Question: What do you understand
by the term RMR? How it is used
for designing a support plan for u/g
mine workings. Draw a RMR based
support plan for B&P development
workings at a depth of 300m.

Hkkjr dksfdax dksy
fyfeVsM
Answer:
RMR means Rock Mass Rating.
Rock Mass Rating (RMR) is the sum of the five
parameter ratings.
1. Layer thickness
30
2. Structural features
25
3. Weatherability
20
4. Rock strength
15
5. Groundwater
10
• If there are more than one rock type, then the
combined RMR is obtained as :
Combined RMR

Σ(RMR of each bed x bed thickness)

= ----------------------Σ (thickness of each bed)

Hkkjr dksfdax dksy
fyfeVsM
RMR so determined / obtained is further adjusted
for various geo-mining conditions such as:
Depth
•
Lateral Stress
•
Influence of adjacent and overlying workings
•
Mode of drivage
•
Finally roof is classified on the basis of adjusted /
final RMR as given below:
Sl.
Range of RMR
Class of Roof Description
of roof
1.
0-20
V
Very Poor
2.
20-40
IV
Poor
3.
40-60
III
Fair
4.
60-80
II
Good
5.
80-100
I
Very Good
Hkkjr dksfdax dksy
fyfeVsM
• Use of RMR in designing a support plan for
underground mine workings:
1. Rock Load is derived with following empirical
formula :Expected rock load = rock density x gallery
width x (1.7-0.037 RMR + 0.0002 x RMR2)
= 2.215 x 3.6 x (1.7 - 0.037 x 55 + 0.0002 x
55 x 55) = 2.15 te/sq.m
supposing gallery width = 3.6m
rock density = 2.215 te/m3 ( derived in lab
test)
Taking factor of safety = 2
Resistance applied = Rock Load X FOS
= 2.15 X 2 = 4.30 te/m2
Let Area of Exposure = 3.6m X 2m = 7.2m2
Hkkjr dksfdax dksy
=
fyfeVsM
• Total Resistance required = 4.30 te/m2 X 7.2 m2
= 30.96 te
•
• suppose one roof bolt takes load of 8 te
• Number of roof bolts to be jammed = 30.96/8
= 4 nos
•
• This way RMR is used for determining the support
design.
2. Estimation of
Support Load Density(SLD) in
depillaring district – RMR is also used to estimate the
SLD by following empirical formula:
For slice junction,
r.H0.50 X K0.64 X W1.17
• SLD = ----------------------R0.90
Hkkjr dksfdax dksy
fyfeVsM
within slice,
r. H 0.67 X K 0.84 X W 1.74
-----------------------• SLD =
R 1.42
In the Split Gallery
r. H 0.52 X K 0.59 X W 1.12
-----------------------• SLD =
R 1.02
For
Goaf Edge
r. H 0.54 X K 0.49 X W 0.89
-----------------------• SLD =
R 0.79
•
Hkkjr dksfdax dksy
fyfeVsM
• Where, r = weighted average rock density of the
immediate roof (te/m3)
• H = depth of cover (m)
• K = ratio horizontal to vertical
• W = width of split or slice (m)
• R = weighted average RMR of the immediate roof
rock.
3. Monitoring of Strata Support
RMR is also used in calculation of theoretical
maximum convergence and convergence velocity of
strata
• Cm = 40 X B X D 1/3 ( 1-RMR/100)3 (mm) 
• Cv = 0.55 X B X D1.7 ( 1-RMR/100)5.6 (mm/day)
B = roadway width
D = density of roof rock
Hkkjr dksfdax dksy
fyfeVsM

More Related Content

What's hot

What's hot (20)

Mining terminology
Mining terminologyMining terminology
Mining terminology
 
Topic 7-mining methods-part iii -surface mining- placer mining
Topic 7-mining methods-part iii -surface mining- placer miningTopic 7-mining methods-part iii -surface mining- placer mining
Topic 7-mining methods-part iii -surface mining- placer mining
 
Rock mass classification or rock mass rating of rock materials in civil and m...
Rock mass classification or rock mass rating of rock materials in civil and m...Rock mass classification or rock mass rating of rock materials in civil and m...
Rock mass classification or rock mass rating of rock materials in civil and m...
 
Topic 2 classification of mineral deposits
Topic 2 classification of mineral depositsTopic 2 classification of mineral deposits
Topic 2 classification of mineral deposits
 
Placer formation
Placer formationPlacer formation
Placer formation
 
Paleozoic stratigraphy
Paleozoic stratigraphy Paleozoic stratigraphy
Paleozoic stratigraphy
 
Economic geology - Metallogeny and plate tectonics
Economic geology - Metallogeny and plate tectonicsEconomic geology - Metallogeny and plate tectonics
Economic geology - Metallogeny and plate tectonics
 
DRILLING METHODS
DRILLING METHODSDRILLING METHODS
DRILLING METHODS
 
Underground mining method
Underground mining methodUnderground mining method
Underground mining method
 
Slopestability
SlopestabilitySlopestability
Slopestability
 
Open pit mining
Open pit miningOpen pit mining
Open pit mining
 
Lecture 4: Underground Mining
Lecture 4: Underground MiningLecture 4: Underground Mining
Lecture 4: Underground Mining
 
Rock mechanics
Rock mechanicsRock mechanics
Rock mechanics
 
Ore bearing fluids
Ore bearing fluidsOre bearing fluids
Ore bearing fluids
 
Mechanical characters of rock
Mechanical characters of rockMechanical characters of rock
Mechanical characters of rock
 
Geophysical exploration
Geophysical exploration Geophysical exploration
Geophysical exploration
 
Alluvial mining in geology based
Alluvial mining in geology basedAlluvial mining in geology based
Alluvial mining in geology based
 
Index properties of rock
Index properties of rockIndex properties of rock
Index properties of rock
 
GEOBOTONICAL GUIDES FOR ORE
 GEOBOTONICAL  GUIDES FOR ORE  GEOBOTONICAL  GUIDES FOR ORE
GEOBOTONICAL GUIDES FOR ORE
 
2 tunnels
2 tunnels2 tunnels
2 tunnels
 

Viewers also liked

Code of practice for mine surveyors
Code of practice for mine surveyorsCode of practice for mine surveyors
Code of practice for mine surveyors
Krishna Deo Prasad
 
Rock mass classification system
Rock mass classification systemRock mass classification system
Rock mass classification system
Sylvester Saragih
 
Diamond core drilling
Diamond core drillingDiamond core drilling
Diamond core drilling
Cik Mimie
 
Métodos de explotación subterranea 5ta clase
Métodos de explotación subterranea  5ta claseMétodos de explotación subterranea  5ta clase
Métodos de explotación subterranea 5ta clase
Flor Flores Montero
 
01 introduccion de siseño de mina subterraneas
01 introduccion de siseño de mina subterraneas01 introduccion de siseño de mina subterraneas
01 introduccion de siseño de mina subterraneas
Hamilton Flores Zavaleta
 

Viewers also liked (20)

Rmr
RmrRmr
Rmr
 
Code of practice for mine surveyors
Code of practice for mine surveyorsCode of practice for mine surveyors
Code of practice for mine surveyors
 
Rock mass classification system
Rock mass classification systemRock mass classification system
Rock mass classification system
 
modification of rmr system for indian coal mines
 modification of rmr system for indian coal mines modification of rmr system for indian coal mines
modification of rmr system for indian coal mines
 
Diapositiva de economia
Diapositiva de economiaDiapositiva de economia
Diapositiva de economia
 
Venti minas i
Venti minas  iVenti minas  i
Venti minas i
 
Top 10 trainee surveyor interview questions and answers
Top 10 trainee surveyor interview questions and answersTop 10 trainee surveyor interview questions and answers
Top 10 trainee surveyor interview questions and answers
 
Top 10 mine surveyor interview questions and answers
Top 10 mine surveyor interview questions and answersTop 10 mine surveyor interview questions and answers
Top 10 mine surveyor interview questions and answers
 
Diamond core drilling
Diamond core drillingDiamond core drilling
Diamond core drilling
 
Longwall mining
Longwall miningLongwall mining
Longwall mining
 
Environmental Management - Coal Mining
Environmental Management - Coal MiningEnvironmental Management - Coal Mining
Environmental Management - Coal Mining
 
Mining Geology and Exploration | Rodger Allen Gold Mine
 Mining Geology and Exploration | Rodger Allen Gold Mine Mining Geology and Exploration | Rodger Allen Gold Mine
Mining Geology and Exploration | Rodger Allen Gold Mine
 
Underground mine
Underground mineUnderground mine
Underground mine
 
Block caving
Block cavingBlock caving
Block caving
 
Diseño de métodos de explotación subterránea en mineria
Diseño de métodos de explotación subterránea en mineriaDiseño de métodos de explotación subterránea en mineria
Diseño de métodos de explotación subterránea en mineria
 
Introducción métodos de explotación
Introducción métodos de explotaciónIntroducción métodos de explotación
Introducción métodos de explotación
 
Métodos de explotación subterranea 5ta clase
Métodos de explotación subterranea  5ta claseMétodos de explotación subterranea  5ta clase
Métodos de explotación subterranea 5ta clase
 
01 introduccion de siseño de mina subterraneas
01 introduccion de siseño de mina subterraneas01 introduccion de siseño de mina subterraneas
01 introduccion de siseño de mina subterraneas
 
Rock mechanics
Rock mechanicsRock mechanics
Rock mechanics
 
8 ejemplos Prácticos de IPER
8 ejemplos Prácticos de IPER8 ejemplos Prácticos de IPER
8 ejemplos Prácticos de IPER
 

Similar to What is Rock Mass Rating?

Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdf
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdfLecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdf
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdf
ssuserd8a85b
 
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdf
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdfLecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdf
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdf
ssuserd8a85b
 
A two equation VLES turbulence model with near-wall delayed behaviour
A two equation VLES turbulence model with near-wall delayed behaviourA two equation VLES turbulence model with near-wall delayed behaviour
A two equation VLES turbulence model with near-wall delayed behaviour
Applied CCM Pty Ltd
 
Worked example extract_flat_slabs
Worked example extract_flat_slabsWorked example extract_flat_slabs
Worked example extract_flat_slabs
luantvconst
 
DSD-INT - SWAN Advanced Course - 02 - Setting up a SWAN computation
DSD-INT - SWAN Advanced Course - 02 - Setting up a SWAN computationDSD-INT - SWAN Advanced Course - 02 - Setting up a SWAN computation
DSD-INT - SWAN Advanced Course - 02 - Setting up a SWAN computation
Deltares
 
Design ppt
Design pptDesign ppt
Design ppt
tishu001
 
Columns lecture#3
Columns lecture#3Columns lecture#3
Columns lecture#3
Irfan Malik
 
chapter6designofconcreteslab-28two-wayslab-29.pptx
chapter6designofconcreteslab-28two-wayslab-29.pptxchapter6designofconcreteslab-28two-wayslab-29.pptx
chapter6designofconcreteslab-28two-wayslab-29.pptx
WanMuhammadIzzatFitr
 
lec10lec11fatigueanalysis-161211121313.pdf
lec10lec11fatigueanalysis-161211121313.pdflec10lec11fatigueanalysis-161211121313.pdf
lec10lec11fatigueanalysis-161211121313.pdf
ssuser748bff
 

Similar to What is Rock Mass Rating? (20)

Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16.pdf
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16.pdfLecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16.pdf
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16.pdf
 
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdf
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdfLecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdf
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdf
 
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdf
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdfLecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdf
Lecture-5-Slabs-and-Flat-Slabs-PHG-N-Rev13-15-Oct-16 (1).pdf
 
edited_VLSI DESIGN U2-1.pdf
edited_VLSI DESIGN U2-1.pdfedited_VLSI DESIGN U2-1.pdf
edited_VLSI DESIGN U2-1.pdf
 
A two equation VLES turbulence model with near-wall delayed behaviour
A two equation VLES turbulence model with near-wall delayed behaviourA two equation VLES turbulence model with near-wall delayed behaviour
A two equation VLES turbulence model with near-wall delayed behaviour
 
Worked example extract_flat_slabs
Worked example extract_flat_slabsWorked example extract_flat_slabs
Worked example extract_flat_slabs
 
New approch towards support desugn
New approch towards support desugnNew approch towards support desugn
New approch towards support desugn
 
DSD-INT - SWAN Advanced Course - 02 - Setting up a SWAN computation
DSD-INT - SWAN Advanced Course - 02 - Setting up a SWAN computationDSD-INT - SWAN Advanced Course - 02 - Setting up a SWAN computation
DSD-INT - SWAN Advanced Course - 02 - Setting up a SWAN computation
 
Culvert Design 201 Structural Design, Durability & Applications
Culvert Design 201 Structural Design, Durability & ApplicationsCulvert Design 201 Structural Design, Durability & Applications
Culvert Design 201 Structural Design, Durability & Applications
 
RCC BMD
RCC BMDRCC BMD
RCC BMD
 
Design ppt
Design pptDesign ppt
Design ppt
 
Parametric study on dynamic soil structure interaction analysis.pptx
Parametric study on dynamic soil structure interaction analysis.pptxParametric study on dynamic soil structure interaction analysis.pptx
Parametric study on dynamic soil structure interaction analysis.pptx
 
CVEN 440_540 Classnotes (6) --- Static analysis of pile foundation.pptx
CVEN 440_540 Classnotes (6) --- Static analysis of pile foundation.pptxCVEN 440_540 Classnotes (6) --- Static analysis of pile foundation.pptx
CVEN 440_540 Classnotes (6) --- Static analysis of pile foundation.pptx
 
Slender columnn and two-way slabs
Slender columnn and two-way slabsSlender columnn and two-way slabs
Slender columnn and two-way slabs
 
Columns lecture#3
Columns lecture#3Columns lecture#3
Columns lecture#3
 
chapter6designofconcreteslab-28two-wayslab-29.pptx
chapter6designofconcreteslab-28two-wayslab-29.pptxchapter6designofconcreteslab-28two-wayslab-29.pptx
chapter6designofconcreteslab-28two-wayslab-29.pptx
 
lec10lec11fatigueanalysis-161211121313.pdf
lec10lec11fatigueanalysis-161211121313.pdflec10lec11fatigueanalysis-161211121313.pdf
lec10lec11fatigueanalysis-161211121313.pdf
 
Rectangular tank
Rectangular tankRectangular tank
Rectangular tank
 
Three Phase Induction Motor Design (Electrical Machine Design)
Three Phase Induction Motor Design (Electrical Machine Design)Three Phase Induction Motor Design (Electrical Machine Design)
Three Phase Induction Motor Design (Electrical Machine Design)
 
Commissioning of Truebeam LINAC
Commissioning of Truebeam LINACCommissioning of Truebeam LINAC
Commissioning of Truebeam LINAC
 

More from Krishna Deo Prasad

Safety management plan by DGMS
Safety management plan by DGMSSafety management plan by DGMS
Safety management plan by DGMS
Krishna Deo Prasad
 
Emergency preparedness plan for mines
Emergency preparedness plan for minesEmergency preparedness plan for mines
Emergency preparedness plan for mines
Krishna Deo Prasad
 
Blasting inprovement techniques
Blasting inprovement techniquesBlasting inprovement techniques
Blasting inprovement techniques
Krishna Deo Prasad
 
Transport & digging capacity calculation
Transport & digging capacity calculationTransport & digging capacity calculation
Transport & digging capacity calculation
Krishna Deo Prasad
 
Danger due to fire & innundation
Danger due to fire & innundationDanger due to fire & innundation
Danger due to fire & innundation
Krishna Deo Prasad
 
Salient features of mines act, rules and regulation
Salient features of mines act, rules and regulationSalient features of mines act, rules and regulation
Salient features of mines act, rules and regulation
Krishna Deo Prasad
 

More from Krishna Deo Prasad (14)

Roles & Functions of Safety Committee.pptx
Roles & Functions of  Safety Committee.pptxRoles & Functions of  Safety Committee.pptx
Roles & Functions of Safety Committee.pptx
 
Objective, Importance & Need of Frontline Supervisors Training.pptx
Objective, Importance & Need of Frontline Supervisors Training.pptxObjective, Importance & Need of Frontline Supervisors Training.pptx
Objective, Importance & Need of Frontline Supervisors Training.pptx
 
Supply Chain Management
Supply Chain ManagementSupply Chain Management
Supply Chain Management
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
UG Explosives and Blasting
UG Explosives and BlastingUG Explosives and Blasting
UG Explosives and Blasting
 
Sustainability challenges before coal india
Sustainability challenges before coal indiaSustainability challenges before coal india
Sustainability challenges before coal india
 
highwall mining know - how
highwall mining know - howhighwall mining know - how
highwall mining know - how
 
Safety management plan by DGMS
Safety management plan by DGMSSafety management plan by DGMS
Safety management plan by DGMS
 
Emergency preparedness plan for mines
Emergency preparedness plan for minesEmergency preparedness plan for mines
Emergency preparedness plan for mines
 
Blasting inprovement techniques
Blasting inprovement techniquesBlasting inprovement techniques
Blasting inprovement techniques
 
Transport & digging capacity calculation
Transport & digging capacity calculationTransport & digging capacity calculation
Transport & digging capacity calculation
 
Danger due to fire & innundation
Danger due to fire & innundationDanger due to fire & innundation
Danger due to fire & innundation
 
Formation & Role of Internal Safety Organisation(ISO)
Formation & Role of Internal Safety Organisation(ISO)Formation & Role of Internal Safety Organisation(ISO)
Formation & Role of Internal Safety Organisation(ISO)
 
Salient features of mines act, rules and regulation
Salient features of mines act, rules and regulationSalient features of mines act, rules and regulation
Salient features of mines act, rules and regulation
 

Recently uploaded

Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
dlhescort
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
amitlee9823
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 

Recently uploaded (20)

Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 

What is Rock Mass Rating?

  • 1. Question: What do you understand by the term RMR? How it is used for designing a support plan for u/g mine workings. Draw a RMR based support plan for B&P development workings at a depth of 300m. Hkkjr dksfdax dksy fyfeVsM
  • 2. Answer: RMR means Rock Mass Rating. Rock Mass Rating (RMR) is the sum of the five parameter ratings. 1. Layer thickness 30 2. Structural features 25 3. Weatherability 20 4. Rock strength 15 5. Groundwater 10 • If there are more than one rock type, then the combined RMR is obtained as : Combined RMR Σ(RMR of each bed x bed thickness) = ----------------------Σ (thickness of each bed) Hkkjr dksfdax dksy fyfeVsM
  • 3. RMR so determined / obtained is further adjusted for various geo-mining conditions such as: Depth • Lateral Stress • Influence of adjacent and overlying workings • Mode of drivage • Finally roof is classified on the basis of adjusted / final RMR as given below: Sl. Range of RMR Class of Roof Description of roof 1. 0-20 V Very Poor 2. 20-40 IV Poor 3. 40-60 III Fair 4. 60-80 II Good 5. 80-100 I Very Good Hkkjr dksfdax dksy fyfeVsM
  • 4. • Use of RMR in designing a support plan for underground mine workings: 1. Rock Load is derived with following empirical formula :Expected rock load = rock density x gallery width x (1.7-0.037 RMR + 0.0002 x RMR2) = 2.215 x 3.6 x (1.7 - 0.037 x 55 + 0.0002 x 55 x 55) = 2.15 te/sq.m supposing gallery width = 3.6m rock density = 2.215 te/m3 ( derived in lab test) Taking factor of safety = 2 Resistance applied = Rock Load X FOS = 2.15 X 2 = 4.30 te/m2 Let Area of Exposure = 3.6m X 2m = 7.2m2 Hkkjr dksfdax dksy = fyfeVsM
  • 5. • Total Resistance required = 4.30 te/m2 X 7.2 m2 = 30.96 te • • suppose one roof bolt takes load of 8 te • Number of roof bolts to be jammed = 30.96/8 = 4 nos • • This way RMR is used for determining the support design. 2. Estimation of Support Load Density(SLD) in depillaring district – RMR is also used to estimate the SLD by following empirical formula: For slice junction, r.H0.50 X K0.64 X W1.17 • SLD = ----------------------R0.90 Hkkjr dksfdax dksy fyfeVsM
  • 6. within slice, r. H 0.67 X K 0.84 X W 1.74 -----------------------• SLD = R 1.42 In the Split Gallery r. H 0.52 X K 0.59 X W 1.12 -----------------------• SLD = R 1.02 For Goaf Edge r. H 0.54 X K 0.49 X W 0.89 -----------------------• SLD = R 0.79 • Hkkjr dksfdax dksy fyfeVsM
  • 7. • Where, r = weighted average rock density of the immediate roof (te/m3) • H = depth of cover (m) • K = ratio horizontal to vertical • W = width of split or slice (m) • R = weighted average RMR of the immediate roof rock. 3. Monitoring of Strata Support RMR is also used in calculation of theoretical maximum convergence and convergence velocity of strata • Cm = 40 X B X D 1/3 ( 1-RMR/100)3 (mm)  • Cv = 0.55 X B X D1.7 ( 1-RMR/100)5.6 (mm/day) B = roadway width D = density of roof rock Hkkjr dksfdax dksy fyfeVsM