SlideShare a Scribd company logo
1 of 22
Download to read offline
OPEN ACCESS
What is Open Access?
• As per definition of Open Access in the Electricity Act, 2003, Open
Access is “the non-discriminatory provision for the use of
transmission lines or distribution system or associated facilities with
such lines or system by any licensee or consumer or a person
engaged in generation in accordance with the regulations specified
by the Appropriate Commission”.
• Open Access allows consumers to choose among a large number of
sellers, instead of being forced to buy electricity from their existing
utility. Similarly, generators can choose their own buyers within or
outside their state, instead of selling power to their utility. This is
done by payment of transmission charges as decided by CERC for
use of CTU lines and as determined by SERC for using of state
transmission and distribution systems.
What are different technical and financial
requirements for availing Open Access?
• Minimum volume of power should be 1 MW
• Scheduling should be done on a 15 minute-block basis
• Installation of special Energy Meter, 0.2S Class CT-PT set,
commissioning of RTU, meter testing and CT/PT set
testing report, commissioning and testing report of
equipment by STU to be submitted to SLDC along with
forwarding letter addressed to the CE.
• No Objection Certificate from SLDCs
Who will control/regulate the power
flow?
• The power sector is regulated by Central Electricity
Regulatory Commission at central level and by the
various State Electricity Regulatory Commissions at state
level. The power system is operated and controlled by
various Load Dispatch Centres functioning at the State,
Regional and National levels respectively.
What is the process of Power trading?
• Powers is bought from an entity in a surplus location / surplus utilities / generating
stations and sold through the state or central transmission company into an entity
in deficit states/utilities
What are the different categories of
Trading Licensee?
• As per Central Electricity Regulatory Commission (Procedure, Terms and
Conditions for grant of trading licence and other related matters) Regulations,
2009, with subsequent amendments, there are four categories of Trading Licensee
with varying maximum permissible volume for transactions
Category Volume of electricity proposed to be traded in a year
Category I No Limit
Category II Not more than 1500 MUs
Category III Not more than 500 MUs
Category IV Not more than 100 MUs
What are the services provided by the power
traders?
• Facilitating to reduce geographical, seasonal & daily gap between
demand and supply
• Bilateral power trading contracts between generators, traders and
customers
• Co-ordination with various intervening agencies e.g. Central & State
Transmission Utility, Load Despatch Centres and regulators
• Payment security mechanisms as per contract
• Portfolio Management (Collective scheduling/sale of CPP power of
States)
• Contract Management
• Consultancy in above areas for optimisation of power sale/purchase
requirement and tender participation
• Market intelligence data support and sharing the latest trends in
power sector
What are different products offered by a
Trader?
• Transactions through Bilateral Arrangement-
 Long Term Arrangements including competitive bidding (consultancy
only including bid preparation)
 Medium Term Arrangement for upto 3 years
 Short term arrangements
 Over-The-Counter transactions, under negotiated pricing between
identified seller and buyer
• b. Transactions through Power Exchange platform as a trading cum
clearing member
 Day Ahead contracts
 Intra-Day contracts
 Weekly contracts
 Daily Contracts
 Day Ahead Contingency
 Renewable Energy Certificates
What different roles a Trader shall perform on behalf of its
client?
• Marketing
• Commercial
• Regulatory
• Financial
• Advisory
How Financial Settlement of a trade is
done?
• For Day Ahead Collective Transactions- Financial settlement is done by electronic
transfer of funds between the clearing members & the Exchange. The proceeds from
sale of power are transferred to members settlement account by 2 P.M of the day
following the day of delivery by power exchange. The fund transfer to clients account is
either through electronic money transfer system or by issuing cheque as preferred by
the client. The buyers have to pay the amount of power purchased at MCP by 14.30
Hours on the day of bidding.
• For Bilateral Transactions-Invoices for the energy charges shall be raised as per
billing cycle. The relevant bills will be raised based usually on the provisional
weekly energy data for the energy at delivery point based on RLDC/SLDC website
data. Financial Settlement will be done in accordance with any rebate/surcharge,
as and when applicable, and shall include SLDC Scheduling & Handling charges,
T&D charges, CSS and Open Access charges, if any.
What is the trading margin cap by
Hon’ble CERC?
• Depending on the contracted price for a
bilateral deal, CERC has capped the trading
margin that can be maximum charged as
follows:
Sale Price (Rs./KwH) Margin (Rs./kWh)
=< 3 Upto 0.04
>3 Upto 0.07
What are the risks involved in power
trading?
• Credit Risk The seller of power may encounter payment default risk -. The power traders play their
role as a shield to sellers by managing the credit risk involved in a power transaction. The power
traders primarily deal with the entities having credit concerns - through appropriate risk mitigation
techniques.
• Operational Risks
Risks include availability and reliability of transmission facility and power generation by the seller
without interruption. The power traders apply for open access well in advance with the identified
agencies for approval of open access required for an advance transaction.
• Price risk
A contract finalised in advance between a buyer and a seller through a power trader is always
subject to price risk. The price on the spot market during the delivery period of an advance contract
may be substantially different. Such situation may give an arbitrage advantage to a buyer or seller
to exit the contract executed in advance.
• Competition on account of direct trading between the surplus and deficit unit.
There may be a situation that the prospective buyer and seller, who had previously dealt through
the trader, develop commercial relationship. In this case they may bypass the trader to engage in a
direct commercial relationship
• Dependence on few buyers and sellers of power.
There are occasions where the restriction of buyers and sellers significantly reduce business
opportunities. Also during participation of tenders called by SEB, few sellers may be interested in
the same, because there may long gestation period to decide the final contract.
How will any deviations from
schedule be settled?
• All deviations shall be settled at central level
as per Deviation Settlement Mechanism, 2014
as amended from time to time and/or the
prevailing settlement mechanism at the state
level.
What are present CERC regulations applicable related to Open
access and Power Trading?
• The CERC Regulations applicable include
• Power Market regulation, 2010
• Open Access in Inter State Regulations, 2008
• Fixation of Trading Market Regulation, 2010
• Deviation Settlement Mechanism, 2014
• Indian Electricity Grid Code, 2010
What are major differences in transactions at Power
Exchange, and that through a Trading Licensee?
Power Exchange Transactions Transactions Through Traders
Transactions are of collective nature
Transactions can be bilateral as well as as a member client on
Power Exchange platform
Products restricted to those offered at the Exchange
Products include those offered at Exchange, as well as other
bilateral arrangements
Pricing of electricity is determined at power exchange end
based on demand supply condition on daily basis.
Pricing of electricity may be on negotiated basis, tender
discovered or market determined if transacting at the Exchange
platform
Power supply under day ahead market is subject to daily
varying demand supply condition, grid corridor availability.
Bilateral arrangements ensure firm supply with pricing and
advance booking of corridors result in lesser incidents of
congestion
Buyers to make payment in advance
Bilateral arrangement follows billing cycle and thus buyers can
avail credit.
What is the price discovery mechanism at power Exchange?
How is it different from that with Traders?
• Price discovery at Power Exchanges is done by an anonymous double sided closed
auction process, wherein all sale and purchase offers are collectively treated,
initially in an unconstrained scenario. The aggregate supply and demand curves
are drawn on Price-Quantity axes. The intersection point of the two curves gives
the Market Clearing Price (MCP) and Market Clearing Volume (MCV)
corresponding to price and quantity of the intersection point. Based on these
results the provisional obligation and provisional power flow is calculated. Funds
available in the settlement account of the Members are checked with the Clearing
Banks and also requisition for capacity allocation is sent to the National Load
Despatch Centre (NLDC). In case sufficient funds are not available in the
settlement account of the Member then his bid(s) is deleted from further
evaluation procedure. Based on the transmission capacity reserved for the
Exchange by the NLDC on day-ahead basis by 2.00 PM, fresh iteration is run at 2.30
PM and final Market Clearing Price and Volume as well as Area Clearing Price and
Volume are determined. These Area Clearing Prices are used for settlement of the
contracts
• Price Discovery over bilateral route, through a trader, is done as per requirements
of seller and the buyer, on negotiated basis or as discovered in a tender process
What would be the tentative landed cost at the consumers’
periphery while purchasing power from the Power Exchange?
• Key factors that influence the landed cost per unit of
electricity include
• Point of Connection (PoC) Charges & Losses, as applicable
for utilisation of CTU network, and as approved by
CERC/NLDC
• State Transmission Charges & Losses, as applicable for
utilising STU network, and as approved by SERC/SLDC
• Distribution Charges & Losses, as applicable
• Cross Subsidy Surcharge, if any, as approved by SERC
• Electricity Duty, if any, as approved by SERC
• Scheduling & Handling Charges
• Trading Margin charged by Trader
The Landed Cost per unit of electricity would vary from consumer to consumer
depending on the various charges and losses applicable within his state/region. A
sample Landed Cost is shown below. The values assumed for calculation are only
indicative and would vary accordingly.
Particular Unit
Rate at Regional Periphery 4 Rs./kWh
PoC Charge (Drawl) 0.1489 Rs./kWh
PoC Loss (Drawl) 1.43 %
State Transmission Charge 0.08 Rs./kWh
State Transmission Loss 3.10 %
Distribution Charges 0.1 Rs./kWh
Distribution Loss 9 %
IEX Transaction Charges 0.02 Rs./kWh
Cross Subsidy Surcharge 0.2 Rs./kWh
Scheduling & Handling charges 0.13 Rs./kWh
Landed Cost 5.383 Rs./kWh
What is Renewable Purchase Obligation? Who are obligated to
fulfil RPO?
• RPOs, put simply, are the minimum percentages of the total
power that electricity distribution companies and some
large power consumers need to purchase from renewable
energy (RE) sources. RPO makes it mandatory for the
obligated entities to meet part of their energy needs
through green energy. The state-wise RPO targets are fixed
by the respective State Electricity Regulatory Commissions,
who may set separate targets for solar and non-solar
energy.
Entities obliged to fulfil RPO include
• Distribution Licensee
• Open Access Customer
• Captive Power consumer
What is REC?
RPOs, put simply, are the REC is a tradable certificate of proof that one MWh of electricity
has been injected (or deemed to have been injected) to grid by an RE generator.
The Electricity Act, 2003, the policies framed under the Act, as also the National Action Plan
on Climate Change (NAPCC) provide for a roadmap for increasing the share of renewable in
the total generation capacity in the country. However, Renewable Energy (RE) sources are
not evenly spread across different parts of the country. This inhibits SERCs in states with
poor RE generation source from specifying higher Renewable Purchase Obligation (RPO). On
the other hand states with high potential of RE sources harness the RE potential beyond the
RPO level fixed by the SERCs.
The REC mechanism seeks to address this mismatch between availability of RE sources and
the requirement of the obligated entities to meet their RPO.
There are two categories of RECs, viz., solar RECs and non-solar RECs. Solar RECs are issued
to eligible entities for generation of electricity based on solar as renewable energy source,
and non-solar RECs are issued to eligible entities for generation of electricity based on
renewable energy sources other than solar. Obligated entities can purchase these RECs in
order to fulfil their RPO.
How are RECs issued to a RE generator?
• The RE generators who fulfil the eligibility criteria can
apply for the accreditation to concerned State Agency.
After successful accreditation the eligible entity (RE
generator) may apply for registration to the Central
Agency. After successful registration the eligible entity
may obtain REC through the 'process of issuance of
REC' by Central Agency. The detailed procedures for
Accreditation, Registration, Issuance and Redemption
of REC can be downloaded from various websites.
www.cercind.gov.in
www.nldc.in
www.recregistryindia.nic.in
Where and how are RECs traded?
• RECs are tradable only at the Power Exchanges at the market determined
price. REC trade at IEX is done on the last Wednesday of every month. The
present applicable floor and forbearance price for REC trading are as
REC Floor Price (Rs.) Forbearance Price (Rs.)
Solar 3500 5800
Non-Solar 1500 3300

More Related Content

What's hot

Indian electricity market and power exchanges
Indian electricity market and power exchangesIndian electricity market and power exchanges
Indian electricity market and power exchangesNageswar Rao
 
Demand side management
Demand side managementDemand side management
Demand side managementRohit Garg
 
Tariff structure & Cerc tariff regulation
Tariff structure & Cerc tariff regulationTariff structure & Cerc tariff regulation
Tariff structure & Cerc tariff regulationSushant Kumar Sinha
 
MATLAB programs Power System Simulation lab (Electrical Engineer)
MATLAB programs Power System Simulation  lab (Electrical Engineer)MATLAB programs Power System Simulation  lab (Electrical Engineer)
MATLAB programs Power System Simulation lab (Electrical Engineer)Mathankumar S
 
Tariff-based Competitive Bidding in the Power Sector
Tariff-based Competitive Bidding in the Power SectorTariff-based Competitive Bidding in the Power Sector
Tariff-based Competitive Bidding in the Power SectorIPPAI
 
Electricity Trading in India
Electricity Trading in IndiaElectricity Trading in India
Electricity Trading in IndiaNitin Virmani
 
demand side management
demand side managementdemand side management
demand side managementanushsourabh
 
What is a regulatory asset
What is a regulatory assetWhat is a regulatory asset
What is a regulatory assetAmit Kumar
 
Procedure for-distribution-open-access, Tata Power
Procedure for-distribution-open-access, Tata PowerProcedure for-distribution-open-access, Tata Power
Procedure for-distribution-open-access, Tata PowerJay Ranvir
 
8: Energy Accounting, Metering & Monitoring
8: Energy Accounting, Metering & Monitoring8: Energy Accounting, Metering & Monitoring
8: Energy Accounting, Metering & MonitoringAlliance To Save Energy
 
Concept Of Grid Code Anilpatil Session Iii
Concept Of Grid Code Anilpatil Session  IiiConcept Of Grid Code Anilpatil Session  Iii
Concept Of Grid Code Anilpatil Session IiiAnil Patil
 

What's hot (20)

Indian electricity market and power exchanges
Indian electricity market and power exchangesIndian electricity market and power exchanges
Indian electricity market and power exchanges
 
Demand side management
Demand side managementDemand side management
Demand side management
 
Tariff structure & Cerc tariff regulation
Tariff structure & Cerc tariff regulationTariff structure & Cerc tariff regulation
Tariff structure & Cerc tariff regulation
 
Power Market regulation
Power Market regulationPower Market regulation
Power Market regulation
 
MATLAB programs Power System Simulation lab (Electrical Engineer)
MATLAB programs Power System Simulation  lab (Electrical Engineer)MATLAB programs Power System Simulation  lab (Electrical Engineer)
MATLAB programs Power System Simulation lab (Electrical Engineer)
 
Tariff-based Competitive Bidding in the Power Sector
Tariff-based Competitive Bidding in the Power SectorTariff-based Competitive Bidding in the Power Sector
Tariff-based Competitive Bidding in the Power Sector
 
Electricity Trading in India
Electricity Trading in IndiaElectricity Trading in India
Electricity Trading in India
 
demand side management
demand side managementdemand side management
demand side management
 
Indian Electricity Grid Code
Indian Electricity Grid CodeIndian Electricity Grid Code
Indian Electricity Grid Code
 
Energy Storage
Energy StorageEnergy Storage
Energy Storage
 
Micro-grid
Micro-gridMicro-grid
Micro-grid
 
Power Purchase Agreement PPA
Power Purchase Agreement PPA Power Purchase Agreement PPA
Power Purchase Agreement PPA
 
Energy scenario in India
Energy scenario in IndiaEnergy scenario in India
Energy scenario in India
 
Electricity market 2030_presentation_long_new
Electricity market 2030_presentation_long_newElectricity market 2030_presentation_long_new
Electricity market 2030_presentation_long_new
 
What is a regulatory asset
What is a regulatory assetWhat is a regulatory asset
What is a regulatory asset
 
Procedure for-distribution-open-access, Tata Power
Procedure for-distribution-open-access, Tata PowerProcedure for-distribution-open-access, Tata Power
Procedure for-distribution-open-access, Tata Power
 
8: Energy Accounting, Metering & Monitoring
8: Energy Accounting, Metering & Monitoring8: Energy Accounting, Metering & Monitoring
8: Energy Accounting, Metering & Monitoring
 
Evolution of Smart Grids
Evolution of Smart GridsEvolution of Smart Grids
Evolution of Smart Grids
 
Concept Of Grid Code Anilpatil Session Iii
Concept Of Grid Code Anilpatil Session  IiiConcept Of Grid Code Anilpatil Session  Iii
Concept Of Grid Code Anilpatil Session Iii
 
Abt meter
Abt meterAbt meter
Abt meter
 

Similar to Open access

Introduction to Virtual Power Purchase Agreement instruments.pptx
Introduction to Virtual Power Purchase Agreement instruments.pptxIntroduction to Virtual Power Purchase Agreement instruments.pptx
Introduction to Virtual Power Purchase Agreement instruments.pptxmsounak95
 
Distribution open access Maharashtra
Distribution open access  MaharashtraDistribution open access  Maharashtra
Distribution open access MaharashtraJay Ranvir
 
Deviation Settlement Mechanism for Improving Grid Frequency Regime in India.pptx
Deviation Settlement Mechanism for Improving Grid Frequency Regime in India.pptxDeviation Settlement Mechanism for Improving Grid Frequency Regime in India.pptx
Deviation Settlement Mechanism for Improving Grid Frequency Regime in India.pptxSUBRATAMUKHOPADHYAY9
 
COE POG draft for public comment 4.3.12
COE POG draft for public comment 4.3.12COE POG draft for public comment 4.3.12
COE POG draft for public comment 4.3.12cityofevanston
 
Day-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNA
Day-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNADay-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNA
Day-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNAIPPAI
 
Potential Effects of the Eligible Customer Declaration in the Nigerian Electr...
Potential Effects of the Eligible Customer Declaration in the Nigerian Electr...Potential Effects of the Eligible Customer Declaration in the Nigerian Electr...
Potential Effects of the Eligible Customer Declaration in the Nigerian Electr...Emmanuel Aondowase Anchaver
 
telecommunication standard strategy policy
telecommunication standard  strategy policytelecommunication standard  strategy policy
telecommunication standard strategy policyMdSharifUddinShajib
 
Telecom interconnect Billing Basics
Telecom interconnect Billing   BasicsTelecom interconnect Billing   Basics
Telecom interconnect Billing BasicsShilpin Pvt. Ltd.
 
Electricity Act (Amendment) Bill 2022.pptx
Electricity Act (Amendment) Bill 2022.pptxElectricity Act (Amendment) Bill 2022.pptx
Electricity Act (Amendment) Bill 2022.pptxmsounak95
 
Multi year tariffs and regulations
Multi year tariffs and regulationsMulti year tariffs and regulations
Multi year tariffs and regulationsNavajyoti Martha
 
Training power exchanges_18-may-2014
Training power exchanges_18-may-2014Training power exchanges_18-may-2014
Training power exchanges_18-may-2014PRIYANK JAIN
 
WIRES - Transmission 101 - April 21 2015
WIRES - Transmission 101 - April 21 2015WIRES - Transmission 101 - April 21 2015
WIRES - Transmission 101 - April 21 2015Adriann McCoy
 
NC Idea Final Pitch - CellBreaker
NC Idea Final Pitch - CellBreakerNC Idea Final Pitch - CellBreaker
NC Idea Final Pitch - CellBreakerJon Colgan
 
Presentation on rajasthan solar thermal rf s
Presentation on rajasthan solar thermal rf sPresentation on rajasthan solar thermal rf s
Presentation on rajasthan solar thermal rf svaibhavtuls
 
Contracts for difference
Contracts for differenceContracts for difference
Contracts for differenceGeoff White
 

Similar to Open access (20)

Introduction to Virtual Power Purchase Agreement instruments.pptx
Introduction to Virtual Power Purchase Agreement instruments.pptxIntroduction to Virtual Power Purchase Agreement instruments.pptx
Introduction to Virtual Power Purchase Agreement instruments.pptx
 
Distribution open access Maharashtra
Distribution open access  MaharashtraDistribution open access  Maharashtra
Distribution open access Maharashtra
 
Deviation Settlement Mechanism for Improving Grid Frequency Regime in India.pptx
Deviation Settlement Mechanism for Improving Grid Frequency Regime in India.pptxDeviation Settlement Mechanism for Improving Grid Frequency Regime in India.pptx
Deviation Settlement Mechanism for Improving Grid Frequency Regime in India.pptx
 
COE POG draft for public comment 4.3.12
COE POG draft for public comment 4.3.12COE POG draft for public comment 4.3.12
COE POG draft for public comment 4.3.12
 
Day-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNA
Day-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNADay-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNA
Day-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNA
 
Potential Effects of the Eligible Customer Declaration in the Nigerian Electr...
Potential Effects of the Eligible Customer Declaration in the Nigerian Electr...Potential Effects of the Eligible Customer Declaration in the Nigerian Electr...
Potential Effects of the Eligible Customer Declaration in the Nigerian Electr...
 
telecommunication standard strategy policy
telecommunication standard  strategy policytelecommunication standard  strategy policy
telecommunication standard strategy policy
 
Telecom interconnect Billing Basics
Telecom interconnect Billing   BasicsTelecom interconnect Billing   Basics
Telecom interconnect Billing Basics
 
Electricity Act (Amendment) Bill 2022.pptx
Electricity Act (Amendment) Bill 2022.pptxElectricity Act (Amendment) Bill 2022.pptx
Electricity Act (Amendment) Bill 2022.pptx
 
EMconcept.pptx
EMconcept.pptxEMconcept.pptx
EMconcept.pptx
 
TBCB_29032019.pptx
TBCB_29032019.pptxTBCB_29032019.pptx
TBCB_29032019.pptx
 
Multi year tariffs and regulations
Multi year tariffs and regulationsMulti year tariffs and regulations
Multi year tariffs and regulations
 
Training power exchanges_18-may-2014
Training power exchanges_18-may-2014Training power exchanges_18-may-2014
Training power exchanges_18-may-2014
 
Electricity policies
Electricity policiesElectricity policies
Electricity policies
 
WIRES - Transmission 101 - April 21 2015
WIRES - Transmission 101 - April 21 2015WIRES - Transmission 101 - April 21 2015
WIRES - Transmission 101 - April 21 2015
 
Radical Innovation in the Electricity Sector – New Zealand Electricity Author...
Radical Innovation in the Electricity Sector – New Zealand Electricity Author...Radical Innovation in the Electricity Sector – New Zealand Electricity Author...
Radical Innovation in the Electricity Sector – New Zealand Electricity Author...
 
NC Idea Final Pitch - CellBreaker
NC Idea Final Pitch - CellBreakerNC Idea Final Pitch - CellBreaker
NC Idea Final Pitch - CellBreaker
 
Presentation on rajasthan solar thermal rf s
Presentation on rajasthan solar thermal rf sPresentation on rajasthan solar thermal rf s
Presentation on rajasthan solar thermal rf s
 
Contracts for difference
Contracts for differenceContracts for difference
Contracts for difference
 
Digitalisation in the Energy Sector
Digitalisation in the Energy Sector Digitalisation in the Energy Sector
Digitalisation in the Energy Sector
 

More from Jay Ranvir

Solar net metering policy
Solar net metering policySolar net metering policy
Solar net metering policyJay Ranvir
 
Open access mp
Open access mpOpen access mp
Open access mpJay Ranvir
 
Profile on the production retreaded tyre
Profile on the production retreaded tyreProfile on the production retreaded tyre
Profile on the production retreaded tyreJay Ranvir
 
Tyre Retreading by Hot Retreading Process
Tyre Retreading by Hot Retreading ProcessTyre Retreading by Hot Retreading Process
Tyre Retreading by Hot Retreading ProcessJay Ranvir
 
Open Access Charges Rajasthan
Open Access Charges RajasthanOpen Access Charges Rajasthan
Open Access Charges RajasthanJay Ranvir
 
Response to msedcl demands
Response to msedcl demandsResponse to msedcl demands
Response to msedcl demandsJay Ranvir
 
Practice directions rts net metering regulations 2015
Practice directions  rts  net metering regulations 2015Practice directions  rts  net metering regulations 2015
Practice directions rts net metering regulations 2015Jay Ranvir
 
Ppa agreement draft
Ppa agreement draftPpa agreement draft
Ppa agreement draftJay Ranvir
 
Notified f &amp;s regulations 2018
Notified f &amp;s  regulations 2018Notified f &amp;s  regulations 2018
Notified f &amp;s regulations 2018Jay Ranvir
 
Detailed comparison of capex vs opex
Detailed comparison of capex vs opexDetailed comparison of capex vs opex
Detailed comparison of capex vs opexJay Ranvir
 
Plastics to oil report
Plastics to oil reportPlastics to oil report
Plastics to oil reportJay Ranvir
 
Detail information of 5 t pyrolysis plant
Detail information of 5 t pyrolysis plantDetail information of 5 t pyrolysis plant
Detail information of 5 t pyrolysis plantJay Ranvir
 
Model ppa for renewable energy sources
Model ppa for renewable energy sourcesModel ppa for renewable energy sources
Model ppa for renewable energy sourcesJay Ranvir
 
Verification of compliance of renewable purchase obligation
Verification of compliance of renewable purchase obligationVerification of compliance of renewable purchase obligation
Verification of compliance of renewable purchase obligationJay Ranvir
 
Short term open access status for march 17
Short term open access status for march 17Short term open access status for march 17
Short term open access status for march 17Jay Ranvir
 
The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)Jay Ranvir
 
The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)Jay Ranvir
 
Forecasting, scheduling and imbalance handling for Solar Wind Energy
Forecasting, scheduling and imbalance handling for Solar Wind EnergyForecasting, scheduling and imbalance handling for Solar Wind Energy
Forecasting, scheduling and imbalance handling for Solar Wind EnergyJay Ranvir
 
Ppa model presentation
Ppa model presentationPpa model presentation
Ppa model presentationJay Ranvir
 

More from Jay Ranvir (20)

Solar net metering policy
Solar net metering policySolar net metering policy
Solar net metering policy
 
Open access mp
Open access mpOpen access mp
Open access mp
 
Profile on the production retreaded tyre
Profile on the production retreaded tyreProfile on the production retreaded tyre
Profile on the production retreaded tyre
 
Tyre Retreading by Hot Retreading Process
Tyre Retreading by Hot Retreading ProcessTyre Retreading by Hot Retreading Process
Tyre Retreading by Hot Retreading Process
 
Ch21
Ch21Ch21
Ch21
 
Open Access Charges Rajasthan
Open Access Charges RajasthanOpen Access Charges Rajasthan
Open Access Charges Rajasthan
 
Response to msedcl demands
Response to msedcl demandsResponse to msedcl demands
Response to msedcl demands
 
Practice directions rts net metering regulations 2015
Practice directions  rts  net metering regulations 2015Practice directions  rts  net metering regulations 2015
Practice directions rts net metering regulations 2015
 
Ppa agreement draft
Ppa agreement draftPpa agreement draft
Ppa agreement draft
 
Notified f &amp;s regulations 2018
Notified f &amp;s  regulations 2018Notified f &amp;s  regulations 2018
Notified f &amp;s regulations 2018
 
Detailed comparison of capex vs opex
Detailed comparison of capex vs opexDetailed comparison of capex vs opex
Detailed comparison of capex vs opex
 
Plastics to oil report
Plastics to oil reportPlastics to oil report
Plastics to oil report
 
Detail information of 5 t pyrolysis plant
Detail information of 5 t pyrolysis plantDetail information of 5 t pyrolysis plant
Detail information of 5 t pyrolysis plant
 
Model ppa for renewable energy sources
Model ppa for renewable energy sourcesModel ppa for renewable energy sources
Model ppa for renewable energy sources
 
Verification of compliance of renewable purchase obligation
Verification of compliance of renewable purchase obligationVerification of compliance of renewable purchase obligation
Verification of compliance of renewable purchase obligation
 
Short term open access status for march 17
Short term open access status for march 17Short term open access status for march 17
Short term open access status for march 17
 
The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)
 
The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)
 
Forecasting, scheduling and imbalance handling for Solar Wind Energy
Forecasting, scheduling and imbalance handling for Solar Wind EnergyForecasting, scheduling and imbalance handling for Solar Wind Energy
Forecasting, scheduling and imbalance handling for Solar Wind Energy
 
Ppa model presentation
Ppa model presentationPpa model presentation
Ppa model presentation
 

Recently uploaded

call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitolTechU
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerunnathinaik
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaVirag Sontakke
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxJiesonDelaCerna
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 

Recently uploaded (20)

call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptx
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developer
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of India
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptx
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 

Open access

  • 2. What is Open Access? • As per definition of Open Access in the Electricity Act, 2003, Open Access is “the non-discriminatory provision for the use of transmission lines or distribution system or associated facilities with such lines or system by any licensee or consumer or a person engaged in generation in accordance with the regulations specified by the Appropriate Commission”. • Open Access allows consumers to choose among a large number of sellers, instead of being forced to buy electricity from their existing utility. Similarly, generators can choose their own buyers within or outside their state, instead of selling power to their utility. This is done by payment of transmission charges as decided by CERC for use of CTU lines and as determined by SERC for using of state transmission and distribution systems.
  • 3. What are different technical and financial requirements for availing Open Access? • Minimum volume of power should be 1 MW • Scheduling should be done on a 15 minute-block basis • Installation of special Energy Meter, 0.2S Class CT-PT set, commissioning of RTU, meter testing and CT/PT set testing report, commissioning and testing report of equipment by STU to be submitted to SLDC along with forwarding letter addressed to the CE. • No Objection Certificate from SLDCs
  • 4. Who will control/regulate the power flow? • The power sector is regulated by Central Electricity Regulatory Commission at central level and by the various State Electricity Regulatory Commissions at state level. The power system is operated and controlled by various Load Dispatch Centres functioning at the State, Regional and National levels respectively.
  • 5. What is the process of Power trading? • Powers is bought from an entity in a surplus location / surplus utilities / generating stations and sold through the state or central transmission company into an entity in deficit states/utilities
  • 6. What are the different categories of Trading Licensee? • As per Central Electricity Regulatory Commission (Procedure, Terms and Conditions for grant of trading licence and other related matters) Regulations, 2009, with subsequent amendments, there are four categories of Trading Licensee with varying maximum permissible volume for transactions Category Volume of electricity proposed to be traded in a year Category I No Limit Category II Not more than 1500 MUs Category III Not more than 500 MUs Category IV Not more than 100 MUs
  • 7. What are the services provided by the power traders? • Facilitating to reduce geographical, seasonal & daily gap between demand and supply • Bilateral power trading contracts between generators, traders and customers • Co-ordination with various intervening agencies e.g. Central & State Transmission Utility, Load Despatch Centres and regulators • Payment security mechanisms as per contract • Portfolio Management (Collective scheduling/sale of CPP power of States) • Contract Management • Consultancy in above areas for optimisation of power sale/purchase requirement and tender participation • Market intelligence data support and sharing the latest trends in power sector
  • 8. What are different products offered by a Trader? • Transactions through Bilateral Arrangement-  Long Term Arrangements including competitive bidding (consultancy only including bid preparation)  Medium Term Arrangement for upto 3 years  Short term arrangements  Over-The-Counter transactions, under negotiated pricing between identified seller and buyer • b. Transactions through Power Exchange platform as a trading cum clearing member  Day Ahead contracts  Intra-Day contracts  Weekly contracts  Daily Contracts  Day Ahead Contingency  Renewable Energy Certificates
  • 9. What different roles a Trader shall perform on behalf of its client? • Marketing • Commercial • Regulatory • Financial • Advisory
  • 10. How Financial Settlement of a trade is done? • For Day Ahead Collective Transactions- Financial settlement is done by electronic transfer of funds between the clearing members & the Exchange. The proceeds from sale of power are transferred to members settlement account by 2 P.M of the day following the day of delivery by power exchange. The fund transfer to clients account is either through electronic money transfer system or by issuing cheque as preferred by the client. The buyers have to pay the amount of power purchased at MCP by 14.30 Hours on the day of bidding. • For Bilateral Transactions-Invoices for the energy charges shall be raised as per billing cycle. The relevant bills will be raised based usually on the provisional weekly energy data for the energy at delivery point based on RLDC/SLDC website data. Financial Settlement will be done in accordance with any rebate/surcharge, as and when applicable, and shall include SLDC Scheduling & Handling charges, T&D charges, CSS and Open Access charges, if any.
  • 11. What is the trading margin cap by Hon’ble CERC? • Depending on the contracted price for a bilateral deal, CERC has capped the trading margin that can be maximum charged as follows: Sale Price (Rs./KwH) Margin (Rs./kWh) =< 3 Upto 0.04 >3 Upto 0.07
  • 12. What are the risks involved in power trading? • Credit Risk The seller of power may encounter payment default risk -. The power traders play their role as a shield to sellers by managing the credit risk involved in a power transaction. The power traders primarily deal with the entities having credit concerns - through appropriate risk mitigation techniques. • Operational Risks Risks include availability and reliability of transmission facility and power generation by the seller without interruption. The power traders apply for open access well in advance with the identified agencies for approval of open access required for an advance transaction. • Price risk A contract finalised in advance between a buyer and a seller through a power trader is always subject to price risk. The price on the spot market during the delivery period of an advance contract may be substantially different. Such situation may give an arbitrage advantage to a buyer or seller to exit the contract executed in advance. • Competition on account of direct trading between the surplus and deficit unit. There may be a situation that the prospective buyer and seller, who had previously dealt through the trader, develop commercial relationship. In this case they may bypass the trader to engage in a direct commercial relationship • Dependence on few buyers and sellers of power. There are occasions where the restriction of buyers and sellers significantly reduce business opportunities. Also during participation of tenders called by SEB, few sellers may be interested in the same, because there may long gestation period to decide the final contract.
  • 13. How will any deviations from schedule be settled? • All deviations shall be settled at central level as per Deviation Settlement Mechanism, 2014 as amended from time to time and/or the prevailing settlement mechanism at the state level.
  • 14. What are present CERC regulations applicable related to Open access and Power Trading? • The CERC Regulations applicable include • Power Market regulation, 2010 • Open Access in Inter State Regulations, 2008 • Fixation of Trading Market Regulation, 2010 • Deviation Settlement Mechanism, 2014 • Indian Electricity Grid Code, 2010
  • 15. What are major differences in transactions at Power Exchange, and that through a Trading Licensee? Power Exchange Transactions Transactions Through Traders Transactions are of collective nature Transactions can be bilateral as well as as a member client on Power Exchange platform Products restricted to those offered at the Exchange Products include those offered at Exchange, as well as other bilateral arrangements Pricing of electricity is determined at power exchange end based on demand supply condition on daily basis. Pricing of electricity may be on negotiated basis, tender discovered or market determined if transacting at the Exchange platform Power supply under day ahead market is subject to daily varying demand supply condition, grid corridor availability. Bilateral arrangements ensure firm supply with pricing and advance booking of corridors result in lesser incidents of congestion Buyers to make payment in advance Bilateral arrangement follows billing cycle and thus buyers can avail credit.
  • 16. What is the price discovery mechanism at power Exchange? How is it different from that with Traders? • Price discovery at Power Exchanges is done by an anonymous double sided closed auction process, wherein all sale and purchase offers are collectively treated, initially in an unconstrained scenario. The aggregate supply and demand curves are drawn on Price-Quantity axes. The intersection point of the two curves gives the Market Clearing Price (MCP) and Market Clearing Volume (MCV) corresponding to price and quantity of the intersection point. Based on these results the provisional obligation and provisional power flow is calculated. Funds available in the settlement account of the Members are checked with the Clearing Banks and also requisition for capacity allocation is sent to the National Load Despatch Centre (NLDC). In case sufficient funds are not available in the settlement account of the Member then his bid(s) is deleted from further evaluation procedure. Based on the transmission capacity reserved for the Exchange by the NLDC on day-ahead basis by 2.00 PM, fresh iteration is run at 2.30 PM and final Market Clearing Price and Volume as well as Area Clearing Price and Volume are determined. These Area Clearing Prices are used for settlement of the contracts • Price Discovery over bilateral route, through a trader, is done as per requirements of seller and the buyer, on negotiated basis or as discovered in a tender process
  • 17. What would be the tentative landed cost at the consumers’ periphery while purchasing power from the Power Exchange? • Key factors that influence the landed cost per unit of electricity include • Point of Connection (PoC) Charges & Losses, as applicable for utilisation of CTU network, and as approved by CERC/NLDC • State Transmission Charges & Losses, as applicable for utilising STU network, and as approved by SERC/SLDC • Distribution Charges & Losses, as applicable • Cross Subsidy Surcharge, if any, as approved by SERC • Electricity Duty, if any, as approved by SERC • Scheduling & Handling Charges • Trading Margin charged by Trader
  • 18. The Landed Cost per unit of electricity would vary from consumer to consumer depending on the various charges and losses applicable within his state/region. A sample Landed Cost is shown below. The values assumed for calculation are only indicative and would vary accordingly. Particular Unit Rate at Regional Periphery 4 Rs./kWh PoC Charge (Drawl) 0.1489 Rs./kWh PoC Loss (Drawl) 1.43 % State Transmission Charge 0.08 Rs./kWh State Transmission Loss 3.10 % Distribution Charges 0.1 Rs./kWh Distribution Loss 9 % IEX Transaction Charges 0.02 Rs./kWh Cross Subsidy Surcharge 0.2 Rs./kWh Scheduling & Handling charges 0.13 Rs./kWh Landed Cost 5.383 Rs./kWh
  • 19. What is Renewable Purchase Obligation? Who are obligated to fulfil RPO? • RPOs, put simply, are the minimum percentages of the total power that electricity distribution companies and some large power consumers need to purchase from renewable energy (RE) sources. RPO makes it mandatory for the obligated entities to meet part of their energy needs through green energy. The state-wise RPO targets are fixed by the respective State Electricity Regulatory Commissions, who may set separate targets for solar and non-solar energy. Entities obliged to fulfil RPO include • Distribution Licensee • Open Access Customer • Captive Power consumer
  • 20. What is REC? RPOs, put simply, are the REC is a tradable certificate of proof that one MWh of electricity has been injected (or deemed to have been injected) to grid by an RE generator. The Electricity Act, 2003, the policies framed under the Act, as also the National Action Plan on Climate Change (NAPCC) provide for a roadmap for increasing the share of renewable in the total generation capacity in the country. However, Renewable Energy (RE) sources are not evenly spread across different parts of the country. This inhibits SERCs in states with poor RE generation source from specifying higher Renewable Purchase Obligation (RPO). On the other hand states with high potential of RE sources harness the RE potential beyond the RPO level fixed by the SERCs. The REC mechanism seeks to address this mismatch between availability of RE sources and the requirement of the obligated entities to meet their RPO. There are two categories of RECs, viz., solar RECs and non-solar RECs. Solar RECs are issued to eligible entities for generation of electricity based on solar as renewable energy source, and non-solar RECs are issued to eligible entities for generation of electricity based on renewable energy sources other than solar. Obligated entities can purchase these RECs in order to fulfil their RPO.
  • 21. How are RECs issued to a RE generator? • The RE generators who fulfil the eligibility criteria can apply for the accreditation to concerned State Agency. After successful accreditation the eligible entity (RE generator) may apply for registration to the Central Agency. After successful registration the eligible entity may obtain REC through the 'process of issuance of REC' by Central Agency. The detailed procedures for Accreditation, Registration, Issuance and Redemption of REC can be downloaded from various websites. www.cercind.gov.in www.nldc.in www.recregistryindia.nic.in
  • 22. Where and how are RECs traded? • RECs are tradable only at the Power Exchanges at the market determined price. REC trade at IEX is done on the last Wednesday of every month. The present applicable floor and forbearance price for REC trading are as REC Floor Price (Rs.) Forbearance Price (Rs.) Solar 3500 5800 Non-Solar 1500 3300