SlideShare a Scribd company logo
1 of 10
Download to read offline
http://www.iaeme.com/IJMET/index.asp 397 editor@iaeme.com
International Journal of Mechanical Engineering and Technology (IJMET)
Volume 10, Issue 02, February 2019, pp. 397-406, Article ID: IJMET_10_02_042
Available online at http://www.iaeme.com/ijmet/issues.asp?JType=IJMET&VType=10&IType=2
ISSN Print: 0976-6340 and ISSN Online: 0976-6359
© IAEME Publication Scopus Indexed
SYNCHRONIZING ASSEMBLY LINE
OPERATIONS IN COTTON GINNING
INDUSTRIES TOWARDS REDUCED CYCLE
TIME
Dr. Ashok G. Matani
Associate Professor -Mechanical Engineering Department,
Government College of Engineering, Amravati- [M.S.] India
Mohd. Sohail Ansari
2nd
Year M.Tech. Production, Government College of Engineering,
Amravati – 444604 [M.S.]
Dr. S. K. Doifode
HOD - Chemistry Department, Government College of Engineering,
Amravati–444604 [M.S.] India
ABSTRACT
Problem-solving and ongoing procedure enhancements are key elements to
obtaining quality improvement in business operations. Many process and machine
improvement strategies have been suggested and implemented in organizations, where
define, measure, analysis, improve and control is mostly applied. Here we aimed at
improving the machine productivity of assembly line in a cotton ginning assembly line
in an Industry. The tool which is used to improve the productivity of assembly line are
time study and method study. Based on this, the study provides data of time required
for each assembly processes, sequence of each operations and flow of the product in
assembly line.
The present study has been done at an industry, a leading manufacturer of cotton
ginning machine. The aim of the study is to identify the various problems on the
assembly line which causes unnecessary delay in the operations. The problem is found
in the assembly line and is solved by work study techniques and it is found that cycle
time of bottle neck operation was reduced by 33.05% per trolley
Keywords: machine improvement strategies.
Synchronizing Assembly Line Operations in Cotton Ginning Industries Towards Reduced Cycle
Time
http://www.iaeme.com/IJMET/index.asp 398 editor@iaeme.com
Cite this Article: Dr. Ashok G. Matani, Mohd. Sohail Ansari and Dr. S. K. Doifode,
Synchronizing Assembly Line Operations in Cotton Ginning Industries Towards
Reduced Cycle Time, International Journal of Mechanical Engineering and
Technology, 10(2), 2019, pp. 397-406.
http://www.iaeme.com/IJMET/issues.asp?JType=IJMET&VType=10&IType=2
1. INTRODUCTION
1.1. Productivity Improvement
Productivity improvement means reduction in wastage of resources like men, time, material,
capital etc. It is the human efforts to produce more profit in terms of less wastage of material,
less time consumption in assembly of manufacturing with less inputs of resources provided so
that the benefits will become maximum for the organization.
Productivity improvement is the key to do the right thing better & improve it
continuously. Therefore, it is important to adopt adequate or efficient productivity
improvement technique to maximize the machine output with a less consumption of
resources.
1.2. Work study
Work study investigates the work done in acompany/organization and it aim to find the best
andmost efficient way of using all the resources which areavailable i.e. material, man,
machine, money etc.Work study techniques involve
a) Method study and
b) Time study techniques.
1.2.1. Method Study
Method study targets at finding the best way of doing thework. Method study involves
systematic investigation(Which involves recording and critical investigation) of thecurrent
method of doing the job so that easy, fast, whichcauses less fatigue to the worker, safe,
economical way ofdoing the work can be developed and installed at low cost.This is basically
achieved by eliminating the unnecessarymotions which are involved in a procedure of doing
thework and the same can also be achieved by changing thesequence of operations or process
itself.
1.2.2. Time study
Time study is a technique of work measurement used toestablish time for a qualified worker
to carry out specifiedtask under specified conditions and at defined level ofperformance.
2. CASE STUDY
The study has been done at an industry, a leading manufacturer of Cotton Ginning Machine.
The aim of the study is to identify the various problems on the assembly line which causes
unnecessary delay in the operations. The problem is found in the assembly line having six
work stations where it is found that there are various operations creating bottle neck on the
assembly line. It is desirable that 40 Cotton Ginning machine to be assembled on the
assembly line but it is observed that 75% of cotton ginning machine are assembled a day.
Thus the concern of this paper is to present the ideas which can beused by the industry to
reduce its cycle time of theoperations in its assembly line to enhance theefficiency of the
system.
Dr. Ashok G. Matani, Mohd. Sohail Ansari and Dr. S. K. Doifode
http://www.iaeme.com/IJMET/index.asp 399 editor@iaeme.com
3. OBJECTIVE
 To identify the operations causing bottle neck in the assembly line.
 By using the method study technique, identify the problem work stations in the
assembly line.
 Develop a method to solve the problem which is causing unnecessary delay in the
assembly line.
 Conduct time study in the assembly line after implementation of the new method for
trial period of 10 days.
 Suggest new method to the concern personnel in the organisation.
4. STUDIES AT INDUSTRY
 First step is to determine the operation sequence in each work stations on the assembly
line.
 Observe and identify the cycle time for each operations on all work stations.
 It is found that sub assembly of the seed channel of the cotton ginning machine took
around 13.92 minutes and the time should be around 10.5 minutes for a trolley in a
work station.
 The problem associated with present method is that the sub assembly of seed channel
fitting or tightening of bolts and nuts on workstation 2 are done manually by spanners
and cannot be tightened by the torque wrench due to the design constraint. Thus it is
observed that due to this manual operation, the overall work station time of the
workstation 2 is around 13.92 minutes which is far greater than the other work stations
and also the work station time of station 1 is the least around 3.4 minutes shown in the
graph below.
 Now it is observed that by loose fitting of seed channels at the workstation 1 and
manually tightening of the nut and bolts are done in the workstation 2 can decrease
workstation time of station 2 to 9.32 minutes and simultaneously increases the
workstation time of station 1 to 7.93 minutes i.e. total decrease in time of 4.6 minutes
from station 2 and increase in the same on station 1.
 By implementing the new method, line efficiency of the assembly line increases.
Synchronizing Assembly Line Operations in Cotton Ginning Industries Towards Reduced Cycle
Time
http://www.iaeme.com/IJMET/index.asp 400 editor@iaeme.com
Figure Assembly Line Layout of the industry
Tables for the cycle time and Work Stations Time with sequence of operations before implementation
of the new method.
WORK STATION 1
Sr. No. Operation Sequence Time consumed in Part assembly (Seconds)
1 Side Frame 94.8 88.3 82.9
2 Cross bar fitting 22 19.8 23.6
3 Rail fitting 81 92 87.5
Total workstation time 195.8 200.1 194
WORK STATION 2
Sr. No. Operation Sequence Time consumed in Part assembly (Seconds)
1 Seed channel 1 fitting 273 266.4 282.3
2 Seed channel 2 fitting 562.2 481.2 533.6
Total workstation time 835.2 747.6 815.9
WORK STATION 3
Sr. No. Operation Sequence Time consumed in Part assembly (Seconds)
1 Back knife fitting 81.6 95.4 88.6
2 Knife holder fitting 87 131.4 112.8
3 Fix knife fitting 9.22 10.2 9.58
4 Seed Guard Jumbo fitting 85.8 72 81.7
Total workstation time 263.2 309 292.68
Dr. Ashok G. Matani, Mohd. Sohail Ansari and Dr. S. K. Doifode
http://www.iaeme.com/IJMET/index.asp 401 editor@iaeme.com
WORK STATION 4
Sr. No. Operation Sequence Time consumed in Part assembly (Seconds)
1 Ratchet fitting 16 21 18.5
2 Side plate fitting 81.6 78.5 86.9
3 Beater assembly fitting 387.6 241 321.3
Total workstation time 485.2 340.5 426.7
WORK STATION 5
Sr. No. Operation Sequence Time consumed in Part assembly (Seconds)
1 Weight lever fitting 136.8 198 169.5
2 Gear box fitting 270 388.8 340.6
Total workstation time 406.8 586.8 510.1
WORK STATION 6
Sr. No. Operation Sequence Time consumed in Part assembly (Seconds)
1 Gear box plate cover fitting 364.8 379.8 353.8
Tables for the cycle time and Work Stations Time with sequence of operations after implementation
of the new method.
WORK STATION 1
Sr. No. Operation Sequence Time consumed in Part assembly (Seconds)
1 Side Frame 94.8 88.3 82.9
2 Cross bar fitting 22 19.8 23.6
3 Rail fitting 81 92 87.5
4 Seed channel loose fitting 276 282 276
Total workstation time 471.8 482.1 470
WORK STATION 2
Sr. No. Operation Sequence Time consumed in Part assembly (Seconds)
1 Seed channel 1 tightening 135 128.4 144.3
2 Seed channel 2 tightening 424.5 346.2 395.6
Total workstation time 559.2 474.6 539.9
Synchronizing Assembly Line Operations in Cotton Ginning Industries Towards Reduced Cycle
Time
http://www.iaeme.com/IJMET/index.asp 402 editor@iaeme.com
W/S 1 W/S 2 W/S 3 W/S 4 W/S 5 W/S 6
w/s time (reading 1) 195.8 835.2 263.62 485.2 406.8 364.8
w/s time (reading 2) 200.1 747.6 309 340.5 586.8 379.8
w/s time (reading 3) 194 815.9 292.68 426.7 510.1 353.8
195.8
835.2
263.62
485.2
406.8
364.8
200.1
747.6
309
340.5
586.8
379.8
194
815.9
292.68
426.7
510.1
353.8
TIME(INSECONDS)
WORK STATIONS (W/S)
Three readings of all six work stations in assembly
line before implemenation of new method
w/s time (reading 1) w/s time (reading 2) w/s time (reading 3)
w/s 1 w/s 2 w/s 3 w/s 4 w/s 5 w/s 6
w/s 1 (reading 1) 471.8 559.2 263.62 485.2 406.8 364.8
w/s 2 (reading 2) 482.1 474.6 309 340.5 586.8 379.8
w/s 3 (reading 3) 470 539.9 292.68 426.7 510.1 353.8
471.8
559.2
263.62
485.2
406.8
364.8
482.1
474.6
309
340.5
586.8
379.8
470
539.9
292.68
426.7
510.1
353.8
TIME(INSECONDS)
WORKSTATIONS
Three readings of all six work stations in assembly
line after implemenation of new method
w/s 1 (reading 1) w/s 2 (reading 2) w/s 3 (reading 3)
Dr. Ashok G. Matani, Mohd. Sohail Ansari and Dr. S. K. Doifode
http://www.iaeme.com/IJMET/index.asp 403 editor@iaeme.com
Cycle time of each operations in the work stations and work station time are given above
in the table. Thus by using the above table we can calculate line efficiency of the assembly
line.
 Number of work stations = 6
 Capacity of assembly line = 40 units per shift per day
 Total shift time = 480 minutes
 Unproductive time or worker allowances = 60 minutes
 Actual production time = Total shift time - Unproductive time or worker allowances
= 480-60
= 420 minutes.
 For full capacity, time required by one workstation for one trolley
=
Actual production time
Capacity of plant
=
420
40
= 10.5 minutes
 Therefore, line efficiency before implementation of new method
=
𝐴𝑐𝑡𝑢𝑎𝑙 𝑝𝑟𝑜𝑑𝑢𝑐𝑡𝑖𝑜𝑛 𝑡𝑖𝑚𝑒
𝑛𝑢𝑚𝑏𝑒𝑟 𝑜𝑓 𝑤𝑜𝑟𝑘𝑠𝑡𝑎𝑡𝑖𝑜𝑛𝑠 × 𝑙𝑎𝑟𝑔𝑒𝑠𝑡 𝑤𝑜𝑟𝑘𝑠𝑡𝑎𝑡𝑖𝑜𝑛 𝑡𝑖𝑚𝑒
=
420
6 ×13.92
= 50.28 %
 Line efficiency after implementation of new method
=
420
6 × 9.78
= 71.57 %
Thus by implementing line new method, line efficiency increases from 50.28% to 71.57%.
195.8 200.1 194
471.8 482.1 470
0
100
200
300
400
500
600
w/s 1 (reading 1) w/s 2 (reading 2) w/s 3 (reading 3)
time(inseconds)
workstation 1 readings
comparision of the workstation 1 before and after implementation of new
method
w/s time before improvement w/s time after improvement
Synchronizing Assembly Line Operations in Cotton Ginning Industries Towards Reduced Cycle
Time
http://www.iaeme.com/IJMET/index.asp 404 editor@iaeme.com
835.2
747.6
815.9
559.2
474.6
539.9
0
100
200
300
400
500
600
700
800
900
w/s 1 (reading 1) w/s 1 (reading 2) w/s 1 (reading 3)
time(inseconds)
workstation 2 readings
comparision of the workstation 2 before and after implementation of new
method
w/s time before improvement w/s time after improvement
Dr. Ashok G. Matani, Mohd. Sohail Ansari and Dr. S. K. Doifode
http://www.iaeme.com/IJMET/index.asp 405 editor@iaeme.com
It can be seen and compared from the above two graphs that the workstation time of
workstation 1 is increased and workstation time of w/s 2 is decreased by changing the
operation in the process sheetand thus reducing w/s time of the workstation 2.
5. CONCLUSIONS
The results can be concluded that the time required to complete the sub assembly of seed
channel in the work station -2 is reduced to 9.32 minutes from 13.92 minutes.
Percentage decrease in time by above study is
=
13.92−9.32
13.92
× 100
= 33.05 %
Thus the productivity of the assembly line of the cotton ginning machine is improved and
the line efficiency are increased by the application of work study and change in operation in
the process sheet.
REFERENCES
[1] Ashish Kalra, Sachin Marwah, Productivity improvement in assembly line of automobile
industry by reducing cycle time of operations, International Journal of Engineering
Research & Technology, 5(5):28-31.
[2] Swapnil T. Firake, Dr. K. H. Inamdar, Productivity improvement of automotive assembly
line through line balancing, International Journal of Technical Research and
Applications, 2(3):124-128.
[3] Cengiz Durana, Aysel Cetindereb, Yunus Emre Aksuc, Productivity improvement by
work and time study technique for earth energy-glass manufacturing company, 4th
World
Conference on Business, Economics and Management, WCBEM, Science Direct,
Procedia Economics and Finance 26(2015) ,pp 109 – 113.
Synchronizing Assembly Line Operations in Cotton Ginning Industries Towards Reduced Cycle
Time
http://www.iaeme.com/IJMET/index.asp 406 editor@iaeme.com
[4] Mayourshikha Pancholi (Bhatnagar), Productivity improvement in chassis assembly line
of automative industry by using work study methods, International Journal of
Engineering Sciences & Research Technology, pp 454-459.
[5] Shamuvel V.Pandit, Sunil J Kadam, Avinash Kharat, Chetan U Nayakawade, Productivity
improvement by application of line balancing, International Journal of Innovative
Research in Science, Engineering and Technology, 3(4):11495-11502.
[6] Nikhil Verma, Pulkit Trivedi, Vivek Agnihotri, Productivity Improvement in assembly
line of an automobile industry, IOSR Journal of Mechanical and Civil Engineering (IOSR-
JMCE), 12(4): 01-06.
[7] Dr. A. G. Matani, (2006), Improving water use efficiency by effective water conservation
techniques, Indian Journal of Environmental Protection, 26(3):260-264.
[8] Dr. A.G. Matani, S. K. Doifode, (2015), Effective industrial waste utilization technologies
towards cleaner environment, International Journal of Chemical and Physical Sciences,
491(1): 536-540.
[9] Dr . A.G. Matani,(2006), Strategies for better waste management in industrial estates,
Journal of Industrial Pollution Control, 22(1): 67-72.
[10] Dr. S. K. Doifode Dr. A. G. Matani (2015), Advanced environment protection techniques
by industries: potential for corporate social responsibility activities, Journal of The
International Association of Advanced Technology and Science, 15(3):1-8
[11] P Saurabh Jha and Mohd Salman Khan. An Experimental Study on the Automotive
Production Line Using Assembly Line Balancing Techniques. International Journal of
Mechanical Engineering and Technology, 8(3), 2017, pp. 22– 33
[12] Madasamy alias PrabuNivas.C, Venkatesh. J and Kannan. K, Implementation of Special
Product & Process Characteristic (Sppc) in A Clutch Cover Assembly Line, International
Journal of Mechanical Engineering and Technology, 9(11), 2018, pp. 1025–1034
[13] S.K. Gupta , Dr. V.K. Mahna , Dr. R.V. Singh and Rajender Kumar, Mixed Model
Assembly Line Balancing: Strategic Tool to Improve Line Efficiency in Real World,
International Journal of Industrial Engineering Research and Development (IJIERD),
Volume 3, Issue 1, January- June (2012), pp. 58-66
[14] K. Parthiban, M. Kumaresan, M. Shantharaj and N.M. Vijay Aravindhan, Reducing the
Run out Defect in Cover Assembly Line of Clutch Plate, International Journal of
Mechanical Engineering and Technology, 9(11), 2018, pp. 1042–1050.

More Related Content

What's hot

DEVELOPMENT OF AN ELECTRICALLY OPERATED CASSAVA PEELING AND SLICING MACHINE
DEVELOPMENT OF AN ELECTRICALLY OPERATED CASSAVA PEELING AND SLICING MACHINEDEVELOPMENT OF AN ELECTRICALLY OPERATED CASSAVA PEELING AND SLICING MACHINE
DEVELOPMENT OF AN ELECTRICALLY OPERATED CASSAVA PEELING AND SLICING MACHINEOyeniyi Samuel
 
A Review on Design and Fabrication of Groundnut Shelling and Separating Machine.
A Review on Design and Fabrication of Groundnut Shelling and Separating Machine.A Review on Design and Fabrication of Groundnut Shelling and Separating Machine.
A Review on Design and Fabrication of Groundnut Shelling and Separating Machine.IRJET Journal
 
Maintenance Strategy and Activites of Textile Industry (Spinning Mill)
Maintenance Strategy and Activites of Textile Industry (Spinning Mill)Maintenance Strategy and Activites of Textile Industry (Spinning Mill)
Maintenance Strategy and Activites of Textile Industry (Spinning Mill)Danial Sohail
 
Design and analysis of jig and welding fixture
Design and analysis of jig and welding fixtureDesign and analysis of jig and welding fixture
Design and analysis of jig and welding fixturesagmech24
 
Design & Fabrication of Groundnut Sheller Machine
Design & Fabrication of Groundnut Sheller MachineDesign & Fabrication of Groundnut Sheller Machine
Design & Fabrication of Groundnut Sheller MachineIRJET Journal
 
Studentsproject groundnutshellarmachine-140507061025-phpapp02
Studentsproject groundnutshellarmachine-140507061025-phpapp02Studentsproject groundnutshellarmachine-140507061025-phpapp02
Studentsproject groundnutshellarmachine-140507061025-phpapp02Shivam Prajapati
 
Design and modification of bale cutting machine to improve its productivity
Design and modification of bale cutting machine to improve its productivityDesign and modification of bale cutting machine to improve its productivity
Design and modification of bale cutting machine to improve its productivityeSAT Journals
 
Study of Manufacturing of Multi-Saddle Clamp
Study of Manufacturing of Multi-Saddle ClampStudy of Manufacturing of Multi-Saddle Clamp
Study of Manufacturing of Multi-Saddle ClampIRJET Journal
 
IRJET- Design and Fabrication of Cocoa Pod Splitting and Bean Extraction ...
IRJET-  	  Design and Fabrication of Cocoa Pod Splitting and Bean Extraction ...IRJET-  	  Design and Fabrication of Cocoa Pod Splitting and Bean Extraction ...
IRJET- Design and Fabrication of Cocoa Pod Splitting and Bean Extraction ...IRJET Journal
 
IRJET- Small Thread Attachment for Internal Threading on Lathe Machine
IRJET-  	  Small Thread Attachment for Internal Threading on Lathe MachineIRJET-  	  Small Thread Attachment for Internal Threading on Lathe Machine
IRJET- Small Thread Attachment for Internal Threading on Lathe MachineIRJET Journal
 
Amtek persentation aman (11 me-06)
Amtek persentation aman (11 me-06)Amtek persentation aman (11 me-06)
Amtek persentation aman (11 me-06)Aman5252
 
#PRESENTATION by AKSHAY JANGID (Trainee)
#PRESENTATION by AKSHAY JANGID (Trainee)#PRESENTATION by AKSHAY JANGID (Trainee)
#PRESENTATION by AKSHAY JANGID (Trainee)AKSHAY JANGID
 
design and fixture in horn assembly
design and fixture in horn assemblydesign and fixture in horn assembly
design and fixture in horn assemblyJayavignesh Jt
 
Ergonomics in the garment industry
Ergonomics in the garment industryErgonomics in the garment industry
Ergonomics in the garment industrydr Gordana Colovic
 
ring gear production
ring gear productionring gear production
ring gear productionSachin Sharma
 
Design, development and fabrication of a low cost corn deseeding machine
Design, development and fabrication of a low cost corn deseeding machineDesign, development and fabrication of a low cost corn deseeding machine
Design, development and fabrication of a low cost corn deseeding machineeSAT Publishing House
 

What's hot (20)

DEVELOPMENT OF AN ELECTRICALLY OPERATED CASSAVA PEELING AND SLICING MACHINE
DEVELOPMENT OF AN ELECTRICALLY OPERATED CASSAVA PEELING AND SLICING MACHINEDEVELOPMENT OF AN ELECTRICALLY OPERATED CASSAVA PEELING AND SLICING MACHINE
DEVELOPMENT OF AN ELECTRICALLY OPERATED CASSAVA PEELING AND SLICING MACHINE
 
A Review on Design and Fabrication of Groundnut Shelling and Separating Machine.
A Review on Design and Fabrication of Groundnut Shelling and Separating Machine.A Review on Design and Fabrication of Groundnut Shelling and Separating Machine.
A Review on Design and Fabrication of Groundnut Shelling and Separating Machine.
 
Maintenance Strategy and Activites of Textile Industry (Spinning Mill)
Maintenance Strategy and Activites of Textile Industry (Spinning Mill)Maintenance Strategy and Activites of Textile Industry (Spinning Mill)
Maintenance Strategy and Activites of Textile Industry (Spinning Mill)
 
Design and analysis of jig and welding fixture
Design and analysis of jig and welding fixtureDesign and analysis of jig and welding fixture
Design and analysis of jig and welding fixture
 
Jyoti ind.training report
Jyoti ind.training reportJyoti ind.training report
Jyoti ind.training report
 
Design & Fabrication of Groundnut Sheller Machine
Design & Fabrication of Groundnut Sheller MachineDesign & Fabrication of Groundnut Sheller Machine
Design & Fabrication of Groundnut Sheller Machine
 
PG thesis
PG thesisPG thesis
PG thesis
 
Studentsproject groundnutshellarmachine-140507061025-phpapp02
Studentsproject groundnutshellarmachine-140507061025-phpapp02Studentsproject groundnutshellarmachine-140507061025-phpapp02
Studentsproject groundnutshellarmachine-140507061025-phpapp02
 
Design and modification of bale cutting machine to improve its productivity
Design and modification of bale cutting machine to improve its productivityDesign and modification of bale cutting machine to improve its productivity
Design and modification of bale cutting machine to improve its productivity
 
Study of Manufacturing of Multi-Saddle Clamp
Study of Manufacturing of Multi-Saddle ClampStudy of Manufacturing of Multi-Saddle Clamp
Study of Manufacturing of Multi-Saddle Clamp
 
IRJET- Design and Fabrication of Cocoa Pod Splitting and Bean Extraction ...
IRJET-  	  Design and Fabrication of Cocoa Pod Splitting and Bean Extraction ...IRJET-  	  Design and Fabrication of Cocoa Pod Splitting and Bean Extraction ...
IRJET- Design and Fabrication of Cocoa Pod Splitting and Bean Extraction ...
 
IRJET- Small Thread Attachment for Internal Threading on Lathe Machine
IRJET-  	  Small Thread Attachment for Internal Threading on Lathe MachineIRJET-  	  Small Thread Attachment for Internal Threading on Lathe Machine
IRJET- Small Thread Attachment for Internal Threading on Lathe Machine
 
Amtek persentation aman (11 me-06)
Amtek persentation aman (11 me-06)Amtek persentation aman (11 me-06)
Amtek persentation aman (11 me-06)
 
#PRESENTATION by AKSHAY JANGID (Trainee)
#PRESENTATION by AKSHAY JANGID (Trainee)#PRESENTATION by AKSHAY JANGID (Trainee)
#PRESENTATION by AKSHAY JANGID (Trainee)
 
merged_document
merged_documentmerged_document
merged_document
 
design and fixture in horn assembly
design and fixture in horn assemblydesign and fixture in horn assembly
design and fixture in horn assembly
 
Ergonomics in the garment industry
Ergonomics in the garment industryErgonomics in the garment industry
Ergonomics in the garment industry
 
Summer training
Summer trainingSummer training
Summer training
 
ring gear production
ring gear productionring gear production
ring gear production
 
Design, development and fabrication of a low cost corn deseeding machine
Design, development and fabrication of a low cost corn deseeding machineDesign, development and fabrication of a low cost corn deseeding machine
Design, development and fabrication of a low cost corn deseeding machine
 

Similar to Ijmet 10 02_042

A case study on productivity improvement of wearing insert and cutting ring
A case study on productivity improvement of wearing insert and cutting ringA case study on productivity improvement of wearing insert and cutting ring
A case study on productivity improvement of wearing insert and cutting ringIJECSJournal
 
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...IRJET Journal
 
Implementation of a Cellular Manufacturing Tool for Minimization of Non Value...
Implementation of a Cellular Manufacturing Tool for Minimization of Non Value...Implementation of a Cellular Manufacturing Tool for Minimization of Non Value...
Implementation of a Cellular Manufacturing Tool for Minimization of Non Value...IJERA Editor
 
Reducing manufacturing lead time of steam turbine casing
Reducing manufacturing lead time of steam turbine casingReducing manufacturing lead time of steam turbine casing
Reducing manufacturing lead time of steam turbine casingeSAT Publishing House
 
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...ijsrd.com
 
Design and Development of Valve Lapping Machine
Design and Development of Valve Lapping MachineDesign and Development of Valve Lapping Machine
Design and Development of Valve Lapping MachineIRJET Journal
 
IRJET- Development of Ejection System to Improve Productivity
IRJET-  	  Development of Ejection System to Improve ProductivityIRJET-  	  Development of Ejection System to Improve Productivity
IRJET- Development of Ejection System to Improve ProductivityIRJET Journal
 
IRJET- Development of Ejection System to Improve Productivity
IRJET- Development of Ejection System to Improve ProductivityIRJET- Development of Ejection System to Improve Productivity
IRJET- Development of Ejection System to Improve ProductivityIRJET Journal
 
PRODUCTIVITY IMPROVEMENT IN SPREADING (CUTTING) SECTION BY IMPLEMENTING PRE-D...
PRODUCTIVITY IMPROVEMENT IN SPREADING (CUTTING) SECTION BY IMPLEMENTING PRE-D...PRODUCTIVITY IMPROVEMENT IN SPREADING (CUTTING) SECTION BY IMPLEMENTING PRE-D...
PRODUCTIVITY IMPROVEMENT IN SPREADING (CUTTING) SECTION BY IMPLEMENTING PRE-D...IRJET Journal
 
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...IRJET Journal
 
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean ToolsIRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean ToolsIRJET Journal
 
IRJET- Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
IRJET-  	  Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...IRJET-  	  Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
IRJET- Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...IRJET Journal
 
IMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVAN
IMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVANIMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVAN
IMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVANIRJET Journal
 
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...IRJET Journal
 
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machine
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machineDevelopment of fixture_to_reduce_the_cycle_time_of_c_8_griding_machine
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machineLaukik Raut
 
Design and Fabrication of Pneumatic Bar Bending Machine
Design and Fabrication of Pneumatic Bar Bending MachineDesign and Fabrication of Pneumatic Bar Bending Machine
Design and Fabrication of Pneumatic Bar Bending MachineIRJET Journal
 
IRJET- Productivity Improvement by Time Study Analysis Moderate Scale Ind...
IRJET-  	  Productivity Improvement by Time Study Analysis Moderate Scale Ind...IRJET-  	  Productivity Improvement by Time Study Analysis Moderate Scale Ind...
IRJET- Productivity Improvement by Time Study Analysis Moderate Scale Ind...IRJET Journal
 

Similar to Ijmet 10 02_042 (20)

Plant Layout
Plant LayoutPlant Layout
Plant Layout
 
A case study on productivity improvement of wearing insert and cutting ring
A case study on productivity improvement of wearing insert and cutting ringA case study on productivity improvement of wearing insert and cutting ring
A case study on productivity improvement of wearing insert and cutting ring
 
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
 
Implementation of a Cellular Manufacturing Tool for Minimization of Non Value...
Implementation of a Cellular Manufacturing Tool for Minimization of Non Value...Implementation of a Cellular Manufacturing Tool for Minimization of Non Value...
Implementation of a Cellular Manufacturing Tool for Minimization of Non Value...
 
Reducing manufacturing lead time of steam turbine casing
Reducing manufacturing lead time of steam turbine casingReducing manufacturing lead time of steam turbine casing
Reducing manufacturing lead time of steam turbine casing
 
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
 
Design and Development of Valve Lapping Machine
Design and Development of Valve Lapping MachineDesign and Development of Valve Lapping Machine
Design and Development of Valve Lapping Machine
 
IRJET- Development of Ejection System to Improve Productivity
IRJET-  	  Development of Ejection System to Improve ProductivityIRJET-  	  Development of Ejection System to Improve Productivity
IRJET- Development of Ejection System to Improve Productivity
 
IRJET- Development of Ejection System to Improve Productivity
IRJET- Development of Ejection System to Improve ProductivityIRJET- Development of Ejection System to Improve Productivity
IRJET- Development of Ejection System to Improve Productivity
 
PRODUCTIVITY IMPROVEMENT IN SPREADING (CUTTING) SECTION BY IMPLEMENTING PRE-D...
PRODUCTIVITY IMPROVEMENT IN SPREADING (CUTTING) SECTION BY IMPLEMENTING PRE-D...PRODUCTIVITY IMPROVEMENT IN SPREADING (CUTTING) SECTION BY IMPLEMENTING PRE-D...
PRODUCTIVITY IMPROVEMENT IN SPREADING (CUTTING) SECTION BY IMPLEMENTING PRE-D...
 
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
 
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean ToolsIRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
 
O0123190100
O0123190100O0123190100
O0123190100
 
IRJET- Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
IRJET-  	  Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...IRJET-  	  Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
IRJET- Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
 
IMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVAN
IMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVANIMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVAN
IMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVAN
 
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
 
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machine
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machineDevelopment of fixture_to_reduce_the_cycle_time_of_c_8_griding_machine
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machine
 
On3425302537
On3425302537On3425302537
On3425302537
 
Design and Fabrication of Pneumatic Bar Bending Machine
Design and Fabrication of Pneumatic Bar Bending MachineDesign and Fabrication of Pneumatic Bar Bending Machine
Design and Fabrication of Pneumatic Bar Bending Machine
 
IRJET- Productivity Improvement by Time Study Analysis Moderate Scale Ind...
IRJET-  	  Productivity Improvement by Time Study Analysis Moderate Scale Ind...IRJET-  	  Productivity Improvement by Time Study Analysis Moderate Scale Ind...
IRJET- Productivity Improvement by Time Study Analysis Moderate Scale Ind...
 

More from IAEME Publication

IAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME Publication
 
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...IAEME Publication
 
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSA STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSIAEME Publication
 
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSBROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSIAEME Publication
 
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSDETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSIAEME Publication
 
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSIAEME Publication
 
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOVOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOIAEME Publication
 
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IAEME Publication
 
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYVISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYIAEME Publication
 
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...IAEME Publication
 
GANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEGANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEIAEME Publication
 
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...IAEME Publication
 
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...IAEME Publication
 
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...IAEME Publication
 
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...IAEME Publication
 
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...IAEME Publication
 
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...IAEME Publication
 
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...IAEME Publication
 
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...IAEME Publication
 
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTA MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTIAEME Publication
 

More from IAEME Publication (20)

IAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdf
 
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
 
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSA STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
 
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSBROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
 
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSDETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
 
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
 
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOVOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
 
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
 
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYVISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
 
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
 
GANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEGANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICE
 
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
 
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
 
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
 
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
 
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
 
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
 
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
 
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
 
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTA MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
 

Recently uploaded

What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...Call Girls in Nagpur High Profile
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 

Recently uploaded (20)

What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 

Ijmet 10 02_042

  • 1. http://www.iaeme.com/IJMET/index.asp 397 editor@iaeme.com International Journal of Mechanical Engineering and Technology (IJMET) Volume 10, Issue 02, February 2019, pp. 397-406, Article ID: IJMET_10_02_042 Available online at http://www.iaeme.com/ijmet/issues.asp?JType=IJMET&VType=10&IType=2 ISSN Print: 0976-6340 and ISSN Online: 0976-6359 © IAEME Publication Scopus Indexed SYNCHRONIZING ASSEMBLY LINE OPERATIONS IN COTTON GINNING INDUSTRIES TOWARDS REDUCED CYCLE TIME Dr. Ashok G. Matani Associate Professor -Mechanical Engineering Department, Government College of Engineering, Amravati- [M.S.] India Mohd. Sohail Ansari 2nd Year M.Tech. Production, Government College of Engineering, Amravati – 444604 [M.S.] Dr. S. K. Doifode HOD - Chemistry Department, Government College of Engineering, Amravati–444604 [M.S.] India ABSTRACT Problem-solving and ongoing procedure enhancements are key elements to obtaining quality improvement in business operations. Many process and machine improvement strategies have been suggested and implemented in organizations, where define, measure, analysis, improve and control is mostly applied. Here we aimed at improving the machine productivity of assembly line in a cotton ginning assembly line in an Industry. The tool which is used to improve the productivity of assembly line are time study and method study. Based on this, the study provides data of time required for each assembly processes, sequence of each operations and flow of the product in assembly line. The present study has been done at an industry, a leading manufacturer of cotton ginning machine. The aim of the study is to identify the various problems on the assembly line which causes unnecessary delay in the operations. The problem is found in the assembly line and is solved by work study techniques and it is found that cycle time of bottle neck operation was reduced by 33.05% per trolley Keywords: machine improvement strategies.
  • 2. Synchronizing Assembly Line Operations in Cotton Ginning Industries Towards Reduced Cycle Time http://www.iaeme.com/IJMET/index.asp 398 editor@iaeme.com Cite this Article: Dr. Ashok G. Matani, Mohd. Sohail Ansari and Dr. S. K. Doifode, Synchronizing Assembly Line Operations in Cotton Ginning Industries Towards Reduced Cycle Time, International Journal of Mechanical Engineering and Technology, 10(2), 2019, pp. 397-406. http://www.iaeme.com/IJMET/issues.asp?JType=IJMET&VType=10&IType=2 1. INTRODUCTION 1.1. Productivity Improvement Productivity improvement means reduction in wastage of resources like men, time, material, capital etc. It is the human efforts to produce more profit in terms of less wastage of material, less time consumption in assembly of manufacturing with less inputs of resources provided so that the benefits will become maximum for the organization. Productivity improvement is the key to do the right thing better & improve it continuously. Therefore, it is important to adopt adequate or efficient productivity improvement technique to maximize the machine output with a less consumption of resources. 1.2. Work study Work study investigates the work done in acompany/organization and it aim to find the best andmost efficient way of using all the resources which areavailable i.e. material, man, machine, money etc.Work study techniques involve a) Method study and b) Time study techniques. 1.2.1. Method Study Method study targets at finding the best way of doing thework. Method study involves systematic investigation(Which involves recording and critical investigation) of thecurrent method of doing the job so that easy, fast, whichcauses less fatigue to the worker, safe, economical way ofdoing the work can be developed and installed at low cost.This is basically achieved by eliminating the unnecessarymotions which are involved in a procedure of doing thework and the same can also be achieved by changing thesequence of operations or process itself. 1.2.2. Time study Time study is a technique of work measurement used toestablish time for a qualified worker to carry out specifiedtask under specified conditions and at defined level ofperformance. 2. CASE STUDY The study has been done at an industry, a leading manufacturer of Cotton Ginning Machine. The aim of the study is to identify the various problems on the assembly line which causes unnecessary delay in the operations. The problem is found in the assembly line having six work stations where it is found that there are various operations creating bottle neck on the assembly line. It is desirable that 40 Cotton Ginning machine to be assembled on the assembly line but it is observed that 75% of cotton ginning machine are assembled a day. Thus the concern of this paper is to present the ideas which can beused by the industry to reduce its cycle time of theoperations in its assembly line to enhance theefficiency of the system.
  • 3. Dr. Ashok G. Matani, Mohd. Sohail Ansari and Dr. S. K. Doifode http://www.iaeme.com/IJMET/index.asp 399 editor@iaeme.com 3. OBJECTIVE  To identify the operations causing bottle neck in the assembly line.  By using the method study technique, identify the problem work stations in the assembly line.  Develop a method to solve the problem which is causing unnecessary delay in the assembly line.  Conduct time study in the assembly line after implementation of the new method for trial period of 10 days.  Suggest new method to the concern personnel in the organisation. 4. STUDIES AT INDUSTRY  First step is to determine the operation sequence in each work stations on the assembly line.  Observe and identify the cycle time for each operations on all work stations.  It is found that sub assembly of the seed channel of the cotton ginning machine took around 13.92 minutes and the time should be around 10.5 minutes for a trolley in a work station.  The problem associated with present method is that the sub assembly of seed channel fitting or tightening of bolts and nuts on workstation 2 are done manually by spanners and cannot be tightened by the torque wrench due to the design constraint. Thus it is observed that due to this manual operation, the overall work station time of the workstation 2 is around 13.92 minutes which is far greater than the other work stations and also the work station time of station 1 is the least around 3.4 minutes shown in the graph below.  Now it is observed that by loose fitting of seed channels at the workstation 1 and manually tightening of the nut and bolts are done in the workstation 2 can decrease workstation time of station 2 to 9.32 minutes and simultaneously increases the workstation time of station 1 to 7.93 minutes i.e. total decrease in time of 4.6 minutes from station 2 and increase in the same on station 1.  By implementing the new method, line efficiency of the assembly line increases.
  • 4. Synchronizing Assembly Line Operations in Cotton Ginning Industries Towards Reduced Cycle Time http://www.iaeme.com/IJMET/index.asp 400 editor@iaeme.com Figure Assembly Line Layout of the industry Tables for the cycle time and Work Stations Time with sequence of operations before implementation of the new method. WORK STATION 1 Sr. No. Operation Sequence Time consumed in Part assembly (Seconds) 1 Side Frame 94.8 88.3 82.9 2 Cross bar fitting 22 19.8 23.6 3 Rail fitting 81 92 87.5 Total workstation time 195.8 200.1 194 WORK STATION 2 Sr. No. Operation Sequence Time consumed in Part assembly (Seconds) 1 Seed channel 1 fitting 273 266.4 282.3 2 Seed channel 2 fitting 562.2 481.2 533.6 Total workstation time 835.2 747.6 815.9 WORK STATION 3 Sr. No. Operation Sequence Time consumed in Part assembly (Seconds) 1 Back knife fitting 81.6 95.4 88.6 2 Knife holder fitting 87 131.4 112.8 3 Fix knife fitting 9.22 10.2 9.58 4 Seed Guard Jumbo fitting 85.8 72 81.7 Total workstation time 263.2 309 292.68
  • 5. Dr. Ashok G. Matani, Mohd. Sohail Ansari and Dr. S. K. Doifode http://www.iaeme.com/IJMET/index.asp 401 editor@iaeme.com WORK STATION 4 Sr. No. Operation Sequence Time consumed in Part assembly (Seconds) 1 Ratchet fitting 16 21 18.5 2 Side plate fitting 81.6 78.5 86.9 3 Beater assembly fitting 387.6 241 321.3 Total workstation time 485.2 340.5 426.7 WORK STATION 5 Sr. No. Operation Sequence Time consumed in Part assembly (Seconds) 1 Weight lever fitting 136.8 198 169.5 2 Gear box fitting 270 388.8 340.6 Total workstation time 406.8 586.8 510.1 WORK STATION 6 Sr. No. Operation Sequence Time consumed in Part assembly (Seconds) 1 Gear box plate cover fitting 364.8 379.8 353.8 Tables for the cycle time and Work Stations Time with sequence of operations after implementation of the new method. WORK STATION 1 Sr. No. Operation Sequence Time consumed in Part assembly (Seconds) 1 Side Frame 94.8 88.3 82.9 2 Cross bar fitting 22 19.8 23.6 3 Rail fitting 81 92 87.5 4 Seed channel loose fitting 276 282 276 Total workstation time 471.8 482.1 470 WORK STATION 2 Sr. No. Operation Sequence Time consumed in Part assembly (Seconds) 1 Seed channel 1 tightening 135 128.4 144.3 2 Seed channel 2 tightening 424.5 346.2 395.6 Total workstation time 559.2 474.6 539.9
  • 6. Synchronizing Assembly Line Operations in Cotton Ginning Industries Towards Reduced Cycle Time http://www.iaeme.com/IJMET/index.asp 402 editor@iaeme.com W/S 1 W/S 2 W/S 3 W/S 4 W/S 5 W/S 6 w/s time (reading 1) 195.8 835.2 263.62 485.2 406.8 364.8 w/s time (reading 2) 200.1 747.6 309 340.5 586.8 379.8 w/s time (reading 3) 194 815.9 292.68 426.7 510.1 353.8 195.8 835.2 263.62 485.2 406.8 364.8 200.1 747.6 309 340.5 586.8 379.8 194 815.9 292.68 426.7 510.1 353.8 TIME(INSECONDS) WORK STATIONS (W/S) Three readings of all six work stations in assembly line before implemenation of new method w/s time (reading 1) w/s time (reading 2) w/s time (reading 3) w/s 1 w/s 2 w/s 3 w/s 4 w/s 5 w/s 6 w/s 1 (reading 1) 471.8 559.2 263.62 485.2 406.8 364.8 w/s 2 (reading 2) 482.1 474.6 309 340.5 586.8 379.8 w/s 3 (reading 3) 470 539.9 292.68 426.7 510.1 353.8 471.8 559.2 263.62 485.2 406.8 364.8 482.1 474.6 309 340.5 586.8 379.8 470 539.9 292.68 426.7 510.1 353.8 TIME(INSECONDS) WORKSTATIONS Three readings of all six work stations in assembly line after implemenation of new method w/s 1 (reading 1) w/s 2 (reading 2) w/s 3 (reading 3)
  • 7. Dr. Ashok G. Matani, Mohd. Sohail Ansari and Dr. S. K. Doifode http://www.iaeme.com/IJMET/index.asp 403 editor@iaeme.com Cycle time of each operations in the work stations and work station time are given above in the table. Thus by using the above table we can calculate line efficiency of the assembly line.  Number of work stations = 6  Capacity of assembly line = 40 units per shift per day  Total shift time = 480 minutes  Unproductive time or worker allowances = 60 minutes  Actual production time = Total shift time - Unproductive time or worker allowances = 480-60 = 420 minutes.  For full capacity, time required by one workstation for one trolley = Actual production time Capacity of plant = 420 40 = 10.5 minutes  Therefore, line efficiency before implementation of new method = 𝐴𝑐𝑡𝑢𝑎𝑙 𝑝𝑟𝑜𝑑𝑢𝑐𝑡𝑖𝑜𝑛 𝑡𝑖𝑚𝑒 𝑛𝑢𝑚𝑏𝑒𝑟 𝑜𝑓 𝑤𝑜𝑟𝑘𝑠𝑡𝑎𝑡𝑖𝑜𝑛𝑠 × 𝑙𝑎𝑟𝑔𝑒𝑠𝑡 𝑤𝑜𝑟𝑘𝑠𝑡𝑎𝑡𝑖𝑜𝑛 𝑡𝑖𝑚𝑒 = 420 6 ×13.92 = 50.28 %  Line efficiency after implementation of new method = 420 6 × 9.78 = 71.57 % Thus by implementing line new method, line efficiency increases from 50.28% to 71.57%. 195.8 200.1 194 471.8 482.1 470 0 100 200 300 400 500 600 w/s 1 (reading 1) w/s 2 (reading 2) w/s 3 (reading 3) time(inseconds) workstation 1 readings comparision of the workstation 1 before and after implementation of new method w/s time before improvement w/s time after improvement
  • 8. Synchronizing Assembly Line Operations in Cotton Ginning Industries Towards Reduced Cycle Time http://www.iaeme.com/IJMET/index.asp 404 editor@iaeme.com 835.2 747.6 815.9 559.2 474.6 539.9 0 100 200 300 400 500 600 700 800 900 w/s 1 (reading 1) w/s 1 (reading 2) w/s 1 (reading 3) time(inseconds) workstation 2 readings comparision of the workstation 2 before and after implementation of new method w/s time before improvement w/s time after improvement
  • 9. Dr. Ashok G. Matani, Mohd. Sohail Ansari and Dr. S. K. Doifode http://www.iaeme.com/IJMET/index.asp 405 editor@iaeme.com It can be seen and compared from the above two graphs that the workstation time of workstation 1 is increased and workstation time of w/s 2 is decreased by changing the operation in the process sheetand thus reducing w/s time of the workstation 2. 5. CONCLUSIONS The results can be concluded that the time required to complete the sub assembly of seed channel in the work station -2 is reduced to 9.32 minutes from 13.92 minutes. Percentage decrease in time by above study is = 13.92−9.32 13.92 × 100 = 33.05 % Thus the productivity of the assembly line of the cotton ginning machine is improved and the line efficiency are increased by the application of work study and change in operation in the process sheet. REFERENCES [1] Ashish Kalra, Sachin Marwah, Productivity improvement in assembly line of automobile industry by reducing cycle time of operations, International Journal of Engineering Research & Technology, 5(5):28-31. [2] Swapnil T. Firake, Dr. K. H. Inamdar, Productivity improvement of automotive assembly line through line balancing, International Journal of Technical Research and Applications, 2(3):124-128. [3] Cengiz Durana, Aysel Cetindereb, Yunus Emre Aksuc, Productivity improvement by work and time study technique for earth energy-glass manufacturing company, 4th World Conference on Business, Economics and Management, WCBEM, Science Direct, Procedia Economics and Finance 26(2015) ,pp 109 – 113.
  • 10. Synchronizing Assembly Line Operations in Cotton Ginning Industries Towards Reduced Cycle Time http://www.iaeme.com/IJMET/index.asp 406 editor@iaeme.com [4] Mayourshikha Pancholi (Bhatnagar), Productivity improvement in chassis assembly line of automative industry by using work study methods, International Journal of Engineering Sciences & Research Technology, pp 454-459. [5] Shamuvel V.Pandit, Sunil J Kadam, Avinash Kharat, Chetan U Nayakawade, Productivity improvement by application of line balancing, International Journal of Innovative Research in Science, Engineering and Technology, 3(4):11495-11502. [6] Nikhil Verma, Pulkit Trivedi, Vivek Agnihotri, Productivity Improvement in assembly line of an automobile industry, IOSR Journal of Mechanical and Civil Engineering (IOSR- JMCE), 12(4): 01-06. [7] Dr. A. G. Matani, (2006), Improving water use efficiency by effective water conservation techniques, Indian Journal of Environmental Protection, 26(3):260-264. [8] Dr. A.G. Matani, S. K. Doifode, (2015), Effective industrial waste utilization technologies towards cleaner environment, International Journal of Chemical and Physical Sciences, 491(1): 536-540. [9] Dr . A.G. Matani,(2006), Strategies for better waste management in industrial estates, Journal of Industrial Pollution Control, 22(1): 67-72. [10] Dr. S. K. Doifode Dr. A. G. Matani (2015), Advanced environment protection techniques by industries: potential for corporate social responsibility activities, Journal of The International Association of Advanced Technology and Science, 15(3):1-8 [11] P Saurabh Jha and Mohd Salman Khan. An Experimental Study on the Automotive Production Line Using Assembly Line Balancing Techniques. International Journal of Mechanical Engineering and Technology, 8(3), 2017, pp. 22– 33 [12] Madasamy alias PrabuNivas.C, Venkatesh. J and Kannan. K, Implementation of Special Product & Process Characteristic (Sppc) in A Clutch Cover Assembly Line, International Journal of Mechanical Engineering and Technology, 9(11), 2018, pp. 1025–1034 [13] S.K. Gupta , Dr. V.K. Mahna , Dr. R.V. Singh and Rajender Kumar, Mixed Model Assembly Line Balancing: Strategic Tool to Improve Line Efficiency in Real World, International Journal of Industrial Engineering Research and Development (IJIERD), Volume 3, Issue 1, January- June (2012), pp. 58-66 [14] K. Parthiban, M. Kumaresan, M. Shantharaj and N.M. Vijay Aravindhan, Reducing the Run out Defect in Cover Assembly Line of Clutch Plate, International Journal of Mechanical Engineering and Technology, 9(11), 2018, pp. 1042–1050.