Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

KOKO WASKO - CV (Update 28-Mar-16)

99 views

Published on

  • Be the first to comment

  • Be the first to like this

KOKO WASKO - CV (Update 28-Mar-16)

  1. 1. KOKO WASKO Address : Perumahan Gramapuri Tamansari B5 No.28 RT. 002 RW. 037 Wanasari Cibitung Bekasi Phone Number : 0821-252-333-79 Email : koko.wasko160479@gmail.com Place & DOB : Kuningan, 16th April 1979 Status : Married with 3 child Religion : Islam SUMMARY PROFILE Since 2002, I've worked in the field of PPC (Production Planning & Control), Assembly Production Control, Manufacturing (Zinc Die Casting, Plastic Injection, Machining & Key Cutting), Painting and New Model Development. Familiar with MS Office (such as MS Word, MS Excel, MS Power Point), Internet & E-mail. Mature with good communication and interpersonal skill, has a strong leadership, analytical thinking, and highly motivated. PROFESSIONAL EXPERIENCES 6 MEI 2002 - PRESENT PT HONDA LOCK INDONESIA NEW MODEL, PPC & ASSEMBLY SENIOR MANAGER Japanese Automotive Parts Manufacture Company 2 Wheel Product : Key Set & Starter Magnetic 4 Wheel Product : Set Key Cylinder, Door Mirror, Outer Handle, Door Latch, Wheel Sensor ■As New Model, PPC & Assembly Senior Manager 【Oct 2015 – current】 - Responsible for Control Project Development - Responsible for Production Planning & Delivery Control - Responsible for Production Assembly (2W : Key Set & Starter Magnetic and 4W : Door Mirror, Outer Handle & Set Key Cylinder, Door Latch and Wheel Sensor) - Control of Business Plan (TQM) Direct report to Advisor, Director and President Director
  2. 2. ■As Manufacturing (Plastic Injection, Key Molding & Painting) Manager 【Mar 2014 – Feb 2015】 - Production Control of Plastic Injection, Key Molding & Painting Process - Control of quality part (quality in process and ensure quality part before send to next process) - Quality Improvement - Productivity Up - Investment & Man Power Need calculation - Control of Business Plan (TQM) Direct report to Advisor, Director and President Director ■As New Model Development & 4 Wheel Assembly Production Manager 【Mar 2012 – Feb 2014】  New Model Development : - Responsible for control project development (such as Master Schedule, New Part, New Dies, Man Power Training, Document Control Process : Work Standard, Check Sheet, Control Plan, FMEA, etc) - Responsible for control Spec / Drawing from customer and internal R&D - Evaluation project and ensure the project runs according to schedule and spec requirement. - Project coordination with all relevant sections - Provide direction and decisions on problems that occur and what actions to take. - Report to Top Management of project implementation. - Control of Business Plan (TQM)  4 Wheel Assembly Production : - Responsible for the smooth running of the production process in accordance with schedule. - Periodic review on loading capacity (such as man power need, shift, cycle time, cap/man and plan of investment or improvement for capacity up). - Man power competency evaluation and training plan. - Provide direction and decisions on problems that occur and what actions to take. - Control of Business Plan (TQM) Direct report to Advisor, Director and President Director ■As Production Planning and Control (PPC) & New Model Development Manager 【Mar 2011 – Feb 2012】
  3. 3.  Production Planning and Control (PPC) : - Ordering Control from customer (Yearly, Monthly, Daily) - Production Plan for Assembly (Monthly, Daily) by AS400 system - Delivery Control to customer (Daily) - Control of Loading Capacity & Man Power Need (Monthly, Yearly, 3 Years) - Investment & Man Power Need calculation by EDP system - Control of Business Plan (TQM)  New Model Development : - Responsible for control project development (such as Master Schedule, New Part, New Dies, Man Power Training, Document Control Process : Work Standard, Check Sheet, Control Plan, FMEA, etc) - Responsible for control Spec / Drawing from customer and internal R&D - Evaluation project and ensure the project runs according to schedule and spec requirement. - Project coordination with all relevant sections - Provide direction and decisions on problems that occur and what actions to take. - Report to Top Management of project implementation. - Control of Business Plan (TQM) Direct report to Advisor, Director and President Director ■As Manufacture Assistant Manager 【Feb 2010 – Feb 2011】 - Production Control of Zinc Die Casting, Plastic Injection & Machining Process - Control of quality part (quality in process and ensure quality part before send to next process) - Quality Improvement - Productivity Up - Investment & Man Power Need calculation - Control of Business Plan (TQM) Direct report to Manager, Advisor and Factory Manager ■As 4 Wheel & Starter Magnetic Assembly Production Assistant Manager 【Jan 2008 – Jan 2010】 - Control of production achievement - Skill Up Man Power / Training Plan - Productivity Up - Quality Improvement - Investment & Man Power Need calculation - Control of Business Plan (TQM) Direct report to Manager, Advisor and Factory Manager
  4. 4. ■As New Model Development Section Head 【Jun 2006 – Dec 2007】 - Control of New Model Development - Create of Master Schedule - Control of equipment, die, new part, man power, support process & document control process - Cordinate meeting & evaluation - Prepare of QAV from customer - Control of trial event & delivery sample to customer Direct report to Manager, Advisor and Factory Manager ■As Production Planning and Control Staff 【Mei 2002 – May 2006】 - Create of Daily Production Plan - Input of Daily Production Actual - Monitoring stock finished good - Delivery preparation (Document Delivery, part, setting man power) - PIC Stock Taking finished good - Monthly Stock Report Direct report to Section Head and Manager OVERSEAS EXPERIENCE Mar 2014 Project Meeting at Honda Lock Thailand Transfer production of 2R Key Set from Honda Lock Thailand to Honda Lock Indonesia (Honda Lock Group Policy) Jun 2012 Study Visits of QSB (Quality System Basic) Implementation at Honda Lock Thailand, Thailand Related PM7 Project from Gerenal Motor Indonesia and starting development ISO TS16949 at Honda Lock Indonesia Mar 2012 Project Development for PM7 General Motor at Honda Lock Japan in Miyazaki, Japan Honda Lock Indonesia has received project from General Motor Indonesia (PM7 Project – SPIN vehicle) Oct 2008 Study Visits of 4 Wheel Production at Honda Lock Thailand, Thailand Starting of 4 Wheel Production at Honda Lock Indonesia PROFESSIONAL ACHIEVEMENTS 2014 – current Act as Leader of 5S Committee Create implementation rule of 5S in factory 2013 Development ISO TS16949 in New Model Department Create a new model’s procedure referred to ISO TS16949
  5. 5. 2009 – 2013 Act as Leader of IDEA BOX Committee Motivate all employees to make improvements to make the proposal even though it is a simple improvement In 2012, committee was able to collect ±7600 pieces of proposed improvements. 2008 Build 4W Assembly Production System In 2008, starting production of 4W assembly at Honda Lock Indonesia (Door Mirror, Outer Handle, Door Latch) 2006 Build New Model Development System Create procedure of new model development, document control, spec or drawing control system. In 2006, established a new department in Honda Lock Indonesia for handling of New Model Development. EDUCATION BACKGROUND 2002 Diploma III Akademi Pimpinan Perusahaan Depperindag majoring in Production Management with GPA 3.33 1997 Senior High School SMUN 1 Kuningan – Jawa Barat 1994 Junior High School SMPN 1 Cimara – Kuningan Jawa Barat 1991 Elementary School SDN Cimara II – Kuningan Jawa Barat SEMINAR AND TRAINING ATTENDS 2016 HRGA (Internal) Managerial Mentality HRGA (Internal) Total Quality Management (TQM) 2015 Central System Trainining for Trainer 2012 PQI Consultant Core Tools ISO/TS 16949 : 2009 (FMEA, APQP, & PPAP) 2010 PPM Manajement Effective Leadership PPM Manajement Effective Supervisory Management 2009 PPM Manajement Problems Solving And Decision Making (Minout Indonesia) Matsushita Gobel Foundation Horenso Premysis Consulting Internal Quality Auditor ISO 9001 : 2008 2008 Premysis Consulting ISO 14001 Internal Environmental Auditor 2005 Premysis Consulting ISO 9001 : 2000 Internal Quality Auditor
  6. 6. COMPUTER SKILL MS. Power Point Advance in making report and present it to Top Management MS. Excel Advance in making report & analyze data MS. Word Advance in making letter AS400 (Production System) Advance in use data for making report, analyze and regristration of spec (Bill Of Material) CURRENT RENUMERATION PACKAGE Current Salary : IDR 18,000,000 Allowance : THR, Bonus, Medical, Comunication and Transportation Availability : 1 Month Notice

×