Controlling
It’s the process of monitoring, comparing, and correcting work performance. All
managers should control even if their units are performing as planned because they can’t
really know that unless they’ve evaluated what activities have been done and compared
actual performance against the desired standard. Effective controls ensure that activities are
completed in ways that lead to the attainment of goals. Whether controls are effective, then,
is determined by how well they help employees and managers achieve their goals.
Figure 1 shows the different aspects of the management functions wherein the
management cycle is also exhibited. This figure depicts the connection of Planning and
Controlling. Controlling identifies lapses or gaps of the executed plan or action.
Figure 1
The Control Process is a three-step process of measuring actual performance,
comparing actual performance against a standard, and taking managerial action to correct
deviations or to address inadequate standards.
The control process assumes that performance standards already exist, and they do.
They’re the specific goals created during the planning process.
Step 1. Measuring Actual Performance
 To determine what actual performance is, a manager must first get information about it.
HOW WE MEASURE.
Four approaches used by managers to measure and report actual performance are
personal observations, statistical reports, oral reports, and written reports.
Step 2. Comparing Actual Performance Against the Standard
 The comparing step determines the variation between actual performance and the
standard. Although some variation in performance can be expected in all activities, it’s
critical to determine an acceptable range of variation.
Step 3. Taking Managerial Action
 Managers can choose among three possible courses of action: do nothing, correct the
actual performance, or revise the standards.
1. Correct Actual Performance
Depending on what the problem is, a manager could take different corrective actions.
Example: An unsatisfactory work is the reason for performance variations, the manager
could correct it by things such as training programs, disciplinary action, changes in
compensation practices, and so forth. One decision that a manager must make is
whether to take immediate corrective action, which corrects problems at once to get
performance back on track, or to use basic corrective action, which looks at how and
why performance deviated before correcting the source of deviation.
2. Revise the Standard
It’s possible that the variance was a result of an unrealistic standard—too low or too high
a goal. In that situation, the standard needs the corrective action, not the performance.
Example: If performance consistently exceeds the goal, then a manager should look at
whether the goal is too easy and needs to be raised. On the other hand, managers
must be cautious about revising a standard downward.
Controlling Organizational Performance
 Organizational Performance
o the accumulated results of all the organization’s work activities.
 Organizational Productivity
o the amount of goods or services produced divided by the inputs needed to
generate that output.
 Organizational Effectiveness
o the measure of how appropriate organizational goals are and how well those goals
are being met.
 Tools for Measuring Organizational Performance
o Feedforward Control - The most desirable type of control prevents problems
because it takes place before the actual activity.
o Concurrent Control - This takes place while a work activity is in progress.
o Feedback Control - The control that takes place after the activity is done.
Financial Controls
Information Controls
A management information system (MIS) is a system used to provide managers with
needed information on a regular basis. In theory, this system can be manual or computer-
based, although most organizations have moved to computer-supported applications. The
term system in MIS implies order, arrangement, and purpose. Further, an MIS focuses
specifically on providing managers with information (processed and analyzed data), not
merely data (raw, unanalyzed facts).
For example, a library provides a good analogy. Although it can contain millions of
volumes, a library doesn’t do you any good if you can’t find what you want quickly. That’s why
librarians spend a great deal of time cataloging a library’s collections and ensuring that
materials are returned to their proper locations.
CASE APPLICATION: Baggage Blunders
Terminal 5 (T5), built by British Airways for $8.6 billion, is London Heathrow Airport’s newest state-
of-the-art facility. Made of glass, concrete, and steel, it’s the largest free-standing building in the United
Kingdom and has more than 10 miles of belts for moving luggage. At the terminal’s unveiling in March
of 2008, Queen Elizabeth II called it a “twenty-first-century gateway to Britain.” Alas . . . the accolades
didn’t last long! After two decades in planning and 100 million hours in manpower, opening day didn’t
work out as planned. Endless lines and major baggage handling delays led to numerous flight
cancellations stranding many irate passengers.
Airport operators said the problems were triggered by glitches in the terminal’s high-tech
baggage-handling system. With its massive automation features, T5 was planned to ease congestion
at Heathrow and improve the flying experience for the 30 million passengers expected to pass through
it annually. With 96 self-service check-in kiosks, more than 90 fast check-in bag drops, 54 standard
check-in desks, and miles of suitcase-moving belts estimated to be able to process 12,000 bags per
hour, the facility’s design seemed to support those goals.
However, within the first few hours of the terminal’s operation, problems developed. Presumably
understaffed, baggage workers were unable to clear incoming luggage fast enough. Arriving
passengers waited more than an hour for their bags. Departing passengers tried in vain to check in for
flights. Flights left with empty cargo holds. Sometime on day one, the airline checked in only those
passengers with no luggage. And it didn’t help that the moving belt system jammed at one point.
Lesser problems also became apparent: a few broken escalators, some hand dryers that didn’t work,
a gate that wouldn’t function at the new Underground station, and inexperienced ticket sellers who
didn’t know the fares between Heathrow and various stations on the Piccadilly line.
By the end of the first full day of operation, Britain’s Department of Transportation released a
statement calling for British Airways and the airport operator BAA to “work hard to resolve these issues
and limit disruptions to passengers.” You might be tempted to think that all of this could have been
prevented if British Airways had only tested the system. But thorough runs of all systems “from toilets to
check in and seating” took place six months before opening, including four full-scale test runs using
16,000 volunteers.
Although T5’s debut was far from perfect, things have certainly changed. A recent customer
satisfaction survey showed that 80 percent of passengers waited less than five minutes to check in.
And those passengers are extremely satisfied with the terminal’s lounges, catering, facilities, and
ambience. It’s a nice ending to the chaotic beginning.

More Related Content

What's hot

Managing in a unionized environment
Managing in a unionized environmentManaging in a unionized environment
Managing in a unionized environmentdrjapeng
 
Management history module by usama tariq
Management history module by usama tariqManagement history module by usama tariq
Management history module by usama tariqusama_tariq99
 
HRM Basics Er. S Sood
HRM Basics Er. S SoodHRM Basics Er. S Sood
HRM Basics Er. S Soodshart sood
 
3 phases of Human Resource Management
3 phases of Human Resource Management3 phases of Human Resource Management
3 phases of Human Resource ManagementIanne Loretizo
 
Development of management thought
Development of management thoughtDevelopment of management thought
Development of management thoughtDhananjay Mull
 
Efficient utilization of hr
Efficient utilization of hrEfficient utilization of hr
Efficient utilization of hrMaria Javed
 
employee turnover-slideshare- by chandan jha
employee turnover-slideshare- by chandan jhaemployee turnover-slideshare- by chandan jha
employee turnover-slideshare- by chandan jhaChanand Jha
 
Case Study Super Juice
Case Study   Super JuiceCase Study   Super Juice
Case Study Super JuiceAbdul Haseeb
 
1.frederick taylor, Scientific Principles of Management, Evolution of Mangem...
1.frederick taylor,  Scientific Principles of Management, Evolution of Mangem...1.frederick taylor,  Scientific Principles of Management, Evolution of Mangem...
1.frederick taylor, Scientific Principles of Management, Evolution of Mangem...PROF. PUTTU GURU PRASAD
 
Fundamentals of management
Fundamentals of managementFundamentals of management
Fundamentals of managementmskriz
 
Total Quality Management
Total Quality Management Total Quality Management
Total Quality Management Prachi Singla
 
Evolution of management thought
Evolution of management thoughtEvolution of management thought
Evolution of management thoughtUjjwal 'Shanu'
 
The Human Resource Management Environment in the Philippines
The Human Resource Management Environment in the PhilippinesThe Human Resource Management Environment in the Philippines
The Human Resource Management Environment in the PhilippinesJenica Bodestyne
 
Introduction to management
Introduction to managementIntroduction to management
Introduction to managementVanessa Pereira
 
Denisi hr 1e_ch.01_student
Denisi hr 1e_ch.01_studentDenisi hr 1e_ch.01_student
Denisi hr 1e_ch.01_studentshawnabushell
 
The evolution of management thought(1)(2)
The evolution of management thought(1)(2)The evolution of management thought(1)(2)
The evolution of management thought(1)(2)Sheefali Bansal
 

What's hot (20)

Managing in a unionized environment
Managing in a unionized environmentManaging in a unionized environment
Managing in a unionized environment
 
Management history module by usama tariq
Management history module by usama tariqManagement history module by usama tariq
Management history module by usama tariq
 
HRM Basics Er. S Sood
HRM Basics Er. S SoodHRM Basics Er. S Sood
HRM Basics Er. S Sood
 
Origin of management
Origin of managementOrigin of management
Origin of management
 
3 phases of Human Resource Management
3 phases of Human Resource Management3 phases of Human Resource Management
3 phases of Human Resource Management
 
Development of management thought
Development of management thoughtDevelopment of management thought
Development of management thought
 
Im101 Chap1
Im101 Chap1Im101 Chap1
Im101 Chap1
 
Efficient utilization of hr
Efficient utilization of hrEfficient utilization of hr
Efficient utilization of hr
 
employee turnover-slideshare- by chandan jha
employee turnover-slideshare- by chandan jhaemployee turnover-slideshare- by chandan jha
employee turnover-slideshare- by chandan jha
 
Management Theories
Management TheoriesManagement Theories
Management Theories
 
Case Study Super Juice
Case Study   Super JuiceCase Study   Super Juice
Case Study Super Juice
 
1.frederick taylor, Scientific Principles of Management, Evolution of Mangem...
1.frederick taylor,  Scientific Principles of Management, Evolution of Mangem...1.frederick taylor,  Scientific Principles of Management, Evolution of Mangem...
1.frederick taylor, Scientific Principles of Management, Evolution of Mangem...
 
Fundamentals of management
Fundamentals of managementFundamentals of management
Fundamentals of management
 
Total Quality Management
Total Quality Management Total Quality Management
Total Quality Management
 
Evolution of management thought
Evolution of management thoughtEvolution of management thought
Evolution of management thought
 
The Human Resource Management Environment in the Philippines
The Human Resource Management Environment in the PhilippinesThe Human Resource Management Environment in the Philippines
The Human Resource Management Environment in the Philippines
 
Introduction to management
Introduction to managementIntroduction to management
Introduction to management
 
Denisi hr 1e_ch.01_student
Denisi hr 1e_ch.01_studentDenisi hr 1e_ch.01_student
Denisi hr 1e_ch.01_student
 
The evolution of management thought(1)(2)
The evolution of management thought(1)(2)The evolution of management thought(1)(2)
The evolution of management thought(1)(2)
 
Chapter 1
Chapter 1Chapter 1
Chapter 1
 

Similar to Controlling

Controlling for Organizational Performance
Controlling for Organizational PerformanceControlling for Organizational Performance
Controlling for Organizational PerformanceKriti Kampani
 
Introduction to controlling
Introduction to controllingIntroduction to controlling
Introduction to controllingMuhammad Arslan
 
Major Questions You Should Be Able to Answer16.1Control Whe.docx
Major Questions You Should Be Able to Answer16.1Control Whe.docxMajor Questions You Should Be Able to Answer16.1Control Whe.docx
Major Questions You Should Be Able to Answer16.1Control Whe.docxcroysierkathey
 
Quality management in projects
Quality management in projectsQuality management in projects
Quality management in projectsselinasimpson311
 
TOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENTTOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENTReaz Uddin
 
Control of Quality
Control of QualityControl of Quality
Control of QualityAditya Singh
 
Case Study: Improving a Scheduling Process
Case Study: Improving a Scheduling ProcessCase Study: Improving a Scheduling Process
Case Study: Improving a Scheduling ProcessLean Systems
 
Ensemble - Process, Strategy and Performance Management
Ensemble - Process, Strategy and Performance ManagementEnsemble - Process, Strategy and Performance Management
Ensemble - Process, Strategy and Performance ManagementRefik Tuncer
 
0601075 inventory management
0601075 inventory management0601075 inventory management
0601075 inventory managementSupa Buoy
 
Chapter [vii] day 9 of 1st march 2015
Chapter [vii] day 9 of 1st march 2015Chapter [vii] day 9 of 1st march 2015
Chapter [vii] day 9 of 1st march 2015pyi kyaw lynn
 
General Workflow an introduction
General Workflow an introductionGeneral Workflow an introduction
General Workflow an introductionNarender Singh
 
Leveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous ImprovementLeveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous ImprovementCIToolkit
 
Leveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous ImprovementLeveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous ImprovementCIToolkit
 
CH6 6.1 PROCESS THINKING Process thinking is the point o.docx
CH6 6.1 PROCESS THINKING Process thinking is the point o.docxCH6 6.1 PROCESS THINKING Process thinking is the point o.docx
CH6 6.1 PROCESS THINKING Process thinking is the point o.docxsleeperharwell
 

Similar to Controlling (20)

Controlling for Organizational Performance
Controlling for Organizational PerformanceControlling for Organizational Performance
Controlling for Organizational Performance
 
Baggage blunders case
Baggage blunders caseBaggage blunders case
Baggage blunders case
 
Introduction to controlling
Introduction to controllingIntroduction to controlling
Introduction to controlling
 
Major Questions You Should Be Able to Answer16.1Control Whe.docx
Major Questions You Should Be Able to Answer16.1Control Whe.docxMajor Questions You Should Be Able to Answer16.1Control Whe.docx
Major Questions You Should Be Able to Answer16.1Control Whe.docx
 
Quality management in projects
Quality management in projectsQuality management in projects
Quality management in projects
 
TOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENTTOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENT
 
Control of Quality
Control of QualityControl of Quality
Control of Quality
 
Case Study: Improving a Scheduling Process
Case Study: Improving a Scheduling ProcessCase Study: Improving a Scheduling Process
Case Study: Improving a Scheduling Process
 
Ensemble - Process, Strategy and Performance Management
Ensemble - Process, Strategy and Performance ManagementEnsemble - Process, Strategy and Performance Management
Ensemble - Process, Strategy and Performance Management
 
internship ppt
internship pptinternship ppt
internship ppt
 
0601075 inventory management
0601075 inventory management0601075 inventory management
0601075 inventory management
 
Chapter [vii] day 9 of 1st march 2015
Chapter [vii] day 9 of 1st march 2015Chapter [vii] day 9 of 1st march 2015
Chapter [vii] day 9 of 1st march 2015
 
Operations Management
Operations ManagementOperations Management
Operations Management
 
Operations Management Q&A
Operations Management Q&AOperations Management Q&A
Operations Management Q&A
 
General Workflow an introduction
General Workflow an introductionGeneral Workflow an introduction
General Workflow an introduction
 
Driving Performance
Driving PerformanceDriving Performance
Driving Performance
 
Controlling by Taufiq
Controlling by Taufiq  Controlling by Taufiq
Controlling by Taufiq
 
Leveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous ImprovementLeveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous Improvement
 
Leveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous ImprovementLeveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous Improvement
 
CH6 6.1 PROCESS THINKING Process thinking is the point o.docx
CH6 6.1 PROCESS THINKING Process thinking is the point o.docxCH6 6.1 PROCESS THINKING Process thinking is the point o.docx
CH6 6.1 PROCESS THINKING Process thinking is the point o.docx
 

More from Jeremy Paul Gecolea

The Philippine Shipbuilding Industry
The Philippine Shipbuilding IndustryThe Philippine Shipbuilding Industry
The Philippine Shipbuilding IndustryJeremy Paul Gecolea
 
Cultural Diversity: Its Effects and Overcoming its Challenges
Cultural Diversity: Its Effects and Overcoming its ChallengesCultural Diversity: Its Effects and Overcoming its Challenges
Cultural Diversity: Its Effects and Overcoming its ChallengesJeremy Paul Gecolea
 
The Law of Supply and Demand, and Government Intervention
The Law of Supply and Demand, and Government InterventionThe Law of Supply and Demand, and Government Intervention
The Law of Supply and Demand, and Government InterventionJeremy Paul Gecolea
 
Areas of Ethics in Human Resources Management and Basic Human Rights
Areas of Ethics in Human Resources Management and Basic Human RightsAreas of Ethics in Human Resources Management and Basic Human Rights
Areas of Ethics in Human Resources Management and Basic Human RightsJeremy Paul Gecolea
 
Training, Learning, Talent Management and Development
Training, Learning, Talent Management and DevelopmentTraining, Learning, Talent Management and Development
Training, Learning, Talent Management and DevelopmentJeremy Paul Gecolea
 

More from Jeremy Paul Gecolea (13)

Planning part 3
Planning part 3Planning part 3
Planning part 3
 
Planning Part 1
Planning  Part 1Planning  Part 1
Planning Part 1
 
Planning part 2
Planning part 2Planning part 2
Planning part 2
 
The Philippine Shipbuilding Industry
The Philippine Shipbuilding IndustryThe Philippine Shipbuilding Industry
The Philippine Shipbuilding Industry
 
Kinds of Quantitative Research
Kinds of Quantitative ResearchKinds of Quantitative Research
Kinds of Quantitative Research
 
Monetary policy
Monetary policyMonetary policy
Monetary policy
 
Products and services
Products and servicesProducts and services
Products and services
 
Cultural Diversity: Its Effects and Overcoming its Challenges
Cultural Diversity: Its Effects and Overcoming its ChallengesCultural Diversity: Its Effects and Overcoming its Challenges
Cultural Diversity: Its Effects and Overcoming its Challenges
 
The Law of Supply and Demand, and Government Intervention
The Law of Supply and Demand, and Government InterventionThe Law of Supply and Demand, and Government Intervention
The Law of Supply and Demand, and Government Intervention
 
Unethical Practices
Unethical PracticesUnethical Practices
Unethical Practices
 
Areas of Ethics in Human Resources Management and Basic Human Rights
Areas of Ethics in Human Resources Management and Basic Human RightsAreas of Ethics in Human Resources Management and Basic Human Rights
Areas of Ethics in Human Resources Management and Basic Human Rights
 
Training, Learning, Talent Management and Development
Training, Learning, Talent Management and DevelopmentTraining, Learning, Talent Management and Development
Training, Learning, Talent Management and Development
 
Gender-based communication
Gender-based communicationGender-based communication
Gender-based communication
 

Recently uploaded

Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 

Recently uploaded (20)

Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 

Controlling

  • 1. Controlling It’s the process of monitoring, comparing, and correcting work performance. All managers should control even if their units are performing as planned because they can’t really know that unless they’ve evaluated what activities have been done and compared actual performance against the desired standard. Effective controls ensure that activities are completed in ways that lead to the attainment of goals. Whether controls are effective, then, is determined by how well they help employees and managers achieve their goals. Figure 1 shows the different aspects of the management functions wherein the management cycle is also exhibited. This figure depicts the connection of Planning and Controlling. Controlling identifies lapses or gaps of the executed plan or action. Figure 1
  • 2. The Control Process is a three-step process of measuring actual performance, comparing actual performance against a standard, and taking managerial action to correct deviations or to address inadequate standards. The control process assumes that performance standards already exist, and they do. They’re the specific goals created during the planning process. Step 1. Measuring Actual Performance  To determine what actual performance is, a manager must first get information about it. HOW WE MEASURE. Four approaches used by managers to measure and report actual performance are personal observations, statistical reports, oral reports, and written reports. Step 2. Comparing Actual Performance Against the Standard  The comparing step determines the variation between actual performance and the standard. Although some variation in performance can be expected in all activities, it’s critical to determine an acceptable range of variation.
  • 3. Step 3. Taking Managerial Action  Managers can choose among three possible courses of action: do nothing, correct the actual performance, or revise the standards. 1. Correct Actual Performance Depending on what the problem is, a manager could take different corrective actions. Example: An unsatisfactory work is the reason for performance variations, the manager could correct it by things such as training programs, disciplinary action, changes in compensation practices, and so forth. One decision that a manager must make is whether to take immediate corrective action, which corrects problems at once to get performance back on track, or to use basic corrective action, which looks at how and why performance deviated before correcting the source of deviation. 2. Revise the Standard It’s possible that the variance was a result of an unrealistic standard—too low or too high a goal. In that situation, the standard needs the corrective action, not the performance. Example: If performance consistently exceeds the goal, then a manager should look at whether the goal is too easy and needs to be raised. On the other hand, managers must be cautious about revising a standard downward.
  • 4. Controlling Organizational Performance  Organizational Performance o the accumulated results of all the organization’s work activities.  Organizational Productivity o the amount of goods or services produced divided by the inputs needed to generate that output.  Organizational Effectiveness o the measure of how appropriate organizational goals are and how well those goals are being met.  Tools for Measuring Organizational Performance o Feedforward Control - The most desirable type of control prevents problems because it takes place before the actual activity. o Concurrent Control - This takes place while a work activity is in progress. o Feedback Control - The control that takes place after the activity is done.
  • 5. Financial Controls Information Controls A management information system (MIS) is a system used to provide managers with needed information on a regular basis. In theory, this system can be manual or computer- based, although most organizations have moved to computer-supported applications. The term system in MIS implies order, arrangement, and purpose. Further, an MIS focuses specifically on providing managers with information (processed and analyzed data), not merely data (raw, unanalyzed facts). For example, a library provides a good analogy. Although it can contain millions of volumes, a library doesn’t do you any good if you can’t find what you want quickly. That’s why librarians spend a great deal of time cataloging a library’s collections and ensuring that materials are returned to their proper locations.
  • 6. CASE APPLICATION: Baggage Blunders Terminal 5 (T5), built by British Airways for $8.6 billion, is London Heathrow Airport’s newest state- of-the-art facility. Made of glass, concrete, and steel, it’s the largest free-standing building in the United Kingdom and has more than 10 miles of belts for moving luggage. At the terminal’s unveiling in March of 2008, Queen Elizabeth II called it a “twenty-first-century gateway to Britain.” Alas . . . the accolades didn’t last long! After two decades in planning and 100 million hours in manpower, opening day didn’t work out as planned. Endless lines and major baggage handling delays led to numerous flight cancellations stranding many irate passengers. Airport operators said the problems were triggered by glitches in the terminal’s high-tech baggage-handling system. With its massive automation features, T5 was planned to ease congestion at Heathrow and improve the flying experience for the 30 million passengers expected to pass through it annually. With 96 self-service check-in kiosks, more than 90 fast check-in bag drops, 54 standard check-in desks, and miles of suitcase-moving belts estimated to be able to process 12,000 bags per hour, the facility’s design seemed to support those goals. However, within the first few hours of the terminal’s operation, problems developed. Presumably understaffed, baggage workers were unable to clear incoming luggage fast enough. Arriving passengers waited more than an hour for their bags. Departing passengers tried in vain to check in for flights. Flights left with empty cargo holds. Sometime on day one, the airline checked in only those passengers with no luggage. And it didn’t help that the moving belt system jammed at one point. Lesser problems also became apparent: a few broken escalators, some hand dryers that didn’t work, a gate that wouldn’t function at the new Underground station, and inexperienced ticket sellers who didn’t know the fares between Heathrow and various stations on the Piccadilly line. By the end of the first full day of operation, Britain’s Department of Transportation released a statement calling for British Airways and the airport operator BAA to “work hard to resolve these issues and limit disruptions to passengers.” You might be tempted to think that all of this could have been prevented if British Airways had only tested the system. But thorough runs of all systems “from toilets to check in and seating” took place six months before opening, including four full-scale test runs using 16,000 volunteers. Although T5’s debut was far from perfect, things have certainly changed. A recent customer satisfaction survey showed that 80 percent of passengers waited less than five minutes to check in. And those passengers are extremely satisfied with the terminal’s lounges, catering, facilities, and ambience. It’s a nice ending to the chaotic beginning.