Primary Learning Objectives:
· Experience the steps in a typical purchasing transaction
· See how an ERP system handles a typical purchasing
transaction
The objective of this assignment is for you to become familiar
with the steps and the documents involved in a typical
purchasing transaction and also investigate how the SAP system
operates for this type of transaction. We will be using the
financial accounting (FI) and the materials management (MM)
modules of SAP. We start by creating the master data in the
system. We create master data for a new material and a new
vendor and then link these together using an information record.
After that we run through a transaction in which we purchase
the material we just created from the vendor we also just
created. As the various steps of the purchase are recorded in
SAP, we will ask you to answer some questions about what is
occurring.
Keep in mind that this business process is normally done by
more than one person in order to properly segregate duties and
maintain authorization controls. However, in this exercise you
will do all of the steps from your individual SAP logon.
You will perform the following tasks:
Create a material master
Create a vendor master
Create an information record to link the vendor and material
Create a purchase order for the material
Receive the material
Receive the invoice from the vendor
Make payment to the vendor
For all of the following work you will use your own company
code. This company code is based on the SAP number assigned
to you (see Blackboard grades). Whenever you see the value
XX in the assignment you will substitute your assigned SAP
number. Be sure to use only your assigned SAP number.
Step 1: Create a Material Master record for a Trading Goods
The material master record contains all the data required to
define and manage a material. In SAP this is formally part of
the Materials Management (MM) module. However, some
important accounting information is also contained within this
record. For example, product cost and pricing information and
also tax information are contained within the material master
record.
The master record consists of individual views and the
individual views are presented in the form of tabbed pages.
These views are organized on a functional or departmental
basis. Each department has its own view that permits easy
access and maintenance. In other words, data is integrated from
engineering, manufacturing, sales and distribution, purchasing,
accounting and other departments. This master data is used as a
source of data for purchase order processing throughout the
procurement cycle. For simplicity, we are ordering a trading
good that we will subsequently sell. Trading goods are items
that we purchase for resale. There are other types of goods such
as raw materials that are used to manufacture finished products.
The product that we are going to purchase is an aerodynamic
bicycle helmet.
Just a reminder: When you see an “XX” enter your assigned
SAP number.
Logistics Materials Management Material Master Material
Create (Special) Trading Goods (MMH1)
Create Finished Product (Initial Screen)
Field
Input
Material Number
AeroHelmXX (XX = assigned number)
Industry Sector
Retail
Click on the Select Views button on the application tool bar
Select the following views:
· Basic Data 1
· Accounting 1
Click on the Continue Icon
Organization Level pop-up window
Field
Input
Plant
DLXX
Storage Location
TGXX
Click on the Enter Icon
Basic Data 1:
Field
Input
Material description
Aerodynamic Helmet XX
Base Unit of Measure
EA
Material Group
SFTY
Gross Weight
1
Weight Unit
LB
Net Weight
1
Looking at both the Dimensions/EANs and the Packaging
Material Data tabs answer the following question.
1.1 The Basic Unit of Measure is EA (which stands for Each or
individual units). Look at the other units of measure and give
three different examples of what types of products may use
these types of unit of measure. (Hint: Look at the possible
values and the definitions of the fields. There are lots of them,
but you only need to select three of them and give an example.)
_____________________________________________________
________________________
Click on the Enter Icon
Purchasing:
Field
Input
Purchasing Group
NXX
The purchasing group represents the people in the purchasing
department of the company assigned to purchase specific types
of products. In a real company there are specialists that are
very knowledgeable about a group of products and the vendors
who sell those products.
1.2 GBI is a bicycle manufacturer who supplies all of the
different types of products involved in cycling including
products they purchase from other manufacturers. Explain what
type of specialization buyers may have at GBI.
Click on the Enter Icon
Plant Data/Storage 1
· No information is needed here. However, look at the data on
this tab.
Looking at the various items under the Shelf life data tab
answer the following question.
1.3 While this tab does not apply to our aerodynamic helmet
explain how it would be used for other products. Again, give an
example of products for which this data would be very
important.
_____________________________________________________
________________________
Click on the Enter Icon
Accounting 1:
Field
Input
Valuation class
3100
Price Control
S
Moving Price
80
Standard Price
80
The SAP terminology is a little confusing in this part of the
process. What we would normally term cost, they term price.
That is, by their terminology price (not cost) is what we paid
for the good.
The price control of S means that the company is using standard
costing with the standard cost you entered of $80. The moving
price is the moving average price that is calculated by averaging
the costing of the good (what they actually paid for the good)
over a specific period of time. The standard cost is a constant
cost used by the company and is used in many ways to measure
the performance of the company with respect to this good. You
will learn more about this in your managerial accounting class.
1.4 Why is it very important for the company to know how
much the good costs?
_____________________________________________________
________________________
· Click on the Enter Icon
· Click on “Yes” when asked to Save
Write down the message on the status bar.
___________________________________
Step 2: Create a Vendor Master record (we will buy the finished
product from this vendor)Logistics Materials Management
Purchasing Master Data Vendor Central Create (XK01)
On the Create Vendor: Initial Screen
Field
Input
Vendor
A999XX (XX = assigned number)
Company code
USXX
Purchasing organization
USXX
Account group
LIEF
· Click on the Enter Icon
On the Create Vendor: Address
Field
Input
Title
Company
Name
Brain_Buckets_XX
Search term
XX (assigned number)
Street address
Glenn 304
Postal code
95929
City
Chico
Country
US
Region
CA
Language
English
2.1 Near the very bottom of the screen there is a field for
Standard Comm. Mtd. Why could this be a very important piece
of information to have?
_____________________________________________________
______________
· Click the Next Screen icon or Enter icon to go to next view
On the Create Vendor: Control
· No Information needs to be entered
· Click on the Next Screen icon or on enter icon
On the Create Vendor: Payment Transactions
· No Information needs to be entered
· Click on the Next Screen icon or on enter icon
On the Create Vendor: Contact Person
· No Information needs to be entered
· Click on the Next Screen icon or on enter icon
On the Create Vendor: Accounting Information Accounting
Field
Input
Rec. Account
300000
Sort Key
001 (posting date)
Cash mgmnt group
A1 (domestic pmt.)
The reconcilation account (Recon. Account) is a very important
account, since this is where we track how much we owe each
specific vendor. At the end of this assignment you will be
asked to check this vendor’s account to be sure that we have
paid our bill in full.
· Click the Next Screen icon or enter icon to go to next view
On the Create Vendor: Payment Transactions Accounting
Field
Input
Payment terms
0001
2.2 What are the payment terms for this vendor? What type of
payment discount do we get?
_____________________________________________________
___________________
· Click on the page arrow icon
On the Create Vendor: Correspondence Accounting
· No information needs to be entered
2.3 Explain what dunning is and how it would be used. (Hint:
You may have to look this up on the Internet.)
_____________________________________________________
___________________
· Click on the Next Screen icon
On the Create Vendor: Purchasing Data
Field
Input
Order currency
USD
Payment terms
0001
On the Create Vendor: Partner Function
· No data needs to be entered
· Click on Save icon to save the data.
Write down the message on the status bar.
____________________________________
The creation of a material and a vendor would allow us to order
those goods from that vendor. However, as an additional
control, we can define the relationship between the good and the
vendor. In SAP this is done by creating an information record.
That is the next step in the process.
Step 3: Create an Information record for Vendor/Material
Logistics Materials Management Purchasing Master Data
Info Record Create (ME11)
Field
Input
Vendor
A999XX
Material
AeroHelmXX
Purchasing Org.
USXX
Plant
DLXX
Click on Enter Icon to continue.
On Create Info Record: General Data screen, click on Purch.
Org. data 1 button
On Create Info Record: Purch. Org. data 1 view, enter
Field
Input
Pl.Deliv.Time
2 (days)
Purch. group
NXX
Standard qty.
10
Minimum qty
5
Net price
80
The above data defines the relationship between the material
and the vendor.
3.1 Explain how the above data can be a strong control in the
purchasing process.
_____________________________________________________
_____________________
_____________________________________________________
_____________________
· Click on Save icon to save the data.
Write down the Information record number shown on the status
bar. ______________________
Step 4: Create a Purchase Order to buy the Finished Product
LogisticsMaterials ManagementPurchasing Purchase
OrderCreate Vendor/Supplying Plant Known (ME21N)
On the Create Purchase Order screen:
Field
Input
(Field) (will be defaulted)
Standard purchase order
Vendor
A999XX
Document date
Today’ date
Note: If the screen looks like the following, click on Header
and Item Overview icons to expand those areas.
When you expand your view, an error message may tell you to
enter the organizational data and redirect you to the Org. Data
page. If you are not redirected to the org. data page, click on the
Org. Datatab page, enter the following data:
Field
Input
Purchasing org.
USXX
Purchasing group
NXX
Company code
USXX
Click on Enter
Enter the following data under item overview area:
Field
Data
Material
AeroHelmXX
P.O. Quantity
10
Delivery date
Today’s date
Plant
DLXX
Storage location
TGXX
You need to scroll to the right to find the Plant and Storage
location fields.
You may get warnings about the dates. Just Click on Enterto
get by them.
Click on Enter .
4.1 When you click on enter, the description of the material,
unit of measure and price will be filled in. Where did this data
come from?
_____________________________________________________
_________________________
Click on Save .
This is very important!
Write down the purchase order number shown on the bottom of
the screen. ___________________
Step 5: Receive the Product from the Vendor
Logistics Materials Management Inventory Management
Goods Movement Goods Receipt For Purchase Order PO
Number Known. (MIGO)
Goods Receipt Purchase Order <User> screen appears.
Field
Input
Purchase Order
Purchase order # from step 4 above
Delivery Note
XX
Click on Enter and all the data will be copied from the purchase
order
Select Item OK box to confirm the receipt. (this is at the
bottom of the screen)
Click on Enter
Click on Save .
Write down the material document number
___________________.
Step 6: Receive the Invoice from the Vendor
Logistics à Materials Management à Purchasing à Purchase
Order à Follow-on Functions à Logistics Invoice
Verification(MIRO)
Field
Input
Invoice date
Today’s date
Posting date
Today’s date
Under Basic Data tab
Purchase Order/Scheduling Agreement
Purchase order # from step 4
Click on Enter , the information will be copied from the
purchase order to the invoice
· Enter Amount (in Basic data tab) same as the Amount shown
in the line item.
Click on Enter , the Balance should be 0.00 and the light should
be green.
Click on Post (Save).
Write down the invoice number ___________________.
Step 7: Make the Payment by Cash to the Vendor
Accounting à Financial Accounting à Accounts Payable à
Document Entry à OutgoingPayment à Post(F-53)
Field
Input
Document Date
Today’s date
Posting Date
Today’s date
Company Code
USXX
Currency/Rate
USD
Under Bank Data area
Account
100000 (Bank Account)
Amount
Amount of payment
Under open item selection area
Account (the vendor number)
A999XX
Automatic search
Select
Click on Process Open Items Button
The Not Assigned amount should be 0.00 .
Post (Save) the transaction.
Write down the document
number.____________________________
Step 8: Check Status of the Transaction
As the final step you will examine the inventory of your good
and the amount you owe the vendor.
To check inventory go to transaction code MMBE and enter
your information for your good.
Click of the execute button .
8.1 How much inventory do you have?
Leave that transaction and enter transaction code FBL1N. This
tells you how much money you owe the vendor. Enter your
vendor (A999XX) and select the Cleared Items radio button in
the middle of the screen under the Line Item Selection tab.
Click of the execute button .
8.2 How much do you owe your vendor?
Assignment Submission
Place your answers on the abbreviated form of this assignment
that is provided to you. The assignment is due on Thursday
September 25, 2014. Be sure to submit your answers both
electronically to Blackboard in the Assignment 3 folder and in
hardcopy form.
BSIS 105 – Assignment 3
BSIS 105 – Assignment 3
Implementation Plan Template
CMGT/445 Version 5
1
Implementation Plan
University of Phoenix Material
Implementation Plan Template
Use the following template to create your implementation plan
in Week Four.
Project Name or Identification: T-shirt Company Startup
Business
Project Stakeholders
· Romero Edwards
· Owner, CEO, and manager
· romeroedwards93yahoo.com
Project Description
· Background
Identity is one of the key features that any entity, group or
individual may have. There are different ways of developing
identity and each may be used in different ways. After carrying
out research on the trends that have been able to survive the
changes in time, I have discovered that branded t-Shirts are top
in that category. It is against this backdrop that I came up with
the black and white youth T-Shirt as a symbol for youths from
all races gender religion and career to identify with the current
generation. The information contained in this paper explains
how I shall use virtual and online markets to ensure that the
brand has been sold across the globe.
· Description of the challenge or opportunity
Challenge
There are different challenges that the brand may face once it
enters into the market. The first challenge is the challenge of
the established brands that are already selling in the market.
Two of the most selling brands include Nike and Fila. These
two brands have dominated clothing industry especially for
casual wear t-shirts. The model of marketing used by these
companies is able to reach out to many people. The companies
have been sponsoring different sports events, branding
community development initiatives and other forms of
marketing that involve reaching out to the people.
The other challenge that the brand may face is time taken to
establish the brand. The market at times is slow to accept new
products due to the fear on their quality and the unseen future.
This is especially a challenge to small enterprises which depend
on the revenue from the new product for them to have a going
concern. This requires the marketing material to be persuasive
enough in order to lure the customers and change the market
preference.
The other challenge that the brand shall face is the rating of the
marketing items on the Google marketing platform. One of the
features that are linked with Google marketing is peer rating.
The feature allows other persons who are using the platform to
rate brands. A brand which receives high rating is viewed to be
preferable and this may change the perception that the
consumers will have on the product. This in return will affect
the preference that the products will have once it hits the
market.
Opportunities
The first major opportunity that the brand has is the theme that
it passes. The T Shirts pass a message of tolerance amongst
people from different racial and religion backgrounds. This is a
convenient message especially in the twenty first century when
there are concerted efforts to fight any racial discrimination.
The fight against racism is convenient for sportsmen, office
based careers, technical workers and government officials
internationally.
The other opportunity that the brand has is the appeal to the
youth. As the paper elaborates in sections below, the T-Shirts
shall be holding names that portray the chances in patterns that
affects the youth in the last year. This shall change every year
and thus every youth shall be looking upon the next set of T-
Shirts and thus demand shall be high each year. The team shall
allow the youth to participate in developing the brand for the
year through internet platforms. Indeed, Google marketing
offers opportunity for customers to give their feedback on the
views they have on the product. This is the feature that the
marketing team shall use to gather details on the items that the
youth would wish included in the succeeding year’s T-Shirt.
Also, the marketing platform presents the brand with an
opportunity of stealing the global show through Google
Marketing. Google marketing can be viewed from any remote
computer which has internet connections globally through the
World Wide Web. Thus, the product can go viral within the
same day that it is floated to the market. This may even
overwhelm the production department of the organization.
· Overview of the desired impact
· Global impact: using Google marketing allows the brand to get
the attention of the international market. This is vital in the
optimization of company’s potential. The company targets the
international customer base and use of Google marketing helps
in attaining such a market.
· Wide market on first roll out: it is a common tradition for
companies to start small and grow big. However, internet based
marketing helps companies to roll out at medium level. While
the level of marketing may be a consideration, with enough
capital, internet based marketing can be vital in developing a
wide customer base at the first roll out.
· Passing out the message: while making high sales is one aim
of the brand development, the brand development also seeks to
pass out an antiracist message to the customers. This is
expected to change the level of thinking to include more
tolerant views. The success of this campaign can be easily
transformed into success of the organization since the customers
can be lured to buy products of the company that facilitated the
noble course.
Measurable Organizational Value (MOV)
· Project’s overall goal and measure of success
The overall goal of the project is to present the market with a
new design of t shirt while at the same time pass the antiracism
message. This shall include development of a common voice to
the youth against racists and adding up their voices to the
international fight against racism. The following items shall be
used to measure success of the project
· Rating by other users of Google marketing: as noted earlier in
this paper, other users are allowed to describe their ratings on
the brands that are marketed on Google marketer. While it is
hard to know the real intention of the persons making the rating
(since there are chances of down rating by malicious persons or
overrating by persons who are unrealistic and only wish to
prove the marketer rights), the platform can always be used as a
sampling ground for the acceptance or otherwise that the
product shall have once it is released to the market.
· Visits and revisits of product online profile: a brand that is
built using strong visual features will have high number of
visits on its online profile (on Google marketing website.
· Number of recommendations from online viewers: Google
marketing allows users to recommend other persons who hold
Google accounts products and brands which are portrayed
through Google marketing. A preferred brand will have high
number of recommendations.
· Online based sales: since Google is an online based marketing,
online based sales can be directly linked to it. Successful online
based marketing will lead to high online based sales.
· What elements of the project provide value to the
organization?
Elements of the project that would provide value to the
organization include;
· Company brand; brand which passes right message to the
people
· The anti-racists campaign: many people would be interested in
joining the global course which has all the right attitudes
· Use of internet marketing; virtual markets are the modern
forms of marketing and this shows that the organization
embraces technological developments.
· Real time requisitions: customers always are glad where they
can be able to source hoods and services from online sources
and be allowed to place their requisitions online and real-time.
This includes provision for electronic money transfer which
would increase the level of communication between the
producer and the consumer. This also reduces the number of
middlemen between the producer and the consumer.
· ROI (return on investment) and cost versus benefit
Google marketing has one of the special features where the
company does not have a fixed cost for the advertisements. The
company allows the advertiser to come up with maximum
budget for the day and the price for each click. The budget may
be scaled up or down according to the advertising needs of the
brand that is being advertised. The marketing method thus
leaves the marketer to come up with the flexible budget. Thus,
the marketing shall not be expensive. Other costs include
· Hosting an organization’s website
· Cost of broadband connectivity
· Cost of designing the t shirts and the website.
The benefits are similar to achievement of goals that have been
outlined in earlier sections of this paper
· Statement or table format
Project Scope
· What will be included in the scope of this project?
The project shall include the following features
· Branded T-Shirts that shall be marketed over Google
marketing
· Videos for promoting the T-shirts
· Web-link to organization website
· Web loins to products webpage on the company’s website
· A guide which shall answer frequently asked questions about
the brand
· An open letter inviting all users of Google marketing to trade
· The features to identify the organization like logo and theme
colors
· What will be considered outside the scope of this project?
The organization will also consider
· Marketing complementary products like shoes and caps
· Use of newspaper and magazine captions citing quality of the
products
· What are the project’s main deliverables?
The project’s main deliverable is high sales. You cannot market
if you are certain that the amount from sales won’t be sufficient
to meet the marketing needs.
· Provide a statement and description.
The product being marketed is a branded T-shirt which carries
important information against racism and which calls for unity
of young men internationally.
Project Schedule Summary
· Project start date: January 2015
· Project end date: December 2015
· Timeline of project phases and milestones:
January
- T Shirt design, development videos and development of
website
February
- rolling out the online campaign
March – April
-campaigning for the link and mobilizing friends to visit the ad
and rate it
May- December
- online sales and marketing intensifies
December
- winding up the project
· Project reviews and review dates
Reviews shall be done within the last four days of every month.
Review shall be done by professional and independent marketer
Project Budget Summary
· Total project budget
· Budget broken down by phase
Quality Issues
· Specific quality requirements
While there are no specific standards for branding materials,
some quality requirements shall be required for this project
· Broadband connectivity which shall support round the clock
connections
· A site which shall allows viewing of same data by multiple
users at the same time from different locations
· A brand that cannot easily pass as a replica of other brands in
the market.
Resources Required
· People: the members of the organization shall campaign for
the product using word of mouth and on their social media
pages
· Technology: cloud connectivity for database, and broadband
connection
· Facilities: server which shall be used to update the project,
office space, and desks
· Other : licenses and certification, strong organization culture
and processes
· Resources to be provided
Resource
Name of resource provider
Date to be provided
Office space
land lord
immediately
Office furniture
purchases department
by January
Computer and other devices
purchases department
by January
Broad band connectivity
IT analyst
by February
Assumptions and Risks
· Assumptions used to develop estimates
· That inflation shall not change
· That prices shall not hike by more than 10% of current costs
· Key risks, probability of occurrence, and impact
· Risks
· Products not being viewed on Google marketing
· Dominant companies carrying out a similar campaign
· Malicious copy of brand features
Probabilities
There is a probability that the market will find the message too
rhetoric and thus shun the products
Also, there is probability that the estimated daily budget will
not fit the customers wishing to visit the site
· Organizational or time constraints
· The project has to be delivered within one year
· Risks of not doing this project
· If this project is not done, persons who shall benefit from it
(through reduction of racisms) shall not have benefitted
· Assess dependencies on other projects or areas within or
outside the organization
The project shall highly depend on the efficiency of
computerized system in organization, high data activity
supported by broadband connections and the selection of Google
search engine over other search engines by the target customers
· Assessment project’s impact on the organization
· The project will lead to globalization of organization though
international customer reaching out
· Outstanding issues
· No outstanding issues are being experienced currently
· Formulation of key project risk mitigation strategies
Project Administration
· Communications plan: through social media and automated
emails to other consumers
· Scope management plan: hierarchical order within marketing
and sales team utilized.
· The change control process: strategic management plan used
to change control process
· Quality management plan: a specific plan shall be made to
include the salient features of online marketing
· Testing procedures related to the implementation
The project shall be tested by mock clicks from company’s
offices to determine whether the links are working and also to
justify whether Google is charging for extra clicks or for real
clicks
· Change management plan: use of change managers to manage
shift o online marketing
· Human resources plan: the main human resource plan shall
involve staff members involved in the day to day maintenance
of the website.
Implementation and Continued Maintenance and Project Closure
Plan
· What data or existing format will need to be changed?
· Information on t-shirts changed annually
· Company product website to include features of the new
product
· What production systems will be handled?
· The new product segment will require to be handled. This
shall be development of T-shirts
· What downtime will be needed?
· At least 3mg/s for the website
· How will the integration be communicated?
· Through the integrated systems using the organization’s
database
· How will the new system be deployed (pilot, phased, parallel,
plunge, and so on)?
· Test shall be done through pilot program the implementation
done phase by phase
· Support and maintenance
The following support shall be offered throughout the project
period
· Technical, user, and system training documentation
· The IT analyst shall provide all technical support
· All server staff shall be trained on handling data from the
project
· A copy documentation for the project shall be sent to each
staff member’s email
· System support roles and functions
· To ensure continues service delivery
· To ensure that the system does not fail
· To ensure speedy delivery of services to the consumers
· To deal with increased online sales due to online marketing
success.
· To increase comprehension of new system in the organization
· To reduce ambiguity on the project within the organization
· Project closure
The project shall be closed on the twelve month
Acceptance and Approval
· Romero Edwards 19 September 2014
· The implementation plan approval process has been approved
by the owner Romero Edwards
References
Calkins, T. (2012). Breakthrough marketing plans: How to stop
wasting time and start driving
growth. , : Macmillan.
Ferrell, O. C., & Hartline, M. (2012). Marketing strategy. , :
Cengage Learning.
Nijssen, E. J., & Frambach, R. T. (2001). Creating customer
value through strategic marketing
planning: A management approach. Boston, : Springer Science
& Business Media.
Pride, W., & Ferrell, O. C. (2004). Marketing. Boston, :
Cengage Learning
Appendices (as necessary)
The budget is appendices in excel
Copyright © 2013 by University of Phoenix. All rights reserved.
3
2
(
BSIS 105
Assignment
3
Purchasing Example Using SAP ERP
Abbreviated Hand
In
Version
) Your Name: _________________________ SAP #:
_____
Step 1: Create a Material Master record for a Trading Goods
1.1 The Basic Unit of Measure is EA (which stands for Each or
individual units). Look at the other units of measure and give
three different examples of what types of products may use
these types of unit of measure. (Hint: Look at the possible
values and the definitions of the fields. There are lots of them,
but you only need to select three of them and give an example.)
_____________________________________________________
________________________
1.2 GBI is a bicycle manufacturer who supplies all of the
different types of products involved in cycling including
products they purchase from other manufacturers. Explain what
type of specialization buyers may have at GBI.
1.3 While this tab does not apply to our aerodynamic helmet
explain how it would be used for other products. Again, give an
example of products for which this data would be very
important.
_____________________________________________________
________________________
1.4 Why is it very important for the company to know how
much the good costs?
_____________________________________________________
________________________
Step 2: Create a Vendor Master record (we will buy the finished
product from this vendor)
2.1 Near the very bottom of the screen there is a field for
Standard Comm. Mtd. Why could this be a very important piece
of information to have?
_____________________________________________________
______________
2.2 What are the payment terms for this vendor? What type of
payment discount do we get?
_____________________________________________________
___________________
2.3 Explain what dunning is and how it would be used. (Hint:
You may have to look this up on the Internet.)
_____________________________________________________
___________________
Write down the message on the status bar.
____________________________________
Step 3: Create an Information record for Vendor/Material
3.1 Explain how the above data can be a strong control in the
purchasing process.
_____________________________________________________
_____________________
_____________________________________________________
_____________________
Write down the Information record number shown on the status
bar. ______________________
Step 4: Create a Purchase Order to buy the Finished Product
4.1 When you click on enter, the description of the material,
unit of measure and price will be filled in. Where did this data
come from?
_____________________________________________________
_________________________
This is very important!
Write down the purchase order number shown on the bottom of
the screen. ___________________
Step 5: Receive the Product from the Vendor
Write down the material document number
___________________.
Step 6: Receive the Invoice from the Vendor
Write down the invoice number ___________________.
Step 7: Make the Payment by Cash to the Vendor
Write down the document
number.____________________________
Step 8: Check Status of the Transaction
8.1 How much inventory do you have?
8.2 How much do you owe your vendor?
Assignment Submission
Place your answers on the abbreviated form of this assignment
that is provided to you. The assignment is due on Thursday
September 25, 2014. Be sure to submit your answers both
electronically to Blackboard in the Assignment 3 folder and in
hardcopy form.
BSIS 105 – Assignment 3
BSIS 105 – Assignment 3

More Related Content

Similar to SAP purchasing assignment overview

Material master views
Material master viewsMaterial master views
Material master viewsLokesh Modem
 
Devry bis 155 final exams
Devry bis 155 final examsDevry bis 155 final exams
Devry bis 155 final examsshyaminfo104
 
Material determination
Material determinationMaterial determination
Material determinationmadhu jetty
 
SAP MM Training in Chennai Demo Part-2
SAP MM Training in Chennai Demo Part-2SAP MM Training in Chennai Demo Part-2
SAP MM Training in Chennai Demo Part-2Thecreating Experts
 
Sales Process And Mrp
Sales Process And MrpSales Process And Mrp
Sales Process And MrpKiril Iliev
 
ContentsPhase 1 Design Concepts2Project Description2Use.docx
ContentsPhase 1 Design Concepts2Project Description2Use.docxContentsPhase 1 Design Concepts2Project Description2Use.docx
ContentsPhase 1 Design Concepts2Project Description2Use.docxmaxinesmith73660
 
Sap fico interview questions
Sap fico interview questionsSap fico interview questions
Sap fico interview questionsmanishk93
 
Elshayeb Oracle R12 Order Management
Elshayeb Oracle R12 Order ManagementElshayeb Oracle R12 Order Management
Elshayeb Oracle R12 Order ManagementAhmed Elshayeb
 
Final Project Python - Elyada Wigati Pramaresti.pptx
Final Project Python - Elyada Wigati Pramaresti.pptxFinal Project Python - Elyada Wigati Pramaresti.pptx
Final Project Python - Elyada Wigati Pramaresti.pptxElyada Wigati Pramaresti
 
Check printing in_r12
Check printing in_r12Check printing in_r12
Check printing in_r12Rajesh Khatri
 
Fico interview quetions
Fico interview quetionsFico interview quetions
Fico interview quetionsneerukonda
 
Ficointerviewquestionsandanswers
FicointerviewquestionsandanswersFicointerviewquestionsandanswers
Ficointerviewquestionsandanswerskaran bhagat
 
Ficointerviewquestionsandanswers
FicointerviewquestionsandanswersFicointerviewquestionsandanswers
FicointerviewquestionsandanswersSatyaranjan Swain
 
Fico interview questions and answers
Fico interview questions and answersFico interview questions and answers
Fico interview questions and answersProcessweaver Hr
 
Assignment johnson
Assignment johnsonAssignment johnson
Assignment johnsonJohnson Minj
 
procurement database model -documentation-draft-20150515
procurement  database model -documentation-draft-20150515procurement  database model -documentation-draft-20150515
procurement database model -documentation-draft-20150515Rawntech Mak
 
Chapter 03 Financial Accounting Exerc.docx
Chapter 03 Financial Accounting Exerc.docxChapter 03 Financial Accounting Exerc.docx
Chapter 03 Financial Accounting Exerc.docxtidwellveronique
 

Similar to SAP purchasing assignment overview (20)

Material master views
Material master viewsMaterial master views
Material master views
 
Devry bis 155 final exams
Devry bis 155 final examsDevry bis 155 final exams
Devry bis 155 final exams
 
Material determination
Material determinationMaterial determination
Material determination
 
SAP MM Training in Chennai Demo Part-2
SAP MM Training in Chennai Demo Part-2SAP MM Training in Chennai Demo Part-2
SAP MM Training in Chennai Demo Part-2
 
Fico notes
Fico notesFico notes
Fico notes
 
Sales Process And Mrp
Sales Process And MrpSales Process And Mrp
Sales Process And Mrp
 
Data warehousing
Data warehousingData warehousing
Data warehousing
 
ContentsPhase 1 Design Concepts2Project Description2Use.docx
ContentsPhase 1 Design Concepts2Project Description2Use.docxContentsPhase 1 Design Concepts2Project Description2Use.docx
ContentsPhase 1 Design Concepts2Project Description2Use.docx
 
Sap fico interview questions
Sap fico interview questionsSap fico interview questions
Sap fico interview questions
 
Elshayeb Oracle R12 Order Management
Elshayeb Oracle R12 Order ManagementElshayeb Oracle R12 Order Management
Elshayeb Oracle R12 Order Management
 
Final Project Python - Elyada Wigati Pramaresti.pptx
Final Project Python - Elyada Wigati Pramaresti.pptxFinal Project Python - Elyada Wigati Pramaresti.pptx
Final Project Python - Elyada Wigati Pramaresti.pptx
 
Check printing in_r12
Check printing in_r12Check printing in_r12
Check printing in_r12
 
Fico interview quetions
Fico interview quetionsFico interview quetions
Fico interview quetions
 
Ficointerviewquestionsandanswers
FicointerviewquestionsandanswersFicointerviewquestionsandanswers
Ficointerviewquestionsandanswers
 
Ficointerviewquestionsandanswers
FicointerviewquestionsandanswersFicointerviewquestionsandanswers
Ficointerviewquestionsandanswers
 
Fico interview questions and answers
Fico interview questions and answersFico interview questions and answers
Fico interview questions and answers
 
Assignment johnson
Assignment johnsonAssignment johnson
Assignment johnson
 
11 job costing
11 job costing11 job costing
11 job costing
 
procurement database model -documentation-draft-20150515
procurement  database model -documentation-draft-20150515procurement  database model -documentation-draft-20150515
procurement database model -documentation-draft-20150515
 
Chapter 03 Financial Accounting Exerc.docx
Chapter 03 Financial Accounting Exerc.docxChapter 03 Financial Accounting Exerc.docx
Chapter 03 Financial Accounting Exerc.docx
 

More from hyacinthshackley2629

Your company nameYour nameInstruction Page1. O.docx
Your company nameYour nameInstruction Page1. O.docxYour company nameYour nameInstruction Page1. O.docx
Your company nameYour nameInstruction Page1. O.docxhyacinthshackley2629
 
Your Company NameYour Company NameBudget Proposalfor[ent.docx
Your Company NameYour Company NameBudget Proposalfor[ent.docxYour Company NameYour Company NameBudget Proposalfor[ent.docx
Your Company NameYour Company NameBudget Proposalfor[ent.docxhyacinthshackley2629
 
Your company recently reviewed the results of a penetration test.docx
Your company recently reviewed the results of a penetration test.docxYour company recently reviewed the results of a penetration test.docx
Your company recently reviewed the results of a penetration test.docxhyacinthshackley2629
 
Your company wants to explore moving much of their data and info.docx
Your company wants to explore moving much of their data and info.docxYour company wants to explore moving much of their data and info.docx
Your company wants to explore moving much of their data and info.docxhyacinthshackley2629
 
Your company plans to establish MNE manufacturing operations in Sout.docx
Your company plans to establish MNE manufacturing operations in Sout.docxYour company plans to establish MNE manufacturing operations in Sout.docx
Your company plans to establish MNE manufacturing operations in Sout.docxhyacinthshackley2629
 
Your company just purchased a Dell server MD1420 DAS to use to store.docx
Your company just purchased a Dell server MD1420 DAS to use to store.docxYour company just purchased a Dell server MD1420 DAS to use to store.docx
Your company just purchased a Dell server MD1420 DAS to use to store.docxhyacinthshackley2629
 
your company is moving to a new HRpayroll system that is sponsored .docx
your company is moving to a new HRpayroll system that is sponsored .docxyour company is moving to a new HRpayroll system that is sponsored .docx
your company is moving to a new HRpayroll system that is sponsored .docxhyacinthshackley2629
 
Your company is considering the implementation of a technology s.docx
Your company is considering the implementation of a technology s.docxYour company is considering the implementation of a technology s.docx
Your company is considering the implementation of a technology s.docxhyacinthshackley2629
 
Your company is a security service contractor that consults with bus.docx
Your company is a security service contractor that consults with bus.docxYour company is a security service contractor that consults with bus.docx
Your company is a security service contractor that consults with bus.docxhyacinthshackley2629
 
Your company has just sent you to a Project Management Conference on.docx
Your company has just sent you to a Project Management Conference on.docxYour company has just sent you to a Project Management Conference on.docx
Your company has just sent you to a Project Management Conference on.docxhyacinthshackley2629
 
Your company has designed an information system for a library.  The .docx
Your company has designed an information system for a library.  The .docxYour company has designed an information system for a library.  The .docx
Your company has designed an information system for a library.  The .docxhyacinthshackley2629
 
Your company has had embedded HR generalists in business units for t.docx
Your company has had embedded HR generalists in business units for t.docxYour company has had embedded HR generalists in business units for t.docx
Your company has had embedded HR generalists in business units for t.docxhyacinthshackley2629
 
Your company You are a new Supply Chain Analyst with the ACME.docx
Your company   You are a new Supply Chain Analyst with the ACME.docxYour company   You are a new Supply Chain Analyst with the ACME.docx
Your company You are a new Supply Chain Analyst with the ACME.docxhyacinthshackley2629
 
Your company has asked that you create a survey to collect data .docx
Your company has asked that you create a survey to collect data .docxYour company has asked that you create a survey to collect data .docx
Your company has asked that you create a survey to collect data .docxhyacinthshackley2629
 
Your Communications PlanDescriptionA.What is your .docx
Your Communications PlanDescriptionA.What is your .docxYour Communications PlanDescriptionA.What is your .docx
Your Communications PlanDescriptionA.What is your .docxhyacinthshackley2629
 
Your community includes people from diverse backgrounds. Answer .docx
Your community includes people from diverse backgrounds. Answer .docxYour community includes people from diverse backgrounds. Answer .docx
Your community includes people from diverse backgrounds. Answer .docxhyacinthshackley2629
 
Your Communications Plan Please respond to the following.docx
Your Communications Plan Please respond to the following.docxYour Communications Plan Please respond to the following.docx
Your Communications Plan Please respond to the following.docxhyacinthshackley2629
 
Your Communication InvestigationFor your mission after reading y.docx
Your Communication InvestigationFor your mission after reading y.docxYour Communication InvestigationFor your mission after reading y.docx
Your Communication InvestigationFor your mission after reading y.docxhyacinthshackley2629
 
Your Communications PlanFirst step Choose a topic. Revi.docx
Your Communications PlanFirst step Choose a topic. Revi.docxYour Communications PlanFirst step Choose a topic. Revi.docx
Your Communications PlanFirst step Choose a topic. Revi.docxhyacinthshackley2629
 
Your coffee franchise cleared for business in both countries (Mexico.docx
Your coffee franchise cleared for business in both countries (Mexico.docxYour coffee franchise cleared for business in both countries (Mexico.docx
Your coffee franchise cleared for business in both countries (Mexico.docxhyacinthshackley2629
 

More from hyacinthshackley2629 (20)

Your company nameYour nameInstruction Page1. O.docx
Your company nameYour nameInstruction Page1. O.docxYour company nameYour nameInstruction Page1. O.docx
Your company nameYour nameInstruction Page1. O.docx
 
Your Company NameYour Company NameBudget Proposalfor[ent.docx
Your Company NameYour Company NameBudget Proposalfor[ent.docxYour Company NameYour Company NameBudget Proposalfor[ent.docx
Your Company NameYour Company NameBudget Proposalfor[ent.docx
 
Your company recently reviewed the results of a penetration test.docx
Your company recently reviewed the results of a penetration test.docxYour company recently reviewed the results of a penetration test.docx
Your company recently reviewed the results of a penetration test.docx
 
Your company wants to explore moving much of their data and info.docx
Your company wants to explore moving much of their data and info.docxYour company wants to explore moving much of their data and info.docx
Your company wants to explore moving much of their data and info.docx
 
Your company plans to establish MNE manufacturing operations in Sout.docx
Your company plans to establish MNE manufacturing operations in Sout.docxYour company plans to establish MNE manufacturing operations in Sout.docx
Your company plans to establish MNE manufacturing operations in Sout.docx
 
Your company just purchased a Dell server MD1420 DAS to use to store.docx
Your company just purchased a Dell server MD1420 DAS to use to store.docxYour company just purchased a Dell server MD1420 DAS to use to store.docx
Your company just purchased a Dell server MD1420 DAS to use to store.docx
 
your company is moving to a new HRpayroll system that is sponsored .docx
your company is moving to a new HRpayroll system that is sponsored .docxyour company is moving to a new HRpayroll system that is sponsored .docx
your company is moving to a new HRpayroll system that is sponsored .docx
 
Your company is considering the implementation of a technology s.docx
Your company is considering the implementation of a technology s.docxYour company is considering the implementation of a technology s.docx
Your company is considering the implementation of a technology s.docx
 
Your company is a security service contractor that consults with bus.docx
Your company is a security service contractor that consults with bus.docxYour company is a security service contractor that consults with bus.docx
Your company is a security service contractor that consults with bus.docx
 
Your company has just sent you to a Project Management Conference on.docx
Your company has just sent you to a Project Management Conference on.docxYour company has just sent you to a Project Management Conference on.docx
Your company has just sent you to a Project Management Conference on.docx
 
Your company has designed an information system for a library.  The .docx
Your company has designed an information system for a library.  The .docxYour company has designed an information system for a library.  The .docx
Your company has designed an information system for a library.  The .docx
 
Your company has had embedded HR generalists in business units for t.docx
Your company has had embedded HR generalists in business units for t.docxYour company has had embedded HR generalists in business units for t.docx
Your company has had embedded HR generalists in business units for t.docx
 
Your company You are a new Supply Chain Analyst with the ACME.docx
Your company   You are a new Supply Chain Analyst with the ACME.docxYour company   You are a new Supply Chain Analyst with the ACME.docx
Your company You are a new Supply Chain Analyst with the ACME.docx
 
Your company has asked that you create a survey to collect data .docx
Your company has asked that you create a survey to collect data .docxYour company has asked that you create a survey to collect data .docx
Your company has asked that you create a survey to collect data .docx
 
Your Communications PlanDescriptionA.What is your .docx
Your Communications PlanDescriptionA.What is your .docxYour Communications PlanDescriptionA.What is your .docx
Your Communications PlanDescriptionA.What is your .docx
 
Your community includes people from diverse backgrounds. Answer .docx
Your community includes people from diverse backgrounds. Answer .docxYour community includes people from diverse backgrounds. Answer .docx
Your community includes people from diverse backgrounds. Answer .docx
 
Your Communications Plan Please respond to the following.docx
Your Communications Plan Please respond to the following.docxYour Communications Plan Please respond to the following.docx
Your Communications Plan Please respond to the following.docx
 
Your Communication InvestigationFor your mission after reading y.docx
Your Communication InvestigationFor your mission after reading y.docxYour Communication InvestigationFor your mission after reading y.docx
Your Communication InvestigationFor your mission after reading y.docx
 
Your Communications PlanFirst step Choose a topic. Revi.docx
Your Communications PlanFirst step Choose a topic. Revi.docxYour Communications PlanFirst step Choose a topic. Revi.docx
Your Communications PlanFirst step Choose a topic. Revi.docx
 
Your coffee franchise cleared for business in both countries (Mexico.docx
Your coffee franchise cleared for business in both countries (Mexico.docxYour coffee franchise cleared for business in both countries (Mexico.docx
Your coffee franchise cleared for business in both countries (Mexico.docx
 

Recently uploaded

Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfUmakantAnnand
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptxPoojaSen20
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 

Recently uploaded (20)

Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.Compdf
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptx
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 

SAP purchasing assignment overview

  • 1. 1 11 Assignment Learning Objectives: BSIS 105 Assignment 3Purchasing Example Using SAP ERP Primary Learning Objectives: · Experience the steps in a typical purchasing transaction · See how an ERP system handles a typical purchasing transaction The objective of this assignment is for you to become familiar with the steps and the documents involved in a typical purchasing transaction and also investigate how the SAP system operates for this type of transaction. We will be using the financial accounting (FI) and the materials management (MM) modules of SAP. We start by creating the master data in the system. We create master data for a new material and a new vendor and then link these together using an information record. After that we run through a transaction in which we purchase the material we just created from the vendor we also just created. As the various steps of the purchase are recorded in SAP, we will ask you to answer some questions about what is occurring. Keep in mind that this business process is normally done by more than one person in order to properly segregate duties and maintain authorization controls. However, in this exercise you will do all of the steps from your individual SAP logon. You will perform the following tasks: Create a material master Create a vendor master
  • 2. Create an information record to link the vendor and material Create a purchase order for the material Receive the material Receive the invoice from the vendor Make payment to the vendor For all of the following work you will use your own company code. This company code is based on the SAP number assigned to you (see Blackboard grades). Whenever you see the value XX in the assignment you will substitute your assigned SAP number. Be sure to use only your assigned SAP number. Step 1: Create a Material Master record for a Trading Goods The material master record contains all the data required to define and manage a material. In SAP this is formally part of the Materials Management (MM) module. However, some important accounting information is also contained within this record. For example, product cost and pricing information and also tax information are contained within the material master record. The master record consists of individual views and the individual views are presented in the form of tabbed pages. These views are organized on a functional or departmental basis. Each department has its own view that permits easy access and maintenance. In other words, data is integrated from engineering, manufacturing, sales and distribution, purchasing, accounting and other departments. This master data is used as a source of data for purchase order processing throughout the procurement cycle. For simplicity, we are ordering a trading good that we will subsequently sell. Trading goods are items that we purchase for resale. There are other types of goods such as raw materials that are used to manufacture finished products. The product that we are going to purchase is an aerodynamic bicycle helmet. Just a reminder: When you see an “XX” enter your assigned SAP number. Logistics Materials Management Material Master Material
  • 3. Create (Special) Trading Goods (MMH1) Create Finished Product (Initial Screen) Field Input Material Number AeroHelmXX (XX = assigned number) Industry Sector Retail Click on the Select Views button on the application tool bar Select the following views: · Basic Data 1 · Accounting 1 Click on the Continue Icon Organization Level pop-up window Field Input Plant DLXX Storage Location TGXX Click on the Enter Icon Basic Data 1: Field Input Material description
  • 4. Aerodynamic Helmet XX Base Unit of Measure EA Material Group SFTY Gross Weight 1 Weight Unit LB Net Weight 1 Looking at both the Dimensions/EANs and the Packaging Material Data tabs answer the following question. 1.1 The Basic Unit of Measure is EA (which stands for Each or individual units). Look at the other units of measure and give three different examples of what types of products may use these types of unit of measure. (Hint: Look at the possible values and the definitions of the fields. There are lots of them, but you only need to select three of them and give an example.) _____________________________________________________ ________________________ Click on the Enter Icon Purchasing: Field Input Purchasing Group NXX The purchasing group represents the people in the purchasing department of the company assigned to purchase specific types of products. In a real company there are specialists that are very knowledgeable about a group of products and the vendors who sell those products.
  • 5. 1.2 GBI is a bicycle manufacturer who supplies all of the different types of products involved in cycling including products they purchase from other manufacturers. Explain what type of specialization buyers may have at GBI. Click on the Enter Icon Plant Data/Storage 1 · No information is needed here. However, look at the data on this tab. Looking at the various items under the Shelf life data tab answer the following question. 1.3 While this tab does not apply to our aerodynamic helmet explain how it would be used for other products. Again, give an example of products for which this data would be very important. _____________________________________________________ ________________________ Click on the Enter Icon Accounting 1: Field Input Valuation class 3100 Price Control S
  • 6. Moving Price 80 Standard Price 80 The SAP terminology is a little confusing in this part of the process. What we would normally term cost, they term price. That is, by their terminology price (not cost) is what we paid for the good. The price control of S means that the company is using standard costing with the standard cost you entered of $80. The moving price is the moving average price that is calculated by averaging the costing of the good (what they actually paid for the good) over a specific period of time. The standard cost is a constant cost used by the company and is used in many ways to measure the performance of the company with respect to this good. You will learn more about this in your managerial accounting class. 1.4 Why is it very important for the company to know how much the good costs? _____________________________________________________ ________________________ · Click on the Enter Icon · Click on “Yes” when asked to Save Write down the message on the status bar. ___________________________________ Step 2: Create a Vendor Master record (we will buy the finished product from this vendor)Logistics Materials Management Purchasing Master Data Vendor Central Create (XK01)
  • 7. On the Create Vendor: Initial Screen Field Input Vendor A999XX (XX = assigned number) Company code USXX Purchasing organization USXX Account group LIEF · Click on the Enter Icon On the Create Vendor: Address Field Input Title Company Name Brain_Buckets_XX Search term XX (assigned number) Street address Glenn 304 Postal code 95929 City Chico Country US Region CA Language
  • 8. English 2.1 Near the very bottom of the screen there is a field for Standard Comm. Mtd. Why could this be a very important piece of information to have? _____________________________________________________ ______________ · Click the Next Screen icon or Enter icon to go to next view On the Create Vendor: Control · No Information needs to be entered · Click on the Next Screen icon or on enter icon On the Create Vendor: Payment Transactions · No Information needs to be entered · Click on the Next Screen icon or on enter icon On the Create Vendor: Contact Person · No Information needs to be entered · Click on the Next Screen icon or on enter icon On the Create Vendor: Accounting Information Accounting Field Input Rec. Account 300000 Sort Key 001 (posting date) Cash mgmnt group A1 (domestic pmt.) The reconcilation account (Recon. Account) is a very important account, since this is where we track how much we owe each
  • 9. specific vendor. At the end of this assignment you will be asked to check this vendor’s account to be sure that we have paid our bill in full. · Click the Next Screen icon or enter icon to go to next view On the Create Vendor: Payment Transactions Accounting Field Input Payment terms 0001 2.2 What are the payment terms for this vendor? What type of payment discount do we get? _____________________________________________________ ___________________ · Click on the page arrow icon On the Create Vendor: Correspondence Accounting · No information needs to be entered 2.3 Explain what dunning is and how it would be used. (Hint: You may have to look this up on the Internet.) _____________________________________________________ ___________________ · Click on the Next Screen icon On the Create Vendor: Purchasing Data Field Input Order currency USD Payment terms 0001
  • 10. On the Create Vendor: Partner Function · No data needs to be entered · Click on Save icon to save the data. Write down the message on the status bar. ____________________________________ The creation of a material and a vendor would allow us to order those goods from that vendor. However, as an additional control, we can define the relationship between the good and the vendor. In SAP this is done by creating an information record. That is the next step in the process. Step 3: Create an Information record for Vendor/Material Logistics Materials Management Purchasing Master Data Info Record Create (ME11) Field Input Vendor A999XX Material AeroHelmXX Purchasing Org. USXX Plant DLXX Click on Enter Icon to continue.
  • 11. On Create Info Record: General Data screen, click on Purch. Org. data 1 button On Create Info Record: Purch. Org. data 1 view, enter Field Input Pl.Deliv.Time 2 (days) Purch. group NXX Standard qty. 10 Minimum qty 5 Net price 80 The above data defines the relationship between the material and the vendor. 3.1 Explain how the above data can be a strong control in the purchasing process. _____________________________________________________ _____________________ _____________________________________________________ _____________________ · Click on Save icon to save the data. Write down the Information record number shown on the status bar. ______________________
  • 12. Step 4: Create a Purchase Order to buy the Finished Product LogisticsMaterials ManagementPurchasing Purchase OrderCreate Vendor/Supplying Plant Known (ME21N) On the Create Purchase Order screen: Field Input (Field) (will be defaulted) Standard purchase order Vendor A999XX Document date Today’ date Note: If the screen looks like the following, click on Header and Item Overview icons to expand those areas. When you expand your view, an error message may tell you to enter the organizational data and redirect you to the Org. Data page. If you are not redirected to the org. data page, click on the Org. Datatab page, enter the following data: Field Input Purchasing org. USXX Purchasing group NXX Company code USXX Click on Enter
  • 13. Enter the following data under item overview area: Field Data Material AeroHelmXX P.O. Quantity 10 Delivery date Today’s date Plant DLXX Storage location TGXX You need to scroll to the right to find the Plant and Storage location fields. You may get warnings about the dates. Just Click on Enterto get by them. Click on Enter . 4.1 When you click on enter, the description of the material, unit of measure and price will be filled in. Where did this data come from? _____________________________________________________ _________________________ Click on Save . This is very important! Write down the purchase order number shown on the bottom of the screen. ___________________ Step 5: Receive the Product from the Vendor
  • 14. Logistics Materials Management Inventory Management Goods Movement Goods Receipt For Purchase Order PO Number Known. (MIGO) Goods Receipt Purchase Order <User> screen appears. Field Input Purchase Order Purchase order # from step 4 above Delivery Note XX Click on Enter and all the data will be copied from the purchase order Select Item OK box to confirm the receipt. (this is at the bottom of the screen) Click on Enter Click on Save . Write down the material document number ___________________. Step 6: Receive the Invoice from the Vendor Logistics à Materials Management à Purchasing à Purchase Order à Follow-on Functions à Logistics Invoice Verification(MIRO)
  • 15. Field Input Invoice date Today’s date Posting date Today’s date Under Basic Data tab Purchase Order/Scheduling Agreement Purchase order # from step 4 Click on Enter , the information will be copied from the purchase order to the invoice · Enter Amount (in Basic data tab) same as the Amount shown in the line item. Click on Enter , the Balance should be 0.00 and the light should be green. Click on Post (Save). Write down the invoice number ___________________. Step 7: Make the Payment by Cash to the Vendor Accounting à Financial Accounting à Accounts Payable à Document Entry à OutgoingPayment à Post(F-53) Field Input Document Date Today’s date Posting Date
  • 16. Today’s date Company Code USXX Currency/Rate USD Under Bank Data area Account 100000 (Bank Account) Amount Amount of payment Under open item selection area Account (the vendor number) A999XX Automatic search Select Click on Process Open Items Button The Not Assigned amount should be 0.00 . Post (Save) the transaction. Write down the document number.____________________________ Step 8: Check Status of the Transaction As the final step you will examine the inventory of your good and the amount you owe the vendor. To check inventory go to transaction code MMBE and enter your information for your good. Click of the execute button .
  • 17. 8.1 How much inventory do you have? Leave that transaction and enter transaction code FBL1N. This tells you how much money you owe the vendor. Enter your vendor (A999XX) and select the Cleared Items radio button in the middle of the screen under the Line Item Selection tab. Click of the execute button . 8.2 How much do you owe your vendor? Assignment Submission Place your answers on the abbreviated form of this assignment that is provided to you. The assignment is due on Thursday September 25, 2014. Be sure to submit your answers both electronically to Blackboard in the Assignment 3 folder and in hardcopy form. BSIS 105 – Assignment 3 BSIS 105 – Assignment 3 Implementation Plan Template CMGT/445 Version 5 1 Implementation Plan University of Phoenix Material Implementation Plan Template Use the following template to create your implementation plan in Week Four.
  • 18. Project Name or Identification: T-shirt Company Startup Business Project Stakeholders · Romero Edwards · Owner, CEO, and manager · romeroedwards93yahoo.com Project Description · Background Identity is one of the key features that any entity, group or individual may have. There are different ways of developing identity and each may be used in different ways. After carrying out research on the trends that have been able to survive the changes in time, I have discovered that branded t-Shirts are top in that category. It is against this backdrop that I came up with the black and white youth T-Shirt as a symbol for youths from all races gender religion and career to identify with the current generation. The information contained in this paper explains how I shall use virtual and online markets to ensure that the brand has been sold across the globe. · Description of the challenge or opportunity Challenge There are different challenges that the brand may face once it enters into the market. The first challenge is the challenge of the established brands that are already selling in the market. Two of the most selling brands include Nike and Fila. These two brands have dominated clothing industry especially for casual wear t-shirts. The model of marketing used by these companies is able to reach out to many people. The companies have been sponsoring different sports events, branding community development initiatives and other forms of marketing that involve reaching out to the people. The other challenge that the brand may face is time taken to establish the brand. The market at times is slow to accept new
  • 19. products due to the fear on their quality and the unseen future. This is especially a challenge to small enterprises which depend on the revenue from the new product for them to have a going concern. This requires the marketing material to be persuasive enough in order to lure the customers and change the market preference. The other challenge that the brand shall face is the rating of the marketing items on the Google marketing platform. One of the features that are linked with Google marketing is peer rating. The feature allows other persons who are using the platform to rate brands. A brand which receives high rating is viewed to be preferable and this may change the perception that the consumers will have on the product. This in return will affect the preference that the products will have once it hits the market. Opportunities The first major opportunity that the brand has is the theme that it passes. The T Shirts pass a message of tolerance amongst people from different racial and religion backgrounds. This is a convenient message especially in the twenty first century when there are concerted efforts to fight any racial discrimination. The fight against racism is convenient for sportsmen, office based careers, technical workers and government officials internationally. The other opportunity that the brand has is the appeal to the youth. As the paper elaborates in sections below, the T-Shirts shall be holding names that portray the chances in patterns that affects the youth in the last year. This shall change every year and thus every youth shall be looking upon the next set of T- Shirts and thus demand shall be high each year. The team shall allow the youth to participate in developing the brand for the year through internet platforms. Indeed, Google marketing offers opportunity for customers to give their feedback on the views they have on the product. This is the feature that the marketing team shall use to gather details on the items that the
  • 20. youth would wish included in the succeeding year’s T-Shirt. Also, the marketing platform presents the brand with an opportunity of stealing the global show through Google Marketing. Google marketing can be viewed from any remote computer which has internet connections globally through the World Wide Web. Thus, the product can go viral within the same day that it is floated to the market. This may even overwhelm the production department of the organization. · Overview of the desired impact · Global impact: using Google marketing allows the brand to get the attention of the international market. This is vital in the optimization of company’s potential. The company targets the international customer base and use of Google marketing helps in attaining such a market. · Wide market on first roll out: it is a common tradition for companies to start small and grow big. However, internet based marketing helps companies to roll out at medium level. While the level of marketing may be a consideration, with enough capital, internet based marketing can be vital in developing a wide customer base at the first roll out. · Passing out the message: while making high sales is one aim of the brand development, the brand development also seeks to pass out an antiracist message to the customers. This is expected to change the level of thinking to include more tolerant views. The success of this campaign can be easily transformed into success of the organization since the customers can be lured to buy products of the company that facilitated the noble course. Measurable Organizational Value (MOV) · Project’s overall goal and measure of success The overall goal of the project is to present the market with a new design of t shirt while at the same time pass the antiracism message. This shall include development of a common voice to
  • 21. the youth against racists and adding up their voices to the international fight against racism. The following items shall be used to measure success of the project · Rating by other users of Google marketing: as noted earlier in this paper, other users are allowed to describe their ratings on the brands that are marketed on Google marketer. While it is hard to know the real intention of the persons making the rating (since there are chances of down rating by malicious persons or overrating by persons who are unrealistic and only wish to prove the marketer rights), the platform can always be used as a sampling ground for the acceptance or otherwise that the product shall have once it is released to the market. · Visits and revisits of product online profile: a brand that is built using strong visual features will have high number of visits on its online profile (on Google marketing website. · Number of recommendations from online viewers: Google marketing allows users to recommend other persons who hold Google accounts products and brands which are portrayed through Google marketing. A preferred brand will have high number of recommendations. · Online based sales: since Google is an online based marketing, online based sales can be directly linked to it. Successful online based marketing will lead to high online based sales. · What elements of the project provide value to the organization? Elements of the project that would provide value to the organization include; · Company brand; brand which passes right message to the people · The anti-racists campaign: many people would be interested in joining the global course which has all the right attitudes · Use of internet marketing; virtual markets are the modern forms of marketing and this shows that the organization embraces technological developments. · Real time requisitions: customers always are glad where they
  • 22. can be able to source hoods and services from online sources and be allowed to place their requisitions online and real-time. This includes provision for electronic money transfer which would increase the level of communication between the producer and the consumer. This also reduces the number of middlemen between the producer and the consumer. · ROI (return on investment) and cost versus benefit Google marketing has one of the special features where the company does not have a fixed cost for the advertisements. The company allows the advertiser to come up with maximum budget for the day and the price for each click. The budget may be scaled up or down according to the advertising needs of the brand that is being advertised. The marketing method thus leaves the marketer to come up with the flexible budget. Thus, the marketing shall not be expensive. Other costs include · Hosting an organization’s website · Cost of broadband connectivity · Cost of designing the t shirts and the website. The benefits are similar to achievement of goals that have been outlined in earlier sections of this paper · Statement or table format Project Scope · What will be included in the scope of this project? The project shall include the following features · Branded T-Shirts that shall be marketed over Google marketing · Videos for promoting the T-shirts · Web-link to organization website · Web loins to products webpage on the company’s website · A guide which shall answer frequently asked questions about the brand · An open letter inviting all users of Google marketing to trade
  • 23. · The features to identify the organization like logo and theme colors · What will be considered outside the scope of this project? The organization will also consider · Marketing complementary products like shoes and caps · Use of newspaper and magazine captions citing quality of the products · What are the project’s main deliverables? The project’s main deliverable is high sales. You cannot market if you are certain that the amount from sales won’t be sufficient to meet the marketing needs. · Provide a statement and description. The product being marketed is a branded T-shirt which carries important information against racism and which calls for unity of young men internationally. Project Schedule Summary · Project start date: January 2015 · Project end date: December 2015 · Timeline of project phases and milestones: January - T Shirt design, development videos and development of website February - rolling out the online campaign March – April -campaigning for the link and mobilizing friends to visit the ad and rate it May- December - online sales and marketing intensifies
  • 24. December - winding up the project · Project reviews and review dates Reviews shall be done within the last four days of every month. Review shall be done by professional and independent marketer Project Budget Summary · Total project budget · Budget broken down by phase Quality Issues · Specific quality requirements While there are no specific standards for branding materials, some quality requirements shall be required for this project · Broadband connectivity which shall support round the clock connections · A site which shall allows viewing of same data by multiple users at the same time from different locations · A brand that cannot easily pass as a replica of other brands in the market. Resources Required · People: the members of the organization shall campaign for the product using word of mouth and on their social media pages · Technology: cloud connectivity for database, and broadband connection · Facilities: server which shall be used to update the project, office space, and desks · Other : licenses and certification, strong organization culture and processes · Resources to be provided
  • 25. Resource Name of resource provider Date to be provided Office space land lord immediately Office furniture purchases department by January Computer and other devices purchases department by January Broad band connectivity IT analyst
  • 26. by February Assumptions and Risks · Assumptions used to develop estimates · That inflation shall not change · That prices shall not hike by more than 10% of current costs · Key risks, probability of occurrence, and impact · Risks · Products not being viewed on Google marketing · Dominant companies carrying out a similar campaign · Malicious copy of brand features Probabilities There is a probability that the market will find the message too rhetoric and thus shun the products Also, there is probability that the estimated daily budget will not fit the customers wishing to visit the site · Organizational or time constraints · The project has to be delivered within one year · Risks of not doing this project · If this project is not done, persons who shall benefit from it (through reduction of racisms) shall not have benefitted · Assess dependencies on other projects or areas within or outside the organization The project shall highly depend on the efficiency of
  • 27. computerized system in organization, high data activity supported by broadband connections and the selection of Google search engine over other search engines by the target customers · Assessment project’s impact on the organization · The project will lead to globalization of organization though international customer reaching out · Outstanding issues · No outstanding issues are being experienced currently · Formulation of key project risk mitigation strategies Project Administration · Communications plan: through social media and automated emails to other consumers · Scope management plan: hierarchical order within marketing and sales team utilized. · The change control process: strategic management plan used to change control process · Quality management plan: a specific plan shall be made to include the salient features of online marketing · Testing procedures related to the implementation The project shall be tested by mock clicks from company’s offices to determine whether the links are working and also to justify whether Google is charging for extra clicks or for real clicks · Change management plan: use of change managers to manage shift o online marketing · Human resources plan: the main human resource plan shall involve staff members involved in the day to day maintenance of the website. Implementation and Continued Maintenance and Project Closure Plan
  • 28. · What data or existing format will need to be changed? · Information on t-shirts changed annually · Company product website to include features of the new product · What production systems will be handled? · The new product segment will require to be handled. This shall be development of T-shirts · What downtime will be needed? · At least 3mg/s for the website · How will the integration be communicated? · Through the integrated systems using the organization’s database · How will the new system be deployed (pilot, phased, parallel, plunge, and so on)? · Test shall be done through pilot program the implementation done phase by phase · Support and maintenance The following support shall be offered throughout the project period · Technical, user, and system training documentation · The IT analyst shall provide all technical support · All server staff shall be trained on handling data from the project · A copy documentation for the project shall be sent to each staff member’s email · System support roles and functions · To ensure continues service delivery · To ensure that the system does not fail
  • 29. · To ensure speedy delivery of services to the consumers · To deal with increased online sales due to online marketing success. · To increase comprehension of new system in the organization · To reduce ambiguity on the project within the organization · Project closure The project shall be closed on the twelve month Acceptance and Approval · Romero Edwards 19 September 2014 · The implementation plan approval process has been approved by the owner Romero Edwards References Calkins, T. (2012). Breakthrough marketing plans: How to stop wasting time and start driving growth. , : Macmillan. Ferrell, O. C., & Hartline, M. (2012). Marketing strategy. , : Cengage Learning. Nijssen, E. J., & Frambach, R. T. (2001). Creating customer value through strategic marketing planning: A management approach. Boston, : Springer Science & Business Media. Pride, W., & Ferrell, O. C. (2004). Marketing. Boston, : Cengage Learning Appendices (as necessary) The budget is appendices in excel
  • 30. Copyright © 2013 by University of Phoenix. All rights reserved. 3 2 ( BSIS 105 Assignment 3 Purchasing Example Using SAP ERP Abbreviated Hand In Version ) Your Name: _________________________ SAP #: _____ Step 1: Create a Material Master record for a Trading Goods 1.1 The Basic Unit of Measure is EA (which stands for Each or individual units). Look at the other units of measure and give three different examples of what types of products may use these types of unit of measure. (Hint: Look at the possible values and the definitions of the fields. There are lots of them, but you only need to select three of them and give an example.) _____________________________________________________ ________________________ 1.2 GBI is a bicycle manufacturer who supplies all of the different types of products involved in cycling including products they purchase from other manufacturers. Explain what type of specialization buyers may have at GBI. 1.3 While this tab does not apply to our aerodynamic helmet explain how it would be used for other products. Again, give an
  • 31. example of products for which this data would be very important. _____________________________________________________ ________________________ 1.4 Why is it very important for the company to know how much the good costs? _____________________________________________________ ________________________ Step 2: Create a Vendor Master record (we will buy the finished product from this vendor) 2.1 Near the very bottom of the screen there is a field for Standard Comm. Mtd. Why could this be a very important piece of information to have? _____________________________________________________ ______________ 2.2 What are the payment terms for this vendor? What type of payment discount do we get? _____________________________________________________ ___________________ 2.3 Explain what dunning is and how it would be used. (Hint: You may have to look this up on the Internet.) _____________________________________________________ ___________________ Write down the message on the status bar. ____________________________________
  • 32. Step 3: Create an Information record for Vendor/Material 3.1 Explain how the above data can be a strong control in the purchasing process. _____________________________________________________ _____________________ _____________________________________________________ _____________________ Write down the Information record number shown on the status bar. ______________________ Step 4: Create a Purchase Order to buy the Finished Product 4.1 When you click on enter, the description of the material, unit of measure and price will be filled in. Where did this data come from? _____________________________________________________ _________________________ This is very important! Write down the purchase order number shown on the bottom of the screen. ___________________ Step 5: Receive the Product from the Vendor Write down the material document number ___________________.
  • 33. Step 6: Receive the Invoice from the Vendor Write down the invoice number ___________________. Step 7: Make the Payment by Cash to the Vendor Write down the document number.____________________________ Step 8: Check Status of the Transaction 8.1 How much inventory do you have? 8.2 How much do you owe your vendor? Assignment Submission Place your answers on the abbreviated form of this assignment that is provided to you. The assignment is due on Thursday September 25, 2014. Be sure to submit your answers both electronically to Blackboard in the Assignment 3 folder and in hardcopy form. BSIS 105 – Assignment 3 BSIS 105 – Assignment 3