SlideShare a Scribd company logo
1 of 5
TUTORIAL 3
SOLUTION
SOLUTION FOR Q1
a)
Loss $2,000
(100,000 x (1.87 – 1.85) = 2,000
b)
Asset $950
(100,000 x (1.85 – 1.84) = 1,000
1,000 x 0.95 (present value discount factor) = 950
SOLUTION FOR Q2
a. Forward Contract Cash Flow Hedge of Foreign Currency Receivable
1 December 2012
Accounts receivable (USD) [20,000 x RM3.00] 60,000
Sales 60,000
No entry for the forward contract.
31 December 2012
Accounts receivable (USD) 1,000
Foreign exchange gain 1,000
[20,000 x (RM3.05 – RM3.00)]
Loss on forward contract 1,000
Cash flow hedge reserve 1,000
Cash flow hedge reserve 1,176.36
Forward contract 1,176.36
[20,000 x (RM3.04 – RM3.10) = RM1,200 x .9803 = RM1,176.36]
Cash flow hedge reserve 266.67
Premium revenue 266.67
[20,000 x (RM3.04 – RM3.00) = RM800 x 1/3 = RM266.67]
1 March 2013
Accounts receivable (USD) 1,400
Foreign exchange gain 1,400
[20,000 x (RM3.12 – RM3.05)]
Loss on forward contract 1,400
Cash flow hedge reserve 1,400
Cash flow hedge reserve 423.64
Forward contract 423.64
[20,000 x (RM3.12 - RM3.04) = RM1,600 – 1,176.36]
Cash flow hedge reserve 533.33
Premium revenue 533.33
[RM800 x 2/3 = RM533.33]
Foreign currency (USD) [20,000 x RM3.12] 62,400
Accounts receivable (USD) 62,400
Cash [20,000 x RM3.04] 60,800
Forward contract 1,600
Foreign currency (USD) 62,400
b. Forward Contract Fair Value Hedge of Foreign Currency Receivable
1 December 2012
Accounts receivable (USD) 60,000
Sales 60,000
[20,000 x RM3.00]
No entry for the forward contract.
31 December 2012
Accounts receivable (USD) 1,000
Foreign exchange gain 1,000
[20,000 x (RM3.05 – RM3.00)]
Loss on forward contract 1,176.36
Forward contract 1,176.36
[20,000 x (RM3.04 – RM3.10) = RM1,200 x .9803 = RM1,176.36]
1 March 2013
Accounts receivable (USD) 1,400
Foreign exchange gain 1,400
[20,000 x (RM3.12 – RM3.05)]
Loss on forward contract 423.64
Forward contract 423.64
[20,000 x (RM3.12 – RM3.04) = RM1,600 – 1,176.36]
Foreign currency (USD) 62,400
Accounts receivable (USD) 62,400
[20,000 x RM3.12]
Cash [20,000 x RM3.04] 60,800
Forward contract 1,600
Foreign currency (USD) 62,400
SOLUTION FOR Q3
a)
1 November 2013:
Materials 300,000
Accounts Payable (USD) 300,000
(To record purchase: USD100,000 x RM3.00)
31 December 2013
Foreign exchange loss 900
Accounts payable (USD) 900
[To adjust the value of accounts payable to the new spot rate: 100,000 x (RM3.009 –
RM3.00)]
Forward contract 990
Cash flow hedge reserve 990
[To record the forward contract as an asset at its fair value: 100,000 x (RM2.995 – RM2.985)
= RM1,000 x .990 (PVFn=1/i=1%) = RM990]
Cash flow hedge reserve 900
Gain on forward contract 900
(To record a gain on forward contract to offset the foreign exchange loss on accounts
payable)
Cash flow hedge reserve 1,000
Discount revenue 1,000
[To allocate the forward contract discount to net income using straight-line method: 100,000
x (RM3.00 – RM2.985) = RM1,500 x 2/3 = RM1,000]
31 January 2014
Accounts payable (USD) 2,900
Foreign exchange gain 2,900
[To adjust the value of accounts payable to the new spot rate: 100,000 x (RM3.009 –
RM2.980)]
Cash flow hedge reserve 1,490
Forward contract 1,490
[To adjust the carrying value of the forward contract to its current fair value: 100,000 x
(RM2.985 – RM2.980) = RM500 + RM990]
Cash flow hedge reserve 500
Discount revenue 500
[To allocate the forward contract discount to net income: RM1,500 x 1/3 = RM500]
Loss on forward contract 2,900
Cash flow hedge reserve 2,900
(To record a loss on forward contract to offset the foreign exchange gain on accounts
payable)
Foreign currency (USD) [100,000 x RM2.980] 298,000
Forward contract 500
Cash [100,000 x RM2.985] 298,500
Accounts payable (USD) 298,000
Foreign currency (USD) 298,000
b)
Fair value hedge:
On reporting date, the hedge asset or liability is reported at fair value. Change in fair value is
recognized through profit or loss.
The derivative hedging instrument is adjusted to fair value (resulting in an asset or liability
reported on the balance sheet), with the counterpart recognized as a gain or loss in net
income.
The discount or premium on a forward contract is not allocated to net income.

More Related Content

Similar to Tutorial 3 answer

Initial investment = $2,600,000+80,000+120,000+100,000= $2,900,00.pdf
 Initial investment = $2,600,000+80,000+120,000+100,000= $2,900,00.pdf Initial investment = $2,600,000+80,000+120,000+100,000= $2,900,00.pdf
Initial investment = $2,600,000+80,000+120,000+100,000= $2,900,00.pdf
nageswara1958
 
Bussiness accounting assignment#2
Bussiness accounting assignment#2Bussiness accounting assignment#2
Bussiness accounting assignment#2
niu13ghost
 
Akaun Chapter 7
Akaun Chapter 7Akaun Chapter 7
Akaun Chapter 7
WanBK Leo
 
Break even example fred
Break even example fredBreak even example fred
Break even example fred
Fred Mmbololo
 

Similar to Tutorial 3 answer (20)

Tugas sesi 8.docx
Tugas sesi 8.docxTugas sesi 8.docx
Tugas sesi 8.docx
 
Accounting 970602 paper 2 structured questions for examination from 2016 spec...
Accounting 970602 paper 2 structured questions for examination from 2016 spec...Accounting 970602 paper 2 structured questions for examination from 2016 spec...
Accounting 970602 paper 2 structured questions for examination from 2016 spec...
 
Solution quiz-pararel
Solution quiz-pararelSolution quiz-pararel
Solution quiz-pararel
 
Initial investment = $2,600,000+80,000+120,000+100,000= $2,900,00.pdf
 Initial investment = $2,600,000+80,000+120,000+100,000= $2,900,00.pdf Initial investment = $2,600,000+80,000+120,000+100,000= $2,900,00.pdf
Initial investment = $2,600,000+80,000+120,000+100,000= $2,900,00.pdf
 
Chapter 15
Chapter 15Chapter 15
Chapter 15
 
Buying
Buying Buying
Buying
 
Chapter 12
Chapter 12Chapter 12
Chapter 12
 
leverage chapter problem solution
leverage chapter problem solutionleverage chapter problem solution
leverage chapter problem solution
 
Tutorial 4 eps_answer
Tutorial 4 eps_answerTutorial 4 eps_answer
Tutorial 4 eps_answer
 
Bussiness accounting assignment#2
Bussiness accounting assignment#2Bussiness accounting assignment#2
Bussiness accounting assignment#2
 
Zimbabwe School Examinations Council Zimbabwe Ordinary Level Marking Scheme N...
Zimbabwe School Examinations Council Zimbabwe Ordinary Level Marking Scheme N...Zimbabwe School Examinations Council Zimbabwe Ordinary Level Marking Scheme N...
Zimbabwe School Examinations Council Zimbabwe Ordinary Level Marking Scheme N...
 
Ch2(2011
Ch2(2011Ch2(2011
Ch2(2011
 
working capital ch solution financial management ....mohsin mumtaz
working capital ch solution financial management ....mohsin mumtazworking capital ch solution financial management ....mohsin mumtaz
working capital ch solution financial management ....mohsin mumtaz
 
Accounting 970602 paper 2 core topics for examination from 2010 specimen mark...
Accounting 970602 paper 2 core topics for examination from 2010 specimen mark...Accounting 970602 paper 2 core topics for examination from 2010 specimen mark...
Accounting 970602 paper 2 core topics for examination from 2010 specimen mark...
 
PARTNERSHIP ACCOUNTS - Guarantee
PARTNERSHIP ACCOUNTS - GuaranteePARTNERSHIP ACCOUNTS - Guarantee
PARTNERSHIP ACCOUNTS - Guarantee
 
Chapter 24 (Break Even Analysis).pdf
Chapter 24 (Break Even Analysis).pdfChapter 24 (Break Even Analysis).pdf
Chapter 24 (Break Even Analysis).pdf
 
233665105 eng-g-economy
233665105 eng-g-economy233665105 eng-g-economy
233665105 eng-g-economy
 
Akaun Chapter 7
Akaun Chapter 7Akaun Chapter 7
Akaun Chapter 7
 
T3
T3T3
T3
 
Break even example fred
Break even example fredBreak even example fred
Break even example fred
 

More from kim rae KI (20)

Bab 5
Bab 5Bab 5
Bab 5
 
Bab 4
Bab 4Bab 4
Bab 4
 
Bab 2
Bab 2Bab 2
Bab 2
 
Bab 3
Bab 3Bab 3
Bab 3
 
Bab 13
Bab 13Bab 13
Bab 13
 
Bab 12
Bab 12Bab 12
Bab 12
 
Bab 11
Bab 11Bab 11
Bab 11
 
Bab 10
Bab 10Bab 10
Bab 10
 
Bab 1 (p3)
Bab 1 (p3)Bab 1 (p3)
Bab 1 (p3)
 
Bab 1 (p2)
Bab 1 (p2)Bab 1 (p2)
Bab 1 (p2)
 
Bab 1 (p1)
Bab 1 (p1)Bab 1 (p1)
Bab 1 (p1)
 
Equity part2
Equity part2Equity part2
Equity part2
 
Equity part1
Equity part1Equity part1
Equity part1
 
Current liabilities ppt
Current liabilities pptCurrent liabilities ppt
Current liabilities ppt
 
Chapter4
Chapter4Chapter4
Chapter4
 
Chapter3
Chapter3Chapter3
Chapter3
 
Chapter2 receivable edited2013
Chapter2 receivable edited2013Chapter2 receivable edited2013
Chapter2 receivable edited2013
 
Sqqs1013 ch6-a122
Sqqs1013 ch6-a122Sqqs1013 ch6-a122
Sqqs1013 ch6-a122
 
Sqqs1013 ch5-a122
Sqqs1013 ch5-a122Sqqs1013 ch5-a122
Sqqs1013 ch5-a122
 
Sqqs1013 ch4-a112
Sqqs1013 ch4-a112Sqqs1013 ch4-a112
Sqqs1013 ch4-a112
 

Recently uploaded

Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSSpellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
AnaAcapella
 
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
EADTU
 

Recently uploaded (20)

TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
 
Graduate Outcomes Presentation Slides - English (v3).pptx
Graduate Outcomes Presentation Slides - English (v3).pptxGraduate Outcomes Presentation Slides - English (v3).pptx
Graduate Outcomes Presentation Slides - English (v3).pptx
 
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
 
When Quality Assurance Meets Innovation in Higher Education - Report launch w...
When Quality Assurance Meets Innovation in Higher Education - Report launch w...When Quality Assurance Meets Innovation in Higher Education - Report launch w...
When Quality Assurance Meets Innovation in Higher Education - Report launch w...
 
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSSpellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
 
Basic Civil Engineering notes on Transportation Engineering & Modes of Transport
Basic Civil Engineering notes on Transportation Engineering & Modes of TransportBasic Civil Engineering notes on Transportation Engineering & Modes of Transport
Basic Civil Engineering notes on Transportation Engineering & Modes of Transport
 
How To Create Editable Tree View in Odoo 17
How To Create Editable Tree View in Odoo 17How To Create Editable Tree View in Odoo 17
How To Create Editable Tree View in Odoo 17
 
ESSENTIAL of (CS/IT/IS) class 07 (Networks)
ESSENTIAL of (CS/IT/IS) class 07 (Networks)ESSENTIAL of (CS/IT/IS) class 07 (Networks)
ESSENTIAL of (CS/IT/IS) class 07 (Networks)
 
An overview of the various scriptures in Hinduism
An overview of the various scriptures in HinduismAn overview of the various scriptures in Hinduism
An overview of the various scriptures in Hinduism
 
PSYPACT- Practicing Over State Lines May 2024.pptx
PSYPACT- Practicing Over State Lines May 2024.pptxPSYPACT- Practicing Over State Lines May 2024.pptx
PSYPACT- Practicing Over State Lines May 2024.pptx
 
Andreas Schleicher presents at the launch of What does child empowerment mean...
Andreas Schleicher presents at the launch of What does child empowerment mean...Andreas Schleicher presents at the launch of What does child empowerment mean...
Andreas Schleicher presents at the launch of What does child empowerment mean...
 
Observing-Correct-Grammar-in-Making-Definitions.pptx
Observing-Correct-Grammar-in-Making-Definitions.pptxObserving-Correct-Grammar-in-Making-Definitions.pptx
Observing-Correct-Grammar-in-Making-Definitions.pptx
 
8 Tips for Effective Working Capital Management
8 Tips for Effective Working Capital Management8 Tips for Effective Working Capital Management
8 Tips for Effective Working Capital Management
 
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptxAnalyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
 
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & Systems
 
ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...
ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...
ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...
 
OS-operating systems- ch05 (CPU Scheduling) ...
OS-operating systems- ch05 (CPU Scheduling) ...OS-operating systems- ch05 (CPU Scheduling) ...
OS-operating systems- ch05 (CPU Scheduling) ...
 
How to Send Pro Forma Invoice to Your Customers in Odoo 17
How to Send Pro Forma Invoice to Your Customers in Odoo 17How to Send Pro Forma Invoice to Your Customers in Odoo 17
How to Send Pro Forma Invoice to Your Customers in Odoo 17
 
Book Review of Run For Your Life Powerpoint
Book Review of Run For Your Life PowerpointBook Review of Run For Your Life Powerpoint
Book Review of Run For Your Life Powerpoint
 

Tutorial 3 answer

  • 1. TUTORIAL 3 SOLUTION SOLUTION FOR Q1 a) Loss $2,000 (100,000 x (1.87 – 1.85) = 2,000 b) Asset $950 (100,000 x (1.85 – 1.84) = 1,000 1,000 x 0.95 (present value discount factor) = 950 SOLUTION FOR Q2 a. Forward Contract Cash Flow Hedge of Foreign Currency Receivable 1 December 2012 Accounts receivable (USD) [20,000 x RM3.00] 60,000 Sales 60,000 No entry for the forward contract. 31 December 2012 Accounts receivable (USD) 1,000 Foreign exchange gain 1,000 [20,000 x (RM3.05 – RM3.00)] Loss on forward contract 1,000 Cash flow hedge reserve 1,000 Cash flow hedge reserve 1,176.36 Forward contract 1,176.36 [20,000 x (RM3.04 – RM3.10) = RM1,200 x .9803 = RM1,176.36] Cash flow hedge reserve 266.67 Premium revenue 266.67 [20,000 x (RM3.04 – RM3.00) = RM800 x 1/3 = RM266.67]
  • 2. 1 March 2013 Accounts receivable (USD) 1,400 Foreign exchange gain 1,400 [20,000 x (RM3.12 – RM3.05)] Loss on forward contract 1,400 Cash flow hedge reserve 1,400 Cash flow hedge reserve 423.64 Forward contract 423.64 [20,000 x (RM3.12 - RM3.04) = RM1,600 – 1,176.36] Cash flow hedge reserve 533.33 Premium revenue 533.33 [RM800 x 2/3 = RM533.33] Foreign currency (USD) [20,000 x RM3.12] 62,400 Accounts receivable (USD) 62,400 Cash [20,000 x RM3.04] 60,800 Forward contract 1,600 Foreign currency (USD) 62,400 b. Forward Contract Fair Value Hedge of Foreign Currency Receivable 1 December 2012 Accounts receivable (USD) 60,000 Sales 60,000 [20,000 x RM3.00] No entry for the forward contract.
  • 3. 31 December 2012 Accounts receivable (USD) 1,000 Foreign exchange gain 1,000 [20,000 x (RM3.05 – RM3.00)] Loss on forward contract 1,176.36 Forward contract 1,176.36 [20,000 x (RM3.04 – RM3.10) = RM1,200 x .9803 = RM1,176.36] 1 March 2013 Accounts receivable (USD) 1,400 Foreign exchange gain 1,400 [20,000 x (RM3.12 – RM3.05)] Loss on forward contract 423.64 Forward contract 423.64 [20,000 x (RM3.12 – RM3.04) = RM1,600 – 1,176.36] Foreign currency (USD) 62,400 Accounts receivable (USD) 62,400 [20,000 x RM3.12] Cash [20,000 x RM3.04] 60,800 Forward contract 1,600 Foreign currency (USD) 62,400
  • 4. SOLUTION FOR Q3 a) 1 November 2013: Materials 300,000 Accounts Payable (USD) 300,000 (To record purchase: USD100,000 x RM3.00) 31 December 2013 Foreign exchange loss 900 Accounts payable (USD) 900 [To adjust the value of accounts payable to the new spot rate: 100,000 x (RM3.009 – RM3.00)] Forward contract 990 Cash flow hedge reserve 990 [To record the forward contract as an asset at its fair value: 100,000 x (RM2.995 – RM2.985) = RM1,000 x .990 (PVFn=1/i=1%) = RM990] Cash flow hedge reserve 900 Gain on forward contract 900 (To record a gain on forward contract to offset the foreign exchange loss on accounts payable) Cash flow hedge reserve 1,000 Discount revenue 1,000 [To allocate the forward contract discount to net income using straight-line method: 100,000 x (RM3.00 – RM2.985) = RM1,500 x 2/3 = RM1,000] 31 January 2014 Accounts payable (USD) 2,900 Foreign exchange gain 2,900 [To adjust the value of accounts payable to the new spot rate: 100,000 x (RM3.009 – RM2.980)] Cash flow hedge reserve 1,490 Forward contract 1,490
  • 5. [To adjust the carrying value of the forward contract to its current fair value: 100,000 x (RM2.985 – RM2.980) = RM500 + RM990] Cash flow hedge reserve 500 Discount revenue 500 [To allocate the forward contract discount to net income: RM1,500 x 1/3 = RM500] Loss on forward contract 2,900 Cash flow hedge reserve 2,900 (To record a loss on forward contract to offset the foreign exchange gain on accounts payable) Foreign currency (USD) [100,000 x RM2.980] 298,000 Forward contract 500 Cash [100,000 x RM2.985] 298,500 Accounts payable (USD) 298,000 Foreign currency (USD) 298,000 b) Fair value hedge: On reporting date, the hedge asset or liability is reported at fair value. Change in fair value is recognized through profit or loss. The derivative hedging instrument is adjusted to fair value (resulting in an asset or liability reported on the balance sheet), with the counterpart recognized as a gain or loss in net income. The discount or premium on a forward contract is not allocated to net income.