MAINTENANCE INSTRUCTIONS FOR POWER TRANSFORMERS
Maintenance Schedule
Sl
No
Inspection
frequency
Items to be
inspected
To be checked
Action required if
inspection shows
unsatisfactory
conditions
1 Hourly Ambient temperature
2 Hourly Winding
temperature
Ensure that temperature rise is
within specified limits.
3 Hourly Oil temperature
4 Hourly Load (amps)
Check against rated figures given
on the name plate
5 Hourly Voltage
6 Daily
Oil level in
transformer
Check oil level gauge
If low, top with dry
oil find whether there
is any leak.
7 Daily Oil level in bushing -- --
8 Daily Dehydrating breather
Check that air passages are free.
Check colour of active agent
If silicagel is pink,
change by new
charge. The old
charge may be
reactivated for using
again.
9 Daily
Oil level in OLTC
conservator
Check oil sight window or oil
level gauge
If low, top with new
dry oil
Sl
No
Inspection
frequency
Items to be
inspected
To be checked
Action required if
inspection shows
unsatisfactory
conditions
10 Daily
Relief diaphragm of
OLTC explosion
vent
--
Replace if cracked or
broken
11 Daily
Cooler fan, bearing
motor & operating
mechanism
Check the bearings. Examine
contacts, check manual control
and interlock
Lubricate the bearing.
Replace burnt or worn
contacts.
12 Quarterly
Bushings
Examine for cracks and dirt deposit
Clean the dirt. If
cracked or broken
replace the bushing.
13 Quarterly
Oil in transformer
Check for dielectric strength and
water content
Take suitable action
to restore quality of
oil.
14
Half yearly or
at the
end of 5000
operations
Oil in the diverter
switch of OLTC
a. Dielectric strength
Filter or replace if
BDV is less than
specified value.
b. Water content
Measure the water
content using KARL
FISHER method.
Replace/ recondition
if exceeds that limits
specified
15 Yearly Oil in transformer Check acidity resistivity, tan delta
and sludge
Filter or replace
16 Yearly
Oil filled condenser
bushing
Refer to the maintenance schedule
for OIP condenser bushings
As recommended
17 Yearly Gasket joints
Tighten the bolts
evenly to avoid
uneven pressure
Sl
No
Inspection
frequency
Items to be
inspected
To be checked
Action required if
inspection shows
unsatisfactory
conditions
18 Yearly Cable boxes Check sealing arrangements and
find out whether there is any leak
Replace gasket if
leaking
19 Yearly
Relays alarm and
other circuits
Examine relay and alarm contacts,
their operation fuses etc. check
relay accuracy.
Clean the components.
Replace contacts and
fuse if necessary
20 Yearly Painting
Rusting/colour
Touch up to be done
21 Yearly Earth resistance
--
Take suitable action if
earth resistance is
high
22
After 50000
operations of
the OLTC
Arcing contacts -- Replace if necessary
23 -do-
Lubricating oil in
the gear box of
driving
mechanism
Low oil level
Add or replace with
lubricating oil
24
5 yearly
1000 kVA to 2000
kVA
Overall inspection including core
and coil
Wash the core and
coils with clean oil
7 – 10
yearly
above 3000 kVA
Note :
In case of abnormal phenomena occurring during service, inform the manufacturer
the exact nature of the phenomena together with the name plate particulars for easy
identification.

More Related Content

What's hot

Variable frequency drives
Variable frequency drivesVariable frequency drives
Variable frequency drives
Naveen Sihag
 
substation automation
substation automationsubstation automation
substation automation
Mahbub Rashid
 
Presentation_Power_Transformers-1
Presentation_Power_Transformers-1Presentation_Power_Transformers-1
Presentation_Power_Transformers-1
Nageswar Rao
 

What's hot (20)

Variable frequency drives
Variable frequency drivesVariable frequency drives
Variable frequency drives
 
Automatic transfer switch (ats)
Automatic transfer switch (ats)Automatic transfer switch (ats)
Automatic transfer switch (ats)
 
HT and LT SWITCHGEAR
HT and LT SWITCHGEARHT and LT SWITCHGEAR
HT and LT SWITCHGEAR
 
Installation Operation & Maintenance of 33kV & 11kV Switchgear
Installation   Operation & Maintenance of 33kV & 11kV SwitchgearInstallation   Operation & Maintenance of 33kV & 11kV Switchgear
Installation Operation & Maintenance of 33kV & 11kV Switchgear
 
Transformer maintenance
Transformer maintenance Transformer maintenance
Transformer maintenance
 
transformer protection
transformer protection transformer protection
transformer protection
 
substation automation
substation automationsubstation automation
substation automation
 
Problems in overhead transmission line
Problems in overhead transmission lineProblems in overhead transmission line
Problems in overhead transmission line
 
Transformer oil-specifications new
Transformer oil-specifications newTransformer oil-specifications new
Transformer oil-specifications new
 
Basics of electrical control panel
Basics of electrical control panelBasics of electrical control panel
Basics of electrical control panel
 
Elgi Instrument air compressor Electrical and control wiring
Elgi Instrument air compressor Electrical and control wiringElgi Instrument air compressor Electrical and control wiring
Elgi Instrument air compressor Electrical and control wiring
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 
Presentation_Power_Transformers-1
Presentation_Power_Transformers-1Presentation_Power_Transformers-1
Presentation_Power_Transformers-1
 
Insulation Resistance Test
Insulation Resistance TestInsulation Resistance Test
Insulation Resistance Test
 
RTCC & AVR
RTCC & AVRRTCC & AVR
RTCC & AVR
 
Circuit breaker
Circuit breakerCircuit breaker
Circuit breaker
 
Power Electronics
Power ElectronicsPower Electronics
Power Electronics
 
Esp rectifier transformer
Esp rectifier transformerEsp rectifier transformer
Esp rectifier transformer
 
High voltage underground cables
High voltage underground cablesHigh voltage underground cables
High voltage underground cables
 
Transformer
TransformerTransformer
Transformer
 

Similar to Power transformer maintenance schedule

Transformer & OLTC
Transformer & OLTCTransformer & OLTC
Transformer & OLTC
Rohit Dave
 
Joe's presentation1
Joe's presentation1Joe's presentation1
Joe's presentation1
exjon
 
Halderman ch027 lecture
Halderman ch027 lectureHalderman ch027 lecture
Halderman ch027 lecture
mcfalltj
 
2004 Pontiac GTO Service Repair Manual
2004 Pontiac GTO Service Repair Manual2004 Pontiac GTO Service Repair Manual
2004 Pontiac GTO Service Repair Manual
hjsnekmde
 

Similar to Power transformer maintenance schedule (20)

Transformer & OLTC
Transformer & OLTCTransformer & OLTC
Transformer & OLTC
 
Zabatt compressor-maintenance
Zabatt compressor-maintenanceZabatt compressor-maintenance
Zabatt compressor-maintenance
 
Joe's presentation1
Joe's presentation1Joe's presentation1
Joe's presentation1
 
Pre commissioning checks & periodic inspection on power transformers
Pre commissioning checks & periodic inspection  on power transformersPre commissioning checks & periodic inspection  on power transformers
Pre commissioning checks & periodic inspection on power transformers
 
2004 6.0 l f error de arranque
2004 6.0 l f error de arranque2004 6.0 l f error de arranque
2004 6.0 l f error de arranque
 
Halderman ch027 lecture
Halderman ch027 lectureHalderman ch027 lecture
Halderman ch027 lecture
 
2006 pontiac gto service repair manual
2006 pontiac gto service repair manual2006 pontiac gto service repair manual
2006 pontiac gto service repair manual
 
2004 Pontiac GTO Service Repair Manual
2004 Pontiac GTO Service Repair Manual2004 Pontiac GTO Service Repair Manual
2004 Pontiac GTO Service Repair Manual
 
2005 pontiac gto service repair manual
2005 pontiac gto service repair manual2005 pontiac gto service repair manual
2005 pontiac gto service repair manual
 
2006 pontiac gto service repair manual
2006 pontiac gto service repair manual2006 pontiac gto service repair manual
2006 pontiac gto service repair manual
 
2004 pontiac gto service repair manual
2004 pontiac gto service repair manual2004 pontiac gto service repair manual
2004 pontiac gto service repair manual
 
2005 Pontiac GTO Service Repair Manual.pdf
2005 Pontiac GTO Service Repair Manual.pdf2005 Pontiac GTO Service Repair Manual.pdf
2005 Pontiac GTO Service Repair Manual.pdf
 
2005 Pontiac GTO Service Repair Manual.pdf
2005 Pontiac GTO Service Repair Manual.pdf2005 Pontiac GTO Service Repair Manual.pdf
2005 Pontiac GTO Service Repair Manual.pdf
 
2006 Pontiac GTO Service Repair Manual.pdf
2006 Pontiac GTO Service Repair Manual.pdf2006 Pontiac GTO Service Repair Manual.pdf
2006 Pontiac GTO Service Repair Manual.pdf
 
2004 Pontiac GTO Service Repair Manual.pdf
2004 Pontiac GTO Service Repair Manual.pdf2004 Pontiac GTO Service Repair Manual.pdf
2004 Pontiac GTO Service Repair Manual.pdf
 
2005 Pontiac GTO Service Repair Manual.pdf
2005 Pontiac GTO Service Repair Manual.pdf2005 Pontiac GTO Service Repair Manual.pdf
2005 Pontiac GTO Service Repair Manual.pdf
 
2006 Pontiac GTO Service Repair Manual.pdf
2006 Pontiac GTO Service Repair Manual.pdf2006 Pontiac GTO Service Repair Manual.pdf
2006 Pontiac GTO Service Repair Manual.pdf
 
2004 Pontiac GTO Service Repair Manual.pdf
2004 Pontiac GTO Service Repair Manual.pdf2004 Pontiac GTO Service Repair Manual.pdf
2004 Pontiac GTO Service Repair Manual.pdf
 
2004 Pontiac GTO Service Repair Manual.pdf
2004 Pontiac GTO Service Repair Manual.pdf2004 Pontiac GTO Service Repair Manual.pdf
2004 Pontiac GTO Service Repair Manual.pdf
 
2005 Pontiac GTO Service Repair Manual.pdf
2005 Pontiac GTO Service Repair Manual.pdf2005 Pontiac GTO Service Repair Manual.pdf
2005 Pontiac GTO Service Repair Manual.pdf
 

Recently uploaded

Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
 

Recently uploaded (20)

Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 

Power transformer maintenance schedule

  • 1. MAINTENANCE INSTRUCTIONS FOR POWER TRANSFORMERS Maintenance Schedule Sl No Inspection frequency Items to be inspected To be checked Action required if inspection shows unsatisfactory conditions 1 Hourly Ambient temperature 2 Hourly Winding temperature Ensure that temperature rise is within specified limits. 3 Hourly Oil temperature 4 Hourly Load (amps) Check against rated figures given on the name plate 5 Hourly Voltage 6 Daily Oil level in transformer Check oil level gauge If low, top with dry oil find whether there is any leak. 7 Daily Oil level in bushing -- -- 8 Daily Dehydrating breather Check that air passages are free. Check colour of active agent If silicagel is pink, change by new charge. The old charge may be reactivated for using again. 9 Daily Oil level in OLTC conservator Check oil sight window or oil level gauge If low, top with new dry oil
  • 2. Sl No Inspection frequency Items to be inspected To be checked Action required if inspection shows unsatisfactory conditions 10 Daily Relief diaphragm of OLTC explosion vent -- Replace if cracked or broken 11 Daily Cooler fan, bearing motor & operating mechanism Check the bearings. Examine contacts, check manual control and interlock Lubricate the bearing. Replace burnt or worn contacts. 12 Quarterly Bushings Examine for cracks and dirt deposit Clean the dirt. If cracked or broken replace the bushing. 13 Quarterly Oil in transformer Check for dielectric strength and water content Take suitable action to restore quality of oil. 14 Half yearly or at the end of 5000 operations Oil in the diverter switch of OLTC a. Dielectric strength Filter or replace if BDV is less than specified value. b. Water content Measure the water content using KARL FISHER method. Replace/ recondition if exceeds that limits specified 15 Yearly Oil in transformer Check acidity resistivity, tan delta and sludge Filter or replace 16 Yearly Oil filled condenser bushing Refer to the maintenance schedule for OIP condenser bushings As recommended 17 Yearly Gasket joints Tighten the bolts evenly to avoid uneven pressure
  • 3. Sl No Inspection frequency Items to be inspected To be checked Action required if inspection shows unsatisfactory conditions 18 Yearly Cable boxes Check sealing arrangements and find out whether there is any leak Replace gasket if leaking 19 Yearly Relays alarm and other circuits Examine relay and alarm contacts, their operation fuses etc. check relay accuracy. Clean the components. Replace contacts and fuse if necessary 20 Yearly Painting Rusting/colour Touch up to be done 21 Yearly Earth resistance -- Take suitable action if earth resistance is high 22 After 50000 operations of the OLTC Arcing contacts -- Replace if necessary 23 -do- Lubricating oil in the gear box of driving mechanism Low oil level Add or replace with lubricating oil 24 5 yearly 1000 kVA to 2000 kVA Overall inspection including core and coil Wash the core and coils with clean oil 7 – 10 yearly above 3000 kVA Note : In case of abnormal phenomena occurring during service, inform the manufacturer the exact nature of the phenomena together with the name plate particulars for easy identification.