
Desarrollo de la propuesta de financiamiento.Desarrollo de la propuesta de financiamiento.
Desarrollo de la propuesta de financiamiento.
 
CRBP- Why children do matter for businesses
CRBP- Why  children do matter for businessesCRBP- Why  children do matter for businesses
CRBP- Why children do matter for businesses
 
Media Evaluation Question 3
Media Evaluation Question 3Media Evaluation Question 3
Media Evaluation Question 3
 

Similar to Rab final bata

Planing pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliahPlaning pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliahSekertariat_Akmaliah
 
Planing pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliahPlaning pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliahReguti
 
Data penawaran subur jaya
Data penawaran subur jayaData penawaran subur jaya
Data penawaran subur jayaverytudjuka
 
2.pengajuanrabcandramas terasdepanatapasbes
2.pengajuanrabcandramas terasdepanatapasbes2.pengajuanrabcandramas terasdepanatapasbes
2.pengajuanrabcandramas terasdepanatapasbesDeny Sulistio
 
Cost of breeder farm
Cost of breeder farmCost of breeder farm
Cost of breeder farmOmar Faruque
 
Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal ashleyyeap
 
3. pekerjaan sipil dan bangunan
3. pekerjaan sipil dan bangunan3. pekerjaan sipil dan bangunan
3. pekerjaan sipil dan bangunanSyahrul Najmi
 
Rehab kantor pariwsata
Rehab kantor pariwsataRehab kantor pariwsata
Rehab kantor pariwsataKashmir Brown
 
Builder Sample
Builder SampleBuilder Sample
Builder SampleHai Nguyen
 
128249253 deped-estimate
128249253 deped-estimate128249253 deped-estimate
128249253 deped-estimateimaduddin91
 
Home Owner Sample
Home Owner SampleHome Owner Sample
Home Owner SampleHai Nguyen
 
Home Owner Sample
Home Owner SampleHome Owner Sample
Home Owner SampleHai Nguyen
 
28725680 qarghayi-anp-estimation
28725680 qarghayi-anp-estimation28725680 qarghayi-anp-estimation
28725680 qarghayi-anp-estimationimaduddin91
 
Adendum blh 2009 diperbaiki
Adendum blh 2009 diperbaikiAdendum blh 2009 diperbaiki
Adendum blh 2009 diperbaikikurniawan yusril
 
Building economics presentation 3 2
Building economics presentation 3 2Building economics presentation 3 2
Building economics presentation 3 2Syafiq Zariful
 
020 ejemplo de presupuesto (mano de obra, materiales y transporte)
020 ejemplo de presupuesto (mano de obra, materiales y transporte)020 ejemplo de presupuesto (mano de obra, materiales y transporte)
020 ejemplo de presupuesto (mano de obra, materiales y transporte)independiente
 
cost appraisal
cost appraisalcost appraisal
cost appraisalahmong4
 

Similar to Rab final bata (20)

Planing pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliahPlaning pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliah
 
Planing pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliahPlaning pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliah
 
Data penawaran subur jaya
Data penawaran subur jayaData penawaran subur jaya
Data penawaran subur jaya
 
2.pengajuanrabcandramas terasdepanatapasbes
2.pengajuanrabcandramas terasdepanatapasbes2.pengajuanrabcandramas terasdepanatapasbes
2.pengajuanrabcandramas terasdepanatapasbes
 
Cost of breeder farm
Cost of breeder farmCost of breeder farm
Cost of breeder farm
 
Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal
 
Rab
RabRab
Rab
 
3. pekerjaan sipil dan bangunan
3. pekerjaan sipil dan bangunan3. pekerjaan sipil dan bangunan
3. pekerjaan sipil dan bangunan
 
Rehab kantor pariwsata
Rehab kantor pariwsataRehab kantor pariwsata
Rehab kantor pariwsata
 
Builder Sample
Builder SampleBuilder Sample
Builder Sample
 
128249253 deped-estimate
128249253 deped-estimate128249253 deped-estimate
128249253 deped-estimate
 
Home Owner Sample
Home Owner SampleHome Owner Sample
Home Owner Sample
 
Home Owner Sample
Home Owner SampleHome Owner Sample
Home Owner Sample
 
28725680 qarghayi-anp-estimation
28725680 qarghayi-anp-estimation28725680 qarghayi-anp-estimation
28725680 qarghayi-anp-estimation
 
Adendum blh 2009 diperbaiki
Adendum blh 2009 diperbaikiAdendum blh 2009 diperbaiki
Adendum blh 2009 diperbaiki
 
Building economics presentation 3 2
Building economics presentation 3 2Building economics presentation 3 2
Building economics presentation 3 2
 
020 ejemplo de presupuesto (mano de obra, materiales y transporte)
020 ejemplo de presupuesto (mano de obra, materiales y transporte)020 ejemplo de presupuesto (mano de obra, materiales y transporte)
020 ejemplo de presupuesto (mano de obra, materiales y transporte)
 
cost appraisal
cost appraisalcost appraisal
cost appraisal
 
School
SchoolSchool
School
 
Single storied house
Single storied houseSingle storied house
Single storied house
 

Recently uploaded

Call Girls in Noida Sector 77 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
Call Girls in Noida Sector 77 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...Call Girls in Noida Sector 77 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
Call Girls in Noida Sector 77 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...delhimodel235
 
Call Girls In Hari Nagar Dadb Block {8447779280}Hari Nagar {West Delhi Escort...
Call Girls In Hari Nagar Dadb Block {8447779280}Hari Nagar {West Delhi Escort...Call Girls In Hari Nagar Dadb Block {8447779280}Hari Nagar {West Delhi Escort...
Call Girls In Hari Nagar Dadb Block {8447779280}Hari Nagar {West Delhi Escort...asmaqueen5
 
Omaxe Dwarka In Delhi E Brochure Pdf
Omaxe Dwarka In Delhi E Brochure     PdfOmaxe Dwarka In Delhi E Brochure     Pdf
Omaxe Dwarka In Delhi E Brochure Pdfashiyadav24
 
Call Girls in Janakpuri ↫8447779280↫Short 1500 Night 6000-Escorts Service In ...
Call Girls in Janakpuri ↫8447779280↫Short 1500 Night 6000-Escorts Service In ...Call Girls in Janakpuri ↫8447779280↫Short 1500 Night 6000-Escorts Service In ...
Call Girls in Janakpuri ↫8447779280↫Short 1500 Night 6000-Escorts Service In ...asmaqueen5
 
Listing Turkey Sylvana Istanbul - Bahcesehir
Listing Turkey Sylvana Istanbul - BahcesehirListing Turkey Sylvana Istanbul - Bahcesehir
Listing Turkey Sylvana Istanbul - BahcesehirListing Turkey
 
FULL ENJOY - 8264348440 Call Girls in DLf Phase 4 | Gurgaon
FULL ENJOY - 8264348440 Call Girls in DLf Phase 4 | GurgaonFULL ENJOY - 8264348440 Call Girls in DLf Phase 4 | Gurgaon
FULL ENJOY - 8264348440 Call Girls in DLf Phase 4 | Gurgaonsoniya singh
 
Majestique Viman Nagar Pune Brochure.pdf
Majestique Viman Nagar Pune Brochure.pdfMajestique Viman Nagar Pune Brochure.pdf
Majestique Viman Nagar Pune Brochure.pdfBabyrudram
 
Puravankara Mundhwa Pune E-Brochure.pdf
Puravankara Mundhwa Pune  E-Brochure.pdfPuravankara Mundhwa Pune  E-Brochure.pdf
Puravankara Mundhwa Pune E-Brochure.pdfManishSaxena95
 
call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️
call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️
call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️soniya singh
 
Magarpatta Nova Elegance Mundhwa Pune E-Brochure.pdf
Magarpatta Nova Elegance Mundhwa Pune  E-Brochure.pdfMagarpatta Nova Elegance Mundhwa Pune  E-Brochure.pdf
Magarpatta Nova Elegance Mundhwa Pune E-Brochure.pdfManishSaxena95
 
Call Girls In Mayur Vihar Delhi ☆↫8447779280 ❤Escorts Service In Delhi
Call Girls In Mayur Vihar Delhi ☆↫8447779280 ❤Escorts Service In DelhiCall Girls In Mayur Vihar Delhi ☆↫8447779280 ❤Escorts Service In Delhi
Call Girls In Mayur Vihar Delhi ☆↫8447779280 ❤Escorts Service In Delhiasmaqueen5
 
The Omaxe State Dwarka Delhi-broucher.pdf.pdf
The Omaxe State Dwarka Delhi-broucher.pdf.pdfThe Omaxe State Dwarka Delhi-broucher.pdf.pdf
The Omaxe State Dwarka Delhi-broucher.pdf.pdfkratirudram
 
Call Girls in Noida Sector 13 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
Call Girls in Noida Sector 13 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...Call Girls in Noida Sector 13 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
Call Girls in Noida Sector 13 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...delhimodel235
 
Rustomjee Cleon Bandra East, Mumbai - Brochure.pdf
Rustomjee Cleon Bandra East, Mumbai - Brochure.pdfRustomjee Cleon Bandra East, Mumbai - Brochure.pdf
Rustomjee Cleon Bandra East, Mumbai - Brochure.pdfmonikasharma630
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | Gurgaon
FULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | GurgaonFULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | Gurgaon
FULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | Gurgaonsoniya singh
 
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|AkshayJoshi575980
 
3D Architectural Rendering Company by Panoram CGI
3D Architectural Rendering Company by Panoram CGI3D Architectural Rendering Company by Panoram CGI
3D Architectural Rendering Company by Panoram CGIPanoram CGI
 
call girls in lajapat nagar 9811711561/..
call girls in lajapat nagar 9811711561/..call girls in lajapat nagar 9811711561/..
call girls in lajapat nagar 9811711561/..vikas rana
 

Recently uploaded (20)

Call Girls in Noida Sector 77 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
Call Girls in Noida Sector 77 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...Call Girls in Noida Sector 77 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
Call Girls in Noida Sector 77 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
 
Call Girls In Hari Nagar Dadb Block {8447779280}Hari Nagar {West Delhi Escort...
Call Girls In Hari Nagar Dadb Block {8447779280}Hari Nagar {West Delhi Escort...Call Girls In Hari Nagar Dadb Block {8447779280}Hari Nagar {West Delhi Escort...
Call Girls In Hari Nagar Dadb Block {8447779280}Hari Nagar {West Delhi Escort...
 
Omaxe Dwarka In Delhi E Brochure Pdf
Omaxe Dwarka In Delhi E Brochure     PdfOmaxe Dwarka In Delhi E Brochure     Pdf
Omaxe Dwarka In Delhi E Brochure Pdf
 
Call Girls in Janakpuri ↫8447779280↫Short 1500 Night 6000-Escorts Service In ...
Call Girls in Janakpuri ↫8447779280↫Short 1500 Night 6000-Escorts Service In ...Call Girls in Janakpuri ↫8447779280↫Short 1500 Night 6000-Escorts Service In ...
Call Girls in Janakpuri ↫8447779280↫Short 1500 Night 6000-Escorts Service In ...
 
Listing Turkey Sylvana Istanbul - Bahcesehir
Listing Turkey Sylvana Istanbul - BahcesehirListing Turkey Sylvana Istanbul - Bahcesehir
Listing Turkey Sylvana Istanbul - Bahcesehir
 
FULL ENJOY - 8264348440 Call Girls in DLf Phase 4 | Gurgaon
FULL ENJOY - 8264348440 Call Girls in DLf Phase 4 | GurgaonFULL ENJOY - 8264348440 Call Girls in DLf Phase 4 | Gurgaon
FULL ENJOY - 8264348440 Call Girls in DLf Phase 4 | Gurgaon
 
Majestique Viman Nagar Pune Brochure.pdf
Majestique Viman Nagar Pune Brochure.pdfMajestique Viman Nagar Pune Brochure.pdf
Majestique Viman Nagar Pune Brochure.pdf
 
Puravankara Mundhwa Pune E-Brochure.pdf
Puravankara Mundhwa Pune  E-Brochure.pdfPuravankara Mundhwa Pune  E-Brochure.pdf
Puravankara Mundhwa Pune E-Brochure.pdf
 
call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️
call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️
call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️
 
Magarpatta Nova Elegance Mundhwa Pune E-Brochure.pdf
Magarpatta Nova Elegance Mundhwa Pune  E-Brochure.pdfMagarpatta Nova Elegance Mundhwa Pune  E-Brochure.pdf
Magarpatta Nova Elegance Mundhwa Pune E-Brochure.pdf
 
Call Girls In Mayur Vihar Delhi ☆↫8447779280 ❤Escorts Service In Delhi
Call Girls In Mayur Vihar Delhi ☆↫8447779280 ❤Escorts Service In DelhiCall Girls In Mayur Vihar Delhi ☆↫8447779280 ❤Escorts Service In Delhi
Call Girls In Mayur Vihar Delhi ☆↫8447779280 ❤Escorts Service In Delhi
 
Find Furnished Short Term Rentals in Minneapolis | CHBO
Find Furnished Short Term Rentals in Minneapolis | CHBOFind Furnished Short Term Rentals in Minneapolis | CHBO
Find Furnished Short Term Rentals in Minneapolis | CHBO
 
The Omaxe State Dwarka Delhi-broucher.pdf.pdf
The Omaxe State Dwarka Delhi-broucher.pdf.pdfThe Omaxe State Dwarka Delhi-broucher.pdf.pdf
The Omaxe State Dwarka Delhi-broucher.pdf.pdf
 
Call Girls in Noida Sector 13 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
Call Girls in Noida Sector 13 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...Call Girls in Noida Sector 13 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
Call Girls in Noida Sector 13 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
 
Rustomjee Cleon Bandra East, Mumbai - Brochure.pdf
Rustomjee Cleon Bandra East, Mumbai - Brochure.pdfRustomjee Cleon Bandra East, Mumbai - Brochure.pdf
Rustomjee Cleon Bandra East, Mumbai - Brochure.pdf
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | Gurgaon
FULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | GurgaonFULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | Gurgaon
FULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | Gurgaon
 
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
 
3D Architectural Rendering Company by Panoram CGI
3D Architectural Rendering Company by Panoram CGI3D Architectural Rendering Company by Panoram CGI
3D Architectural Rendering Company by Panoram CGI
 
call girls in lajapat nagar 9811711561/..
call girls in lajapat nagar 9811711561/..call girls in lajapat nagar 9811711561/..
call girls in lajapat nagar 9811711561/..
 
VIP Escorts in Delhi:🔝9953056974🔝 Hot Qutub Minar Delhi Escorts Service
VIP Escorts in Delhi:🔝9953056974🔝 Hot Qutub Minar Delhi Escorts ServiceVIP Escorts in Delhi:🔝9953056974🔝 Hot Qutub Minar Delhi Escorts Service
VIP Escorts in Delhi:🔝9953056974🔝 Hot Qutub Minar Delhi Escorts Service
 

Rab final bata

  • 1. NO Uraian Pekerjaan I PEKERJAAN PENDAHULUAN 366,680.000 II PEKERJAAN TANAH DAN PASIR 1,776,867.800 III PEKERJAAN PASANGAN BATU BELAH 5,465,344.000 IV PEKERJAAN STRUKTUR BETON BERTULANG 6,372,407.200 V PEKERJAAN PASANGAN DAN PLESTERAN 15,414,624.400 VI PEKERJAAN LANTAI DAN PLAFOND PENUTUP ATAP 27,614,382.470 VII PEKERJAAN FINISHING 4,833,895.000 VIII SALURAN KELILING AIR HUJAN 745,920.000 IX PEKERJAAN PINTU JENDELA DAN KANOPI 15,521,000.000 X PEKERJAAN MEKANIKAL & ELEKTRIKAL Pekerjaan elektrikal 3,757,500.000 Pekerjaan Mekanikal 5,518,088.500 Jumlah Total 87,386,709.370 REKAPITULASI Jumlah Harga ( Rp ) Page 1 of 3
  • 2. Volume Satuan Jumlah Harga ( Rp ) ( Rp ) I PEKERJAAN PENDAHULUAN 1 Uniset dan bouwplank 4.00 m' 39,920.00 159,680.00 2 Pembersihan lokasi 60.00 m2 3,450.00 207,000.00 Sub Jumlah 366,680.00 II PEKERJAAN TANAH DAN PASIR 1 Galian tanah 38.84 m3 19,170.00 744,562.80 2 Urug tanah kembali 24.05 m3 7,000.00 168,350.00 3 Urug pasir bawah pondasi & lantai 7.89 m3 109,500.00 863,955.00 Sub Jumlah 1,776,867.80 III PEKERJAAN PASANGAN BATU BELAH 1 Pasangan batu belah camp 1pc:5psr 14.80 m3 369,280.00 5,465,344.00 Sub Jumlah 5,465,344.00 IV PEKERJAAN STRUKTUR BETON BERTULANG Catatan : Mutu beton : fc' = 22,5 Mpa (camp. 1: 2: 3) 1 Betom sloof 15x20cm & ring balk 1.18 m 3 2,701,360.00 3,187,604.80 2 Beton kolom praktis 15x15cm 1.56 m³ 2,041,540.00 3,184,802.40 Sub Jumlah 6,372,407.20 V PEKERJAAN PASANGAN DAN PLESTERAN 1 Pasang dinding bata camp. 1pc:5psr 24.06 m³ 395,710.00 9,520,782.60 2 Plesteran dinding camp. 1pc:5psr 343.08 m² 15,040.00 5,159,923.20 3 Sponengan 217.78 m1 3,370.00 733,918.60 Sub Jumlah 15,414,624.40 VI PEKERJAAN LANTAI DAN PLAFOND PENUTUP ATAP 1 Keramik lantai 30x30 cm (setara platinum) 41.90 m² 75,730.00 3,173,087.00 2 Keramik lantai km 20x20 (setara platinum) 2.25 m² 65,230.00 146,767.50 3 Keramik dinding km 20x25 cm (setara platinum) 9.00 m² 73,480.00 661,320.00 4 Plin keramik 10x30cm (setara platinum) 44.99 m1 25,243.33 1,135,697.57 5 Plafond gypsumboard t=9mm rangka kayu 57.41 m² 72,500.00 4,162,225.00 6 List plafond gypsum 63.44 m' 17,500.00 1,110,200.00 6 List plank kayu (25 tebal 2cm) 14.86 m' 28,870.00 429,008.20 7 Rangka atap (kuda2, usuk, reng kayu kalimantan) 64.08 m² 142,940.00 9,159,595.20 7 Penutup atap(genteng keramik KIA) 64.08 m² 90,750.00 5,815,260.00 8 Bubungan 25.80 m' 70,590.00 1,821,222.00 Sub Jumlah 27,614,382.47 VII PEKERJAAN FINISHING 1 Cat dinding tembok dalam catylac 343.08 m² 12,500.00 4,288,500.00 2 Cat langit-langit 57.41 m² 9,500.00 545,395.00 Sub Jumlah 4,833,895.00 VIII SALURAN KELILING AIR HUJAN 1 Saluran air hujan U 20 6.00 m' 124,320.00 745,920.00 Sub Jumlah 745,920.00 RENCANA ANGGARAN BIAYA No Uraian Pekerjaan Harga Page 2 of 3
  • 3. Volume Satuan Jumlah Harga ( Rp ) ( Rp ) No Uraian Pekerjaan Harga IX PEKERJAAN PINTU JENDELA DAN KANOPI 1 Pek. Pintu P1 kayu jati finishing melamin 3.000 unit 1,749,000.00 5,247,000.00 2 Pek. Pintu P2 kayu jati finishing melamin 1.000 unit 1,749,000.00 1,749,000.00 3 Pek. Pintu PVC P3 murico 1.000 unit 225,000.00 225,000.00 4 Jendela J1 kayu jati finishing melamin 5.000 unit 895,000.00 4,475,000.00 5 Kanopi polycarbonate (rangka hollow stainless stell) 9.000 m² 425,000.00 3,825,000.00 Sub Jumlah 15,521,000.00 X PEKERJAAN MEKANIKAL & ELEKTRIKAL A Pekerjaan elektrikal 1 Lampu SL 23 watt philip (termasuk fitting) 6.00 unit 55,000.00 330,000.00 2 Down light swillite DL 5 KBF 4.00 unit 85,000.00 340,000.00 2 Lampu dinding luar 2.00 unit 145,000.00 290,000.00 3 Lampu taman 1.00 unit 220,000.00 220,000.00 3 Instalasi penerangan & stok kontak 26.00 ttk 90,000.00 2,340,000.00 4 Saklar tunggal broco 4.00 bh 17,500.00 70,000.00 4 Saklar double broco 4.00 bh 20,000.00 80,000.00 5 Stop kontak broco 5.00 bh 17,500.00 87,500.00 Sub Jumlah 3,757,500.00 B Pekerjaan Mekanikal a. Pemipaan & sanitary - Pipa air bersih 3/4" wavin AW 14.93 m1 26,700.00 398,631.00 - Pipa air bersih 1/2" wavin AW 7.05 m1 21,550.00 151,927.50 - Pipa air bekas 3" wavin AW 10.93 m1 38,500.00 420,805.00 - Pipa air kotor 4" wavin AW 7.23 m1 57,500.00 415,725.00 - Kran air bersih merk TOTO 4.00 m1 125,000.00 500,000.00 - Washtafel merk TOTO 1.00 m1 850,000.00 850,000.00 - Shower tray merk TOTO 1.00 m1 356,000.00 356,000.00 - Closet jongkok merk TOTO 1.00 m1 1,325,000.00 1,325,000.00 b. Septik tank kapasitas 1,5m3 1.00 unit 1,100,000.00 1,100,000.00 Sub Jumlah 5,518,088.50 Page 3 of 3