FIRE CLAIMS :
PROFESSIONAL APPROACH
Vimal Goyal
FIII, ACII (London),
Chartered Insurance Broker
vg@smcindiaonline.com
vkgnia@hotmail.com
Cell +919899699304
Tips
To avoid
Disputes
Claim
Process :
Major stages
Claim
Process :
Documentation
How to
Speed up
Process
Introduction
Case
Studies
Areas of
Dispute
INTRODUCTION :
Significance of claims
īŽ Delivery of promise
īŽ Displays attitude :
īƒ˜ You are with insured or take it as a burden
īƒ˜ You help at each step or do just postman’s job & leave to
mercy of surveyor and insurance co.
īŽ Test of underwriting precautions, add-on covers
īŽ Shows competence to service the insurance portfolio
īŽ Trust of client in insurer
īŽ Faith in the intermediary
īŽ Can strengthen or demolish long term relationship
with the insurer and intermediary
īŽ Publicity through word of mouth
CLAIM PROCESS :
Major stages in life cycle of a claim
īŽ Intimation of claim
īŽ Deputation of surveyor by insurance co.
īŽ First visit of surveyor and on-site verifications
īŽ Go ahead for repairs/ demolition / removal
īŽ Letter of requirements from surveyor
īŽ Compliance for processing on account payment
īŽ Submission of documents, discussions, response to
queries of surveyor
īŽ Reinstatement / repairs, its verification by surveyor
īŽ Sharing of assessment by surveyor and consent
īŽ Submission of survey report to insurance co.
īŽ Processing by insurance co., addressing their queries
īŽ Approval, discharge, NOC, Subrogation, Payment
CLAIM PROCESS :
Documentation for Fire claim
General (List is not exhaustive)
īŽ A copy of the written intimation letter to insurer
īŽ A copy of the insurance policies involved
īŽ Profile of the Company, nature of business, turnover,
products, locations
īŽ A brief write up about the affected premises : date of
start of operation, turnover, nature of activities, no.
of workers, working hours, capacities, turnover,
bankers, statutory returns filed, past claims.
īŽ Balance sheet of the company : with unit-wise details
of Fixed Assets Schedule
īŽ Occurrence report & Statement of eye witnesses
īŽ Details of damaged and undamaged items
īŽ Itemwise claim within 15 days from date of loss
CLAIM PROCESS :
Documentation for Fire claim
General
īŽ Manufacturing process, flow chart, raw materials
īŽ Copy of the intimation of the loss to Police, Fire
Brigade, factories inspector and any other authority
īŽ Fire Brigade report / Meteorological deptt. report (in
case of flood, cyclone etc.)
īŽ Daily Diary report / FIR issued by the Police
īŽ News paper clips
īŽ Claim form and Claim bill
īŽ Photographs, Video, CCTV footage
īŽ Copy of the license for the operation / factory from
the relevant local authority.
īŽ Copy of NOC from Fire Brigade Department from the
past three years
CLAIM PROCESS :
Documentation for Fire claim
General
īŽ Drawing layout of the Fire hydrant points and fire
fighting equipment
īŽ Fixed asset register since inception
īŽ Documents to establish adequacy of insurance : how
sum insured arrived at, valuation report, what is
reinstatement / replacement value
īŽ Identify the items insured damaged in the FAR
īŽ Purchase ledger for building, P&M, Electricals, FFF,
Office Equipment Computers.
īŽ Purchase invoices of all items above certain amt.
īŽ Estimated quantities for salvage items
īŽ Salvage offer
īŽ Bills of repairs / replacement with payment proof
CLAIM PROCESS :
Documentation for Fire claim
Building
īŽ Complete dimensioned layout of the factory premises
marking the area affected by fire
īŽ Layout of the factory premises passed by the
relevant authority for the construction of the factory
īŽ Structural engineers inspection report along with
results of the tests conducted giving the condition of
affected building and repair methodology
īŽ Item wise estimate of the repairs of the damaged
portion of the affected building giving the item name,
qty, rate & amount for the material and labour
(BOQ) separately for existing and new design.
īŽ Quotation giving the reinstatement cost of the
damaged building
īŽ Rent agreement/agreement with Principals TP
CLAIM PROCESS :
Documentation for Fire claim
P&M, Electricals, FFF, Office Equipments, IT Assets etc.
īŽ Layout of the factory premises marking the
installation of the various machinery
īŽ 'Single Line Diagram (SLD)' showing the electrical
connections from the main to the end consumer P&M
īŽ Service Engineer/OEM's Report with nature of
damage, cause of damage, method of restoration,
estimate of repairs
īŽ Estimates/quotations of repairs and replacement
machine-wise with specifications duly supported with
copy of the original procurement invoice
īŽ Quotation giving the restoration cost of line wise and
machine wise along with complete specifications
īŽ Log Records of maintenance of machinery
CLAIM PROCESS :
Documentation for Fire claim
Stocks
īŽ Testing report prior to loss, of the finished goods and stock in
process that are damaged
īŽ Testing report after the loss with explanation on standard
parameters and deviations in test result
īŽ Detailed statement giving the procurement date and
consumption of stock damaged in fire along with supporting
documents
īŽ 'Material Hazard Sheet' for all the types of stocks present in the
factory premises at the time of fire
īŽ Write up on stock process, stock movement & accounting
system adopted : Purchase, process, PO, despatch,
methodology of tracking stock level
īŽ Estimate of loss in respect of the damaged stock, along with
cost supporting documents giving costing of each article stage
wise duly certified by cost accountant, correlate the same with
the relevant purchase orders and cost supporting document
CLAIM PROCESS :
Documentation for Fire claim
Stocks
īŽ Copies of purchase orders in hand from buyers on date of loss
īŽ Trading account from last audited balance sheet till date of loss
īŽ Copy of VAT / GST returns along-with acknowledgements
īŽ Copy of Excise returns (ER1) along-with acknowledgements
īŽ Monthly Stock statement submitted with your Banks
īŽ Itemized monthly purchase & sales ledgers for specified period
īŽ Purchase invoices, import documents, stock registers etc. to
substantiate the claimed quantities and value. Purchase cost,
processing cost and carrying cost. (Excluding profit element)
īŽ Volumetric analysis of stocks for each type of material : Floor
plan, item name and quantity stored in each area
īŽ Details of damaged and undamaged items (Quantities and
value) : items identified as affected / damaged from remains,
items saved
īŽ Ageing of stocks : to check obsoletion, if any.
CLAIM PROCESS :
How to speed up the process
īŽ Maintain and provide standard formats to the insured
īŽ Take the claim as a project and make someone from client side
as Project in-charge
īŽ Joint meeting of all concerned on insured side, earmark and
assign documentations in three categories:
īƒ˜ Readily available internally
īƒ˜ Can be prepared internally
īƒ˜ To be sourced from outside agencies
īŽ Assigning of duties to concerned persons : Name, time-line
īŽ Mark and Prioritize documents for “Go ahead” for repairs and
for On account payment
īŽ Review to take updates every week : speak to concerned
persons / assignee directly to clarify his concerns / issues
īŽ Discuss and brain-storm difficult areas and decide / ask client to
decide to make the choice out of different options
īŽ Scrutinize documents from surveyors and insurer’s perspective
īŽ Review claim working : Market value Vs. RIV, Speed Vs. Amt.
CLAIM PROCESS :
How to speed up the process
īŽ Don’t hesitate to provide documents to surveyor in piecemeal :
give surveyor opportunity to review documents received
īŽ Persistent follow-up with client, surveyor, insurer at least on
weekly basis : Follow-up telephonic discussions by email
īŽ Regularly discuss and maintain cordial relations with surveyor
and insurers : Do not create any ego issues on either side.
īŽ Correspondence and discussions : polite, does not help to be
offensive. Present differing point of view as academic discussion
īŽ Keep legal aspects in mind but never use legal words
īŽ Don’t manipulate documents : Surveyors have means to know
through scrutiny.
īŽ Presentation : easy to co-relate, qualitative, makes a lot of
difference.
īŽ Grey Areas : After informal discussions, present the view point
in a logical and forceful manner.
CLAIM PROCESS :
Areas of dispute
īŽ Claim not payable / liability is denied
īƒ˜ Policy coverage (Location misdescription, Property miscription / Items not
covered; peril not covered, falls in exclusion, Insurable interest, basement
storage, storage in open)
īƒ˜ Breach of condition : (Delay in intimation, fraudulent means, non-
submission of documents)
īƒ˜ Extraneous issues : Not valid but taken as ground by surveyor / insurance
co. (Fire safety approval, negligence, Remarks by Fire Brigade, Police)
īŽ Claim file closed as NO CLAIM: Non-compliance of requirements
īŽ Deduction from claim amount :
īƒ˜ A Part of claim is denied : Property held in trust, Purchase unpaid on DOL,
Not capitalized in insured’s books, Promotion material/samples, spares
īƒ˜ Deduction from actual loss : Underinsurance, Improvement, CTL Vs.
Repair, GP ratio, Obsoletion, Salvage, Testing
īŽ Non-standard settlement of claim
īƒ˜ Breach of warranty : (FEA not maintained)
īƒ˜ Underwriting related breach (occupancy, premium rating)
īŽ Inordinate Delay in settlement of claim
īƒ˜ By surveyor : Busy in other assignments, piecemeal, response time
īƒ˜ By insurance co. : Appointment of second surveyor, investigator, Queries in
piecemeal, Concerned officials on leave/tour/busy
Examples of disputes and :
Tips to avoid disputes
īŽ Generic description of property covered
īŽ Occupation : Actual vs. Tariff item
īŽ Designation of property : Alignment with Fixed Assets headings
īŽ Capital work in progress
īŽ Working of Reinstatement value
īŽ Property held in trust or on commission
īŽ Perils : Add on covers or consider IAR
īŽ Policy audit : RIV Clause, Stocks declaration clause
īŽ Presentation
īŽ Scrutiny of documents from surveyors and insurer’s angle
before submission
īŽ Database of survey reports : working of adequacy and
deductions from claim amount
īŽ Dealing person from intermediary should have practical working
experience of both underwriting and claims
CLAIM PROCESS :
Case studies
īŽ Denial of claim : Fraudulent means
īŽ Description of stock items covered : declared by bank (other
likewise goods)
īŽ Electrical Exclusion / dynamo clause
īŽ Smoke : No fire
īŽ Sales cost Less Net profit or Gross Profit
īŽ Purchase bills not available : considered 75% depreciation
īŽ Fixed Assets register not available
īŽ Machinery under installation / ACs not installed
īŽ Part Market value part RIV
īŽ Change of location within same complex
īŽ Salvage treatment : Sorting, segregation, drying expenses : No
cover for loss control / minimization expenses
īŽ Documents for issuance of stocks-in process
Any questions?
THANK YOU
Vimal Goyal
FIII, ACII (London),
Chartered Insurance Broker
vg@smcindiaonline.com
vkgnia@hotmail.com
Cell +919899699304

More Related Content

What's hot

Loans and advances ppt
Loans and advances pptLoans and advances ppt
Loans and advances pptRahul Prajapati
 
Chapter 1[definition and nature of insurance]
Chapter 1[definition and nature of insurance]Chapter 1[definition and nature of insurance]
Chapter 1[definition and nature of insurance]aaykhan
 
Incomes exempt from tax under section 10
Incomes exempt from tax under section 10Incomes exempt from tax under section 10
Incomes exempt from tax under section 10Dr. Sanjay Sawant Dessai
 
Debts Recovery Tribunals and Appellate Tribunals(DRT & DART)
Debts Recovery Tribunals and Appellate Tribunals(DRT & DART)Debts Recovery Tribunals and Appellate Tribunals(DRT & DART)
Debts Recovery Tribunals and Appellate Tribunals(DRT & DART)Abinash Mandilwar
 
Income from Capital gains
Income from Capital gainsIncome from Capital gains
Income from Capital gainsMohammed Haroon
 
Types of marine insurance policy
Types of marine insurance policyTypes of marine insurance policy
Types of marine insurance policyISHA JAISWAL
 
E filing of Income tax
E filing of Income taxE filing of Income tax
E filing of Income taxRocky Sharma
 
Special types of banking customers
Special types of banking customersSpecial types of banking customers
Special types of banking customersHaseena Hameed
 
Fire insurance everything you wanted to know 17012017
Fire insurance everything you wanted to know 17012017Fire insurance everything you wanted to know 17012017
Fire insurance everything you wanted to know 17012017Lajpat Ray Chandnani
 
Lecture slide chapter 2 insurance and risk management
Lecture slide chapter 2 insurance and risk managementLecture slide chapter 2 insurance and risk management
Lecture slide chapter 2 insurance and risk managementDashing Shithil
 
Burglary Insurance
Burglary InsuranceBurglary Insurance
Burglary InsuranceSaumya Singh
 
Life insurance concept, nature & use of life insurance, distinguishing c...
Life insurance  concept, nature & use of life insurance, distinguishing c...Life insurance  concept, nature & use of life insurance, distinguishing c...
Life insurance concept, nature & use of life insurance, distinguishing c...Ravi kumar
 
Pledge
PledgePledge
PledgeLeninM9
 
Customs duty ppt
Customs duty ppt Customs duty ppt
Customs duty ppt Babasab Patil
 
Fire insurance
Fire insuranceFire insurance
Fire insurancedesert54321
 
Fire insurance
Fire insuranceFire insurance
Fire insurancenajmul biplob
 

What's hot (20)

Fire Insurance
Fire InsuranceFire Insurance
Fire Insurance
 
Loans and advances ppt
Loans and advances pptLoans and advances ppt
Loans and advances ppt
 
Burglary insurance
Burglary insuranceBurglary insurance
Burglary insurance
 
Chapter 1[definition and nature of insurance]
Chapter 1[definition and nature of insurance]Chapter 1[definition and nature of insurance]
Chapter 1[definition and nature of insurance]
 
Incomes exempt from tax under section 10
Incomes exempt from tax under section 10Incomes exempt from tax under section 10
Incomes exempt from tax under section 10
 
Debts Recovery Tribunals and Appellate Tribunals(DRT & DART)
Debts Recovery Tribunals and Appellate Tribunals(DRT & DART)Debts Recovery Tribunals and Appellate Tribunals(DRT & DART)
Debts Recovery Tribunals and Appellate Tribunals(DRT & DART)
 
Income from Capital gains
Income from Capital gainsIncome from Capital gains
Income from Capital gains
 
Types of marine insurance policy
Types of marine insurance policyTypes of marine insurance policy
Types of marine insurance policy
 
E filing of Income tax
E filing of Income taxE filing of Income tax
E filing of Income tax
 
Special types of banking customers
Special types of banking customersSpecial types of banking customers
Special types of banking customers
 
Fire insurance everything you wanted to know 17012017
Fire insurance everything you wanted to know 17012017Fire insurance everything you wanted to know 17012017
Fire insurance everything you wanted to know 17012017
 
Lecture slide chapter 2 insurance and risk management
Lecture slide chapter 2 insurance and risk managementLecture slide chapter 2 insurance and risk management
Lecture slide chapter 2 insurance and risk management
 
Burglary Insurance
Burglary InsuranceBurglary Insurance
Burglary Insurance
 
Bailment
BailmentBailment
Bailment
 
Life insurance concept, nature & use of life insurance, distinguishing c...
Life insurance  concept, nature & use of life insurance, distinguishing c...Life insurance  concept, nature & use of life insurance, distinguishing c...
Life insurance concept, nature & use of life insurance, distinguishing c...
 
Claim settlement
Claim settlementClaim settlement
Claim settlement
 
Pledge
PledgePledge
Pledge
 
Customs duty ppt
Customs duty ppt Customs duty ppt
Customs duty ppt
 
Fire insurance
Fire insuranceFire insurance
Fire insurance
 
Fire insurance
Fire insuranceFire insurance
Fire insurance
 

Similar to Fire Insurance claims

Project insurance claims
Project insurance claimsProject insurance claims
Project insurance claimsgoyalvimal
 
Marine Cargo insurance claims
Marine Cargo insurance claimsMarine Cargo insurance claims
Marine Cargo insurance claimsgoyalvimal
 
Sample inspection report copy
Sample inspection report copySample inspection report copy
Sample inspection report copyBrad Stinson
 
COLD STORE PROJECT SCHEME.
COLD STORE PROJECT SCHEME.COLD STORE PROJECT SCHEME.
COLD STORE PROJECT SCHEME.CHARAK RAY
 
International sale contract
International sale contract International sale contract
International sale contract T.H. Y.P
 
Construction Claims
Construction ClaimsConstruction Claims
Construction ClaimsRajesh Sharma
 
Purchasing (Procurement) By Starodubtsevtendering
Purchasing (Procurement) By StarodubtsevtenderingPurchasing (Procurement) By Starodubtsevtendering
Purchasing (Procurement) By StarodubtsevtenderingYuriy Starodubtsev
 
Tender & Tender Notice
Tender & Tender NoticeTender & Tender Notice
Tender & Tender NoticeSakshi Kirar
 
Which documents are required for submitting an R&D claim
Which documents are required for submitting an R&D claimWhich documents are required for submitting an R&D claim
Which documents are required for submitting an R&D claimAlexander Clifford
 
PROCUREMENT.pptx
PROCUREMENT.pptxPROCUREMENT.pptx
PROCUREMENT.pptxSuresh426721
 
CONTRACT MANAGEMENT.pptx
CONTRACT MANAGEMENT.pptxCONTRACT MANAGEMENT.pptx
CONTRACT MANAGEMENT.pptxihsanmuhammad44
 
Final presentation2
Final presentation2Final presentation2
Final presentation2DougJarvis
 
Contract costing
Contract costingContract costing
Contract costingShubham Verma
 
Contract costing
Contract costingContract costing
Contract costingShubham Verma
 
Episode 28 : Project Management Contract
Episode 28 : Project Management ContractEpisode 28 : Project Management Contract
Episode 28 : Project Management ContractSAJJAD KHUDHUR ABBAS
 
Contract Management
Contract ManagementContract Management
Contract ManagementPankaj K Sinha
 
AMITHYA HOTELS & RESORTS POLICIES & PROCEDURES STANDARD OPERATING PROCEDURE
AMITHYA HOTELS & RESORTS POLICIES & PROCEDURES STANDARD OPERATING PROCEDUREAMITHYA HOTELS & RESORTS POLICIES & PROCEDURES STANDARD OPERATING PROCEDURE
AMITHYA HOTELS & RESORTS POLICIES & PROCEDURES STANDARD OPERATING PROCEDUREDulini2
 

Similar to Fire Insurance claims (20)

Project insurance claims
Project insurance claimsProject insurance claims
Project insurance claims
 
Marine Cargo insurance claims
Marine Cargo insurance claimsMarine Cargo insurance claims
Marine Cargo insurance claims
 
Sample inspection report copy
Sample inspection report copySample inspection report copy
Sample inspection report copy
 
COLD STORE PROJECT SCHEME.
COLD STORE PROJECT SCHEME.COLD STORE PROJECT SCHEME.
COLD STORE PROJECT SCHEME.
 
International sale contract
International sale contract International sale contract
International sale contract
 
Construction Claims
Construction ClaimsConstruction Claims
Construction Claims
 
Purchasing (Procurement) By Starodubtsevtendering
Purchasing (Procurement) By StarodubtsevtenderingPurchasing (Procurement) By Starodubtsevtendering
Purchasing (Procurement) By Starodubtsevtendering
 
Event proposals and bidding
Event proposals and biddingEvent proposals and bidding
Event proposals and bidding
 
Tender & Tender Notice
Tender & Tender NoticeTender & Tender Notice
Tender & Tender Notice
 
Which documents are required for submitting an R&D claim
Which documents are required for submitting an R&D claimWhich documents are required for submitting an R&D claim
Which documents are required for submitting an R&D claim
 
PROCUREMENT.pptx
PROCUREMENT.pptxPROCUREMENT.pptx
PROCUREMENT.pptx
 
CONTRACT MANAGEMENT.pptx
CONTRACT MANAGEMENT.pptxCONTRACT MANAGEMENT.pptx
CONTRACT MANAGEMENT.pptx
 
Final presentation2
Final presentation2Final presentation2
Final presentation2
 
Contract costing
Contract costingContract costing
Contract costing
 
Contract costing
Contract costingContract costing
Contract costing
 
Episode 28 : Project Management Contract
Episode 28 : Project Management ContractEpisode 28 : Project Management Contract
Episode 28 : Project Management Contract
 
Contract Management
Contract ManagementContract Management
Contract Management
 
Govind_Bio
Govind_BioGovind_Bio
Govind_Bio
 
Texas.PDF
Texas.PDFTexas.PDF
Texas.PDF
 
AMITHYA HOTELS & RESORTS POLICIES & PROCEDURES STANDARD OPERATING PROCEDURE
AMITHYA HOTELS & RESORTS POLICIES & PROCEDURES STANDARD OPERATING PROCEDUREAMITHYA HOTELS & RESORTS POLICIES & PROCEDURES STANDARD OPERATING PROCEDURE
AMITHYA HOTELS & RESORTS POLICIES & PROCEDURES STANDARD OPERATING PROCEDURE
 

Recently uploaded

internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerunnathinaik
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
ā¤­ā¤žā¤°ā¤¤-ā¤°āĨ‹ā¤Ž ā¤ĩāĨā¤¯ā¤žā¤Ēā¤žā¤°.pptx, Indo-Roman Trade,
ā¤­ā¤žā¤°ā¤¤-ā¤°āĨ‹ā¤Ž ā¤ĩāĨā¤¯ā¤žā¤Ēā¤žā¤°.pptx, Indo-Roman Trade,ā¤­ā¤žā¤°ā¤¤-ā¤°āĨ‹ā¤Ž ā¤ĩāĨā¤¯ā¤žā¤Ēā¤žā¤°.pptx, Indo-Roman Trade,
ā¤­ā¤žā¤°ā¤¤-ā¤°āĨ‹ā¤Ž ā¤ĩāĨā¤¯ā¤žā¤Ēā¤žā¤°.pptx, Indo-Roman Trade,Virag Sontakke
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxUnboundStockton
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 

Recently uploaded (20)

internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developer
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
ā¤­ā¤žā¤°ā¤¤-ā¤°āĨ‹ā¤Ž ā¤ĩāĨā¤¯ā¤žā¤Ēā¤žā¤°.pptx, Indo-Roman Trade,
ā¤­ā¤žā¤°ā¤¤-ā¤°āĨ‹ā¤Ž ā¤ĩāĨā¤¯ā¤žā¤Ēā¤žā¤°.pptx, Indo-Roman Trade,ā¤­ā¤žā¤°ā¤¤-ā¤°āĨ‹ā¤Ž ā¤ĩāĨā¤¯ā¤žā¤Ēā¤žā¤°.pptx, Indo-Roman Trade,
ā¤­ā¤žā¤°ā¤¤-ā¤°āĨ‹ā¤Ž ā¤ĩāĨā¤¯ā¤žā¤Ēā¤žā¤°.pptx, Indo-Roman Trade,
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docx
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 

Fire Insurance claims

  • 1. FIRE CLAIMS : PROFESSIONAL APPROACH Vimal Goyal FIII, ACII (London), Chartered Insurance Broker vg@smcindiaonline.com vkgnia@hotmail.com Cell +919899699304
  • 2. Tips To avoid Disputes Claim Process : Major stages Claim Process : Documentation How to Speed up Process Introduction Case Studies Areas of Dispute
  • 3. INTRODUCTION : Significance of claims īŽ Delivery of promise īŽ Displays attitude : īƒ˜ You are with insured or take it as a burden īƒ˜ You help at each step or do just postman’s job & leave to mercy of surveyor and insurance co. īŽ Test of underwriting precautions, add-on covers īŽ Shows competence to service the insurance portfolio īŽ Trust of client in insurer īŽ Faith in the intermediary īŽ Can strengthen or demolish long term relationship with the insurer and intermediary īŽ Publicity through word of mouth
  • 4. CLAIM PROCESS : Major stages in life cycle of a claim īŽ Intimation of claim īŽ Deputation of surveyor by insurance co. īŽ First visit of surveyor and on-site verifications īŽ Go ahead for repairs/ demolition / removal īŽ Letter of requirements from surveyor īŽ Compliance for processing on account payment īŽ Submission of documents, discussions, response to queries of surveyor īŽ Reinstatement / repairs, its verification by surveyor īŽ Sharing of assessment by surveyor and consent īŽ Submission of survey report to insurance co. īŽ Processing by insurance co., addressing their queries īŽ Approval, discharge, NOC, Subrogation, Payment
  • 5. CLAIM PROCESS : Documentation for Fire claim General (List is not exhaustive) īŽ A copy of the written intimation letter to insurer īŽ A copy of the insurance policies involved īŽ Profile of the Company, nature of business, turnover, products, locations īŽ A brief write up about the affected premises : date of start of operation, turnover, nature of activities, no. of workers, working hours, capacities, turnover, bankers, statutory returns filed, past claims. īŽ Balance sheet of the company : with unit-wise details of Fixed Assets Schedule īŽ Occurrence report & Statement of eye witnesses īŽ Details of damaged and undamaged items īŽ Itemwise claim within 15 days from date of loss
  • 6. CLAIM PROCESS : Documentation for Fire claim General īŽ Manufacturing process, flow chart, raw materials īŽ Copy of the intimation of the loss to Police, Fire Brigade, factories inspector and any other authority īŽ Fire Brigade report / Meteorological deptt. report (in case of flood, cyclone etc.) īŽ Daily Diary report / FIR issued by the Police īŽ News paper clips īŽ Claim form and Claim bill īŽ Photographs, Video, CCTV footage īŽ Copy of the license for the operation / factory from the relevant local authority. īŽ Copy of NOC from Fire Brigade Department from the past three years
  • 7. CLAIM PROCESS : Documentation for Fire claim General īŽ Drawing layout of the Fire hydrant points and fire fighting equipment īŽ Fixed asset register since inception īŽ Documents to establish adequacy of insurance : how sum insured arrived at, valuation report, what is reinstatement / replacement value īŽ Identify the items insured damaged in the FAR īŽ Purchase ledger for building, P&M, Electricals, FFF, Office Equipment Computers. īŽ Purchase invoices of all items above certain amt. īŽ Estimated quantities for salvage items īŽ Salvage offer īŽ Bills of repairs / replacement with payment proof
  • 8. CLAIM PROCESS : Documentation for Fire claim Building īŽ Complete dimensioned layout of the factory premises marking the area affected by fire īŽ Layout of the factory premises passed by the relevant authority for the construction of the factory īŽ Structural engineers inspection report along with results of the tests conducted giving the condition of affected building and repair methodology īŽ Item wise estimate of the repairs of the damaged portion of the affected building giving the item name, qty, rate & amount for the material and labour (BOQ) separately for existing and new design. īŽ Quotation giving the reinstatement cost of the damaged building īŽ Rent agreement/agreement with Principals TP
  • 9. CLAIM PROCESS : Documentation for Fire claim P&M, Electricals, FFF, Office Equipments, IT Assets etc. īŽ Layout of the factory premises marking the installation of the various machinery īŽ 'Single Line Diagram (SLD)' showing the electrical connections from the main to the end consumer P&M īŽ Service Engineer/OEM's Report with nature of damage, cause of damage, method of restoration, estimate of repairs īŽ Estimates/quotations of repairs and replacement machine-wise with specifications duly supported with copy of the original procurement invoice īŽ Quotation giving the restoration cost of line wise and machine wise along with complete specifications īŽ Log Records of maintenance of machinery
  • 10. CLAIM PROCESS : Documentation for Fire claim Stocks īŽ Testing report prior to loss, of the finished goods and stock in process that are damaged īŽ Testing report after the loss with explanation on standard parameters and deviations in test result īŽ Detailed statement giving the procurement date and consumption of stock damaged in fire along with supporting documents īŽ 'Material Hazard Sheet' for all the types of stocks present in the factory premises at the time of fire īŽ Write up on stock process, stock movement & accounting system adopted : Purchase, process, PO, despatch, methodology of tracking stock level īŽ Estimate of loss in respect of the damaged stock, along with cost supporting documents giving costing of each article stage wise duly certified by cost accountant, correlate the same with the relevant purchase orders and cost supporting document
  • 11. CLAIM PROCESS : Documentation for Fire claim Stocks īŽ Copies of purchase orders in hand from buyers on date of loss īŽ Trading account from last audited balance sheet till date of loss īŽ Copy of VAT / GST returns along-with acknowledgements īŽ Copy of Excise returns (ER1) along-with acknowledgements īŽ Monthly Stock statement submitted with your Banks īŽ Itemized monthly purchase & sales ledgers for specified period īŽ Purchase invoices, import documents, stock registers etc. to substantiate the claimed quantities and value. Purchase cost, processing cost and carrying cost. (Excluding profit element) īŽ Volumetric analysis of stocks for each type of material : Floor plan, item name and quantity stored in each area īŽ Details of damaged and undamaged items (Quantities and value) : items identified as affected / damaged from remains, items saved īŽ Ageing of stocks : to check obsoletion, if any.
  • 12. CLAIM PROCESS : How to speed up the process īŽ Maintain and provide standard formats to the insured īŽ Take the claim as a project and make someone from client side as Project in-charge īŽ Joint meeting of all concerned on insured side, earmark and assign documentations in three categories: īƒ˜ Readily available internally īƒ˜ Can be prepared internally īƒ˜ To be sourced from outside agencies īŽ Assigning of duties to concerned persons : Name, time-line īŽ Mark and Prioritize documents for “Go ahead” for repairs and for On account payment īŽ Review to take updates every week : speak to concerned persons / assignee directly to clarify his concerns / issues īŽ Discuss and brain-storm difficult areas and decide / ask client to decide to make the choice out of different options īŽ Scrutinize documents from surveyors and insurer’s perspective īŽ Review claim working : Market value Vs. RIV, Speed Vs. Amt.
  • 13. CLAIM PROCESS : How to speed up the process īŽ Don’t hesitate to provide documents to surveyor in piecemeal : give surveyor opportunity to review documents received īŽ Persistent follow-up with client, surveyor, insurer at least on weekly basis : Follow-up telephonic discussions by email īŽ Regularly discuss and maintain cordial relations with surveyor and insurers : Do not create any ego issues on either side. īŽ Correspondence and discussions : polite, does not help to be offensive. Present differing point of view as academic discussion īŽ Keep legal aspects in mind but never use legal words īŽ Don’t manipulate documents : Surveyors have means to know through scrutiny. īŽ Presentation : easy to co-relate, qualitative, makes a lot of difference. īŽ Grey Areas : After informal discussions, present the view point in a logical and forceful manner.
  • 14. CLAIM PROCESS : Areas of dispute īŽ Claim not payable / liability is denied īƒ˜ Policy coverage (Location misdescription, Property miscription / Items not covered; peril not covered, falls in exclusion, Insurable interest, basement storage, storage in open) īƒ˜ Breach of condition : (Delay in intimation, fraudulent means, non- submission of documents) īƒ˜ Extraneous issues : Not valid but taken as ground by surveyor / insurance co. (Fire safety approval, negligence, Remarks by Fire Brigade, Police) īŽ Claim file closed as NO CLAIM: Non-compliance of requirements īŽ Deduction from claim amount : īƒ˜ A Part of claim is denied : Property held in trust, Purchase unpaid on DOL, Not capitalized in insured’s books, Promotion material/samples, spares īƒ˜ Deduction from actual loss : Underinsurance, Improvement, CTL Vs. Repair, GP ratio, Obsoletion, Salvage, Testing īŽ Non-standard settlement of claim īƒ˜ Breach of warranty : (FEA not maintained) īƒ˜ Underwriting related breach (occupancy, premium rating) īŽ Inordinate Delay in settlement of claim īƒ˜ By surveyor : Busy in other assignments, piecemeal, response time īƒ˜ By insurance co. : Appointment of second surveyor, investigator, Queries in piecemeal, Concerned officials on leave/tour/busy
  • 15. Examples of disputes and : Tips to avoid disputes īŽ Generic description of property covered īŽ Occupation : Actual vs. Tariff item īŽ Designation of property : Alignment with Fixed Assets headings īŽ Capital work in progress īŽ Working of Reinstatement value īŽ Property held in trust or on commission īŽ Perils : Add on covers or consider IAR īŽ Policy audit : RIV Clause, Stocks declaration clause īŽ Presentation īŽ Scrutiny of documents from surveyors and insurer’s angle before submission īŽ Database of survey reports : working of adequacy and deductions from claim amount īŽ Dealing person from intermediary should have practical working experience of both underwriting and claims
  • 16. CLAIM PROCESS : Case studies īŽ Denial of claim : Fraudulent means īŽ Description of stock items covered : declared by bank (other likewise goods) īŽ Electrical Exclusion / dynamo clause īŽ Smoke : No fire īŽ Sales cost Less Net profit or Gross Profit īŽ Purchase bills not available : considered 75% depreciation īŽ Fixed Assets register not available īŽ Machinery under installation / ACs not installed īŽ Part Market value part RIV īŽ Change of location within same complex īŽ Salvage treatment : Sorting, segregation, drying expenses : No cover for loss control / minimization expenses īŽ Documents for issuance of stocks-in process
  • 18. THANK YOU Vimal Goyal FIII, ACII (London), Chartered Insurance Broker vg@smcindiaonline.com vkgnia@hotmail.com Cell +919899699304