MINISTRY OF EDUCATION, MALAYSIA
VOCATIONAL COLLEGE STANDARD CURRICULUM
COURSE INFORMATION
PROGRAMME : CONSTRUCTION TECHNOLOGY
COURSE NAME : FORMWORK
COURSE CODE : WTP 1033
YEAR / SEMESTER : 1 / SEMESTER 1
CREDIT UNIT : 3.0 credit/hrs
CONTACT HOUR : FACE TO FACE : 7.0 HOURS/WEEK
NON FACE TO FACE :
COURSE TYPE : VOCATIONAL
PREREQUISITE : -
CORE REQUISITE : -
`
Document Page 2/15
COURSE OUTCOMES:
At the end of the module, students should be able to:-
1. Identify residential building formwork requirement.
2. Fabricate formwork members.
3. Set out formwork alignment.
4. Carry out formwork installation.
5. Coordinate formwork inspection.
6. Dismantle formwork member (after concreting has matured).
COURSE DESCRIPTION
Residential building formwork is the addition of base materials and concrete contained within retaining walls to use as a slab for
construction of homes, businesses, and other buildings. The importance of the formwork specification for concrete is based on
strength and durability.
The person who is competent in residential building formwork shall be able to identify residential building formwork requirement,
fabricate formwork members, set out formwork alignment, carry out formwork installation, coordinate formwork Inspection and
dismantle formwork member (after concreting has matured).
The outcome of this competency is to install a stable formwork to be able to hold the wet concrete in the correct position in
accordance with the approved construction drawing specification.
`
Document Page 3/15
CONTENT AND LEARNING STANDARDS
PROGRAM : CONSTRUCTION TECHNOLOGY
COURSE NAME : FORMWORK
COURSE CODE : WTP 1033
CONTACT
HOURS
CONTENT STANDARD LEARNING STANDARD PERFORMANCE CRITERIA
140 HOURS
(20 WEEKS)
1. IDENTIFY
RESIDENTIAL
BUILDING
FORMWORK
REQUIREMENT
RELATED KNOWLEDGE
i. Contract documents.
ii. Content of contract documents
• Drawing
• Specification
• Bill of quantities
• Cost
• Duration
iii. Approved construction drawing
• Mechanical and Electrical plan
• Building plan
o Structure plan
o Architecture plan
o Internal plumbing
iv. Types and purpose of formwork such as:
• Timber
• Metal
• Plastic
• Aluminium
v. Types of formwork element
ASSESSMENT CRITERIA
i. Type of formwork listed and explained
according to approved construction
drawing.
ii. Approved construction drawing details
listed and explained based on design,
dimension and type of residential
building formworks.
iii. Types of formwork element listed and
explained according to construction
drawing.
`
Document Page 4/15
• Foundation
• Stump
• Beam
o Ground
o Upper
o Roof
• Column/stiffener
• Slab
• Wall
• Staircase
APPLIED SKILL:
i. Obtain approved construction drawing.
ii. Interpret approved construction drawing.
iii. Finalise approved construction drawing
details.
iv. Determine information regarding building
formwork works.
ATTITUDE / SAFETY / ENVIRONMENTAL:
ATTITUDE
- Meticulous and details in interpreting
contract document.
- Honesty in the privacy and confidenciality of
the contract documents.
`
Document Page 5/15
2. FABRICATE
FORMWORK
MEMBERS
RELATED KNOWLEDGE
i. Types of formwork such as:
• Plywood / metal
• Timber
• Plastic
• Aluminium
ii. Types of formwork accesories such as:
• Mould Oil
• Nails
• Strut
iii. Types of formwork fabrication tools and
equipment such as:
• Scaffolding
• Plumb bob
• Hammer
• Cutter
• Saw
• Measurement tape
• Marking ink
• Brush
• Tie rod/tie form
iv. Method of formwork preparation such as:
• Measure
• Mark
• Cut
• Fabricate
v. Method and technique of formwork cutting.
vi. Formwork members assembly procedure such
as:
ASSESSMENT CRITERIA
i. Formwork materials condition
checked and arranged according to
drawing specification.
ii. Formwork fabrication tools and
equipment condition checked and
arranged according to fabrication
requirement.
iii. Formwork material accurately cut and
quality checked according to
construction drawing specification.
iv. Formwork members assembled and
quality checked according to drawing
specification drawing.
`
Document Page 6/15
• Platform/base levelling
• Formwork members
• Strut and prop
• Formwork tie
APPLIED SKILL:
i. Prepare formwork materials.
ii. Prepare formwork fabrication tools and
equipment.
iii. Cut formwork material.
iv. Assemble formwork members.
ATTITUDE / SAFETY / ENVIRONMENTAL:
ATTITUDE:
- Careful and meticulous in cutting and
assemble formwork members.
SAFETY:
- Adhere to safety rules and regulations.
- Wear proper PPE.
3. SET OUT
FORMWORK
ALIGNMENT
RELATED KNOWLEDGE
i. Formwork members location.
ii. Formwork members dimension.
iii. Marking techniques
• Visual/observation
• Marking string
ASSESSMENT CRITERIA
i. Formwork members dimension
checked according to appoved
drawing.
ii. Level marking for formwork members
confirmed according to appoved
drawing.
`
Document Page 7/15
• Laser
• Measure tape
iv. Formwork members align
• Horizontalness
• Verticality
• Slanting
APPLIED SKILL:
i. Confirm formwork members location.
ii. Confirm formwork members dimension.
iii. Mark formwork members level.
iv. Align formwork members horizontalness,
verticality and slanting.
ATTITUDE / SAFETY / ENVIRONMENTAL:
ATTITUDE:
- Diligent, patient and meticulous in carrying out
formwork alignment.
SAFETY:
- Adhere to safety rules and regulations.
- Wear proper PPE.
iii. Formwork alignment work properly
done according to construction
practices quality.
`
Document Page 8/15
4. CARRY OUT
FORMWORK
INSTALLATION
RELATED KNOWLEDGE
i. Formwork members to designated area.
ii. Method and technique formwork installation
such as:
• Strut
• Tie rod
• Prop
• Scaffolding
iii. Purpose of using mould oil to formwork
internal surface.
iv. Formwork installation practice.
APPLIED SKILL:
i. Place formwork members to designated area.
ii. Install formwork at designated area.
iii. Apply mould oil to formwork internal surface.
ATTITUDE / SAFETY / ENVIRONMENTAL:
ATTITUDE:
- Diligent, patient and meticulous in carrying out
formwork alignment.
SAFETY:
- Adhere to safety rules and regulations.
- Wear proper PPE.
ASSESSMENT CRITERIA
i. Formwork members placed to
designated area according
construction drawing.
ii. Formwork installed according to
construction drawing specification and
installation quality.
`
Document Page 9/15
5. COORDINATE
FORMWORK
INSPECTION
RELATED KNOWLEDGE
i. Authorize personnel such as:
• Local authority
• Registered architect/engineer
ii. Formwork inspection criteria
• Size
• Alignment
• Verticality
• Strength
• Durability
• Cleanliness
• Permeability
iii. Types of inspection form (RIN, RFI, etc) used
before, during and after inspection.
iv. Inspection form format.
v. Method of filling in inspection form.
vi. Formwork Inspection arrangement.
vii. Regulatory body requirement on residential
building formwork such as:
• Safety and health
• Quality control
APPLIED SKILL:
i. Confirm authorized personnel from authorities
and consultant.
ii. Determine size, alignment, verticality,
strength, durability, cleanliness and
permeability.
iii. Arrange inspection formwork.
iv. Rectify any non compliance formwork
Installation.
ASSESSMENT CRITERIA
i. Authorise personnel listed and
confirmed.
ii. Formworks inspection excuted in
accordance with planning schedule.
iii. Size, dimension and alignment
checked according to inspection
criteria.
iv. Formworks non compliance
rectification works done and quality
checked according to inspection result.
`
Document Page 10/15
ATTITUDE / SAFETY / ENVIRONMENTAL:
ATTITUDE:
- Ability to collaborate and cooperate with other
department
6. DISMANTLE
FORMWORK
MEMBER (AFTER
CONCRETING HAS
MATURED)
RELATED KNOWLEDGE
i. Method and technique formwork remove such
as:
• Strut
• Tie rod
• Prop
• Scaffolding
ii. Materials formwork safely kept/cart away/
dispose.
iii. Housekeeping and 3R activities.
iv. Safety procedure comply when installing and
dismantling formwork.
APPLIED SKILL:
i. Remove strut, tie rod, prop and scaffolding.
ii. Keep/cart away/ dispose materials formwork
safely.
iii. Carry out housekeeping and 3R activities.
iv. Comply to regulatory body requirement.
v. Adhere to safety rules and regulation.
ASSESSMENT CRITERIA
i. Strut, tie rod, prop and scaffolding
removed according to standard
procedure.
ii. Materials formwork kept for recycle.
iii. Housekeeping and 3R activities
properly done according to safety
procedure.
iv. Regulatory body requirement complied
related to formworks activities.
v. Safety rules and regulation applied
related to formworks activities.
`
Document Page 11/15
ATTITUDE / SAFETY / ENVIRONMENTAL:
ATTITUDE:
- Diligent in following procedure.
- Ensure timely completion of work.
SAFETY:
- Adhere to safety requirement.
EMPLOYABILITY SKILLS
Core Abilities
SILA RUJUK LAMPIRAN A : JADUAL PEMETAAN NOSS DAN KSKV
SILA RUJUK LAMPIRAN B : JADUAL PEMETAAN NOSS DAN CORE ABILITY TAHAP 1, 2, 3
`
Document Page 12/15
Tools, Equipment and Materials (TEM)
ITEMS RATIO (TEM : Trainees)
1. Mould Oil
2. Nail
3. Plywood/metal
4. Timber
5. Strut
6. Scaffolding
7. PPE
8. Plumbub
9. Hammer
10. Cutter
11. Saw
12. Measurement tape
13. Marking ink
14. Brush
15. Tie rod/tie form
16. Sample for inspection form
17. Sample for construction drawing
18. Sample for authorities documents(Planning approval documents,
Building plan approval documents)
1:5
1:5
1:5
1:5
1:5
1:5
1:1
1:5
1:1
1:5
1:1
1:1
1:1
1:1
1:5
1:1
1:1
1:1
REFERENCES
`
Document Page 13/15
1. Edward Allen, Joseph Iano, (2009) Fundamentals of Building Construction: Material and Method, John Wiley And Son Inc, New
Hersey, ISBN 978-0-470-07468-8
2. Francis D.K. Ching, (2010), Building Construction Illustrated Fourth Edition, John Wiley And Son Inc, New Jersey, ISBN: 378-0-
470-08781-7
3. Edward Allen, Rob Thallon, Fundamentals of Residential Construction, John Wiley And Son Inc, New Jersey, ISBN 978-0-470-5-
4085-4
4. Tan Boon Tong, (2000) Teknologi Binaan Bangunan, Dewan Bahasa, Kuala Lumpur.
5. Whitney C Clark Huntington (2001), Building Construction, Materials and Types Of Construction, Robert E. Mickadeit.
6. N. Jackson (1984), Civil Engineering Materials, English Language Book Society Macmillan (Elbs).
7. Uzairi Haji Saidin(1988), Aturcara Kontrak dan Tafsiran,Petaling Jaya IBS Buku.
8. William Irvine (2005), Surveying for Construction, McGraw-Hill Education.
9. WG Mc Lean (2004), Theory & Problems of Engineering Mechanics Static and Dynamics, Sahaums.
10. A.M.NevelleJ.J.Brooke(1990), Concrete Technology, Longman, New Jersey.
11. Case, J Chilver, A.H (1987),Kekuatan Bahan dan Struktur,DewanBahasa.
12. Nunally, S.W (1998), Construction Methods and Management, Prentice Hall.
13. Wang, B.T.H (1987), Construction and Development - With Reference to Malaysian Practice', Pelanduk Publication.
14. Peter Domone, John Hilston(1994), Construction Materials.

More Related Content

Similar to WTP 1033 FORMWORK.pdf

Assignment front sheet assignment 2
Assignment front sheet assignment 2Assignment front sheet assignment 2
Assignment front sheet assignment 2
NeilOw87
 
Piping Installation and Erection Procedure.pdf
Piping Installation and Erection Procedure.pdfPiping Installation and Erection Procedure.pdf
Piping Installation and Erection Procedure.pdf
MDAbdullah621330
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
waleed ibrahim
 
Multidispline Inspector - DEEPAK RAI
Multidispline Inspector - DEEPAK RAIMultidispline Inspector - DEEPAK RAI
Multidispline Inspector - DEEPAK RAI
Deepak Rai
 
validated CS of fabricator and welder
validated CS of fabricator and weldervalidated CS of fabricator and welder
validated CS of fabricator and welder
atiqa_shahbaz
 
Praneshkumar QC Supervisor
Praneshkumar QC SupervisorPraneshkumar QC Supervisor
Praneshkumar QC Supervisor
Pranesh Kumar
 

Similar to WTP 1033 FORMWORK.pdf (20)

Tools WorkshopPractice.pdf
Tools WorkshopPractice.pdfTools WorkshopPractice.pdf
Tools WorkshopPractice.pdf
 
Assignment front sheet assignment 2
Assignment front sheet assignment 2Assignment front sheet assignment 2
Assignment front sheet assignment 2
 
Piping Installation and Erection Procedure.pdf
Piping Installation and Erection Procedure.pdfPiping Installation and Erection Procedure.pdf
Piping Installation and Erection Procedure.pdf
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
 
ANAND CV
ANAND CVANAND CV
ANAND CV
 
Nivin Joseph- resume
Nivin Joseph- resumeNivin Joseph- resume
Nivin Joseph- resume
 
arun megarme
arun megarmearun megarme
arun megarme
 
Project Delivery Education Program
Project Delivery Education ProgramProject Delivery Education Program
Project Delivery Education Program
 
Industrial Internship at Shapoorji Pallonji & Co. Pvt. Ltd. (HBCH & RC Site)
Industrial Internship at Shapoorji Pallonji & Co. Pvt. Ltd. (HBCH & RC Site)Industrial Internship at Shapoorji Pallonji & Co. Pvt. Ltd. (HBCH & RC Site)
Industrial Internship at Shapoorji Pallonji & Co. Pvt. Ltd. (HBCH & RC Site)
 
Resume
ResumeResume
Resume
 
javed_C.V.
javed_C.V.javed_C.V.
javed_C.V.
 
C.V.
C.V.C.V.
C.V.
 
Javed c.v.
Javed c.v.Javed c.v.
Javed c.v.
 
Javed c.v.
Javed c.v.Javed c.v.
Javed c.v.
 
Multidispline Inspector - DEEPAK RAI
Multidispline Inspector - DEEPAK RAIMultidispline Inspector - DEEPAK RAI
Multidispline Inspector - DEEPAK RAI
 
validated CS of fabricator and welder
validated CS of fabricator and weldervalidated CS of fabricator and welder
validated CS of fabricator and welder
 
CV_Balaji 2016
CV_Balaji 2016CV_Balaji 2016
CV_Balaji 2016
 
AHMED MOHIY 21
AHMED MOHIY 21 AHMED MOHIY 21
AHMED MOHIY 21
 
Praneshkumar QC Supervisor
Praneshkumar QC SupervisorPraneshkumar QC Supervisor
Praneshkumar QC Supervisor
 
Practical Assessment 3 - Reinforcement
Practical Assessment 3 - ReinforcementPractical Assessment 3 - Reinforcement
Practical Assessment 3 - Reinforcement
 

Recently uploaded

SPLICE Working Group: Reusable Code Examples
SPLICE Working Group:Reusable Code ExamplesSPLICE Working Group:Reusable Code Examples
SPLICE Working Group: Reusable Code Examples
Peter Brusilovsky
 

Recently uploaded (20)

An Overview of the Odoo 17 Knowledge App
An Overview of the Odoo 17 Knowledge AppAn Overview of the Odoo 17 Knowledge App
An Overview of the Odoo 17 Knowledge App
 
VAMOS CUIDAR DO NOSSO PLANETA! .
VAMOS CUIDAR DO NOSSO PLANETA!                    .VAMOS CUIDAR DO NOSSO PLANETA!                    .
VAMOS CUIDAR DO NOSSO PLANETA! .
 
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjjStl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjj
 
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
 
Book Review of Run For Your Life Powerpoint
Book Review of Run For Your Life PowerpointBook Review of Run For Your Life Powerpoint
Book Review of Run For Your Life Powerpoint
 
AIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.pptAIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.ppt
 
e-Sealing at EADTU by Kamakshi Rajagopal
e-Sealing at EADTU by Kamakshi Rajagopale-Sealing at EADTU by Kamakshi Rajagopal
e-Sealing at EADTU by Kamakshi Rajagopal
 
Major project report on Tata Motors and its marketing strategies
Major project report on Tata Motors and its marketing strategiesMajor project report on Tata Motors and its marketing strategies
Major project report on Tata Motors and its marketing strategies
 
Andreas Schleicher presents at the launch of What does child empowerment mean...
Andreas Schleicher presents at the launch of What does child empowerment mean...Andreas Schleicher presents at the launch of What does child empowerment mean...
Andreas Schleicher presents at the launch of What does child empowerment mean...
 
DEMONSTRATION LESSON IN ENGLISH 4 MATATAG CURRICULUM
DEMONSTRATION LESSON IN ENGLISH 4 MATATAG CURRICULUMDEMONSTRATION LESSON IN ENGLISH 4 MATATAG CURRICULUM
DEMONSTRATION LESSON IN ENGLISH 4 MATATAG CURRICULUM
 
Observing-Correct-Grammar-in-Making-Definitions.pptx
Observing-Correct-Grammar-in-Making-Definitions.pptxObserving-Correct-Grammar-in-Making-Definitions.pptx
Observing-Correct-Grammar-in-Making-Definitions.pptx
 
male presentation...pdf.................
male presentation...pdf.................male presentation...pdf.................
male presentation...pdf.................
 
Đề tieng anh thpt 2024 danh cho cac ban hoc sinh
Đề tieng anh thpt 2024 danh cho cac ban hoc sinhĐề tieng anh thpt 2024 danh cho cac ban hoc sinh
Đề tieng anh thpt 2024 danh cho cac ban hoc sinh
 
PSYPACT- Practicing Over State Lines May 2024.pptx
PSYPACT- Practicing Over State Lines May 2024.pptxPSYPACT- Practicing Over State Lines May 2024.pptx
PSYPACT- Practicing Over State Lines May 2024.pptx
 
The Story of Village Palampur Class 9 Free Study Material PDF
The Story of Village Palampur Class 9 Free Study Material PDFThe Story of Village Palampur Class 9 Free Study Material PDF
The Story of Village Palampur Class 9 Free Study Material PDF
 
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
 
Trauma-Informed Leadership - Five Practical Principles
Trauma-Informed Leadership - Five Practical PrinciplesTrauma-Informed Leadership - Five Practical Principles
Trauma-Informed Leadership - Five Practical Principles
 
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptxAnalyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
 
SPLICE Working Group: Reusable Code Examples
SPLICE Working Group:Reusable Code ExamplesSPLICE Working Group:Reusable Code Examples
SPLICE Working Group: Reusable Code Examples
 
ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...
ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...
ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...
 

WTP 1033 FORMWORK.pdf

  • 1. ` Document Page 1/15 MINISTRY OF EDUCATION, MALAYSIA VOCATIONAL COLLEGE STANDARD CURRICULUM COURSE INFORMATION PROGRAMME : CONSTRUCTION TECHNOLOGY COURSE NAME : FORMWORK COURSE CODE : WTP 1033 YEAR / SEMESTER : 1 / SEMESTER 1 CREDIT UNIT : 3.0 credit/hrs CONTACT HOUR : FACE TO FACE : 7.0 HOURS/WEEK NON FACE TO FACE : COURSE TYPE : VOCATIONAL PREREQUISITE : - CORE REQUISITE : -
  • 2. ` Document Page 2/15 COURSE OUTCOMES: At the end of the module, students should be able to:- 1. Identify residential building formwork requirement. 2. Fabricate formwork members. 3. Set out formwork alignment. 4. Carry out formwork installation. 5. Coordinate formwork inspection. 6. Dismantle formwork member (after concreting has matured). COURSE DESCRIPTION Residential building formwork is the addition of base materials and concrete contained within retaining walls to use as a slab for construction of homes, businesses, and other buildings. The importance of the formwork specification for concrete is based on strength and durability. The person who is competent in residential building formwork shall be able to identify residential building formwork requirement, fabricate formwork members, set out formwork alignment, carry out formwork installation, coordinate formwork Inspection and dismantle formwork member (after concreting has matured). The outcome of this competency is to install a stable formwork to be able to hold the wet concrete in the correct position in accordance with the approved construction drawing specification.
  • 3. ` Document Page 3/15 CONTENT AND LEARNING STANDARDS PROGRAM : CONSTRUCTION TECHNOLOGY COURSE NAME : FORMWORK COURSE CODE : WTP 1033 CONTACT HOURS CONTENT STANDARD LEARNING STANDARD PERFORMANCE CRITERIA 140 HOURS (20 WEEKS) 1. IDENTIFY RESIDENTIAL BUILDING FORMWORK REQUIREMENT RELATED KNOWLEDGE i. Contract documents. ii. Content of contract documents • Drawing • Specification • Bill of quantities • Cost • Duration iii. Approved construction drawing • Mechanical and Electrical plan • Building plan o Structure plan o Architecture plan o Internal plumbing iv. Types and purpose of formwork such as: • Timber • Metal • Plastic • Aluminium v. Types of formwork element ASSESSMENT CRITERIA i. Type of formwork listed and explained according to approved construction drawing. ii. Approved construction drawing details listed and explained based on design, dimension and type of residential building formworks. iii. Types of formwork element listed and explained according to construction drawing.
  • 4. ` Document Page 4/15 • Foundation • Stump • Beam o Ground o Upper o Roof • Column/stiffener • Slab • Wall • Staircase APPLIED SKILL: i. Obtain approved construction drawing. ii. Interpret approved construction drawing. iii. Finalise approved construction drawing details. iv. Determine information regarding building formwork works. ATTITUDE / SAFETY / ENVIRONMENTAL: ATTITUDE - Meticulous and details in interpreting contract document. - Honesty in the privacy and confidenciality of the contract documents.
  • 5. ` Document Page 5/15 2. FABRICATE FORMWORK MEMBERS RELATED KNOWLEDGE i. Types of formwork such as: • Plywood / metal • Timber • Plastic • Aluminium ii. Types of formwork accesories such as: • Mould Oil • Nails • Strut iii. Types of formwork fabrication tools and equipment such as: • Scaffolding • Plumb bob • Hammer • Cutter • Saw • Measurement tape • Marking ink • Brush • Tie rod/tie form iv. Method of formwork preparation such as: • Measure • Mark • Cut • Fabricate v. Method and technique of formwork cutting. vi. Formwork members assembly procedure such as: ASSESSMENT CRITERIA i. Formwork materials condition checked and arranged according to drawing specification. ii. Formwork fabrication tools and equipment condition checked and arranged according to fabrication requirement. iii. Formwork material accurately cut and quality checked according to construction drawing specification. iv. Formwork members assembled and quality checked according to drawing specification drawing.
  • 6. ` Document Page 6/15 • Platform/base levelling • Formwork members • Strut and prop • Formwork tie APPLIED SKILL: i. Prepare formwork materials. ii. Prepare formwork fabrication tools and equipment. iii. Cut formwork material. iv. Assemble formwork members. ATTITUDE / SAFETY / ENVIRONMENTAL: ATTITUDE: - Careful and meticulous in cutting and assemble formwork members. SAFETY: - Adhere to safety rules and regulations. - Wear proper PPE. 3. SET OUT FORMWORK ALIGNMENT RELATED KNOWLEDGE i. Formwork members location. ii. Formwork members dimension. iii. Marking techniques • Visual/observation • Marking string ASSESSMENT CRITERIA i. Formwork members dimension checked according to appoved drawing. ii. Level marking for formwork members confirmed according to appoved drawing.
  • 7. ` Document Page 7/15 • Laser • Measure tape iv. Formwork members align • Horizontalness • Verticality • Slanting APPLIED SKILL: i. Confirm formwork members location. ii. Confirm formwork members dimension. iii. Mark formwork members level. iv. Align formwork members horizontalness, verticality and slanting. ATTITUDE / SAFETY / ENVIRONMENTAL: ATTITUDE: - Diligent, patient and meticulous in carrying out formwork alignment. SAFETY: - Adhere to safety rules and regulations. - Wear proper PPE. iii. Formwork alignment work properly done according to construction practices quality.
  • 8. ` Document Page 8/15 4. CARRY OUT FORMWORK INSTALLATION RELATED KNOWLEDGE i. Formwork members to designated area. ii. Method and technique formwork installation such as: • Strut • Tie rod • Prop • Scaffolding iii. Purpose of using mould oil to formwork internal surface. iv. Formwork installation practice. APPLIED SKILL: i. Place formwork members to designated area. ii. Install formwork at designated area. iii. Apply mould oil to formwork internal surface. ATTITUDE / SAFETY / ENVIRONMENTAL: ATTITUDE: - Diligent, patient and meticulous in carrying out formwork alignment. SAFETY: - Adhere to safety rules and regulations. - Wear proper PPE. ASSESSMENT CRITERIA i. Formwork members placed to designated area according construction drawing. ii. Formwork installed according to construction drawing specification and installation quality.
  • 9. ` Document Page 9/15 5. COORDINATE FORMWORK INSPECTION RELATED KNOWLEDGE i. Authorize personnel such as: • Local authority • Registered architect/engineer ii. Formwork inspection criteria • Size • Alignment • Verticality • Strength • Durability • Cleanliness • Permeability iii. Types of inspection form (RIN, RFI, etc) used before, during and after inspection. iv. Inspection form format. v. Method of filling in inspection form. vi. Formwork Inspection arrangement. vii. Regulatory body requirement on residential building formwork such as: • Safety and health • Quality control APPLIED SKILL: i. Confirm authorized personnel from authorities and consultant. ii. Determine size, alignment, verticality, strength, durability, cleanliness and permeability. iii. Arrange inspection formwork. iv. Rectify any non compliance formwork Installation. ASSESSMENT CRITERIA i. Authorise personnel listed and confirmed. ii. Formworks inspection excuted in accordance with planning schedule. iii. Size, dimension and alignment checked according to inspection criteria. iv. Formworks non compliance rectification works done and quality checked according to inspection result.
  • 10. ` Document Page 10/15 ATTITUDE / SAFETY / ENVIRONMENTAL: ATTITUDE: - Ability to collaborate and cooperate with other department 6. DISMANTLE FORMWORK MEMBER (AFTER CONCRETING HAS MATURED) RELATED KNOWLEDGE i. Method and technique formwork remove such as: • Strut • Tie rod • Prop • Scaffolding ii. Materials formwork safely kept/cart away/ dispose. iii. Housekeeping and 3R activities. iv. Safety procedure comply when installing and dismantling formwork. APPLIED SKILL: i. Remove strut, tie rod, prop and scaffolding. ii. Keep/cart away/ dispose materials formwork safely. iii. Carry out housekeeping and 3R activities. iv. Comply to regulatory body requirement. v. Adhere to safety rules and regulation. ASSESSMENT CRITERIA i. Strut, tie rod, prop and scaffolding removed according to standard procedure. ii. Materials formwork kept for recycle. iii. Housekeeping and 3R activities properly done according to safety procedure. iv. Regulatory body requirement complied related to formworks activities. v. Safety rules and regulation applied related to formworks activities.
  • 11. ` Document Page 11/15 ATTITUDE / SAFETY / ENVIRONMENTAL: ATTITUDE: - Diligent in following procedure. - Ensure timely completion of work. SAFETY: - Adhere to safety requirement. EMPLOYABILITY SKILLS Core Abilities SILA RUJUK LAMPIRAN A : JADUAL PEMETAAN NOSS DAN KSKV SILA RUJUK LAMPIRAN B : JADUAL PEMETAAN NOSS DAN CORE ABILITY TAHAP 1, 2, 3
  • 12. ` Document Page 12/15 Tools, Equipment and Materials (TEM) ITEMS RATIO (TEM : Trainees) 1. Mould Oil 2. Nail 3. Plywood/metal 4. Timber 5. Strut 6. Scaffolding 7. PPE 8. Plumbub 9. Hammer 10. Cutter 11. Saw 12. Measurement tape 13. Marking ink 14. Brush 15. Tie rod/tie form 16. Sample for inspection form 17. Sample for construction drawing 18. Sample for authorities documents(Planning approval documents, Building plan approval documents) 1:5 1:5 1:5 1:5 1:5 1:5 1:1 1:5 1:1 1:5 1:1 1:1 1:1 1:1 1:5 1:1 1:1 1:1 REFERENCES
  • 13. ` Document Page 13/15 1. Edward Allen, Joseph Iano, (2009) Fundamentals of Building Construction: Material and Method, John Wiley And Son Inc, New Hersey, ISBN 978-0-470-07468-8 2. Francis D.K. Ching, (2010), Building Construction Illustrated Fourth Edition, John Wiley And Son Inc, New Jersey, ISBN: 378-0- 470-08781-7 3. Edward Allen, Rob Thallon, Fundamentals of Residential Construction, John Wiley And Son Inc, New Jersey, ISBN 978-0-470-5- 4085-4 4. Tan Boon Tong, (2000) Teknologi Binaan Bangunan, Dewan Bahasa, Kuala Lumpur. 5. Whitney C Clark Huntington (2001), Building Construction, Materials and Types Of Construction, Robert E. Mickadeit. 6. N. Jackson (1984), Civil Engineering Materials, English Language Book Society Macmillan (Elbs). 7. Uzairi Haji Saidin(1988), Aturcara Kontrak dan Tafsiran,Petaling Jaya IBS Buku. 8. William Irvine (2005), Surveying for Construction, McGraw-Hill Education. 9. WG Mc Lean (2004), Theory & Problems of Engineering Mechanics Static and Dynamics, Sahaums. 10. A.M.NevelleJ.J.Brooke(1990), Concrete Technology, Longman, New Jersey. 11. Case, J Chilver, A.H (1987),Kekuatan Bahan dan Struktur,DewanBahasa. 12. Nunally, S.W (1998), Construction Methods and Management, Prentice Hall. 13. Wang, B.T.H (1987), Construction and Development - With Reference to Malaysian Practice', Pelanduk Publication. 14. Peter Domone, John Hilston(1994), Construction Materials.