SlideShare a Scribd company logo
1 of 39
Download to read offline
Infrastructure Developments in
Indonesia – Key Improvements
and Priority Projects
Roundtable Discussion on Infrastructure Investment
Opportunity in Indonesia
Wahyu Utomo
Acting Deputy Minister for Coordination of Infrastructure
and Regional Development, CMEA and Chairman of
KPPIP Implementation Team
Rainier Haryanto
Program Director KPPIP
London, 15th July 2016
Presentation Outline
Indonesia’s Infrastructure Targets
Recent Reforms for Infrastructure Acceleration
Committee for Acceleration for Priority Infrastructure
Delivery (KPPIP)
National Strategic and Priority Projects
2
Presentation Outline
Indonesia’s Infrastructure Targets
Recent Reforms for Infrastructure Acceleration
Committee for Acceleration for Priority Infrastructure
Delivery (KPPIP)
National Strategic and Priority Projects
3
Indonesia has determined its infrastructure targets for the period of
2016 – 2019 which were stipulated in the National Medium Term Plan
4
Enggano
Kertajati
Singkawang
Muara
Teweh
Miangas
Maratua
Tojo Una-
Una
Pohuwato
Moa
Namniwel
Taria
Kenyam
Aboy
Sultan
Hassanuddin
Banda Aceh
Belawan
Kuala Tanjung
Dumai
Batam
Pangkal
Pinang
Pontianak
Panjang
Padang
Tj. Priok
Cilacap
Tj. Perak
Lombok
Kupang
Palangkaraya Banjarmasin
Makassar
Maloy
Bitung
Halmahera
Sorong
Jayapura
Merauke
Ambon
Koroway
Batu
Sea toll concept as a means to
support Indonesia in becoming the
world maritime axis.
•develop 24 new seaports
•increase number of substantial
vessels (pioneer cargo, transport
vessels, pioneer crossing vessels)
•develop 60 crossing ports
Strengthen connectivity through air
transport infrastructure
development
• develop 15 new airports
• develop air cargo facilities in 6
locations
• increase number of pioneer
airplanes
Improve transport efficiency by road
development and maintenance
•develop 2,650 km of new roads
•develop 1,000 km of new toll roads
•rehabilitate 46,770 km of existing road
Reduce logistic cost by improving railway
infrastructure
develop new tracks in Java, Sumatra,
Sulawesi, and Kalimantan:
2,159 km inter-urban railways
1,099 km urban railways
Develop urban transport
• develop Bus Rapid Transit
(BRT) in 29 cities
• develop Mass Rapid Transit
(MRT) in 6 metropolis and 17
large cities.
Achieve electrification ratio of 96.6% by
2019 through generating capacity
improvement
•develop power plants with total capacity
of 35,000 MW
Ensure efficiency of fuel production
by optimizing
domestic refineries
•build new oil refineries of
2x300,000 barrels
•Expand existing refineries in
Cilacap and Balongan
Energy Related
Logistic Related
Location of 24 new seaports &
15 new airports
Source: Bappenas
Achieving food sovereignty through
irrigation system improvement
• develop 33 new dams and 30
hydropower plants
• expand 1 million ha irrigation system
• rehabilitate existing irrigation system
To achieve those targets, Indonesia requires an estimated investment of
USD 368.9 Billion
5
SECTOR State Budget Regional Budget SOE Private/PPP Total
Roads 20.6 15.4 5.0 15.4 56.4
Railways 7.2 - 0.8 9.4 17.4
Sea Transportation 20 - 18.3 7.2 45.5
Air Transportation 4.9 0.4 3.8 1.9 11.1
River Transportation & Ferries 2.8 - 0.8 - 3.6
Urban Transportation 4.7 1.2 0.4 0.4 6.6
Electricity 9.2 - 34.2 33.5 76.9
Oil & Gas 0.3 - 11.7 27.1 39.0
Information & Communication Technology
(ICT) 1.2 1.2 2.1 17.2 21.5
Water Resources 15.1 5.2 0.5 13.8 34.7
Drinking Water & Sanitation 10.1 15.2 3.4 2.3 31.0
Housing 14.2 3.4 1.0 6.7 25.2
Total funding needs 110.3 42 82 134.9 368.9
Allocation percentage 29.88% 11.37% 22.23% 36.52% 100%
In USD billionInfrastructure Projects Investment Needs by Sector (2015-2019)
Source: BAPPENAS (FOREX 1 USD=Rp 13,000)
Presentation Outline
Indonesia’s Infrastructure Targets
Recent Reforms for Infrastructure Acceleration
Committee for Acceleration for Priority Infrastructure
Delivery (KPPIP)
National Strategic and Priority Projects
6
The Government has enacted various reforms to accelerate
infrastructure provision
Fiscal reforms Institutional reforms Regulatory reforms
Supported by improving awareness of Indonesian infrastructure issues, convergent reforms are
building a better business environment for tomorrow’s investment
• Investing in Indonesian infra-
structure has been regarded
as risky
• Uncertain returns on
investment.
• Did not have any fiscal
mechanisms to support the
infrastructure investment
• Lack of leadership to
implement the changes
needed
• Indonesian regulatory corpus
has been characterized by
some ambiguities and
conflicting regulation
Indonesia now has fiscal
supports
•Viability Gap Funding
(VGF);
•Availability Payment;
•Land revolving fund; and
•Risk-sharing scheme.
Institutional strengthening covers
establishment and empowerment of:
•KPPIP (Committee for Acceleration
of Priority Infrastructure Delivery).
•Empowerment of PT. SMI and IIGF
•PPP Unit under Ministry of Finance.
Revised regulations on:
• Public Private Partnership (PPP);
• Availability Payment;
• Direct Lending;
• Land acquisition; and
• Other deregulations as listed in the
Economic Policy Packages.
BeforeAfter
7
Reformations along the project life cycle aim to encourage and accelerate
infrastructure projects using the Public Private Partnership (PPP) scheme
GOVERNMENT OF INDONESIA
Preparation Bidding Process Construction
Viability Gap
Funding
(VGF)
Guarantee
Fund
Land
Acquisition
Tax Facilities Availability
Payment
A facility
contributing to
assist GCA on
PPP project
preparation
(PDF&TA)
Managing
entity:
KPPIP, PT
SMI and PT
IIF, Ministry of
Finance under
its new PPP
Unit
A facility with
contribution
to
construction
cost to
increase
project
financial
viabilityManaging
entity:
Ministry of
Finance based
on GCA
proposal
Govt’s
commitment:
49% max per
project
Guaranteeing
government's
contractual
obligations under
infrastructure
concession
agreements
Managing entity:
Indonesia
Infrastructure
Guarantee Fund
(IIGF) – wholly
owned by MoF
Govt’s
commitment:
US$ 450 Mil
MoF Reg. No.
159/PMK.010.20
15 re: tax holiday
for pioneer
sector, such as
base metal, oil
refinery, basic
petrochemical,
machinery,
renewable
energy, & telco
equipment
industries, which
will be further
expanded.
Managing entity:
Ministry of Finance
A scheme in which
concessionaire
receive sum of
money periodically
from government
after the
completion of an
asset.
Ministry of Finance
Regulation on
Availability
Payment has been
ratified.
Managing entity:
Ministry of Finance
A facility to
support land
acquisition for
infrastructure
projects
particularly on
the private
sector projects.
Managing entity:
Ministry of
Finance; Ministry
of Agrarian and
Land
Spatial/BPN
Govt’s
commitment:
US$ 12 Mi (only
for 2016)
Project
Development
Facility (PDF)
8
Project Development Facility is to boost private sector participation in
various stages of infrastructure preparation
Planning
Preparation
Implementation
Private Sector Roles Improved Support for Private Sector
• Propose unsolicited projects
• Prepare OBC (Outline Business
Case) and other planning
documents
• Prepare FBC (Final Business
Case)
• Provide Transaction Advisory
• Acquire land*
• Design and construct
infrastructure
• Operate and maintain
infrastructure
• The Public Private Partnership
Presidential Regulation no 38/2015
provides incentives for unsolicited projects
• New procurement regulation and OBC
facilities from KPPIP and Bappenas
• Debottlenecking support
• New procurement regulation and PDF/TA
facilities from PPP unit under MoF
• Direct appointment allowed for investors that
propose power projects, which have acquired the
land
• Land acquisition regulations provide certainty and
acceleration
• Land Bank
• Debottlenecking support
• Fiscal support and guarantee from MoF
and IIGF to improve project bankability
• Availability payment from state and
regional budgets for construction,
operations and maintenance
• Long-term financing by PT SMI and PT IIF
9
The Ministry of Finance has issued the regulation on Availability Payment
with the objective of improving project attractiveness to investors
Stipulates Availability Payment as one funding scheme for infrastructure development.Presidential Regulation no.
38/2015
Legal Basis
Availability Payment enables private
participation when the infrastructure
is not commercially viable and
the demand risk is high.
The government adopts this
scheme to achieve these goals:
•Ensure service quality for users
•Improve Value for Money for
government
•Provide attractive return for private
sector providers
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Operation and Maintenance Cost
Revenue
Cost
Construction
Availability Payment
Ministry of Finance Regulation
no. 190/PMK.08/2015
Ministry of Home Affairs
Regulation (on progress)
Regulates the criteria for projects that can be funded by Availability Payment and the
implementation of the scheme.
Will stipulate on budgeting system for Availability Payment funded by regional budget.
Has been successfully applied in Trans
Sumatera Toll Road, Palembang –
Indralaya section
Planning Preparation Implementation
Hand over of
land rights
Time span in working days (Assuming there will be objections from land owners):
Max. 289 days Max. 257 days Max. 37 days
TOTAL 583 DAYS
Unregulated
If there is no objection from the land
owners, total days needed could be
speeded up to around 15 – 20 % of
maximum days above.
Land Acquisition Policy - Law No. 2/2012 aims to accelerate land
acquisition and it has been implemented successfully
BPN as central agency in implementation of
land acquisition
Implementation of Law No. 2/2012:
• The best example of a successful
implementation of the law is the city of
Bojonegoro, where the civil society was
socialized early to the law and where the
land appraisal and compensation amount
were attractive.
• Outcome: the overall land acquisition
process for the Java North Line Double
Track Rail project took less than 2 years.
Successful case of the
implementation of the New Law
LawNo2/2012
More detailed regulation on implementation of
land acquisition
Neutral decision making regarding community
rejection
Better Land Appraisal Team Appointment
Less bureaucratic land right revocation
process
11
Policy reforms are aiming to create a more conducive investment climate
for infrastructure delivery
Presidential Decree (PP) No.
146/2015 regarding Refinery
Projects
Government has issued the Decree to provide guideline in implementing and executing New
Development and Expansion of Refinery in order to achieve the national energy supply
through a provision of integrated supply of petrol and other related products.
12
Presidential Decree (PP) No.
4/2016 regarding Electricy
Projects
Government has issued the Decree to refine a guideline to accelerate the provision of
electricity in Indonesia. The decree is stipulated the role of PT PLN to be the point of contact
to provide the electricity and a number of facilities are provided in order to accelerate the
provision of electricity.
Presidential Regulation (PR)
No. 38/2015 regarding PPP
(4th revision of PR No.
67/2005)
Presidential Regulation (PR)
No. 39/2014 regarding the
New Negative List of
Investment
Government has revised the original regulation on PPP (Presidential Regulation No. 67/2005)
three times to accommodate more concerns regarding PPP development in Indonesia. For
example, social infrastructure projects, the latest revision accommodates international
institutions to provide feasibility study/ project preparation support, criteria and compensation
for unsolicited project proposal, the need of stronger fiscal support from Ministry of Finance.
Government has revised the previous Negative list of investment to encourage more foreign
businesses to take part in infrastructure development. For example, in transport sector,
foreign ownership of seaport facility increased from 49% to 95% during PPP concession
period. The government also allows 100% foreign ownership of power plant >10MW during
PPP concession period (previously 95%).
The Government has issued Presidential Regulation No. 4/2016 on
Electricity Infrastructure Acceleration to accelerate power projects
13
Government
PT PLN
EPC Powerplant and
Transmission
PLN Subsidiary
(Joint Venture)
Independent
Power
Producer
Provision of Electricity
Strengthen Equity
• Equity Injection by the Government;
• Direct Lending;
• Bond issuance by PT PLN;
• Loan from independent lenders;
• PT PLN divident allocation;
• Company Tax Holiday;
• Asset Revaluation;
• Other type of funding.
2B1
Government Support (outside Guarantee)
• Provision of Primary Energy
• Provision of Renewable Energy
• Simplicity of Permits and non-Licensing
• Spatial Planning
• Land acquisition
• Resolution on Legal Matters
Local Content
Obligation on the usage of local content
through an open book system, price
guideline, reverse engineering or other
methods to maximise the local content.
2A
Assignment
13
SJKU *)
Ministry of
Finance
Strengthen PLN
Balance Sheet:
•Financial Asset Optimisation;
•Hedging; and
•Refinancing
*) SJKU=Surat Jaminan Kelayakan Usaha/
Guarantee Letter for Doing Business
One Map Policy as introduced in Economic Policy Package VIII
14
2016
2018
2019
CompilationofGeospatialinformation(IGT)
One Map Policy
Basic Map RBI
1: 50.000
Compilation of maps using Basic Indonesian Terrain Map 1:50,000
Kelompok A: Peta Status
(K/L terkait dan 34 Pemprov)
SynchronizationofIGT
One Map Policy as a basis for decision making
Group B: Potential Map
IGT Spatial Planning Map
1.Land Spatial Local Government Regulation
(District, Town and Province)
2.President Regulation on National Strategic
Area Sptaial Planning. l
3.Defence Area Map
4.Coastline and Small Islands Regional
Planning Map (RZWP3K) Province
Group A: Status Map
IGT Regulation Map
1.IGT Forestry (SK Penetapan, IUPHHK,
HTR, KHDTK)
2.IGT Oil and Gas and Mineral (IUP/KP, Izin
WKP)
3.IGT Wide Scale Land Ownership (HGU,
HPL, HGB)
4.IGT Communal Land
5.IGT Location Permit (District/Town)
6.IGT Special Zone (SEZ, Industrial Zone,
KPBPB)
7.IGT Transmigration
8.IGT Country Borders (land and sea)
9.IGT Regional Borderline (land and sea)
IGT Transportation and Utility Map
1.Fisheries Port
2.General Port
3.Airport
4.Road and Railway Network
5.Utility Network (Oil and Gas pipeline, Water and
wastewater distribution, landfill)
6.Electricity Network (Powerplant, Main Grid,
Transmission Line)
7.Dam, weir and irigation
IGT Environmental Map
1.Ground water and surface water
2.Natural Resources Nexus (Forest, Water and Public
Land)
3.Land Coverage
4.Mangrove
5.Geological Structure and Rock Classification
6.Soil Type and Sructure
7.Rainfall and Energy
8.River Catchment
IGT Regional Potential Map
1.Paddy Field
2.Fisheries Processing Area (WPP)
3.Limestone Area
4.Natural Resources - Geology
5.Natural Resources - Mineral
6.Village Potential
7.Cultural Heritage
PT Sarana Multi Infrastructure is one of the non-bank institution with
the capacity to provide funding for infrastructure projects
PT SMI is a State-Owned Enterprise that acts as a Catalyst in Accelerating Infrastructure Development. Its duty is to support the
Government’s infrastructure agenda for Indonesia through partnerships with private and/or multilateral finacial institutions in PPP
projects.
Sector Focus
Electricity &
Energy Efficiency
Road & BridgesTransportation
Regional
Infrastructure
Prison SchoolHospital
Market
Tourism
InfrastructureTelecommunication Irrigation &
Waterway
Oil & Gas
Waste Water &
Waste
Management
Train Rolling Stock
Social Infrastructure
Water Supply
Renewable Energy
ADVISORY SERVICES PROJECT DEVELOPMENT
Funding Sources
State Additional Equity Injection
Loans and Grants from
Domestic and Foreign
Capital Market
(Bonds, Securities)
Securitization
Infrastructure Financing
o Senior Loan
o Banking Complementary
o Arranger & Underwriter
o PPP Standby Lender
o Geothermal Financing
Municipal Financing / Regional
Infrastructure Development
Fund (RIDF)
FINANCING
• Mezzanine
• Equity
Investment
• Take Out Financing
• Promoter
Financing
• Subordinated Loan
Public Sector Advisory
o Municipal Training & Capacity
Building
o Municipal Technical Assistance
o Donor Fund Management for
Municipalities
Private Sector Advisory
o Investment Advisory
o Financial Advisory
o Training & Capacity Building
(Commercial)
Project Development Facilities
(PDF)
o PPP Project Development
• PPP Showcase Projects
• PPP Priority Projects
PDF & Donor Fund
Management
Technical Assistance for
municipal project
15
For the future, PT SMI’s capacity will be expanded following the
merging with the Indonesia Investment Center
16
SMI before
PIP injection
Phase 1: Infrastructure Finance
Company
Phase 2: Development Bank
PIP balance sheet
Government
support
(e.g. regulation,
tax incentives, ...)
SMI (Persero) SMI (Persero) UU LPPI (Lembaga)
Now-20171 2017 onwards1
• Additional roles to provide municipal
financing (social infrastructure)
• More active in tapping alternative sources
of funding and reduce cost of funds to
grow size of financing
• Expanded roles to catalyze infrastructure
market, e.g. provider of PDF, channeling
on multilateral loans
• Requires government support: tax
advantaged funding
• Fast growing infrastructure
financier
• Started tapping into alternative
funding sources, but still
relatively small
• Begin to act as advisor to public
and private sector to help
project feasibility
• Grow Infrastructure and priority sectors
• Support economic and social development of
Indonesia
• Unlock market failures preventing
development
• Combine world-class project finance with a
focus on economic outcomes
• Requires gov. support: bankruptcy remote,
minimum capital guarantee, government
guaranteed loan and tax exempt entity status
Strategic Industry
Maritime
Catalyze
infrastructure
finance market
One-stop
infrastructure
financialadvisor
Agriculture
Financing of
nationaland regional
infrastructure
Indonesian Infrastructure Guarantee Fund (IIGF)/PT PII is the institution
mandated to provide Government Guarantee
IIGF/PT PII established on 30 December 2009 to be a Single Window Process for Government Guarantee. It has a mandate to
provide guarantees for Government Contracting Agencies’ (Ministries, Regional Governments, SOEs) contractual obligations under
Cooperation Agreement of PPP infrastucture projects.
17
Presidential Regulation
67/2005*
Presidential Regulation
78/2010
MOF Regulation
260/2010
Primary
Objective of
IIGF
Single Window Mechanism for
Guarantee Provision
*as has been ammended by Presidential Regulatian No. 13/2010; No. 56/2011; No.38/2016
4. Ring-fence GOI Contingent Liabilities and
minimize Sudden Shock to RoI State Budget
3. Improve governance, transparency and consistency of
guarantee provision process
2. Provide guarantees to well structured PPPs
1. Improve creditworthiness – bankability of PPP projects
The guarantees provided by IIGF lowers risks burdened by the private
sector, thus making the less feasible government projects more attractive
To attract investor interest
Enhance competition in bidding
process
Minimize sudden shock to RoI
State Budget
Systematic, measurable and
accountable in fiscal risk
mitigation
Mitigate risks which are
not covered in the market
Enhance transparency, certainty
and consistency for project
guarantee and evaluation process
Enhance Bankability
Enlarge loan due date
Contract Agreement complied
with common standard
18
The Government has expanded the scope of government guarantee,
thus increasing the scope of projects that may be covered
Presidential Reg. No. 82/2015 on Central Government
Guarantee for Infrastructure Financing with Direct
Lending from International Finance Institution to State
Owned Enterprises
• Potential guarantee for PT PLN (National Electricity
Company) is expecting to obtain Direct Lending for
IPP projects for power plants and transmission
projects (e.g. Sumatera 500 kV Transmission).
• Potential guarantee to construction SOEs which
have been assigned by Presidential Regulation to
implement infrastructure projects
Regulatory Basis
Presidential Reg. No. 78/2010 on Infrastructure
Guarantee for Public Private Partnership
Provided by The Entity for Infrastructure Guarantee
Implementation to Date
• Approved guarantee for Central Java Power Plant,
Palapa Ring Broadband and Batang-Semarang Toll
Road
• Letter of Intent has been issued for Lampung Water
Supply Project, Umbulan Water Supply Project
• Potential guarantee for Sumsel 9 and 10 Mine
Mouth Power Plants
Government Guarantee for Direct LendingGovernment Guarantee for PPP
19
Presentation Outline
Indonesia’s Infrastructure Targets
Recent Reforms for Infrastructure Acceleration
Committee for Acceleration for Priority Infrastructure
Delivery (KPPIP)
National Strategic and Priority Projects
20
Committee for Acceleration of Priority Infrastructure Delivery (KPPIP)
KPPIP was established to revitalize KKPPI1 functions by downsizing the organizational structure, authorizing synergized decision
makings and involvement since the project preparation stage, and strengthening capacity building in internal committee.
KPPIP members include ministries and
institutions that play significant roles in project
preparation
Coordinating Ministry of Economic
Affairs
Ministry of Finance
Ministry of National Development
Planning/Bappenas
Ministry of Agrarian and Spatial
Planning (BPN)
Coordinating Ministry of Maritime
Affairs2
Ministry of Environment &
Forestry 2
1 KKPPI or Komite Kebijakan Percepatan Penyediaan Infrastruktur, in English called Committee for Acceleration of Policy and Infrastructure Provision was
the committee prior to the revitalization of KPPIP
2 Proposed revision of Presidential Reg. 75/2014;
3OBC: Outline Business Case; 4PDF: Project Development Fund
In carrying out its mandates, KPPIP strengthens its internal synergy by
dividing the work and preventing duplication efforts so that efficient and
effective infrastructure delivery can be achieved
Examples of line Ministries/Institutions involvement based on each line
Ministry/Institution mandates:
o Assessing and providing OBC facility for bottom-up projects
o Developing Pre-Feasibility standard and quality guidelines
o Debottlenecking on issues related to land acquisition and
supporting acceleration efforts
o Providing OBC3 facility for top-down projects
o Monitoring and debottlenecking of projects on economic issues
o Reviewing and approving Government support and guarantee
o Providing PDF4 facility for PPP projects
EKON
• KPPIP involves other line Ministries/Institutions in infrastructure sector
(economy or social) when making decision.
• KPPIP has established the Electricity Team (UP3KN) , the
Development of Bontang Oil Refinery Acceleration Team and Land
Acquisition Acceleration Team etc.
ExistingMembersProposed
21
UP3KN
Working
Unit
Bontang Oil
Refinery
Working
Team
Other
Working
Teams
Team for
Land
Acquisition
Acceleration
Finance
Team
Legal Team
KPPIP is supported by a a full time Project Management Office (PMO)
which consists of experienced professionals
Committee
Coordinating Minister of Economic Affairs
Minister of Finance
Minister of National Development Planning
Minister of Agrarian and Spatial Planning
Implementation Team
Sectoral Working Team
Pool of Consultants
Full-Time
PMO
Professionals1. Act as the single point of contact for all
government agencies, potential funders
and private sector investors for
coordinating and delivering the Strategic &
Priority Infrastructure projects;
2. Coordinate the delivery of the projects to be
on-time, within the budget and at the best
quality;
3. Enable and facilitate the GCAs' capabilities
to deliver projects via various fiscal and
technical support schemes.
Mission
Champion in Managing and Delivering the
Strategic & Priority Infrastructure Projects in
Indonesia
Vision
Inter-Sectoral
WorkingTeams
22
KPPIP PMO Organization Chart - Professionals
Implementation Team
Program Director
Procurement Team
1. Senior Procurement
2. Procurement
Office Manager
Administration Team
Financial
Director
Project Director
for Energy &
Electricity Sector
Project Director for
Water Resources and
Sanitation Sector
Project Director
for Transportation
Sector
Project Director for
Roads and Bridges
Sector
Communication
Specialist
Legal Specialist
PMO Supporting Consultant
External Consultants
23
As stipulated by Pres. Reg. No. 75/2014, KPPIP was mandated to
execute six main tasks
Top down projects
(from
President/Vice
President)*
Bottom Up Projects
(Proposed by Line
Ministries and
Regional Govt)
* OBC (Outline Business Case) is the output of pre-feasibility study.
FBC (Final Business Case) is the output of feasibility study.
** Project owner is the ministry, agency head, regional heads,
SOE/ROE heads established as the responsible party in priority
infrastructure delivery.
3. Determination
of funding
scheme &
source for priority
projects
State Budget
SOE appointment
PPP/Strategic Funding
Coordinate between the
project owner** and
Bappenas related to
funding source (State
Budget, Regional Budget,
ODA)
SOE appointment aims
to accelerate
implementation and
leverage SOE financial
capacity.
PPP Unit at MoF to
coordinate FBC*
development and do
transaction advisory to
implement PPP projects
(involving internationally
reputable consultant).
2.
Determination
of Priority
Projects
4. Monitoring &
Debottlenecking
KPPIP assists
development of
Action Plans and
monitor
debottlenecking
efforts
KPPIP’s six main tasks as stipulated in Pres. Reg. No. 75/2014
5. Determine strategy and policy
6. Facilitate capacity and institutional building related to Priority Infrastructure delivery
1. Development of
pre-feasibility study
(OBC*) quality
standard and
revise/re-do when
necessary (3-6
months)
Ground
breaking
24
Additional mandate for National Strategic Project: Monitoring and Evaluation including debottlenecking high level issues.
To standardize good practices, KPPIP has developed tools for project
preparation
OBC Guideline
KPPIP is developing OBC Guideline which consists of required elements in
the OBC to ensure that the pre-feasibility study from Project Owners satisfies
the standard for good quality project preparation. Value for Money (VfM)
analysis is included in the Guideline to determine the most beneficial funding
scheme for the project.
Together with KPPIP, Bappenas also provides fund for Pre-Feasibility Study.
Moreover, Ministry of Finance has developed PPP Unit which will provide
Project Development Fund for Final Business Case (FBC) and Transaction
Advisor.
Funding Scheme Guideline
This sector-specific guideline is the tool to determine the most optimal funding
scheme by using the elements of OBC. This Guideline will ensure that the
projects offered to investors are bankable and prepared based on an
international quality standard.
25
Moreover, KPPIP is in the process implementing an integrated IT
System for monitoring of national strategic and priority projects
KPPIP is currently in the process implementating an integrated IT system for providing database
on projects’ latest status which can be effectively utilized for monitoring purposes.
4
3
2
1
Database
Project
information such
as map, track,
existing study
and latest
project status.
An integrated IT
system with
monitoring capacity for
stakeholders, so that
they can have real
time data.
Platform data
outlook that is
efficient and
functional using a
user-friendly
framework.
Record decisions related
to projects and
synchronize the
implementation schedule
that can be utilized by
stakeholders.
26
Presentation Outline
Indonesia’s Infrastructure Targets
Recent Reforms for Infrastructure Acceleration
Committee for Acceleration for Priority Infrastructure
Delivery (KPPIP)
National Strategic and Priority Projects
27
For setting a pipeline, the Government has issued President Decree no 3/2016
listing down National Strategic Projects (PSN) and facilities
Some details on the facilities and special
treatments are:
•Clear maximum duration of permitting
process
•The process for Location
Determination/Location Permit may be done
in parallel with the processing of
Environmental Permit, Building Permit,
Disturbance Permit, and approval for building
design using data sharing.
•Construction for National Strategic Projects
can begin after obtaining minimum: Location
Determination/Location Permit,
Environmental Permit, Forest Permit (IPPKH)
and/or Building Permit.
•The Government might be able to provide a
sovereign guarantee to projects executed by
Local Government or Business Entity.
1. Permits and Non-Licensing
2. Government Procurement
4. Debottlenecking
5. Spatial Planning
6. Land Acquisition
3. Government Guarantee
Presidential Regulation on National
Strategic Projects provides facilities and
special treatments on:
28
The National Strategic Projects consist of 225 projects in various sectors
and 1 electricity projects with estimated investment costs of IDR 2,476 T
ROAD RAILWAY AIRPORT SEAPORT HOUSING ENERGY
FISHERIES/
MARITIME
52 19 17 13 3 7 3
SECTORS
WATER
SUPPLY
ECONOMIC
ZONES DAMS
COMMUNIC
ATION
NATIONAL
BORDERS SMELTER POWER
10 25 60 3 7 6 1 program
SPREAD OF NATIONAL STRATEGIC PROJECTS
1
2
3
4
5
6
LOCATIONS
1. Sumatera 46
2. Java 89
3. Kalimantan 24
4. Bali & Nusa Tenggara 16
5. Sulawesi 28
6. Maluku & Papua 13
7. National 10
Indonesia Coordinating Board for Investments’s (BKPM) roles in the
National Strategic Projects
To attract participation of the private sector, the Government
provides a number of facilities to an electricity program and
strategic projects comprising of: 52 road projects, 19 railways, 17
airports, 13 ports, 3 housing, 7 energy, 10 clean water, 7 border
development, 60 dams, 3 technology projects, 25 estates, 6
mining related projects and 3 agrarian and fisheries projects.
Licenses for
Administration
of National
Strategic
Project
Minister/
Head of
Institution
Governor
or
Municipal/
Regent
Business
Entity
Location
Determination
5 working
days
Location
Permit
5 working
days
Construction
Building Permit
5 working
days
Forestry
Borrow to Use
License
30 working
days
Environmental
License
60 working
days
Investment
Principle
License
5 working
days
Issued by
BKPM as One
Door
Integrated
Service
30
KPPIP’s roles in National Strategic Projects and Priority Projects
Priority Projects
KPPIP to provide knowledge sharing on the
project preparation and debottlenecking
activities.
KPPIP will provide monitoring and
evaluation on the project and also
debottlenecting on key strategic issues.
KPPIP will actively involve in the whole
project lifecycle from the project
preparation up to operational and
maintenance. The project will receive
additional facilities from KPPIP during the
project implementation.
KPPIP role
31
PT SMI’s role in National Strategic Project and Priority Project
Accumulated as end of 2015 Year 2016 + Pipeline
National Priority
Projects
(Coordinating Ministry of
Economy Regulation
No.12/2015)
1 project
Toll Road Trans Sumatera Ruas Medan – Binjai
Total Commitment of IDR481 billion
Total Project Value IDR1.6 trillion
3 projects
o PLTU Mulut Tambang Sumatera Selatan 8
o Toll Road Trans Sumatera Ruas Palembang – Indralaya and
Ruas Bakauheni – Terbanggi Besar.
Total Commitment of IDR6.54 trillion
Total Project Value of IDR39.6 trillion
National Strategic
Projects
(Presidential Regulation
No. 3 tahun 2016)
9 projects
o Toll Road Solo – Ngawi
o Toll Road Ngawi – Kertosono
o Toll Road Medan – Binjai
o Toll Road Pejagan – Pemalang
o Soekarno – Hatta Airport Development
o Titab Water Dam, Bali
o Logung Water Dam, Jawa Tengah
o Bajulmati Water Dam, Jawa Timur
Total Commitment of IDR3.38 trillion
Total Project Value of IDR35.88 trillion
6 projects
o Toll Road Pandaan-Malang
o Toll Road Bogor Ring Road
o Port Pelindo IV
o Toll Road Trans Sumatera Palembang – Indralaya and
Bakauheni – Terbanggi Besar
o Toll Road Trans Jawa Semarang-Solo.
o Waskita Toll Road (12 Segments Toll Road di Jawa) – Equity
Investment*
Total Commitment of IDR5.51 trillion
Total Project Value of IDR30.34 trillion
RPJMN Projects
(Presidential Regulation
No. 2 tahun 2015)
9 projects
o Toll Road Trans Jawa (Cikopo-Palimanan, Solo-Ngawi,
Ngawi-Kertosono, dan Pejagan-Pemalang)
o Toll Road Trans Sumatera (Medan-Binjai)
o Soekarno – Hatta Airport Capacity Improvement
o Titab Water Dam, Bali
o Logung Water Dam, Jawa Tengah
o Palaran Port, Samarinda
Total Commitment of IDR3.60 trillion
Total Project Value of IDR36.39 trillion
7 projects
o PLTMH (part of 35 GW)
o PLTU 2x15MW Sorong and PLTU 2x7 MW Biak, Papua Barat
o Belawan International Container Terminal (BICT)
o Coal Train Sumatera Selatan
o Toll Road Trans Sumatera Palembang-Indralaya and Bakauheni
– Terbanggi Besar.
o Toll Road Trans Jawa Semarang-Solo
Total Project Value of IDR37.58 trillion
32
Prioritizing Project Pipeline - the Government has also issued the
Regulation of Coordinating Ministry of Economic Affairs no 12/2015
4
4
4
4
3
5
6
13
13
18 21
11
1
25
9
2
7
10
4
26
4
27
15
30
23
16
29
12
19
29
29
29
29
29
29
29
29
29
4
4
8
14
19
20
22
24
28
1. Balikpapan-Samarinda Toll Road
2. Manado-Bitung Toll Road
3. Panimbang Serang Toll Road
4. Trans Sumatera Toll Road (8 sections)
5. SHIA Express Railway
6. MRT Jakarta South – North Line
7. Makassar – Parepare Railway
8. Kuala Tanjung International Port Hub
9. Bitung International Port Hub
10.Karangkates IV & V (2x50MW) Hydro-Electric
Power Plant
11. Kesamben (37MW) Hydro-Electric Power Plant
12. Lodoyo (10MW) Hydro-Electric Power Plant
13. Inland Waterways/Cikarang – Bekasi – Laut (CBL)
14. Light Rail Transit (LRT) South Sumatera
15. Integrated Light Rail Transit (LRT) within Jakarta,
Bogor, Depok and Bekasi
16. National Capital Integrated Coastal Development
(NCICD) Fase A
17. Jakarta Sewerage System
18. West Semarang Water Supply
19. High Voltage Direct Current (HVDC)
20. Sumatera 500 kV Transmission Line
21. Central – West Java Transmission Line 500 kV
22. Central Java Power Plant (CJPP)/Batang Power
Plant
23. Indramayu Power Plant
24. Mine to Mouth Power Plant Sumatera Selatan 8, 9,
10
25. Bontang Refinery
26. Revitalization of the Existing Refiniries (Balikpapan,
Cilacap, Balongan, Dumai, Plaju)
27. New Port Development in West Java (North Part)
28. Tuban Refinery
29. Palapa Ring Broadband
30. East Kalimantan Railway
From the National Strategic Projects, the Government has selected a list of 30 Priority Project to be the focus of
infrastructure delivery in the beginning of 2016.
These projects are managed directly by the Committee for Acceleration of Priority Infrastructure Delivery (KPPIP)
Project Under Construction
Project Under Preparation
33
Some of achievements to date in infrastructure delivery (1/2)
Acceleration on the Project Preparation and the Decision Making Process
Bontang Oil Refinery Revived the project preparation process, which has been delayed for 5 years.
Facilitated the preparation of an Outline Business Case (OBC) by allocating an
amount of ~IDR14 Billion for the engagement of an international company to
conduct the work.
Facilitated meetings among the stakeholders to assess recommendation on the
funding scheme and subsequently, obtained an approval at Ministerial level.
Panimbang – Serang Toll
Road
Facilitated the preparation of Value for Money review, which is part of a project
preparation process under Public-Private Partnership scheme and a basis of
justification to determine the funding scheme.
Developed a standard in preparing the Pre-feasibility Study/Outline Business
Case (OBC) for a toll road project.
Facilitated meetings among the stakeholders to assess recommendation on the
funding scheme and subsequently, obtained an approval at Ministerial level.
Facilitated the preparation of an Environmental Impact Analysis (EIA), which is
required for the land acquisition. As a result, location permit has been issued.
Acceleration to determine the Project Funding Scheme
Jakarta Sewerage System
(JSS)
Provided a guideline in preparing the OBC, that becomes a basis for the funding
scheme recommendation, in accordance with the standards set by KPPIP
Facilitated meetings among the stakeholders to assess recommendation on the
funding scheme and subsequently, obtained an approval at Ministerial level.
South Sumatera Light
Rapid Transit (LRT)
Reviewed the existing financial assessment of the project.
Reviewed the SOE capability for developing the project.
Provided a recommendation to the decision maker on the project funding
scheme.
34
Some of achievements to date in infrastructure delivery (2/2)
Debottlenecking in Land Acquisition Problems
Central Java Power Plant (CJPP)/
PLTU Batang
Provided recommendations to accelerate the land acquisition in accordance with the
applicable regulations
Performed activities to coordinate the decision making process to accelerate the land
acquisition.
Facilitated a project-accelerating finalization process for Financial Close.
PLTU Indramayu Performed activities to accelerate issuance of the environmental permit by the Head of
Regency (that has been delayed for 3 years) in order to progress the project preparation.
Supported the coordination to resolve spatial planning issue which serves as the basis for
the issuance of Location Permit required for land acquisition.
NCICD Promoted the decision making process on the matrix of responsibilities between the
government and investor for the preparation of EIA.
BBWS has approved the matrix of responsibilities and is currently conducting a tender for
provisional of consulting services to prepare the EIA.
MRT Jakarta (North – South
Corridor)
Performed activities to accelerate the President’s approval in voluntarily utilising the
National Police residential area for the station development.
Accelerated the disbursement process of the foreign loan to ensure that the construction
can be conducted on schedule.
Facilitating the coordination to overcome gas pipeline issue
Revisions to the Infrastructure Related Regulation
Manado – Bitung Toll Road Accelerated the issuance of the Minister of Agrarian and Spatial Planning Regulation No.
6/2015, which provides an adjustment to the Presidential Regulation No. 30/2015 and is
required prior to continuing the land acquisition for Section 2.
35
Potential Projects for Investment
Bontang Refinery Project
• Investment Value: IDR 75 T – 150 T (subject to the final structure)
• Project Structure Scheme: Public Private Partnership (PPP)
• Location: Bontang, Kalimantan Timur
• Government Contracting Agency (GCA): PT Pertamina
• Construction Commencement Target Date: 2018
• Commercial Operation Target Date: 2023
Project Information
• Preliminary Environmental Study, Location Assesment and Site
Preparation have been carried out by PT Pertamina. Outline
Business Case has been developed by KPPIP.
• The ministerial meeting has agreed that the project scheme will be
PPP with PT Pertamina as the GCA. The project structure has been
further formalized by the Minister of Energy and Mineral Resources
Decree.
• Land Acquistion and Certification of 160 Ha was completed. The
remaining 300 Ha is subjected to the issuance of spatial planning
revision by the Bontang City Counciil.
• The confirmation to proceed letter for Government Guarantee
processing has been issued by Indonesia Infrastructure Guarantee
Fund (IIGF)
• The GCA is currently in the process of procuring transaction advisor
Latest Status
• A combination of Grass Root Refinery
(GRR) and Refinery Development
Master Plan (RDMP) is required to
increase the supply of crude oil and fuel
to minimise import.
• Bontang Refinery Project is new refinery
project with target capacity of 235,000
barrell per day.
• Bontang Refinery project is designed to
combine its fuel refinery configuration
with a petrochemical plant.
Description
36
Potential Projects for Investment
Serang - Panimbang Toll Road
37
• Investment Value: IDR 11 Trillion
• Project Structure Scheme: KPBU
• Location: Banten
• Government Contracting Agency (GCA): BPJT
• Construction Commencement Target: 2017
• Commercial Operation Target: 2018
Project Information
• The Environmental Study (AMDAL) has been issued in
December 2015, followed by the issuance of the
Environmental Permit in early 2016.
• In May 9th 2016, Bina Marga has completed the Land
Acquisition Planning documents which was submitted to
Banten Provincial Government in May 23rd 2016.
• The Location Determination has been issued in May 29th
2016, which further triggered the land acquisition process
according to Law No. 2/2012.
Latest Status
The development of Serang – Panimbang
Toll Road has the objective to support the
economic improvements or areas
surrounding Tanjung Lesung Special
Economic Zones (SEZ).
Serang – Panimbang toll road route
passes through 1 city, 3 regencies, 14
districts, and 50 villages in the Banten
province, which spans along 84 km.
Description
Potential Projects for Investment
Jakarta Sewerage System
38
• Investment Value: IDR 150 Trillion (all zones)
• Project Structure Scheme: State Budget with foreign loan from
Japan International Corporation Agency and potential PPP for
the remaining 13 zones
• Location: DKI Jakarta
• Government Contracting Agency (GCA): DKI Jakarta
Provincial Government
• Construction Commencement Target: 2018 (Zone 1)
• Commercial Operation Target: 2021 (Zone 1)
Project Information
• The project scheme funding sources has been decided to be
State Budget with foreign loan from Japan International
Corporation Agency.
• For Zone 1, Directorate General of Cipta Karya and
Bappenas are currently processing the loan to be included in
Green Book.
• The funding schemes for the remaining zones have not been
decided yet.
Latest Status
The Jakarta Sewerage System will
manage domestic waste management in
15 zones (incl. the zone already
operating), which is aimed to begin with
Zone 1 and Zone 6.
Description
KPPIP
Menara Merdeka, 8th floor
Jl Budi Kemuliaan I No 2, Jakarta 10110
E-mail : sekretariat@kppip.go.id
Landline : +62 21 2957 3771
THANK YOU

More Related Content

What's hot

Case Study of Tolled Road Project
Case Study of Tolled Road ProjectCase Study of Tolled Road Project
Case Study of Tolled Road ProjectIOSR Journals
 
Amrut by Gajanand Ram (Town Planner)
Amrut  by Gajanand  Ram (Town Planner)Amrut  by Gajanand  Ram (Town Planner)
Amrut by Gajanand Ram (Town Planner)urbanranchi
 
Data Compilation on Urban Metropolitan Transport Authority (UMTA) of Differen...
Data Compilation on Urban Metropolitan Transport Authority (UMTA) of Differen...Data Compilation on Urban Metropolitan Transport Authority (UMTA) of Differen...
Data Compilation on Urban Metropolitan Transport Authority (UMTA) of Differen...Centre for Public Policy Research
 
PPP Case Study - Beijing Metro Line 4 v5
PPP Case Study - Beijing Metro Line 4 v5PPP Case Study - Beijing Metro Line 4 v5
PPP Case Study - Beijing Metro Line 4 v5Oliver Parker
 
Role of centre and state in finance of urban development project
Role of centre and state in finance of urban development projectRole of centre and state in finance of urban development project
Role of centre and state in finance of urban development projectanupriya sharma
 
WEBINAR: Transforming India's Urban Infrastructure with Project AMRUT (Atal M...
WEBINAR: Transforming India's Urban Infrastructure with Project AMRUT (Atal M...WEBINAR: Transforming India's Urban Infrastructure with Project AMRUT (Atal M...
WEBINAR: Transforming India's Urban Infrastructure with Project AMRUT (Atal M...WRI Ross Center for Sustainable Cities
 
Policy challenge-province-road-standard
Policy challenge-province-road-standardPolicy challenge-province-road-standard
Policy challenge-province-road-standardTEJASWI SHARMA
 
LRPT Phase 2 Presentation
LRPT Phase 2 PresentationLRPT Phase 2 Presentation
LRPT Phase 2 PresentationCOTA BUS
 
Area Development Districts' Role in Kentucky's Road Prioritization Process
Area Development Districts' Role in Kentucky's Road Prioritization ProcessArea Development Districts' Role in Kentucky's Road Prioritization Process
Area Development Districts' Role in Kentucky's Road Prioritization ProcessRPO America
 
Ppp case study in nigeria second niger bridge (world bank ppp mooc final pr...
Ppp case study in nigeria   second niger bridge (world bank ppp mooc final pr...Ppp case study in nigeria   second niger bridge (world bank ppp mooc final pr...
Ppp case study in nigeria second niger bridge (world bank ppp mooc final pr...toju_philip
 
Rural Infrastructure development and Technology misssions
Rural Infrastructure development and Technology misssionsRural Infrastructure development and Technology misssions
Rural Infrastructure development and Technology misssionsYajush Sonar
 

What's hot (17)

Case Study of Tolled Road Project
Case Study of Tolled Road ProjectCase Study of Tolled Road Project
Case Study of Tolled Road Project
 
Jnnurm
JnnurmJnnurm
Jnnurm
 
Amrut by Gajanand Ram (Town Planner)
Amrut  by Gajanand  Ram (Town Planner)Amrut  by Gajanand  Ram (Town Planner)
Amrut by Gajanand Ram (Town Planner)
 
Data Compilation on Urban Metropolitan Transport Authority (UMTA) of Differen...
Data Compilation on Urban Metropolitan Transport Authority (UMTA) of Differen...Data Compilation on Urban Metropolitan Transport Authority (UMTA) of Differen...
Data Compilation on Urban Metropolitan Transport Authority (UMTA) of Differen...
 
PPP Case Study - Beijing Metro Line 4 v5
PPP Case Study - Beijing Metro Line 4 v5PPP Case Study - Beijing Metro Line 4 v5
PPP Case Study - Beijing Metro Line 4 v5
 
Msc
MscMsc
Msc
 
Role of centre and state in finance of urban development project
Role of centre and state in finance of urban development projectRole of centre and state in finance of urban development project
Role of centre and state in finance of urban development project
 
Infra on Roads
Infra on RoadsInfra on Roads
Infra on Roads
 
WEBINAR: Transforming India's Urban Infrastructure with Project AMRUT (Atal M...
WEBINAR: Transforming India's Urban Infrastructure with Project AMRUT (Atal M...WEBINAR: Transforming India's Urban Infrastructure with Project AMRUT (Atal M...
WEBINAR: Transforming India's Urban Infrastructure with Project AMRUT (Atal M...
 
Policy challenge-province-road-standard
Policy challenge-province-road-standardPolicy challenge-province-road-standard
Policy challenge-province-road-standard
 
Text msc
Text mscText msc
Text msc
 
Hollywood Road Corridor
Hollywood Road CorridorHollywood Road Corridor
Hollywood Road Corridor
 
LRPT Phase 2 Presentation
LRPT Phase 2 PresentationLRPT Phase 2 Presentation
LRPT Phase 2 Presentation
 
Area Development Districts' Role in Kentucky's Road Prioritization Process
Area Development Districts' Role in Kentucky's Road Prioritization ProcessArea Development Districts' Role in Kentucky's Road Prioritization Process
Area Development Districts' Role in Kentucky's Road Prioritization Process
 
Ppp case study in nigeria second niger bridge (world bank ppp mooc final pr...
Ppp case study in nigeria   second niger bridge (world bank ppp mooc final pr...Ppp case study in nigeria   second niger bridge (world bank ppp mooc final pr...
Ppp case study in nigeria second niger bridge (world bank ppp mooc final pr...
 
Rural Infrastructure development and Technology misssions
Rural Infrastructure development and Technology misssionsRural Infrastructure development and Technology misssions
Rural Infrastructure development and Technology misssions
 
IHA Congress 2011 - Global Workshop - Jasper Oduor
IHA Congress 2011 - Global Workshop - Jasper OduorIHA Congress 2011 - Global Workshop - Jasper Oduor
IHA Congress 2011 - Global Workshop - Jasper Oduor
 

Similar to Indonesia Infrastructure Roundtable Discusses Key Projects

Infrastructure Developments In Indonesia - Key Improvements and Priority Proj...
Infrastructure Developments In Indonesia - Key Improvements and Priority Proj...Infrastructure Developments In Indonesia - Key Improvements and Priority Proj...
Infrastructure Developments In Indonesia - Key Improvements and Priority Proj...Lynn Aziz
 
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.Public Private Partnerships. Infrastructure Projects Plan in Indonesia.
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.Oswar Mungkasa
 
Indonesian electricity-guide 2011
Indonesian electricity-guide 2011Indonesian electricity-guide 2011
Indonesian electricity-guide 2011Denny Saputra
 
Infrastructure development - Myrna Chua, Philippines
Infrastructure development - Myrna Chua, PhilippinesInfrastructure development - Myrna Chua, Philippines
Infrastructure development - Myrna Chua, PhilippinesOECD Governance
 
How JICA mobilizes private sector finance and investments for affordable and ...
How JICA mobilizes private sector finance and investments for affordable and ...How JICA mobilizes private sector finance and investments for affordable and ...
How JICA mobilizes private sector finance and investments for affordable and ...OECD Environment
 
RPN Manila 2022: Session 5.1 Slamet Rona Ircham MoF.pdf
RPN Manila 2022: Session 5.1 Slamet Rona Ircham MoF.pdfRPN Manila 2022: Session 5.1 Slamet Rona Ircham MoF.pdf
RPN Manila 2022: Session 5.1 Slamet Rona Ircham MoF.pdfOECD Environment
 
Performance Audit of GBPWD.pptx
Performance Audit of GBPWD.pptxPerformance Audit of GBPWD.pptx
Performance Audit of GBPWD.pptxsheikhInayat5
 
pmgatishaktischeme-211026085954.pdf
pmgatishaktischeme-211026085954.pdfpmgatishaktischeme-211026085954.pdf
pmgatishaktischeme-211026085954.pdfOfficerToBe
 
Public Private Patnership
Public Private Patnership Public Private Patnership
Public Private Patnership Sagar Srivastava
 
How to successfully target and secure OBOR projects
How to successfully target and secure OBOR projectsHow to successfully target and secure OBOR projects
How to successfully target and secure OBOR projectsAconex
 
Management Presentation 2016_Update 1Q-16_v20
Management Presentation 2016_Update 1Q-16_v20Management Presentation 2016_Update 1Q-16_v20
Management Presentation 2016_Update 1Q-16_v20Adrianto Januri
 
Infrastructure Development New (3)
Infrastructure Development New (3)Infrastructure Development New (3)
Infrastructure Development New (3)Ashutosh Kumar Jha
 
Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)
Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)
Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)DBTGrupoIndia
 
GRP 2 PRESENTATION (5) (2).pptx
GRP 2 PRESENTATION (5) (2).pptxGRP 2 PRESENTATION (5) (2).pptx
GRP 2 PRESENTATION (5) (2).pptxBarshaSahu15
 
SECOND high level commitie report ON INFRASTRUCTURE PROJECT
SECOND high level commitie report ON INFRASTRUCTURE PROJECTSECOND high level commitie report ON INFRASTRUCTURE PROJECT
SECOND high level commitie report ON INFRASTRUCTURE PROJECTMANI SHANKAR DWIVEDI
 

Similar to Indonesia Infrastructure Roundtable Discusses Key Projects (20)

Infrastructure Developments In Indonesia - Key Improvements and Priority Proj...
Infrastructure Developments In Indonesia - Key Improvements and Priority Proj...Infrastructure Developments In Indonesia - Key Improvements and Priority Proj...
Infrastructure Developments In Indonesia - Key Improvements and Priority Proj...
 
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.Public Private Partnerships. Infrastructure Projects Plan in Indonesia.
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.
 
Indonesian electricity-guide 2011
Indonesian electricity-guide 2011Indonesian electricity-guide 2011
Indonesian electricity-guide 2011
 
Infrastructure development - Myrna Chua, Philippines
Infrastructure development - Myrna Chua, PhilippinesInfrastructure development - Myrna Chua, Philippines
Infrastructure development - Myrna Chua, Philippines
 
How JICA mobilizes private sector finance and investments for affordable and ...
How JICA mobilizes private sector finance and investments for affordable and ...How JICA mobilizes private sector finance and investments for affordable and ...
How JICA mobilizes private sector finance and investments for affordable and ...
 
RPN Manila 2022: Session 5.1 Slamet Rona Ircham MoF.pdf
RPN Manila 2022: Session 5.1 Slamet Rona Ircham MoF.pdfRPN Manila 2022: Session 5.1 Slamet Rona Ircham MoF.pdf
RPN Manila 2022: Session 5.1 Slamet Rona Ircham MoF.pdf
 
Performance Audit of GBPWD.pptx
Performance Audit of GBPWD.pptxPerformance Audit of GBPWD.pptx
Performance Audit of GBPWD.pptx
 
PM Gatishakti scheme
PM Gatishakti schemePM Gatishakti scheme
PM Gatishakti scheme
 
pmgatishaktischeme-211026085954.pdf
pmgatishaktischeme-211026085954.pdfpmgatishaktischeme-211026085954.pdf
pmgatishaktischeme-211026085954.pdf
 
The IPA: The future for government projects and programmes
The IPA: The future for government projects and programmesThe IPA: The future for government projects and programmes
The IPA: The future for government projects and programmes
 
National monetisation pipeline
National monetisation pipelineNational monetisation pipeline
National monetisation pipeline
 
Public Private Patnership
Public Private Patnership Public Private Patnership
Public Private Patnership
 
How to successfully target and secure OBOR projects
How to successfully target and secure OBOR projectsHow to successfully target and secure OBOR projects
How to successfully target and secure OBOR projects
 
Management Presentation 2016_Update 1Q-16_v20
Management Presentation 2016_Update 1Q-16_v20Management Presentation 2016_Update 1Q-16_v20
Management Presentation 2016_Update 1Q-16_v20
 
Boot model
Boot modelBoot model
Boot model
 
PURA STATUS
PURA STATUSPURA STATUS
PURA STATUS
 
Infrastructure Development New (3)
Infrastructure Development New (3)Infrastructure Development New (3)
Infrastructure Development New (3)
 
Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)
Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)
Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)
 
GRP 2 PRESENTATION (5) (2).pptx
GRP 2 PRESENTATION (5) (2).pptxGRP 2 PRESENTATION (5) (2).pptx
GRP 2 PRESENTATION (5) (2).pptx
 
SECOND high level commitie report ON INFRASTRUCTURE PROJECT
SECOND high level commitie report ON INFRASTRUCTURE PROJECTSECOND high level commitie report ON INFRASTRUCTURE PROJECT
SECOND high level commitie report ON INFRASTRUCTURE PROJECT
 

More from Harun Al-Rasyid Lubis

Lect 02 si 5142 (intro to appraisal ) rev
Lect 02 si 5142 (intro to appraisal ) revLect 02 si 5142 (intro to appraisal ) rev
Lect 02 si 5142 (intro to appraisal ) revHarun Al-Rasyid Lubis
 
LP network chapter 5 transportation and assignment problem
LP  network chapter 5 transportation and assignment problemLP  network chapter 5 transportation and assignment problem
LP network chapter 5 transportation and assignment problemHarun Al-Rasyid Lubis
 
Kuliah teori dan analisis jaringan - linear programming
Kuliah teori dan analisis jaringan - linear programmingKuliah teori dan analisis jaringan - linear programming
Kuliah teori dan analisis jaringan - linear programmingHarun Al-Rasyid Lubis
 

More from Harun Al-Rasyid Lubis (6)

Lect 02 si 5142 (intro to appraisal ) rev
Lect 02 si 5142 (intro to appraisal ) revLect 02 si 5142 (intro to appraisal ) rev
Lect 02 si 5142 (intro to appraisal ) rev
 
Lecture 01 introduction --rev
Lecture 01   introduction --revLecture 01   introduction --rev
Lecture 01 introduction --rev
 
Perpres nomor 38_tahun_2015
Perpres nomor 38_tahun_2015Perpres nomor 38_tahun_2015
Perpres nomor 38_tahun_2015
 
LP network chapter 5 transportation and assignment problem
LP  network chapter 5 transportation and assignment problemLP  network chapter 5 transportation and assignment problem
LP network chapter 5 transportation and assignment problem
 
Kuliah teori dan analisis jaringan - linear programming
Kuliah teori dan analisis jaringan - linear programmingKuliah teori dan analisis jaringan - linear programming
Kuliah teori dan analisis jaringan - linear programming
 
Review network modeling
Review network modelingReview network modeling
Review network modeling
 

Recently uploaded

internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerunnathinaik
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitolTechU
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupJonathanParaisoCruz
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...jaredbarbolino94
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentInMediaRes1
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfadityarao40181
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxsocialsciencegdgrohi
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 

Recently uploaded (20)

internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developer
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptx
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized Group
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media Component
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdf
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
 
ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 

Indonesia Infrastructure Roundtable Discusses Key Projects

  • 1. Infrastructure Developments in Indonesia – Key Improvements and Priority Projects Roundtable Discussion on Infrastructure Investment Opportunity in Indonesia Wahyu Utomo Acting Deputy Minister for Coordination of Infrastructure and Regional Development, CMEA and Chairman of KPPIP Implementation Team Rainier Haryanto Program Director KPPIP London, 15th July 2016
  • 2. Presentation Outline Indonesia’s Infrastructure Targets Recent Reforms for Infrastructure Acceleration Committee for Acceleration for Priority Infrastructure Delivery (KPPIP) National Strategic and Priority Projects 2
  • 3. Presentation Outline Indonesia’s Infrastructure Targets Recent Reforms for Infrastructure Acceleration Committee for Acceleration for Priority Infrastructure Delivery (KPPIP) National Strategic and Priority Projects 3
  • 4. Indonesia has determined its infrastructure targets for the period of 2016 – 2019 which were stipulated in the National Medium Term Plan 4 Enggano Kertajati Singkawang Muara Teweh Miangas Maratua Tojo Una- Una Pohuwato Moa Namniwel Taria Kenyam Aboy Sultan Hassanuddin Banda Aceh Belawan Kuala Tanjung Dumai Batam Pangkal Pinang Pontianak Panjang Padang Tj. Priok Cilacap Tj. Perak Lombok Kupang Palangkaraya Banjarmasin Makassar Maloy Bitung Halmahera Sorong Jayapura Merauke Ambon Koroway Batu Sea toll concept as a means to support Indonesia in becoming the world maritime axis. •develop 24 new seaports •increase number of substantial vessels (pioneer cargo, transport vessels, pioneer crossing vessels) •develop 60 crossing ports Strengthen connectivity through air transport infrastructure development • develop 15 new airports • develop air cargo facilities in 6 locations • increase number of pioneer airplanes Improve transport efficiency by road development and maintenance •develop 2,650 km of new roads •develop 1,000 km of new toll roads •rehabilitate 46,770 km of existing road Reduce logistic cost by improving railway infrastructure develop new tracks in Java, Sumatra, Sulawesi, and Kalimantan: 2,159 km inter-urban railways 1,099 km urban railways Develop urban transport • develop Bus Rapid Transit (BRT) in 29 cities • develop Mass Rapid Transit (MRT) in 6 metropolis and 17 large cities. Achieve electrification ratio of 96.6% by 2019 through generating capacity improvement •develop power plants with total capacity of 35,000 MW Ensure efficiency of fuel production by optimizing domestic refineries •build new oil refineries of 2x300,000 barrels •Expand existing refineries in Cilacap and Balongan Energy Related Logistic Related Location of 24 new seaports & 15 new airports Source: Bappenas Achieving food sovereignty through irrigation system improvement • develop 33 new dams and 30 hydropower plants • expand 1 million ha irrigation system • rehabilitate existing irrigation system
  • 5. To achieve those targets, Indonesia requires an estimated investment of USD 368.9 Billion 5 SECTOR State Budget Regional Budget SOE Private/PPP Total Roads 20.6 15.4 5.0 15.4 56.4 Railways 7.2 - 0.8 9.4 17.4 Sea Transportation 20 - 18.3 7.2 45.5 Air Transportation 4.9 0.4 3.8 1.9 11.1 River Transportation & Ferries 2.8 - 0.8 - 3.6 Urban Transportation 4.7 1.2 0.4 0.4 6.6 Electricity 9.2 - 34.2 33.5 76.9 Oil & Gas 0.3 - 11.7 27.1 39.0 Information & Communication Technology (ICT) 1.2 1.2 2.1 17.2 21.5 Water Resources 15.1 5.2 0.5 13.8 34.7 Drinking Water & Sanitation 10.1 15.2 3.4 2.3 31.0 Housing 14.2 3.4 1.0 6.7 25.2 Total funding needs 110.3 42 82 134.9 368.9 Allocation percentage 29.88% 11.37% 22.23% 36.52% 100% In USD billionInfrastructure Projects Investment Needs by Sector (2015-2019) Source: BAPPENAS (FOREX 1 USD=Rp 13,000)
  • 6. Presentation Outline Indonesia’s Infrastructure Targets Recent Reforms for Infrastructure Acceleration Committee for Acceleration for Priority Infrastructure Delivery (KPPIP) National Strategic and Priority Projects 6
  • 7. The Government has enacted various reforms to accelerate infrastructure provision Fiscal reforms Institutional reforms Regulatory reforms Supported by improving awareness of Indonesian infrastructure issues, convergent reforms are building a better business environment for tomorrow’s investment • Investing in Indonesian infra- structure has been regarded as risky • Uncertain returns on investment. • Did not have any fiscal mechanisms to support the infrastructure investment • Lack of leadership to implement the changes needed • Indonesian regulatory corpus has been characterized by some ambiguities and conflicting regulation Indonesia now has fiscal supports •Viability Gap Funding (VGF); •Availability Payment; •Land revolving fund; and •Risk-sharing scheme. Institutional strengthening covers establishment and empowerment of: •KPPIP (Committee for Acceleration of Priority Infrastructure Delivery). •Empowerment of PT. SMI and IIGF •PPP Unit under Ministry of Finance. Revised regulations on: • Public Private Partnership (PPP); • Availability Payment; • Direct Lending; • Land acquisition; and • Other deregulations as listed in the Economic Policy Packages. BeforeAfter 7
  • 8. Reformations along the project life cycle aim to encourage and accelerate infrastructure projects using the Public Private Partnership (PPP) scheme GOVERNMENT OF INDONESIA Preparation Bidding Process Construction Viability Gap Funding (VGF) Guarantee Fund Land Acquisition Tax Facilities Availability Payment A facility contributing to assist GCA on PPP project preparation (PDF&TA) Managing entity: KPPIP, PT SMI and PT IIF, Ministry of Finance under its new PPP Unit A facility with contribution to construction cost to increase project financial viabilityManaging entity: Ministry of Finance based on GCA proposal Govt’s commitment: 49% max per project Guaranteeing government's contractual obligations under infrastructure concession agreements Managing entity: Indonesia Infrastructure Guarantee Fund (IIGF) – wholly owned by MoF Govt’s commitment: US$ 450 Mil MoF Reg. No. 159/PMK.010.20 15 re: tax holiday for pioneer sector, such as base metal, oil refinery, basic petrochemical, machinery, renewable energy, & telco equipment industries, which will be further expanded. Managing entity: Ministry of Finance A scheme in which concessionaire receive sum of money periodically from government after the completion of an asset. Ministry of Finance Regulation on Availability Payment has been ratified. Managing entity: Ministry of Finance A facility to support land acquisition for infrastructure projects particularly on the private sector projects. Managing entity: Ministry of Finance; Ministry of Agrarian and Land Spatial/BPN Govt’s commitment: US$ 12 Mi (only for 2016) Project Development Facility (PDF) 8
  • 9. Project Development Facility is to boost private sector participation in various stages of infrastructure preparation Planning Preparation Implementation Private Sector Roles Improved Support for Private Sector • Propose unsolicited projects • Prepare OBC (Outline Business Case) and other planning documents • Prepare FBC (Final Business Case) • Provide Transaction Advisory • Acquire land* • Design and construct infrastructure • Operate and maintain infrastructure • The Public Private Partnership Presidential Regulation no 38/2015 provides incentives for unsolicited projects • New procurement regulation and OBC facilities from KPPIP and Bappenas • Debottlenecking support • New procurement regulation and PDF/TA facilities from PPP unit under MoF • Direct appointment allowed for investors that propose power projects, which have acquired the land • Land acquisition regulations provide certainty and acceleration • Land Bank • Debottlenecking support • Fiscal support and guarantee from MoF and IIGF to improve project bankability • Availability payment from state and regional budgets for construction, operations and maintenance • Long-term financing by PT SMI and PT IIF 9
  • 10. The Ministry of Finance has issued the regulation on Availability Payment with the objective of improving project attractiveness to investors Stipulates Availability Payment as one funding scheme for infrastructure development.Presidential Regulation no. 38/2015 Legal Basis Availability Payment enables private participation when the infrastructure is not commercially viable and the demand risk is high. The government adopts this scheme to achieve these goals: •Ensure service quality for users •Improve Value for Money for government •Provide attractive return for private sector providers 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Operation and Maintenance Cost Revenue Cost Construction Availability Payment Ministry of Finance Regulation no. 190/PMK.08/2015 Ministry of Home Affairs Regulation (on progress) Regulates the criteria for projects that can be funded by Availability Payment and the implementation of the scheme. Will stipulate on budgeting system for Availability Payment funded by regional budget.
  • 11. Has been successfully applied in Trans Sumatera Toll Road, Palembang – Indralaya section Planning Preparation Implementation Hand over of land rights Time span in working days (Assuming there will be objections from land owners): Max. 289 days Max. 257 days Max. 37 days TOTAL 583 DAYS Unregulated If there is no objection from the land owners, total days needed could be speeded up to around 15 – 20 % of maximum days above. Land Acquisition Policy - Law No. 2/2012 aims to accelerate land acquisition and it has been implemented successfully BPN as central agency in implementation of land acquisition Implementation of Law No. 2/2012: • The best example of a successful implementation of the law is the city of Bojonegoro, where the civil society was socialized early to the law and where the land appraisal and compensation amount were attractive. • Outcome: the overall land acquisition process for the Java North Line Double Track Rail project took less than 2 years. Successful case of the implementation of the New Law LawNo2/2012 More detailed regulation on implementation of land acquisition Neutral decision making regarding community rejection Better Land Appraisal Team Appointment Less bureaucratic land right revocation process 11
  • 12. Policy reforms are aiming to create a more conducive investment climate for infrastructure delivery Presidential Decree (PP) No. 146/2015 regarding Refinery Projects Government has issued the Decree to provide guideline in implementing and executing New Development and Expansion of Refinery in order to achieve the national energy supply through a provision of integrated supply of petrol and other related products. 12 Presidential Decree (PP) No. 4/2016 regarding Electricy Projects Government has issued the Decree to refine a guideline to accelerate the provision of electricity in Indonesia. The decree is stipulated the role of PT PLN to be the point of contact to provide the electricity and a number of facilities are provided in order to accelerate the provision of electricity. Presidential Regulation (PR) No. 38/2015 regarding PPP (4th revision of PR No. 67/2005) Presidential Regulation (PR) No. 39/2014 regarding the New Negative List of Investment Government has revised the original regulation on PPP (Presidential Regulation No. 67/2005) three times to accommodate more concerns regarding PPP development in Indonesia. For example, social infrastructure projects, the latest revision accommodates international institutions to provide feasibility study/ project preparation support, criteria and compensation for unsolicited project proposal, the need of stronger fiscal support from Ministry of Finance. Government has revised the previous Negative list of investment to encourage more foreign businesses to take part in infrastructure development. For example, in transport sector, foreign ownership of seaport facility increased from 49% to 95% during PPP concession period. The government also allows 100% foreign ownership of power plant >10MW during PPP concession period (previously 95%).
  • 13. The Government has issued Presidential Regulation No. 4/2016 on Electricity Infrastructure Acceleration to accelerate power projects 13 Government PT PLN EPC Powerplant and Transmission PLN Subsidiary (Joint Venture) Independent Power Producer Provision of Electricity Strengthen Equity • Equity Injection by the Government; • Direct Lending; • Bond issuance by PT PLN; • Loan from independent lenders; • PT PLN divident allocation; • Company Tax Holiday; • Asset Revaluation; • Other type of funding. 2B1 Government Support (outside Guarantee) • Provision of Primary Energy • Provision of Renewable Energy • Simplicity of Permits and non-Licensing • Spatial Planning • Land acquisition • Resolution on Legal Matters Local Content Obligation on the usage of local content through an open book system, price guideline, reverse engineering or other methods to maximise the local content. 2A Assignment 13 SJKU *) Ministry of Finance Strengthen PLN Balance Sheet: •Financial Asset Optimisation; •Hedging; and •Refinancing *) SJKU=Surat Jaminan Kelayakan Usaha/ Guarantee Letter for Doing Business
  • 14. One Map Policy as introduced in Economic Policy Package VIII 14 2016 2018 2019 CompilationofGeospatialinformation(IGT) One Map Policy Basic Map RBI 1: 50.000 Compilation of maps using Basic Indonesian Terrain Map 1:50,000 Kelompok A: Peta Status (K/L terkait dan 34 Pemprov) SynchronizationofIGT One Map Policy as a basis for decision making Group B: Potential Map IGT Spatial Planning Map 1.Land Spatial Local Government Regulation (District, Town and Province) 2.President Regulation on National Strategic Area Sptaial Planning. l 3.Defence Area Map 4.Coastline and Small Islands Regional Planning Map (RZWP3K) Province Group A: Status Map IGT Regulation Map 1.IGT Forestry (SK Penetapan, IUPHHK, HTR, KHDTK) 2.IGT Oil and Gas and Mineral (IUP/KP, Izin WKP) 3.IGT Wide Scale Land Ownership (HGU, HPL, HGB) 4.IGT Communal Land 5.IGT Location Permit (District/Town) 6.IGT Special Zone (SEZ, Industrial Zone, KPBPB) 7.IGT Transmigration 8.IGT Country Borders (land and sea) 9.IGT Regional Borderline (land and sea) IGT Transportation and Utility Map 1.Fisheries Port 2.General Port 3.Airport 4.Road and Railway Network 5.Utility Network (Oil and Gas pipeline, Water and wastewater distribution, landfill) 6.Electricity Network (Powerplant, Main Grid, Transmission Line) 7.Dam, weir and irigation IGT Environmental Map 1.Ground water and surface water 2.Natural Resources Nexus (Forest, Water and Public Land) 3.Land Coverage 4.Mangrove 5.Geological Structure and Rock Classification 6.Soil Type and Sructure 7.Rainfall and Energy 8.River Catchment IGT Regional Potential Map 1.Paddy Field 2.Fisheries Processing Area (WPP) 3.Limestone Area 4.Natural Resources - Geology 5.Natural Resources - Mineral 6.Village Potential 7.Cultural Heritage
  • 15. PT Sarana Multi Infrastructure is one of the non-bank institution with the capacity to provide funding for infrastructure projects PT SMI is a State-Owned Enterprise that acts as a Catalyst in Accelerating Infrastructure Development. Its duty is to support the Government’s infrastructure agenda for Indonesia through partnerships with private and/or multilateral finacial institutions in PPP projects. Sector Focus Electricity & Energy Efficiency Road & BridgesTransportation Regional Infrastructure Prison SchoolHospital Market Tourism InfrastructureTelecommunication Irrigation & Waterway Oil & Gas Waste Water & Waste Management Train Rolling Stock Social Infrastructure Water Supply Renewable Energy ADVISORY SERVICES PROJECT DEVELOPMENT Funding Sources State Additional Equity Injection Loans and Grants from Domestic and Foreign Capital Market (Bonds, Securities) Securitization Infrastructure Financing o Senior Loan o Banking Complementary o Arranger & Underwriter o PPP Standby Lender o Geothermal Financing Municipal Financing / Regional Infrastructure Development Fund (RIDF) FINANCING • Mezzanine • Equity Investment • Take Out Financing • Promoter Financing • Subordinated Loan Public Sector Advisory o Municipal Training & Capacity Building o Municipal Technical Assistance o Donor Fund Management for Municipalities Private Sector Advisory o Investment Advisory o Financial Advisory o Training & Capacity Building (Commercial) Project Development Facilities (PDF) o PPP Project Development • PPP Showcase Projects • PPP Priority Projects PDF & Donor Fund Management Technical Assistance for municipal project 15
  • 16. For the future, PT SMI’s capacity will be expanded following the merging with the Indonesia Investment Center 16 SMI before PIP injection Phase 1: Infrastructure Finance Company Phase 2: Development Bank PIP balance sheet Government support (e.g. regulation, tax incentives, ...) SMI (Persero) SMI (Persero) UU LPPI (Lembaga) Now-20171 2017 onwards1 • Additional roles to provide municipal financing (social infrastructure) • More active in tapping alternative sources of funding and reduce cost of funds to grow size of financing • Expanded roles to catalyze infrastructure market, e.g. provider of PDF, channeling on multilateral loans • Requires government support: tax advantaged funding • Fast growing infrastructure financier • Started tapping into alternative funding sources, but still relatively small • Begin to act as advisor to public and private sector to help project feasibility • Grow Infrastructure and priority sectors • Support economic and social development of Indonesia • Unlock market failures preventing development • Combine world-class project finance with a focus on economic outcomes • Requires gov. support: bankruptcy remote, minimum capital guarantee, government guaranteed loan and tax exempt entity status Strategic Industry Maritime Catalyze infrastructure finance market One-stop infrastructure financialadvisor Agriculture Financing of nationaland regional infrastructure
  • 17. Indonesian Infrastructure Guarantee Fund (IIGF)/PT PII is the institution mandated to provide Government Guarantee IIGF/PT PII established on 30 December 2009 to be a Single Window Process for Government Guarantee. It has a mandate to provide guarantees for Government Contracting Agencies’ (Ministries, Regional Governments, SOEs) contractual obligations under Cooperation Agreement of PPP infrastucture projects. 17 Presidential Regulation 67/2005* Presidential Regulation 78/2010 MOF Regulation 260/2010 Primary Objective of IIGF Single Window Mechanism for Guarantee Provision *as has been ammended by Presidential Regulatian No. 13/2010; No. 56/2011; No.38/2016 4. Ring-fence GOI Contingent Liabilities and minimize Sudden Shock to RoI State Budget 3. Improve governance, transparency and consistency of guarantee provision process 2. Provide guarantees to well structured PPPs 1. Improve creditworthiness – bankability of PPP projects
  • 18. The guarantees provided by IIGF lowers risks burdened by the private sector, thus making the less feasible government projects more attractive To attract investor interest Enhance competition in bidding process Minimize sudden shock to RoI State Budget Systematic, measurable and accountable in fiscal risk mitigation Mitigate risks which are not covered in the market Enhance transparency, certainty and consistency for project guarantee and evaluation process Enhance Bankability Enlarge loan due date Contract Agreement complied with common standard 18
  • 19. The Government has expanded the scope of government guarantee, thus increasing the scope of projects that may be covered Presidential Reg. No. 82/2015 on Central Government Guarantee for Infrastructure Financing with Direct Lending from International Finance Institution to State Owned Enterprises • Potential guarantee for PT PLN (National Electricity Company) is expecting to obtain Direct Lending for IPP projects for power plants and transmission projects (e.g. Sumatera 500 kV Transmission). • Potential guarantee to construction SOEs which have been assigned by Presidential Regulation to implement infrastructure projects Regulatory Basis Presidential Reg. No. 78/2010 on Infrastructure Guarantee for Public Private Partnership Provided by The Entity for Infrastructure Guarantee Implementation to Date • Approved guarantee for Central Java Power Plant, Palapa Ring Broadband and Batang-Semarang Toll Road • Letter of Intent has been issued for Lampung Water Supply Project, Umbulan Water Supply Project • Potential guarantee for Sumsel 9 and 10 Mine Mouth Power Plants Government Guarantee for Direct LendingGovernment Guarantee for PPP 19
  • 20. Presentation Outline Indonesia’s Infrastructure Targets Recent Reforms for Infrastructure Acceleration Committee for Acceleration for Priority Infrastructure Delivery (KPPIP) National Strategic and Priority Projects 20
  • 21. Committee for Acceleration of Priority Infrastructure Delivery (KPPIP) KPPIP was established to revitalize KKPPI1 functions by downsizing the organizational structure, authorizing synergized decision makings and involvement since the project preparation stage, and strengthening capacity building in internal committee. KPPIP members include ministries and institutions that play significant roles in project preparation Coordinating Ministry of Economic Affairs Ministry of Finance Ministry of National Development Planning/Bappenas Ministry of Agrarian and Spatial Planning (BPN) Coordinating Ministry of Maritime Affairs2 Ministry of Environment & Forestry 2 1 KKPPI or Komite Kebijakan Percepatan Penyediaan Infrastruktur, in English called Committee for Acceleration of Policy and Infrastructure Provision was the committee prior to the revitalization of KPPIP 2 Proposed revision of Presidential Reg. 75/2014; 3OBC: Outline Business Case; 4PDF: Project Development Fund In carrying out its mandates, KPPIP strengthens its internal synergy by dividing the work and preventing duplication efforts so that efficient and effective infrastructure delivery can be achieved Examples of line Ministries/Institutions involvement based on each line Ministry/Institution mandates: o Assessing and providing OBC facility for bottom-up projects o Developing Pre-Feasibility standard and quality guidelines o Debottlenecking on issues related to land acquisition and supporting acceleration efforts o Providing OBC3 facility for top-down projects o Monitoring and debottlenecking of projects on economic issues o Reviewing and approving Government support and guarantee o Providing PDF4 facility for PPP projects EKON • KPPIP involves other line Ministries/Institutions in infrastructure sector (economy or social) when making decision. • KPPIP has established the Electricity Team (UP3KN) , the Development of Bontang Oil Refinery Acceleration Team and Land Acquisition Acceleration Team etc. ExistingMembersProposed 21
  • 22. UP3KN Working Unit Bontang Oil Refinery Working Team Other Working Teams Team for Land Acquisition Acceleration Finance Team Legal Team KPPIP is supported by a a full time Project Management Office (PMO) which consists of experienced professionals Committee Coordinating Minister of Economic Affairs Minister of Finance Minister of National Development Planning Minister of Agrarian and Spatial Planning Implementation Team Sectoral Working Team Pool of Consultants Full-Time PMO Professionals1. Act as the single point of contact for all government agencies, potential funders and private sector investors for coordinating and delivering the Strategic & Priority Infrastructure projects; 2. Coordinate the delivery of the projects to be on-time, within the budget and at the best quality; 3. Enable and facilitate the GCAs' capabilities to deliver projects via various fiscal and technical support schemes. Mission Champion in Managing and Delivering the Strategic & Priority Infrastructure Projects in Indonesia Vision Inter-Sectoral WorkingTeams 22
  • 23. KPPIP PMO Organization Chart - Professionals Implementation Team Program Director Procurement Team 1. Senior Procurement 2. Procurement Office Manager Administration Team Financial Director Project Director for Energy & Electricity Sector Project Director for Water Resources and Sanitation Sector Project Director for Transportation Sector Project Director for Roads and Bridges Sector Communication Specialist Legal Specialist PMO Supporting Consultant External Consultants 23
  • 24. As stipulated by Pres. Reg. No. 75/2014, KPPIP was mandated to execute six main tasks Top down projects (from President/Vice President)* Bottom Up Projects (Proposed by Line Ministries and Regional Govt) * OBC (Outline Business Case) is the output of pre-feasibility study. FBC (Final Business Case) is the output of feasibility study. ** Project owner is the ministry, agency head, regional heads, SOE/ROE heads established as the responsible party in priority infrastructure delivery. 3. Determination of funding scheme & source for priority projects State Budget SOE appointment PPP/Strategic Funding Coordinate between the project owner** and Bappenas related to funding source (State Budget, Regional Budget, ODA) SOE appointment aims to accelerate implementation and leverage SOE financial capacity. PPP Unit at MoF to coordinate FBC* development and do transaction advisory to implement PPP projects (involving internationally reputable consultant). 2. Determination of Priority Projects 4. Monitoring & Debottlenecking KPPIP assists development of Action Plans and monitor debottlenecking efforts KPPIP’s six main tasks as stipulated in Pres. Reg. No. 75/2014 5. Determine strategy and policy 6. Facilitate capacity and institutional building related to Priority Infrastructure delivery 1. Development of pre-feasibility study (OBC*) quality standard and revise/re-do when necessary (3-6 months) Ground breaking 24 Additional mandate for National Strategic Project: Monitoring and Evaluation including debottlenecking high level issues.
  • 25. To standardize good practices, KPPIP has developed tools for project preparation OBC Guideline KPPIP is developing OBC Guideline which consists of required elements in the OBC to ensure that the pre-feasibility study from Project Owners satisfies the standard for good quality project preparation. Value for Money (VfM) analysis is included in the Guideline to determine the most beneficial funding scheme for the project. Together with KPPIP, Bappenas also provides fund for Pre-Feasibility Study. Moreover, Ministry of Finance has developed PPP Unit which will provide Project Development Fund for Final Business Case (FBC) and Transaction Advisor. Funding Scheme Guideline This sector-specific guideline is the tool to determine the most optimal funding scheme by using the elements of OBC. This Guideline will ensure that the projects offered to investors are bankable and prepared based on an international quality standard. 25
  • 26. Moreover, KPPIP is in the process implementing an integrated IT System for monitoring of national strategic and priority projects KPPIP is currently in the process implementating an integrated IT system for providing database on projects’ latest status which can be effectively utilized for monitoring purposes. 4 3 2 1 Database Project information such as map, track, existing study and latest project status. An integrated IT system with monitoring capacity for stakeholders, so that they can have real time data. Platform data outlook that is efficient and functional using a user-friendly framework. Record decisions related to projects and synchronize the implementation schedule that can be utilized by stakeholders. 26
  • 27. Presentation Outline Indonesia’s Infrastructure Targets Recent Reforms for Infrastructure Acceleration Committee for Acceleration for Priority Infrastructure Delivery (KPPIP) National Strategic and Priority Projects 27
  • 28. For setting a pipeline, the Government has issued President Decree no 3/2016 listing down National Strategic Projects (PSN) and facilities Some details on the facilities and special treatments are: •Clear maximum duration of permitting process •The process for Location Determination/Location Permit may be done in parallel with the processing of Environmental Permit, Building Permit, Disturbance Permit, and approval for building design using data sharing. •Construction for National Strategic Projects can begin after obtaining minimum: Location Determination/Location Permit, Environmental Permit, Forest Permit (IPPKH) and/or Building Permit. •The Government might be able to provide a sovereign guarantee to projects executed by Local Government or Business Entity. 1. Permits and Non-Licensing 2. Government Procurement 4. Debottlenecking 5. Spatial Planning 6. Land Acquisition 3. Government Guarantee Presidential Regulation on National Strategic Projects provides facilities and special treatments on: 28
  • 29. The National Strategic Projects consist of 225 projects in various sectors and 1 electricity projects with estimated investment costs of IDR 2,476 T ROAD RAILWAY AIRPORT SEAPORT HOUSING ENERGY FISHERIES/ MARITIME 52 19 17 13 3 7 3 SECTORS WATER SUPPLY ECONOMIC ZONES DAMS COMMUNIC ATION NATIONAL BORDERS SMELTER POWER 10 25 60 3 7 6 1 program SPREAD OF NATIONAL STRATEGIC PROJECTS 1 2 3 4 5 6 LOCATIONS 1. Sumatera 46 2. Java 89 3. Kalimantan 24 4. Bali & Nusa Tenggara 16 5. Sulawesi 28 6. Maluku & Papua 13 7. National 10
  • 30. Indonesia Coordinating Board for Investments’s (BKPM) roles in the National Strategic Projects To attract participation of the private sector, the Government provides a number of facilities to an electricity program and strategic projects comprising of: 52 road projects, 19 railways, 17 airports, 13 ports, 3 housing, 7 energy, 10 clean water, 7 border development, 60 dams, 3 technology projects, 25 estates, 6 mining related projects and 3 agrarian and fisheries projects. Licenses for Administration of National Strategic Project Minister/ Head of Institution Governor or Municipal/ Regent Business Entity Location Determination 5 working days Location Permit 5 working days Construction Building Permit 5 working days Forestry Borrow to Use License 30 working days Environmental License 60 working days Investment Principle License 5 working days Issued by BKPM as One Door Integrated Service 30
  • 31. KPPIP’s roles in National Strategic Projects and Priority Projects Priority Projects KPPIP to provide knowledge sharing on the project preparation and debottlenecking activities. KPPIP will provide monitoring and evaluation on the project and also debottlenecting on key strategic issues. KPPIP will actively involve in the whole project lifecycle from the project preparation up to operational and maintenance. The project will receive additional facilities from KPPIP during the project implementation. KPPIP role 31
  • 32. PT SMI’s role in National Strategic Project and Priority Project Accumulated as end of 2015 Year 2016 + Pipeline National Priority Projects (Coordinating Ministry of Economy Regulation No.12/2015) 1 project Toll Road Trans Sumatera Ruas Medan – Binjai Total Commitment of IDR481 billion Total Project Value IDR1.6 trillion 3 projects o PLTU Mulut Tambang Sumatera Selatan 8 o Toll Road Trans Sumatera Ruas Palembang – Indralaya and Ruas Bakauheni – Terbanggi Besar. Total Commitment of IDR6.54 trillion Total Project Value of IDR39.6 trillion National Strategic Projects (Presidential Regulation No. 3 tahun 2016) 9 projects o Toll Road Solo – Ngawi o Toll Road Ngawi – Kertosono o Toll Road Medan – Binjai o Toll Road Pejagan – Pemalang o Soekarno – Hatta Airport Development o Titab Water Dam, Bali o Logung Water Dam, Jawa Tengah o Bajulmati Water Dam, Jawa Timur Total Commitment of IDR3.38 trillion Total Project Value of IDR35.88 trillion 6 projects o Toll Road Pandaan-Malang o Toll Road Bogor Ring Road o Port Pelindo IV o Toll Road Trans Sumatera Palembang – Indralaya and Bakauheni – Terbanggi Besar o Toll Road Trans Jawa Semarang-Solo. o Waskita Toll Road (12 Segments Toll Road di Jawa) – Equity Investment* Total Commitment of IDR5.51 trillion Total Project Value of IDR30.34 trillion RPJMN Projects (Presidential Regulation No. 2 tahun 2015) 9 projects o Toll Road Trans Jawa (Cikopo-Palimanan, Solo-Ngawi, Ngawi-Kertosono, dan Pejagan-Pemalang) o Toll Road Trans Sumatera (Medan-Binjai) o Soekarno – Hatta Airport Capacity Improvement o Titab Water Dam, Bali o Logung Water Dam, Jawa Tengah o Palaran Port, Samarinda Total Commitment of IDR3.60 trillion Total Project Value of IDR36.39 trillion 7 projects o PLTMH (part of 35 GW) o PLTU 2x15MW Sorong and PLTU 2x7 MW Biak, Papua Barat o Belawan International Container Terminal (BICT) o Coal Train Sumatera Selatan o Toll Road Trans Sumatera Palembang-Indralaya and Bakauheni – Terbanggi Besar. o Toll Road Trans Jawa Semarang-Solo Total Project Value of IDR37.58 trillion 32
  • 33. Prioritizing Project Pipeline - the Government has also issued the Regulation of Coordinating Ministry of Economic Affairs no 12/2015 4 4 4 4 3 5 6 13 13 18 21 11 1 25 9 2 7 10 4 26 4 27 15 30 23 16 29 12 19 29 29 29 29 29 29 29 29 29 4 4 8 14 19 20 22 24 28 1. Balikpapan-Samarinda Toll Road 2. Manado-Bitung Toll Road 3. Panimbang Serang Toll Road 4. Trans Sumatera Toll Road (8 sections) 5. SHIA Express Railway 6. MRT Jakarta South – North Line 7. Makassar – Parepare Railway 8. Kuala Tanjung International Port Hub 9. Bitung International Port Hub 10.Karangkates IV & V (2x50MW) Hydro-Electric Power Plant 11. Kesamben (37MW) Hydro-Electric Power Plant 12. Lodoyo (10MW) Hydro-Electric Power Plant 13. Inland Waterways/Cikarang – Bekasi – Laut (CBL) 14. Light Rail Transit (LRT) South Sumatera 15. Integrated Light Rail Transit (LRT) within Jakarta, Bogor, Depok and Bekasi 16. National Capital Integrated Coastal Development (NCICD) Fase A 17. Jakarta Sewerage System 18. West Semarang Water Supply 19. High Voltage Direct Current (HVDC) 20. Sumatera 500 kV Transmission Line 21. Central – West Java Transmission Line 500 kV 22. Central Java Power Plant (CJPP)/Batang Power Plant 23. Indramayu Power Plant 24. Mine to Mouth Power Plant Sumatera Selatan 8, 9, 10 25. Bontang Refinery 26. Revitalization of the Existing Refiniries (Balikpapan, Cilacap, Balongan, Dumai, Plaju) 27. New Port Development in West Java (North Part) 28. Tuban Refinery 29. Palapa Ring Broadband 30. East Kalimantan Railway From the National Strategic Projects, the Government has selected a list of 30 Priority Project to be the focus of infrastructure delivery in the beginning of 2016. These projects are managed directly by the Committee for Acceleration of Priority Infrastructure Delivery (KPPIP) Project Under Construction Project Under Preparation 33
  • 34. Some of achievements to date in infrastructure delivery (1/2) Acceleration on the Project Preparation and the Decision Making Process Bontang Oil Refinery Revived the project preparation process, which has been delayed for 5 years. Facilitated the preparation of an Outline Business Case (OBC) by allocating an amount of ~IDR14 Billion for the engagement of an international company to conduct the work. Facilitated meetings among the stakeholders to assess recommendation on the funding scheme and subsequently, obtained an approval at Ministerial level. Panimbang – Serang Toll Road Facilitated the preparation of Value for Money review, which is part of a project preparation process under Public-Private Partnership scheme and a basis of justification to determine the funding scheme. Developed a standard in preparing the Pre-feasibility Study/Outline Business Case (OBC) for a toll road project. Facilitated meetings among the stakeholders to assess recommendation on the funding scheme and subsequently, obtained an approval at Ministerial level. Facilitated the preparation of an Environmental Impact Analysis (EIA), which is required for the land acquisition. As a result, location permit has been issued. Acceleration to determine the Project Funding Scheme Jakarta Sewerage System (JSS) Provided a guideline in preparing the OBC, that becomes a basis for the funding scheme recommendation, in accordance with the standards set by KPPIP Facilitated meetings among the stakeholders to assess recommendation on the funding scheme and subsequently, obtained an approval at Ministerial level. South Sumatera Light Rapid Transit (LRT) Reviewed the existing financial assessment of the project. Reviewed the SOE capability for developing the project. Provided a recommendation to the decision maker on the project funding scheme. 34
  • 35. Some of achievements to date in infrastructure delivery (2/2) Debottlenecking in Land Acquisition Problems Central Java Power Plant (CJPP)/ PLTU Batang Provided recommendations to accelerate the land acquisition in accordance with the applicable regulations Performed activities to coordinate the decision making process to accelerate the land acquisition. Facilitated a project-accelerating finalization process for Financial Close. PLTU Indramayu Performed activities to accelerate issuance of the environmental permit by the Head of Regency (that has been delayed for 3 years) in order to progress the project preparation. Supported the coordination to resolve spatial planning issue which serves as the basis for the issuance of Location Permit required for land acquisition. NCICD Promoted the decision making process on the matrix of responsibilities between the government and investor for the preparation of EIA. BBWS has approved the matrix of responsibilities and is currently conducting a tender for provisional of consulting services to prepare the EIA. MRT Jakarta (North – South Corridor) Performed activities to accelerate the President’s approval in voluntarily utilising the National Police residential area for the station development. Accelerated the disbursement process of the foreign loan to ensure that the construction can be conducted on schedule. Facilitating the coordination to overcome gas pipeline issue Revisions to the Infrastructure Related Regulation Manado – Bitung Toll Road Accelerated the issuance of the Minister of Agrarian and Spatial Planning Regulation No. 6/2015, which provides an adjustment to the Presidential Regulation No. 30/2015 and is required prior to continuing the land acquisition for Section 2. 35
  • 36. Potential Projects for Investment Bontang Refinery Project • Investment Value: IDR 75 T – 150 T (subject to the final structure) • Project Structure Scheme: Public Private Partnership (PPP) • Location: Bontang, Kalimantan Timur • Government Contracting Agency (GCA): PT Pertamina • Construction Commencement Target Date: 2018 • Commercial Operation Target Date: 2023 Project Information • Preliminary Environmental Study, Location Assesment and Site Preparation have been carried out by PT Pertamina. Outline Business Case has been developed by KPPIP. • The ministerial meeting has agreed that the project scheme will be PPP with PT Pertamina as the GCA. The project structure has been further formalized by the Minister of Energy and Mineral Resources Decree. • Land Acquistion and Certification of 160 Ha was completed. The remaining 300 Ha is subjected to the issuance of spatial planning revision by the Bontang City Counciil. • The confirmation to proceed letter for Government Guarantee processing has been issued by Indonesia Infrastructure Guarantee Fund (IIGF) • The GCA is currently in the process of procuring transaction advisor Latest Status • A combination of Grass Root Refinery (GRR) and Refinery Development Master Plan (RDMP) is required to increase the supply of crude oil and fuel to minimise import. • Bontang Refinery Project is new refinery project with target capacity of 235,000 barrell per day. • Bontang Refinery project is designed to combine its fuel refinery configuration with a petrochemical plant. Description 36
  • 37. Potential Projects for Investment Serang - Panimbang Toll Road 37 • Investment Value: IDR 11 Trillion • Project Structure Scheme: KPBU • Location: Banten • Government Contracting Agency (GCA): BPJT • Construction Commencement Target: 2017 • Commercial Operation Target: 2018 Project Information • The Environmental Study (AMDAL) has been issued in December 2015, followed by the issuance of the Environmental Permit in early 2016. • In May 9th 2016, Bina Marga has completed the Land Acquisition Planning documents which was submitted to Banten Provincial Government in May 23rd 2016. • The Location Determination has been issued in May 29th 2016, which further triggered the land acquisition process according to Law No. 2/2012. Latest Status The development of Serang – Panimbang Toll Road has the objective to support the economic improvements or areas surrounding Tanjung Lesung Special Economic Zones (SEZ). Serang – Panimbang toll road route passes through 1 city, 3 regencies, 14 districts, and 50 villages in the Banten province, which spans along 84 km. Description
  • 38. Potential Projects for Investment Jakarta Sewerage System 38 • Investment Value: IDR 150 Trillion (all zones) • Project Structure Scheme: State Budget with foreign loan from Japan International Corporation Agency and potential PPP for the remaining 13 zones • Location: DKI Jakarta • Government Contracting Agency (GCA): DKI Jakarta Provincial Government • Construction Commencement Target: 2018 (Zone 1) • Commercial Operation Target: 2021 (Zone 1) Project Information • The project scheme funding sources has been decided to be State Budget with foreign loan from Japan International Corporation Agency. • For Zone 1, Directorate General of Cipta Karya and Bappenas are currently processing the loan to be included in Green Book. • The funding schemes for the remaining zones have not been decided yet. Latest Status The Jakarta Sewerage System will manage domestic waste management in 15 zones (incl. the zone already operating), which is aimed to begin with Zone 1 and Zone 6. Description
  • 39. KPPIP Menara Merdeka, 8th floor Jl Budi Kemuliaan I No 2, Jakarta 10110 E-mail : sekretariat@kppip.go.id Landline : +62 21 2957 3771 THANK YOU