PDCA
Prepared by Indar Hendarin
28..12.2017
PROBLEM SOLVING & DECISION MAKING
 + IDE PERBAIKAN
2
1. Overview of the PDCA Problem Solving Cycle.
2. Foundations of the PDCA Cycle
3. Plan Step
4. Do Step
5. Check Step
6. Act Step
7. Using the Problem Solving Tools and PDCA
 PDCA – PROBLEM SOLVING & DECISION MAKING
3
Overview of the PDCA Problem Solving Cycle: The PDCA Wheel
Design or revise business process
components to improve results.
Implement the plan and measure
its performance.
Assess the measurements and report the
results to decision makers.
Decide on changes needed to
improve the process.
The concept of the PDCA Cycle was originally developed by Walter Shewhart at Bell Laboratories in
the 1930s. It was then popularized by W. Edwards Deming in the 1950s onward and is frequently
referred to as “the Deming Wheel.”
4
Foundations of the PDCA Cycle
The foundations of the PDCA cycle and Deming’s teachings consist of the following
three principles:
1.Customer Satisfaction: Satisfying customers’ needs should be paramount for all
workers in the organization.
2.Management by Fact. Decision making must be made on data collected from
operations and analyzed using statistical tools. Decision makers must practice and
encourage a scientific approach to problem solving.
3.Respect for People. A sustainable problem solving and continuous improvement
approach should be based on the belief that employees are self-motivated and are
capable of coming up with effective and creative ideas.
5
Steps of PDCA: The Plan step
 Recognize the problem and establish priorities.
Problem may be outlined in very general terms based on information from several
sources.
 Form the problem solving team.
Interdisciplinary teams of individuals close to the problem are best.
 Define the problem and its scope clearly.
Who,What,Where and When.
Pareto Analysis can be useful in defining the problem.
 Analyze the problem/process.
Process flowcharts can be useful a useful tool.
 Determine possible causes.
Cause-and-effect diagrams are helpful in identifying root causes of a problem.
Data from the diagrams can be organized using check sheets, scatter diagrams,
histograms, and run charts.
 Identify possible solutions.
Brainstorm to find solutions. Avoid the temptation to propose quick, immediate
fixes. Goals should be specific, measurable, achievable, and realistic.
 Evaluate potential solutions.
Focus on solutions that address root causes and prevention of problem
occurrence. Solutions should be cost-effective; achieving group consensus is
important.
6
Steps of PDCA (continued)
The Do step
 Implement the solution or process change
 Monitor results and collect data
The Check step
 Review and evaluate the result of the change
 Measure progress against milestones
 Check for any unforeseen consequences
The Act step
 If successful,
 Standardize process changes
 Communicate to all involved
 Provide training in new methods
7
Problem Solving Tools
1. Check Sheet. A simple tool for collecting data about problems or complaints.
Example 1.
Appliance Department Complaints
Late Wrong Faulty Total Units %
Month delivery appliance installation installed Complaints
January 2 3 3 8 800 1.00%
February 4 3 4 11 900 1.22%
March 1 4 3 8 750 1.07%
April 4 5 2 11 1050 1.05%
May 3 5 5 13 1400 0.93%
June 2 6 3 11 980 1.12%
July 3 4 4 11 1030 1.07%
August 5 6 6 17 1500 1.13%
September 3 5 5 13 1330 0.98%
October 4 6 6 16 1500 1.07%
November 3 7 5 15 1320 1.14%
December 3 8 6 17 1550 1.10%
8
Problem Solving Tools (continued)
2. Histogram. A graph which presents the collected data as a frequency distribution in bar-chart
form. Example 1
Complaint Type
0
1
2
3
4
5
6
7
8
9
January
February
March
April
May
June
July
August
September
October
November
December
Month
Frequency
Late
Wrong
Faulty
9
Problem Solving Tools (continued)
3. Pareto Chart. Orders problems by their relative frequency in decreasing order. Focus
and priority should be given to problems that offer the largest potential improvement.
Example 1
Pareto Chart for complaints
0
10
20
30
40
50
60
70
Wrong appliance Faulty installation Late delivery
Complaint category
Numberofcomplaints
10
Problem Solving Tools (continued)
4. Scatter Diagram. A graphical tool to check if two relationships exist between two
variables. Example 1
Scatter Diagram for faulty installations
0
20
40
60
80
100
120
140
160
180
0 1 2 3 4 5 6 7
Number of faulty installations
Numberofinstallationspercrew
11
Problem Solving Tools (continued)
5. Flowchart. A visual representation of a process which can help in identifying points
where failures may occur and intervention is useful. Example 2
Rounded box - represents an event which occurs automatically, such as receive telephone call.
Rectangle or box - represents an event which is controlled within the process. A step or action which is
taken.
Diamond - represents a decision point in the process. Typically will require a `yes' or `no' response.
Circle - represents a point at which the flowchart connects with another process. The name of the other
process appears within the symbol.
12
Problem Solving Tools (continued)
6. Cause-and-effect diagram (fishbone diagram). Offers a structured approach for
identifying all possible causes of a problem. The classic diagram is as shown:
In retail, a better representation is the 5S (Pal & Byron 2003):
13
Problem Solving Tools (continued)
7. Control Chart. Is a statistical tool used to monitor the performance of a process over
time. It is a time-ordered graph of sample data which can be used to identify when
assignable causes of variation may be present.
Example 1
If observations fall between the lower control limit and the upper control limit, then the
process is in control. Otherwise, corrective action is needed.
Control Chart for Complaints
0.70%
1.00%
1.30%
0 2 4 6 8 10 12 14
Month
%complaints
Upper Control Limit
Lower Control Limit
14
Problem Solving Tools (continued)
Process variations can be one of two types:
a) Random variations which are created by many minor factors.
b) Assignable variations whose main source can be identified and corrected.
There are four types of control charts:
1. Control Charts for Variables. Variables are measured such as length of time a certain
item is out of stock. Control charts can be:
1.a. Mean Control Charts
1.b. Range Control Charts
2. Control Charts for Attributes. Attributes are counted such as number of service calls and
number of returns on an item. Control charts can be:
2.a. p-charts
2.b. c-Charts
15
Problem Solving Tools (continued)
Mean Control Charts: Used to measure the mean (central tendency) of a process.
Example 3: A store manager is concerned about the length of time items are out of stock.
The store manager has a policy that the average time items can be out of stock is 2.2
days (30.8 hours based on 14-hour days) with a standard deviation of 5 hours. A sample
of 10 out of stock items was taken and the length of time they were out of stock was
measured. The data is shown below:
LCL=Mean-2(Standard Deviation) = 30.8 – 2 (5)= 20.8 hrs
UCL=Mean+2(Standard Deviation) = 30.8 + 2 (5)= 40.8 hrs
Since 41.2 is larger than 40.8, the duration of out of stock has a mean larger than 30.8
hours.
Duration
Item out of stock
1 18
2 33
3 29
4 45
5 50
6 45
7 60
8 31
9 40
10 61
Average 41.2
16
Problem Solving Tools (continued)
Range Control Charts: Used to measure the variability (dispersion) of a process. Example 3:
Suppose that the average range for the mean stock out duration over the last 5 samples has
been R1=32 hours
Range = R = 61 – 18 = 43 hours
LCLR = D3 R =0.22 × 32= 7.04 hours
UCLR = D4 R = 1.78 × 32= 56.96 hours
Since 43 is between 7.04 and 56.96, the dispersion of the stock out times has not changed.
17
Problem Solving Tools (continued)
p-charts: Used to monitor the percentage of failures generated by a process. Example 1:
Suppose that managers are concerned about increased number of complaints in Oct-Dec. Has
the installation process deteriorated over the last three months?
Using Jan-Sep data
Proportion of complaints =103/9740=0.01057
For sample size of 100 installations for Oct, Nov, and Dec, Standard deviation of p =
((0.015057)(1-0.01057)/400)1/2=0.005113
LCL=0.01057-2(0.005113)=0.000348
UCL=0.01057+2(0.005113)=0.02080
Since all sample proportions are between 0.00348 and 0.02080, the process is in control.
Late Wrong Faulty Total Sample %
delivery appliance installation Size Complaints
October 1 3 4 8 400 2.00%
November 1 3 3 7 400 1.75%
December 2 2 3 7 400 1.75%
18
Problem Solving Tools (continued)
c-Charts: Used to monitor the number of defects per unit. Example 4: Number of
defectives per 25 yd2 of installed bathroom tile in 10 samples of 25 yd2 are:
LCL=Average–2 (average)1/2 =1.90–2 (1.90)1/2 = -0.857 LCL=0
UCL=Average+2(average)1/2 =1.90+2 (1.90)1/2 = 4.65
A new sample of 25 yd2 was examined and the number of defects was 5. Since
5>4.65, the process needs to be examined.
Number
Sample of defects
1 2
2 3
3 0
4 2
5 1
6 3
7 2
8 1
9 2
10 3
Average 1.90
19
Problem Solving Tools (continued)
8. Run Chart. A graphical tool to monitor important process variables over time. A helpful
tool in identifying trends and cycles. Example 1
9. Brainstorming. An idea generating technique for a group of people to solve problems.
 Encourage unrestrained collective thinking
 All ideas are welcomed
 No single member dominates the session
Run chart for good installations
98.60%
98.70%
98.80%
98.90%
99.00%
99.10%
1 2 3 4 5 6 7 8 9 10 11 12
Period
%goodinstallations
20
Konsep Ide Perbaikan
Contents
1. Konsep
2. COPQ
3. Target
4. Form Ide Perbaikan
5. Kriteria Ide Perbaikan
6. Sample Ide Perbaikan
21
21/8
Mencari masalah dalam area kerja
dengan kriteria :
Energi
Produk
Proses
Lain”
Pemilihan Tema
Mengurangi COPQ
Meningkatkan produktivitas
Meningkatkan motivasi kerja
karyawan
Tujuan
Menentukan jumlah Incentive sesuai
hasil penilaian
Penilaian bertingkat oleh pimpinan
setempat
Penilaian akhir oleh tim khusus sesuai
tinjauan area kerja.
Incentive
Menentukan target perbaikan
Melaksanakan Ide Perbaikan sesuai
target/tim/bulan
Membuat laporan sebelum dan
sesudah perbaikan
Perbaikan
Untuk meningkatkan persaingan bisnis maka perlu menguatkan pola pikir karyawan
untuk melakukan inovasi dengan melakukan kegiatan inovasi di area kerja sampai
kepada hal terkecil dengan melibatkan seluruh karyawan.
IDE PERBAIKAN
1. Konsep
22
• Hidden Loss adalah loss yang tidak tampak pada hasil akhir proses ataupun
customer kita.
• Ganti Model
• Ganti Material
• Mesin Trouble
• Perbaikan Kualitas
• Proses Lain
• Terlambat pengiriman
• Kelebihan Stock
• Loading Ulang
• Test Analisa
• Perubahan Design
Model
• Hidden loss harus diangkat ke permukaan untuk memudahkan dalam analisa
masalah serta mencari solusi pemecahan
Direct Loss
Hidden Loss
Peluang untuk
meningkatkan
keuntungan
2. COPQ (Cost of Poor Quality)
COPQ adalah biaya yang harus dikeluarkan karena tidak mengerjakan dengan
benar dari pertama (Not 1st Quality)
22/8
23
23/8
Ide Perbaikan
(Unit : EA)
3. Target
Penetapan target pelaksanaan ide perbaikan adalah berdasarkan persentase
jumlah ide perbaikan terhadap jumlah karyawan di setiap area kerja dengan
rasio xx per bulan.
’08
Target
xxx
*) Jumlah Karyawan
= xx X 6 Bulan (Jul~Dec)
= xxx
(*
’08 Target
DEPT. 2Q 3Q 4Q
Xxx
xxx
xxx
xxx
xxx
xxx
TOTAL
T/T
Target
/Bulan
1Q 2Q 3Q 4Q
xxx
xx
xx
xx
Trend Target
(Unit : EA)
**) Mulai : Juli 2008
(**
24
24/8
▣. Hasil kegiatan IDE PERBAIKAN
Judul tema
Kesimpulan
Efek Pengontrolan Selanjutnya
Masa
pelaksanaan
PIC/NIK
Kuantitatif Kualitatif
Analisa dan Inspeksi Perbaikan & HasilMasalah dan Kondisi
Sekarang
KPI (Unit) Sebelum Sesudah
Target
Kategori
Ka.Seksi Ka.Tim
Level:
FI Tim MI Tim
Level :
1 – 2 – 3 - 4
Dept.
/DIV Process
Level: Level: Level:
Energi Proses
Produk Lain”
4. Form Ide Perbaikan
25
25/8
▣. Hasil kegiatan IDE PERBAIKAN
Judul tema
Kesimpulan
Efek Pengontrolan Selanjutnya
Masa
pelaksanaan
PIC/NIK
Kuantitatif Kualitatif
Analisa dan Inspeksi Perbaikan & HasilMasalah dan Kondisi
Sekarang
KPI (Unit) Sebelum Sesudah
Target
Kategori
Energi Proses
Produk Lain”
Ka.Seksi Ka.Tim
Level:
FI Tim MI Tim
Level :
1 – 2 – 3 - 4
Dept.
/DIV Process
Level: Level: Level:
Cost Saving
- Per bulan atau pertahun
Kondisi sebelum Kondisi sesudah
Hal yang
terukur
(satuannya)
Hasil
sebelum
Hasil
sesudah
Penjelasan singkat hasil perbaikan
(Summary)
- Analisa masalah
- Isi perbaikan
Bagaimana untuk menjaga kestabilan kondisi
:
- Pemakaian checksheet
- Rutinitas kegiatan
- Audit, dll.
Area proses
perbaikan
4. Form Ide Perbaikan
26
26/8
5. Kriteria Ide Perbaikan
Item Kinerja Level - 1(Rp 10.000) Level - 2 (Rp 20.000) Level - 3 (Rp 30.000) Level - 4 (Rp 50.000)
Product/Man hour Peningkatan < 2.5% 2.5% - 5% 5% - 10% 10.1 - 15%
Loss Time Pengurangan < 2.5% 2.5% - 5%
Defect Ratio Pengurangan < 2.5% 2.5% - 5%
Yield Peningkatan < 2.5% 2.5% - 5% 5% - 10% 10.1% ~ 15%
Customer Service Pengurangan < 2.5% 2.5% - 5%
Lain”
Umum Penghematan Rp 1.000.000 per bulan Rp 2.000.000 per Month Rp 3.000.000 per bulan > Rp 3.000.000 per bulan
Prosedur Kerja 5% ~ 10% 10%
Pemakaian Ulang
< 2.5% 2.5% - 5% 5% ~ 10% >10 %
< 2.5% 2.5% - 5% 5% - 10 % >10 %
Level bahaya/ Faktor Resiko Membuat tanda bahaya Membuat/revisi prosedur kerja
Lining, labeling, sticker Visual Penandaan posisi (material, rute) Pada area bahaya
Visual Management Info Visual
Visual umum Membuat visual digital
Actual Action Lay out Visual
Maintenance Machine < 2.5% 2.5% - 5% 5% - 10 % >10 %
5 ~ 10% dari Loss Time kritis. (data 3
bulan terakhir)
> 10% From Critical Loss Time.
Attachment : 3 months previous data
5 ~ 10% dari Loss Time kritis. (data 3
bulan terakhir)
> 10% From 3 Worst defect .
Attachment : 3 months previous data
Mengurangi defect di pelanggan 5.1% ~
10%
Mengurangi defect di pelanggan >
10%
Revisi standar metode
pemeriksaan
Membuat standar metode baru
pemeriksaan
Membuat/modifikasi alat/mesin
produksi untuk mengurangi defect
Membuat/revisi prosedur
kerja untuk penurunan
biaya
Pemakaian material daur
ulang
Pemakaian metrial daur
ulang untuk penurunan
biaya
Membuat alat keselamatan kerja untuk
menghindari insiden (cover mesin,
perputaran mesin)
Membuat visual (Produksi,
Kualitas,TPM,5R)
Membuat visual digital (terhubung
dengan data base)
Membuat sistem visual masalah
mesin (Buzzer dan atau lampu) pada
mesin
Membuat sistem visual masalah
mesin (Buzzer dan atau lampu)
pada ruang kontrol
Membuat sistem visual masalah mesin
di ruang kontrol Control Room dengan
perbaikan manual
Membuat sistem visual masalah
mesin di ruang kontrol Control Room
dengan perbaikan otomatis
Merubah layout station Line, alat kerja
untuk pelaksanaan 3R
Mengurangi frekuensi
masalah mesin
27
27/8
6. Sample Ide Perbaikan
Judul tema
Kesimpulan
Efek Pengontrolan Selanjutnya- Pemakaian stretch Film berkurang total 33.8% (11  8 putaran + Stretching)
Awal : 612 cm (11 out)  557 cm = 9% (Stretching)  405 = 27.3% (8 put)
- Predicted Cost Down:/year
2004 Input Amount = 11.017  Reduce 33.8% = KU$ 3.724/month
Saving to 2004 input amount = KU$ 3.724/month (KU$ 44.69/year)
Masa
pelaksanaan Leader Gilbert S.05.3.01 ~Mengurangi pemakaian Stretch Film
Saat wrapping pallet, total jumlah putaran terlalu banyak pada sisi paling atas dan paling bawah disamping stretching dari Film tersebut
kurang kuat karena tekanan dari udara (air pressure) ke cylinder tidak besar. Hal ini menyebabkan loss pemakaian stretch film yang
cukup besar.
1. Jumlah putaran di sisi paling atas
dan sisi paling bawah terlalu
banyak (2~3 putaran)
2. Kerenggangan stretch film masih
kurang karena ada loss dari kurang
kuatnya air pressure ke cylinder
penahan roll.
Tank
1. Cara yang digunakan sekarang :
- Putaran stationer pada sisi atas dan bawah masing-
masing 2 putaran yang bisa dikurangi menjadi 1
putaran
- Tekanan ke roller kurang sehingga kerenggangan
film saat wrapping kurang
1. Total jumlah putaran pada 14” : (4/3 susun)
Sebelum : 11/9 putaran Sesudah : 8/6 putaran
2. Total jumlah putaran pada 21” : (3/2 susun)
Sebelum : 11/9 putaran Sesudah : 8/6 putaran
3. Kerenggangan film ditingkatkan :
Sebelum : 612 cm Sesudah : 557 cm (9%)
Meningkatkan Lot OK ratio sehingga pem-buangan
stretch film akibat rework dapat dihilangkanKuantitatif Kulitatif
Putaran stasioner
sisi atas dan bawah
terlalu banyak
Mengurangi jumlah putaran bawah
Mengakibatkan terbuka bagian corner Sisi bawah tetap tercover dengan me-
nurunkan sensor bottom dari roller
Analisa dan Inspeksi Perbaikan & HasilMasalah dan kondisi
sekarang
28
THE END
THANK YOU

More Related Content

What's hot

Awareness To Lean & 7 Qc Tools
Awareness To Lean & 7 Qc ToolsAwareness To Lean & 7 Qc Tools
Awareness To Lean & 7 Qc ToolsNilesh Sawant
 
Quality and statistical process control ppt @ bec doms
Quality and statistical process control ppt @ bec domsQuality and statistical process control ppt @ bec doms
Quality and statistical process control ppt @ bec domsBabasab Patil
 
Statistical process control (spc)
Statistical process control (spc)Statistical process control (spc)
Statistical process control (spc)Dinah Faye Indino
 
SPC Basics Training V1 By Carlos Sanchez
SPC Basics Training V1 By Carlos SanchezSPC Basics Training V1 By Carlos Sanchez
SPC Basics Training V1 By Carlos SanchezCarlos Sanchez
 
Quality tools-asq-london-may-10-2006
Quality tools-asq-london-may-10-2006Quality tools-asq-london-may-10-2006
Quality tools-asq-london-may-10-2006Omnex Inc.
 
Histogram, Pareto Diagram, Ishikawa Diagram, and Control Chart
Histogram, Pareto Diagram, Ishikawa Diagram, and Control ChartHistogram, Pareto Diagram, Ishikawa Diagram, and Control Chart
Histogram, Pareto Diagram, Ishikawa Diagram, and Control ChartNicola Ergo
 
Statistical analysis process- dr. a.amsavel
Statistical analysis  process- dr. a.amsavelStatistical analysis  process- dr. a.amsavel
Statistical analysis process- dr. a.amsavelAmsavel Vel
 
7 qc tools
7 qc tools7 qc tools
7 qc toolskmsonam
 
Statistical Process Control
Statistical Process ControlStatistical Process Control
Statistical Process ControlNicola Mezzetti
 
7 QC quality control (7 QC) tools for continuous improvement of manufacturing...
7 QC quality control (7 QC) tools for continuous improvement of manufacturing...7 QC quality control (7 QC) tools for continuous improvement of manufacturing...
7 QC quality control (7 QC) tools for continuous improvement of manufacturing...Chandan Sah
 
7 QC and New 7 QC Comparison & Applicability
7 QC and New 7 QC Comparison & Applicability7 QC and New 7 QC Comparison & Applicability
7 QC and New 7 QC Comparison & Applicabilityaksahu4u
 
7 qc tools basic
7 qc tools basic7 qc tools basic
7 qc tools basicAnkit Shama
 
#The 7 Basic Quality Tools For Process Improvement - By SN Panigrahi
#The 7 Basic Quality Tools For Process Improvement - By SN Panigrahi#The 7 Basic Quality Tools For Process Improvement - By SN Panigrahi
#The 7 Basic Quality Tools For Process Improvement - By SN PanigrahiSN Panigrahi, PMP
 
Statistical Process control
Statistical Process controlStatistical Process control
Statistical Process controlPrashant Tomar
 
7 qc tools training material[1]
7 qc tools training material[1]7 qc tools training material[1]
7 qc tools training material[1]gurmukh singh
 

What's hot (19)

Awareness To Lean & 7 Qc Tools
Awareness To Lean & 7 Qc ToolsAwareness To Lean & 7 Qc Tools
Awareness To Lean & 7 Qc Tools
 
Quality and statistical process control ppt @ bec doms
Quality and statistical process control ppt @ bec domsQuality and statistical process control ppt @ bec doms
Quality and statistical process control ppt @ bec doms
 
7qc Tools 173
7qc Tools 1737qc Tools 173
7qc Tools 173
 
7 qc tools.
7 qc tools.7 qc tools.
7 qc tools.
 
Statistical process control (spc)
Statistical process control (spc)Statistical process control (spc)
Statistical process control (spc)
 
SPC Basics Training V1 By Carlos Sanchez
SPC Basics Training V1 By Carlos SanchezSPC Basics Training V1 By Carlos Sanchez
SPC Basics Training V1 By Carlos Sanchez
 
Quality tools-asq-london-may-10-2006
Quality tools-asq-london-may-10-2006Quality tools-asq-london-may-10-2006
Quality tools-asq-london-may-10-2006
 
Histogram, Pareto Diagram, Ishikawa Diagram, and Control Chart
Histogram, Pareto Diagram, Ishikawa Diagram, and Control ChartHistogram, Pareto Diagram, Ishikawa Diagram, and Control Chart
Histogram, Pareto Diagram, Ishikawa Diagram, and Control Chart
 
Statistical analysis process- dr. a.amsavel
Statistical analysis  process- dr. a.amsavelStatistical analysis  process- dr. a.amsavel
Statistical analysis process- dr. a.amsavel
 
7 qc tools
7 qc tools7 qc tools
7 qc tools
 
Statistical Process Control
Statistical Process ControlStatistical Process Control
Statistical Process Control
 
7 QC quality control (7 QC) tools for continuous improvement of manufacturing...
7 QC quality control (7 QC) tools for continuous improvement of manufacturing...7 QC quality control (7 QC) tools for continuous improvement of manufacturing...
7 QC quality control (7 QC) tools for continuous improvement of manufacturing...
 
7 qc tool training
7 qc tool  training7 qc tool  training
7 qc tool training
 
7 QC and New 7 QC Comparison & Applicability
7 QC and New 7 QC Comparison & Applicability7 QC and New 7 QC Comparison & Applicability
7 QC and New 7 QC Comparison & Applicability
 
7 qc tools basic
7 qc tools basic7 qc tools basic
7 qc tools basic
 
#The 7 Basic Quality Tools For Process Improvement - By SN Panigrahi
#The 7 Basic Quality Tools For Process Improvement - By SN Panigrahi#The 7 Basic Quality Tools For Process Improvement - By SN Panigrahi
#The 7 Basic Quality Tools For Process Improvement - By SN Panigrahi
 
Statistical Process control
Statistical Process controlStatistical Process control
Statistical Process control
 
7 qc tools training material[1]
7 qc tools training material[1]7 qc tools training material[1]
7 qc tools training material[1]
 
7 qcdoe
7 qcdoe7 qcdoe
7 qcdoe
 

Similar to Pdca prob solving & decision making

problem-solving.pptx
problem-solving.pptxproblem-solving.pptx
problem-solving.pptxhadi261715
 
Seven tools of TQM
Seven tools of TQMSeven tools of TQM
Seven tools of TQMvar93
 
Seven Basic Quality Control Tools أدوات ضبط الجودة السبعة
Seven Basic Quality Control Tools أدوات ضبط الجودة السبعةSeven Basic Quality Control Tools أدوات ضبط الجودة السبعة
Seven Basic Quality Control Tools أدوات ضبط الجودة السبعةMohamed Khaled
 
process monitoring (statistical process control)
process monitoring (statistical process control)process monitoring (statistical process control)
process monitoring (statistical process control)Bindutesh Saner
 
Effective CAPA Implementation in a Management System - Praneet Surti
Effective CAPA Implementation in a Management System - Praneet SurtiEffective CAPA Implementation in a Management System - Praneet Surti
Effective CAPA Implementation in a Management System - Praneet SurtiPraneet Surti
 
Quality Management.ppt
Quality Management.pptQuality Management.ppt
Quality Management.pptddelucy
 
Quality Management & ControlSeung-Kuk Paik, Ph.D.Systems a.docx
Quality Management & ControlSeung-Kuk Paik, Ph.D.Systems a.docxQuality Management & ControlSeung-Kuk Paik, Ph.D.Systems a.docx
Quality Management & ControlSeung-Kuk Paik, Ph.D.Systems a.docxmakdul
 
qc-tools.ppt
qc-tools.pptqc-tools.ppt
qc-tools.pptAlpharoot
 
Mangt tool with statistical process control ch 18 asif jamal
Mangt tool with statistical process control  ch 18 asif jamalMangt tool with statistical process control  ch 18 asif jamal
Mangt tool with statistical process control ch 18 asif jamalAsif Jamal
 
7 QC(Quality Control) Tools
7 QC(Quality Control) Tools7 QC(Quality Control) Tools
7 QC(Quality Control) Toolsmanju3426
 
Root Cause Analysis Guide Book.pdf
Root Cause Analysis Guide Book.pdfRoot Cause Analysis Guide Book.pdf
Root Cause Analysis Guide Book.pdfRohitLakhotia12
 
Optimizing and controlling processes
Optimizing and controlling processesOptimizing and controlling processes
Optimizing and controlling processesnawafino
 
Optimizing and controlling processes
Optimizing and controlling processesOptimizing and controlling processes
Optimizing and controlling processesnawafino
 
OpEx SPC Training Module
OpEx SPC Training ModuleOpEx SPC Training Module
OpEx SPC Training Moduleguestad37e2f
 

Similar to Pdca prob solving & decision making (20)

problem-solving.pptx
problem-solving.pptxproblem-solving.pptx
problem-solving.pptx
 
Seven tools of TQM
Seven tools of TQMSeven tools of TQM
Seven tools of TQM
 
Ch04 spc
Ch04 spcCh04 spc
Ch04 spc
 
Seven Basic Quality Control Tools أدوات ضبط الجودة السبعة
Seven Basic Quality Control Tools أدوات ضبط الجودة السبعةSeven Basic Quality Control Tools أدوات ضبط الجودة السبعة
Seven Basic Quality Control Tools أدوات ضبط الجودة السبعة
 
Training Module
Training ModuleTraining Module
Training Module
 
process monitoring (statistical process control)
process monitoring (statistical process control)process monitoring (statistical process control)
process monitoring (statistical process control)
 
Effective CAPA Implementation in a Management System - Praneet Surti
Effective CAPA Implementation in a Management System - Praneet SurtiEffective CAPA Implementation in a Management System - Praneet Surti
Effective CAPA Implementation in a Management System - Praneet Surti
 
7qc Tools 173
7qc Tools 1737qc Tools 173
7qc Tools 173
 
Total Quality tools
Total Quality toolsTotal Quality tools
Total Quality tools
 
Quality Management.ppt
Quality Management.pptQuality Management.ppt
Quality Management.ppt
 
Quality Management & ControlSeung-Kuk Paik, Ph.D.Systems a.docx
Quality Management & ControlSeung-Kuk Paik, Ph.D.Systems a.docxQuality Management & ControlSeung-Kuk Paik, Ph.D.Systems a.docx
Quality Management & ControlSeung-Kuk Paik, Ph.D.Systems a.docx
 
qc-tools.ppt
qc-tools.pptqc-tools.ppt
qc-tools.ppt
 
Mangt tool with statistical process control ch 18 asif jamal
Mangt tool with statistical process control  ch 18 asif jamalMangt tool with statistical process control  ch 18 asif jamal
Mangt tool with statistical process control ch 18 asif jamal
 
7 QC(Quality Control) Tools
7 QC(Quality Control) Tools7 QC(Quality Control) Tools
7 QC(Quality Control) Tools
 
Root Cause Analysis Guide Book.pdf
Root Cause Analysis Guide Book.pdfRoot Cause Analysis Guide Book.pdf
Root Cause Analysis Guide Book.pdf
 
Report
ReportReport
Report
 
Optimizing and controlling processes
Optimizing and controlling processesOptimizing and controlling processes
Optimizing and controlling processes
 
Optimizing and controlling processes
Optimizing and controlling processesOptimizing and controlling processes
Optimizing and controlling processes
 
OpEx SPC Training Module
OpEx SPC Training ModuleOpEx SPC Training Module
OpEx SPC Training Module
 
Run Chart
Run ChartRun Chart
Run Chart
 

Recently uploaded

(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 

Recently uploaded (20)

(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 

Pdca prob solving & decision making

  • 1. PDCA Prepared by Indar Hendarin 28..12.2017 PROBLEM SOLVING & DECISION MAKING  + IDE PERBAIKAN
  • 2. 2 1. Overview of the PDCA Problem Solving Cycle. 2. Foundations of the PDCA Cycle 3. Plan Step 4. Do Step 5. Check Step 6. Act Step 7. Using the Problem Solving Tools and PDCA  PDCA – PROBLEM SOLVING & DECISION MAKING
  • 3. 3 Overview of the PDCA Problem Solving Cycle: The PDCA Wheel Design or revise business process components to improve results. Implement the plan and measure its performance. Assess the measurements and report the results to decision makers. Decide on changes needed to improve the process. The concept of the PDCA Cycle was originally developed by Walter Shewhart at Bell Laboratories in the 1930s. It was then popularized by W. Edwards Deming in the 1950s onward and is frequently referred to as “the Deming Wheel.”
  • 4. 4 Foundations of the PDCA Cycle The foundations of the PDCA cycle and Deming’s teachings consist of the following three principles: 1.Customer Satisfaction: Satisfying customers’ needs should be paramount for all workers in the organization. 2.Management by Fact. Decision making must be made on data collected from operations and analyzed using statistical tools. Decision makers must practice and encourage a scientific approach to problem solving. 3.Respect for People. A sustainable problem solving and continuous improvement approach should be based on the belief that employees are self-motivated and are capable of coming up with effective and creative ideas.
  • 5. 5 Steps of PDCA: The Plan step  Recognize the problem and establish priorities. Problem may be outlined in very general terms based on information from several sources.  Form the problem solving team. Interdisciplinary teams of individuals close to the problem are best.  Define the problem and its scope clearly. Who,What,Where and When. Pareto Analysis can be useful in defining the problem.  Analyze the problem/process. Process flowcharts can be useful a useful tool.  Determine possible causes. Cause-and-effect diagrams are helpful in identifying root causes of a problem. Data from the diagrams can be organized using check sheets, scatter diagrams, histograms, and run charts.  Identify possible solutions. Brainstorm to find solutions. Avoid the temptation to propose quick, immediate fixes. Goals should be specific, measurable, achievable, and realistic.  Evaluate potential solutions. Focus on solutions that address root causes and prevention of problem occurrence. Solutions should be cost-effective; achieving group consensus is important.
  • 6. 6 Steps of PDCA (continued) The Do step  Implement the solution or process change  Monitor results and collect data The Check step  Review and evaluate the result of the change  Measure progress against milestones  Check for any unforeseen consequences The Act step  If successful,  Standardize process changes  Communicate to all involved  Provide training in new methods
  • 7. 7 Problem Solving Tools 1. Check Sheet. A simple tool for collecting data about problems or complaints. Example 1. Appliance Department Complaints Late Wrong Faulty Total Units % Month delivery appliance installation installed Complaints January 2 3 3 8 800 1.00% February 4 3 4 11 900 1.22% March 1 4 3 8 750 1.07% April 4 5 2 11 1050 1.05% May 3 5 5 13 1400 0.93% June 2 6 3 11 980 1.12% July 3 4 4 11 1030 1.07% August 5 6 6 17 1500 1.13% September 3 5 5 13 1330 0.98% October 4 6 6 16 1500 1.07% November 3 7 5 15 1320 1.14% December 3 8 6 17 1550 1.10%
  • 8. 8 Problem Solving Tools (continued) 2. Histogram. A graph which presents the collected data as a frequency distribution in bar-chart form. Example 1 Complaint Type 0 1 2 3 4 5 6 7 8 9 January February March April May June July August September October November December Month Frequency Late Wrong Faulty
  • 9. 9 Problem Solving Tools (continued) 3. Pareto Chart. Orders problems by their relative frequency in decreasing order. Focus and priority should be given to problems that offer the largest potential improvement. Example 1 Pareto Chart for complaints 0 10 20 30 40 50 60 70 Wrong appliance Faulty installation Late delivery Complaint category Numberofcomplaints
  • 10. 10 Problem Solving Tools (continued) 4. Scatter Diagram. A graphical tool to check if two relationships exist between two variables. Example 1 Scatter Diagram for faulty installations 0 20 40 60 80 100 120 140 160 180 0 1 2 3 4 5 6 7 Number of faulty installations Numberofinstallationspercrew
  • 11. 11 Problem Solving Tools (continued) 5. Flowchart. A visual representation of a process which can help in identifying points where failures may occur and intervention is useful. Example 2 Rounded box - represents an event which occurs automatically, such as receive telephone call. Rectangle or box - represents an event which is controlled within the process. A step or action which is taken. Diamond - represents a decision point in the process. Typically will require a `yes' or `no' response. Circle - represents a point at which the flowchart connects with another process. The name of the other process appears within the symbol.
  • 12. 12 Problem Solving Tools (continued) 6. Cause-and-effect diagram (fishbone diagram). Offers a structured approach for identifying all possible causes of a problem. The classic diagram is as shown: In retail, a better representation is the 5S (Pal & Byron 2003):
  • 13. 13 Problem Solving Tools (continued) 7. Control Chart. Is a statistical tool used to monitor the performance of a process over time. It is a time-ordered graph of sample data which can be used to identify when assignable causes of variation may be present. Example 1 If observations fall between the lower control limit and the upper control limit, then the process is in control. Otherwise, corrective action is needed. Control Chart for Complaints 0.70% 1.00% 1.30% 0 2 4 6 8 10 12 14 Month %complaints Upper Control Limit Lower Control Limit
  • 14. 14 Problem Solving Tools (continued) Process variations can be one of two types: a) Random variations which are created by many minor factors. b) Assignable variations whose main source can be identified and corrected. There are four types of control charts: 1. Control Charts for Variables. Variables are measured such as length of time a certain item is out of stock. Control charts can be: 1.a. Mean Control Charts 1.b. Range Control Charts 2. Control Charts for Attributes. Attributes are counted such as number of service calls and number of returns on an item. Control charts can be: 2.a. p-charts 2.b. c-Charts
  • 15. 15 Problem Solving Tools (continued) Mean Control Charts: Used to measure the mean (central tendency) of a process. Example 3: A store manager is concerned about the length of time items are out of stock. The store manager has a policy that the average time items can be out of stock is 2.2 days (30.8 hours based on 14-hour days) with a standard deviation of 5 hours. A sample of 10 out of stock items was taken and the length of time they were out of stock was measured. The data is shown below: LCL=Mean-2(Standard Deviation) = 30.8 – 2 (5)= 20.8 hrs UCL=Mean+2(Standard Deviation) = 30.8 + 2 (5)= 40.8 hrs Since 41.2 is larger than 40.8, the duration of out of stock has a mean larger than 30.8 hours. Duration Item out of stock 1 18 2 33 3 29 4 45 5 50 6 45 7 60 8 31 9 40 10 61 Average 41.2
  • 16. 16 Problem Solving Tools (continued) Range Control Charts: Used to measure the variability (dispersion) of a process. Example 3: Suppose that the average range for the mean stock out duration over the last 5 samples has been R1=32 hours Range = R = 61 – 18 = 43 hours LCLR = D3 R =0.22 × 32= 7.04 hours UCLR = D4 R = 1.78 × 32= 56.96 hours Since 43 is between 7.04 and 56.96, the dispersion of the stock out times has not changed.
  • 17. 17 Problem Solving Tools (continued) p-charts: Used to monitor the percentage of failures generated by a process. Example 1: Suppose that managers are concerned about increased number of complaints in Oct-Dec. Has the installation process deteriorated over the last three months? Using Jan-Sep data Proportion of complaints =103/9740=0.01057 For sample size of 100 installations for Oct, Nov, and Dec, Standard deviation of p = ((0.015057)(1-0.01057)/400)1/2=0.005113 LCL=0.01057-2(0.005113)=0.000348 UCL=0.01057+2(0.005113)=0.02080 Since all sample proportions are between 0.00348 and 0.02080, the process is in control. Late Wrong Faulty Total Sample % delivery appliance installation Size Complaints October 1 3 4 8 400 2.00% November 1 3 3 7 400 1.75% December 2 2 3 7 400 1.75%
  • 18. 18 Problem Solving Tools (continued) c-Charts: Used to monitor the number of defects per unit. Example 4: Number of defectives per 25 yd2 of installed bathroom tile in 10 samples of 25 yd2 are: LCL=Average–2 (average)1/2 =1.90–2 (1.90)1/2 = -0.857 LCL=0 UCL=Average+2(average)1/2 =1.90+2 (1.90)1/2 = 4.65 A new sample of 25 yd2 was examined and the number of defects was 5. Since 5>4.65, the process needs to be examined. Number Sample of defects 1 2 2 3 3 0 4 2 5 1 6 3 7 2 8 1 9 2 10 3 Average 1.90
  • 19. 19 Problem Solving Tools (continued) 8. Run Chart. A graphical tool to monitor important process variables over time. A helpful tool in identifying trends and cycles. Example 1 9. Brainstorming. An idea generating technique for a group of people to solve problems.  Encourage unrestrained collective thinking  All ideas are welcomed  No single member dominates the session Run chart for good installations 98.60% 98.70% 98.80% 98.90% 99.00% 99.10% 1 2 3 4 5 6 7 8 9 10 11 12 Period %goodinstallations
  • 20. 20 Konsep Ide Perbaikan Contents 1. Konsep 2. COPQ 3. Target 4. Form Ide Perbaikan 5. Kriteria Ide Perbaikan 6. Sample Ide Perbaikan
  • 21. 21 21/8 Mencari masalah dalam area kerja dengan kriteria : Energi Produk Proses Lain” Pemilihan Tema Mengurangi COPQ Meningkatkan produktivitas Meningkatkan motivasi kerja karyawan Tujuan Menentukan jumlah Incentive sesuai hasil penilaian Penilaian bertingkat oleh pimpinan setempat Penilaian akhir oleh tim khusus sesuai tinjauan area kerja. Incentive Menentukan target perbaikan Melaksanakan Ide Perbaikan sesuai target/tim/bulan Membuat laporan sebelum dan sesudah perbaikan Perbaikan Untuk meningkatkan persaingan bisnis maka perlu menguatkan pola pikir karyawan untuk melakukan inovasi dengan melakukan kegiatan inovasi di area kerja sampai kepada hal terkecil dengan melibatkan seluruh karyawan. IDE PERBAIKAN 1. Konsep
  • 22. 22 • Hidden Loss adalah loss yang tidak tampak pada hasil akhir proses ataupun customer kita. • Ganti Model • Ganti Material • Mesin Trouble • Perbaikan Kualitas • Proses Lain • Terlambat pengiriman • Kelebihan Stock • Loading Ulang • Test Analisa • Perubahan Design Model • Hidden loss harus diangkat ke permukaan untuk memudahkan dalam analisa masalah serta mencari solusi pemecahan Direct Loss Hidden Loss Peluang untuk meningkatkan keuntungan 2. COPQ (Cost of Poor Quality) COPQ adalah biaya yang harus dikeluarkan karena tidak mengerjakan dengan benar dari pertama (Not 1st Quality) 22/8
  • 23. 23 23/8 Ide Perbaikan (Unit : EA) 3. Target Penetapan target pelaksanaan ide perbaikan adalah berdasarkan persentase jumlah ide perbaikan terhadap jumlah karyawan di setiap area kerja dengan rasio xx per bulan. ’08 Target xxx *) Jumlah Karyawan = xx X 6 Bulan (Jul~Dec) = xxx (* ’08 Target DEPT. 2Q 3Q 4Q Xxx xxx xxx xxx xxx xxx TOTAL T/T Target /Bulan 1Q 2Q 3Q 4Q xxx xx xx xx Trend Target (Unit : EA) **) Mulai : Juli 2008 (**
  • 24. 24 24/8 ▣. Hasil kegiatan IDE PERBAIKAN Judul tema Kesimpulan Efek Pengontrolan Selanjutnya Masa pelaksanaan PIC/NIK Kuantitatif Kualitatif Analisa dan Inspeksi Perbaikan & HasilMasalah dan Kondisi Sekarang KPI (Unit) Sebelum Sesudah Target Kategori Ka.Seksi Ka.Tim Level: FI Tim MI Tim Level : 1 – 2 – 3 - 4 Dept. /DIV Process Level: Level: Level: Energi Proses Produk Lain” 4. Form Ide Perbaikan
  • 25. 25 25/8 ▣. Hasil kegiatan IDE PERBAIKAN Judul tema Kesimpulan Efek Pengontrolan Selanjutnya Masa pelaksanaan PIC/NIK Kuantitatif Kualitatif Analisa dan Inspeksi Perbaikan & HasilMasalah dan Kondisi Sekarang KPI (Unit) Sebelum Sesudah Target Kategori Energi Proses Produk Lain” Ka.Seksi Ka.Tim Level: FI Tim MI Tim Level : 1 – 2 – 3 - 4 Dept. /DIV Process Level: Level: Level: Cost Saving - Per bulan atau pertahun Kondisi sebelum Kondisi sesudah Hal yang terukur (satuannya) Hasil sebelum Hasil sesudah Penjelasan singkat hasil perbaikan (Summary) - Analisa masalah - Isi perbaikan Bagaimana untuk menjaga kestabilan kondisi : - Pemakaian checksheet - Rutinitas kegiatan - Audit, dll. Area proses perbaikan 4. Form Ide Perbaikan
  • 26. 26 26/8 5. Kriteria Ide Perbaikan Item Kinerja Level - 1(Rp 10.000) Level - 2 (Rp 20.000) Level - 3 (Rp 30.000) Level - 4 (Rp 50.000) Product/Man hour Peningkatan < 2.5% 2.5% - 5% 5% - 10% 10.1 - 15% Loss Time Pengurangan < 2.5% 2.5% - 5% Defect Ratio Pengurangan < 2.5% 2.5% - 5% Yield Peningkatan < 2.5% 2.5% - 5% 5% - 10% 10.1% ~ 15% Customer Service Pengurangan < 2.5% 2.5% - 5% Lain” Umum Penghematan Rp 1.000.000 per bulan Rp 2.000.000 per Month Rp 3.000.000 per bulan > Rp 3.000.000 per bulan Prosedur Kerja 5% ~ 10% 10% Pemakaian Ulang < 2.5% 2.5% - 5% 5% ~ 10% >10 % < 2.5% 2.5% - 5% 5% - 10 % >10 % Level bahaya/ Faktor Resiko Membuat tanda bahaya Membuat/revisi prosedur kerja Lining, labeling, sticker Visual Penandaan posisi (material, rute) Pada area bahaya Visual Management Info Visual Visual umum Membuat visual digital Actual Action Lay out Visual Maintenance Machine < 2.5% 2.5% - 5% 5% - 10 % >10 % 5 ~ 10% dari Loss Time kritis. (data 3 bulan terakhir) > 10% From Critical Loss Time. Attachment : 3 months previous data 5 ~ 10% dari Loss Time kritis. (data 3 bulan terakhir) > 10% From 3 Worst defect . Attachment : 3 months previous data Mengurangi defect di pelanggan 5.1% ~ 10% Mengurangi defect di pelanggan > 10% Revisi standar metode pemeriksaan Membuat standar metode baru pemeriksaan Membuat/modifikasi alat/mesin produksi untuk mengurangi defect Membuat/revisi prosedur kerja untuk penurunan biaya Pemakaian material daur ulang Pemakaian metrial daur ulang untuk penurunan biaya Membuat alat keselamatan kerja untuk menghindari insiden (cover mesin, perputaran mesin) Membuat visual (Produksi, Kualitas,TPM,5R) Membuat visual digital (terhubung dengan data base) Membuat sistem visual masalah mesin (Buzzer dan atau lampu) pada mesin Membuat sistem visual masalah mesin (Buzzer dan atau lampu) pada ruang kontrol Membuat sistem visual masalah mesin di ruang kontrol Control Room dengan perbaikan manual Membuat sistem visual masalah mesin di ruang kontrol Control Room dengan perbaikan otomatis Merubah layout station Line, alat kerja untuk pelaksanaan 3R Mengurangi frekuensi masalah mesin
  • 27. 27 27/8 6. Sample Ide Perbaikan Judul tema Kesimpulan Efek Pengontrolan Selanjutnya- Pemakaian stretch Film berkurang total 33.8% (11  8 putaran + Stretching) Awal : 612 cm (11 out)  557 cm = 9% (Stretching)  405 = 27.3% (8 put) - Predicted Cost Down:/year 2004 Input Amount = 11.017  Reduce 33.8% = KU$ 3.724/month Saving to 2004 input amount = KU$ 3.724/month (KU$ 44.69/year) Masa pelaksanaan Leader Gilbert S.05.3.01 ~Mengurangi pemakaian Stretch Film Saat wrapping pallet, total jumlah putaran terlalu banyak pada sisi paling atas dan paling bawah disamping stretching dari Film tersebut kurang kuat karena tekanan dari udara (air pressure) ke cylinder tidak besar. Hal ini menyebabkan loss pemakaian stretch film yang cukup besar. 1. Jumlah putaran di sisi paling atas dan sisi paling bawah terlalu banyak (2~3 putaran) 2. Kerenggangan stretch film masih kurang karena ada loss dari kurang kuatnya air pressure ke cylinder penahan roll. Tank 1. Cara yang digunakan sekarang : - Putaran stationer pada sisi atas dan bawah masing- masing 2 putaran yang bisa dikurangi menjadi 1 putaran - Tekanan ke roller kurang sehingga kerenggangan film saat wrapping kurang 1. Total jumlah putaran pada 14” : (4/3 susun) Sebelum : 11/9 putaran Sesudah : 8/6 putaran 2. Total jumlah putaran pada 21” : (3/2 susun) Sebelum : 11/9 putaran Sesudah : 8/6 putaran 3. Kerenggangan film ditingkatkan : Sebelum : 612 cm Sesudah : 557 cm (9%) Meningkatkan Lot OK ratio sehingga pem-buangan stretch film akibat rework dapat dihilangkanKuantitatif Kulitatif Putaran stasioner sisi atas dan bawah terlalu banyak Mengurangi jumlah putaran bawah Mengakibatkan terbuka bagian corner Sisi bawah tetap tercover dengan me- nurunkan sensor bottom dari roller Analisa dan Inspeksi Perbaikan & HasilMasalah dan kondisi sekarang