Role Of Operations Research In   Managerial Decision Making
Management Science Operations Research Operational Research Operations Analysis  It is sometimes believed that operations research refers to constant monitoring of  an organization's  ongoing activities such as production scheduling and inventory control, facility maintenance and repair, staffing of service facilities etc.  Whereas many management science studies treat other kind of decisions that bear on daily operations only indirectly. These studies usually have planning orientation. For example determining the breadth of a firm’s product line, developing a long term plan for plant expansion, designing a network of warehouses for a wholesale distribution system, entering a new business by merger or acquisition .  
Some Definitions Of Operations Research ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Major O.R.Techniques ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Characteristics Of O.R. 1.  Inter-disciplinary Team Approach 2.  Holistic Approach To The System 3.  Focus On Decision Making
Phases Of An O.R. Study ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Areas Of Applications Of Operations Research (Schumacher-Smith Survey) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],  Percent Of    Companies   Area Of Application    Reporting    Activities
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Usage Of OR Techniques Among 125 Companies
Operations Research Software Available   Bernard W.Taylor, Management Science, Prentice-Hall,Inc., Englewood Cliffs, New Jersey (Contains AB: QM 4.0 By Sang Lee), 1996.   Hamdy A.Taha, Operations Research : An Introduction, Prentice-Hall Of India, New Delhi, (Contains Tora And SimmnetI1),1995. Sang M.Lee and Jung P.Shim,  Micro Management Science, Allyn and Bacon, (Contains Micro Manager Version2.0),1990. Yih-long Chang, Quantitative  Systems (QS) Version 3.0, Prentice-Hall, Inc., Englewood Cliffs, New Jersey, 1995. Yih-long Chang, Quantitative Systems For Business Plus (QSB+) Version 3.0, Prentice-Hall, Inc., Englewood Cliffs,NewJersey,1994.  
The Five Generations Of OR There Is Now A Realization That To Solve A Larger Set Of “Real-World "problems, And So Make A Significant Impact On Decision Making Technology, One Needs To Employ A Much Larger Combination Of Techniques And Tools, Dependent Upon The Situation. Artificial Barriers And Constraints Of The Discipline; Should Not Be Inhibiting. Fifth/? DSS And ES Methodologies Symbolize This Generation. ES Were Developed By AI In Response To Difficulties It Had Encountered; DSS By MS/OR. Decision Maker In Both Cases Becoming More Involved. Fourth/ 1970s- Present Those Who Emphasized Heuristics Programming And Ai-based Methodology Separated From OR, Thus Creating Two Approaches To “Satisficing.” Multiple Objective Optimization And Goal Programming Reflected The Change In OR. OR Associated With Quantitative; AI With Qualitative.  Third/ 1960s Emphasized Mathematical/Optimization Techniques. Scientific Methods Still Employed And Computers Began To Be Integrated Into Tool Box. Second / 1950s Emphasized The Applications Of The Scientific Methods  To Problems Involving Operations Of Systems. OR Teams Were Interdisciplinary And Addressed Complex Problems.  First/ 1930s-1940s Description Generation/ Time Frame
  OR’S FORMULATION ,[object Object],[object Object],[object Object],[object Object],ATTEMPTED TO USE MATHEMATICAL/ OPTIMIZATION  TECHNIQUES TO SOLVE  PROBLEMS INVOLVING OPERATIONS OF CS QUANTITATIVE METHODOLOGY APPLIED TO SOME SUBSET  OF PROBLEMS INVOLVING OPERATIONS OF CS FIRST GENERATION DSS DEVELOPED  IN  RESPONSE TO THE LIMITED SUCCESS ACHIEVED BY  THE  PREVIOUS GENERATION QUALITATIVE METHODOLOGY APPLIED TO LARGE CLASS OF PROBLEMS(GENERAL PROBLEM SOLVERS-GPS) ES DEVELOPED IN RESPONSE TO THE LACK OF SUCCESS IN CREATING GPS IN  PREVIOUS GENERATION CLASSICAL OR THIRD GENERATION EARLY OR SECOND GENERATION THE FIVE GENERATIONS OF OR MS/OR FOURTH GENERATION SOR (SYNERGISTICOR) FIFTH GENERATION ( 1930s-1940s) ( 1950s) ( 1970s)-PRESENT AI/ES ( 1960s) AI (?) OTHER RELEVANT PARADIGMS AI/ES MS/OR/DSS AI CLASSICAL OR QUALITATIVE QUANTITATIVE SYNERGY OF ALL SCHOOLS OF THOUGHT
Some Definitions Of Linear Programming ,[object Object],[object Object],[object Object]
  Janata fertilizers uses nitrates, phosphates, potash and an inert filler material for fertilizer manufacture. The firm mixes these four ingredients to make two basic fertilizers, 5-10-5 and 6-5-10 (nos. represent % wt. Of nitrates, phosphates and potash in each tonne of fertilizers). The contribution towards profits and overheads is Rs.300 and Rs.400 per tonne for (5-10-5) and (6-5-10) respectively. The firm has 120 tonnes of nitrates ,200 tonnes of phosphates, 150 tonnes of potash and unlimited filler material. They will not receive additional chemicals until next month. They believe that they can sell or store at negligible cost all fertilizer produced during the month. Determine optimal product mix.   
[object Object],[object Object],[object Object],[object Object],A state agricultural federation manufactures and markets cattle feed. It uses two ingredients which have the following  characteristics     Specifications are that fiber content should be at least 50% and fat content should not exceed 18% in every one kg. Of the feed. What amounts of A and B should be used so that cost/kg. is minimized?
PROBLEM-I     5-10-5   6-5-10  Available   NITRATES  5%  6%  120 TONNES PHOSPHATES  10%  5%  200 TONNES POTASH  5%  10%  150 TONNES CONTRIBUTION    Rs.300   Rs.400 Per Tonne
Problem-2 ,[object Object],[object Object],[object Object],[object Object],Required Fiber Content – At least 50% Fat Content  -  Not More Then 18%
A MEDIA PLANNING PROBLEM EXPOSURE RATES TA   TB MAGAZINE 2%   1% (Rs.80,000) TV COMMERCIAL 1%   3% (Rs.3,20,000) MINIMAL EXPOSURE 50%   30% ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
A Product Mix Problem   Cont/Pair Rs 150 Rs.100   HIKING BOOTS  SKING BOOTS   AVAILABLE  SEWING  2 3   13 HOURS STRETCHING 5 2   16 HOURS SOLUTION   :-  HB-2, SB-3   TC = Rs 600. ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
PRODUCTS MATERIALS   CONT/UNIT   A   B   C P 1 1  2   3 Rs.3 P 2 2  1  1 Rs.4 P 3 3  2   1 Rs.5 AVAILABLE 10  12  15 PRIMAL PROBLEM MAX Z  = 3X 1 +4X 2 +5X 3 X 1 +2X 2 +3X 3 <  10 2X 1 +X 2 +2X 3 <  12 3X 1 +X 2 +X 3 <  15 X 1 , X 2 , X 3   >  0 SV CONT   Q  3  4  5  0  0  0 COEFF. X 1   X 2   X 3   S 1   S 2   S 3 S 2   0   1  0  0   4/5  -1/5  1  -3/5 X 1   3   4  1  0  -1/5  -1/5  0  2/5 X 2   4   3  0  1  8/5  3/5  0  -1/5   OC    -4/5  -9/5  -2/5 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
SV  COST  Q  10  12   15  0 0  0   COEFF.  Y 1   Y 2   Y 3  S 1 S 2   S 3 Y 3 15 2/5  0  3/5   1 -2/5 1/5  0 S 3 0 4/5  0  -4/5  0  1/5  -8/5  1 Y 1 10 9/5  1  1/5   0  1/5  -3/5  0 OC   1   4   3
Applications Of Linear Programming In  Production Management ,[object Object],2  Production Smoothing 3.   Assembly Line Balancing 4.   Sub Contracting 5. Some Purchasing Decisions 6 .  Location Of Production Facilities ,[object Object],[object Object],[object Object],[object Object],[object Object]
APPLICATIONS OF LINEAR PRORAMMING IN FINANCIAL MANAGEMENT ,[object Object],2.  Financing Decisions 3.  Portfolio Selection 4.  Profit Planning 5 .  Financial Audit Applications Of Linear Programming  In Personnel Management 1.  Job Assignment 2.  Manpower Scheduling 3.  Manpower Planning 4.  Equitable Salaries 5.  Manpower Deployment
Limitations Of Linear Programming ,[object Object],2.  Additivity 3.  Continuity 4.  Certainty 5.  Single Objective
[object Object],[object Object],[object Object],[object Object],[object Object]
3.   A FARMER HAS A 100- HECTARE FARM. HE CAN SELL ALL THE TOMATOES, LETTUCE, OR RADISHES HE CAN RAISE. THE PRICE HE CAN OBTAIN IS RE.1 PER KILOGRAM FOR TOMATOES, RE. 0.75 A HEAD FOR LETTUCE AND RS. 2 PER KILOGRAM FOR RADISHES. THE AVERAGE YIELD PER HECTARE IS 2,000 KILOGRAM OF  TOMATOES, 3000 HEADS OF LETTUCE AND 1,000 KILOGRAMS OF RADISHES. FERTILIZER IS AVAILABLE AT RE. 0.50 PER  KILOGRAM AND THE AMOUNT REQUIRED PER HECTARE IS 100 KILOGRAMS EACH FOR TOMATOES AND LETTUCE AND 50 KILOGRAMS FOR RADISHES. LABOUR REQUIRED FOR SOWING, CULTIVATING AND HARVESTING PER HECTARE IS 5 MAN-DAYS EACH FOR TOMATOES AND RADISHES AND 6 MAN-DAYS FOR LETTUCE. A TOTAL OF 400 MAN-DAYS OF LABOUR ARE AVAILABLE AT RS.20 PER MAN-DAY. FORMULATE THIS PROBLEM AS A LINEAR PROGRAMMING MODEL TO MAXIMIZE THE FARMER’S TOTAL PROFIT.
4.  FOUR PRDUCTS HAVE TO BE PROCESSED THROUGH THE PLANT, THE QUANTITIES REQUIRED FOR THE NEXT PRODUCTION  PERIOD BEING: PRODUCT 1 2,000   UNITS PRODUCT 2 3,000  UNITS PRODUCT 3 3,000  UNITS PRODUCT 4 6,000  UNITS  THERE ARE THREE PRODUCTION LINES ON WHICH THE PRODUCTS COULD BE PROCESSED. THE RATES FOR PRODUCTION IN UNITS PER DAY AND THE TOTAL AVAILABLE CAPACITY IN DAYS ARE GIVEN IN THE FOLLOWING TABLE. THE COST OF USING THE LINES IS RS. 600,  RS. 500, RS. 400 PER DAY,RESPECTIVELY, ASSIGNMENT OF FOUR PRODUCTS: RATES OF PRODUCTION IN UNITS PER DAY. PRODUCTION   PRODUCT   MAX.LINE LINE   1  2  3  4  CAPACITY(DAYS) A   150  100  500  400 20 B   200  100  760  400  20 C   160  80  890  600 18 FORMULATE THE ABOVE AS A LINEAR PROGRAMMING PROBLEM TO MINIMIZE THE COST OF  PRODUCTION .
5.  PRQ FEED COMPANY MARKETS TWO FEED MIXES FOR CATTLE. THE FIRST MIX, FERTILEX, REQUIRES AT LEAST TWICE AS MUCH WHEAT AS BARLEY. THE SECOND MIX, MULTIPLEX REQUIRES AT LEAST TWICE AS MUCH BARELY AS WHEAT. WHEAT COSTS RS.1.50 PER KG. AND ONLY 1,000 KG. ARE AVAILABLE THIS MONTH. BARLEY COSTS RS. 1.25 PER KG. AND 1200 KG. ARE AVAILABLE. FERTILEX SELLS FOR RS.1.80 PER KG. UPTO 99 KG, AND EACH ADDITIONAL KG. OVER 99 KG. SELLS FOR RS.1.65. MULTIPLEX SELLS AT RS. 1.70 PER KG. UPTO 99 KG. AND EACH ADDITIONAL KG.OVER 99 KG. SELLS FOR RS.1.55. BHARAT FARMS WILL BUY ANY AND ALL AMOUNTS OF BOTH MIXES PQR FEED COMPANY WILL MIX. SET UP THE LINEAR PROGRAMMING PROBLEM TO DETERMINE THE PRODUCE MIX THAT RESULTS IN MAXIMUM PROFITS .
A MANUFACTURER HAS CONTRACTED TO PRODUCE 2,000 UNITS OF A PARTICULER PRODUCT OVER THE NEXT EIGHT MONTHS. DELIVERIES  ARE SCHEDULED AS FOLLOW: JANUARY 100 FEBRUARY 200 MARCH 300 APRIL 400 MAY 100 JUNE 100 JULY  500 AUGUST 300 TOTAL 2,000 THE MANUFACTURER  HAS ESTIMATED THAT IT COSTS HIM RE. 1 TO STORE ONE UNIT OF PRODUCT FOR ONE MONTH. HE HAS A WAREHOUSE CAPACITY OF 300 UNITS. THE MANUFACTURER CAN PRODUCE ANY NUMBER OF UNITS IN A GIVEN MONTH, SINCE THE UNIT CAN BE  PRODUCED MOSTLY WITH PART-TIME LABOUR,  WHICH CAN BE EASILY OBTAINED. HOWEVER,THERE ARE THE COST OF TRANING NEW PERSONNEL AND COSTS ASSOCIATED  WITH LAYING OFF PERSONNEL WHO HAVE BEEN HIRED. THE MANUFACTURER HAS ESTIMATED THAT IT COSTS APPOXIMATELY 75 PAISE PER UNIT TO INCRESE THE PRODUCTION LEVEL FROM ONE MONTH TO THE NEXT(E.G. IF PRODUCTION IN JANUARY IS 200 AND IS INCREASED TO 300 IN FEBRUARY, THE COST IS RS.75 FOR TRANING THE ADDITIONAL PEOPLE REQUIRED  TO PRODUCE AT THE 300 UNIT LEVEL.)SIMILARLY IT COSTS 50 PAISE PER UNIT TO REDUCE PRODUCTION FROM ONE MONTH TO THE NEXT. (AT THE END OF EIGHT MONTHS, ALL EMPLOYEE WILL BE LAID OFF WITH THE CORRESPONDING PRODUCTION-REDUCTION COSTS). ASSUME THE PRODUCTION LEVEL BEFORE JANUARY IS ZERO . FORMULATE THE ABOVE AS A LINEAR PROGRAMMING PROBLEM.
Transportation Models ,[object Object],[object Object],[object Object],[object Object],. ,[object Object],[object Object]
The Assignment Model ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
AN ASSIGNMENT PROBLEM WORKERS   I II III IV   A 16 15 18 JOBS   B 13 16 14   C 14 13 11   D 16 18 17   A ROUTING PROBLEM  TO CITY A B C D E   A - 4 7 4   FROM     B 4 - 3 4   CITY     C 7 6 - 7     D 3 7 - 7   E 4 5 7 - 160 10 60 80 80 110   A TRANSPORTATION PROBLEM   WAREHOUSES 14 12 3 5 12 15 6 3 4 FACTORIES 500/500 220 110 90 80 REQD. 190 43 40 38 39 C 150 51 52 49 40 B 160 37 38 48 42 A CAPACITY G F E D TO/ FROM
For Maximization Case ,[object Object],For Minimization Case ,[object Object]
The cutting division of the photo film corporation requisitions from stock control department plastic films of 85 feet (fixed  unit length) which can be cut according to two patterns. First pattern will cut each film length into 35 feet pieces with the remaining 15 feet to scrap. Second pattern will cut each film length into a 35 feet piece and two 25 feet pieces with nothing to scrap. The present order from a customer is for 8 pieces of 35 feet length and 6 pieces of 25 feet length. What minimum number of plastic films of 85 feet should be cut to meet customer requirement?  
Problems On Integer Linear Programming ,[object Object],[object Object]
2. ABC COMPANY HAS 4 INDEPENDENT INVESTMENT PROJECTS AND MUST ALLOCATE A FIXED CAPITAL TO ONE OR MORE OF THEM SO THAT THE COMPANY’S NET PRESENT VALUE IS MAXIMIZED. THE ESTIMATED NET PRESENT VALUE AND THE ANTICIPATED CASH OUTFLOWS ASSOCIATED WITH THESE PROJECTS IS GIVEN IN THE FOLLOWING TABLE:   NPV   CASH OUTFLOWS(RS.1000)   PR. NO  (RS. 1000)  YEAR(I)  YEAR(II) 1 100   50 150 2   50   105   30 3 140   318 143 4   90   100   68 IN SELECTING THESE PROJECTS, THE COMPANY IS CONSTRAINED TO LIMIT ITS EXPENDITURE IN THE FIRST YEAR TO RS.5, 15,000 AND IN THE SECOND YEAR TO RS. 6,38,000. IF PROJECTS 1 AND 3 ARE MCTUALLY EXCLUSIVE, HOW SHOULD THE INVESTMENT BE MADE SO THAT THE TOTAL NET PRESENT VALUE IS MAXIMIZED?
  SET-UP   COST PER   MAX.  MACHINE   COST(Rs )  UNIT (Rs) PRODUCTION     1   8000  5 4000   2   5000  4 3000   3   4000  8 1000 QUANTITY REQUIRED:5000 UNITS AT MINIMUM COST. PRODUCT PLANT P Q R CAPACITY A 35 24 20   600 B 30 28 25   1,000 C 20 25 37   800 D 24 32 28   800 DEMAND 500 800 600
[object Object],[object Object],[object Object],BASIC CONCEPTS OF GOAL PROGRAMMING
NTC PRODUCES TWO TYPES OF MATERIALS, A STRONG UPHOLSTERY MATERIAL AND A REGULAR DRESS MATERIAL. THE UPHOLSTERY IS PRODUCED ACCORDING TO DIRECT ORDERS FROM FURNITURE MANUFACTURERS. THE DRESS MATERIAL ON THE OTHER HAND, IS DISTRIBUTED TO RETAIL FABRIC STORES. AVERAGE PRODUCTION RATES FOR THE TWO MATERIALS ARE IDENTICAL; 1000 METRES/HR. BY RUNNING TWO SHIFTS, NET OPERATIONAL CAPACITY OF THE PLANT IS 80 HOURS/WK. THE MARKETING DEPARTMENT REPORTS THAT THE MAXIMUM ESTIMATED SALES FOR THE FOLLOWING WEEK IS 70,000 M. OF UPHOLSTERY AND 45,000 M. OF DRESS MATERIAL. ACCORDING TO THE ACCOUNTING DEPARTMENT, THE APPROXIMATE PROFIT FROM A METRE OF UPHOLSTERY MATERIAL IS RS.2.50 AND FROM A METRE OF DRESS MATERIAL IS RS.1.50.   THE M.D. OF THE COMPANY BELIVES THAT A GOOD EMPLOYER- EMPLOYEE RELATIONSHIP IS IMPORTANT IN BUSINESS. HENCE HE DECIDES THAT A STABLE EMPLOYMENT LEVEL IS A PRIMARY  GOAL FOR THE FIRM. THEREFORE, WHENEVER THERE IS EXCESS DEMAND OVER NORMAL PRODUCTION, HE SIMPLY EXPANDS PRODUCTION CAPACITY BY PROVIDING OVERTIME. HOWEVER HE FEELS THAT OVERTIME OF MORE THAN 10 HOURS/WK. SHOULD BE AVOIDED – BECAUSE OF ACCELERATING COSTS. CONTD….P/2.
[object Object],[object Object],[object Object],[object Object],[object Object]
BHARAT TELEVISION COMPANY PRODUCES CTV SETS. IT HAS TWO PRODUCTION LINES. PRODUCTION RATE OF LINE-1 IS 2 SETS/HR. AND IT IS 1.1/2 SETS/ HR. IN LINE-2. THE REGULAR  PRODUCTION CAPACITY IS 40 HR./WK. FOR BOTH LINES. EXPECTED PROFIT FROM AN AVERAGE CTV SET IS RS.1000/- . THE TOP MANAGEMENT OF THE FIRM HAS THE FOLLOWING GOALS FOR THE WEEK (IN ORDINAL RANKING): ,[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],APPLICATION AREAS OF GOAL PROGRAMMING GOAL PROGRAMMING HAS BEEN WIDELY APPLIED TO VARIOUS DECISION PROBLEMS IN BUSINESS FIRMS, GOVERNMENT AGENCIES, AND NON PROFIT INSTITUTIONS. SOME OF THE BEST KNOWN APPLICATIONS OF GOAL PROGRAMMING INCLUDE THE FOLLOWING PROBLEM AREAS:  
LOCATION  1  2  3  4  5  6  7 1  -  12  27  14  45  36  15 2  -  10  25  32  M  22   3   -  28  50  28  10 4    -  16  20  32 5   -  26  35 6   -   20 7   - . TOTAL OF 30, 50  & 20 TONNES OF THIS COMMODITY ARE TO BE SENT FROM LOCATIONS 1, 2 & 3 RESPECTIVELY. A TOTAL OF 15, 30 25 & 30 TONNES ARE TO BE SENT TO LOCATIONS 4, 5, 6 & 7 RESPECTIVELY. SHIPMENTS CAN BE SENT THROUGH INTERMEDIATE LOCATIONS AT A COST EQUAL TO THE SUM OF THE COSTS FOR EACH OF THE LEGS OF THE JOURNEY. THE PROBLEM IS TO DETERMINE THE OPTIMAL SHIPPING PLAN.       A CERTAIN CORPORATION MUST SHIP A CERTAIN PERISHABLE COMMODITY FROM LOCATIONS 1, 2, 3, TO LOCATIONS 4, 5, 6 &7. A    THE AIR FREIGHT PER TONNE (IN 100 RS.) BETWEEN SEVEN LOCATIONS IS GIVEN IN THE FOLLOWING TABLE. WHERE NO DIRECT AIR FREIGHT SERVICE IS AVAILABLE, A VERY HIGH COST  M HAS BEEN USED.
A PROBLEM ON DYNAMIC PROGRAMMING   ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]

More Related Content

Viewers also liked

Rmf04303[1]
Rmf04303[1]Rmf04303[1]
Rmf04303[1]Yambal
 
Las maravillas del mundo
Las maravillas del mundoLas maravillas del mundo
Las maravillas del mundoMarinaElena
 
Comfor katalog 11_2013
Comfor katalog 11_2013Comfor katalog 11_2013
Comfor katalog 11_2013comfor_web
 
28 τακτικές marketing για να αυξήσετε τις πωλήσεις σας αυτό το καλοκαίρι
28 τακτικές marketing για να αυξήσετε τις πωλήσεις σας αυτό το καλοκαίρι28 τακτικές marketing για να αυξήσετε τις πωλήσεις σας αυτό το καλοκαίρι
28 τακτικές marketing για να αυξήσετε τις πωλήσεις σας αυτό το καλοκαίριBusiness Coaching Lab
 
Three Lions Store design sample
Three Lions Store design sampleThree Lions Store design sample
Three Lions Store design sampleanthonyacker.com
 
Aeroportuaria 2012
Aeroportuaria 2012Aeroportuaria 2012
Aeroportuaria 2012john rojas
 
Zurich Amelia Showalter at Kampaweb on A/B-Testing
Zurich Amelia Showalter at Kampaweb on A/B-Testing Zurich Amelia Showalter at Kampaweb on A/B-Testing
Zurich Amelia Showalter at Kampaweb on A/B-Testing Kampaweb
 
Milton santos a globalização da comunicação
Milton santos   a globalização da comunicaçãoMilton santos   a globalização da comunicação
Milton santos a globalização da comunicaçãoAmadeu Neto
 
So tay huong dan dao tao tot
So tay huong dan dao tao totSo tay huong dan dao tao tot
So tay huong dan dao tao totNguyen Kien
 
Falcona rentals particpant information 2012
Falcona rentals  particpant information 2012Falcona rentals  particpant information 2012
Falcona rentals particpant information 2012ferferolive
 

Viewers also liked (20)

ASquare
ASquareASquare
ASquare
 
1334 2-1-1 norma inen
1334 2-1-1 norma inen1334 2-1-1 norma inen
1334 2-1-1 norma inen
 
Rmf04303[1]
Rmf04303[1]Rmf04303[1]
Rmf04303[1]
 
Domingo 2º de adviento 2015
Domingo 2º de adviento 2015Domingo 2º de adviento 2015
Domingo 2º de adviento 2015
 
Immobilien Kroatien / Insel Krk - Luxus-Wohnung in einer modernen Stadtvilla
Immobilien Kroatien / Insel Krk - Luxus-Wohnung in einer modernen Stadtvilla Immobilien Kroatien / Insel Krk - Luxus-Wohnung in einer modernen Stadtvilla
Immobilien Kroatien / Insel Krk - Luxus-Wohnung in einer modernen Stadtvilla
 
Las maravillas del mundo
Las maravillas del mundoLas maravillas del mundo
Las maravillas del mundo
 
Comfor katalog 11_2013
Comfor katalog 11_2013Comfor katalog 11_2013
Comfor katalog 11_2013
 
Ruta urbana de Pujerra
Ruta urbana de PujerraRuta urbana de Pujerra
Ruta urbana de Pujerra
 
28 τακτικές marketing για να αυξήσετε τις πωλήσεις σας αυτό το καλοκαίρι
28 τακτικές marketing για να αυξήσετε τις πωλήσεις σας αυτό το καλοκαίρι28 τακτικές marketing για να αυξήσετε τις πωλήσεις σας αυτό το καλοκαίρι
28 τακτικές marketing για να αυξήσετε τις πωλήσεις σας αυτό το καλοκαίρι
 
Explosivimetro
ExplosivimetroExplosivimetro
Explosivimetro
 
Modulo Edu2.0
Modulo Edu2.0Modulo Edu2.0
Modulo Edu2.0
 
DHCP
DHCPDHCP
DHCP
 
Three Lions Store design sample
Three Lions Store design sampleThree Lions Store design sample
Three Lions Store design sample
 
Duotono
DuotonoDuotono
Duotono
 
Aeroportuaria 2012
Aeroportuaria 2012Aeroportuaria 2012
Aeroportuaria 2012
 
Zurich Amelia Showalter at Kampaweb on A/B-Testing
Zurich Amelia Showalter at Kampaweb on A/B-Testing Zurich Amelia Showalter at Kampaweb on A/B-Testing
Zurich Amelia Showalter at Kampaweb on A/B-Testing
 
Milton santos a globalização da comunicação
Milton santos   a globalização da comunicaçãoMilton santos   a globalização da comunicação
Milton santos a globalização da comunicação
 
M.psiquiatricas en la ep.
M.psiquiatricas en la ep.M.psiquiatricas en la ep.
M.psiquiatricas en la ep.
 
So tay huong dan dao tao tot
So tay huong dan dao tao totSo tay huong dan dao tao tot
So tay huong dan dao tao tot
 
Falcona rentals particpant information 2012
Falcona rentals  particpant information 2012Falcona rentals  particpant information 2012
Falcona rentals particpant information 2012
 

Similar to Presentation 1-modified

080324 Miller Opportunity Matrix Asq Presentation
080324 Miller Opportunity Matrix Asq Presentation080324 Miller Opportunity Matrix Asq Presentation
080324 Miller Opportunity Matrix Asq Presentationrwmill9716
 
1 2 chem plantdesign-intro to plant design economics
1 2 chem plantdesign-intro to plant design  economics1 2 chem plantdesign-intro to plant design  economics
1 2 chem plantdesign-intro to plant design economicsayimsevenfold
 
Operation research and its application
Operation research and its applicationOperation research and its application
Operation research and its applicationpriya sinha
 
Operation research and its application
Operation research and its applicationOperation research and its application
Operation research and its applicationpriya sinha
 
Applying Lean Six Sigma To Reduce Linen Loss In An Acute Care
Applying Lean Six Sigma To Reduce Linen Loss In An Acute CareApplying Lean Six Sigma To Reduce Linen Loss In An Acute Care
Applying Lean Six Sigma To Reduce Linen Loss In An Acute CareFelicia Clark
 
Mech vii-operation research [06 me74]-notes
Mech vii-operation research [06 me74]-notesMech vii-operation research [06 me74]-notes
Mech vii-operation research [06 me74]-notesMallikarjunaswamy Swamy
 
Introduction to plant design economics
Introduction to plant design economicsIntroduction to plant design economics
Introduction to plant design economicsSunita Jobli
 
A STUDY OF SPARE PARTS INVENTORY MANAGEMENT CASE STUDY OF REDUCTION HALVE SP...
A STUDY OF SPARE PARTS INVENTORY MANAGEMENT  CASE STUDY OF REDUCTION HALVE SP...A STUDY OF SPARE PARTS INVENTORY MANAGEMENT  CASE STUDY OF REDUCTION HALVE SP...
A STUDY OF SPARE PARTS INVENTORY MANAGEMENT CASE STUDY OF REDUCTION HALVE SP...Leslie Schulte
 
Quality Management.ppt
Quality Management.pptQuality Management.ppt
Quality Management.pptddelucy
 
Quality Improvement using FMEA : A Short Review
Quality Improvement using FMEA : A Short ReviewQuality Improvement using FMEA : A Short Review
Quality Improvement using FMEA : A Short ReviewIRJET Journal
 
Operation research (definition, phases)
Operation research (definition, phases)Operation research (definition, phases)
Operation research (definition, phases)DivyaKS12
 
Bài Giảng: Quy hoạch tuyến tính (Linear Programming)
Bài Giảng: Quy hoạch tuyến tính (Linear Programming)Bài Giảng: Quy hoạch tuyến tính (Linear Programming)
Bài Giảng: Quy hoạch tuyến tính (Linear Programming)Hiền Tôn Nguyễn Trọng
 
QM0012- STATISTICAL PROCESS CONTROL AND PROCESS CAPABILITY
QM0012- STATISTICAL PROCESS CONTROL AND PROCESS CAPABILITYQM0012- STATISTICAL PROCESS CONTROL AND PROCESS CAPABILITY
QM0012- STATISTICAL PROCESS CONTROL AND PROCESS CAPABILITYsmumbahelp
 
090528 Miller Process Forensics Talk @ Asq
090528 Miller Process Forensics Talk @ Asq090528 Miller Process Forensics Talk @ Asq
090528 Miller Process Forensics Talk @ Asqrwmill9716
 
Opportunity Assessment and Advanced Control
Opportunity Assessment and Advanced ControlOpportunity Assessment and Advanced Control
Opportunity Assessment and Advanced ControlJim Cahill
 
A Study On the Effectiveness Of Lean Manufacturing Practices In MSME.
A Study On the Effectiveness Of Lean Manufacturing Practices In MSME.A Study On the Effectiveness Of Lean Manufacturing Practices In MSME.
A Study On the Effectiveness Of Lean Manufacturing Practices In MSME.jas16
 

Similar to Presentation 1-modified (20)

080324 Miller Opportunity Matrix Asq Presentation
080324 Miller Opportunity Matrix Asq Presentation080324 Miller Opportunity Matrix Asq Presentation
080324 Miller Opportunity Matrix Asq Presentation
 
1 2 chem plantdesign-intro to plant design economics
1 2 chem plantdesign-intro to plant design  economics1 2 chem plantdesign-intro to plant design  economics
1 2 chem plantdesign-intro to plant design economics
 
Operation research and its application
Operation research and its applicationOperation research and its application
Operation research and its application
 
Operation research and its application
Operation research and its applicationOperation research and its application
Operation research and its application
 
Applying Lean Six Sigma To Reduce Linen Loss In An Acute Care
Applying Lean Six Sigma To Reduce Linen Loss In An Acute CareApplying Lean Six Sigma To Reduce Linen Loss In An Acute Care
Applying Lean Six Sigma To Reduce Linen Loss In An Acute Care
 
Mech vii-operation research [06 me74]-notes
Mech vii-operation research [06 me74]-notesMech vii-operation research [06 me74]-notes
Mech vii-operation research [06 me74]-notes
 
Introduction to plant design economics
Introduction to plant design economicsIntroduction to plant design economics
Introduction to plant design economics
 
A STUDY OF SPARE PARTS INVENTORY MANAGEMENT CASE STUDY OF REDUCTION HALVE SP...
A STUDY OF SPARE PARTS INVENTORY MANAGEMENT  CASE STUDY OF REDUCTION HALVE SP...A STUDY OF SPARE PARTS INVENTORY MANAGEMENT  CASE STUDY OF REDUCTION HALVE SP...
A STUDY OF SPARE PARTS INVENTORY MANAGEMENT CASE STUDY OF REDUCTION HALVE SP...
 
Quality Management.ppt
Quality Management.pptQuality Management.ppt
Quality Management.ppt
 
Quality Improvement using FMEA : A Short Review
Quality Improvement using FMEA : A Short ReviewQuality Improvement using FMEA : A Short Review
Quality Improvement using FMEA : A Short Review
 
Operation research (definition, phases)
Operation research (definition, phases)Operation research (definition, phases)
Operation research (definition, phases)
 
Bài Giảng: Quy hoạch tuyến tính (Linear Programming)
Bài Giảng: Quy hoạch tuyến tính (Linear Programming)Bài Giảng: Quy hoạch tuyến tính (Linear Programming)
Bài Giảng: Quy hoạch tuyến tính (Linear Programming)
 
5. mba 205 operations research assignment 2nd semester
5. mba 205 operations research assignment 2nd semester5. mba 205 operations research assignment 2nd semester
5. mba 205 operations research assignment 2nd semester
 
I04402058062
I04402058062I04402058062
I04402058062
 
QM0012- STATISTICAL PROCESS CONTROL AND PROCESS CAPABILITY
QM0012- STATISTICAL PROCESS CONTROL AND PROCESS CAPABILITYQM0012- STATISTICAL PROCESS CONTROL AND PROCESS CAPABILITY
QM0012- STATISTICAL PROCESS CONTROL AND PROCESS CAPABILITY
 
090528 Miller Process Forensics Talk @ Asq
090528 Miller Process Forensics Talk @ Asq090528 Miller Process Forensics Talk @ Asq
090528 Miller Process Forensics Talk @ Asq
 
Opportunity Assessment and Advanced Control
Opportunity Assessment and Advanced ControlOpportunity Assessment and Advanced Control
Opportunity Assessment and Advanced Control
 
A012270104
A012270104A012270104
A012270104
 
Taguchi
Taguchi Taguchi
Taguchi
 
A Study On the Effectiveness Of Lean Manufacturing Practices In MSME.
A Study On the Effectiveness Of Lean Manufacturing Practices In MSME.A Study On the Effectiveness Of Lean Manufacturing Practices In MSME.
A Study On the Effectiveness Of Lean Manufacturing Practices In MSME.
 

More from Kinshook Chaturvedi (20)

Working and functions_of_rbi[1]
Working and functions_of_rbi[1]Working and functions_of_rbi[1]
Working and functions_of_rbi[1]
 
Role of idfc_in_infrastucture_finance
Role of idfc_in_infrastucture_financeRole of idfc_in_infrastucture_finance
Role of idfc_in_infrastucture_finance
 
Mutual funds
Mutual fundsMutual funds
Mutual funds
 
Iifcl ppt
Iifcl pptIifcl ppt
Iifcl ppt
 
Basel ii norms.ppt
Basel ii norms.pptBasel ii norms.ppt
Basel ii norms.ppt
 
Retail banking pres
Retail banking presRetail banking pres
Retail banking pres
 
Presentation on lic of india
Presentation on lic of indiaPresentation on lic of india
Presentation on lic of india
 
Mfi dfi
Mfi dfiMfi dfi
Mfi dfi
 
Management of np as imt
Management of np as imtManagement of np as imt
Management of np as imt
 
Life insurance in india final raja
Life insurance in india final rajaLife insurance in india final raja
Life insurance in india final raja
 
Financial inclusion
Financial inclusionFinancial inclusion
Financial inclusion
 
Corporate banking v2
Corporate banking v2Corporate banking v2
Corporate banking v2
 
Corporate banking latest
Corporate banking latestCorporate banking latest
Corporate banking latest
 
Financial mgt exercises
Financial mgt exercisesFinancial mgt exercises
Financial mgt exercises
 
Csac10[1].p
Csac10[1].pCsac10[1].p
Csac10[1].p
 
Csac08[1].p
Csac08[1].pCsac08[1].p
Csac08[1].p
 
Csac05[1].p
Csac05[1].pCsac05[1].p
Csac05[1].p
 
Csac14[1].p
Csac14[1].pCsac14[1].p
Csac14[1].p
 
Csac06[1].p
Csac06[1].pCsac06[1].p
Csac06[1].p
 
Xyber001 16 12_09 (2)
Xyber001 16 12_09 (2)Xyber001 16 12_09 (2)
Xyber001 16 12_09 (2)
 

Recently uploaded

Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Serviceankitnayak356677
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxAbhayThakur200703
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...lizamodels9
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 

Recently uploaded (20)

Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptx
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 

Presentation 1-modified

  • 1. Role Of Operations Research In Managerial Decision Making
  • 2. Management Science Operations Research Operational Research Operations Analysis It is sometimes believed that operations research refers to constant monitoring of an organization's ongoing activities such as production scheduling and inventory control, facility maintenance and repair, staffing of service facilities etc. Whereas many management science studies treat other kind of decisions that bear on daily operations only indirectly. These studies usually have planning orientation. For example determining the breadth of a firm’s product line, developing a long term plan for plant expansion, designing a network of warehouses for a wholesale distribution system, entering a new business by merger or acquisition .  
  • 3.
  • 4.
  • 5. Characteristics Of O.R. 1. Inter-disciplinary Team Approach 2. Holistic Approach To The System 3. Focus On Decision Making
  • 6.
  • 7.
  • 8.
  • 9. Operations Research Software Available   Bernard W.Taylor, Management Science, Prentice-Hall,Inc., Englewood Cliffs, New Jersey (Contains AB: QM 4.0 By Sang Lee), 1996. Hamdy A.Taha, Operations Research : An Introduction, Prentice-Hall Of India, New Delhi, (Contains Tora And SimmnetI1),1995. Sang M.Lee and Jung P.Shim, Micro Management Science, Allyn and Bacon, (Contains Micro Manager Version2.0),1990. Yih-long Chang, Quantitative Systems (QS) Version 3.0, Prentice-Hall, Inc., Englewood Cliffs, New Jersey, 1995. Yih-long Chang, Quantitative Systems For Business Plus (QSB+) Version 3.0, Prentice-Hall, Inc., Englewood Cliffs,NewJersey,1994.  
  • 10. The Five Generations Of OR There Is Now A Realization That To Solve A Larger Set Of “Real-World &quot;problems, And So Make A Significant Impact On Decision Making Technology, One Needs To Employ A Much Larger Combination Of Techniques And Tools, Dependent Upon The Situation. Artificial Barriers And Constraints Of The Discipline; Should Not Be Inhibiting. Fifth/? DSS And ES Methodologies Symbolize This Generation. ES Were Developed By AI In Response To Difficulties It Had Encountered; DSS By MS/OR. Decision Maker In Both Cases Becoming More Involved. Fourth/ 1970s- Present Those Who Emphasized Heuristics Programming And Ai-based Methodology Separated From OR, Thus Creating Two Approaches To “Satisficing.” Multiple Objective Optimization And Goal Programming Reflected The Change In OR. OR Associated With Quantitative; AI With Qualitative. Third/ 1960s Emphasized Mathematical/Optimization Techniques. Scientific Methods Still Employed And Computers Began To Be Integrated Into Tool Box. Second / 1950s Emphasized The Applications Of The Scientific Methods To Problems Involving Operations Of Systems. OR Teams Were Interdisciplinary And Addressed Complex Problems. First/ 1930s-1940s Description Generation/ Time Frame
  • 11.
  • 12.
  • 13.   Janata fertilizers uses nitrates, phosphates, potash and an inert filler material for fertilizer manufacture. The firm mixes these four ingredients to make two basic fertilizers, 5-10-5 and 6-5-10 (nos. represent % wt. Of nitrates, phosphates and potash in each tonne of fertilizers). The contribution towards profits and overheads is Rs.300 and Rs.400 per tonne for (5-10-5) and (6-5-10) respectively. The firm has 120 tonnes of nitrates ,200 tonnes of phosphates, 150 tonnes of potash and unlimited filler material. They will not receive additional chemicals until next month. They believe that they can sell or store at negligible cost all fertilizer produced during the month. Determine optimal product mix.  
  • 14.
  • 15. PROBLEM-I 5-10-5 6-5-10 Available NITRATES 5% 6% 120 TONNES PHOSPHATES 10% 5% 200 TONNES POTASH 5% 10% 150 TONNES CONTRIBUTION Rs.300 Rs.400 Per Tonne
  • 16.
  • 17.
  • 18.
  • 19.
  • 20. SV COST Q 10 12 15 0 0 0 COEFF. Y 1 Y 2 Y 3 S 1 S 2 S 3 Y 3 15 2/5 0 3/5 1 -2/5 1/5 0 S 3 0 4/5 0 -4/5 0 1/5 -8/5 1 Y 1 10 9/5 1 1/5 0 1/5 -3/5 0 OC 1 4 3
  • 21.
  • 22.
  • 23.
  • 24.
  • 25. 3. A FARMER HAS A 100- HECTARE FARM. HE CAN SELL ALL THE TOMATOES, LETTUCE, OR RADISHES HE CAN RAISE. THE PRICE HE CAN OBTAIN IS RE.1 PER KILOGRAM FOR TOMATOES, RE. 0.75 A HEAD FOR LETTUCE AND RS. 2 PER KILOGRAM FOR RADISHES. THE AVERAGE YIELD PER HECTARE IS 2,000 KILOGRAM OF TOMATOES, 3000 HEADS OF LETTUCE AND 1,000 KILOGRAMS OF RADISHES. FERTILIZER IS AVAILABLE AT RE. 0.50 PER KILOGRAM AND THE AMOUNT REQUIRED PER HECTARE IS 100 KILOGRAMS EACH FOR TOMATOES AND LETTUCE AND 50 KILOGRAMS FOR RADISHES. LABOUR REQUIRED FOR SOWING, CULTIVATING AND HARVESTING PER HECTARE IS 5 MAN-DAYS EACH FOR TOMATOES AND RADISHES AND 6 MAN-DAYS FOR LETTUCE. A TOTAL OF 400 MAN-DAYS OF LABOUR ARE AVAILABLE AT RS.20 PER MAN-DAY. FORMULATE THIS PROBLEM AS A LINEAR PROGRAMMING MODEL TO MAXIMIZE THE FARMER’S TOTAL PROFIT.
  • 26. 4. FOUR PRDUCTS HAVE TO BE PROCESSED THROUGH THE PLANT, THE QUANTITIES REQUIRED FOR THE NEXT PRODUCTION PERIOD BEING: PRODUCT 1 2,000 UNITS PRODUCT 2 3,000 UNITS PRODUCT 3 3,000 UNITS PRODUCT 4 6,000 UNITS THERE ARE THREE PRODUCTION LINES ON WHICH THE PRODUCTS COULD BE PROCESSED. THE RATES FOR PRODUCTION IN UNITS PER DAY AND THE TOTAL AVAILABLE CAPACITY IN DAYS ARE GIVEN IN THE FOLLOWING TABLE. THE COST OF USING THE LINES IS RS. 600, RS. 500, RS. 400 PER DAY,RESPECTIVELY, ASSIGNMENT OF FOUR PRODUCTS: RATES OF PRODUCTION IN UNITS PER DAY. PRODUCTION PRODUCT MAX.LINE LINE 1 2 3 4 CAPACITY(DAYS) A 150 100 500 400 20 B 200 100 760 400 20 C 160 80 890 600 18 FORMULATE THE ABOVE AS A LINEAR PROGRAMMING PROBLEM TO MINIMIZE THE COST OF PRODUCTION .
  • 27. 5. PRQ FEED COMPANY MARKETS TWO FEED MIXES FOR CATTLE. THE FIRST MIX, FERTILEX, REQUIRES AT LEAST TWICE AS MUCH WHEAT AS BARLEY. THE SECOND MIX, MULTIPLEX REQUIRES AT LEAST TWICE AS MUCH BARELY AS WHEAT. WHEAT COSTS RS.1.50 PER KG. AND ONLY 1,000 KG. ARE AVAILABLE THIS MONTH. BARLEY COSTS RS. 1.25 PER KG. AND 1200 KG. ARE AVAILABLE. FERTILEX SELLS FOR RS.1.80 PER KG. UPTO 99 KG, AND EACH ADDITIONAL KG. OVER 99 KG. SELLS FOR RS.1.65. MULTIPLEX SELLS AT RS. 1.70 PER KG. UPTO 99 KG. AND EACH ADDITIONAL KG.OVER 99 KG. SELLS FOR RS.1.55. BHARAT FARMS WILL BUY ANY AND ALL AMOUNTS OF BOTH MIXES PQR FEED COMPANY WILL MIX. SET UP THE LINEAR PROGRAMMING PROBLEM TO DETERMINE THE PRODUCE MIX THAT RESULTS IN MAXIMUM PROFITS .
  • 28. A MANUFACTURER HAS CONTRACTED TO PRODUCE 2,000 UNITS OF A PARTICULER PRODUCT OVER THE NEXT EIGHT MONTHS. DELIVERIES ARE SCHEDULED AS FOLLOW: JANUARY 100 FEBRUARY 200 MARCH 300 APRIL 400 MAY 100 JUNE 100 JULY 500 AUGUST 300 TOTAL 2,000 THE MANUFACTURER HAS ESTIMATED THAT IT COSTS HIM RE. 1 TO STORE ONE UNIT OF PRODUCT FOR ONE MONTH. HE HAS A WAREHOUSE CAPACITY OF 300 UNITS. THE MANUFACTURER CAN PRODUCE ANY NUMBER OF UNITS IN A GIVEN MONTH, SINCE THE UNIT CAN BE PRODUCED MOSTLY WITH PART-TIME LABOUR, WHICH CAN BE EASILY OBTAINED. HOWEVER,THERE ARE THE COST OF TRANING NEW PERSONNEL AND COSTS ASSOCIATED WITH LAYING OFF PERSONNEL WHO HAVE BEEN HIRED. THE MANUFACTURER HAS ESTIMATED THAT IT COSTS APPOXIMATELY 75 PAISE PER UNIT TO INCRESE THE PRODUCTION LEVEL FROM ONE MONTH TO THE NEXT(E.G. IF PRODUCTION IN JANUARY IS 200 AND IS INCREASED TO 300 IN FEBRUARY, THE COST IS RS.75 FOR TRANING THE ADDITIONAL PEOPLE REQUIRED TO PRODUCE AT THE 300 UNIT LEVEL.)SIMILARLY IT COSTS 50 PAISE PER UNIT TO REDUCE PRODUCTION FROM ONE MONTH TO THE NEXT. (AT THE END OF EIGHT MONTHS, ALL EMPLOYEE WILL BE LAID OFF WITH THE CORRESPONDING PRODUCTION-REDUCTION COSTS). ASSUME THE PRODUCTION LEVEL BEFORE JANUARY IS ZERO . FORMULATE THE ABOVE AS A LINEAR PROGRAMMING PROBLEM.
  • 29.
  • 30.
  • 31. AN ASSIGNMENT PROBLEM WORKERS I II III IV A 16 15 18 JOBS B 13 16 14 C 14 13 11 D 16 18 17 A ROUTING PROBLEM TO CITY A B C D E A - 4 7 4 FROM B 4 - 3 4 CITY C 7 6 - 7 D 3 7 - 7 E 4 5 7 - 160 10 60 80 80 110 A TRANSPORTATION PROBLEM WAREHOUSES 14 12 3 5 12 15 6 3 4 FACTORIES 500/500 220 110 90 80 REQD. 190 43 40 38 39 C 150 51 52 49 40 B 160 37 38 48 42 A CAPACITY G F E D TO/ FROM
  • 32.
  • 33. The cutting division of the photo film corporation requisitions from stock control department plastic films of 85 feet (fixed unit length) which can be cut according to two patterns. First pattern will cut each film length into 35 feet pieces with the remaining 15 feet to scrap. Second pattern will cut each film length into a 35 feet piece and two 25 feet pieces with nothing to scrap. The present order from a customer is for 8 pieces of 35 feet length and 6 pieces of 25 feet length. What minimum number of plastic films of 85 feet should be cut to meet customer requirement?  
  • 34.
  • 35. 2. ABC COMPANY HAS 4 INDEPENDENT INVESTMENT PROJECTS AND MUST ALLOCATE A FIXED CAPITAL TO ONE OR MORE OF THEM SO THAT THE COMPANY’S NET PRESENT VALUE IS MAXIMIZED. THE ESTIMATED NET PRESENT VALUE AND THE ANTICIPATED CASH OUTFLOWS ASSOCIATED WITH THESE PROJECTS IS GIVEN IN THE FOLLOWING TABLE:   NPV CASH OUTFLOWS(RS.1000) PR. NO (RS. 1000) YEAR(I) YEAR(II) 1 100 50 150 2 50 105 30 3 140 318 143 4 90 100 68 IN SELECTING THESE PROJECTS, THE COMPANY IS CONSTRAINED TO LIMIT ITS EXPENDITURE IN THE FIRST YEAR TO RS.5, 15,000 AND IN THE SECOND YEAR TO RS. 6,38,000. IF PROJECTS 1 AND 3 ARE MCTUALLY EXCLUSIVE, HOW SHOULD THE INVESTMENT BE MADE SO THAT THE TOTAL NET PRESENT VALUE IS MAXIMIZED?
  • 36. SET-UP COST PER MAX. MACHINE COST(Rs ) UNIT (Rs) PRODUCTION 1 8000 5 4000 2 5000 4 3000 3 4000 8 1000 QUANTITY REQUIRED:5000 UNITS AT MINIMUM COST. PRODUCT PLANT P Q R CAPACITY A 35 24 20 600 B 30 28 25 1,000 C 20 25 37 800 D 24 32 28 800 DEMAND 500 800 600
  • 37.
  • 38. NTC PRODUCES TWO TYPES OF MATERIALS, A STRONG UPHOLSTERY MATERIAL AND A REGULAR DRESS MATERIAL. THE UPHOLSTERY IS PRODUCED ACCORDING TO DIRECT ORDERS FROM FURNITURE MANUFACTURERS. THE DRESS MATERIAL ON THE OTHER HAND, IS DISTRIBUTED TO RETAIL FABRIC STORES. AVERAGE PRODUCTION RATES FOR THE TWO MATERIALS ARE IDENTICAL; 1000 METRES/HR. BY RUNNING TWO SHIFTS, NET OPERATIONAL CAPACITY OF THE PLANT IS 80 HOURS/WK. THE MARKETING DEPARTMENT REPORTS THAT THE MAXIMUM ESTIMATED SALES FOR THE FOLLOWING WEEK IS 70,000 M. OF UPHOLSTERY AND 45,000 M. OF DRESS MATERIAL. ACCORDING TO THE ACCOUNTING DEPARTMENT, THE APPROXIMATE PROFIT FROM A METRE OF UPHOLSTERY MATERIAL IS RS.2.50 AND FROM A METRE OF DRESS MATERIAL IS RS.1.50.   THE M.D. OF THE COMPANY BELIVES THAT A GOOD EMPLOYER- EMPLOYEE RELATIONSHIP IS IMPORTANT IN BUSINESS. HENCE HE DECIDES THAT A STABLE EMPLOYMENT LEVEL IS A PRIMARY GOAL FOR THE FIRM. THEREFORE, WHENEVER THERE IS EXCESS DEMAND OVER NORMAL PRODUCTION, HE SIMPLY EXPANDS PRODUCTION CAPACITY BY PROVIDING OVERTIME. HOWEVER HE FEELS THAT OVERTIME OF MORE THAN 10 HOURS/WK. SHOULD BE AVOIDED – BECAUSE OF ACCELERATING COSTS. CONTD….P/2.
  • 39.
  • 40.
  • 41.
  • 42. LOCATION 1 2 3 4 5 6 7 1 - 12 27 14 45 36 15 2 - 10 25 32 M 22 3 - 28 50 28 10 4 - 16 20 32 5 - 26 35 6 - 20 7 - . TOTAL OF 30, 50 & 20 TONNES OF THIS COMMODITY ARE TO BE SENT FROM LOCATIONS 1, 2 & 3 RESPECTIVELY. A TOTAL OF 15, 30 25 & 30 TONNES ARE TO BE SENT TO LOCATIONS 4, 5, 6 & 7 RESPECTIVELY. SHIPMENTS CAN BE SENT THROUGH INTERMEDIATE LOCATIONS AT A COST EQUAL TO THE SUM OF THE COSTS FOR EACH OF THE LEGS OF THE JOURNEY. THE PROBLEM IS TO DETERMINE THE OPTIMAL SHIPPING PLAN.   A CERTAIN CORPORATION MUST SHIP A CERTAIN PERISHABLE COMMODITY FROM LOCATIONS 1, 2, 3, TO LOCATIONS 4, 5, 6 &7. A   THE AIR FREIGHT PER TONNE (IN 100 RS.) BETWEEN SEVEN LOCATIONS IS GIVEN IN THE FOLLOWING TABLE. WHERE NO DIRECT AIR FREIGHT SERVICE IS AVAILABLE, A VERY HIGH COST M HAS BEEN USED.
  • 43.