SCE/CAR/MCE CLAIMS :
PROFESSIONAL APPROACH
Vimal Goyal
FIII, ACII (London),
Chartered Insurance Broker,
Director
SMC Insurance Brokers P. Ltd.
vg@smcindiaonline.com
vkgnia@hotmail.com
Cell +919899699304
Tips
To avoid
Disputes
Claim
Process :
Major stages
Claim
Process :
Documentation
How to
Speed up
Process
Introduction
Case
Studies
Areas of
Dispute
INTRODUCTION :
Significance of claims
 Delivery of promise
 Displays attitude :
 You are with insured or take it as a burden
 You help at each step or do just postman’s job & leave to
mercy of surveyor and insurance co.
 Test of underwriting precautions, add-on covers
 Shows competence to service the insurance portfolio
 Trust of client in insurer
 Faith in the intermediary
 Can strengthen or demolish long term relationship
with the insurer and intermediary
 Publicity through word of mouth
CLAIM PROCESS :
Major stages in life cycle of a claim
 Intimation of claim: Policy no., Address, contact, Loss Estimate
 Deputation of surveyor by insurance co.
 Action for recovery from Carrier / shipping co. for marine part
 First visit of surveyor and on-site verifications
 Go ahead for further action : dismantle/repair/replacement
 Letter of requirements from surveyor (LOR)
 Submission of documents, discussions, response to queries of
surveyor, Request for on account payment
 Replacement / repair/strengthen, its verification by surveyor
 Salvage disposal process : Tender / auction
 Assessment, Consent and submission of survey report
 Processing by insurance co., addressing their queries
 Approval, discharge, NOC, Subrogation (marine), Payment
CLAIM PROCESS :
Documentation for SCE/CAR claims
General (List is not exhaustive)
 Copy of the written intimation to insurer
 Copy of the insurance policy
 Occurrence report & Statement of eye witnesses
 Segregation Report : damaged and undamaged
items, Extent of damage
 Proposal for loss minimization efforts and docs
 Profile of the Company
 A brief write up about the affected project: date of
start, specifications, bar chart, work completed
before DOL, bills raised to principal, past claims.
 Tender document and Bill of quantities (BOQ)
CLAIM PROCESS :
Documentation for SCE/CAR claims
General (contd…)
 Bills for repairs/ invoice for replacements, wherever
applicable with payment proof
 Photographs / Video at different stages
 Documentary evidence in support of the amounts
claimed
 Copy of the intimation of the loss to Police, Fire
Brigade and any other authority
 Fire Brigade report / Meteorological deptt. report (in
case of flood, cyclone etc.)
 Daily Diary report / FIR issued by the Police
 Photographs, Video, CCTV footage, News paper clips
 Duly completed claim form and Claim bill
CLAIM PROCESS :
Documentation for SCE/CAR claims
General (contd…)
 Test report by the Quality Control personnel
 Drawing layout of the Fire hydrant points and fire
fighting equipment
 Documents to establish adequacy of insurance : how
sum insured arrived at, total project cost
 Purchase invoices of all items above certain amt.
 GST, Import duty : Reversal / input credit, exemption
 Estimated quantities for salvage items
 Offer for salvage value / Docs as per Salvage process
 Final Survey report
CLAIM PROCESS :
Documentation for SCE/CAR claims
Building
 Complete dimensioned layout of the premises
marking the area affected by fire
 Structural engineers inspection report along with
results of the tests conducted giving the condition of
affected building and repair methodology
 Item wise estimate of the repairs of the damaged
portion of the affected building giving the item name,
qty, rate & amount for the material and labour
 BOQ separately for existing (damaged +
Undamaged) and new design, if there is any change
in the design / specifications.
CLAIM PROCESS :
Documentation for SCE/CAR claims
P&M and other assets
 Layout of the premises marking the installation of
the various machinery
 'Single Line Diagram (SLD)' showing the electrical
connections from the main to the end consumer P&M
 Service Engineer/OEM's Report with nature of
damage, cause of damage, method of restoration,
estimate of repairs
 Estimates/quotations of repairs and replacement
machine-wise with specifications duly supported with
copy of the original procurement invoice
 Technical data, specifications, operating parameters
before and after reported failure / damage.
 Original purchase invoice, Quote for replacement (if
second hand)
CLAIM PROCESS :
Documentation for SCE/CAR claims
Stocks (at site or off-site storage location)
 Stock ledger : Received and issued with supporting documents
 Itemized purchase ledger for specified period
 Purchase invoices, import documents, transportation documents
etc. to substantiate the claimed quantities and value.
 Estimate of loss in respect of the damaged stock, along with
cost supporting documents giving costing of each article
(Excluding profit element)
 Volumetric analysis of stocks for each type of material : Floor
plan, item name and quantity stored in each area
 Details of damaged and undamaged items (Quantities and
value) : items identified as affected / damaged from remains,
items saved
 Testing report after the loss with explanation on standard
parameters and deviations in test result
CLAIM PROCESS :
Documentation for Marine claim
Recovery Rights
 Intimation to carrier / shipping co. and invitation for joint
inspection (within 72 hours) : If loss observed after delivery
 Copy of monetary claim lodged on railways/road carriers/postal
authorities/shipping co. within time limit
 Postal Acknowledgement for monetary claim lodged (if received
back), otherwise proof of sending the letter by Regd. AD post.
 Reply to the monetary claim lodged, if any
 Original open delivery / short delivery / Non-delivery Certificate
/ Damage Certificate issued by Carrier (Insured obliged to make
best of efforts to obtain this)
 Letter of Subrogation & Special Power of Attorney
CLAIM PROCESS :
How to speed up the process
 Maintain and provide standard formats to the insured
 Take the claim as a project and make someone from client side
as Project in-charge
 Joint meeting of all concerned on insured side, earmark and
assign documentations in three categories:
 Readily available internally
 Can be prepared internally
 To be sourced from outside agencies
 Assigning of duties to concerned persons : Name, time-line
 Mark and Prioritize documents to get “Go ahead” for next
course of action
 Review to take updates every week : speak to concerned
persons / assignee directly to clarify his concerns / issues
 Discuss and brain-storm difficult areas and decide / ask client to
decide to make the choice out of different options
 Scrutinize documents from surveyors and insurer’s perspective
CLAIM PROCESS :
How to speed up the process
 Don’t hesitate to provide documents to surveyor in piecemeal :
give surveyor opportunity to review documents received
 Persistent follow-up with client, surveyor, insurer at least on
weekly basis : Follow-up telephonic discussions by email
 Regularly discuss and maintain cordial relations with surveyor
and insurers : Do not create any ego issues on either side.
 Correspondence and discussions : polite, does not help to be
offensive. Present differing point of view as academic discussion
 Keep legal aspects in mind but never use legal words
 Don’t manipulate documents : Surveyors have means to know
through scrutiny.
 Presentation : easy to co-relate, qualitative, makes a lot of
difference.
 Grey Areas : After informal discussions, present the view point
in a logical and forceful manner.
CLAIM PROCESS :
Areas of dispute
 Claim not payable / liability is denied
 Exclusions : Loss discovered at time of taking inventory, Faulty design
(CAR), Breakage of Glass, Testing done but principle not taken over
 Policy coverage : Duration - Loss after testing / 4 weeks of readiness,
Defect liability / extended maintenance cover : link to occurrence before
commissioning
 Breach of condition : Delay in intimation, fraudulent means
 Fear of damage, fear of liability, breach of regulation, Govt authority action
 Claim file closed as NO CLAIM: Non-compliance of requirements
 Deduction from claim amount :
 To the extent included in S.I. : BOQ, Excise, Freight (expediting cost)
 Loss during transit OR during storage / handling / erection
 Loss minimization expenses
 Burglary/theft in multiple events,
 Debris removal : Dismantling expenses, Foreign Debris
 Non-standard settlement of claim
 Breach of express warranty, Loss of recovery rights in marine
 Inordinate Delay in settlement of claim
 By surveyor : Busy in other assignments, piecemeal, response time
 By insurance co. : Queries in piecemeal, officials on leave/tour/busy
Examples of disputes and :
Tips to avoid disputes
 Photo / video at different stages (particularly wet risks)
 Maintenance Cost sheet, SI working and BOQ of each project
incl material supplied by principals
 Second hand machinery : declaration
 Cover for site office and its contents
 S.I. for Debris removal to cover dismantling expenses, external
/ foreign debris (To check link to percentage of claim amt.)
 Reusable scaffolding / shuttering material : CPM
 Additional or increased expenses cover as a result of insured
peril (Boulders to be removed to access project site)
 Put to use endorsement
 Amendment to fire fighting endorsement
 Additional duty cover
 Stretch warranty for road
 Transmission line exclusion by PSU insurers duty to treaty limits
 Building in course of construction, items lying in store
 Go through and understand tariff endorsements and warranties
CLAIM PROCESS :
Case studies
 Road and Bridge : Put to use / operation
 Flood linked to rainfall data on different dates : multiple excess
 Water leakage from overhead tank
 Theft by other contractors or their staff working at site
 Escalators : Truss, Chinese Engineers
 Transformer, Panel, Gilks for Sikkim Govt.
 Fire in temporary office
 Excise : Centvat credit Original purchase, Repl. purchase
 Theft of parts of transmission lines
 Storage in open along the long area of project
 Electrical cable damaged gradually : Extended maintenance
 Fire : absence of fire fighting equipment
 Bridge on River : to the extent included in original scope
 Natural topography damaged : artificial to be created after loss
 Temporary road for diversion after damage, signs / watchman
 Cause of damage in Road Bridge slip case
Any questions?
THANK YOU
Vimal Goyal
FIII, ACII (London),
Chartered Insurance Broker
vg@smcindiaonline.com
vkgnia@hotmail.com
Cell +919899699304

More Related Content

What's hot

Civil Engineering Completed Risks or Completed Construction Insurance
Civil Engineering Completed Risks  or Completed Construction InsuranceCivil Engineering Completed Risks  or Completed Construction Insurance
Civil Engineering Completed Risks or Completed Construction InsuranceLajpat Ray Chandnani
 
Apresentação da AllVan Consultoria de Benefícios e Seguros
Apresentação da AllVan Consultoria de Benefícios e SegurosApresentação da AllVan Consultoria de Benefícios e Seguros
Apresentação da AllVan Consultoria de Benefícios e SegurosAllVan
 
Fire insurance claim
Fire insurance claimFire insurance claim
Fire insurance claimraghu14
 
Group Medical Insurance Policy of 2015 2016 for members
Group Medical Insurance Policy of 2015 2016 for membersGroup Medical Insurance Policy of 2015 2016 for members
Group Medical Insurance Policy of 2015 2016 for memberschander311
 
Types of insurance_power_point_presentation_1.10.1.g1
Types of insurance_power_point_presentation_1.10.1.g1Types of insurance_power_point_presentation_1.10.1.g1
Types of insurance_power_point_presentation_1.10.1.g1b34farmer
 
Property all risk and business interruption training
Property all risk and business interruption trainingProperty all risk and business interruption training
Property all risk and business interruption trainingAfrianto Budi
 
Claims Final (2)
Claims Final (2)Claims Final (2)
Claims Final (2)vijay popat
 
Types of insurance By SHAMSIKADALUR MBA
Types of insurance By SHAMSIKADALUR MBATypes of insurance By SHAMSIKADALUR MBA
Types of insurance By SHAMSIKADALUR MBAshamsikadalur
 
Introduction to insurance
Introduction to insuranceIntroduction to insurance
Introduction to insuranceNick Wolff
 
motor insurance.ppt
motor insurance.pptmotor insurance.ppt
motor insurance.pptRamzan Shah
 
Fire insurance part1
Fire insurance part1Fire insurance part1
Fire insurance part1Dhurgadevi4
 
16.tarım sigortası
16.tarım sigortası16.tarım sigortası
16.tarım sigortasıeFinans
 
Consequential loss policy in relation with fire insurance
Consequential loss policy in relation with fire insuranceConsequential loss policy in relation with fire insurance
Consequential loss policy in relation with fire insuranceANMOL GULATI
 

What's hot (20)

Civil Engineering Completed Risks or Completed Construction Insurance
Civil Engineering Completed Risks  or Completed Construction InsuranceCivil Engineering Completed Risks  or Completed Construction Insurance
Civil Engineering Completed Risks or Completed Construction Insurance
 
Apresentação da AllVan Consultoria de Benefícios e Seguros
Apresentação da AllVan Consultoria de Benefícios e SegurosApresentação da AllVan Consultoria de Benefícios e Seguros
Apresentação da AllVan Consultoria de Benefícios e Seguros
 
Fire insurance claim
Fire insurance claimFire insurance claim
Fire insurance claim
 
Group Medical Insurance Policy of 2015 2016 for members
Group Medical Insurance Policy of 2015 2016 for membersGroup Medical Insurance Policy of 2015 2016 for members
Group Medical Insurance Policy of 2015 2016 for members
 
Motor insurance
Motor insurance   Motor insurance
Motor insurance
 
Types of insurance_power_point_presentation_1.10.1.g1
Types of insurance_power_point_presentation_1.10.1.g1Types of insurance_power_point_presentation_1.10.1.g1
Types of insurance_power_point_presentation_1.10.1.g1
 
Property all risk and business interruption training
Property all risk and business interruption trainingProperty all risk and business interruption training
Property all risk and business interruption training
 
Claims Final (2)
Claims Final (2)Claims Final (2)
Claims Final (2)
 
fire insurance
fire insurancefire insurance
fire insurance
 
Types of insurance By SHAMSIKADALUR MBA
Types of insurance By SHAMSIKADALUR MBATypes of insurance By SHAMSIKADALUR MBA
Types of insurance By SHAMSIKADALUR MBA
 
Standard Fire & Special Perils Policy (Internal Training)
Standard Fire & Special Perils Policy (Internal Training)Standard Fire & Special Perils Policy (Internal Training)
Standard Fire & Special Perils Policy (Internal Training)
 
Introduction to insurance
Introduction to insuranceIntroduction to insurance
Introduction to insurance
 
motor insurance.ppt
motor insurance.pptmotor insurance.ppt
motor insurance.ppt
 
Fire insurance part1
Fire insurance part1Fire insurance part1
Fire insurance part1
 
Leasing vs. Buying
Leasing vs. BuyingLeasing vs. Buying
Leasing vs. Buying
 
Contractors all risk insurance
Contractors all risk insuranceContractors all risk insurance
Contractors all risk insurance
 
Insurance basics
Insurance basicsInsurance basics
Insurance basics
 
General insurance
General insurance General insurance
General insurance
 
16.tarım sigortası
16.tarım sigortası16.tarım sigortası
16.tarım sigortası
 
Consequential loss policy in relation with fire insurance
Consequential loss policy in relation with fire insuranceConsequential loss policy in relation with fire insurance
Consequential loss policy in relation with fire insurance
 

Similar to Project insurance claims

Marine Cargo insurance claims
Marine Cargo insurance claimsMarine Cargo insurance claims
Marine Cargo insurance claimsgoyalvimal
 
Wind power epc o&m april 2013
Wind power epc o&m  april 2013Wind power epc o&m  april 2013
Wind power epc o&m april 2013Weero Koster
 
Sample inspection report copy
Sample inspection report copySample inspection report copy
Sample inspection report copyBrad Stinson
 
International sale contract
International sale contract International sale contract
International sale contract T.H. Y.P
 
Episode 28 : Project Management Contract
Episode 28 : Project Management ContractEpisode 28 : Project Management Contract
Episode 28 : Project Management ContractSAJJAD KHUDHUR ABBAS
 
COLD STORE PROJECT SCHEME.
COLD STORE PROJECT SCHEME.COLD STORE PROJECT SCHEME.
COLD STORE PROJECT SCHEME.CHARAK RAY
 
Indian Construction Contracts & Covid19 : Way Forward
Indian Construction Contracts & Covid19 : Way ForwardIndian Construction Contracts & Covid19 : Way Forward
Indian Construction Contracts & Covid19 : Way ForwardBadrinath Srinivasan
 
EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...
EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...
EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...EMLI Indonesia
 
Solar PPA Presentation
Solar PPA PresentationSolar PPA Presentation
Solar PPA Presentationmatt_UCI
 
Construction claims, disputes and project closure
Construction claims, disputes and project closureConstruction claims, disputes and project closure
Construction claims, disputes and project closuresrinivas2036
 
C solutions wreck removal contracts the interface with emergency salvage se...
C solutions   wreck removal contracts the interface with emergency salvage se...C solutions   wreck removal contracts the interface with emergency salvage se...
C solutions wreck removal contracts the interface with emergency salvage se...Zertec
 
Contracts & Claims Management Workshop (Session-1)
Contracts & Claims Management Workshop (Session-1)Contracts & Claims Management Workshop (Session-1)
Contracts & Claims Management Workshop (Session-1)Tahir B Mirza
 
How To Protect Your Construction Business and Legal Interests
How To Protect Your Construction Business and Legal InterestsHow To Protect Your Construction Business and Legal Interests
How To Protect Your Construction Business and Legal InterestsPalecek & Palecek, PLLC
 
Emission Reduction Purchase Agreement (ERPA) - Buying and Selling Carbon Cred...
Emission Reduction Purchase Agreement (ERPA) - Buying and Selling Carbon Cred...Emission Reduction Purchase Agreement (ERPA) - Buying and Selling Carbon Cred...
Emission Reduction Purchase Agreement (ERPA) - Buying and Selling Carbon Cred...UNDP Eurasia
 
"Types and Causes of Construction Claims"
"Types and Causes of Construction Claims""Types and Causes of Construction Claims"
"Types and Causes of Construction Claims"Abhishek Shah
 
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1Antonio Coladarce
 
Blyth Group Drying Corporate Presentation
Blyth Group Drying Corporate PresentationBlyth Group Drying Corporate Presentation
Blyth Group Drying Corporate PresentationGary Woodcock
 

Similar to Project insurance claims (20)

Marine Cargo insurance claims
Marine Cargo insurance claimsMarine Cargo insurance claims
Marine Cargo insurance claims
 
Wind power epc o&m april 2013
Wind power epc o&m  april 2013Wind power epc o&m  april 2013
Wind power epc o&m april 2013
 
Contract Management
Contract ManagementContract Management
Contract Management
 
Sample inspection report copy
Sample inspection report copySample inspection report copy
Sample inspection report copy
 
International sale contract
International sale contract International sale contract
International sale contract
 
Episode 28 : Project Management Contract
Episode 28 : Project Management ContractEpisode 28 : Project Management Contract
Episode 28 : Project Management Contract
 
COLD STORE PROJECT SCHEME.
COLD STORE PROJECT SCHEME.COLD STORE PROJECT SCHEME.
COLD STORE PROJECT SCHEME.
 
Indian Construction Contracts & Covid19 : Way Forward
Indian Construction Contracts & Covid19 : Way ForwardIndian Construction Contracts & Covid19 : Way Forward
Indian Construction Contracts & Covid19 : Way Forward
 
EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...
EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...
EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...
 
Solar PPA Presentation
Solar PPA PresentationSolar PPA Presentation
Solar PPA Presentation
 
Construction claims, disputes and project closure
Construction claims, disputes and project closureConstruction claims, disputes and project closure
Construction claims, disputes and project closure
 
Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...
Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...
Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...
 
C solutions wreck removal contracts the interface with emergency salvage se...
C solutions   wreck removal contracts the interface with emergency salvage se...C solutions   wreck removal contracts the interface with emergency salvage se...
C solutions wreck removal contracts the interface with emergency salvage se...
 
Contracts & Claims Management Workshop (Session-1)
Contracts & Claims Management Workshop (Session-1)Contracts & Claims Management Workshop (Session-1)
Contracts & Claims Management Workshop (Session-1)
 
How To Protect Your Construction Business and Legal Interests
How To Protect Your Construction Business and Legal InterestsHow To Protect Your Construction Business and Legal Interests
How To Protect Your Construction Business and Legal Interests
 
Emission Reduction Purchase Agreement (ERPA) - Buying and Selling Carbon Cred...
Emission Reduction Purchase Agreement (ERPA) - Buying and Selling Carbon Cred...Emission Reduction Purchase Agreement (ERPA) - Buying and Selling Carbon Cred...
Emission Reduction Purchase Agreement (ERPA) - Buying and Selling Carbon Cred...
 
Tenders.ppt
 Tenders.ppt Tenders.ppt
Tenders.ppt
 
"Types and Causes of Construction Claims"
"Types and Causes of Construction Claims""Types and Causes of Construction Claims"
"Types and Causes of Construction Claims"
 
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1
 
Blyth Group Drying Corporate Presentation
Blyth Group Drying Corporate PresentationBlyth Group Drying Corporate Presentation
Blyth Group Drying Corporate Presentation
 

Recently uploaded

Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxcallscotland1987
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.MaryamAhmad92
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Association for Project Management
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfPoh-Sun Goh
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxVishalSingh1417
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...pradhanghanshyam7136
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxnegromaestrong
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 

Recently uploaded (20)

Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptx
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 

Project insurance claims

  • 1. SCE/CAR/MCE CLAIMS : PROFESSIONAL APPROACH Vimal Goyal FIII, ACII (London), Chartered Insurance Broker, Director SMC Insurance Brokers P. Ltd. vg@smcindiaonline.com vkgnia@hotmail.com Cell +919899699304
  • 2. Tips To avoid Disputes Claim Process : Major stages Claim Process : Documentation How to Speed up Process Introduction Case Studies Areas of Dispute
  • 3. INTRODUCTION : Significance of claims  Delivery of promise  Displays attitude :  You are with insured or take it as a burden  You help at each step or do just postman’s job & leave to mercy of surveyor and insurance co.  Test of underwriting precautions, add-on covers  Shows competence to service the insurance portfolio  Trust of client in insurer  Faith in the intermediary  Can strengthen or demolish long term relationship with the insurer and intermediary  Publicity through word of mouth
  • 4. CLAIM PROCESS : Major stages in life cycle of a claim  Intimation of claim: Policy no., Address, contact, Loss Estimate  Deputation of surveyor by insurance co.  Action for recovery from Carrier / shipping co. for marine part  First visit of surveyor and on-site verifications  Go ahead for further action : dismantle/repair/replacement  Letter of requirements from surveyor (LOR)  Submission of documents, discussions, response to queries of surveyor, Request for on account payment  Replacement / repair/strengthen, its verification by surveyor  Salvage disposal process : Tender / auction  Assessment, Consent and submission of survey report  Processing by insurance co., addressing their queries  Approval, discharge, NOC, Subrogation (marine), Payment
  • 5. CLAIM PROCESS : Documentation for SCE/CAR claims General (List is not exhaustive)  Copy of the written intimation to insurer  Copy of the insurance policy  Occurrence report & Statement of eye witnesses  Segregation Report : damaged and undamaged items, Extent of damage  Proposal for loss minimization efforts and docs  Profile of the Company  A brief write up about the affected project: date of start, specifications, bar chart, work completed before DOL, bills raised to principal, past claims.  Tender document and Bill of quantities (BOQ)
  • 6. CLAIM PROCESS : Documentation for SCE/CAR claims General (contd…)  Bills for repairs/ invoice for replacements, wherever applicable with payment proof  Photographs / Video at different stages  Documentary evidence in support of the amounts claimed  Copy of the intimation of the loss to Police, Fire Brigade and any other authority  Fire Brigade report / Meteorological deptt. report (in case of flood, cyclone etc.)  Daily Diary report / FIR issued by the Police  Photographs, Video, CCTV footage, News paper clips  Duly completed claim form and Claim bill
  • 7. CLAIM PROCESS : Documentation for SCE/CAR claims General (contd…)  Test report by the Quality Control personnel  Drawing layout of the Fire hydrant points and fire fighting equipment  Documents to establish adequacy of insurance : how sum insured arrived at, total project cost  Purchase invoices of all items above certain amt.  GST, Import duty : Reversal / input credit, exemption  Estimated quantities for salvage items  Offer for salvage value / Docs as per Salvage process  Final Survey report
  • 8. CLAIM PROCESS : Documentation for SCE/CAR claims Building  Complete dimensioned layout of the premises marking the area affected by fire  Structural engineers inspection report along with results of the tests conducted giving the condition of affected building and repair methodology  Item wise estimate of the repairs of the damaged portion of the affected building giving the item name, qty, rate & amount for the material and labour  BOQ separately for existing (damaged + Undamaged) and new design, if there is any change in the design / specifications.
  • 9. CLAIM PROCESS : Documentation for SCE/CAR claims P&M and other assets  Layout of the premises marking the installation of the various machinery  'Single Line Diagram (SLD)' showing the electrical connections from the main to the end consumer P&M  Service Engineer/OEM's Report with nature of damage, cause of damage, method of restoration, estimate of repairs  Estimates/quotations of repairs and replacement machine-wise with specifications duly supported with copy of the original procurement invoice  Technical data, specifications, operating parameters before and after reported failure / damage.  Original purchase invoice, Quote for replacement (if second hand)
  • 10. CLAIM PROCESS : Documentation for SCE/CAR claims Stocks (at site or off-site storage location)  Stock ledger : Received and issued with supporting documents  Itemized purchase ledger for specified period  Purchase invoices, import documents, transportation documents etc. to substantiate the claimed quantities and value.  Estimate of loss in respect of the damaged stock, along with cost supporting documents giving costing of each article (Excluding profit element)  Volumetric analysis of stocks for each type of material : Floor plan, item name and quantity stored in each area  Details of damaged and undamaged items (Quantities and value) : items identified as affected / damaged from remains, items saved  Testing report after the loss with explanation on standard parameters and deviations in test result
  • 11. CLAIM PROCESS : Documentation for Marine claim Recovery Rights  Intimation to carrier / shipping co. and invitation for joint inspection (within 72 hours) : If loss observed after delivery  Copy of monetary claim lodged on railways/road carriers/postal authorities/shipping co. within time limit  Postal Acknowledgement for monetary claim lodged (if received back), otherwise proof of sending the letter by Regd. AD post.  Reply to the monetary claim lodged, if any  Original open delivery / short delivery / Non-delivery Certificate / Damage Certificate issued by Carrier (Insured obliged to make best of efforts to obtain this)  Letter of Subrogation & Special Power of Attorney
  • 12. CLAIM PROCESS : How to speed up the process  Maintain and provide standard formats to the insured  Take the claim as a project and make someone from client side as Project in-charge  Joint meeting of all concerned on insured side, earmark and assign documentations in three categories:  Readily available internally  Can be prepared internally  To be sourced from outside agencies  Assigning of duties to concerned persons : Name, time-line  Mark and Prioritize documents to get “Go ahead” for next course of action  Review to take updates every week : speak to concerned persons / assignee directly to clarify his concerns / issues  Discuss and brain-storm difficult areas and decide / ask client to decide to make the choice out of different options  Scrutinize documents from surveyors and insurer’s perspective
  • 13. CLAIM PROCESS : How to speed up the process  Don’t hesitate to provide documents to surveyor in piecemeal : give surveyor opportunity to review documents received  Persistent follow-up with client, surveyor, insurer at least on weekly basis : Follow-up telephonic discussions by email  Regularly discuss and maintain cordial relations with surveyor and insurers : Do not create any ego issues on either side.  Correspondence and discussions : polite, does not help to be offensive. Present differing point of view as academic discussion  Keep legal aspects in mind but never use legal words  Don’t manipulate documents : Surveyors have means to know through scrutiny.  Presentation : easy to co-relate, qualitative, makes a lot of difference.  Grey Areas : After informal discussions, present the view point in a logical and forceful manner.
  • 14. CLAIM PROCESS : Areas of dispute  Claim not payable / liability is denied  Exclusions : Loss discovered at time of taking inventory, Faulty design (CAR), Breakage of Glass, Testing done but principle not taken over  Policy coverage : Duration - Loss after testing / 4 weeks of readiness, Defect liability / extended maintenance cover : link to occurrence before commissioning  Breach of condition : Delay in intimation, fraudulent means  Fear of damage, fear of liability, breach of regulation, Govt authority action  Claim file closed as NO CLAIM: Non-compliance of requirements  Deduction from claim amount :  To the extent included in S.I. : BOQ, Excise, Freight (expediting cost)  Loss during transit OR during storage / handling / erection  Loss minimization expenses  Burglary/theft in multiple events,  Debris removal : Dismantling expenses, Foreign Debris  Non-standard settlement of claim  Breach of express warranty, Loss of recovery rights in marine  Inordinate Delay in settlement of claim  By surveyor : Busy in other assignments, piecemeal, response time  By insurance co. : Queries in piecemeal, officials on leave/tour/busy
  • 15. Examples of disputes and : Tips to avoid disputes  Photo / video at different stages (particularly wet risks)  Maintenance Cost sheet, SI working and BOQ of each project incl material supplied by principals  Second hand machinery : declaration  Cover for site office and its contents  S.I. for Debris removal to cover dismantling expenses, external / foreign debris (To check link to percentage of claim amt.)  Reusable scaffolding / shuttering material : CPM  Additional or increased expenses cover as a result of insured peril (Boulders to be removed to access project site)  Put to use endorsement  Amendment to fire fighting endorsement  Additional duty cover  Stretch warranty for road  Transmission line exclusion by PSU insurers duty to treaty limits  Building in course of construction, items lying in store  Go through and understand tariff endorsements and warranties
  • 16. CLAIM PROCESS : Case studies  Road and Bridge : Put to use / operation  Flood linked to rainfall data on different dates : multiple excess  Water leakage from overhead tank  Theft by other contractors or their staff working at site  Escalators : Truss, Chinese Engineers  Transformer, Panel, Gilks for Sikkim Govt.  Fire in temporary office  Excise : Centvat credit Original purchase, Repl. purchase  Theft of parts of transmission lines  Storage in open along the long area of project  Electrical cable damaged gradually : Extended maintenance  Fire : absence of fire fighting equipment  Bridge on River : to the extent included in original scope  Natural topography damaged : artificial to be created after loss  Temporary road for diversion after damage, signs / watchman  Cause of damage in Road Bridge slip case
  • 18. THANK YOU Vimal Goyal FIII, ACII (London), Chartered Insurance Broker vg@smcindiaonline.com vkgnia@hotmail.com Cell +919899699304