METRADOC.U.S/.C.PARCIALS/.MES01MES02MES03TOTAL
01OBRASPROVISIONALES6,624.303,486.32400.002,737.996,624.30
01.01MOVILIZACIONYDESMOVILIZACIONDEEQUIPOSYMAQUINARIASglb1.004,675.974,675.972,337.992,337.994,675.97
01.02CARTELDEIDENTIFICACIONDELAOBRADE(3.60x2.40m)und1.00748.33748.33748.33748.33
01.03ALQUILERDEALMACENYOFICINAmes3.00400.001,200.00400.00400.00400.001,200.00
02SEGURIDADYSALUDENOBRAYMEDIOAMBIENTE7,105.063,016.233,016.231,072.607,105.06
02.01EQUIPOSDEPROTECCIÓNINDIVIDUALund25.00155.493,887.251,943.631,943.633,887.25
02.02SEÑALIZACIÓNTEMPORALDESEGURIDADENOBRAund1.00717.81717.81239.27239.27239.27717.81
02.03MITIGACIONAMBIENTALglb1.002,500.002,500.00833.33833.33833.332,500.00
03MOVIMIENTODETIERRAS6,834.196,834.190.000.006,834.19
03.01TRAZO,NIVELACIONYREPLANTEOGENERALm21,664.032.604,326.484,326.484,326.48
03.02DEMOLICIONDEESTRUCTURASDECONCRETOSIMPLEm396.9517.251,672.391,672.391,672.39
03.03ELIMINACIONDEMATERIALEXCEDENTECONMAQUINARIAD<=1kmm3116.347.18835.32835.32835.32
04LOSADEPORTIVA129,873.9048,663.6661,238.1419,972.10129,873.90
04.01TRABAJOSPRELIMINARES1,699.921,699.920.000.001,699.92
04.01.01TRAZO,NIVELACIONYREPLANTEOm2776.222.191,699.921,699.921,699.92
04.02MOVIMIENTODETIERRAS24,421.4724,421.470.000.0024,421.47
04.02.01EXCAVACIONMANUALENTERRENONORMALm3116.4345.025,241.685,241.685,241.68
04.02.02REFINE,NIVELACIONYCOMPACTACIONDESUBRASANTEm2776.223.462,685.722,685.722,685.72
04.02.03BASEGRANULARCOMPACTADOe=0.10MAL95%PROCTORMODIFICADOm2776.2217.1213,288.8913,288.8913,288.89
04.02.04ELIMINACIONDEMATERIALEXCEDENTED=30Mm3139.7222.943,205.183,205.183,205.18
04.03CONCRETOENLOSA67,733.2420,319.9747,413.270.0067,733.24
04.03.01ENCOFRADOYDESENCOFRADOP/LOSAm290.6044.374,019.921,205.982,813.944,019.92
04.03.02CONCRETOF'c=175kg/cm2ENLOSAm3118.77505.5360,041.8018,012.5442,029.2660,041.80
04.03.03CURADODECONCRETOCONADITIVOm2776.224.733,671.521,101.462,570.063,671.52
04.04JUNTASENLOSA2,321.450.000.002,321.452,321.45
04.04.01JUNTASASFALTICASm648.453.582,321.452,321.452,321.45
04.05PINTURA1,872.830.000.001,872.831,872.83
04.05.01PINTADODEMARCASDEPORTIVASENLOSAm422.764.431,872.831,872.831,872.83
04.06ESTRUCTURAMETALICA5,180.360.000.005,180.365,180.36
ÍTEMDESCRIPCIÓNUNID
COSTOBASECRONOGRAMADECOSTOVALORIZADO
CRONOGRAMAVALORIZADODEOBRA
PROYECTO:“CREACIONDELOSADERECREACIONMULTIUSOENLALOCALIDADDESANTOTORIBIODELDISTRITODEMATACOTO–PROVINCIADEYUNGAY–DEPARTAMENTODEANCASH
FECHA:DICIEMBRE2019
METRADOC.U.S/.C.PARCIALS/.MES01MES02MES03TOTAL
ÍTEMDESCRIPCIÓNUNID
COSTOBASECRONOGRAMADECOSTOVALORIZADO
CRONOGRAMAVALORIZADODEOBRA
PROYECTO:“CREACIONDELOSADERECREACIONMULTIUSOENLALOCALIDADDESANTOTORIBIODELDISTRITODEMATACOTO–PROVINCIADEYUNGAY–DEPARTAMENTODEANCASH
FECHA:DICIEMBRE2019
04.06.01ARCODEFULBITO(02ARCOSYTABLEROSDEBASQUET)und2.002,094.024,188.044,188.044,188.04
04.06.02POSTESPARANET(02POSTES)und2.00369.04738.08738.08738.08
04.06.03EQUIPAMIENTODEPORTIVOjgo2.00127.12254.24254.24254.24
04.07DRENAJEPLUVIAL17,476.670.0013,824.873,651.8017,476.67
04.07.01EXCAVACIONPARADRENAJEm318.4045.90844.56844.56844.56
04.07.02REFINE,NIVELACIONYCOMPACTACIONDEBASESm239.603.46137.02137.02137.02
04.07.03RELLENODEZANJACONMATERIALPROPIOm35.6033.07185.19185.19185.19
04.07.04ELIMINACIONDEMATERIALEXCEDENTED=30Mm315.3622.94352.36352.36352.36
04.07.05ENCOFRADOYDESENCOFRADOPARACANALm2116.8368.818,039.078,039.078,039.07
04.07.06CONCRETOF'c=175kg/cm2ENCANALm38.44505.534,266.674,266.674,266.67
04.07.07JUNTASDECONSTRUCCIONm19.803.5870.8870.8870.88
04.07.08REJILLAMETALICAENCANALm64.0042.632,728.322,728.322,728.32
04.07.09TUBERIADEEVACUACIONDELDRENAJEPLUVIALm35.0024.36852.60852.60852.60
04.08INSTALACIONESELECTRICAS(REFLECTORES)9,167.962,222.300.006,945.669,167.96
04.08.01EXCAVACIONDEZANJAENMATERIALSUELTOm314.6245.02658.19658.19658.19
04.08.02INSTALACIONCABLEELECTRICOENDUCTOS,FORMANDOTERNA(CABLES2.5A4MM2)m107.0010.601,134.201,134.201,134.20
04.08.03RELLENODEZANJACONMATERIALPROPIOm313.0033.07429.91429.91429.91
04.08.04CONCRETOF'c=175kg/cm2ENDADOm31.94505.53980.73980.73980.73
04.08.05INSTALACIONDEPOSTESP/REFLECTORESund3.00631.111,893.331,893.331,893.33
04.08.06INSTALACIONDEREFLECTORESund6.00678.604,071.604,071.604,071.60
05CERCOPERIMETRICO93,489.0559,679.8210,335.1523,474.0893,489.05
05.01TRABAJOSPRELIMINARES603.56603.560.000.00603.56
05.01.01TRAZO,NIVELACIONYREPLANTEOm2275.602.19603.56603.56603.56
05.02MOVIMIENTODETIERRAS7,066.457,066.450.000.007,066.45
05.02.01EXCAVACIONDEZANJAPARACIMIENTOSCORRIDOSm385.9445.023,869.023,869.023,869.02
05.02.02REFINE,NIVELACIONYCOMPACTACIONDEBASESm2117.433.46406.31406.31406.31
05.02.03RELLENODEZANJACONMATERIALPROPIOm376.7733.072,538.782,538.782,538.78
05.02.04ELIMINACIONDEMATERIALEXCEDENTED=30Mm311.0022.94252.34252.34252.34
05.03CONCRETOSIMPLE24,520.4317,862.940.006,657.4924,520.43
METRADOC.U.S/.C.PARCIALS/.MES01MES02MES03TOTAL
ÍTEMDESCRIPCIÓNUNID
COSTOBASECRONOGRAMADECOSTOVALORIZADO
CRONOGRAMAVALORIZADODEOBRA
PROYECTO:“CREACIONDELOSADERECREACIONMULTIUSOENLALOCALIDADDESANTOTORIBIODELDISTRITODEMATACOTO–PROVINCIADEYUNGAY–DEPARTAMENTODEANCASH
FECHA:DICIEMBRE2019
05.03.01CONCRETO1:10+30%P.G.PARACIMIENTOSCORRIDOSm332.04347.3811,130.0611,130.0611,130.06
05.03.02ENCOFRADOYDESENCOFRADOPARASOBRECIMIENTOSYVEREDASDEACCESOm260.2868.814,147.874,147.874,147.87
05.03.03CONCRETO1:8+25%P.M.PARASOBRECIMIENTOSm36.37405.812,585.012,585.012,585.01
05.03.04CONCRETOF'c=175kg/cm2ENVEREDADEACCESOm312.47505.536,303.966,303.966,303.96
05.03.05JUNTASDECONSTRUCCIONm98.753.58353.53353.53353.53
05.04MURODECONTENCION34,462.7134,146.870.00315.8434,462.71
05.04.01ENCOFRADOYDESENCOFRADOPARAMUROSm2221.9035.737,928.497,928.497,928.49
05.04.02CONCRETOCICLOPEOFC=140KG/CM2+70%PG.m376.15331.1725,218.6025,218.6025,218.60
05.04.03JUNTADECONTRACCIONE=1",@3.00Mm56.005.64315.84315.84315.84
05.04.04CURADODECONCRETOCONADITIVOm2211.374.73999.78999.78999.78
05.05CERCODEMALLAMETALICA26,835.900.0010,335.1516,500.7526,835.90
05.05.01CERCODEMALLAMETALICA(CARP.METALICA)m146.90140.7120,670.3010,335.1510,335.1520,670.30
05.05.02PUERTAC/MARCODETUBOCUADRADO2"x2"C/MALLANº10m211.20550.506,165.606,165.606,165.60
06TRIBUNA119,876.8759,912.8059,964.070.00119,876.87
06.01TRABAJOSPRELIMINARES278.68278.680.000.00278.68
06.01.01TRAZO,NIVELACIONYREPLANTEOm2127.252.19278.68278.68278.68
06.02MOVIMIENTODETIERRAS3,209.583,209.580.000.003,209.58
06.02.01EXCAVACIONMANUALENMATERIALSUELTOm338.1745.021,718.411,718.411,718.41
06.02.02REFINE,NIVELACIONYCOMPACTACIONDEBASESm2127.253.46440.29440.29440.29
06.02.03ELIMINACIONDEMATERIALEXCEDENTED=30Mm345.8122.941,050.881,050.881,050.88
06.03CONCRETOCICLOPEOENGRADERIAS71,789.1456,424.5415,364.600.0071,789.14
06.03.01ENCOFRADOYDESENCOFRADOP/TRIBUNASYESCALERASm2168.8237.696,362.835,090.261,272.576,362.83
06.03.02CONCRETOCICLOPEOFC=140KG/CM2+70%PG.m3193.48331.1764,074.7751,259.8212,814.9564,074.77
06.03.03JUNTASDECONSTRUCCIONm26.003.5893.0874.4618.6293.08
06.03.04CURADODECONCRETOCONADITIVOm2266.064.731,258.461,258.461,258.46
06.04SOBRECIMIENTO2,111.830.002,111.830.002,111.83
06.04.01ENCOFRADOYDESENCOFRADOPARASOBRECIMIENTOSm220.3768.811,401.661,401.661,401.66
06.04.02CONCRETO1:8+25%P.M.PARASOBRECIMIENTOSm31.75405.81710.17710.17710.17
06.05COLUMNASDECONCRETO11,780.100.0011,780.100.0011,780.10
METRADOC.U.S/.C.PARCIALS/.MES01MES02MES03TOTAL
ÍTEMDESCRIPCIÓNUNID
COSTOBASECRONOGRAMADECOSTOVALORIZADO
CRONOGRAMAVALORIZADODEOBRA
PROYECTO:“CREACIONDELOSADERECREACIONMULTIUSOENLALOCALIDADDESANTOTORIBIODELDISTRITODEMATACOTO–PROVINCIADEYUNGAY–DEPARTAMENTODEANCASH
FECHA:DICIEMBRE2019
06.05.01ACEROESTRUCTURALTRABAJADOPARACOLUMNASkg1,086.106.176,701.246,701.246,701.24
06.05.02ENCOFRADOYDESENCOFRADONORMALENCOLUMNASm248.7355.912,724.492,724.492,724.49
06.05.03CONCRETOF'C=175KG/CM2.PARACOLUMNASm33.97593.042,354.372,354.372,354.37
06.06VIGASDECONCRETO3,942.360.003,942.360.003,942.36
06.06.01ACEROESTRUCTURALTRABAJADOPARAVIGASkg278.536.171,718.531,718.531,718.53
06.06.02ENCOFRADOYDESENCOFRADONORMALENVIGASm222.9155.911,280.901,280.901,280.90
06.06.03CONCRETOF'c=175Kg/cm2ENVIGASm31.59593.04942.93942.93942.93
06.07ALBAÑILERIA,REVOQUESYENLUCIDOS13,583.130.0013,583.130.0013,583.13
06.07.01MURODESOGACARAV.C/LADR.KK18HUECOSAMARRECONCEM:ARENA.m274.9869.455,207.365,207.365,207.36
06.07.02TARRAJEOENEXTERIORES(MORTEROE=1.50CM)m2264.2231.708,375.778,375.778,375.77
06.08ESTRUICTURAMETALICAYCOBERTURAS13,182.050.0013,182.050.0013,182.05
06.08.01ESTRUCTURAMETALICAPARACOBERTURAm2115.3549.195,674.075,674.075,674.07
06.08.02CORREASMETALICASDE2"x2"ENTECHOm153.8023.593,628.143,628.143,628.14
06.08.03COBERTURADEFLEXIFORTEDE1.83x1.10Mm2123.6831.373,879.843,879.843,879.84
07MODULODESERVICIOSHIGIENICOSYVESTUARIOS153,940.400.0061,262.3592,678.05153,940.40
07.01TRABAJOSPRELIMINARES345.760.00345.760.00345.76
07.01.01TRAZO,NIVELACIONYREPLANTEOm2157.882.19345.76345.76345.76
07.02MOVIMIENTODETIERRAS2,601.970.002,601.970.002,601.97
07.02.01EXCAVACIONPARACIMIENTOSHASTA1.00MTTERRENONORMALm334.1045.021,535.181,535.181,535.18
07.02.02NIVELACIONINTERIORAPISONADOMANUALm244.632.87128.09128.09128.09
07.02.03ELIMINACIONDEMATERIALEXCEDENTED=30Mm340.9222.94938.70938.70938.70
07.03OBRASDECONCRETOSIMPLE15,062.720.0015,062.720.0015,062.72
07.03.01CONCRETO1:10+30%P.G.PARACIMIENTOSCORRIDOSm329.84347.3810,365.8210,365.8210,365.82
07.03.02ENCOFRADOYDESENCOFRADOPARASOBRECIMIENTOSm239.5770.722,798.392,798.392,798.39
07.03.03CONCRETO1:8+25%P.M.PARASOBRECIMIENTOSm33.27405.811,327.001,327.001,327.00
07.03.04CONCRETOf'c=100kg/cm2P/SOLADOSm31.25457.21571.51571.51571.51
07.04CONCRETOARMADO27,942.090.0027,942.090.0027,942.09
07.04.01ZAPATAS4,198.230.004,198.230.004,198.23
07.04.01.01ACEROESTRUCTURALTRABAJADOPARAZAPATASkg206.456.031,244.891,244.891,244.89
METRADOC.U.S/.C.PARCIALS/.MES01MES02MES03TOTAL
ÍTEMDESCRIPCIÓNUNID
COSTOBASECRONOGRAMADECOSTOVALORIZADO
CRONOGRAMAVALORIZADODEOBRA
PROYECTO:“CREACIONDELOSADERECREACIONMULTIUSOENLALOCALIDADDESANTOTORIBIODELDISTRITODEMATACOTO–PROVINCIADEYUNGAY–DEPARTAMENTODEANCASH
FECHA:DICIEMBRE2019
07.04.01.02CONCRETOF'c=175kg/cm2ENZAPATASm34.98593.042,953.342,953.342,953.34
07.04.02COLUMNAS10,315.910.0010,315.910.0010,315.91
07.04.02.01ACEROESTRUCTURALTRABAJADOPARACOLUMNASkg579.216.173,573.733,573.733,573.73
07.04.02.02ENCOFRADOYDESENCOFRADONORMALENCOLUMNASm272.5455.914,055.714,055.714,055.71
07.04.02.03CONCRETOF'C=175KG/CM2.PARACOLUMNASm34.53593.042,686.472,686.472,686.47
07.04.03VIGAS13,427.950.0013,427.950.0013,427.95
07.04.03.01ACEROESTRUCTURALTRABAJADOPARAVIGASYDINTELESkg809.766.174,996.224,996.224,996.22
07.04.03.02ENCOFRADOYDESENCOFRADONORMALENVIGASm280.0655.914,476.154,476.154,476.15
07.04.03.03CONCRETOF'c=175kg/cm2ENVIGASm36.67593.043,955.583,955.583,955.58
07.05ALBAÑILERIA15,309.810.0015,309.810.0015,309.81
07.05.01MURODESOGACONLADR.KK18HUECOSAMARRECONCEM:ARENA.m2230.7064.1214,792.4814,792.4814,792.48
07.05.02MURODECANTOCONLADR.KK18HUECOSAMARRECONCEM:ARENA.m211.3445.62517.33517.33517.33
07.06CIELORASOYCOBERTURA21,619.100.000.0021,619.1021,619.10
07.06.01CIELORRASOCONPANELDEFIBROCEMENTOE=4mmm2145.7574.5710,868.5810,868.5810,868.58
07.06.02CORREASMETALICASDE2"x2"ENTECHOm149.8523.593,534.963,534.963,534.96
07.06.03COBERTURACONTEJAANDINAm2153.4947.017,215.567,215.567,215.56
07.07REVOQUES,ENLUCIOSYMOLDURAS20,558.600.000.0020,558.6020,558.60
07.07.01TARRAJEOENINTERIORESYEXTERIORESC/MORTERODE1:5e=1.5cm(INC.COLUMNAS)m2653.1328.0218,300.7018,300.7018,300.70
07.07.02VESTIDURADEDERRAMESENPUERTAS,VENTANASYVANOS.m67.0033.702,257.902,257.902,257.90
07.08PISOSYPAVIMENTOS11,846.320.000.0011,846.3211,846.32
07.08.01FALSOPISOE=4"(MEZCLA1:10CEMENTO-HORMIGON)m2102.9949.365,083.595,083.595,083.59
07.08.02PISOCERÁMICODECOLORBLANCODE30x30CMm282.8955.244,578.844,578.844,578.84
07.08.03CONCRETOF'c=175kg/cm2ENVEREDAPERIMETRALm34.32505.532,183.892,183.892,183.89
07.09ZOCALOS7,641.980.000.007,641.987,641.98
07.09.01ZOCALODEMAYOLICABLANCADE0.15x0.30mm2140.0454.577,641.987,641.987,641.98
07.10CARPINTERIAMETALICA4,593.960.000.004,593.964,593.96
07.10.01PUERTAMETALICACONMARCO2"X2"X1/8"YREFUERZOSm214.70230.873,393.793,393.793,393.79
07.10.02VENTANACONANGULOSYPERFILESDEFIERROm29.48126.601,200.171,200.171,200.17
07.11CERRAJERIA512.520.000.00512.52512.52
METRADOC.U.S/.C.PARCIALS/.MES01MES02MES03TOTAL
ÍTEMDESCRIPCIÓNUNID
COSTOBASECRONOGRAMADECOSTOVALORIZADO
CRONOGRAMAVALORIZADODEOBRA
PROYECTO:“CREACIONDELOSADERECREACIONMULTIUSOENLALOCALIDADDESANTOTORIBIODELDISTRITODEMATACOTO–PROVINCIADEYUNGAY–DEPARTAMENTODEANCASH
FECHA:DICIEMBRE2019
07.11.01CERRADURAPARAPUERTAPRINCIPALPESADA3GOLPESpza6.0085.42512.52512.52512.52
07.12VIDRIO,CRISTALESYSIMILARES758.270.000.00758.27758.27
07.12.01VIDRIOSEMIDOBLE.NACIONALINCOLOROINC.COLOCACIONpza78.749.63758.27758.27758.27
07.13PINTURA4,342.230.000.004,342.234,342.23
07.13.01PINTURAVINILICAENMUROSINTERIORESYEXTERIORES2MANOSm2373.709.473,538.943,538.943,538.94
07.13.02PINTURAENCARPINTERIAMETALICA(PUERTASVENTANAS)m223.5534.11803.29803.29803.29
07.14APARATOSYACCESORIOSSANITARIOS5,390.900.000.005,390.905,390.90
07.14.01INODOROMONTECARLOBLANCOCOMERCIAL(SINCOLOCACION)pza8.00179.021,432.161,432.161,432.16
07.14.02LAVATORIOSONNET19X10BLANCOCOMERCIAL(SINCOLOCACION)pza6.00114.41686.46686.46686.46
07.14.03DUCHASCROMADASDECABEZAGIRATORIApza6.00122.88737.28737.28737.28
07.14.04JABONERASDELOZACOLORC/ASADE15X15pza6.0025.42152.52152.52152.52
07.14.05TOALLERADELOSAYBARRAPLASTICA,COLORBLANCOund6.0038.14228.84228.84228.84
07.14.06PAPELERADELOSAYBARRAPLASTICA,COLORBLANCOund6.0020.34122.04122.04122.04
07.14.07COLOCACIONDEACCESORIOSSANITARIOS.und40.0050.792,031.602,031.602,031.60
07.15INSTALACIONESELECTRICAS4,181.620.000.004,181.624,181.62
07.15.01SALIDADETECHOC/CABLEAWGTW2.5MM(14)+DPVCSAP19MM(3/4)pto17.0058.67997.39997.39997.39
07.15.02SALIDAPARATOMACORRIENTEBIPOLARDOBLECONPVCpto13.0081.921,064.961,064.961,064.96
07.15.03TUBERIAPVCSEL(ELECTRICA)D=3/4"m170.0011.081,883.601,883.601,883.60
07.15.04TABLERODEDISTRIBUCIONCAJAMETALICA12POLOSund1.00133.77133.77133.77133.77
07.15.05INTERRUPTORTHERMOMAGNETICOMONOFASICA2x30Aund2.0050.95101.90101.90101.90
07.16SISTEMADEDESAGUE7,324.930.000.007,324.937,324.93
07.16.01SALIDADETUBOPVCSALPARADESAGUE2"pto16.0076.891,230.241,230.241,230.24
07.16.02SALIDADETUBOPVCSALPARADESAGUE4"pto8.0087.22697.76697.76697.76
07.16.03SALIDADETUBOPVCSALPARAVENTILACIONDE2"pto2.0070.72141.44141.44141.44
07.16.04INSTALACIONDETUBERIADEPVCSAL2"m50.0018.34917.00917.00917.00
07.16.05INSTALACIONDETUBERIADEPVCSAL4"m115.0024.362,801.402,801.402,801.40
07.16.06CAJADEREGISTRODEDESAGUE12"X24"pza7.00185.051,295.351,295.351,295.35
07.16.07ACCESORIOSPARADESAGUEjgo1.00241.74241.74241.74241.74
07.17SISTEMADEAGUAFRIA3,378.540.000.003,378.543,378.54
METRADOC.U.S/.C.PARCIALS/.MES01MES02MES03TOTAL
ÍTEMDESCRIPCIÓNUNID
COSTOBASECRONOGRAMADECOSTOVALORIZADO
CRONOGRAMAVALORIZADODEOBRA
PROYECTO:“CREACIONDELOSADERECREACIONMULTIUSOENLALOCALIDADDESANTOTORIBIODELDISTRITODEMATACOTO–PROVINCIADEYUNGAY–DEPARTAMENTODEANCASH
FECHA:DICIEMBRE2019
07.17.01SALIDADEAGUAFRIACONTUBERIADEPVC-SAP1/2"pto24.0034.75834.00834.00834.00
07.17.02REDDEDISTRIBUCIONTUBERIADE1/2"PVC-SAPm120.008.491,018.801,018.801,018.80
07.17.03REDDEDISTRIBUCIONTUBERIADE3/4"PVC-SAPm120.0010.331,239.601,239.601,239.60
07.17.04VALVULADECOMPUERTADEBRONCEDE1/2"und6.0032.74196.44196.44196.44
07.17.05VALVULADECOMPUERTADEBRONCEDE3/4"und2.0044.8589.7089.7089.70
07.18CONEXIONDOMICILIARIA529.080.000.00529.08529.08
07.18.01CONEXIONDEDESAGUEund1.00529.08529.08529.08529.08
08PRUEBASDEENSAYODELABORATORIO2,100.001,295.00345.00460.002,100.00
08.01RESISTENCIAALACOMPRESIONDELCONCRETOund15.0030.00450.00135.00135.00180.00450.00
08.02DISEÑODEMEZCLADELCONCRETOund2.00350.00700.00210.00210.00280.00700.00
08.03PROCTORMODIFICADOund2.00350.00700.00700.00700.00
08.04DENSIDADDECAMPOund10.0025.00250.00250.00250.00
09FLETE20,862.248,344.908,344.904,172.4520,862.24
09.01FLETETERRESTREglb1.0020,862.2420,862.248,344.908,344.904,172.4520,862.24
COSTODIRECTOS/.540,706.01S/.191,232.92S/.204,905.83S/.144,567.27S/.540,706.01
PORCENTAJE%XCADAMES100.00%35.37%37.90%26.74%100.00%
PORCENTAJE%ACUMULADO0.00%35.37%73.26%100.00%

More Related Content

Recently uploaded

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
 

Recently uploaded (20)

Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 

Featured

Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
Kurio // The Social Media Age(ncy)
 
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them wellGood Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Saba Software
 

Featured (20)

Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
 
ChatGPT webinar slides
ChatGPT webinar slidesChatGPT webinar slides
ChatGPT webinar slides
 
More than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike RoutesMore than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike Routes
 
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
 
Barbie - Brand Strategy Presentation
Barbie - Brand Strategy PresentationBarbie - Brand Strategy Presentation
Barbie - Brand Strategy Presentation
 
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them wellGood Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
 

Cronograma valorizado sto_toribio