SlideShare a Scribd company logo
1 of 3
Download to read offline
Mohamed Abou Bakr Abd El Salam
E-mail: eng.mohamedbakr@gmail.com
E-mail: mohamed_aboubakr@ebgdco.com
Address: Borg Al Unes - Elquraay Street from El Kholafaa El
Rashdin Street
El-Mansoura - Al-Dakahlia - Egypt
Tel: 0502252354 Mobile: +201061716989/+201021800990
OBJECTIVE
Ambitious to pursue a rewarding & challenging career in the area of Control and Automation
I am willing to be one of the basic building blocks of the organization that I am going to be in, with the experience
and capability that I have in order to achieve organization’s goals and create mutual benefits.
PERSONAL DATA
Birth Date: 1/8/1987
Military Status: Exempted
Nationality: Egyptian
National No.: 28708011213578
Marital Status: Married
Gender: Male
Religion: Muslim
Member in Egyptian Engineering Association: (ID: 72/07954)
Member at ISA (International Society of Automation): ID: 33244455
Work Experience
-Working As Maintenance Instrumentation Control Engineer At Agiba Petroleum Company from jan-2009
to Feb-2010
Field Experience
1. Instrumentation (Reading Manuals, Adjusting, Calibration, troubleshooting , Preventive
Maintenance , P&ID diagrams , supervision on contractors projects )
2. Control (PLC Projects, SCADA, Pneumatic Controllers)
3. Electricity (Fair Knowledge)
4. Attend a commissioning of a small project to convert a conventional control panel to PLC panel on a
train containing Heater Treater , Desalter , scrubber, cooler and do all activates (review ladder
diagrams , hot loop check with control loops )
5. Working with small booster pumps with its controller Murphy
6. Working is upgrading for some small projects and make scope of work to Telemetry system and ESD
system
7. Good reading with new catalogue find new documentation on internet
Working as Project Engineer at El-Wastani Petroleum Company (WASCO) from Feb 2010 to June 2010
Field Experience
1-Supervision on technicians at connecting a lighting, power, fire system network before cementing the roofs
2-Reading AutoCAD Drawings of electrical working (fair)
3- Attend a commissioning of a Noddel compression package by EMC main contractor (WPS, Applied
Control) as subcontractor (20 Million US Dollar)
4- Make a punch list before startup the project
-Working as Senior Instrumentation & Control Engineer at EGBDCO (Egyptian Bahraini Gas Derivative
Company) from June 2010 till now(Get Promoted at Jan 2014)
NGL Plant Project (150 Million US Dollar)
Work Experience (Engineering Phase, Construction Phase, Commissioning and Start Up phase)
1- Reviewing data sheets of all instrumentation sent by engineering firm
2- Searching about all new technologies of all control and instrument companies like (Siemens,
AllenBradlly, FMC, Emerson, Wika…)
3- Making Tenders, Contracts, technical clarifications for vendors, revise the material on site based on
packing list and the P.O issued.
4- Attend the FAT test of ICSS (integrated control safety system ) At Exterran Dubai and make the
release for shipment for them
5- Make punch list for ICSS at the fat prior to the SAT based on P&ID, Control Narratives,C&E
6- Supervise the construction company Petrojet on Instrumentation works based on received drawing
from the engineering firm (cable trays, installation of transmitters …)
7- Making a construction punch list to be done before commissioning
8- Attend Hazop of our plant utility by Risk Tec company
9- Attend a Control Narrative Course by the engineering company Exterran
10- Attend SAT for Fire and Gas detection System (Safety Manager –Honeywell ) and sign the SAT
document
11- Member of commissioning team and supervisor for all commissioning activities(Loop Check,
Functional test, instrument Calibration , control system modification
12- Member in the startup of the Plant and commissioning of each package (Solar Turbine
Compressor,Turboexpander Mafitrench , Gas Chromatograph, metering system , Fire and Gas
system , Tank Gauging system )
13- Reading from Standard (ISA,NFPA,IEEE.IEC)
14- Executing Master Plan For Preventive Maintenance CMMS program (EMCMAINT,ORACLE)
15- Doing Shut Down Plans and CM’s Plans
16- Executing Budget For Instrument Department
17- Work with (PTW, COW, Risk Assesment, Procedures…)
18- Calibration activities for all sensors (Pressure,Flow,Temprature.Level)
19- Attend Hazop for Fuel Gas Skid Project
Tools of work
1-Very Familiar with Control system Controller software and corresponding Display system
(WinCC, Factory Talk, HMI Builder, ACQIRA, Omni Flow Computers)
2- Deal with all instrument brands (Emerson, Micro Motion, Yokogawa, Rosemount, FMC,…..)
3- Field Communicator with HART, Field Bus Protocols
4-Deal with all communication protocols, RS-485,232, ModBus, etc
5- Flow Computers
6- All Software related to my instrument and Control work
7- Public Address General Alarm System (Industronic)
PROFESSIONAL TRAINING & COURSES
Attended EED 2008 (Egyptian Engineering Day)
As Exhibitor of My Project SMART SCADA
 Power Transformers Operation & Maintenance at EATG by Dr.Mohamed Hamdallah
From 29-3-2009 to 2-4-2009
 HSE Induction, Near Miss & Hazard Observation at PETROSAFE from 3/5/2009 to 4/5/2009
(Instructor: Eng.Esam El Hellawy)
 Risk Assessment, Hazid &Hazop Principle at PETROSAFE from 5/5/2009 to 7/5/2009
(Instructor: Eng.Esam El Hellawy)
 Introduction to Step7 300 SIMATIC & wincc2007 (Commissioning of Midpoint Project)
By EMC form 14/6/2009 to 16/6/2009
 Pneumatic Control System at Oil & Gas Skills (OGS) from 27/12/2009 to 31/12/2009
By Eng.Allaa Omar El Din (GASCO)
 Control Logix 5000 Fundamentals and troubleshooting at (El Sewedy Automation ) from 17/10/2010
to 21/10/2010
 Factory Talk SE Fundamental and troubleshooting at (El Sewedy Automation ) from
24/10/2010 to 26 /10/2010
 RSlinx and RS networks Fundamental and troubleshooting at (El Sewedy Automation ) from
27/10/2010 to 28 /10/2010
 Expander Compressor P&ID explanation , operation
 Tailored Course customized on my application ( RSLOGIX5000,Factory Talk 6) AT JAN 2013
 Analytical Instrumentation and Gas Chromatograph Jan 2014
 Safety Instrumented System and Emergency Shutdown System based on IEC61511,61508,ISA84
Other Skills
• Traveling, Reading, Web Navigation, Searching, and Messaging
• Effectively communicates in a cross-functional teamwork
• Got a sense of self-confidence and determination
• Able to work under pressure.
• Quickly learns new topics that are related to my career
• Hopes for further development and training
• Member in Resala Organization for Charity works
• Member in El Ahly Sporting Club
EDUCATION
WORKING ON RESEARCH POINT (INDUSTRIAL WIRELESS INSTRUMENT IN OIL AND GAS FIELD)
 PREPARING TO Automatic control MASTER - Faculty of Engineering –Mansoura University
Research point (wireless instrumentation) Grade: Good 78.75%
 2008-2009 Automatic control Diploma-Faculty of Engineering –Mansoura University
Grade: Very. Good 79.5%
Research Point (SCADA over oil industry)
2003-2008 Bachelor's degree Faculty of Engineering- Mansoura University-Computer and system Dept.
General Grade: Pass
Graduation year 2008
LANGUAGE
ARABIC : Mother Tongue
ENGLISH: Very Good (writing, reading & speaking)
Graduation project
Graduation project title: SMART SCADA (Implementation over Power Distribution and
Protection)
Graduation project grade: Excellent
References
Available upon request

More Related Content

What's hot

2382-FERDINAND G. TEODORO-E&I QC SUPERVISOR.DOCX
2382-FERDINAND G. TEODORO-E&I QC SUPERVISOR.DOCX2382-FERDINAND G. TEODORO-E&I QC SUPERVISOR.DOCX
2382-FERDINAND G. TEODORO-E&I QC SUPERVISOR.DOCXferdinand teodoro
 
Mohamed Mady C
Mohamed Mady CMohamed Mady C
Mohamed Mady CENGADAM
 
Digital Design With Systemc (with notes)
Digital Design With Systemc (with notes)Digital Design With Systemc (with notes)
Digital Design With Systemc (with notes)Marc Engels
 
Sr.Planning Engineer - Tarek Abdelaziz's C.V.
Sr.Planning Engineer - Tarek Abdelaziz's C.V.Sr.Planning Engineer - Tarek Abdelaziz's C.V.
Sr.Planning Engineer - Tarek Abdelaziz's C.V.Tarek Abdelaziz
 
Nisanth April 2015
Nisanth April 2015Nisanth April 2015
Nisanth April 2015Nisanth K N
 
instrument supervisor
instrument supervisorinstrument supervisor
instrument supervisorhosam issa
 
SEooC ISO 26262 | What is Safety Element Out of Context in Automotive Functio...
SEooC ISO 26262 | What is Safety Element Out of Context in Automotive Functio...SEooC ISO 26262 | What is Safety Element Out of Context in Automotive Functio...
SEooC ISO 26262 | What is Safety Element Out of Context in Automotive Functio...Embitel Technologies (I) PVT LTD
 
Elsayed Mohamed Elsayed.rev6
Elsayed Mohamed Elsayed.rev6Elsayed Mohamed Elsayed.rev6
Elsayed Mohamed Elsayed.rev6Elsayed Mohamed
 
iain loudon CV 2016
iain loudon CV 2016iain loudon CV 2016
iain loudon CV 2016Iain Loudon
 
Noman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updatedNoman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updatedNouman Jamil
 

What's hot (18)

Anthony Phillips CV
Anthony Phillips CVAnthony Phillips CV
Anthony Phillips CV
 
2382-FERDINAND G. TEODORO-E&I QC SUPERVISOR.DOCX
2382-FERDINAND G. TEODORO-E&I QC SUPERVISOR.DOCX2382-FERDINAND G. TEODORO-E&I QC SUPERVISOR.DOCX
2382-FERDINAND G. TEODORO-E&I QC SUPERVISOR.DOCX
 
Mohamed Mady C
Mohamed Mady CMohamed Mady C
Mohamed Mady C
 
CV 2016 new
CV 2016 newCV 2016 new
CV 2016 new
 
Digital Design With Systemc (with notes)
Digital Design With Systemc (with notes)Digital Design With Systemc (with notes)
Digital Design With Systemc (with notes)
 
Sr.Planning Engineer - Tarek Abdelaziz's C.V.
Sr.Planning Engineer - Tarek Abdelaziz's C.V.Sr.Planning Engineer - Tarek Abdelaziz's C.V.
Sr.Planning Engineer - Tarek Abdelaziz's C.V.
 
My new cv
My new cvMy new cv
My new cv
 
MUHAMMAD AMIN CV
MUHAMMAD AMIN CVMUHAMMAD AMIN CV
MUHAMMAD AMIN CV
 
Nisanth April 2015
Nisanth April 2015Nisanth April 2015
Nisanth April 2015
 
instrument supervisor
instrument supervisorinstrument supervisor
instrument supervisor
 
SEooC ISO 26262 | What is Safety Element Out of Context in Automotive Functio...
SEooC ISO 26262 | What is Safety Element Out of Context in Automotive Functio...SEooC ISO 26262 | What is Safety Element Out of Context in Automotive Functio...
SEooC ISO 26262 | What is Safety Element Out of Context in Automotive Functio...
 
Elsayed Mohamed Elsayed.rev6
Elsayed Mohamed Elsayed.rev6Elsayed Mohamed Elsayed.rev6
Elsayed Mohamed Elsayed.rev6
 
iain loudon CV 2016
iain loudon CV 2016iain loudon CV 2016
iain loudon CV 2016
 
Noman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updatedNoman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updated
 
C.v Muhammad Moaviah. M
C.v Muhammad Moaviah. MC.v Muhammad Moaviah. M
C.v Muhammad Moaviah. M
 
Eng.M.Sallam
Eng.M.SallamEng.M.Sallam
Eng.M.Sallam
 
MOHAMED SALEM C.V
MOHAMED  SALEM  C.VMOHAMED  SALEM  C.V
MOHAMED SALEM C.V
 
Raafat_CV
Raafat_CVRaafat_CV
Raafat_CV
 

Similar to Mohamed Abou Bakr CV

Similar to Mohamed Abou Bakr CV (20)

my C.V Mohanad Zaki
my C.V Mohanad Zakimy C.V Mohanad Zaki
my C.V Mohanad Zaki
 
Mohanad 123-4
Mohanad 123-4Mohanad 123-4
Mohanad 123-4
 
Mahmoud_CV
Mahmoud_CVMahmoud_CV
Mahmoud_CV
 
zohir mohsen cv
zohir mohsen cvzohir mohsen cv
zohir mohsen cv
 
zohir mohsen cv
zohir mohsen cvzohir mohsen cv
zohir mohsen cv
 
CV
CVCV
CV
 
Elshayeb
ElshayebElshayeb
Elshayeb
 
ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)
 
Elsayed cv in eg u 07 09 2015
Elsayed cv in eg u 07 09 2015Elsayed cv in eg u 07 09 2015
Elsayed cv in eg u 07 09 2015
 
Ahmed Elrassas CV_11_2015-rev2
Ahmed Elrassas CV_11_2015-rev2Ahmed Elrassas CV_11_2015-rev2
Ahmed Elrassas CV_11_2015-rev2
 
tayssircv_(2)1
tayssircv_(2)1tayssircv_(2)1
tayssircv_(2)1
 
Sreekumar_Resume
Sreekumar_ResumeSreekumar_Resume
Sreekumar_Resume
 
Resume
ResumeResume
Resume
 
Resume instrumentation engineer
Resume instrumentation engineer Resume instrumentation engineer
Resume instrumentation engineer
 
Mpe. muhammad elkhatib
Mpe. muhammad elkhatibMpe. muhammad elkhatib
Mpe. muhammad elkhatib
 
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDINSenior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
 
Mohamed Mahmoud Mohamed Rezk_ Rev 3
Mohamed Mahmoud Mohamed Rezk_ Rev 3Mohamed Mahmoud Mohamed Rezk_ Rev 3
Mohamed Mahmoud Mohamed Rezk_ Rev 3
 
Yasser Elghoul C.V
Yasser Elghoul C.VYasser Elghoul C.V
Yasser Elghoul C.V
 
Ajman University of science & technology
Ajman University of science & technologyAjman University of science & technology
Ajman University of science & technology
 
___CV of Senior ELV%2c Special & Electrical Systems Engineer (Amr Gamal) (1) (2)
___CV of Senior ELV%2c Special & Electrical Systems Engineer (Amr Gamal) (1) (2)___CV of Senior ELV%2c Special & Electrical Systems Engineer (Amr Gamal) (1) (2)
___CV of Senior ELV%2c Special & Electrical Systems Engineer (Amr Gamal) (1) (2)
 

Mohamed Abou Bakr CV

  • 1. Mohamed Abou Bakr Abd El Salam E-mail: eng.mohamedbakr@gmail.com E-mail: mohamed_aboubakr@ebgdco.com Address: Borg Al Unes - Elquraay Street from El Kholafaa El Rashdin Street El-Mansoura - Al-Dakahlia - Egypt Tel: 0502252354 Mobile: +201061716989/+201021800990 OBJECTIVE Ambitious to pursue a rewarding & challenging career in the area of Control and Automation I am willing to be one of the basic building blocks of the organization that I am going to be in, with the experience and capability that I have in order to achieve organization’s goals and create mutual benefits. PERSONAL DATA Birth Date: 1/8/1987 Military Status: Exempted Nationality: Egyptian National No.: 28708011213578 Marital Status: Married Gender: Male Religion: Muslim Member in Egyptian Engineering Association: (ID: 72/07954) Member at ISA (International Society of Automation): ID: 33244455 Work Experience -Working As Maintenance Instrumentation Control Engineer At Agiba Petroleum Company from jan-2009 to Feb-2010 Field Experience 1. Instrumentation (Reading Manuals, Adjusting, Calibration, troubleshooting , Preventive Maintenance , P&ID diagrams , supervision on contractors projects ) 2. Control (PLC Projects, SCADA, Pneumatic Controllers) 3. Electricity (Fair Knowledge) 4. Attend a commissioning of a small project to convert a conventional control panel to PLC panel on a train containing Heater Treater , Desalter , scrubber, cooler and do all activates (review ladder diagrams , hot loop check with control loops ) 5. Working with small booster pumps with its controller Murphy 6. Working is upgrading for some small projects and make scope of work to Telemetry system and ESD system 7. Good reading with new catalogue find new documentation on internet Working as Project Engineer at El-Wastani Petroleum Company (WASCO) from Feb 2010 to June 2010 Field Experience 1-Supervision on technicians at connecting a lighting, power, fire system network before cementing the roofs 2-Reading AutoCAD Drawings of electrical working (fair) 3- Attend a commissioning of a Noddel compression package by EMC main contractor (WPS, Applied Control) as subcontractor (20 Million US Dollar) 4- Make a punch list before startup the project -Working as Senior Instrumentation & Control Engineer at EGBDCO (Egyptian Bahraini Gas Derivative Company) from June 2010 till now(Get Promoted at Jan 2014) NGL Plant Project (150 Million US Dollar)
  • 2. Work Experience (Engineering Phase, Construction Phase, Commissioning and Start Up phase) 1- Reviewing data sheets of all instrumentation sent by engineering firm 2- Searching about all new technologies of all control and instrument companies like (Siemens, AllenBradlly, FMC, Emerson, Wika…) 3- Making Tenders, Contracts, technical clarifications for vendors, revise the material on site based on packing list and the P.O issued. 4- Attend the FAT test of ICSS (integrated control safety system ) At Exterran Dubai and make the release for shipment for them 5- Make punch list for ICSS at the fat prior to the SAT based on P&ID, Control Narratives,C&E 6- Supervise the construction company Petrojet on Instrumentation works based on received drawing from the engineering firm (cable trays, installation of transmitters …) 7- Making a construction punch list to be done before commissioning 8- Attend Hazop of our plant utility by Risk Tec company 9- Attend a Control Narrative Course by the engineering company Exterran 10- Attend SAT for Fire and Gas detection System (Safety Manager –Honeywell ) and sign the SAT document 11- Member of commissioning team and supervisor for all commissioning activities(Loop Check, Functional test, instrument Calibration , control system modification 12- Member in the startup of the Plant and commissioning of each package (Solar Turbine Compressor,Turboexpander Mafitrench , Gas Chromatograph, metering system , Fire and Gas system , Tank Gauging system ) 13- Reading from Standard (ISA,NFPA,IEEE.IEC) 14- Executing Master Plan For Preventive Maintenance CMMS program (EMCMAINT,ORACLE) 15- Doing Shut Down Plans and CM’s Plans 16- Executing Budget For Instrument Department 17- Work with (PTW, COW, Risk Assesment, Procedures…) 18- Calibration activities for all sensors (Pressure,Flow,Temprature.Level) 19- Attend Hazop for Fuel Gas Skid Project Tools of work 1-Very Familiar with Control system Controller software and corresponding Display system (WinCC, Factory Talk, HMI Builder, ACQIRA, Omni Flow Computers) 2- Deal with all instrument brands (Emerson, Micro Motion, Yokogawa, Rosemount, FMC,…..) 3- Field Communicator with HART, Field Bus Protocols 4-Deal with all communication protocols, RS-485,232, ModBus, etc 5- Flow Computers 6- All Software related to my instrument and Control work 7- Public Address General Alarm System (Industronic) PROFESSIONAL TRAINING & COURSES Attended EED 2008 (Egyptian Engineering Day) As Exhibitor of My Project SMART SCADA  Power Transformers Operation & Maintenance at EATG by Dr.Mohamed Hamdallah From 29-3-2009 to 2-4-2009  HSE Induction, Near Miss & Hazard Observation at PETROSAFE from 3/5/2009 to 4/5/2009 (Instructor: Eng.Esam El Hellawy)  Risk Assessment, Hazid &Hazop Principle at PETROSAFE from 5/5/2009 to 7/5/2009 (Instructor: Eng.Esam El Hellawy)  Introduction to Step7 300 SIMATIC & wincc2007 (Commissioning of Midpoint Project) By EMC form 14/6/2009 to 16/6/2009  Pneumatic Control System at Oil & Gas Skills (OGS) from 27/12/2009 to 31/12/2009 By Eng.Allaa Omar El Din (GASCO)
  • 3.  Control Logix 5000 Fundamentals and troubleshooting at (El Sewedy Automation ) from 17/10/2010 to 21/10/2010  Factory Talk SE Fundamental and troubleshooting at (El Sewedy Automation ) from 24/10/2010 to 26 /10/2010  RSlinx and RS networks Fundamental and troubleshooting at (El Sewedy Automation ) from 27/10/2010 to 28 /10/2010  Expander Compressor P&ID explanation , operation  Tailored Course customized on my application ( RSLOGIX5000,Factory Talk 6) AT JAN 2013  Analytical Instrumentation and Gas Chromatograph Jan 2014  Safety Instrumented System and Emergency Shutdown System based on IEC61511,61508,ISA84 Other Skills • Traveling, Reading, Web Navigation, Searching, and Messaging • Effectively communicates in a cross-functional teamwork • Got a sense of self-confidence and determination • Able to work under pressure. • Quickly learns new topics that are related to my career • Hopes for further development and training • Member in Resala Organization for Charity works • Member in El Ahly Sporting Club EDUCATION WORKING ON RESEARCH POINT (INDUSTRIAL WIRELESS INSTRUMENT IN OIL AND GAS FIELD)  PREPARING TO Automatic control MASTER - Faculty of Engineering –Mansoura University Research point (wireless instrumentation) Grade: Good 78.75%  2008-2009 Automatic control Diploma-Faculty of Engineering –Mansoura University Grade: Very. Good 79.5% Research Point (SCADA over oil industry) 2003-2008 Bachelor's degree Faculty of Engineering- Mansoura University-Computer and system Dept. General Grade: Pass Graduation year 2008 LANGUAGE ARABIC : Mother Tongue ENGLISH: Very Good (writing, reading & speaking) Graduation project Graduation project title: SMART SCADA (Implementation over Power Distribution and Protection) Graduation project grade: Excellent References Available upon request