More Related Content
Similar to Engineering process in detail with block diagram and explanation
Similar to Engineering process in detail with block diagram and explanation (20)
More from sikandar girgoukar
More from sikandar girgoukar (9)
Engineering process in detail with block diagram and explanation
- 1. Resources /material (equipment, facilities
and material needed):
• Engineering software
•Computer and IT systems
• CAD/CAM
Documents/Requirements
(applicable procedures and requirements):
• Customer supplied design inputs
• Engineering function handbook/Design
procedures
• Internal requirements
Process indicators (monitoring and
metrics used):
• Achieve timescale to plan
Process steps/Main activities:
• Customer design process or/and
• Manufacturing engineering
Process personnel (competencies
needed):
• Technical & manufacturing engineering staff
Risks :
• Customer requirements change
• Key personnel attrition
Process Name: 4 - Engineering Process Owner: Mr Banger
Objectives & Targets
• Deliver design to project plan
• Product safety
• Maintain customer approvals
Output:
• Detail manufacturing &
Assembly Planning
Documentation
Input:
• Approved
contract
• Customer flow
down design
criteria/data
- 2. Resources /material (equipment, facilities
and material needed):
• Engineering software
•Computer and IT systems
• CAD/CAM
Documents/Requirements
(applicable procedures and requirements):
• Customer supplied design inputs
• Engineering function handbook/Design
procedures
• Internal requirements
Process indicators (monitoring and
metrics used):
• Achieve timescale to plan
Process steps/Main activities:
• Customer design process or/and
• Manufacturing engineering
Process personnel (competencies
needed):
• Technical & manufacturing engineering staff
Risks :
• Customer requirements change
• Key personnel attrition
Process Name: IT Certification Delivery Process Owner: Mr Banger
Objectives & Targets
• Deliver design to project plan
• Product safety
• Maintain customer approvals
Output:
• Detail manufacturing &
Assembly Planning
Documentation
Input:
• Approved
contract
• Customer flow
down design
criteria/data