0102 Building Planning And Construction Management
1. www.studentyogi.com www.studentyogi.com
Code No: R05220102
Set No. 1
II B.Tech Supplimentary Examinations, Aug/Sep 2008
BUILDING PLANNING AND CONSTRUCTION MANAGEMENT
(Civil Engineering)
Time: 3 hours Max Marks: 80
Answer any FIVE Questions
All Questions carry equal marks
1. Write about the objectives of building bye laws and brie y explain the important
regulations for constructing buildings in a plot of land. [6+10]
2. List the factors based on which residential building design is based. Write in detail
on the following. Budget available, size and type of family and site topography.
[16]
3. List the points to be remembered while planning following types of public buildings.
(a) Cinema theatres
(b) O ces
(c) Bus Stations [16]
4. What are the objectives and principles of planning? [16]
5. Explain the procedure for determining optimum cost and optimum completion time
for a project using CPM. [16]
6. Write a brief notes on planning of infrastructure facilities for mechanization. [16]
7. Write short notes on any two of the following:
(a) Sheep fo ot rollers
(b) Pneumatic tyred rollers
(c) Smooth wheel rollers. [16]
8. What are the di erent stages of processing of aggregate used in concrete. [16]
1 of 1
www.studentyogi.com www.studentyogi.com
2. www.studentyogi.com www.studentyogi.com
Code No: R05220102
Set No. 2
II B.Tech Supplimentary Examinations, Aug/Sep 2008
BUILDING PLANNING AND CONSTRUCTION MANAGEMENT
(Civil Engineering)
Time: 3 hours Max Marks: 80
Answer any FIVE Questions
All Questions carry equal marks
1. (a) Explain the following terms:
i. Basement
ii. Ledge
iii. Mezzanine oor.
(b) Explain how implementation of building regulations helps in improving health
and comfort in buildings. [9+7]
2. List the factors a ecting the design of residential buildings and explain in detail
the following: orientation, function and site topography. [16]
3. Design an village panchayat o ce for the following requirements and draw a line
diagram.
(a) Entrance and waiting room - 15 sq.m.
(b) Meeting hall to accommodate 40 people - 40 sq.m.
(c) V.P. President Chambers with attached toilet - 18 sq.m.
(d) V.P Secretary Chambers with attached toilet - 15 sqm.
(e) O ce for 10 sta - 100 sq.m.
(f ) Toilet blocks - 2 Nos. of suitable size.
(g) Necessary provision to be made for corridors. [16]
4. Activities duration (in days) and relationship amongst the various activities of
pro ject are given bellow:
Activity Duration Can start after
A 10 -
B8A
C 14 -
D6-
E 12 A
F 8 B,G
G 12 D
H7C
(a) Develop the network of the pro ject and nd its duration and critical path
(b) Calculate all oats of non- critical activities.
1 of 2
www.studentyogi.com www.studentyogi.com
3. www.studentyogi.com www.studentyogi.com
Code No: R05220102
Set No. 2
5. Discuss in detail the variation of Total project cost with duration of the pro ject.
[16]
6. Describe the operation and application of di erent types of conveying equipment.
[16]
7. Justify the fact that a bulldozer is versatile construction equipment. [16]
8. What are the di erent stages of processing of aggregate used in concrete. [16]
2 of 2
www.studentyogi.com www.studentyogi.com
4. www.studentyogi.com www.studentyogi.com
Code No: R05220102
Set No. 3
II B.Tech Supplimentary Examinations, Aug/Sep 2008
BUILDING PLANNING AND CONSTRUCTION MANAGEMENT
(Civil Engineering)
Time: 3 hours Max Marks: 80
Answer any FIVE Questions
All Questions carry equal marks
1. Write brie y about the following categories of buildings:
(a) Educational
(b) Business
(c) Hazardous. [6+5+5]
2. (a) Write a detailed note on the factors to be considered for planning a bedroom.
(b) Write the list of all furniture required in a bedroom, including wardrobe and
write the sizes of each. [8+8]
3. Design an village panchayat o ce for the following requirements and draw a line
diagram.
(a) Entrance and waiting room - 15 sq.m.
(b) Meeting hall to accommodate 40 people - 40 sq.m.
(c) V.P. President Chambers with attached toilet - 18 sq.m.
(d) V.P Secretary Chambers with attached toilet - 15 sqm.
(e) O ce for 10 sta - 100 sq.m.
(f ) Toilet blocks - 2 Nos. of suitable size.
(g) Necessary provision to be made for corridors. [16]
4. For the following gure 4 CPM network:
(a) Calculate EST, EFT, LST, LFT and all oats of each activity in a tabular
form
(b) Find critical path and pro ject duration. [16]
Figure 4
1 of 2
www.studentyogi.com www.studentyogi.com
5. www.studentyogi.com www.studentyogi.com
Code No: R05220102
Set No. 3
5. Explain in detail the di erent points which must be kept in view while deciding the
time of Updating. [16]
6. Explain brie y the advantages of using conveying equipment and the situation in
which they will be necessary. [16]
7. Explain the working of a sheep foot roller in detail with the help of a neat sketch.
[16]
8. What are the factors e ecting the output of a Drag line. [16]
2 of 2
www.studentyogi.com www.studentyogi.com
6. www.studentyogi.com www.studentyogi.com
Code No: R05220102
Set No. 4
II B.Tech Supplimentary Examinations, Aug/Sep 2008
BUILDING PLANNING AND CONSTRUCTION MANAGEMENT
(Civil Engineering)
Time: 3 hours Max Marks: 80
Answer any FIVE Questions
All Questions carry equal marks
1. Write in detail the general requirements of a building for re ghting. [16]
2. (a) Draw a neat sketch of the furniture arrangement in a drawing arm dining room
of size 3.60 × 5.80m.
(b) Show clearly the sizes of each type of furniture and the clearances required.
[8+8]
3. Design a primary school (from LKG to IV class) with the following requirements,
to accommodate a total strength of 240 students.
(a) Class rooms - 6 nos - each 60 m2.
(b) Principal’s room - 15 m2.
(provide attached toilet)
(c) Sta room for 5 members each - 2 nos of 30 m2 each.
(d) O ce for 6 people - 50 m2.
(e) Library - 50 m2.
(f ) Toilets for sta , students, as required.
Provide the required circulation spaces and entrance hall Make any necessary as-
sumption, Draw a single line plan. [16]
4. (a) Enumerate the physical signi cance of positive slack, zero slack and negative
slack
(b) Explain three time estimates with reference to PERT. [16]
5. For the project network shown in gure 5 and data given below, determine the
optimum time duration and optimum cost. Also plot a curve of total cost vs. time
and indicate on it the optimum time and optimum cost. [16]
Data
Activity Normal Time Crash Time Normal Cost Crash Cost Cost Stope
(Tn)days (Tc )days (Cn)Rs. (Cc)Rs. Rs.Per day
10-20 4 3 400 600 200
20-30 5 2 300 750 150
20-40 7 5 360 540 90
30-40 4 2 500 1000 250
1 of 2
www.studentyogi.com www.studentyogi.com
7. www.studentyogi.com www.studentyogi.com
Code No: R05220102
Set No. 4
Figure 5
6. Discuss in detail the various factors e ecting the selection of construction equip-
ment. [16]
7. With the help of neat sketch explain the working of a Scraper. [16]
8. Explain brie y the working of following:
(a) Centrifugal pump.
(b) Jaw crusher.
[16]
2 of 2
www.studentyogi.com www.studentyogi.com