3. INTRODUCTION :
Significance of claims
īŽ Delivery of promise
īŽ Displays attitude :
ī You are with insured or take it as a burden
ī You help at each step or do just postmanâs job & leave to
mercy of surveyor and insurance co.
īŽ Test of underwriting precautions, add-on covers
īŽ Shows competence to service the insurance portfolio
īŽ Trust of client in insurer
īŽ Faith in the intermediary
īŽ Can strengthen or demolish long term relationship
with the insurer and intermediary
īŽ Publicity through word of mouth
4. CLAIM PROCESS :
Major stages in life cycle of a claim
īŽ Intimation of claim
īŽ Deputation of surveyor by insurance co.
īŽ First visit of surveyor and on-site verifications
īŽ Go ahead for repairs/ demolition / removal
īŽ Letter of requirements from surveyor
īŽ Compliance for processing on account payment
īŽ Submission of documents, discussions, response to
queries of surveyor
īŽ Reinstatement / repairs, its verification by surveyor
īŽ Sharing of assessment by surveyor and consent
īŽ Submission of survey report to insurance co.
īŽ Processing by insurance co., addressing their queries
īŽ Approval, discharge, NOC, Subrogation, Payment
5. CLAIM PROCESS :
Documentation for Fire claim
General (List is not exhaustive)
īŽ A copy of the written intimation letter to insurer
īŽ A copy of the insurance policies involved
īŽ Profile of the Company, nature of business, turnover,
products, locations
īŽ A brief write up about the affected premises : date of
start of operation, turnover, nature of activities, no.
of workers, working hours, capacities, turnover,
bankers, statutory returns filed, past claims.
īŽ Balance sheet of the company : with unit-wise details
of Fixed Assets Schedule
īŽ Occurrence report & Statement of eye witnesses
īŽ Details of damaged and undamaged items
īŽ Itemwise claim within 15 days from date of loss
6. CLAIM PROCESS :
Documentation for Fire claim
General
īŽ Manufacturing process, flow chart, raw materials
īŽ Copy of the intimation of the loss to Police, Fire
Brigade, factories inspector and any other authority
īŽ Fire Brigade report / Meteorological deptt. report (in
case of flood, cyclone etc.)
īŽ Daily Diary report / FIR issued by the Police
īŽ News paper clips
īŽ Claim form and Claim bill
īŽ Photographs, Video, CCTV footage
īŽ Copy of the license for the operation / factory from
the relevant local authority.
īŽ Copy of NOC from Fire Brigade Department from the
past three years
7. CLAIM PROCESS :
Documentation for Fire claim
General
īŽ Drawing layout of the Fire hydrant points and fire
fighting equipment
īŽ Fixed asset register since inception
īŽ Documents to establish adequacy of insurance : how
sum insured arrived at, valuation report, what is
reinstatement / replacement value
īŽ Identify the items insured damaged in the FAR
īŽ Purchase ledger for building, P&M, Electricals, FFF,
Office Equipment Computers.
īŽ Purchase invoices of all items above certain amt.
īŽ Estimated quantities for salvage items
īŽ Salvage offer
īŽ Bills of repairs / replacement with payment proof
8. CLAIM PROCESS :
Documentation for Fire claim
Building
īŽ Complete dimensioned layout of the factory premises
marking the area affected by fire
īŽ Layout of the factory premises passed by the
relevant authority for the construction of the factory
īŽ Structural engineers inspection report along with
results of the tests conducted giving the condition of
affected building and repair methodology
īŽ Item wise estimate of the repairs of the damaged
portion of the affected building giving the item name,
qty, rate & amount for the material and labour
(BOQ) separately for existing and new design.
īŽ Quotation giving the reinstatement cost of the
damaged building
īŽ Rent agreement/agreement with Principals TP
9. CLAIM PROCESS :
Documentation for Fire claim
P&M, Electricals, FFF, Office Equipments, IT Assets etc.
īŽ Layout of the factory premises marking the
installation of the various machinery
īŽ 'Single Line Diagram (SLD)' showing the electrical
connections from the main to the end consumer P&M
īŽ Service Engineer/OEM's Report with nature of
damage, cause of damage, method of restoration,
estimate of repairs
īŽ Estimates/quotations of repairs and replacement
machine-wise with specifications duly supported with
copy of the original procurement invoice
īŽ Quotation giving the restoration cost of line wise and
machine wise along with complete specifications
īŽ Log Records of maintenance of machinery
10. CLAIM PROCESS :
Documentation for Fire claim
Stocks
īŽ Testing report prior to loss, of the finished goods and stock in
process that are damaged
īŽ Testing report after the loss with explanation on standard
parameters and deviations in test result
īŽ Detailed statement giving the procurement date and
consumption of stock damaged in fire along with supporting
documents
īŽ 'Material Hazard Sheet' for all the types of stocks present in the
factory premises at the time of fire
īŽ Write up on stock process, stock movement & accounting
system adopted : Purchase, process, PO, despatch,
methodology of tracking stock level
īŽ Estimate of loss in respect of the damaged stock, along with
cost supporting documents giving costing of each article stage
wise duly certified by cost accountant, correlate the same with
the relevant purchase orders and cost supporting document
11. CLAIM PROCESS :
Documentation for Fire claim
Stocks
īŽ Copies of purchase orders in hand from buyers on date of loss
īŽ Trading account from last audited balance sheet till date of loss
īŽ Copy of VAT / GST returns along-with acknowledgements
īŽ Copy of Excise returns (ER1) along-with acknowledgements
īŽ Monthly Stock statement submitted with your Banks
īŽ Itemized monthly purchase & sales ledgers for specified period
īŽ Purchase invoices, import documents, stock registers etc. to
substantiate the claimed quantities and value. Purchase cost,
processing cost and carrying cost. (Excluding profit element)
īŽ Volumetric analysis of stocks for each type of material : Floor
plan, item name and quantity stored in each area
īŽ Details of damaged and undamaged items (Quantities and
value) : items identified as affected / damaged from remains,
items saved
īŽ Ageing of stocks : to check obsoletion, if any.
12. CLAIM PROCESS :
How to speed up the process
īŽ Maintain and provide standard formats to the insured
īŽ Take the claim as a project and make someone from client side
as Project in-charge
īŽ Joint meeting of all concerned on insured side, earmark and
assign documentations in three categories:
ī Readily available internally
ī Can be prepared internally
ī To be sourced from outside agencies
īŽ Assigning of duties to concerned persons : Name, time-line
īŽ Mark and Prioritize documents for âGo aheadâ for repairs and
for On account payment
īŽ Review to take updates every week : speak to concerned
persons / assignee directly to clarify his concerns / issues
īŽ Discuss and brain-storm difficult areas and decide / ask client to
decide to make the choice out of different options
īŽ Scrutinize documents from surveyors and insurerâs perspective
īŽ Review claim working : Market value Vs. RIV, Speed Vs. Amt.
13. CLAIM PROCESS :
How to speed up the process
īŽ Donât hesitate to provide documents to surveyor in piecemeal :
give surveyor opportunity to review documents received
īŽ Persistent follow-up with client, surveyor, insurer at least on
weekly basis : Follow-up telephonic discussions by email
īŽ Regularly discuss and maintain cordial relations with surveyor
and insurers : Do not create any ego issues on either side.
īŽ Correspondence and discussions : polite, does not help to be
offensive. Present differing point of view as academic discussion
īŽ Keep legal aspects in mind but never use legal words
īŽ Donât manipulate documents : Surveyors have means to know
through scrutiny.
īŽ Presentation : easy to co-relate, qualitative, makes a lot of
difference.
īŽ Grey Areas : After informal discussions, present the view point
in a logical and forceful manner.
14. CLAIM PROCESS :
Areas of dispute
īŽ Claim not payable / liability is denied
ī Policy coverage (Location misdescription, Property miscription / Items not
covered; peril not covered, falls in exclusion, Insurable interest, basement
storage, storage in open)
ī Breach of condition : (Delay in intimation, fraudulent means, non-
submission of documents)
ī Extraneous issues : Not valid but taken as ground by surveyor / insurance
co. (Fire safety approval, negligence, Remarks by Fire Brigade, Police)
īŽ Claim file closed as NO CLAIM: Non-compliance of requirements
īŽ Deduction from claim amount :
ī A Part of claim is denied : Property held in trust, Purchase unpaid on DOL,
Not capitalized in insuredâs books, Promotion material/samples, spares
ī Deduction from actual loss : Underinsurance, Improvement, CTL Vs.
Repair, GP ratio, Obsoletion, Salvage, Testing
īŽ Non-standard settlement of claim
ī Breach of warranty : (FEA not maintained)
ī Underwriting related breach (occupancy, premium rating)
īŽ Inordinate Delay in settlement of claim
ī By surveyor : Busy in other assignments, piecemeal, response time
ī By insurance co. : Appointment of second surveyor, investigator, Queries in
piecemeal, Concerned officials on leave/tour/busy
15. Examples of disputes and :
Tips to avoid disputes
īŽ Generic description of property covered
īŽ Occupation : Actual vs. Tariff item
īŽ Designation of property : Alignment with Fixed Assets headings
īŽ Capital work in progress
īŽ Working of Reinstatement value
īŽ Property held in trust or on commission
īŽ Perils : Add on covers or consider IAR
īŽ Policy audit : RIV Clause, Stocks declaration clause
īŽ Presentation
īŽ Scrutiny of documents from surveyors and insurerâs angle
before submission
īŽ Database of survey reports : working of adequacy and
deductions from claim amount
īŽ Dealing person from intermediary should have practical working
experience of both underwriting and claims
16. CLAIM PROCESS :
Case studies
īŽ Denial of claim : Fraudulent means
īŽ Description of stock items covered : declared by bank (other
likewise goods)
īŽ Electrical Exclusion / dynamo clause
īŽ Smoke : No fire
īŽ Sales cost Less Net profit or Gross Profit
īŽ Purchase bills not available : considered 75% depreciation
īŽ Fixed Assets register not available
īŽ Machinery under installation / ACs not installed
īŽ Part Market value part RIV
īŽ Change of location within same complex
īŽ Salvage treatment : Sorting, segregation, drying expenses : No
cover for loss control / minimization expenses
īŽ Documents for issuance of stocks-in process