DEVELOPMENT OF PAVEMENT MANAGEMENT STRATEGIES FOR
ARTERIAL ROADS
Vishwanath G1
, Mahdev2
, M. R. Archana3
, Krishna Prapoorna Biligiri4
1, 2
M.Tech IV semester, Highway Technology, 3
Assistant Professor, Department of Civil Engineering, R. V. College of
Engineering, Bangalore-560059, India
4
Senior Research Scientist, Center for infrastructure, Sustainable Transportation and Urban Planning, Indian Institute of
Science, Bangalore, India:
vishwanathg055@gmail.com, swamy.dhaana@gmail.com, archanamr@rvce.edu.in, krishna@cistup.iisc.ernet.in
Abstract
An arterial road is a high-capacity urban road which delivers the traffic from collector roads to freeways, and between city centres at
the maximum and possible level of service. Therefore it is very important to maintain these roads as they are subjected to heavy traffic
and on monsoon or poor drainage conditions which may damage the pavements at a faster rate further requiring timely maintenance
and costly rehabilitation. Assessing the condition of the pavement periodically is important so that maintenance work can be taken up
accordingly in order to slow down the deterioration rate. A tool which can access the deterioration of pavement is a Pavement
Condition Index (PCI) which is a distress study carried out on pavement. PCI is a numerical rating of the pavement condition that
ranges from 0 -100 with 0 being worst possible condition 100 being the best possible condition. Therefore, this paper aims at bringing
out the methodology used in carrying out the survey on the pavement and for rating of the pavement (PCI) with the case studies of
four arterial roads of Rajarajeshwari Zone, Bangalore city and the PCIs of rating of these pavements at the time of studies was found
to be from very poor to excellent. Pavement management strategies have been proposed based on the condition rating.
Keywords: Flexible Pavements, ASTM, PCI, Pavement Maintenance, Arterial roads
-------------------------------------------------------------------***-----------------------------------------------------------------------
1. INTRODUCTION
Road maintenance is one of the important components of the
entire road system. The maintenance operations involve the
assessment of road condition, diagnosis of the problem and
adopting the most appropriate maintenance steps. Even if the
highway is well designed and constructed, they require
maintenance, the extent of which will depend on several
factors including the pavement type. In order to carry out
design of pavement rehabilitation, the existing pavement
condition must be evaluated. Such an evaluation usually
involves the assessment of the existing pavement surface
distress, roughness, rutting.
During the past four decades, Bangalore has seen many
developments in the form of increased land use of urban and
rural areas, rapid growth of population and increasing number
of motorised and non-motorised vehicles, with steep rise in
industrial, commercial, and residential activities improved
transport system namely, Bangalore Metro which is under
progress. Therefore it is very important to maintain these
roads as they are subjected to heavy traffic (truck load) and on
monsoon or poor drainage conditions which may damage the
pavements.
1.1 Need for the Study
For the improvement of urban road condition, there is a need
to develop a set of procedures that will provide a systematic
evaluation of highway needs, based on appropriate
engineering decision and expert knowledge and at the same
time to determine which road stretches need maintenance and
which are the sections for which the maintenance operation
can be deferred.
1.2 Objectives of Present Paper
The objectives of the present paper is to,
1. Identify the arterial road length in the selected zone,
2. To assess the condition of selected stretches based on
distress survey,
3. To evaluate the PCI value of different sections of
road,
4. To recommend the pavement management strategies
based on PCI values
2. REVIEW OF LITERATURE
2.1 General
In the stream of roadway technology, pavement distress and
failure is considered as a complex as several factors are
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 175
responsible for the pavement deterioration and failure. The
type and extent of maintenance requirement for a road also
depends on the serviceability standard laid down, the
maintenance needs, funds available and many other factors.
The current engineering practice for selection of maintenance
and rehabilitation alternatives is based on subjective judgment
and engineering experience.
2.2 Pavement Condition Index (PCI)
Initially PCI was developed by the United States Army Corps
of Engineers and is based on a visual survey of the pavement
[1]. PCI is a numerical rating of the pavement condition that
ranges from 0 -100 with 0 being worst possible condition 100
being the best possible condition [2]. It is a statistical measure
and requires manual survey of the pavement. PCI surveying
processes and calculation methods have been standardized by
ASTM for both roads and airport pavements.
The PCI provides a measure of the present condition of the
pavement based on the distress observed on the surface of the
pavement, which also indicates the structural integrity and
surface operational condition (localized roughness and safety).
The PCI cannot measure structural capacity nor does it
provide direct measurement of skid resistance or roughness. It
provides an objective and rational basis for determining
maintenance and repair needs and priorities. Continuous
monitoring of the PCI is used to establish the rate of pavement
deterioration, which permits early identification of major
rehabilitation needs. The PCI provides feedback on pavement
performance for validation or improvement of current
pavement design and maintenance procedures.
The PCI values obtained from visual inspection i.e. distress
survey by recording the severity and extent of the various
distress namely cracking, rutting and potholes occurred to
pavement can be utilized well in prioritizing the maintenance
strategies [3]. This method provides cost effective
maintenance and rehabilitation measures for planners and
decision makers for maintenance of pavement in road
network.
The PCI provides an objective rational basis for determining
the maintenance and rehabilitation needs of highway
pavements and for prioritisation of the pavement sections for
maintenance on priority. This methodology considers the
common type of distresses in highway pavements and
suggests the maintenance treatment considering the overall
health of the pavement section [4]. PCI is meant to provide an
objective, rational basis for determining maintenance and
rehabilitation needs and priorities and a warning system for
early identification or projection of major repair requirements
or both.
The PCI can be used as a tool for assessing the condition of
the pavement for periodic maintenance work which could be
taken up accordingly in order to slow down the deterioration
rate of rural roads constructed under PMGSY scheme in India
[5].
The cost effective maintenance and management strategies can
be developed by assessing the severity and extent of measured
pavement distress values, further which can be used as input to
Pavement Maintenance & Management System (PMMS). In
developing the maintenance and management strategies PCI
plays a major role including type of pavement and other road
related information [6].
3. FIELD STUDIES & DATA COLLECTION
3.1 General
The methodology adopted in this study provides a simple
approach in the development of PCI for the selected arterial
road stretches in Bangalore city for taking up cost effective
maintenance measures/treatments. The maintenance treatment
recommendations are based on PCI which involve the
collection and preparation of road inventory data and report,
visual distress survey of the selected stretches based on
pavement performance related parameters.
3.2 Surface Distress Measurements
The existing pavement condition initially was assessed by
visual inspection of the selected road stretches, and then the
sections were made based on the distress type and severity.
Then pavement surface distress measurement was carried out
involving the identification of both type and severity of the
pavement distresses present in the study area of the road
sections. This procedure was performed with the use of
Unified Facilities Criteria (UFC)-2004, ASTM D 6433-07,
Paver asphalt distress manual-1997, Distress Identification
Manual FHWA USDOT-2003, Oregon DOT Manual-2010
and SHRP-P-338 which contains definitions and information
concerning pavement distresses.
3.3 Study Stretches
The following four arterial roads in Rajarajeshwari Zone,
Bangalore city with total length of 36.5 km were selected and
the same with brief inventory detail is listed in Table 1. All the
roads selected are within the Bruhat Bangalore Mahanagara
Palike (BBMP) limits.
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 176
Table 1 Selected Road Stretches
Location
Code
Road Name
Length
in km
Pavement
Type
Divided
Carriageway
Width
in mtr
No. of
Sections
made
1 Magadi Road 9.5 Flexible Yes 15 5
2 Uttarahalli Road 17 Flexible No 10 9
3
Subramanyapura -
Vasantapura Main
Road
3.7 Flexible No 10 2
4 Muddinapalya Road 6.3 Flexible No 10 4
3.4 Methodology of Data Collection
Bangalore is India's fifth-most populous urban agglomeration,
growing metropolitan city with population more than 8.426
million. The local authority (BBMP) has divided Bangalore
into 8 zones namely, Bommonahalli Zone, Bangalore East
Zone, Bangalore South Zone, Byatarayanapura,
Mahadevapura, Bangalore West Zone, Dasarahalli and Raja
Rajeshwari Nagar Zone. For the present study RR zone
(details shown in Table 2) is chosen as this zone covers major
roads that connects many educational institutions, hospitals,
malls, toll roads, religious places, ring roads, developing areas
and it also consist a major connectivity to another growing
city Mysore. The roads in this zone considerably subjected to
heavy axle loads, on monsoon rain and many developments
work namely Bangalore Metro (Namma Metro) due to which
the roads constructed are failed to serve their intended
function, hence a study in this view is required.
Table 2 Road network detail of Rajarajeshwari Zone
Category of the road Length in km
Arterial 94
Sub Arterial 118
Collector street ---
Local Street ---
Total Length 212
There are many feasible approaches to defining performance
and assessing the condition of road facilities. A pavement
condition needs to be characterized in quantifiable terms so
that the potential performance can be associated to a defined
condition. In this study (walk through) pavement survey was
conducted and in this regard the procedure adopted was based
on visual assessment of the type, quantity and severity of
pavement distresses and results in the PCI. UFC – 2004 [1]
was referred for calculation of PCI, the detail calculation
procedure is explained in further section. It was aimed towards
the evaluation and analyzing the existing roadway conditions
so that a realistic definition of the individual problems and
structural requirements of the roadway can be made.
4. ANALYSIS & RESULTS
4.1 Determination of Deduct Values and Pavement
Condition Index
A Deduct Value (DV) is defined as the value that represents
the amount of distress that a pavement has undergone or is
subjected to. Each section was inspected and distress data,
severity levels such as Low (L), Medium (M) and High (H)
were recorded in the distress survey data sheet. The density of
each individual distress was calculated using the Eqns. 1, 2, 3.
Distress amount in square meters
Density = —————————————— x100% (1)
Sample area in square meters
Distress amount in linear meter
Density = —————————————— x100% (2)
Sample area in square meters
Number of potholes
Density = —————————————— x100% (3)
Sample area in square meters
Then the DVs were determined from the DV curves, then for
each distress type and severity Total Deduct Value (TDV) was
computed by summing up all the individual DVs then the
Corrected Deduct Value (CDV) was determined from CDV
curve shown in Fig. 1. Then the PCI was computed using the
Eqn. 4. All the PCIs and rating for the respective section with
TDV and CDV are presented in Table 3.
PCI = 100 – CDV (4)
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 177
TOTAL DEDUCT VALUE (TDV)
Fig1. Corrected deduct value curves for asphalt-surfaced pavements
Table 3 Computation of Pavement Condition Index
Location
code
Beginning Post End Post
Length of
the
Section in
km
Width
of the
Section
in m
TDV CDV PCI RATING
1
Magadi Road Toll Booth Mahadeshwara Nagar 2.7 8 63 40 60 Good
Mahadeshwara Nagar
Magadi Road Toll
Booth
2.7 8 38 28 72 Very Good
Mahadeshwara nagar Sumanahalli Bridge 2.7 7.5 86 55 45 Fair
Sumanahalli Bridge Mahadeshwara Nagar 2.7 7.5 107 62 38 Poor
Sumanahalli Bridge Kamakshipalya 2.4 7.5 140 73 27 Poor
Kamakshipalya Sumanahalli Bridge 2.4 7.5 143 80 20 Very Poor
Kamakshipalya Veeresh Theatre 1.2 7.5 100 58 42 Fair
Veeresh Theatre Kamakshipalya 1.2 7.5 136 70 30 Poor
Veeresh Theatre
Chord Road (Petrol
Bunk)
0.5 7.5 101 57 43 Fair
Chord Road (Petrol
Bunk)
Veeresh Theatre 0.5 7.5 85 54 46 Fair
2
SJBIT College of
Engineering.
Kengeri sat. Bus Stop @
Mysore Road
2.2 10 100 63 37 Poor
JSS College of
Engineering
SJBIT College of
Engineering.
1.2 10 56 35 65 Good
Pattalamma Temple
JSS college of
Engineering
2.7 10 101 57 43 Fair
Uttaralli Main Cross Pattalamma Temple 2 10 97 56 44 Fair
Chikkalasandra Cross Uttarahalli Circle 2.8 7.5 10.5 11 89 Excellent
Kadrenahalli Chikkalasandra Cross 2 7.5 52 38 62 Good
ORR Near Dayanand
Sagar College
Banashankari BMTC 1.4 12 66 43 57 Good
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 178
Banashankari BMTC
Banerghatta ORR Circle
Jayadeva Hospital
3 7.5 42 31 69 Good
Banerghatta ORR Circle
Jayadeva Hospital
Banashankari BMTC 3 7.5 86 55 45 Fair
3
Subramanyapura Bus
Stop
Yadaualm School
Junction
0.9 10 143 70 30 Poor
Yadaualm School
Junction
Konanakuntee @
Kanakpura Road
2.8 10 112 63 37 Poor
4
Vidhaynikethan School Muddinapalaya 2.2 12.5 49 36 64 Good
Muddinapalaya Kempagawada Circle 0.7 8 22 16 84 Very Good
Kempagawada Circle Dwarakwas Road 2.1 7.5 120 63 37 Poor
Dwarakwas Road
Magadi Road Toll
Booth
1.3 9 108 75 25 Very Poor
Determination of appropriate maintenance measures
DISCUSSION & CONCLUSIONS
1. PCI provides an objective rational basis for determining
the maintenance and rehabilitation needs of urban
roads.
2. The suggested methodology considered the common
type of distresses in urban roads and suggests
maintenance treatments considering the overall health
of the pavement.
3. The urban sections that possess higher value of
pavement condition index do not require maintenance
and pavement section that are assigned lower value of
pavement condition index require maintenance on
priority.
4. PCI serves as a warning system for early identification
or projection of major repairs required.
5. Potholes, weathering and raveling, alligator cracking,
polished aggregate and rutting were the major distress
identified on urban stretches. In some parts of the
selected section of roads there were no pavement or
wearing course was absent which require immediate
attention.
6. Due to cutting of pavements across and along the roads
for providing service lines or for repairing existing
service lines and subsequent improper resurfacing has
resulted in deterioration of pavements.
7. PCI is a function of the type of distress, density of
distress and severity of distress hence management
strategies have been recommended based on PCI values
as per PASCER manual
REFERENCES
[1] US Army Corps of Engineers, "PAVER asphalt distress
manual" Technical report TR97/104, (1997).
[2] ASTM D 6433-07, “Standard Practice for Roads and
Parking Lots Pavement Condition Index Surveys”,
(2007).
[3] L. Udayakumar, R. Vivan Robert and M. S. Amarnath,
“Ranking Technique for Prioritisation of Arterial and
Sub Arterial Roads for Maintenance Management”,
Journal of Indian Highways, Vol. 36, No.11, (2008) pp.
41-51
PCI Range Rating Maintenance Measures
86-100 Excellent No maintenance required
71-85 Very Good Little or no maintenance
56-70 Good Routine maintenance, crack sealing and minor patching
41-55 Fairs Preservative treatments (seal coating or thin non-
structural overlay 2” or more)
26-40 Poor Needs patching and repair prior to major overlay Milling
and removal of deterioration extends the life of overlay.
11-25 Very Poor Needs reconstruction with extensive base repair.
0-10 Failed Total Reconstruction
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 179
[4] N H Suma, Nirmalya Chakraborty and A Veeraragavan,
“Simplified Methodology for Prioritisation of Pavement
Maintenance Based on Pavement Condition Index”, 4th
International Conference on Managing Pavements,
(1998).
[5] Ryntathiang and Teiborland Lyngdoh, “Pavement
condition index as a tool for assessing the rural road
pavements: a case study of the Assam rural roads”,
Journal of Indian Highways, Vol. 39, No.10, (2011) pp.
41-57.
[6] Saad Issa Sarsam, “Development of Pavement
Maintenance Management System Using Visual
Evaluation of Asphalt Concrete Surface Condition and
Expert System”, 7th
International Conference on
Managing Pavement Assets, (2008).

More Related Content

What's hot

International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentIJERD Editor
 
flow characteristic study of traffic on national highway
flow characteristic study of traffic on national highwayflow characteristic study of traffic on national highway
flow characteristic study of traffic on national highwayVinaykumar Koli
 
Chapter 1 traffic characterstics
Chapter 1 traffic charactersticsChapter 1 traffic characterstics
Chapter 1 traffic charactersticsAnkit Patel
 
Necessity of integrated transport system to namma
Necessity of integrated transport system to nammaNecessity of integrated transport system to namma
Necessity of integrated transport system to nammaeSAT Publishing House
 
Origin & destination survey
Origin & destination surveyOrigin & destination survey
Origin & destination surveyAkash Pandey
 
Simulation of pedestrian at intersection in urban congested area
Simulation of pedestrian at intersection in urban congested areaSimulation of pedestrian at intersection in urban congested area
Simulation of pedestrian at intersection in urban congested areaeSAT Publishing House
 
Analysis of vibration characteristics of transport utility vehicle by finite ...
Analysis of vibration characteristics of transport utility vehicle by finite ...Analysis of vibration characteristics of transport utility vehicle by finite ...
Analysis of vibration characteristics of transport utility vehicle by finite ...Dr.Vikas Deulgaonkar
 
Transportation Planning and Management
Transportation Planning and ManagementTransportation Planning and Management
Transportation Planning and ManagementLiving Online
 
Cc503 traffic managemant part1
Cc503   traffic managemant part1Cc503   traffic managemant part1
Cc503 traffic managemant part1Syafiqah Jamian
 
Transportation planning 1
Transportation planning 1Transportation planning 1
Transportation planning 1EngrABRahimoon
 
Traffic Engineering
Traffic Engineering Traffic Engineering
Traffic Engineering PadduS
 
Transportation Engineering I
Transportation Engineering  ITransportation Engineering  I
Transportation Engineering IGAURAV. H .TANDON
 
Traffic Engineering And Drainage
Traffic Engineering And DrainageTraffic Engineering And Drainage
Traffic Engineering And DrainagePrashant Ranjan
 

What's hot (18)

International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
 
Accident study
Accident studyAccident study
Accident study
 
flow characteristic study of traffic on national highway
flow characteristic study of traffic on national highwayflow characteristic study of traffic on national highway
flow characteristic study of traffic on national highway
 
Road widening ppt
Road widening pptRoad widening ppt
Road widening ppt
 
Chapter 1 traffic characterstics
Chapter 1 traffic charactersticsChapter 1 traffic characterstics
Chapter 1 traffic characterstics
 
Necessity of integrated transport system to namma
Necessity of integrated transport system to nammaNecessity of integrated transport system to namma
Necessity of integrated transport system to namma
 
Origin & destination survey
Origin & destination surveyOrigin & destination survey
Origin & destination survey
 
Simulation of pedestrian at intersection in urban congested area
Simulation of pedestrian at intersection in urban congested areaSimulation of pedestrian at intersection in urban congested area
Simulation of pedestrian at intersection in urban congested area
 
Analysis of vibration characteristics of transport utility vehicle by finite ...
Analysis of vibration characteristics of transport utility vehicle by finite ...Analysis of vibration characteristics of transport utility vehicle by finite ...
Analysis of vibration characteristics of transport utility vehicle by finite ...
 
Traffic engineering 2
Traffic engineering 2Traffic engineering 2
Traffic engineering 2
 
Transportation Planning and Management
Transportation Planning and ManagementTransportation Planning and Management
Transportation Planning and Management
 
Traffic engineering
Traffic engineeringTraffic engineering
Traffic engineering
 
Cc503 traffic managemant part1
Cc503   traffic managemant part1Cc503   traffic managemant part1
Cc503 traffic managemant part1
 
Transportation planning 1
Transportation planning 1Transportation planning 1
Transportation planning 1
 
Traffic engineering
Traffic engineeringTraffic engineering
Traffic engineering
 
Traffic Engineering
Traffic Engineering Traffic Engineering
Traffic Engineering
 
Transportation Engineering I
Transportation Engineering  ITransportation Engineering  I
Transportation Engineering I
 
Traffic Engineering And Drainage
Traffic Engineering And DrainageTraffic Engineering And Drainage
Traffic Engineering And Drainage
 

Viewers also liked

System to convert 2 d x-ray image into 3-d x-ray image in dentistry
System to convert 2 d x-ray image into 3-d x-ray image in dentistrySystem to convert 2 d x-ray image into 3-d x-ray image in dentistry
System to convert 2 d x-ray image into 3-d x-ray image in dentistryeSAT Publishing House
 
Self checking approach for reducing soft errors in states of fsm
Self checking approach for reducing soft errors in states of fsmSelf checking approach for reducing soft errors in states of fsm
Self checking approach for reducing soft errors in states of fsmeSAT Publishing House
 
A new technique near minimum material zone, to
A new technique   near minimum material zone, toA new technique   near minimum material zone, to
A new technique near minimum material zone, toeSAT Publishing House
 
Advisedly delayed packet attack on tcp based mobile
Advisedly delayed packet attack on tcp based mobileAdvisedly delayed packet attack on tcp based mobile
Advisedly delayed packet attack on tcp based mobileeSAT Publishing House
 
Design and development of a linear variable
Design and development of a linear variableDesign and development of a linear variable
Design and development of a linear variableeSAT Publishing House
 
Root cause failure analysis of blanking device of strainer housing used in st...
Root cause failure analysis of blanking device of strainer housing used in st...Root cause failure analysis of blanking device of strainer housing used in st...
Root cause failure analysis of blanking device of strainer housing used in st...eSAT Publishing House
 
Nonlinear fe modelling of anchorage bond in
Nonlinear fe modelling of anchorage bond inNonlinear fe modelling of anchorage bond in
Nonlinear fe modelling of anchorage bond ineSAT Publishing House
 
Lake sediment thickness estimation using ground penetrating radar
Lake sediment thickness estimation using ground penetrating radarLake sediment thickness estimation using ground penetrating radar
Lake sediment thickness estimation using ground penetrating radareSAT Publishing House
 
Selection of intra prediction modes for intra frame
Selection of intra prediction modes for intra frameSelection of intra prediction modes for intra frame
Selection of intra prediction modes for intra frameeSAT Publishing House
 
A new approach “ring” for restricting web pages from
A new approach “ring” for restricting web pages fromA new approach “ring” for restricting web pages from
A new approach “ring” for restricting web pages fromeSAT Publishing House
 
Unravelling the molecular linkage of co morbid
Unravelling the molecular linkage of co morbidUnravelling the molecular linkage of co morbid
Unravelling the molecular linkage of co morbideSAT Publishing House
 
Effect of thermal barrier coating for the improvement
Effect of thermal barrier coating for the improvementEffect of thermal barrier coating for the improvement
Effect of thermal barrier coating for the improvementeSAT Publishing House
 
Computational model to design circular runner
Computational model to design circular runnerComputational model to design circular runner
Computational model to design circular runnereSAT Publishing House
 
Adaptive neurofuzzy system for asthama
Adaptive neurofuzzy system for asthamaAdaptive neurofuzzy system for asthama
Adaptive neurofuzzy system for asthamaeSAT Publishing House
 
Review study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallsReview study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallseSAT Publishing House
 
Double octagonalshape microstrip antenna
Double octagonalshape microstrip antennaDouble octagonalshape microstrip antenna
Double octagonalshape microstrip antennaeSAT Publishing House
 
IJRET : International Journal of Research in Engineering and TechnologyImprov...
IJRET : International Journal of Research in Engineering and TechnologyImprov...IJRET : International Journal of Research in Engineering and TechnologyImprov...
IJRET : International Journal of Research in Engineering and TechnologyImprov...eSAT Publishing House
 
Analysis the effects of different types of tool on metal spinning process
Analysis the effects of different types of tool on metal spinning processAnalysis the effects of different types of tool on metal spinning process
Analysis the effects of different types of tool on metal spinning processeSAT Publishing House
 
Real time approach of piezo actuated beam for wireless
Real time approach of piezo actuated beam for wirelessReal time approach of piezo actuated beam for wireless
Real time approach of piezo actuated beam for wirelesseSAT Publishing House
 
Identification of isomorphism and detection of distinct mechanism of kinemati...
Identification of isomorphism and detection of distinct mechanism of kinemati...Identification of isomorphism and detection of distinct mechanism of kinemati...
Identification of isomorphism and detection of distinct mechanism of kinemati...eSAT Publishing House
 

Viewers also liked (20)

System to convert 2 d x-ray image into 3-d x-ray image in dentistry
System to convert 2 d x-ray image into 3-d x-ray image in dentistrySystem to convert 2 d x-ray image into 3-d x-ray image in dentistry
System to convert 2 d x-ray image into 3-d x-ray image in dentistry
 
Self checking approach for reducing soft errors in states of fsm
Self checking approach for reducing soft errors in states of fsmSelf checking approach for reducing soft errors in states of fsm
Self checking approach for reducing soft errors in states of fsm
 
A new technique near minimum material zone, to
A new technique   near minimum material zone, toA new technique   near minimum material zone, to
A new technique near minimum material zone, to
 
Advisedly delayed packet attack on tcp based mobile
Advisedly delayed packet attack on tcp based mobileAdvisedly delayed packet attack on tcp based mobile
Advisedly delayed packet attack on tcp based mobile
 
Design and development of a linear variable
Design and development of a linear variableDesign and development of a linear variable
Design and development of a linear variable
 
Root cause failure analysis of blanking device of strainer housing used in st...
Root cause failure analysis of blanking device of strainer housing used in st...Root cause failure analysis of blanking device of strainer housing used in st...
Root cause failure analysis of blanking device of strainer housing used in st...
 
Nonlinear fe modelling of anchorage bond in
Nonlinear fe modelling of anchorage bond inNonlinear fe modelling of anchorage bond in
Nonlinear fe modelling of anchorage bond in
 
Lake sediment thickness estimation using ground penetrating radar
Lake sediment thickness estimation using ground penetrating radarLake sediment thickness estimation using ground penetrating radar
Lake sediment thickness estimation using ground penetrating radar
 
Selection of intra prediction modes for intra frame
Selection of intra prediction modes for intra frameSelection of intra prediction modes for intra frame
Selection of intra prediction modes for intra frame
 
A new approach “ring” for restricting web pages from
A new approach “ring” for restricting web pages fromA new approach “ring” for restricting web pages from
A new approach “ring” for restricting web pages from
 
Unravelling the molecular linkage of co morbid
Unravelling the molecular linkage of co morbidUnravelling the molecular linkage of co morbid
Unravelling the molecular linkage of co morbid
 
Effect of thermal barrier coating for the improvement
Effect of thermal barrier coating for the improvementEffect of thermal barrier coating for the improvement
Effect of thermal barrier coating for the improvement
 
Computational model to design circular runner
Computational model to design circular runnerComputational model to design circular runner
Computational model to design circular runner
 
Adaptive neurofuzzy system for asthama
Adaptive neurofuzzy system for asthamaAdaptive neurofuzzy system for asthama
Adaptive neurofuzzy system for asthama
 
Review study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallsReview study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear walls
 
Double octagonalshape microstrip antenna
Double octagonalshape microstrip antennaDouble octagonalshape microstrip antenna
Double octagonalshape microstrip antenna
 
IJRET : International Journal of Research in Engineering and TechnologyImprov...
IJRET : International Journal of Research in Engineering and TechnologyImprov...IJRET : International Journal of Research in Engineering and TechnologyImprov...
IJRET : International Journal of Research in Engineering and TechnologyImprov...
 
Analysis the effects of different types of tool on metal spinning process
Analysis the effects of different types of tool on metal spinning processAnalysis the effects of different types of tool on metal spinning process
Analysis the effects of different types of tool on metal spinning process
 
Real time approach of piezo actuated beam for wireless
Real time approach of piezo actuated beam for wirelessReal time approach of piezo actuated beam for wireless
Real time approach of piezo actuated beam for wireless
 
Identification of isomorphism and detection of distinct mechanism of kinemati...
Identification of isomorphism and detection of distinct mechanism of kinemati...Identification of isomorphism and detection of distinct mechanism of kinemati...
Identification of isomorphism and detection of distinct mechanism of kinemati...
 

Similar to Development of pavement management strategies for

Geometry condition survey from panthapath to russel square report submited by...
Geometry condition survey from panthapath to russel square report submited by...Geometry condition survey from panthapath to russel square report submited by...
Geometry condition survey from panthapath to russel square report submited by...Pronob Ghosh
 
Road Safety Audit of Chamarajanagar to Haradanahalli District Forest - NH 948
Road Safety Audit of Chamarajanagar to Haradanahalli District Forest - NH 948Road Safety Audit of Chamarajanagar to Haradanahalli District Forest - NH 948
Road Safety Audit of Chamarajanagar to Haradanahalli District Forest - NH 948IRJET Journal
 
Design of traffic signal on NH-12 near Barkatullah University, Bhopal Distric...
Design of traffic signal on NH-12 near Barkatullah University, Bhopal Distric...Design of traffic signal on NH-12 near Barkatullah University, Bhopal Distric...
Design of traffic signal on NH-12 near Barkatullah University, Bhopal Distric...IRJET Journal
 
An investigation of the design implications for openings in a sub standard me...
An investigation of the design implications for openings in a sub standard me...An investigation of the design implications for openings in a sub standard me...
An investigation of the design implications for openings in a sub standard me...eSAT Journals
 
An investigation of the design implications for openings
An investigation of the design implications for openingsAn investigation of the design implications for openings
An investigation of the design implications for openingseSAT Publishing House
 
An investigation of the design implications for openings in a sub standard me...
An investigation of the design implications for openings in a sub standard me...An investigation of the design implications for openings in a sub standard me...
An investigation of the design implications for openings in a sub standard me...eSAT Journals
 
Traffic census and analysis (a case study)
Traffic census and analysis (a case study)Traffic census and analysis (a case study)
Traffic census and analysis (a case study)eSAT Journals
 
Analyzing the role of Highway & their Maintenance A case study
Analyzing the role of Highway & their Maintenance A case studyAnalyzing the role of Highway & their Maintenance A case study
Analyzing the role of Highway & their Maintenance A case studyIRJET Journal
 
TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNAL
TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNALTRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNAL
TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNALIRJET Journal
 
Roadway condition survey full report(BUET)
Roadway condition survey full report(BUET)Roadway condition survey full report(BUET)
Roadway condition survey full report(BUET)Ahmed Ferdous Ankon
 
MODELLING OF PEDESTRIAN GAP ACCEPTANCE BEHAVIOUR AT UNCONTROLLED INTERSECTIONS
MODELLING OF PEDESTRIAN GAP ACCEPTANCE BEHAVIOUR AT UNCONTROLLED INTERSECTIONSMODELLING OF PEDESTRIAN GAP ACCEPTANCE BEHAVIOUR AT UNCONTROLLED INTERSECTIONS
MODELLING OF PEDESTRIAN GAP ACCEPTANCE BEHAVIOUR AT UNCONTROLLED INTERSECTIONSIRJET Journal
 
Performance Evaluation of Rigid Pavements
Performance Evaluation of Rigid PavementsPerformance Evaluation of Rigid Pavements
Performance Evaluation of Rigid PavementsIRJET Journal
 
A study on gap acceptance of unsignalized intersection under mixed traffic co...
A study on gap acceptance of unsignalized intersection under mixed traffic co...A study on gap acceptance of unsignalized intersection under mixed traffic co...
A study on gap acceptance of unsignalized intersection under mixed traffic co...eSAT Publishing House
 
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...IRJET Journal
 
Upgradation of low cost roughness measuring equipment and development of perf...
Upgradation of low cost roughness measuring equipment and development of perf...Upgradation of low cost roughness measuring equipment and development of perf...
Upgradation of low cost roughness measuring equipment and development of perf...eSAT Journals
 
TRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOW
TRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOWTRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOW
TRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOWIRJET Journal
 
Identification of vehicular growth and its management on nh 202 in ranga redd...
Identification of vehicular growth and its management on nh 202 in ranga redd...Identification of vehicular growth and its management on nh 202 in ranga redd...
Identification of vehicular growth and its management on nh 202 in ranga redd...EditorIJAERD
 
Design of Highway with Major Bridge on Stagnant Water
Design of Highway with Major Bridge on Stagnant WaterDesign of Highway with Major Bridge on Stagnant Water
Design of Highway with Major Bridge on Stagnant WaterIRJET Journal
 
ESTIMATION OF CAPACITY AND MODEL DEVELOPMENT USING LINEAR REGRESSION
ESTIMATION OF CAPACITY AND MODEL DEVELOPMENT USING LINEAR REGRESSIONESTIMATION OF CAPACITY AND MODEL DEVELOPMENT USING LINEAR REGRESSION
ESTIMATION OF CAPACITY AND MODEL DEVELOPMENT USING LINEAR REGRESSIONIRJET Journal
 
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRA
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRAAnalysis of Traffic Congestion Characteristics for M.G. Road, AGRA
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRAIRJET Journal
 

Similar to Development of pavement management strategies for (20)

Geometry condition survey from panthapath to russel square report submited by...
Geometry condition survey from panthapath to russel square report submited by...Geometry condition survey from panthapath to russel square report submited by...
Geometry condition survey from panthapath to russel square report submited by...
 
Road Safety Audit of Chamarajanagar to Haradanahalli District Forest - NH 948
Road Safety Audit of Chamarajanagar to Haradanahalli District Forest - NH 948Road Safety Audit of Chamarajanagar to Haradanahalli District Forest - NH 948
Road Safety Audit of Chamarajanagar to Haradanahalli District Forest - NH 948
 
Design of traffic signal on NH-12 near Barkatullah University, Bhopal Distric...
Design of traffic signal on NH-12 near Barkatullah University, Bhopal Distric...Design of traffic signal on NH-12 near Barkatullah University, Bhopal Distric...
Design of traffic signal on NH-12 near Barkatullah University, Bhopal Distric...
 
An investigation of the design implications for openings in a sub standard me...
An investigation of the design implications for openings in a sub standard me...An investigation of the design implications for openings in a sub standard me...
An investigation of the design implications for openings in a sub standard me...
 
An investigation of the design implications for openings
An investigation of the design implications for openingsAn investigation of the design implications for openings
An investigation of the design implications for openings
 
An investigation of the design implications for openings in a sub standard me...
An investigation of the design implications for openings in a sub standard me...An investigation of the design implications for openings in a sub standard me...
An investigation of the design implications for openings in a sub standard me...
 
Traffic census and analysis (a case study)
Traffic census and analysis (a case study)Traffic census and analysis (a case study)
Traffic census and analysis (a case study)
 
Analyzing the role of Highway & their Maintenance A case study
Analyzing the role of Highway & their Maintenance A case studyAnalyzing the role of Highway & their Maintenance A case study
Analyzing the role of Highway & their Maintenance A case study
 
TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNAL
TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNALTRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNAL
TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNAL
 
Roadway condition survey full report(BUET)
Roadway condition survey full report(BUET)Roadway condition survey full report(BUET)
Roadway condition survey full report(BUET)
 
MODELLING OF PEDESTRIAN GAP ACCEPTANCE BEHAVIOUR AT UNCONTROLLED INTERSECTIONS
MODELLING OF PEDESTRIAN GAP ACCEPTANCE BEHAVIOUR AT UNCONTROLLED INTERSECTIONSMODELLING OF PEDESTRIAN GAP ACCEPTANCE BEHAVIOUR AT UNCONTROLLED INTERSECTIONS
MODELLING OF PEDESTRIAN GAP ACCEPTANCE BEHAVIOUR AT UNCONTROLLED INTERSECTIONS
 
Performance Evaluation of Rigid Pavements
Performance Evaluation of Rigid PavementsPerformance Evaluation of Rigid Pavements
Performance Evaluation of Rigid Pavements
 
A study on gap acceptance of unsignalized intersection under mixed traffic co...
A study on gap acceptance of unsignalized intersection under mixed traffic co...A study on gap acceptance of unsignalized intersection under mixed traffic co...
A study on gap acceptance of unsignalized intersection under mixed traffic co...
 
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
 
Upgradation of low cost roughness measuring equipment and development of perf...
Upgradation of low cost roughness measuring equipment and development of perf...Upgradation of low cost roughness measuring equipment and development of perf...
Upgradation of low cost roughness measuring equipment and development of perf...
 
TRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOW
TRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOWTRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOW
TRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOW
 
Identification of vehicular growth and its management on nh 202 in ranga redd...
Identification of vehicular growth and its management on nh 202 in ranga redd...Identification of vehicular growth and its management on nh 202 in ranga redd...
Identification of vehicular growth and its management on nh 202 in ranga redd...
 
Design of Highway with Major Bridge on Stagnant Water
Design of Highway with Major Bridge on Stagnant WaterDesign of Highway with Major Bridge on Stagnant Water
Design of Highway with Major Bridge on Stagnant Water
 
ESTIMATION OF CAPACITY AND MODEL DEVELOPMENT USING LINEAR REGRESSION
ESTIMATION OF CAPACITY AND MODEL DEVELOPMENT USING LINEAR REGRESSIONESTIMATION OF CAPACITY AND MODEL DEVELOPMENT USING LINEAR REGRESSION
ESTIMATION OF CAPACITY AND MODEL DEVELOPMENT USING LINEAR REGRESSION
 
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRA
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRAAnalysis of Traffic Congestion Characteristics for M.G. Road, AGRA
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRA
 

More from eSAT Publishing House

Likely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnamLikely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnameSAT Publishing House
 
Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...eSAT Publishing House
 
Hudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnamHudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnameSAT Publishing House
 
Groundwater investigation using geophysical methods a case study of pydibhim...
Groundwater investigation using geophysical methods  a case study of pydibhim...Groundwater investigation using geophysical methods  a case study of pydibhim...
Groundwater investigation using geophysical methods a case study of pydibhim...eSAT Publishing House
 
Flood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaFlood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaeSAT Publishing House
 
Enhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingEnhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingeSAT Publishing House
 
Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...eSAT Publishing House
 
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...eSAT Publishing House
 
Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...eSAT Publishing House
 
Shear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a reviewShear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a revieweSAT Publishing House
 
Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...eSAT Publishing House
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard managementeSAT Publishing House
 
Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...eSAT Publishing House
 
Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...eSAT Publishing House
 
Coastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaCoastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaeSAT Publishing House
 
Can fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structuresCan fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structureseSAT Publishing House
 
Assessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingsAssessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingseSAT Publishing House
 
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...eSAT Publishing House
 
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...eSAT Publishing House
 
Disaster recovery sustainable housing
Disaster recovery sustainable housingDisaster recovery sustainable housing
Disaster recovery sustainable housingeSAT Publishing House
 

More from eSAT Publishing House (20)

Likely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnamLikely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnam
 
Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...
 
Hudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnamHudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnam
 
Groundwater investigation using geophysical methods a case study of pydibhim...
Groundwater investigation using geophysical methods  a case study of pydibhim...Groundwater investigation using geophysical methods  a case study of pydibhim...
Groundwater investigation using geophysical methods a case study of pydibhim...
 
Flood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaFlood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, india
 
Enhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingEnhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity building
 
Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...
 
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
 
Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...
 
Shear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a reviewShear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a review
 
Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard management
 
Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...
 
Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...
 
Coastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaCoastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of india
 
Can fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structuresCan fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structures
 
Assessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingsAssessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildings
 
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
 
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
 
Disaster recovery sustainable housing
Disaster recovery sustainable housingDisaster recovery sustainable housing
Disaster recovery sustainable housing
 

Recently uploaded

ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 

Recently uploaded (20)

ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 

Development of pavement management strategies for

  • 1. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 174 DEVELOPMENT OF PAVEMENT MANAGEMENT STRATEGIES FOR ARTERIAL ROADS Vishwanath G1 , Mahdev2 , M. R. Archana3 , Krishna Prapoorna Biligiri4 1, 2 M.Tech IV semester, Highway Technology, 3 Assistant Professor, Department of Civil Engineering, R. V. College of Engineering, Bangalore-560059, India 4 Senior Research Scientist, Center for infrastructure, Sustainable Transportation and Urban Planning, Indian Institute of Science, Bangalore, India: vishwanathg055@gmail.com, swamy.dhaana@gmail.com, archanamr@rvce.edu.in, krishna@cistup.iisc.ernet.in Abstract An arterial road is a high-capacity urban road which delivers the traffic from collector roads to freeways, and between city centres at the maximum and possible level of service. Therefore it is very important to maintain these roads as they are subjected to heavy traffic and on monsoon or poor drainage conditions which may damage the pavements at a faster rate further requiring timely maintenance and costly rehabilitation. Assessing the condition of the pavement periodically is important so that maintenance work can be taken up accordingly in order to slow down the deterioration rate. A tool which can access the deterioration of pavement is a Pavement Condition Index (PCI) which is a distress study carried out on pavement. PCI is a numerical rating of the pavement condition that ranges from 0 -100 with 0 being worst possible condition 100 being the best possible condition. Therefore, this paper aims at bringing out the methodology used in carrying out the survey on the pavement and for rating of the pavement (PCI) with the case studies of four arterial roads of Rajarajeshwari Zone, Bangalore city and the PCIs of rating of these pavements at the time of studies was found to be from very poor to excellent. Pavement management strategies have been proposed based on the condition rating. Keywords: Flexible Pavements, ASTM, PCI, Pavement Maintenance, Arterial roads -------------------------------------------------------------------***----------------------------------------------------------------------- 1. INTRODUCTION Road maintenance is one of the important components of the entire road system. The maintenance operations involve the assessment of road condition, diagnosis of the problem and adopting the most appropriate maintenance steps. Even if the highway is well designed and constructed, they require maintenance, the extent of which will depend on several factors including the pavement type. In order to carry out design of pavement rehabilitation, the existing pavement condition must be evaluated. Such an evaluation usually involves the assessment of the existing pavement surface distress, roughness, rutting. During the past four decades, Bangalore has seen many developments in the form of increased land use of urban and rural areas, rapid growth of population and increasing number of motorised and non-motorised vehicles, with steep rise in industrial, commercial, and residential activities improved transport system namely, Bangalore Metro which is under progress. Therefore it is very important to maintain these roads as they are subjected to heavy traffic (truck load) and on monsoon or poor drainage conditions which may damage the pavements. 1.1 Need for the Study For the improvement of urban road condition, there is a need to develop a set of procedures that will provide a systematic evaluation of highway needs, based on appropriate engineering decision and expert knowledge and at the same time to determine which road stretches need maintenance and which are the sections for which the maintenance operation can be deferred. 1.2 Objectives of Present Paper The objectives of the present paper is to, 1. Identify the arterial road length in the selected zone, 2. To assess the condition of selected stretches based on distress survey, 3. To evaluate the PCI value of different sections of road, 4. To recommend the pavement management strategies based on PCI values 2. REVIEW OF LITERATURE 2.1 General In the stream of roadway technology, pavement distress and failure is considered as a complex as several factors are
  • 2. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 175 responsible for the pavement deterioration and failure. The type and extent of maintenance requirement for a road also depends on the serviceability standard laid down, the maintenance needs, funds available and many other factors. The current engineering practice for selection of maintenance and rehabilitation alternatives is based on subjective judgment and engineering experience. 2.2 Pavement Condition Index (PCI) Initially PCI was developed by the United States Army Corps of Engineers and is based on a visual survey of the pavement [1]. PCI is a numerical rating of the pavement condition that ranges from 0 -100 with 0 being worst possible condition 100 being the best possible condition [2]. It is a statistical measure and requires manual survey of the pavement. PCI surveying processes and calculation methods have been standardized by ASTM for both roads and airport pavements. The PCI provides a measure of the present condition of the pavement based on the distress observed on the surface of the pavement, which also indicates the structural integrity and surface operational condition (localized roughness and safety). The PCI cannot measure structural capacity nor does it provide direct measurement of skid resistance or roughness. It provides an objective and rational basis for determining maintenance and repair needs and priorities. Continuous monitoring of the PCI is used to establish the rate of pavement deterioration, which permits early identification of major rehabilitation needs. The PCI provides feedback on pavement performance for validation or improvement of current pavement design and maintenance procedures. The PCI values obtained from visual inspection i.e. distress survey by recording the severity and extent of the various distress namely cracking, rutting and potholes occurred to pavement can be utilized well in prioritizing the maintenance strategies [3]. This method provides cost effective maintenance and rehabilitation measures for planners and decision makers for maintenance of pavement in road network. The PCI provides an objective rational basis for determining the maintenance and rehabilitation needs of highway pavements and for prioritisation of the pavement sections for maintenance on priority. This methodology considers the common type of distresses in highway pavements and suggests the maintenance treatment considering the overall health of the pavement section [4]. PCI is meant to provide an objective, rational basis for determining maintenance and rehabilitation needs and priorities and a warning system for early identification or projection of major repair requirements or both. The PCI can be used as a tool for assessing the condition of the pavement for periodic maintenance work which could be taken up accordingly in order to slow down the deterioration rate of rural roads constructed under PMGSY scheme in India [5]. The cost effective maintenance and management strategies can be developed by assessing the severity and extent of measured pavement distress values, further which can be used as input to Pavement Maintenance & Management System (PMMS). In developing the maintenance and management strategies PCI plays a major role including type of pavement and other road related information [6]. 3. FIELD STUDIES & DATA COLLECTION 3.1 General The methodology adopted in this study provides a simple approach in the development of PCI for the selected arterial road stretches in Bangalore city for taking up cost effective maintenance measures/treatments. The maintenance treatment recommendations are based on PCI which involve the collection and preparation of road inventory data and report, visual distress survey of the selected stretches based on pavement performance related parameters. 3.2 Surface Distress Measurements The existing pavement condition initially was assessed by visual inspection of the selected road stretches, and then the sections were made based on the distress type and severity. Then pavement surface distress measurement was carried out involving the identification of both type and severity of the pavement distresses present in the study area of the road sections. This procedure was performed with the use of Unified Facilities Criteria (UFC)-2004, ASTM D 6433-07, Paver asphalt distress manual-1997, Distress Identification Manual FHWA USDOT-2003, Oregon DOT Manual-2010 and SHRP-P-338 which contains definitions and information concerning pavement distresses. 3.3 Study Stretches The following four arterial roads in Rajarajeshwari Zone, Bangalore city with total length of 36.5 km were selected and the same with brief inventory detail is listed in Table 1. All the roads selected are within the Bruhat Bangalore Mahanagara Palike (BBMP) limits.
  • 3. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 176 Table 1 Selected Road Stretches Location Code Road Name Length in km Pavement Type Divided Carriageway Width in mtr No. of Sections made 1 Magadi Road 9.5 Flexible Yes 15 5 2 Uttarahalli Road 17 Flexible No 10 9 3 Subramanyapura - Vasantapura Main Road 3.7 Flexible No 10 2 4 Muddinapalya Road 6.3 Flexible No 10 4 3.4 Methodology of Data Collection Bangalore is India's fifth-most populous urban agglomeration, growing metropolitan city with population more than 8.426 million. The local authority (BBMP) has divided Bangalore into 8 zones namely, Bommonahalli Zone, Bangalore East Zone, Bangalore South Zone, Byatarayanapura, Mahadevapura, Bangalore West Zone, Dasarahalli and Raja Rajeshwari Nagar Zone. For the present study RR zone (details shown in Table 2) is chosen as this zone covers major roads that connects many educational institutions, hospitals, malls, toll roads, religious places, ring roads, developing areas and it also consist a major connectivity to another growing city Mysore. The roads in this zone considerably subjected to heavy axle loads, on monsoon rain and many developments work namely Bangalore Metro (Namma Metro) due to which the roads constructed are failed to serve their intended function, hence a study in this view is required. Table 2 Road network detail of Rajarajeshwari Zone Category of the road Length in km Arterial 94 Sub Arterial 118 Collector street --- Local Street --- Total Length 212 There are many feasible approaches to defining performance and assessing the condition of road facilities. A pavement condition needs to be characterized in quantifiable terms so that the potential performance can be associated to a defined condition. In this study (walk through) pavement survey was conducted and in this regard the procedure adopted was based on visual assessment of the type, quantity and severity of pavement distresses and results in the PCI. UFC – 2004 [1] was referred for calculation of PCI, the detail calculation procedure is explained in further section. It was aimed towards the evaluation and analyzing the existing roadway conditions so that a realistic definition of the individual problems and structural requirements of the roadway can be made. 4. ANALYSIS & RESULTS 4.1 Determination of Deduct Values and Pavement Condition Index A Deduct Value (DV) is defined as the value that represents the amount of distress that a pavement has undergone or is subjected to. Each section was inspected and distress data, severity levels such as Low (L), Medium (M) and High (H) were recorded in the distress survey data sheet. The density of each individual distress was calculated using the Eqns. 1, 2, 3. Distress amount in square meters Density = —————————————— x100% (1) Sample area in square meters Distress amount in linear meter Density = —————————————— x100% (2) Sample area in square meters Number of potholes Density = —————————————— x100% (3) Sample area in square meters Then the DVs were determined from the DV curves, then for each distress type and severity Total Deduct Value (TDV) was computed by summing up all the individual DVs then the Corrected Deduct Value (CDV) was determined from CDV curve shown in Fig. 1. Then the PCI was computed using the Eqn. 4. All the PCIs and rating for the respective section with TDV and CDV are presented in Table 3. PCI = 100 – CDV (4)
  • 4. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 177 TOTAL DEDUCT VALUE (TDV) Fig1. Corrected deduct value curves for asphalt-surfaced pavements Table 3 Computation of Pavement Condition Index Location code Beginning Post End Post Length of the Section in km Width of the Section in m TDV CDV PCI RATING 1 Magadi Road Toll Booth Mahadeshwara Nagar 2.7 8 63 40 60 Good Mahadeshwara Nagar Magadi Road Toll Booth 2.7 8 38 28 72 Very Good Mahadeshwara nagar Sumanahalli Bridge 2.7 7.5 86 55 45 Fair Sumanahalli Bridge Mahadeshwara Nagar 2.7 7.5 107 62 38 Poor Sumanahalli Bridge Kamakshipalya 2.4 7.5 140 73 27 Poor Kamakshipalya Sumanahalli Bridge 2.4 7.5 143 80 20 Very Poor Kamakshipalya Veeresh Theatre 1.2 7.5 100 58 42 Fair Veeresh Theatre Kamakshipalya 1.2 7.5 136 70 30 Poor Veeresh Theatre Chord Road (Petrol Bunk) 0.5 7.5 101 57 43 Fair Chord Road (Petrol Bunk) Veeresh Theatre 0.5 7.5 85 54 46 Fair 2 SJBIT College of Engineering. Kengeri sat. Bus Stop @ Mysore Road 2.2 10 100 63 37 Poor JSS College of Engineering SJBIT College of Engineering. 1.2 10 56 35 65 Good Pattalamma Temple JSS college of Engineering 2.7 10 101 57 43 Fair Uttaralli Main Cross Pattalamma Temple 2 10 97 56 44 Fair Chikkalasandra Cross Uttarahalli Circle 2.8 7.5 10.5 11 89 Excellent Kadrenahalli Chikkalasandra Cross 2 7.5 52 38 62 Good ORR Near Dayanand Sagar College Banashankari BMTC 1.4 12 66 43 57 Good
  • 5. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 178 Banashankari BMTC Banerghatta ORR Circle Jayadeva Hospital 3 7.5 42 31 69 Good Banerghatta ORR Circle Jayadeva Hospital Banashankari BMTC 3 7.5 86 55 45 Fair 3 Subramanyapura Bus Stop Yadaualm School Junction 0.9 10 143 70 30 Poor Yadaualm School Junction Konanakuntee @ Kanakpura Road 2.8 10 112 63 37 Poor 4 Vidhaynikethan School Muddinapalaya 2.2 12.5 49 36 64 Good Muddinapalaya Kempagawada Circle 0.7 8 22 16 84 Very Good Kempagawada Circle Dwarakwas Road 2.1 7.5 120 63 37 Poor Dwarakwas Road Magadi Road Toll Booth 1.3 9 108 75 25 Very Poor Determination of appropriate maintenance measures DISCUSSION & CONCLUSIONS 1. PCI provides an objective rational basis for determining the maintenance and rehabilitation needs of urban roads. 2. The suggested methodology considered the common type of distresses in urban roads and suggests maintenance treatments considering the overall health of the pavement. 3. The urban sections that possess higher value of pavement condition index do not require maintenance and pavement section that are assigned lower value of pavement condition index require maintenance on priority. 4. PCI serves as a warning system for early identification or projection of major repairs required. 5. Potholes, weathering and raveling, alligator cracking, polished aggregate and rutting were the major distress identified on urban stretches. In some parts of the selected section of roads there were no pavement or wearing course was absent which require immediate attention. 6. Due to cutting of pavements across and along the roads for providing service lines or for repairing existing service lines and subsequent improper resurfacing has resulted in deterioration of pavements. 7. PCI is a function of the type of distress, density of distress and severity of distress hence management strategies have been recommended based on PCI values as per PASCER manual REFERENCES [1] US Army Corps of Engineers, "PAVER asphalt distress manual" Technical report TR97/104, (1997). [2] ASTM D 6433-07, “Standard Practice for Roads and Parking Lots Pavement Condition Index Surveys”, (2007). [3] L. Udayakumar, R. Vivan Robert and M. S. Amarnath, “Ranking Technique for Prioritisation of Arterial and Sub Arterial Roads for Maintenance Management”, Journal of Indian Highways, Vol. 36, No.11, (2008) pp. 41-51 PCI Range Rating Maintenance Measures 86-100 Excellent No maintenance required 71-85 Very Good Little or no maintenance 56-70 Good Routine maintenance, crack sealing and minor patching 41-55 Fairs Preservative treatments (seal coating or thin non- structural overlay 2” or more) 26-40 Poor Needs patching and repair prior to major overlay Milling and removal of deterioration extends the life of overlay. 11-25 Very Poor Needs reconstruction with extensive base repair. 0-10 Failed Total Reconstruction
  • 6. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 179 [4] N H Suma, Nirmalya Chakraborty and A Veeraragavan, “Simplified Methodology for Prioritisation of Pavement Maintenance Based on Pavement Condition Index”, 4th International Conference on Managing Pavements, (1998). [5] Ryntathiang and Teiborland Lyngdoh, “Pavement condition index as a tool for assessing the rural road pavements: a case study of the Assam rural roads”, Journal of Indian Highways, Vol. 39, No.10, (2011) pp. 41-57. [6] Saad Issa Sarsam, “Development of Pavement Maintenance Management System Using Visual Evaluation of Asphalt Concrete Surface Condition and Expert System”, 7th International Conference on Managing Pavement Assets, (2008).