This document contains the resume of Udayakumar K, an electrical and electronics engineer with 10 years of experience working on projects in industries like telecom, paper, automotive, and power grid. It summarizes his educational qualifications, including a B.E. in Electrical and Electronics Engineering, computer skills, professional experience managing electrical works for various companies, and personal details. His experience includes designing electrical systems, installing and testing equipment, coordinating with clients, and ensuring quality and safety standards are met on projects.
1. UDAYAKUMAR . K No.21/19, 1st
Floor,
C-Lic No : C 44967 Pillaiyar Koil Street
Poleyampadu, Thiruverkadu,
Chennai – 600 077,
Mobile : 091-9940149176
E-Mail:udayakumark111@yahoo.co.in
OBJECTIVES:
A challenging career as an Electrical & Electronics Engineer, which would
enthuse me to contribute meaningfully to the industry by leveraging my technical skills.
Being young and energetic, I have Positive attitude & aptitude to learn new things. I am a
self-motivated and team oriented task master. Self-starter and having Independent work
ethics. I am having high level initiative and drive, Courage & Conviction, Confidence &
Achievement. I am having multi-skill sets to implement procedures on and off the fields
including follow-ups. Ability to work independently under pressure. Attach more
importance to timeliness and quality deliverance of the product or service. Always willing to
update my technical knowledge by training and orientation.
QUALIFICATION:
B.E (Electrical & Electronics) - From MS University,
Tamil nadu, in April – 2003, India .
COMPUTER SKILLS:
Microsoft Office, excel, acess, power point
Auto Cad 2007
PLC study from PROLIFIC SYSTEMS & TECHONOLOGY PVT LTD.
C
EXPERIENCE:
2. 10 YEARS of experience in the construction works as an Electrical Engineer
and Project Engineer (Electrical and Electronics) at various fields of Telecom, Paper
Industrial constructions, Hyundai motor industry and Power grid Project work.
PROFESSIONAL ASSOCIATIONS:
KOTEC Automotive Service India Pvt Ltd., (Oct ’11 to Till Date)Chennai-India
SFE Engineering and Technology Pvt Ltd.,(Jan’08 to Sep’11) Gurgaon-India
HUTCHINSON ESSAR South Pvt Ltd ,(Jan’05 to Oct’07) Chennai-India
FLORIND Shoes Pvt Ltd,(Jan’04 to Jan’05) Ambur - India
CLIENTS-Work Experience
Electrical Engineer at Hyundai Mobis India ltd , Chennai TN
Electrical Engineer at Power Grid Corporation India ltd , Bina MP
Electrical Engineer at Hyundai Motor India Ltd.,Chennai TN
Project Engineer at Rainbow Paper Mill Ltd.,Ahamdabad GJ
Electrical Engineer at Hutchinson Telecom company ,Chennai TN
Electrical Maintenance Engineer (Trainee) at Florind Shoes , Ambur TN
Design and execution….
• Design and calculation of selection of cables, Voltage Drop Preparation of single line
diagrams, HT & LT panel schematic diagrams and power distribution arrangements.
• calculations, Short circuit current calculations, Earthing and lightning calculations
and Preparation of Cable Cutting Schedule & Joints.
• Preparation of Electrical layout of indoor & outdoor substations, equipment
arrangements, power panel arrangements, Cable tray routing etc..
2
3. • Preparation of load list and Cable schedules.
• Co – ordinate with EB Officials and proceed the works as per CEIG rules.
• Erection of Switchgears, Diesel Generator set, Power Transformers, Distribution
Transformers, LV switchboards, 110V DC Systems, and UPS Systems.
• Testing of transformers, HV Cable laying, Testing (IR Test & HIPOT), Termination Etc.
Laying of LV, Control, and Fiber Optical cables.
• Installation & commissioning of Fire fighting equipments like detectors, Manual call
points, alarms and Public address systems.
• Installation and commissioning of networking and telecommunication systems.
1. Electrical Engineer in Hyundai & Power Grid Project.
M/s KOTEC Automotive Service India Pvt Ltd ., Chennai. (Oct 2011 to till date)
Projects Involved…
1. Hyundai Projects –New Press shop, Chennai
2. Hyundai Projects – Engine Shop III, Chennai
3. Extension Project - Hyundai Mobis India Pvt. Ltd., Chennai
4. 1PH, 333MVA , ICT 765/400kv Project – Power Grid Corporation of India Ltd., Bina ,
MP
5. Warehouse Project – Hyundai Mobis India Pvt. Ltd., Chennai
6. Audio Airbag Project – Hyundai Mobis India Pvt.Ltd., Chennai
7. Hyundai Projects- R&D Center Substation (Load Upgrade) , Chennai
8. R&D Center Project – Hyundai Mobis India Pvt.Ltd., Hyderabad
Being a Electrical Engineer, I was a responsible for,
• Presence of Progress Meeting and absorb the minutes. Preparation of Material
Take off, Material Procurement, test sheet, Preparing Project dossiers and
technical Data sheets.
• Co – ordinate with EB Officials and proceed the works as per CEIG rules.
3
4. • Check the specification of electrical equipment and made the procurement as
per the client recommendations.
• Erection of Street light & Shop floor lighting
• Cable Tray installation (75*40 , 100*100, 50*50, 300 , 600 &900mm perforated
and ladder tray
• Cable tray support fabrication as per site condition on pipe rack
• Erection of 1PH 333MVA , 765/400/33kv – ICT Auto Transformer ,765kv - 14m,
400kv – 12m & 8m Supporting Structure , BPI & IPS Tube for AUX – BUS
• Erection of 33kv, 11kv Outdoor Switchyards & Indoor Substation
1250KVA(3No’s), &725 KVA Diesel Generator set, 2000KVA ,
33/0.433KV(2No’s) ; 2000KVA , 11/0.433KV(7No’s) Transformers, Bus bar
Trunking Systems , HT < Panels, 110V DC Systems, and UPS Systems.
• All other Electrical works like Lighting and power distribution, Fire fighting
equipments like detectors, Manual call points, alarms and Public address
systems. HVAC System, Lightning Protection and Earthing System.
• Testing of Transformers, CT ratio, VT and Panel Control Wiring.
• To follow the Electrical design & drawings such as control panel diagram and
power distribution systems.
• HV Cable laying, Testing (IR Test & HIPOT), Preparation of Cable Cutting Schedule
& Joints, Termination Etc. Laying of LV, Control, fire control
• Installation and commissioning of networking and telecommunication systems.
2.Project Engineer in Rainbow Paper Mill Project.
M/s SFE Engineering and Technology Pvt Ltd.,(Jan’08 to Sep’11) Gurgaon-India
Projects Involved…
1. Rainbow paper Project – Paper Machine # 7,
2. J K Paper Project - High precision Sheet cutting machine
4
5. Being a Project Engineer Electrical works, I was responsible for,
• HV Cable laying, Testing (IR Test & HIPOT), Preparation of Cable Cutting Schedule
& Joints, Termination Etc. Laying of LV & Control.
• Erection & Commissioning of Power & Distribution Transformers rated at
1500MVA,11/5KV (1No); 1600KVA,5/0.500KV(8No’s); 1600KVA,5/0.433KV(1No),
110V DC Systems, and UPS Systems.
• Testing and Commissioning of various motors from 18.5 KW to 1320 KW in Paper
mill.
• Cable Tray installation (75*40 , 100*100, 50*50, 300 , 600 &900mm perforated
and ladder tray
• Cable tray support fabrication as per site condition on pipe rack
• All other Electrical works like Lighting and small power distribution, detection
System, HVAC System, Lightning Protection and Earthing System.
• Testing of Transformers, CT ratio, VT and Panel Control Wiring.
3.Electrical Engineer at Hutchinson Telecom company , (Jan’05 to Oct’07)
Chennai TN.
Being a O & M Engineer Electrical works, I was responsible for,
• Attending client meeting and coordinating with client for site alarms and site
outage activities.
• As a Engineer involved in site execution, planning and tackling client
• Review the site outage , site fuel consumption report and site alarms for reduce
alarms and outage time
• D.G set, Panel & Battery Bank erected (7.5kva,10kva,12.5kva,15kva,25kva ,
30kva & 500kva, AMF, PIU , PMU with battery bank installation handle) for
telecommunication power plant
• ACDB , DCDB installation for Shelter lighting , FA , AC , SMPS(Power Supply
Module) unit and
5
6. • Cable pulling and dressing
• Power and lighting cable glanding and termination
• Co-ordinate with client for commissioning of panel & DG Set
• Giving a quality assurance for the job.
4.Electrical Maintenance Engineer (Trainee) at Florind Shoes ,
(Jan’04 to Jan’05) Ambur
Being a Maintenance Engineer , I was responsible for,
• Maintenance of electrical accessories and shut down work.
• Material transport coordination & organize the works.
• Prepare daily and weekly reports and submit to our main office.
• Calculate the material quantity and prepare material request.
• Check the stage-by-stage Maintenance activities.
PERSONAL DETAILS:
Date of Birth : 10-03-1980.
Permanent Address :199, Serpadi Post & Village,
Odugathur(via) , VLR – 632 103
Tamilnadu.
Marital Status : Married
Languages known : English, Hindi, Tamil
DECLARATION:
*All the above mentioned details are correct to the best of my knowledge.
Thank You
6