Guidelines for Grid-connected Small Scale (Rooftop) Solar PV
Systems for Tamil Nadu
Version: April 2014
Scope and Purpose
These Guidelines for grid-connected small scale (rooftop) solar PV systems have
been prepared for the benefit of departments and organizations of the
Government of Tamil Nadu that plan to install these systems for their office
buildings. This document is a guideline document only and the Government
Departments and Organizations may make suitable modifications to these
documents to meet their specific (process) requirements.
Grid-connected solar PV Systems
There are basically two solar PV systems: stand-alone and grid-connected.
Stand-alone solar PV systems work with batteries. The solar energy is stored in
the battery and used to feed building loads after conversion from DC to AC power
with a stand-alone inverter. These systems are generally used in remote areas
without grid supply or with unreliable grid supply. The disadvantage of these
systems is that the batteries require replacement once in every 3 – 5 years.
Grid-connected solar PV systems feed solar energy directly into the building
loads without battery storage. Surplus energy, if any, is exported to the
TANGEDCO grid and shortfall, if any, is imported from the grid.
These guidelines apply to grid-connected small scale (rooftop) solar PV systems.
Solar Net-metering
In Tamil Nadu a facility known as “net-metering” has been introduced. In net-
metering the solar energy exported to the grid is deducted from the energy
imported from the grid subject to certain conditions. The consumer pays for the
net-energy imported from the grid. To enable net-metering TANGEDCO will
replace the existing service connection meter with a bidirectional meter that
displays the import and export energy separately. For details of net-metering
please see the relevant order of the Tamil Nadu Electricity Regulatory
Commission (TNERC) of 13-11-2013 (www.tnerc.tn.nic.in).
Rooftop and Installation Requirements
The shadow-free area required for installation of a rooftop solar PV system is
about 12 m2
per kW (kilowatt). This number includes provision for clearances
between solar PV array rows. The solar panels may be installed on the roof of the
building with a south facing tilt angle that varies in Tamil Nadu from 11 – 13
degrees depending on the latitude of the location. Sufficient area shall be
available for servicing the system. The minimum clearance required for cleaning
and servicing of the panels is 0.6m from the parapet wall and in between rows of
panels. In between the rows of solar panels sufficient gap needs to be provided
to avoid the shading of a row by an adjacent row. The solar grid inverter shall be
placed indoor in a safe and easily accessible place.
Capital Subsidy by the Ministry of New and Renewable Energy (MNRE)
The Ministry of New and Renewable Energy of the Government of India provides
capital subsidies for solar PV systems subject to certain conditions. As of date
(March 2014) the capital subsidy for rooftop solar PV systems is 30% of the
benchmark cost or 30% of the actual cost, whichever is less. The up-to-date
Page 2 of 16
benchmark cost and capital subsidy terms and conditions may be checked on the
website of MNRE (see: www.mnre.gov.in).
System Components
A grid-connected solar PV system consists of the following main components:
− Solar PV (photo-voltaic) array
− Solar PV array support structure
− Solar grid inverter
− Protection devices
− Cables
Solar PV System Capacity Sizing
The size of a solar PV system depends on the 90% energy consumption of the
building and the shade-free rooftop (or other) area available. A guideline for
calculating the solar PV system size is given in Annexure 1.
Technical Specifications and Tender Eligibility Criteria
TEDA has developed General Technical Specifications and Tender Eligibility
Criteria for small scale (rooftop) grid-connected solar PV systems. See Annexure
2 and 3.
Page 3 of 16
Annexure 1
Small scale (rooftop) solar PV system capacity sizing
Solar Array Capacity
The capacity of a solar PV array (in kWp, kilowatt-peak) depends90% energy
consumption of the building on and the shade-free rooftop (or other) area
available.
Assumptions
− The roof (or elevated structure) area requirement per kW of solar PV modules
is about 12m2
.
− In Tamil Nadu the typical average annual energy generation per installed kW
of solar PV capacity is 1,500 kWh. (This number assumes a system capacity
utilization factor of 18% and average grid availability of 95% during the
daytime).
As per the Tamil Nadu solar net-metering policy, electricity generated from a
Solar rooftop/Solar system and injected into the TANGEDCO grid shall be capped
commercially at 90% of the electricity consumption by the eligible consumer at
the end of a 12 month settlement period which is from August to July. Excess
energy generated beyond the 90% cap shall be treated as lapsed and will not be
credited for the purpose of net-metering.
With these assumptions, the recommended capacity of the solar modules array
of a proposed grid-connected solar PV system can be calculated with the
following three steps.
Step 1: Calculate the maximum system capacity on the basis of the shade-
free rooftop area.
Formula: Capacity = shade-free rooftop area (in square meters) divided by
12.
Example:
The shade-free rooftop area is 60 m2
.
The maximum solar PV capacity that can be installed on this rooftop area
would be 60 / 12 = 5 kWp
Step 2: Calculate the system capacity based on annual energy consumption.
Formula: Capacity = 90% of annual energy consumption (in kWh) divided by
1,500.
Example:
The (estimated) annual energy consumption is 15,000 kWh
The solar PV system capacity based on annual energy consumption would be
(90% x 15,000) / 1,500 = 9 kWp
Recommended Capacity : Take the lowest of the above two capacity
calculation results.
In this example: 5 kWp
Solar Grid Inverter Capacity
The recommended solar grid inverter capacity in kW shall be in a range of 95% -
110% of the solar PV array capacity. In the above example, the solar array
Page 4 of 16
capacity was calculated to be 5 kW. The solar grid inverter required for this array
would be in a range of 4.75 – 5.50 kW. In Tamil Nadu for systems above 4 kW,
three phase solar grid inverters shall be used (three single phase inverters or a
single three phase inverter).
Page 5 of 16
Annexure 2
General Technical Specification for small scale (rooftop) solar PV
systems
1.0 Introduction
1.1 In grid-connected solar photo-voltaic (PV) systems, solar energy is fed
into the building loads that are connected to the TANGEDCO grid through
a service connection with surplus energy being fed into the grid and
shortfall being drawn from the grid. Production of surplus energy may
happen when solar energy produced exceeds the energy consumption of
the building. This surplus is fed into the grid. During the night, or when
during the day energy demand in the building exceeds solar energy
generation, energy is drawn from the grid. Grid-connected solar PV
systems have no battery storage and will not work during grid outage. For
buildings with grid-connected solar PV systems, the service connection
meter needs to be of the bidirectional type, whereby import kWh and
export kWh are separately recorded.
1.2 A grid-connected solar PV system consists of the solar panels, solar panels
mounting structure, one or more solar grid inverters, protection devices,
meters, interconnection cables and switches.
1.3 Components and parts used in solar PV systems should conform to the BIS
or IEC or other international specifications, wherever such specifications
are available and applicable.
2.0 Quality and Workmanship
2.1 Solar PV modules are designed to last 25 years or more. It is therefore
essential that all system components and parts, including the mounting
structures, cables, junction boxes, distribution boxes and other parts also
have a life cycle of at least 25 years. Therefore all works shall be
undertaken with the highest levels of quality and workmanship. During
inspection special attention will be given to neatness of work execution
and conformity with quality and safety norms. Non compliant works will
have to be redone at the cost of the Installer.
3.0 System Sizing
As per the solar net metering orders of the Tamil Nadu Electricity
Regulatory Commission (TNERC) of 13-11-2013, crediting of energy for
the purpose of net-metering is limited to 90% of the consumed energy
during a 12 month settlement period. The maximum recommended solar
PV capacity for grid-connected solar PV systems is therefore a capacity
that produces not more than 90% of the annual energy consumption of
the building.
Page 6 of 16
4.0 Specification of Solar PV Modules
4.1 Solar PV modules shall be of the crystalline silicon type, manufactured in
India. Detailed specifications of the solar PV modules are given below:
Type Crystalline silicon
Origin Manufactured in India
Efficiency >= 13%
Fill factor >= 70%
Degradation warranty Panel output (Wp) capacity to be
>=90% of design nominal power after
10 years and >=80% of design
nominal power after 25 years.
Module frame Non-corrosive and electrolytically
compatible with the mounting
structure material
Termination box Thermo-plastic, IP 65, UV resistant
Blocking diodes Schottky type
Module minimum rated power The nominal power of a single PV
module shall not be less than 74Wp.
RF Identification tag for each
solar module
Shall be provided inside the module
and must be able to withstand
environmental conditions and last the
lifetime of the solar module.
RF Identification tag data a) Name of the manufacturer of PV
Module
b) Name of the Manufacturer of
Solar cells
c) Month and year of manufacture
(separately for solar cells and
module)
d) Country of origin (separately for
solar cells and module)
e) I-V curve for the module
f) Wm, Im, Vm and FF for the module
g) Unique Serial No and Model No of
the module
h) Date and year of obtaining IEC
PV module qualification
certificate
i) Name of the test lab issuing IEC
Page 7 of 16
certificate
j) Other relevant information on
traceability of solar cells and
module as per ISO 9000
standard
Power output rating To be given for standard test
conditions (STC). I-V curve of the
sample module shall be submitted.
Compliance with standards and
codes
IEC 61215 / IS 14286
IEC 61730 Part 1 and 2
Salt Mist Corrosion Testing As per IEC 61701
5.0 Solar PV Modules Mounting Structure
5.1 The PV modules shall be mounted on fixed metallic structures having
adequate strength and appropriate design, which can withstand the load
of the modules and high wind velocities. The support structure shall be hot
dip galvanized steel or aluminium.
5.2 Detailed specifications for the mounting structure are given below:
Wind velocity withstanding
capacity
150 km / hour
Structure material Hot dip galvanised steel with a
minimum galvanisation thickness of
120 microns or aluminium alloy.
Bolts, nuts, fasteners, panel
mounting clamps
Stainless steel SS 304
Mounting arrangement for
RCC-flat roofs
With removable concrete ballast made
of pre-fabricated PCC (1:2:4), M15
Mounting arrangement for
metal sheet roofs
Mounting directly on the sheet metal,
ensuring stability and wind
withstanding capacity, or penetrating
the sheet metal and fixing to the sub-
structure, ensuring that the roof
remains water proof and ensuring
stability and wind withstanding
capacity.
Page 8 of 16
Mounting arrangement for
elevated structures
The elevated structure has to be
securely anchored to the supporting
surface.
Concrete foundations of appropriate
weight and depth for elevated
structures mounted directly on the
ground;
Bolted with anchor bolts of
appropriate strength for elevated
structures mounted on RCC surfaces.
Mounting arrangement for
ground installations
With removable concrete ballast made
of pre-fabricated PCC (1:2:4), M15;
assuring enough ground clearance to
prevent damage of the module
through water, animals and other
environmental factors.
Installation The structures shall be designed for
simple mechanical on-site installation.
There shall be no requirement of
welding or complex machinery at the
installation site.
Minimum distance between
roof edge and mounting
structure
0.6m
Access for panel cleaning and
maintenance
All solar panels must be accessible
from the top for cleaning and from the
bottom for access to the module-
junction box.
Panel tilt angle North – south orientation with a fixed
tilt angle of 11 – 13 degrees
(depending on location), south facing.
5.3 The prospective Installer shall specify installation details of the solar PV
modules and the support structures with lay-out drawings and array
connection diagrams. The work shall be carried out as per the designs
approved by the Customer.
6.0 Solar Array Fuse
6.1 The cables from the array strings to the solar grid inverters shall be
provided with DC fuse protection. Fuses shall have a voltage rating and
current rating as required. The fuse shall have DIN rail mountable fuse
holders and shall be housed in thermoplastic IP 65 enclosures with
transparent covers.
Page 9 of 16
7.0 Solar Grid Inverter:
7.1 The solar grid inverter converts the DC power of the solar PV modules to
grid-compatible AC power.
7.2 The detailed specifications of the solar grid inverter are given below.
Total output power (AC) To match solar PV plant capacity while
achieving optimum system efficiency
Input DC voltage range As required for the solar grid inverter
DC input.
Maximum power point (MPPT)
tracking
Shall be incorporated
Number of independent MPPT
inputs
1 or more
Operation AC voltage Single phase 230V or Three phase 415V
(+ 12.5%, -20%)
Operating Frequency range 47.5 – 52.5 Hz
Nominal frequency 50 Hz
Power factor of the inverter >0.98 at nominal power
Total harmonic distortion Less than 3%
Built-in Protection AC high / low voltage; AC high /low
frequency
Anti-islanding protection As per VDE 0126-1-1, IEC 60255.5 /
IEC 60255.27
Operating ambient
temperature range
-10 o
C - +60 o
C
Humidity 0 – 95% Rh
Inverter efficiency
Inverter weighted efficiency
>=95%
>=94%
Protection degree IP 65 for outdoor mounting, IP 54 for
indoor mounting
Communication interface RS 485 / RS 232 / RJ45
Safety compliance IEC 62109-1, IEC 62109-2
Page 10 of 16
Environmental Testing IEC 60068-2 (1,2,14,30)
Efficiency Measurement
Procedure
IS/IEC 61683
Cooling Convection
Display type LCD for data display. LCD / LED for
status display
Display parameters to include Output power (W), cumulative energy
(Wh), DC voltage (V), DC current (A),
AC voltage (V), AC frequency (Hz), AC
current (A), cumulative hours of
operation (h).
8.0 DC Combiner Box
8.1 A DC Combiner Box shall be used to combine the DC cables of the solar
module arrays with DC fuse protection for the outgoing DC cable(s) to the
DC Distribution Box.
9.0 DC Distribution Box
9.1 A DC distribution box shall be mounted close to the solar grid inverter. The
DC distribution box shall be of the thermo-plastic IP65 DIN-rail mounting
type and shall comprise the following components and cable terminations:
− Incoming positive and negative DC cables from the DC Combiner Box;
− DC circuit breaker, 2 pole (the cables from the DC Combiner Box will be
connected to this circuit breaker on the incoming side);
− DC surge protection device (SPD), class 2 as per IEC 60364-5-53;
− Outgoing positive and negative DC cables to the solar grid inverter.
9.2 As an alternative to the DC circuit breaker a DC isolator may be used
inside the DC Distribution Box or in a separate external thermoplastic IP
65 enclosure adjacent to the DC Distribution Box. If a DC isolator is used
instead of a DC circuit breaker, a DC fuse shall be installed inside the DC
Distribution Box to protect the DC cable that runs from the DC Distribution
Box to the Solar Grid Inverter.
10.0 AC Distribution Box
10.1 An AC distribution box shall be mounted close to the solar grid inverter.
The AC distribution box shall be of the thermo plastic IP65 DIN rail
mounting type and shall comprise the following components and cable
terminations:
− Incoming 3-core / 5-core (single-phase/three-phase) cable from the
solar grid inverter
Page 11 of 16
− AC circuit breaker, 2-pole / 4-pole
− AC surge protection device (SPD), class 2 as per IEC 60364-5-53
− Outgoing cable to the building electrical distribution board.
11.0 Connection to the Building Electrical System
11.1 The AC output of the solar grid inverter shall be connected to the
building’s electrical system after the TANGEDCO service connection meter
and main switch on the load side. The solar grid inverter output shall be
connected to a dedicated module in the Main Distribution Board (MDB) of
the building. It shall not be connected to a nearby load or socket point of
the building. The connection to the electrical system of the building shall
be done as shown in typical wiring diagram 1 in the Annexure 2.
11.2 For buildings or loads with diesel generator backup, the wiring of the solar
grid inverter shall be such that the solar grid inverter cannot run in
parallel with the diesel generator. This implies that the solar grid inverter
must be connected to a distribution board on the grid side of the
automatic or manual change-over switch as shown in typical wiring
diagram 2 in the Annexure 2.
12.0 Cables
12.1 All cables shall be supplied conforming to IEC 60227/ IS 694 & IEC 60502/
IS 1554. Voltage rating: 1,100V AC, 1,500V DC
12.2 For the DC cabling, XLPE or XLPO insulated and sheathed, UV stabilised
single core flexible copper cables shall be used. Multi-core cables shall not
be used.
12.3 For the AC cabling, PVC or XLPE insulated and PVC sheathed single or
multi-core flexible copper cables shall be used. Outdoor AC cables shall
have a UV-stabilised outer sheath.
12.4 The total voltage drop on the cable segments from the solar PV modules
to the solar grid inverter shall not exceed 2.0%.
12.5 The total voltage drop on the cable segments from the solar grid inverter
to the building distribution board shall not exceed 2.0%
12.6 The DC cables from the SPV module array shall run through a UV-
stabilised PVC conduit pipe of adequate diameter with a minimum wall
thickness of 1.5mm.
12.7 Cables and wires used for the interconnection of solar PV modules shall be
provided with solar PV connectors (MC4) and couplers.
12.8 All cables and conduit pipes shall be clamped to the rooftop, walls and
ceilings with thermo-plastic clamps at intervals not exceeding 50 cm. The
minimum DC cable size shall be 4.0 mm2
copper. The minimum AC cable
size shall be 4.0 mm2
copper. In three phase systems, the size of the
Page 12 of 16
neutral wire size shall be equal to the size of the phase wires. The
following colour coding shall be used for cable wires:
− DC positive: red (the outer PVC sheath can be black with a red line
marking)
− DC negative: black
− AC single phase: Phase: red; neutral: black
− AC three phase: Phases: red, yellow, blue; neutral: black
− Earth wires: green
12.9 Cables and conduits that have to pass through walls or ceilings shall be
taken through a PVC pipe sleeve.
12.10 Cable conductors shall be terminated with tinned copper end-ferrules to
prevent fraying and breaking of individual wire strands. The termination of
the DC and AC cables at the Solar Grid Inverter shall be done as per
instructions of the manufacturer, which in most cases will include the use
of special connectors.
13.0 Earthing
13.1 The PV module structure components shall be electrically interconnected
and shall be grounded.
13.2 Earthing shall be done in accordance with IS 3043-1986, provided that
earthing conductors shall have a minimum size of 6.0 mm2
copper, 10
mm2
aluminium or 70 mm2
hot dip galvanised steel. Unprotected
aluminium or copper-clad aluminium conductors shall not be used for final
underground connections to earth electrodes.
13.3 A minimum of two separate dedicated and interconnected earth electrodes
must be used for the earthing of the solar PV system support structure
with a total earth resistance not exceeding 5 Ohm.
13.4 The earth electrodes shall have a precast concrete enclosure with a
removable lid for inspection and maintenance. The entire earthing system
shall comprise non-corrosive components.
14.0 Surge Protection
14.1 Surge protection shall be provided on the DC side and the AC side of the
solar system.
14.2 The DC surge protection devices (SPDs) shall be installed in the DC
distribution box adjacent to the solar grid inverter.
14.3 The AC SPDs shall be installed in the AC distribution box adjacent to the
solar grid inverter.
14.4 The SPDs earthing terminal shall be connected to earth through the above
mentioned dedicated earthing system. The SPDs shall be of type 2 as per
IEC 60364-5-53
Page 13 of 16
15.0 Junction Boxes
15.1 Junction boxes and solar panel terminal boxes shall be of the thermo
plastic type with IP 65 protection for outdoor use and IP 54 protection for
indoor use.
15.2 Cable terminations shall be taken through thermo-plastic cable glands.
Cable ferrules shall be fitted at the cable termination points for
identification.
16.0 Tools, Tackles and Spares
16.1 The Installer shall keep ready stock of tools, tackles and essential spares
that will be needed for the day-to-day maintenance of the solar PV
system. This shall include but not be limited to, the following:
16.2 Screw driver suitable for the junction boxes and combiner boxes;
16.3 Screw driver and / or Allen key suitable for the connectors, power
distribution blocks, circuit breaker terminals and surge arrestor terminals;
16.4 Spanners / box spanners suitable for the removal of solar PV modules
from the solar PV module support structure;
16.5 Solar panel mounting clamps;
16.6 Cleaning tools for the cleaning of the solar PV modules;
16.7 Spare fuses.
17.0 Caution Signs
17.1 In addition to the standard caution and danger boards or labels as per
Indian Electricity Rules, the AC distribution box near the solar grid
inverter, the building distribution board to which the AC output of the solar
PV system is connected and the Solar Generation Meter shall be provided
with a non-corrosive caution label with the following text:
WARNING – DUAL POWER SOURCE
EB & SOLAR
17.2 The size of the caution label shall be 105mm (width) x 20mm (height)
with white letters on a red background.
17.3 Caution labels as may be prescribed by TANGEDCO shall be fixed as per
TANGEDCO specifications.
18.0 Metering
18.1 An energy meter shall be installed in between the solar grid inverter and
the building distribution board to measure gross solar AC energy
production (the “Solar Generation Meter”). The Solar Generation Meter
shall be of the same accuracy class as the TANGEDCO service connection
meter or as specified by TNERC.
Page 14 of 16
18.2 The existing service connection meter needs to be replaced with a
bidirectional (import kWh and export kWh) service connection meter (the
“Solar Service Connection Meter”) for the purpose of net-metering.
Installation of the Solar Service Connection Meter will be carried out by
TANGEDCO and is not in the scope of the work of the Installer.
19.0 Documentation
19.1 The Installer shall supply the following documentation:
a) System description with working principles.
b) System single line diagram.
c) Solar PV array lay-out.
d) Routing diagram of cables and wires.
e) Data sheets and user manuals of the solar PV panels and the solar grid
inverter.
f) A system operation and maintenance manual.
g) Name, address, mobile number and email address of the service centre
to be contacted in case of failure or complaint.
h) Warranty cards.
i) Maintenance register.
20.0 Test Certificates and Reports to be Furnished
Test Certificates / Reports from IECQ / NABL accredited laboratory for
relevant IEC / equivalent BIS standard for quoted components shall be
furnished. Type Test Certificates shall be provided for the solar modules
and the solar grid inverters to provide evidence of compliance with
standards as specified in articles 4.0 and 7.0 of this Technical
Specification. Customer reserves the right to ask for additional test
certificates or (random) tests to establish compliance with the specified
standards.
Page 15 of 16
Annexe to General Technical Specification
Typical Wiring Diagrams for Grid-Connected Solar System
1. Typical wiring diagram for grid-connected solar PV system without diesel generator.
Note: The Solar Generation Meter shown above is mandatory for consumers who avail of a
generation-based incentive (GBI) and is optional for others.
Page 16 of 16
2. Typical wiring diagram for grid-connected solar PV system with diesel generator.
Note: The Solar Generation Meter shown above is mandatory for consumers who avail of a
generation-based incentive (GBI) and is optional for others.
ANNEXURE-3
TENDER ELIGIBILITY CRITERIA
The suggested Tender Eligibility Criteria are as follows:
The Bidder(s) shall meet the following Eligibility Criteria to participate in the Tender and
shall enclose documentary proof for fulfilling the Eligibility in the Techno commercial Bid.
S.
No
Minimum Eligibility Criteria Proof to be submitted for fulfilling the Eligibility
Criteria
1.
(a)
The Bidder/its wholly owned subsidiary shall be
A Registered Manufacturing Company/ Firm of
SPV Cells/Modules OR Battery OR PV System
Electronics, in India .
OR
A PV System Integrator in India
in existence for at least past one audited year.
Certificate of Incorporation or Registration and
relevant proof shall be submitted.
b) Consortium not exceeding three partners. Each
partner of the Consortium shall be a Registered
Company / Firm in existence for at least past one
audited year.
The prime Bidder amongst the consortium
partners shall be either
(i) a registered manufacturing company/ Firm of
SPV cells / Modules or PV system Electronics in
India.
OR
(ii) a PV system integrator in India.
i. Certificate of Incorporation / Registration of all
the partners shall be submitted.
ii. Copy of consortium agreement shall be
submitted (OR) A letter of intent to execute a
consortium agreement in the event of a
successful bid shall be signed by all the partners
and submitted with the Bid together with the
copy of the proposed consortium Agreement.
S.
No
Minimum Eligibility Criteria Proof to be submitted for fulfilling the Eligibility
Criteria
iii. In case of Consortium, all partners of the
consortium shall be liable jointly and severally
for the execution of the contract in
accordance to the contract terms and a
statement to this effect shall be included in the
letter of intent.
2. The Bidder shall use only SPV modules
manufactured in India
Necessary undertaking letter shall be submitted
from the module manufacturer.
3.
1)
2)
3)
Annual Turnover of the bidder shall be as per the
following.
In case of consortium, consortium partners shall
cumulatively have 50% of the average annual
turnover as per criteria (2) or (3) & prime bidder
shall satisfy the criteria (1).
A summarized sheet of turnover certified by
registered CA shall be furnished.
Tender Values
<Rs.50 L Rs.50L-
Rs.2 Cr
Rs.2Cr-
10 Cr
Rs.10Cr
-25Cr.
Rs.>25Cr.
--
Min
Rs.25 L
Min.
Rs.1 Cr
Min.
Rs.5 Cr.
Min
Rs.10 Cr.
--
Min
Rs.50 L
Min.
Rs.2 Cr -- --
-- -- --
Min.
Rs.10 Cr
Min.
Rs.25 Cr
Turnover in PV Field in the Last Financial Year (OR
Current Financial Year)
Average annual Turnover in the Last two financial
years
Average annual Turnover in the last three
financial years
S.
No
Minimum Eligibility Criteria Proof to be submitted for fulfilling the Eligibility
Criteria
4. Bidder shall have installation experience in
installation of Solar PV Plants of 1Kwp & above
and shall have installed at least 10% of the
quantity tendered (Power plants installed
minimum period of 3 months prior to the date of
bid submission will only be considered) & these
systems shall be working satisfactorily (Lanterns
are not allowed)
Copy of Work Orders and performance certificate
for satisfactory function of those SPV systems
obtained from the end user if system cost was paid
by the end user or from the Government agency.
5. The Bidder shall agree to accept the entire
quantity that is finally allotted to him.
Necessary under taking shall be enclosed in this
regard.
6. Various components of the SPV system shall
conform to the MNRE standards as per the
Technical Specification given in Annexure I.
Copy of test certificates/test reports for each
component shall be submitted.
7. Bidder(s) shall not be currently blacklisted by any
of the State or Central Government or
organizations of the State/Central Government or
Union Territories of India as on date of
submission of tender.
Necessary Undertaking letter shall be furnished.
8. The bidder shall undertake to submit only bound
bids with all pages serially numbered.
Necessary undertaking letter shall be submitted.
9. The bidder shall undertake for product take back
and re-cycling.
Necessary undertaking letter shall be submitted.
Accredited Test centers for MNRE Off-Grid Programme
Lighting Systems Inverter
Charge Controller
>100 W
Lab/
PV Module as per Battery
Organizat
MNRE Environment
ion Efficiency Environmental protections Environmental
Specificatio al
ns
Yes Yes
Yes
Yes
Yes (Including(IEC612
15up MNRE Yes (upto Yes (Including IP) Yes
(Including IP) IP) MNRE
SEC to100WP) Accredited MNRE 10KVA) MNRE Accredited MNRE
MNRE Accredited
NABL Accredited MNRE Accredited
Accredited
Accredited Accredited
STC Test Yes Yes Yes
Yes NABL/
Yes
Yes NABL/
ERTL Facility NABL/ NABL/ Yes NABL/ NABL/
MNRE
MNRE
(east) MNRE MNRE MNRE Up to 1000AH MNRE MNRE
Accredited
Accredited
Accredited Accredited Accredited Accredited Accredited
Yes Yes NABL/
Yes
(IEC61215)u MNRE
(up to
nder ICEEE- Accredited Yes Yes
3KVA) Yes NABL/ Yes NABL/
ETDC CB, NABL/ Yes NABL/
MNRE MNRE
(B) IEC 61701 MNRE Up to 100 AH MNRE
NABL/ Accredited Accredited
(upto100WP) Accredited Accredited
MNRE
NABL
Accredited
Accredited
Yes Yes
NABL/
Yes
(up to
Yes
MNRE 10KVA) Yes NABL/ Yes NABL/
CPRI NABL/ Yes NABL/
No Accredited MNRE MNRE
(B) MNRE Up to 500 AH MNRENABL/ Accredited Accredited
Accredited Accredited
MNRE
Accredited
Only
Yes NABL
Yes
Yes NABL
Yes
Yes NABL
Electronics (up to (up to
ERTL (N) No Accredited No Accredited Accredited& luminaire
NABL 5KVA) 5KW)
Accredited NABL NABL
Accredited Accredited
Yes
(IEC61215
Yes
Yes Yes
IEC 61730 (up to (up to
(except Yes NABL Yes NABL Yes NABL
Pt.II and IEC 6KVA) 6KW)
UL (B) battery) Accredited No Accredited Accredited
61701)
NABL
upto400WP NABL NABL
Accredited
NABL Accredited Accredited
Accredited
Yes Yes
Yes
(IEC61215 & (up to
Yes NABL Yes NABL (up to Yes NABL
TUV 61730 Pt-II) 10KVA)
NO Accredited No Accredited 10KW) Accredited
Rhineland upto400WP
NABL
NABL NABL
AccreditedAccredited Accredited
Only
Yes Yes
(up to (up to
Electronics Yes NABL Yes NABL Yes NABL
5KVA) 5KW)
Inter Tek No & luminaire Accredited No Accredited Accredited
NABL
NABL NABL
Accredited
Accredited Accredited
*Beyond 10KVA self certification by the manufactures is acceptable.

More Related Content

What's hot

Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (...
Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (...Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (...
Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (...Farming Futures
 
Mid term report on analysis of grid connected PV system
Mid term report on analysis of grid connected PV systemMid term report on analysis of grid connected PV system
Mid term report on analysis of grid connected PV systemRamesh Adhikari
 
10 pv system_design
10 pv system_design10 pv system_design
10 pv system_designmemoaden
 
Bangalore | Jul-16 | MINI/MICRO GRID FOR RURAL AREAS
Bangalore | Jul-16 | MINI/MICRO GRID FOR RURAL AREASBangalore | Jul-16 | MINI/MICRO GRID FOR RURAL AREAS
Bangalore | Jul-16 | MINI/MICRO GRID FOR RURAL AREASSmart Villages
 
Microgrid tecnology
Microgrid tecnologyMicrogrid tecnology
Microgrid tecnologyAkash Bhat
 
abb micro-grids and-renewable_energy_integration
abb micro-grids and-renewable_energy_integrationabb micro-grids and-renewable_energy_integration
abb micro-grids and-renewable_energy_integrationSteve Wittrig
 
Energy trading in microgrids and managment system
Energy trading in microgrids and managment systemEnergy trading in microgrids and managment system
Energy trading in microgrids and managment systemmuhammad yousaf khan
 
Handbook for solar_pv_systems
Handbook for solar_pv_systemsHandbook for solar_pv_systems
Handbook for solar_pv_systemsWei Chiao Kuo
 
Photovoltaics Case Study
Photovoltaics Case StudyPhotovoltaics Case Study
Photovoltaics Case StudyLeonardo ENERGY
 
Grid-connected PV system
Grid-connected PV systemGrid-connected PV system
Grid-connected PV systemRamesh Adhikari
 
Microgrid Presentation
Microgrid PresentationMicrogrid Presentation
Microgrid PresentationShahab Khan
 
INDIAN SOLAR ENERGY [Bharat Surya Urja]
INDIAN SOLAR ENERGY [Bharat Surya Urja]INDIAN SOLAR ENERGY [Bharat Surya Urja]
INDIAN SOLAR ENERGY [Bharat Surya Urja]H Janardan Prabhu
 
Kuching | Jan-15 | Feasibility of DC-microgrid For Off-grid Communities Elect...
Kuching | Jan-15 | Feasibility of DC-microgrid For Off-grid Communities Elect...Kuching | Jan-15 | Feasibility of DC-microgrid For Off-grid Communities Elect...
Kuching | Jan-15 | Feasibility of DC-microgrid For Off-grid Communities Elect...Smart Villages
 
performance optimization of Solar pv plant through Micro inverter
performance optimization of Solar pv plant through Micro inverterperformance optimization of Solar pv plant through Micro inverter
performance optimization of Solar pv plant through Micro inverterAshish Verma
 

What's hot (19)

Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (...
Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (...Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (...
Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (...
 
Mid term report on analysis of grid connected PV system
Mid term report on analysis of grid connected PV systemMid term report on analysis of grid connected PV system
Mid term report on analysis of grid connected PV system
 
10 pv system_design
10 pv system_design10 pv system_design
10 pv system_design
 
roof top solar
roof top solarroof top solar
roof top solar
 
Bangalore | Jul-16 | MINI/MICRO GRID FOR RURAL AREAS
Bangalore | Jul-16 | MINI/MICRO GRID FOR RURAL AREASBangalore | Jul-16 | MINI/MICRO GRID FOR RURAL AREAS
Bangalore | Jul-16 | MINI/MICRO GRID FOR RURAL AREAS
 
Microgrid tecnology
Microgrid tecnologyMicrogrid tecnology
Microgrid tecnology
 
abb micro-grids and-renewable_energy_integration
abb micro-grids and-renewable_energy_integrationabb micro-grids and-renewable_energy_integration
abb micro-grids and-renewable_energy_integration
 
Energy trading in microgrids and managment system
Energy trading in microgrids and managment systemEnergy trading in microgrids and managment system
Energy trading in microgrids and managment system
 
Mini grid
Mini gridMini grid
Mini grid
 
Solar Barge
Solar BargeSolar Barge
Solar Barge
 
Handbook for solar_pv_systems
Handbook for solar_pv_systemsHandbook for solar_pv_systems
Handbook for solar_pv_systems
 
Final talk trident-05-10-2021- dr p k rout-converted
Final talk trident-05-10-2021- dr p k rout-convertedFinal talk trident-05-10-2021- dr p k rout-converted
Final talk trident-05-10-2021- dr p k rout-converted
 
Bharat Surya Urja
Bharat Surya UrjaBharat Surya Urja
Bharat Surya Urja
 
Photovoltaics Case Study
Photovoltaics Case StudyPhotovoltaics Case Study
Photovoltaics Case Study
 
Grid-connected PV system
Grid-connected PV systemGrid-connected PV system
Grid-connected PV system
 
Microgrid Presentation
Microgrid PresentationMicrogrid Presentation
Microgrid Presentation
 
INDIAN SOLAR ENERGY [Bharat Surya Urja]
INDIAN SOLAR ENERGY [Bharat Surya Urja]INDIAN SOLAR ENERGY [Bharat Surya Urja]
INDIAN SOLAR ENERGY [Bharat Surya Urja]
 
Kuching | Jan-15 | Feasibility of DC-microgrid For Off-grid Communities Elect...
Kuching | Jan-15 | Feasibility of DC-microgrid For Off-grid Communities Elect...Kuching | Jan-15 | Feasibility of DC-microgrid For Off-grid Communities Elect...
Kuching | Jan-15 | Feasibility of DC-microgrid For Off-grid Communities Elect...
 
performance optimization of Solar pv plant through Micro inverter
performance optimization of Solar pv plant through Micro inverterperformance optimization of Solar pv plant through Micro inverter
performance optimization of Solar pv plant through Micro inverter
 

Similar to Specification grid tie_spv_plant

Ppt on design of solar photovoltaic generation for residential building
Ppt on design of solar photovoltaic generation for residential buildingPpt on design of solar photovoltaic generation for residential building
Ppt on design of solar photovoltaic generation for residential buildingSiya Agarwal
 
Indian National Solar Mission
Indian National Solar MissionIndian National Solar Mission
Indian National Solar MissionH Janardan Prabhu
 
CONTROL STRATEGIES ON GRID-TIED PV INVERTERS
CONTROL STRATEGIES ON GRID-TIED PV INVERTERSCONTROL STRATEGIES ON GRID-TIED PV INVERTERS
CONTROL STRATEGIES ON GRID-TIED PV INVERTERSIRJET Journal
 
Younes Sina, Jonathan Rhyne ,Sabina Ude, Huidong Zang, Mary Waddle ,A report ...
Younes Sina, Jonathan Rhyne ,Sabina Ude, Huidong Zang, Mary Waddle ,A report ...Younes Sina, Jonathan Rhyne ,Sabina Ude, Huidong Zang, Mary Waddle ,A report ...
Younes Sina, Jonathan Rhyne ,Sabina Ude, Huidong Zang, Mary Waddle ,A report ...Younes Sina
 
Presentation for Final Year Students about Solar.pptx
Presentation for Final Year Students about Solar.pptxPresentation for Final Year Students about Solar.pptx
Presentation for Final Year Students about Solar.pptxHafizAsimKhayyam
 
IRJET- Performance Evaluation of Micro Grid
IRJET- Performance Evaluation of Micro GridIRJET- Performance Evaluation of Micro Grid
IRJET- Performance Evaluation of Micro GridIRJET Journal
 
Transformer Less FPGA Controlled 2-Stage Isolated Grid Connected PV System
Transformer Less FPGA Controlled 2-Stage Isolated Grid Connected PV SystemTransformer Less FPGA Controlled 2-Stage Isolated Grid Connected PV System
Transformer Less FPGA Controlled 2-Stage Isolated Grid Connected PV SystemAnoop S
 
Review of Maximum Power Point Tracking Based PV Array to Produce Electric Energy
Review of Maximum Power Point Tracking Based PV Array to Produce Electric EnergyReview of Maximum Power Point Tracking Based PV Array to Produce Electric Energy
Review of Maximum Power Point Tracking Based PV Array to Produce Electric EnergyIRJET Journal
 
On Grid Off Grid SPV plant
On Grid Off Grid SPV plant On Grid Off Grid SPV plant
On Grid Off Grid SPV plant SyedAjmalAndrabi
 
Iaetsd design, engineerning and analysis
Iaetsd design, engineerning and analysisIaetsd design, engineerning and analysis
Iaetsd design, engineerning and analysisIaetsd Iaetsd
 
Design and Development of 5MW Solar PV Grid Connected Power Plant using PVsyst
Design and Development of 5MW Solar PV Grid Connected Power Plant using PVsystDesign and Development of 5MW Solar PV Grid Connected Power Plant using PVsyst
Design and Development of 5MW Solar PV Grid Connected Power Plant using PVsystIRJET Journal
 
IRJET- The Study of Various Control Techniques and Configurations for Grid Co...
IRJET- The Study of Various Control Techniques and Configurations for Grid Co...IRJET- The Study of Various Control Techniques and Configurations for Grid Co...
IRJET- The Study of Various Control Techniques and Configurations for Grid Co...IRJET Journal
 
IRJET- Planning and Designing of Zero Energy Residential Building
IRJET-  	  Planning and Designing of  Zero Energy Residential BuildingIRJET-  	  Planning and Designing of  Zero Energy Residential Building
IRJET- Planning and Designing of Zero Energy Residential BuildingIRJET Journal
 
naveen summer intership report2222
naveen summer intership report2222naveen summer intership report2222
naveen summer intership report2222naveen bhati
 

Similar to Specification grid tie_spv_plant (20)

Solar doc
Solar docSolar doc
Solar doc
 
SORALITE POWER
SORALITE POWERSORALITE POWER
SORALITE POWER
 
Ppt on design of solar photovoltaic generation for residential building
Ppt on design of solar photovoltaic generation for residential buildingPpt on design of solar photovoltaic generation for residential building
Ppt on design of solar photovoltaic generation for residential building
 
Indian National Solar Mission
Indian National Solar MissionIndian National Solar Mission
Indian National Solar Mission
 
CONTROL STRATEGIES ON GRID-TIED PV INVERTERS
CONTROL STRATEGIES ON GRID-TIED PV INVERTERSCONTROL STRATEGIES ON GRID-TIED PV INVERTERS
CONTROL STRATEGIES ON GRID-TIED PV INVERTERS
 
Younes Sina, Jonathan Rhyne ,Sabina Ude, Huidong Zang, Mary Waddle ,A report ...
Younes Sina, Jonathan Rhyne ,Sabina Ude, Huidong Zang, Mary Waddle ,A report ...Younes Sina, Jonathan Rhyne ,Sabina Ude, Huidong Zang, Mary Waddle ,A report ...
Younes Sina, Jonathan Rhyne ,Sabina Ude, Huidong Zang, Mary Waddle ,A report ...
 
Presentation for Final Year Students about Solar.pptx
Presentation for Final Year Students about Solar.pptxPresentation for Final Year Students about Solar.pptx
Presentation for Final Year Students about Solar.pptx
 
IRJET- Performance Evaluation of Micro Grid
IRJET- Performance Evaluation of Micro GridIRJET- Performance Evaluation of Micro Grid
IRJET- Performance Evaluation of Micro Grid
 
JN National Solar-Mission
JN National Solar-MissionJN National Solar-Mission
JN National Solar-Mission
 
Transformer Less FPGA Controlled 2-Stage Isolated Grid Connected PV System
Transformer Less FPGA Controlled 2-Stage Isolated Grid Connected PV SystemTransformer Less FPGA Controlled 2-Stage Isolated Grid Connected PV System
Transformer Less FPGA Controlled 2-Stage Isolated Grid Connected PV System
 
Review of Maximum Power Point Tracking Based PV Array to Produce Electric Energy
Review of Maximum Power Point Tracking Based PV Array to Produce Electric EnergyReview of Maximum Power Point Tracking Based PV Array to Produce Electric Energy
Review of Maximum Power Point Tracking Based PV Array to Produce Electric Energy
 
On Grid Off Grid SPV plant
On Grid Off Grid SPV plant On Grid Off Grid SPV plant
On Grid Off Grid SPV plant
 
Iaetsd design, engineerning and analysis
Iaetsd design, engineerning and analysisIaetsd design, engineerning and analysis
Iaetsd design, engineerning and analysis
 
Design and Development of 5MW Solar PV Grid Connected Power Plant using PVsyst
Design and Development of 5MW Solar PV Grid Connected Power Plant using PVsystDesign and Development of 5MW Solar PV Grid Connected Power Plant using PVsyst
Design and Development of 5MW Solar PV Grid Connected Power Plant using PVsyst
 
IRJET- The Study of Various Control Techniques and Configurations for Grid Co...
IRJET- The Study of Various Control Techniques and Configurations for Grid Co...IRJET- The Study of Various Control Techniques and Configurations for Grid Co...
IRJET- The Study of Various Control Techniques and Configurations for Grid Co...
 
IRJET- Planning and Designing of Zero Energy Residential Building
IRJET-  	  Planning and Designing of  Zero Energy Residential BuildingIRJET-  	  Planning and Designing of  Zero Energy Residential Building
IRJET- Planning and Designing of Zero Energy Residential Building
 
Ijmet 06 09_009
Ijmet 06 09_009Ijmet 06 09_009
Ijmet 06 09_009
 
Ppt semimer
Ppt semimerPpt semimer
Ppt semimer
 
Swot
SwotSwot
Swot
 
naveen summer intership report2222
naveen summer intership report2222naveen summer intership report2222
naveen summer intership report2222
 

More from Jay Ranvir

Solar net metering policy
Solar net metering policySolar net metering policy
Solar net metering policyJay Ranvir
 
Open access mp
Open access mpOpen access mp
Open access mpJay Ranvir
 
Profile on the production retreaded tyre
Profile on the production retreaded tyreProfile on the production retreaded tyre
Profile on the production retreaded tyreJay Ranvir
 
Tyre Retreading by Hot Retreading Process
Tyre Retreading by Hot Retreading ProcessTyre Retreading by Hot Retreading Process
Tyre Retreading by Hot Retreading ProcessJay Ranvir
 
Open Access Charges Rajasthan
Open Access Charges RajasthanOpen Access Charges Rajasthan
Open Access Charges RajasthanJay Ranvir
 
Response to msedcl demands
Response to msedcl demandsResponse to msedcl demands
Response to msedcl demandsJay Ranvir
 
Practice directions rts net metering regulations 2015
Practice directions  rts  net metering regulations 2015Practice directions  rts  net metering regulations 2015
Practice directions rts net metering regulations 2015Jay Ranvir
 
Ppa agreement draft
Ppa agreement draftPpa agreement draft
Ppa agreement draftJay Ranvir
 
Notified f &amp;s regulations 2018
Notified f &amp;s  regulations 2018Notified f &amp;s  regulations 2018
Notified f &amp;s regulations 2018Jay Ranvir
 
Detailed comparison of capex vs opex
Detailed comparison of capex vs opexDetailed comparison of capex vs opex
Detailed comparison of capex vs opexJay Ranvir
 
Plastics to oil report
Plastics to oil reportPlastics to oil report
Plastics to oil reportJay Ranvir
 
Detail information of 5 t pyrolysis plant
Detail information of 5 t pyrolysis plantDetail information of 5 t pyrolysis plant
Detail information of 5 t pyrolysis plantJay Ranvir
 
Model ppa for renewable energy sources
Model ppa for renewable energy sourcesModel ppa for renewable energy sources
Model ppa for renewable energy sourcesJay Ranvir
 
Verification of compliance of renewable purchase obligation
Verification of compliance of renewable purchase obligationVerification of compliance of renewable purchase obligation
Verification of compliance of renewable purchase obligationJay Ranvir
 
Short term open access status for march 17
Short term open access status for march 17Short term open access status for march 17
Short term open access status for march 17Jay Ranvir
 
The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)Jay Ranvir
 
The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)Jay Ranvir
 
Forecasting, scheduling and imbalance handling for Solar Wind Energy
Forecasting, scheduling and imbalance handling for Solar Wind EnergyForecasting, scheduling and imbalance handling for Solar Wind Energy
Forecasting, scheduling and imbalance handling for Solar Wind EnergyJay Ranvir
 
Ppa model presentation
Ppa model presentationPpa model presentation
Ppa model presentationJay Ranvir
 

More from Jay Ranvir (20)

Solar net metering policy
Solar net metering policySolar net metering policy
Solar net metering policy
 
Open access mp
Open access mpOpen access mp
Open access mp
 
Profile on the production retreaded tyre
Profile on the production retreaded tyreProfile on the production retreaded tyre
Profile on the production retreaded tyre
 
Tyre Retreading by Hot Retreading Process
Tyre Retreading by Hot Retreading ProcessTyre Retreading by Hot Retreading Process
Tyre Retreading by Hot Retreading Process
 
Ch21
Ch21Ch21
Ch21
 
Open Access Charges Rajasthan
Open Access Charges RajasthanOpen Access Charges Rajasthan
Open Access Charges Rajasthan
 
Response to msedcl demands
Response to msedcl demandsResponse to msedcl demands
Response to msedcl demands
 
Practice directions rts net metering regulations 2015
Practice directions  rts  net metering regulations 2015Practice directions  rts  net metering regulations 2015
Practice directions rts net metering regulations 2015
 
Ppa agreement draft
Ppa agreement draftPpa agreement draft
Ppa agreement draft
 
Notified f &amp;s regulations 2018
Notified f &amp;s  regulations 2018Notified f &amp;s  regulations 2018
Notified f &amp;s regulations 2018
 
Detailed comparison of capex vs opex
Detailed comparison of capex vs opexDetailed comparison of capex vs opex
Detailed comparison of capex vs opex
 
Plastics to oil report
Plastics to oil reportPlastics to oil report
Plastics to oil report
 
Detail information of 5 t pyrolysis plant
Detail information of 5 t pyrolysis plantDetail information of 5 t pyrolysis plant
Detail information of 5 t pyrolysis plant
 
Model ppa for renewable energy sources
Model ppa for renewable energy sourcesModel ppa for renewable energy sources
Model ppa for renewable energy sources
 
Verification of compliance of renewable purchase obligation
Verification of compliance of renewable purchase obligationVerification of compliance of renewable purchase obligation
Verification of compliance of renewable purchase obligation
 
Short term open access status for march 17
Short term open access status for march 17Short term open access status for march 17
Short term open access status for march 17
 
The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)
 
The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)
 
Forecasting, scheduling and imbalance handling for Solar Wind Energy
Forecasting, scheduling and imbalance handling for Solar Wind EnergyForecasting, scheduling and imbalance handling for Solar Wind Energy
Forecasting, scheduling and imbalance handling for Solar Wind Energy
 
Ppa model presentation
Ppa model presentationPpa model presentation
Ppa model presentation
 

Recently uploaded

HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Recently uploaded (20)

HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

Specification grid tie_spv_plant

  • 1. Page 1 of 16 Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tamil Nadu Version: April 2014 Scope and Purpose These Guidelines for grid-connected small scale (rooftop) solar PV systems have been prepared for the benefit of departments and organizations of the Government of Tamil Nadu that plan to install these systems for their office buildings. This document is a guideline document only and the Government Departments and Organizations may make suitable modifications to these documents to meet their specific (process) requirements. Grid-connected solar PV Systems There are basically two solar PV systems: stand-alone and grid-connected. Stand-alone solar PV systems work with batteries. The solar energy is stored in the battery and used to feed building loads after conversion from DC to AC power with a stand-alone inverter. These systems are generally used in remote areas without grid supply or with unreliable grid supply. The disadvantage of these systems is that the batteries require replacement once in every 3 – 5 years. Grid-connected solar PV systems feed solar energy directly into the building loads without battery storage. Surplus energy, if any, is exported to the TANGEDCO grid and shortfall, if any, is imported from the grid. These guidelines apply to grid-connected small scale (rooftop) solar PV systems. Solar Net-metering In Tamil Nadu a facility known as “net-metering” has been introduced. In net- metering the solar energy exported to the grid is deducted from the energy imported from the grid subject to certain conditions. The consumer pays for the net-energy imported from the grid. To enable net-metering TANGEDCO will replace the existing service connection meter with a bidirectional meter that displays the import and export energy separately. For details of net-metering please see the relevant order of the Tamil Nadu Electricity Regulatory Commission (TNERC) of 13-11-2013 (www.tnerc.tn.nic.in). Rooftop and Installation Requirements The shadow-free area required for installation of a rooftop solar PV system is about 12 m2 per kW (kilowatt). This number includes provision for clearances between solar PV array rows. The solar panels may be installed on the roof of the building with a south facing tilt angle that varies in Tamil Nadu from 11 – 13 degrees depending on the latitude of the location. Sufficient area shall be available for servicing the system. The minimum clearance required for cleaning and servicing of the panels is 0.6m from the parapet wall and in between rows of panels. In between the rows of solar panels sufficient gap needs to be provided to avoid the shading of a row by an adjacent row. The solar grid inverter shall be placed indoor in a safe and easily accessible place. Capital Subsidy by the Ministry of New and Renewable Energy (MNRE) The Ministry of New and Renewable Energy of the Government of India provides capital subsidies for solar PV systems subject to certain conditions. As of date (March 2014) the capital subsidy for rooftop solar PV systems is 30% of the benchmark cost or 30% of the actual cost, whichever is less. The up-to-date
  • 2. Page 2 of 16 benchmark cost and capital subsidy terms and conditions may be checked on the website of MNRE (see: www.mnre.gov.in). System Components A grid-connected solar PV system consists of the following main components: − Solar PV (photo-voltaic) array − Solar PV array support structure − Solar grid inverter − Protection devices − Cables Solar PV System Capacity Sizing The size of a solar PV system depends on the 90% energy consumption of the building and the shade-free rooftop (or other) area available. A guideline for calculating the solar PV system size is given in Annexure 1. Technical Specifications and Tender Eligibility Criteria TEDA has developed General Technical Specifications and Tender Eligibility Criteria for small scale (rooftop) grid-connected solar PV systems. See Annexure 2 and 3.
  • 3. Page 3 of 16 Annexure 1 Small scale (rooftop) solar PV system capacity sizing Solar Array Capacity The capacity of a solar PV array (in kWp, kilowatt-peak) depends90% energy consumption of the building on and the shade-free rooftop (or other) area available. Assumptions − The roof (or elevated structure) area requirement per kW of solar PV modules is about 12m2 . − In Tamil Nadu the typical average annual energy generation per installed kW of solar PV capacity is 1,500 kWh. (This number assumes a system capacity utilization factor of 18% and average grid availability of 95% during the daytime). As per the Tamil Nadu solar net-metering policy, electricity generated from a Solar rooftop/Solar system and injected into the TANGEDCO grid shall be capped commercially at 90% of the electricity consumption by the eligible consumer at the end of a 12 month settlement period which is from August to July. Excess energy generated beyond the 90% cap shall be treated as lapsed and will not be credited for the purpose of net-metering. With these assumptions, the recommended capacity of the solar modules array of a proposed grid-connected solar PV system can be calculated with the following three steps. Step 1: Calculate the maximum system capacity on the basis of the shade- free rooftop area. Formula: Capacity = shade-free rooftop area (in square meters) divided by 12. Example: The shade-free rooftop area is 60 m2 . The maximum solar PV capacity that can be installed on this rooftop area would be 60 / 12 = 5 kWp Step 2: Calculate the system capacity based on annual energy consumption. Formula: Capacity = 90% of annual energy consumption (in kWh) divided by 1,500. Example: The (estimated) annual energy consumption is 15,000 kWh The solar PV system capacity based on annual energy consumption would be (90% x 15,000) / 1,500 = 9 kWp Recommended Capacity : Take the lowest of the above two capacity calculation results. In this example: 5 kWp Solar Grid Inverter Capacity The recommended solar grid inverter capacity in kW shall be in a range of 95% - 110% of the solar PV array capacity. In the above example, the solar array
  • 4. Page 4 of 16 capacity was calculated to be 5 kW. The solar grid inverter required for this array would be in a range of 4.75 – 5.50 kW. In Tamil Nadu for systems above 4 kW, three phase solar grid inverters shall be used (three single phase inverters or a single three phase inverter).
  • 5. Page 5 of 16 Annexure 2 General Technical Specification for small scale (rooftop) solar PV systems 1.0 Introduction 1.1 In grid-connected solar photo-voltaic (PV) systems, solar energy is fed into the building loads that are connected to the TANGEDCO grid through a service connection with surplus energy being fed into the grid and shortfall being drawn from the grid. Production of surplus energy may happen when solar energy produced exceeds the energy consumption of the building. This surplus is fed into the grid. During the night, or when during the day energy demand in the building exceeds solar energy generation, energy is drawn from the grid. Grid-connected solar PV systems have no battery storage and will not work during grid outage. For buildings with grid-connected solar PV systems, the service connection meter needs to be of the bidirectional type, whereby import kWh and export kWh are separately recorded. 1.2 A grid-connected solar PV system consists of the solar panels, solar panels mounting structure, one or more solar grid inverters, protection devices, meters, interconnection cables and switches. 1.3 Components and parts used in solar PV systems should conform to the BIS or IEC or other international specifications, wherever such specifications are available and applicable. 2.0 Quality and Workmanship 2.1 Solar PV modules are designed to last 25 years or more. It is therefore essential that all system components and parts, including the mounting structures, cables, junction boxes, distribution boxes and other parts also have a life cycle of at least 25 years. Therefore all works shall be undertaken with the highest levels of quality and workmanship. During inspection special attention will be given to neatness of work execution and conformity with quality and safety norms. Non compliant works will have to be redone at the cost of the Installer. 3.0 System Sizing As per the solar net metering orders of the Tamil Nadu Electricity Regulatory Commission (TNERC) of 13-11-2013, crediting of energy for the purpose of net-metering is limited to 90% of the consumed energy during a 12 month settlement period. The maximum recommended solar PV capacity for grid-connected solar PV systems is therefore a capacity that produces not more than 90% of the annual energy consumption of the building.
  • 6. Page 6 of 16 4.0 Specification of Solar PV Modules 4.1 Solar PV modules shall be of the crystalline silicon type, manufactured in India. Detailed specifications of the solar PV modules are given below: Type Crystalline silicon Origin Manufactured in India Efficiency >= 13% Fill factor >= 70% Degradation warranty Panel output (Wp) capacity to be >=90% of design nominal power after 10 years and >=80% of design nominal power after 25 years. Module frame Non-corrosive and electrolytically compatible with the mounting structure material Termination box Thermo-plastic, IP 65, UV resistant Blocking diodes Schottky type Module minimum rated power The nominal power of a single PV module shall not be less than 74Wp. RF Identification tag for each solar module Shall be provided inside the module and must be able to withstand environmental conditions and last the lifetime of the solar module. RF Identification tag data a) Name of the manufacturer of PV Module b) Name of the Manufacturer of Solar cells c) Month and year of manufacture (separately for solar cells and module) d) Country of origin (separately for solar cells and module) e) I-V curve for the module f) Wm, Im, Vm and FF for the module g) Unique Serial No and Model No of the module h) Date and year of obtaining IEC PV module qualification certificate i) Name of the test lab issuing IEC
  • 7. Page 7 of 16 certificate j) Other relevant information on traceability of solar cells and module as per ISO 9000 standard Power output rating To be given for standard test conditions (STC). I-V curve of the sample module shall be submitted. Compliance with standards and codes IEC 61215 / IS 14286 IEC 61730 Part 1 and 2 Salt Mist Corrosion Testing As per IEC 61701 5.0 Solar PV Modules Mounting Structure 5.1 The PV modules shall be mounted on fixed metallic structures having adequate strength and appropriate design, which can withstand the load of the modules and high wind velocities. The support structure shall be hot dip galvanized steel or aluminium. 5.2 Detailed specifications for the mounting structure are given below: Wind velocity withstanding capacity 150 km / hour Structure material Hot dip galvanised steel with a minimum galvanisation thickness of 120 microns or aluminium alloy. Bolts, nuts, fasteners, panel mounting clamps Stainless steel SS 304 Mounting arrangement for RCC-flat roofs With removable concrete ballast made of pre-fabricated PCC (1:2:4), M15 Mounting arrangement for metal sheet roofs Mounting directly on the sheet metal, ensuring stability and wind withstanding capacity, or penetrating the sheet metal and fixing to the sub- structure, ensuring that the roof remains water proof and ensuring stability and wind withstanding capacity.
  • 8. Page 8 of 16 Mounting arrangement for elevated structures The elevated structure has to be securely anchored to the supporting surface. Concrete foundations of appropriate weight and depth for elevated structures mounted directly on the ground; Bolted with anchor bolts of appropriate strength for elevated structures mounted on RCC surfaces. Mounting arrangement for ground installations With removable concrete ballast made of pre-fabricated PCC (1:2:4), M15; assuring enough ground clearance to prevent damage of the module through water, animals and other environmental factors. Installation The structures shall be designed for simple mechanical on-site installation. There shall be no requirement of welding or complex machinery at the installation site. Minimum distance between roof edge and mounting structure 0.6m Access for panel cleaning and maintenance All solar panels must be accessible from the top for cleaning and from the bottom for access to the module- junction box. Panel tilt angle North – south orientation with a fixed tilt angle of 11 – 13 degrees (depending on location), south facing. 5.3 The prospective Installer shall specify installation details of the solar PV modules and the support structures with lay-out drawings and array connection diagrams. The work shall be carried out as per the designs approved by the Customer. 6.0 Solar Array Fuse 6.1 The cables from the array strings to the solar grid inverters shall be provided with DC fuse protection. Fuses shall have a voltage rating and current rating as required. The fuse shall have DIN rail mountable fuse holders and shall be housed in thermoplastic IP 65 enclosures with transparent covers.
  • 9. Page 9 of 16 7.0 Solar Grid Inverter: 7.1 The solar grid inverter converts the DC power of the solar PV modules to grid-compatible AC power. 7.2 The detailed specifications of the solar grid inverter are given below. Total output power (AC) To match solar PV plant capacity while achieving optimum system efficiency Input DC voltage range As required for the solar grid inverter DC input. Maximum power point (MPPT) tracking Shall be incorporated Number of independent MPPT inputs 1 or more Operation AC voltage Single phase 230V or Three phase 415V (+ 12.5%, -20%) Operating Frequency range 47.5 – 52.5 Hz Nominal frequency 50 Hz Power factor of the inverter >0.98 at nominal power Total harmonic distortion Less than 3% Built-in Protection AC high / low voltage; AC high /low frequency Anti-islanding protection As per VDE 0126-1-1, IEC 60255.5 / IEC 60255.27 Operating ambient temperature range -10 o C - +60 o C Humidity 0 – 95% Rh Inverter efficiency Inverter weighted efficiency >=95% >=94% Protection degree IP 65 for outdoor mounting, IP 54 for indoor mounting Communication interface RS 485 / RS 232 / RJ45 Safety compliance IEC 62109-1, IEC 62109-2
  • 10. Page 10 of 16 Environmental Testing IEC 60068-2 (1,2,14,30) Efficiency Measurement Procedure IS/IEC 61683 Cooling Convection Display type LCD for data display. LCD / LED for status display Display parameters to include Output power (W), cumulative energy (Wh), DC voltage (V), DC current (A), AC voltage (V), AC frequency (Hz), AC current (A), cumulative hours of operation (h). 8.0 DC Combiner Box 8.1 A DC Combiner Box shall be used to combine the DC cables of the solar module arrays with DC fuse protection for the outgoing DC cable(s) to the DC Distribution Box. 9.0 DC Distribution Box 9.1 A DC distribution box shall be mounted close to the solar grid inverter. The DC distribution box shall be of the thermo-plastic IP65 DIN-rail mounting type and shall comprise the following components and cable terminations: − Incoming positive and negative DC cables from the DC Combiner Box; − DC circuit breaker, 2 pole (the cables from the DC Combiner Box will be connected to this circuit breaker on the incoming side); − DC surge protection device (SPD), class 2 as per IEC 60364-5-53; − Outgoing positive and negative DC cables to the solar grid inverter. 9.2 As an alternative to the DC circuit breaker a DC isolator may be used inside the DC Distribution Box or in a separate external thermoplastic IP 65 enclosure adjacent to the DC Distribution Box. If a DC isolator is used instead of a DC circuit breaker, a DC fuse shall be installed inside the DC Distribution Box to protect the DC cable that runs from the DC Distribution Box to the Solar Grid Inverter. 10.0 AC Distribution Box 10.1 An AC distribution box shall be mounted close to the solar grid inverter. The AC distribution box shall be of the thermo plastic IP65 DIN rail mounting type and shall comprise the following components and cable terminations: − Incoming 3-core / 5-core (single-phase/three-phase) cable from the solar grid inverter
  • 11. Page 11 of 16 − AC circuit breaker, 2-pole / 4-pole − AC surge protection device (SPD), class 2 as per IEC 60364-5-53 − Outgoing cable to the building electrical distribution board. 11.0 Connection to the Building Electrical System 11.1 The AC output of the solar grid inverter shall be connected to the building’s electrical system after the TANGEDCO service connection meter and main switch on the load side. The solar grid inverter output shall be connected to a dedicated module in the Main Distribution Board (MDB) of the building. It shall not be connected to a nearby load or socket point of the building. The connection to the electrical system of the building shall be done as shown in typical wiring diagram 1 in the Annexure 2. 11.2 For buildings or loads with diesel generator backup, the wiring of the solar grid inverter shall be such that the solar grid inverter cannot run in parallel with the diesel generator. This implies that the solar grid inverter must be connected to a distribution board on the grid side of the automatic or manual change-over switch as shown in typical wiring diagram 2 in the Annexure 2. 12.0 Cables 12.1 All cables shall be supplied conforming to IEC 60227/ IS 694 & IEC 60502/ IS 1554. Voltage rating: 1,100V AC, 1,500V DC 12.2 For the DC cabling, XLPE or XLPO insulated and sheathed, UV stabilised single core flexible copper cables shall be used. Multi-core cables shall not be used. 12.3 For the AC cabling, PVC or XLPE insulated and PVC sheathed single or multi-core flexible copper cables shall be used. Outdoor AC cables shall have a UV-stabilised outer sheath. 12.4 The total voltage drop on the cable segments from the solar PV modules to the solar grid inverter shall not exceed 2.0%. 12.5 The total voltage drop on the cable segments from the solar grid inverter to the building distribution board shall not exceed 2.0% 12.6 The DC cables from the SPV module array shall run through a UV- stabilised PVC conduit pipe of adequate diameter with a minimum wall thickness of 1.5mm. 12.7 Cables and wires used for the interconnection of solar PV modules shall be provided with solar PV connectors (MC4) and couplers. 12.8 All cables and conduit pipes shall be clamped to the rooftop, walls and ceilings with thermo-plastic clamps at intervals not exceeding 50 cm. The minimum DC cable size shall be 4.0 mm2 copper. The minimum AC cable size shall be 4.0 mm2 copper. In three phase systems, the size of the
  • 12. Page 12 of 16 neutral wire size shall be equal to the size of the phase wires. The following colour coding shall be used for cable wires: − DC positive: red (the outer PVC sheath can be black with a red line marking) − DC negative: black − AC single phase: Phase: red; neutral: black − AC three phase: Phases: red, yellow, blue; neutral: black − Earth wires: green 12.9 Cables and conduits that have to pass through walls or ceilings shall be taken through a PVC pipe sleeve. 12.10 Cable conductors shall be terminated with tinned copper end-ferrules to prevent fraying and breaking of individual wire strands. The termination of the DC and AC cables at the Solar Grid Inverter shall be done as per instructions of the manufacturer, which in most cases will include the use of special connectors. 13.0 Earthing 13.1 The PV module structure components shall be electrically interconnected and shall be grounded. 13.2 Earthing shall be done in accordance with IS 3043-1986, provided that earthing conductors shall have a minimum size of 6.0 mm2 copper, 10 mm2 aluminium or 70 mm2 hot dip galvanised steel. Unprotected aluminium or copper-clad aluminium conductors shall not be used for final underground connections to earth electrodes. 13.3 A minimum of two separate dedicated and interconnected earth electrodes must be used for the earthing of the solar PV system support structure with a total earth resistance not exceeding 5 Ohm. 13.4 The earth electrodes shall have a precast concrete enclosure with a removable lid for inspection and maintenance. The entire earthing system shall comprise non-corrosive components. 14.0 Surge Protection 14.1 Surge protection shall be provided on the DC side and the AC side of the solar system. 14.2 The DC surge protection devices (SPDs) shall be installed in the DC distribution box adjacent to the solar grid inverter. 14.3 The AC SPDs shall be installed in the AC distribution box adjacent to the solar grid inverter. 14.4 The SPDs earthing terminal shall be connected to earth through the above mentioned dedicated earthing system. The SPDs shall be of type 2 as per IEC 60364-5-53
  • 13. Page 13 of 16 15.0 Junction Boxes 15.1 Junction boxes and solar panel terminal boxes shall be of the thermo plastic type with IP 65 protection for outdoor use and IP 54 protection for indoor use. 15.2 Cable terminations shall be taken through thermo-plastic cable glands. Cable ferrules shall be fitted at the cable termination points for identification. 16.0 Tools, Tackles and Spares 16.1 The Installer shall keep ready stock of tools, tackles and essential spares that will be needed for the day-to-day maintenance of the solar PV system. This shall include but not be limited to, the following: 16.2 Screw driver suitable for the junction boxes and combiner boxes; 16.3 Screw driver and / or Allen key suitable for the connectors, power distribution blocks, circuit breaker terminals and surge arrestor terminals; 16.4 Spanners / box spanners suitable for the removal of solar PV modules from the solar PV module support structure; 16.5 Solar panel mounting clamps; 16.6 Cleaning tools for the cleaning of the solar PV modules; 16.7 Spare fuses. 17.0 Caution Signs 17.1 In addition to the standard caution and danger boards or labels as per Indian Electricity Rules, the AC distribution box near the solar grid inverter, the building distribution board to which the AC output of the solar PV system is connected and the Solar Generation Meter shall be provided with a non-corrosive caution label with the following text: WARNING – DUAL POWER SOURCE EB & SOLAR 17.2 The size of the caution label shall be 105mm (width) x 20mm (height) with white letters on a red background. 17.3 Caution labels as may be prescribed by TANGEDCO shall be fixed as per TANGEDCO specifications. 18.0 Metering 18.1 An energy meter shall be installed in between the solar grid inverter and the building distribution board to measure gross solar AC energy production (the “Solar Generation Meter”). The Solar Generation Meter shall be of the same accuracy class as the TANGEDCO service connection meter or as specified by TNERC.
  • 14. Page 14 of 16 18.2 The existing service connection meter needs to be replaced with a bidirectional (import kWh and export kWh) service connection meter (the “Solar Service Connection Meter”) for the purpose of net-metering. Installation of the Solar Service Connection Meter will be carried out by TANGEDCO and is not in the scope of the work of the Installer. 19.0 Documentation 19.1 The Installer shall supply the following documentation: a) System description with working principles. b) System single line diagram. c) Solar PV array lay-out. d) Routing diagram of cables and wires. e) Data sheets and user manuals of the solar PV panels and the solar grid inverter. f) A system operation and maintenance manual. g) Name, address, mobile number and email address of the service centre to be contacted in case of failure or complaint. h) Warranty cards. i) Maintenance register. 20.0 Test Certificates and Reports to be Furnished Test Certificates / Reports from IECQ / NABL accredited laboratory for relevant IEC / equivalent BIS standard for quoted components shall be furnished. Type Test Certificates shall be provided for the solar modules and the solar grid inverters to provide evidence of compliance with standards as specified in articles 4.0 and 7.0 of this Technical Specification. Customer reserves the right to ask for additional test certificates or (random) tests to establish compliance with the specified standards.
  • 15. Page 15 of 16 Annexe to General Technical Specification Typical Wiring Diagrams for Grid-Connected Solar System 1. Typical wiring diagram for grid-connected solar PV system without diesel generator. Note: The Solar Generation Meter shown above is mandatory for consumers who avail of a generation-based incentive (GBI) and is optional for others.
  • 16. Page 16 of 16 2. Typical wiring diagram for grid-connected solar PV system with diesel generator. Note: The Solar Generation Meter shown above is mandatory for consumers who avail of a generation-based incentive (GBI) and is optional for others.
  • 17. ANNEXURE-3 TENDER ELIGIBILITY CRITERIA The suggested Tender Eligibility Criteria are as follows: The Bidder(s) shall meet the following Eligibility Criteria to participate in the Tender and shall enclose documentary proof for fulfilling the Eligibility in the Techno commercial Bid. S. No Minimum Eligibility Criteria Proof to be submitted for fulfilling the Eligibility Criteria 1. (a) The Bidder/its wholly owned subsidiary shall be A Registered Manufacturing Company/ Firm of SPV Cells/Modules OR Battery OR PV System Electronics, in India . OR A PV System Integrator in India in existence for at least past one audited year. Certificate of Incorporation or Registration and relevant proof shall be submitted. b) Consortium not exceeding three partners. Each partner of the Consortium shall be a Registered Company / Firm in existence for at least past one audited year. The prime Bidder amongst the consortium partners shall be either (i) a registered manufacturing company/ Firm of SPV cells / Modules or PV system Electronics in India. OR (ii) a PV system integrator in India. i. Certificate of Incorporation / Registration of all the partners shall be submitted. ii. Copy of consortium agreement shall be submitted (OR) A letter of intent to execute a consortium agreement in the event of a successful bid shall be signed by all the partners and submitted with the Bid together with the copy of the proposed consortium Agreement.
  • 18. S. No Minimum Eligibility Criteria Proof to be submitted for fulfilling the Eligibility Criteria iii. In case of Consortium, all partners of the consortium shall be liable jointly and severally for the execution of the contract in accordance to the contract terms and a statement to this effect shall be included in the letter of intent. 2. The Bidder shall use only SPV modules manufactured in India Necessary undertaking letter shall be submitted from the module manufacturer. 3. 1) 2) 3) Annual Turnover of the bidder shall be as per the following. In case of consortium, consortium partners shall cumulatively have 50% of the average annual turnover as per criteria (2) or (3) & prime bidder shall satisfy the criteria (1). A summarized sheet of turnover certified by registered CA shall be furnished. Tender Values <Rs.50 L Rs.50L- Rs.2 Cr Rs.2Cr- 10 Cr Rs.10Cr -25Cr. Rs.>25Cr. -- Min Rs.25 L Min. Rs.1 Cr Min. Rs.5 Cr. Min Rs.10 Cr. -- Min Rs.50 L Min. Rs.2 Cr -- -- -- -- -- Min. Rs.10 Cr Min. Rs.25 Cr Turnover in PV Field in the Last Financial Year (OR Current Financial Year) Average annual Turnover in the Last two financial years Average annual Turnover in the last three financial years
  • 19. S. No Minimum Eligibility Criteria Proof to be submitted for fulfilling the Eligibility Criteria 4. Bidder shall have installation experience in installation of Solar PV Plants of 1Kwp & above and shall have installed at least 10% of the quantity tendered (Power plants installed minimum period of 3 months prior to the date of bid submission will only be considered) & these systems shall be working satisfactorily (Lanterns are not allowed) Copy of Work Orders and performance certificate for satisfactory function of those SPV systems obtained from the end user if system cost was paid by the end user or from the Government agency. 5. The Bidder shall agree to accept the entire quantity that is finally allotted to him. Necessary under taking shall be enclosed in this regard. 6. Various components of the SPV system shall conform to the MNRE standards as per the Technical Specification given in Annexure I. Copy of test certificates/test reports for each component shall be submitted. 7. Bidder(s) shall not be currently blacklisted by any of the State or Central Government or organizations of the State/Central Government or Union Territories of India as on date of submission of tender. Necessary Undertaking letter shall be furnished. 8. The bidder shall undertake to submit only bound bids with all pages serially numbered. Necessary undertaking letter shall be submitted. 9. The bidder shall undertake for product take back and re-cycling. Necessary undertaking letter shall be submitted.
  • 20. Accredited Test centers for MNRE Off-Grid Programme Lighting Systems Inverter Charge Controller >100 W Lab/ PV Module as per Battery Organizat MNRE Environment ion Efficiency Environmental protections Environmental Specificatio al ns Yes Yes Yes Yes Yes (Including(IEC612 15up MNRE Yes (upto Yes (Including IP) Yes (Including IP) IP) MNRE SEC to100WP) Accredited MNRE 10KVA) MNRE Accredited MNRE MNRE Accredited NABL Accredited MNRE Accredited Accredited Accredited Accredited STC Test Yes Yes Yes Yes NABL/ Yes Yes NABL/ ERTL Facility NABL/ NABL/ Yes NABL/ NABL/ MNRE MNRE (east) MNRE MNRE MNRE Up to 1000AH MNRE MNRE
  • 21. Accredited Accredited Accredited Accredited Accredited Accredited Accredited Yes Yes NABL/ Yes (IEC61215)u MNRE (up to nder ICEEE- Accredited Yes Yes 3KVA) Yes NABL/ Yes NABL/ ETDC CB, NABL/ Yes NABL/ MNRE MNRE (B) IEC 61701 MNRE Up to 100 AH MNRE NABL/ Accredited Accredited (upto100WP) Accredited Accredited MNRE NABL Accredited Accredited Yes Yes NABL/ Yes (up to Yes MNRE 10KVA) Yes NABL/ Yes NABL/ CPRI NABL/ Yes NABL/ No Accredited MNRE MNRE (B) MNRE Up to 500 AH MNRENABL/ Accredited Accredited
  • 22. Accredited Accredited MNRE Accredited Only Yes NABL Yes Yes NABL Yes Yes NABL Electronics (up to (up to ERTL (N) No Accredited No Accredited Accredited& luminaire NABL 5KVA) 5KW)
  • 23. Accredited NABL NABL Accredited Accredited Yes (IEC61215 Yes Yes Yes IEC 61730 (up to (up to (except Yes NABL Yes NABL Yes NABL Pt.II and IEC 6KVA) 6KW) UL (B) battery) Accredited No Accredited Accredited 61701) NABL upto400WP NABL NABL Accredited NABL Accredited Accredited Accredited Yes Yes Yes (IEC61215 & (up to Yes NABL Yes NABL (up to Yes NABL TUV 61730 Pt-II) 10KVA) NO Accredited No Accredited 10KW) Accredited Rhineland upto400WP NABL NABL NABL AccreditedAccredited Accredited
  • 24. Only Yes Yes (up to (up to Electronics Yes NABL Yes NABL Yes NABL 5KVA) 5KW) Inter Tek No & luminaire Accredited No Accredited Accredited NABL NABL NABL Accredited Accredited Accredited *Beyond 10KVA self certification by the manufactures is acceptable.