GPS is a leading provider
of high quality power systems
Global Power Supply
Expansion or Upgrade
GLOBAL POWER SUPPLY
Generating Solutions for Critical Facilities
Problems or challenges faced today with
upgrading or expanding an existing data
center and accomplishing this with zero to
little interruption to services and
maintaining business continuity.
Drivers
✦ Efficiency
Newer equipment provides increased efficiency
lowering cost of operations
✦ Reliability
Legacy or “end-of-life” equipment no longer is
serviceable or has spare parts
✦ Increased Capacity
Challenges
✦ N or N+1 Design
Data centers built in the late 90’s to early 2000
using Tier 2 design
✦ Physical Space Constraints
No room to install new until old is removedSelf-Contained 1000kVA UPS System
History of Data Center Design
GLOBAL POWER SUPPLY
Generating Solutions for Critical Facilities
When our centers were originally built it is often the
case the space allowed for electrical and cooling was
minimized to save money and to allocate space for the
revenue side of the equation, i.e., “white space”.
When we look to expand or upgrade we find that we
lack the needed space. Often it is necessary to remove
the old before installing the new.
✦ 80’s
Data centers were designed for 50W / Sq. Ft.
✦ 90’s
Design was increased to 90W / Sq. Ft.
✦ 2000’s
Design is 150W-200W / Sq. Ft.
✦ Where are we today?
Typical situation today with existing infrastructure.
✦ Equipment is obsolete and inefficient
✦ New equipment represents an opportunity
to become more efficient and bring our
operating costs down
✦ We lack the capacity necessary in either
power or cooling to meet todays and
tomorrows needs
✦ We are faced with a demanding era with
regard to reliability and in many cases N or
N+1 is not enough
✦ Build a new data center
✦ Cost prohibitive
✦ Time frame typically 18 months
✦ Remodel or Expand
✦ Lower cost than new
✦ Shorter timelines
✦ Challenge of little or no interruption
✦ Externalize Modular Solutions
✦ Short speed of deployment
✦ Controlled costs
✦ Revenue generating “white” space
Identify Your Options
GLOBAL POWER SUPPLY
Generating Solutions for Critical Facilities
Critical Infrastructure Upgrade
GLOBAL POWER SUPPLY
Generating Solutions for Critical Facilities
Processes associated with: Replace existing UPS System
Existing UPS Systems to be replaced Site completed with new UPS Systems
✦ Three phases for a successful project
✦ Discovery
✦ Planning
✦ Execution
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
UPS Replacement N Design
GLOBAL POWER SUPPLY
Generating Solutions for Critical Facilities
Project Description: Replace existing UPS System
Utility
✦ Identify is the utility adequate for the expansion or upgrade
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
UPS Replacement N Design
GLOBAL POWER SUPPLY
Generating Solutions for Critical Facilities
Project Description: Replace existing UPS System
Utility
✦ Identify is the utility adequate for the expansion or upgrade
✦ Identify is the generator adequate
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
UPS Replacement N Design
GLOBAL POWER SUPPLY
Generating Solutions for Critical Facilities
Project Description: Replace existing UPS System
Utility
Electrical Distribution
✦ Identify is the utility adequate for the expansion or upgrade
✦ Identify is the generator adequate
✦ Identify main distribution switchgear capabilities and breaker
configuration
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
UPS Replacement N Design
GLOBAL POWER SUPPLY
Generating Solutions for Critical Facilities
Project Description: Replace existing UPS System
Utility
Electrical Distribution
✦ Identify is the utility adequate for the expansion or upgrade
✦ Identify is the generator adequate
✦ Identify main distribution switchgear capabilities and breaker
configuration
✦ Identify and take reading of existing load to determine proper
size of temp UPS
Critical
Loads
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
UPS Replacement N Design
GLOBAL POWER SUPPLY
Generating Solutions for Critical Facilities
Project Description: Replace existing UPS System
Utility
Electrical Distribution
✦ Identify is the utility adequate for the expansion or upgrade
✦ Identify is the generator adequate
✦ Identify main distribution switchgear capabilities and breaker
configuration
✦ Identify and take reading of existing load to determine proper
size of temp UPS
✦ Identify physical location of temp UPS
✦ Note rental UPS Systems come in both typical “indoor”
configurations as well as self-contained trailers designed for
installation outside of facility
✦ Note it’s also important to determine the conductors lengths
required for the location of “temp UPS”
Critical
Loads
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
UPS Replacement N Design
GLOBAL POWER SUPPLY
Generating Solutions for Critical Facilities
Project Description: Replace existing UPS System
Utility
Electrical Distribution
✦ Identify is the utility adequate for the expansion or upgrade
✦ Identify is the generator adequate
✦ Identify main distribution switchgear capabilities and breaker
configuration
✦ Identify and take reading of existing load to determine proper
size of temp UPS
✦ Identify physical location of temp UPS
✦ Note rental UPS Systems come in both typical “indoor”
configurations as well as self-contained trailers designed for
installation outside of facility
✦ Note it’s also important to determine the conductors lengths
required for the location of “temp UPS”
✦ Temporary UPS installed feeding external maintenance bypass
Critical
Loads
Planning Phase
GLOBAL POWER SUPPLY
Generating Solutions for Critical Facilities
*NEMA 3 R – Cage and frame constructed for ease of movement – sizes up to 6,000A @ 480V
✦ Implementation of Temporary Generators
In stock up to 2 MW with capabilities to parallel
beyond that.
✦ Temporary Switchgear
Up to 6,000A @ 480V
*rentalized NEMA 3R cage and frame.
✦ Temporary UPS Systems
Self-contained UPS trailers or “indoor”
from small 10 kVA up to multi-megawatt.
✦ Power Distribution & Static Switches
UPS Replacement 2N Design
GLOBAL POWER SUPPLY
Generating Solutions for Critical Facilities
Project Description: Replace existing UPS System
Critical
Loads
Static
Bypass
UtilityUtility
Transfer
Switchgear
Alternate Power
Source
Electrical DistributionElectrical Distribution
Transfer
Switchgear
Alternate Power
Source
UPS
N
UPS
+1
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard Output Distribution Switchboard
PDUPDU
Non-Critical
Loads
Non-Critical
Loads
Static
Bypass
Maintenance
Bypass
Maintenance
Bypass
UPS Replacement Discovery Phase
GLOBAL POWER SUPPLY
Generating Solutions for Critical Facilities
Project Description: Branch Circuit Discovery
✦ Single Corded Loads
• Implications of shutting down loads
• Controlled shut down and installation of static switch
Most problems are at the branch level. Working in tandem with the IT/Operations survey
and visually inspect each rack and connected loads. Goal is to identify:
✦ Dual Corded Loads
• Plugged into the A and B properly
• Many times we find they are plugged into the same circuit or not distributed properly.
Using an amp probe identify the load on the circuit. Can the circuit accept the entire
load? Often times we find that the load will exceed the circuit.
UPS Replacement Execution
GLOBAL POWER SUPPLY
Generating Solutions for Critical Facilities
✦ Transfer “A” building load to generator
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
UPS Replacement Execution
GLOBAL POWER SUPPLY
Generating Solutions for Critical Facilities
✦ Transfer “A” building load to generator
✦ Check rental UPS system and ensure
it is in bypass mode
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
UPS Replacement Execution
GLOBAL POWER SUPPLY
Generating Solutions for Critical Facilities
✦ Transfer “A” building load to generator
✦ Check rental UPS system and ensure
it is in bypass mode
✦ Place existing UPS system in bypass
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
UPS Replacement Execution
GLOBAL POWER SUPPLY
Generating Solutions for Critical Facilities
✦ Transfer “A” building load to generator
✦ Check rental UPS system and ensure
it is in bypass mode
✦ Place existing UPS system in bypass
✦ Close output breaker from the rental
UPS’s
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
UPS Replacement Execution
GLOBAL POWER SUPPLY
Generating Solutions for Critical Facilities
✦ Transfer “A” building load to generator
✦ Check rental UPS system and ensure
it is in bypass mode
✦ Place existing UPS system in bypass
✦ Close output breaker from the rental
UPS’s
✦ Open feeder breaker from existing
UPS system to output panel
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
UPS Replacement Execution
GLOBAL POWER SUPPLY
Generating Solutions for Critical Facilities
✦ Transfer “A” building load to generator
✦ Check rental UPS system and ensure
it is in bypass mode
✦ Place existing UPS system in bypass
✦ Close output breaker from the rental
UPS’s
✦ Open feeder breaker from existing
UPS system to output panel
✦ Ensure rental UPS has picked up
the load
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
UPS Replacement Execution
GLOBAL POWER SUPPLY
Generating Solutions for Critical Facilities
✦ Transfer “A” building load to generator
✦ Check rental UPS system and ensure
it is in bypass mode
✦ Place existing UPS system in bypass
✦ Close output breaker from the rental
UPS’s
✦ Open feeder breaker from existing
UPS system to output panel
✦ Ensure rental UPS has picked up
the load
✦ Shutdown existing UPS System and
open AC & DC breakers
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
UPS Replacement Execution
GLOBAL POWER SUPPLY
Generating Solutions for Critical Facilities
✦ Transfer “A” building load to generator
✦ Check rental UPS system and ensure
it is in bypass mode
✦ Place existing UPS system in bypass
✦ Close output breaker from the rental
UPS’s
✦ Open feeder breaker from existing
UPS system to output panel
✦ Ensure rental UPS has picked up
the load
✦ Shutdown existing UPS System and
open AC & DC breakers
✦ Temporary UPS is on line and
carrying load transfer building load
back to utility
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
UPS Replacement Execution
GLOBAL POWER SUPPLY
Generating Solutions for Critical Facilities
✦ Transfer “A” building load to generator
✦ Check rental UPS system and ensure
it is in bypass mode
✦ Place existing UPS system in bypass
✦ Close output breaker from the rental
UPS’s
✦ Open feeder breaker from existing
UPS system to output panel
✦ Ensure rental UPS has picked up
the load
✦ Shutdown existing UPS System and
open AC & DC breakers
✦ Temporary UPS is on line and
carrying load transfer building load
back to utility
✦ Existing UPS are ready to be removed
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
UPS System
Removed
UPS Replacement Execution
GLOBAL POWER SUPPLY
Generating Solutions for Critical Facilities
✦ Transfer “A” building load to generator
✦ Check rental UPS system and ensure
it is in bypass mode
✦ Place existing UPS system in bypass
✦ Close output breaker from the rental
UPS’s
✦ Open feeder breaker from existing
UPS system to output panel
✦ Ensure rental UPS has picked up
the load
✦ Shutdown existing UPS System and
open AC & DC breakers
✦ Temporary UPS is on line and
carrying load transfer building load
back to utility
✦ Existing UPS are ready to be removed
✦ Repeat these steps for “B” side of
data center
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
Critical
Loads
Static
Bypass
Utility
Transfer
Switchgear
Alternate Power
Source
Electrical Distribution
UPS
N
UPS
+1
Mechanical
Switchgear
Mechanical
Loads
Output Distribution Switchboard
PDU
Non-Critical
Loads
Maintenance
Bypass
Temporary UPS
UPS System
Removed
✦ CIMs - (critical infrastructure module)
✦ IT
✦ Electrical
✦ Cooling
✦ Integrated (“all in one”)
Externalize Your Infrastructure
GLOBAL POWER SUPPLY
Generating Solutions for Critical Facilities
Expansion is necessary but time or space pose challenges
CIM Purpose-Built Solutions
Roof Top Installation
GLOBAL POWER SUPPLY
Generating Solutions for Critical Facilities
CIM Purpose-Built Solutions
Raised Platform
GLOBAL POWER SUPPLY
Generating Solutions for Critical Facilities
✦ Scalable by Design
✦ Concurrent Mfg
✦ Less Change Orders
✦ Less On-Site Hours
✦ Factory Built
Benefits of Modular Construction
GLOBAL POWER SUPPLY
Generating Solutions for Critical Facilities
Expansion is necessary but time and space won’t allow.
✦ Lower CAPEX
✦ Predictive Schedule
✦ Predictive Cost
✦ Lower Safety Risk
✦ Reduced Onsite Waste
Speed of Deployment
Traditional
Modular
30% to 50%
Faster
Time Savings
GLOBAL POWER SUPPLY
Generating Solutions for Critical Facilities
Critical infrastructure modules can be deployed in 90 days.
GLOBAL POWER SUPPLY
Thank You
✦ Buy, Sell, Rent & Lease
✦ New, Surplus & Refurbished
✦ Generators, UPS & Cooling
www.globalpwr.com
(800) 706-0906
Any Questions?

More Related Content

What's hot

Turn ON-OFF Methods of SCR.pptx
Turn ON-OFF Methods of SCR.pptxTurn ON-OFF Methods of SCR.pptx
Turn ON-OFF Methods of SCR.pptxSaiKenekar
 
STATIC AND DIGITAL RELAYS
STATIC AND DIGITAL RELAYSSTATIC AND DIGITAL RELAYS
STATIC AND DIGITAL RELAYSDr. Rohit Babu
 
TREEING & TRACKING|BREAKDOWN IN SOLIDS|HIGH VOLTAGE ENGINEERING
TREEING & TRACKING|BREAKDOWN IN SOLIDS|HIGH VOLTAGE ENGINEERINGTREEING & TRACKING|BREAKDOWN IN SOLIDS|HIGH VOLTAGE ENGINEERING
TREEING & TRACKING|BREAKDOWN IN SOLIDS|HIGH VOLTAGE ENGINEERINGPrasant Kumar
 
Power system protection topic 1
Power system protection topic 1Power system protection topic 1
Power system protection topic 1Siswoyo Edo
 
switchgear and protection,study of generator mini project tpp vizag
switchgear and protection,study of generator mini project tpp vizagswitchgear and protection,study of generator mini project tpp vizag
switchgear and protection,study of generator mini project tpp vizagsushi roy
 
Motor Control Centre
Motor Control CentreMotor Control Centre
Motor Control Centresalehkhan
 
Practical Boiler Control and Instrumentation for Engineers and Technicians
Practical Boiler Control and Instrumentation for Engineers and TechniciansPractical Boiler Control and Instrumentation for Engineers and Technicians
Practical Boiler Control and Instrumentation for Engineers and TechniciansLiving Online
 
Protection Devices and the Lightning
Protection Devices and the LightningProtection Devices and the Lightning
Protection Devices and the LightningAmeen San
 
NFPA 780 detailed Risk assessment
NFPA 780 detailed Risk assessmentNFPA 780 detailed Risk assessment
NFPA 780 detailed Risk assessmentJose Dariel Arcila
 
Disadvantages of corona, radio interference, inductive interference between p...
Disadvantages of corona, radio interference, inductive interference between p...Disadvantages of corona, radio interference, inductive interference between p...
Disadvantages of corona, radio interference, inductive interference between p...vishalgohel12195
 
APFC project presentation
APFC project presentationAPFC project presentation
APFC project presentationkartickmp613
 
Power System Protection course - Part I
Power System Protection course - Part IPower System Protection course - Part I
Power System Protection course - Part ISlides Hub
 
Surge and Lightning Protection Oct 2020
Surge and Lightning Protection Oct 2020Surge and Lightning Protection Oct 2020
Surge and Lightning Protection Oct 2020RekaNext Capital
 
Boiler
BoilerBoiler
Boileravik
 
Introduction - Utilities Industry
Introduction - Utilities IndustryIntroduction - Utilities Industry
Introduction - Utilities IndustrySougata Mitra
 
Protection & switchgear
Protection & switchgear  Protection & switchgear
Protection & switchgear johny renoald
 

What's hot (20)

Turn ON-OFF Methods of SCR.pptx
Turn ON-OFF Methods of SCR.pptxTurn ON-OFF Methods of SCR.pptx
Turn ON-OFF Methods of SCR.pptx
 
Voltage Regulation
Voltage RegulationVoltage Regulation
Voltage Regulation
 
STATIC AND DIGITAL RELAYS
STATIC AND DIGITAL RELAYSSTATIC AND DIGITAL RELAYS
STATIC AND DIGITAL RELAYS
 
TREEING & TRACKING|BREAKDOWN IN SOLIDS|HIGH VOLTAGE ENGINEERING
TREEING & TRACKING|BREAKDOWN IN SOLIDS|HIGH VOLTAGE ENGINEERINGTREEING & TRACKING|BREAKDOWN IN SOLIDS|HIGH VOLTAGE ENGINEERING
TREEING & TRACKING|BREAKDOWN IN SOLIDS|HIGH VOLTAGE ENGINEERING
 
Power system protection topic 1
Power system protection topic 1Power system protection topic 1
Power system protection topic 1
 
switchgear and protection,study of generator mini project tpp vizag
switchgear and protection,study of generator mini project tpp vizagswitchgear and protection,study of generator mini project tpp vizag
switchgear and protection,study of generator mini project tpp vizag
 
Motor Control Centre
Motor Control CentreMotor Control Centre
Motor Control Centre
 
Practical Boiler Control and Instrumentation for Engineers and Technicians
Practical Boiler Control and Instrumentation for Engineers and TechniciansPractical Boiler Control and Instrumentation for Engineers and Technicians
Practical Boiler Control and Instrumentation for Engineers and Technicians
 
Circuit breaker
Circuit breakerCircuit breaker
Circuit breaker
 
Protection Devices and the Lightning
Protection Devices and the LightningProtection Devices and the Lightning
Protection Devices and the Lightning
 
NFPA 780 detailed Risk assessment
NFPA 780 detailed Risk assessmentNFPA 780 detailed Risk assessment
NFPA 780 detailed Risk assessment
 
Cable Sizing Calculations
Cable Sizing CalculationsCable Sizing Calculations
Cable Sizing Calculations
 
Disadvantages of corona, radio interference, inductive interference between p...
Disadvantages of corona, radio interference, inductive interference between p...Disadvantages of corona, radio interference, inductive interference between p...
Disadvantages of corona, radio interference, inductive interference between p...
 
Out of step
Out of stepOut of step
Out of step
 
APFC project presentation
APFC project presentationAPFC project presentation
APFC project presentation
 
Power System Protection course - Part I
Power System Protection course - Part IPower System Protection course - Part I
Power System Protection course - Part I
 
Surge and Lightning Protection Oct 2020
Surge and Lightning Protection Oct 2020Surge and Lightning Protection Oct 2020
Surge and Lightning Protection Oct 2020
 
Boiler
BoilerBoiler
Boiler
 
Introduction - Utilities Industry
Introduction - Utilities IndustryIntroduction - Utilities Industry
Introduction - Utilities Industry
 
Protection & switchgear
Protection & switchgear  Protection & switchgear
Protection & switchgear
 

Viewers also liked

Bab ii bab i sistem kerja ups (uninterruptible power system) pada central con...
Bab ii bab i sistem kerja ups (uninterruptible power system) pada central con...Bab ii bab i sistem kerja ups (uninterruptible power system) pada central con...
Bab ii bab i sistem kerja ups (uninterruptible power system) pada central con...Dony Afriansyah
 
Design Research for Emerging Markets
Design Research for Emerging MarketsDesign Research for Emerging Markets
Design Research for Emerging MarketsAndrew Harder
 
Should Colocation Data Centers Fear Consolidation? (SlideShare)
Should Colocation Data Centers Fear Consolidation? (SlideShare)Should Colocation Data Centers Fear Consolidation? (SlideShare)
Should Colocation Data Centers Fear Consolidation? (SlideShare)SP Home Run Inc.
 
Can Data Center Consultants Build Enterprise Value? (SlideShare)
Can Data Center Consultants Build Enterprise Value? (SlideShare)Can Data Center Consultants Build Enterprise Value? (SlideShare)
Can Data Center Consultants Build Enterprise Value? (SlideShare)SP Home Run Inc.
 
Lever Company Presentation January 2012 New
Lever Company Presentation January 2012 NewLever Company Presentation January 2012 New
Lever Company Presentation January 2012 NewStefano Bruno
 
Comparing Software Defined Data Centers vs. Traditional Data Centers (SlideSh...
Comparing Software Defined Data Centers vs. Traditional Data Centers (SlideSh...Comparing Software Defined Data Centers vs. Traditional Data Centers (SlideSh...
Comparing Software Defined Data Centers vs. Traditional Data Centers (SlideSh...SP Home Run Inc.
 
Which New Jersey Data Centers Embrace Managed Services? (SlideShare)
Which New Jersey Data Centers Embrace Managed Services? (SlideShare)Which New Jersey Data Centers Embrace Managed Services? (SlideShare)
Which New Jersey Data Centers Embrace Managed Services? (SlideShare)SP Home Run Inc.
 

Viewers also liked (7)

Bab ii bab i sistem kerja ups (uninterruptible power system) pada central con...
Bab ii bab i sistem kerja ups (uninterruptible power system) pada central con...Bab ii bab i sistem kerja ups (uninterruptible power system) pada central con...
Bab ii bab i sistem kerja ups (uninterruptible power system) pada central con...
 
Design Research for Emerging Markets
Design Research for Emerging MarketsDesign Research for Emerging Markets
Design Research for Emerging Markets
 
Should Colocation Data Centers Fear Consolidation? (SlideShare)
Should Colocation Data Centers Fear Consolidation? (SlideShare)Should Colocation Data Centers Fear Consolidation? (SlideShare)
Should Colocation Data Centers Fear Consolidation? (SlideShare)
 
Can Data Center Consultants Build Enterprise Value? (SlideShare)
Can Data Center Consultants Build Enterprise Value? (SlideShare)Can Data Center Consultants Build Enterprise Value? (SlideShare)
Can Data Center Consultants Build Enterprise Value? (SlideShare)
 
Lever Company Presentation January 2012 New
Lever Company Presentation January 2012 NewLever Company Presentation January 2012 New
Lever Company Presentation January 2012 New
 
Comparing Software Defined Data Centers vs. Traditional Data Centers (SlideSh...
Comparing Software Defined Data Centers vs. Traditional Data Centers (SlideSh...Comparing Software Defined Data Centers vs. Traditional Data Centers (SlideSh...
Comparing Software Defined Data Centers vs. Traditional Data Centers (SlideSh...
 
Which New Jersey Data Centers Embrace Managed Services? (SlideShare)
Which New Jersey Data Centers Embrace Managed Services? (SlideShare)Which New Jersey Data Centers Embrace Managed Services? (SlideShare)
Which New Jersey Data Centers Embrace Managed Services? (SlideShare)
 

Similar to Data Center UPS System Upgrade

Case Study - Fujitsu_Malaga_Perth - (TIA 942) - 20110722
Case Study - Fujitsu_Malaga_Perth - (TIA 942) - 20110722Case Study - Fujitsu_Malaga_Perth - (TIA 942) - 20110722
Case Study - Fujitsu_Malaga_Perth - (TIA 942) - 20110722Chris Dow
 
Aged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptxAged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptxSchneider Electric
 
An Introduction to the Power Module Manufacturers XY Power-A Professional EV ...
An Introduction to the Power Module Manufacturers XY Power-A Professional EV ...An Introduction to the Power Module Manufacturers XY Power-A Professional EV ...
An Introduction to the Power Module Manufacturers XY Power-A Professional EV ...Sam Geoff
 
Low Complexity + Low Cost = High Availability
Low Complexity + Low Cost = High AvailabilityLow Complexity + Low Cost = High Availability
Low Complexity + Low Cost = High AvailabilityUptime Institute
 
Schneider Electric Services_Modernization and Upgrade Solutions.pptx
Schneider Electric Services_Modernization and Upgrade Solutions.pptxSchneider Electric Services_Modernization and Upgrade Solutions.pptx
Schneider Electric Services_Modernization and Upgrade Solutions.pptxSchneider Electric
 
Magellan Power - High Reliability Australian Technology Innovative, Customise...
Magellan Power - High Reliability Australian Technology Innovative, Customise...Magellan Power - High Reliability Australian Technology Innovative, Customise...
Magellan Power - High Reliability Australian Technology Innovative, Customise...Magellan Power
 
Secure Power Design Considerations
Secure Power Design ConsiderationsSecure Power Design Considerations
Secure Power Design ConsiderationsSchneider Electric
 
elcomponics
elcomponicselcomponics
elcomponicspselcom
 
Off grid rooftop pv – elsol solar
Off grid rooftop pv – elsol solarOff grid rooftop pv – elsol solar
Off grid rooftop pv – elsol solarelsolsolar
 
All products brochure
All products brochureAll products brochure
All products brochureJason Becker
 
toaz.info-foot-step-ppt-pr_a0b68b5bda776b607c301df6f3886c6a.pdf
toaz.info-foot-step-ppt-pr_a0b68b5bda776b607c301df6f3886c6a.pdftoaz.info-foot-step-ppt-pr_a0b68b5bda776b607c301df6f3886c6a.pdf
toaz.info-foot-step-ppt-pr_a0b68b5bda776b607c301df6f3886c6a.pdfJyotishkMalviya
 
Hacking the Conventional Data Center Infrastructure
Hacking the Conventional  Data Center InfrastructureHacking the Conventional  Data Center Infrastructure
Hacking the Conventional Data Center InfrastructureSchneider Electric
 
KinetIQ Solutions Capability Statement
KinetIQ Solutions Capability StatementKinetIQ Solutions Capability Statement
KinetIQ Solutions Capability StatementRay Salmons
 
Greg Thomson - Community Microgrid - (17 oct 2014)
Greg Thomson - Community Microgrid - (17 oct 2014)Greg Thomson - Community Microgrid - (17 oct 2014)
Greg Thomson - Community Microgrid - (17 oct 2014)annphancock
 
Versatile control of unidirectional ac–dc boost converters for power quality ...
Versatile control of unidirectional ac–dc boost converters for power quality ...Versatile control of unidirectional ac–dc boost converters for power quality ...
Versatile control of unidirectional ac–dc boost converters for power quality ...IISTech2015
 

Similar to Data Center UPS System Upgrade (20)

Case Study - Fujitsu_Malaga_Perth - (TIA 942) - 20110722
Case Study - Fujitsu_Malaga_Perth - (TIA 942) - 20110722Case Study - Fujitsu_Malaga_Perth - (TIA 942) - 20110722
Case Study - Fujitsu_Malaga_Perth - (TIA 942) - 20110722
 
Energy Storage solutions
Energy Storage solutionsEnergy Storage solutions
Energy Storage solutions
 
Aged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptxAged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptx
 
An Introduction to the Power Module Manufacturers XY Power-A Professional EV ...
An Introduction to the Power Module Manufacturers XY Power-A Professional EV ...An Introduction to the Power Module Manufacturers XY Power-A Professional EV ...
An Introduction to the Power Module Manufacturers XY Power-A Professional EV ...
 
Low Complexity + Low Cost = High Availability
Low Complexity + Low Cost = High AvailabilityLow Complexity + Low Cost = High Availability
Low Complexity + Low Cost = High Availability
 
Schneider Electric Services_Modernization and Upgrade Solutions.pptx
Schneider Electric Services_Modernization and Upgrade Solutions.pptxSchneider Electric Services_Modernization and Upgrade Solutions.pptx
Schneider Electric Services_Modernization and Upgrade Solutions.pptx
 
Magellan Power - High Reliability Australian Technology Innovative, Customise...
Magellan Power - High Reliability Australian Technology Innovative, Customise...Magellan Power - High Reliability Australian Technology Innovative, Customise...
Magellan Power - High Reliability Australian Technology Innovative, Customise...
 
Secure Power Design Considerations
Secure Power Design ConsiderationsSecure Power Design Considerations
Secure Power Design Considerations
 
Gps UPS Power When You Need It
Gps UPS Power When You Need ItGps UPS Power When You Need It
Gps UPS Power When You Need It
 
Gps 2018
Gps 2018Gps 2018
Gps 2018
 
2014 PV Distribution System Modeling Workshop: High Penetration PV Control Co...
2014 PV Distribution System Modeling Workshop: High Penetration PV Control Co...2014 PV Distribution System Modeling Workshop: High Penetration PV Control Co...
2014 PV Distribution System Modeling Workshop: High Penetration PV Control Co...
 
elcomponics
elcomponicselcomponics
elcomponics
 
ComRent Capabilities Overview v10 Solar
ComRent Capabilities Overview v10 SolarComRent Capabilities Overview v10 Solar
ComRent Capabilities Overview v10 Solar
 
Off grid rooftop pv – elsol solar
Off grid rooftop pv – elsol solarOff grid rooftop pv – elsol solar
Off grid rooftop pv – elsol solar
 
All products brochure
All products brochureAll products brochure
All products brochure
 
toaz.info-foot-step-ppt-pr_a0b68b5bda776b607c301df6f3886c6a.pdf
toaz.info-foot-step-ppt-pr_a0b68b5bda776b607c301df6f3886c6a.pdftoaz.info-foot-step-ppt-pr_a0b68b5bda776b607c301df6f3886c6a.pdf
toaz.info-foot-step-ppt-pr_a0b68b5bda776b607c301df6f3886c6a.pdf
 
Hacking the Conventional Data Center Infrastructure
Hacking the Conventional  Data Center InfrastructureHacking the Conventional  Data Center Infrastructure
Hacking the Conventional Data Center Infrastructure
 
KinetIQ Solutions Capability Statement
KinetIQ Solutions Capability StatementKinetIQ Solutions Capability Statement
KinetIQ Solutions Capability Statement
 
Greg Thomson - Community Microgrid - (17 oct 2014)
Greg Thomson - Community Microgrid - (17 oct 2014)Greg Thomson - Community Microgrid - (17 oct 2014)
Greg Thomson - Community Microgrid - (17 oct 2014)
 
Versatile control of unidirectional ac–dc boost converters for power quality ...
Versatile control of unidirectional ac–dc boost converters for power quality ...Versatile control of unidirectional ac–dc boost converters for power quality ...
Versatile control of unidirectional ac–dc boost converters for power quality ...
 

Recently uploaded

Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 

Recently uploaded (20)

Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 

Data Center UPS System Upgrade

  • 1.
  • 2. GPS is a leading provider of high quality power systems Global Power Supply
  • 3. Expansion or Upgrade GLOBAL POWER SUPPLY Generating Solutions for Critical Facilities Problems or challenges faced today with upgrading or expanding an existing data center and accomplishing this with zero to little interruption to services and maintaining business continuity. Drivers ✦ Efficiency Newer equipment provides increased efficiency lowering cost of operations ✦ Reliability Legacy or “end-of-life” equipment no longer is serviceable or has spare parts ✦ Increased Capacity Challenges ✦ N or N+1 Design Data centers built in the late 90’s to early 2000 using Tier 2 design ✦ Physical Space Constraints No room to install new until old is removedSelf-Contained 1000kVA UPS System
  • 4. History of Data Center Design GLOBAL POWER SUPPLY Generating Solutions for Critical Facilities When our centers were originally built it is often the case the space allowed for electrical and cooling was minimized to save money and to allocate space for the revenue side of the equation, i.e., “white space”. When we look to expand or upgrade we find that we lack the needed space. Often it is necessary to remove the old before installing the new. ✦ 80’s Data centers were designed for 50W / Sq. Ft. ✦ 90’s Design was increased to 90W / Sq. Ft. ✦ 2000’s Design is 150W-200W / Sq. Ft. ✦ Where are we today? Typical situation today with existing infrastructure. ✦ Equipment is obsolete and inefficient ✦ New equipment represents an opportunity to become more efficient and bring our operating costs down ✦ We lack the capacity necessary in either power or cooling to meet todays and tomorrows needs ✦ We are faced with a demanding era with regard to reliability and in many cases N or N+1 is not enough
  • 5. ✦ Build a new data center ✦ Cost prohibitive ✦ Time frame typically 18 months ✦ Remodel or Expand ✦ Lower cost than new ✦ Shorter timelines ✦ Challenge of little or no interruption ✦ Externalize Modular Solutions ✦ Short speed of deployment ✦ Controlled costs ✦ Revenue generating “white” space Identify Your Options GLOBAL POWER SUPPLY Generating Solutions for Critical Facilities
  • 6. Critical Infrastructure Upgrade GLOBAL POWER SUPPLY Generating Solutions for Critical Facilities Processes associated with: Replace existing UPS System Existing UPS Systems to be replaced Site completed with new UPS Systems ✦ Three phases for a successful project ✦ Discovery ✦ Planning ✦ Execution
  • 7. Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass UPS Replacement N Design GLOBAL POWER SUPPLY Generating Solutions for Critical Facilities Project Description: Replace existing UPS System Utility ✦ Identify is the utility adequate for the expansion or upgrade
  • 8. Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass UPS Replacement N Design GLOBAL POWER SUPPLY Generating Solutions for Critical Facilities Project Description: Replace existing UPS System Utility ✦ Identify is the utility adequate for the expansion or upgrade ✦ Identify is the generator adequate
  • 9. Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass UPS Replacement N Design GLOBAL POWER SUPPLY Generating Solutions for Critical Facilities Project Description: Replace existing UPS System Utility Electrical Distribution ✦ Identify is the utility adequate for the expansion or upgrade ✦ Identify is the generator adequate ✦ Identify main distribution switchgear capabilities and breaker configuration
  • 10. Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass UPS Replacement N Design GLOBAL POWER SUPPLY Generating Solutions for Critical Facilities Project Description: Replace existing UPS System Utility Electrical Distribution ✦ Identify is the utility adequate for the expansion or upgrade ✦ Identify is the generator adequate ✦ Identify main distribution switchgear capabilities and breaker configuration ✦ Identify and take reading of existing load to determine proper size of temp UPS Critical Loads
  • 11. Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass UPS Replacement N Design GLOBAL POWER SUPPLY Generating Solutions for Critical Facilities Project Description: Replace existing UPS System Utility Electrical Distribution ✦ Identify is the utility adequate for the expansion or upgrade ✦ Identify is the generator adequate ✦ Identify main distribution switchgear capabilities and breaker configuration ✦ Identify and take reading of existing load to determine proper size of temp UPS ✦ Identify physical location of temp UPS ✦ Note rental UPS Systems come in both typical “indoor” configurations as well as self-contained trailers designed for installation outside of facility ✦ Note it’s also important to determine the conductors lengths required for the location of “temp UPS” Critical Loads
  • 12. Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass UPS Replacement N Design GLOBAL POWER SUPPLY Generating Solutions for Critical Facilities Project Description: Replace existing UPS System Utility Electrical Distribution ✦ Identify is the utility adequate for the expansion or upgrade ✦ Identify is the generator adequate ✦ Identify main distribution switchgear capabilities and breaker configuration ✦ Identify and take reading of existing load to determine proper size of temp UPS ✦ Identify physical location of temp UPS ✦ Note rental UPS Systems come in both typical “indoor” configurations as well as self-contained trailers designed for installation outside of facility ✦ Note it’s also important to determine the conductors lengths required for the location of “temp UPS” ✦ Temporary UPS installed feeding external maintenance bypass Critical Loads
  • 13. Planning Phase GLOBAL POWER SUPPLY Generating Solutions for Critical Facilities *NEMA 3 R – Cage and frame constructed for ease of movement – sizes up to 6,000A @ 480V ✦ Implementation of Temporary Generators In stock up to 2 MW with capabilities to parallel beyond that. ✦ Temporary Switchgear Up to 6,000A @ 480V *rentalized NEMA 3R cage and frame. ✦ Temporary UPS Systems Self-contained UPS trailers or “indoor” from small 10 kVA up to multi-megawatt. ✦ Power Distribution & Static Switches
  • 14. UPS Replacement 2N Design GLOBAL POWER SUPPLY Generating Solutions for Critical Facilities Project Description: Replace existing UPS System Critical Loads Static Bypass UtilityUtility Transfer Switchgear Alternate Power Source Electrical DistributionElectrical Distribution Transfer Switchgear Alternate Power Source UPS N UPS +1 UPS N UPS +1 Mechanical Switchgear Mechanical Switchgear Mechanical Loads Output Distribution Switchboard Output Distribution Switchboard PDUPDU Non-Critical Loads Non-Critical Loads Static Bypass Maintenance Bypass Maintenance Bypass
  • 15. UPS Replacement Discovery Phase GLOBAL POWER SUPPLY Generating Solutions for Critical Facilities Project Description: Branch Circuit Discovery ✦ Single Corded Loads • Implications of shutting down loads • Controlled shut down and installation of static switch Most problems are at the branch level. Working in tandem with the IT/Operations survey and visually inspect each rack and connected loads. Goal is to identify: ✦ Dual Corded Loads • Plugged into the A and B properly • Many times we find they are plugged into the same circuit or not distributed properly. Using an amp probe identify the load on the circuit. Can the circuit accept the entire load? Often times we find that the load will exceed the circuit.
  • 16. UPS Replacement Execution GLOBAL POWER SUPPLY Generating Solutions for Critical Facilities ✦ Transfer “A” building load to generator Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS
  • 17. UPS Replacement Execution GLOBAL POWER SUPPLY Generating Solutions for Critical Facilities ✦ Transfer “A” building load to generator ✦ Check rental UPS system and ensure it is in bypass mode Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS
  • 18. UPS Replacement Execution GLOBAL POWER SUPPLY Generating Solutions for Critical Facilities ✦ Transfer “A” building load to generator ✦ Check rental UPS system and ensure it is in bypass mode ✦ Place existing UPS system in bypass Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS
  • 19. UPS Replacement Execution GLOBAL POWER SUPPLY Generating Solutions for Critical Facilities ✦ Transfer “A” building load to generator ✦ Check rental UPS system and ensure it is in bypass mode ✦ Place existing UPS system in bypass ✦ Close output breaker from the rental UPS’s Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS
  • 20. UPS Replacement Execution GLOBAL POWER SUPPLY Generating Solutions for Critical Facilities ✦ Transfer “A” building load to generator ✦ Check rental UPS system and ensure it is in bypass mode ✦ Place existing UPS system in bypass ✦ Close output breaker from the rental UPS’s ✦ Open feeder breaker from existing UPS system to output panel Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS
  • 21. UPS Replacement Execution GLOBAL POWER SUPPLY Generating Solutions for Critical Facilities ✦ Transfer “A” building load to generator ✦ Check rental UPS system and ensure it is in bypass mode ✦ Place existing UPS system in bypass ✦ Close output breaker from the rental UPS’s ✦ Open feeder breaker from existing UPS system to output panel ✦ Ensure rental UPS has picked up the load Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS
  • 22. UPS Replacement Execution GLOBAL POWER SUPPLY Generating Solutions for Critical Facilities ✦ Transfer “A” building load to generator ✦ Check rental UPS system and ensure it is in bypass mode ✦ Place existing UPS system in bypass ✦ Close output breaker from the rental UPS’s ✦ Open feeder breaker from existing UPS system to output panel ✦ Ensure rental UPS has picked up the load ✦ Shutdown existing UPS System and open AC & DC breakers Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS
  • 23. UPS Replacement Execution GLOBAL POWER SUPPLY Generating Solutions for Critical Facilities ✦ Transfer “A” building load to generator ✦ Check rental UPS system and ensure it is in bypass mode ✦ Place existing UPS system in bypass ✦ Close output breaker from the rental UPS’s ✦ Open feeder breaker from existing UPS system to output panel ✦ Ensure rental UPS has picked up the load ✦ Shutdown existing UPS System and open AC & DC breakers ✦ Temporary UPS is on line and carrying load transfer building load back to utility Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS
  • 24. UPS Replacement Execution GLOBAL POWER SUPPLY Generating Solutions for Critical Facilities ✦ Transfer “A” building load to generator ✦ Check rental UPS system and ensure it is in bypass mode ✦ Place existing UPS system in bypass ✦ Close output breaker from the rental UPS’s ✦ Open feeder breaker from existing UPS system to output panel ✦ Ensure rental UPS has picked up the load ✦ Shutdown existing UPS System and open AC & DC breakers ✦ Temporary UPS is on line and carrying load transfer building load back to utility ✦ Existing UPS are ready to be removed Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS UPS System Removed
  • 25. UPS Replacement Execution GLOBAL POWER SUPPLY Generating Solutions for Critical Facilities ✦ Transfer “A” building load to generator ✦ Check rental UPS system and ensure it is in bypass mode ✦ Place existing UPS system in bypass ✦ Close output breaker from the rental UPS’s ✦ Open feeder breaker from existing UPS system to output panel ✦ Ensure rental UPS has picked up the load ✦ Shutdown existing UPS System and open AC & DC breakers ✦ Temporary UPS is on line and carrying load transfer building load back to utility ✦ Existing UPS are ready to be removed ✦ Repeat these steps for “B” side of data center Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS Critical Loads Static Bypass Utility Transfer Switchgear Alternate Power Source Electrical Distribution UPS N UPS +1 Mechanical Switchgear Mechanical Loads Output Distribution Switchboard PDU Non-Critical Loads Maintenance Bypass Temporary UPS UPS System Removed
  • 26. ✦ CIMs - (critical infrastructure module) ✦ IT ✦ Electrical ✦ Cooling ✦ Integrated (“all in one”) Externalize Your Infrastructure GLOBAL POWER SUPPLY Generating Solutions for Critical Facilities Expansion is necessary but time or space pose challenges
  • 27. CIM Purpose-Built Solutions Roof Top Installation GLOBAL POWER SUPPLY Generating Solutions for Critical Facilities
  • 28. CIM Purpose-Built Solutions Raised Platform GLOBAL POWER SUPPLY Generating Solutions for Critical Facilities
  • 29. ✦ Scalable by Design ✦ Concurrent Mfg ✦ Less Change Orders ✦ Less On-Site Hours ✦ Factory Built Benefits of Modular Construction GLOBAL POWER SUPPLY Generating Solutions for Critical Facilities Expansion is necessary but time and space won’t allow. ✦ Lower CAPEX ✦ Predictive Schedule ✦ Predictive Cost ✦ Lower Safety Risk ✦ Reduced Onsite Waste
  • 30. Speed of Deployment Traditional Modular 30% to 50% Faster Time Savings GLOBAL POWER SUPPLY Generating Solutions for Critical Facilities Critical infrastructure modules can be deployed in 90 days.