1. WALTER GROUP OF COMPANIES
Project management
in industrial construction
2. EVGENY WALTER
General Director,
WATER GROUP OF COMPANIES
“Oil Chemistry in Russia
and the CIS” Conference
April 6-7, 2016
I am happy to welcome you on behalf of
WALTER GC.
What is a key to success of the company
that renders services? Of course people, a
strong team of co-thinkers. The team of
WALTER GC started to develop in 2004.
Today we are project team #1 in Russian
wood industry: we take part in construction
of new largest plants for manufacturing of
board products not only as the General
Contractor but also as the Technical
Supervisor!
We are ready to be involved in any project
since it is one more opportunity for
WALTER GC to prove that work, executed
on a high quality level has a name!
3.
MDF plant in Tomsk city, 264 thous. m3
MDF plant in Apsheronsk city, 300 thous. m3
Uvadrev PB plant, 300 thous.m3
Tomlesdrev PB plant, 300 th. m3
STOD OSB plant, 500 thous.m3
Projects related to construction and
installation jobs
8
projects
throughout
Russia
Gagarin MDF plant, 300 тыс.m3
Project for Siberian Group of Chemical
Plants in Seversk city
Project for construction of
multifunctional radiochemical
research complex in
Dimitrovgrad
137billion rubles
amount of investment
4.
MDF plant in Apsheronsk city, 300 thous.m3 Dyatkovo PB plant, 217 thous.m3
STOD OSB plant, 500 thous.m3Igorevsky woodworking plant, 300 thous.m3
Projects related to consulting
6
projects
throughout
Russia
Real-Invest OSB plant, 412 thous.m3
80amount of investment
billion rubles
Taleon-Terra LVL plant, 120 thous.m3
5. Construction and
installation of equipment
Project management in
industrial construction
Selection of
technologies and
industrial equipment
Consulting
Marketing research
-Self-regulating organization certificate
# СРО-С-016-00628/4-24062016 dd. 24.06.2016
-Self-regulating organization certificate
# С-143-77-0660-23-300316 dd. 30.06.2016
-License for construction of nuclear plants
-До-(У) 02-101-2163 dd. 18.06.2015
-Quality management system
complies with international standards ISO 9001:2011
ISO 14001:2014, OHSAS 18001
-License of EMERCOM
#23-Б/00284 dd. 11.08.2015
-License for installation of nuclear plants
До-(У) 02-115-2253 dd. 27.04.2016
WALTER GC
WALTER CONSTRUCTION WALTER COMPANY WALTER CONSULTING
Engineering/ Design
on the Russian market since 2004
6. Project team #1 in wood
industry of Russia
We have been
participating in
construction of the
largest board production
plants for 12 years
7. Providing for a bank guarantee
Full cycle of operations from a
business idea to
commissioning of the facility
99%Facilities
commissioned
in time
European level of business-
process organization
8. The Company’s nucleus
is formed by leading experts,
working in the sphere of
engineering for 15-20 years
650specialists
We exercise tough control over:
terms, budget, quality
10. Project management in industrial
construction
General Contractor Technical Supervisor
Industrial engineering and designConstruction, repair and assembly
of technological equipment
Electric and installation jobs
ConsultingSelection of technologies and
industrial equipment
Marketing research
Services
11. Project team of WALTER GC
is ready to render
professional support
related to:
Management of construction and
installation jobs
Management of design jobs
Management of delivery of equipment and
materials for the project
Management of labor and industrial safety
Management of project risks
We have proved on a practical level
that qualitative project management allows saving
to 30%of time and to 20%of funds
12. Technical
Supervisor
Services
Selection and registration of the
operational site as property
Collection and registration of primary
permits
Control over development of design
documents
Development and control over
construction budget
Approval of the project and
management of the state expert
review
Obtaining of construction permits
Control over construction process
Commissioning
13. General
Contractor
Services
Development and control over
construction schedule
Compliance with the construction
budget
Compliance with standard
operating procedures
Selection of skilled contractors,
supervision of jobs executed by
contractors
Transfer of the constructed facility
to the acceptance committee
Ensuring the fire safety
Compliance with rules of
occupational health and
environmental safety
14. WALTER GC provides a wide range of
services for engineering and design, with
possibility of subsequent manufacture of
equipment and metal structures.
Industrial engineering by WALTER GC is a full-fledged
strategic planning taking into account particular
features of each company.
Industrial engineering and design
15. Industry expertise, practical experience
and employed unique solutions are a
basis for consulting
Construction and
technical audit
Technical and economic
justification for banks
Expert review and
adaptation of projects
Prompt response to issues
arisen during operations
Preparation of a set of
recommendations for further actions
16. Selection of technology and
industrial equipment
WALTER GC renders professionally qualified assistance in
selection of up-to-date technological developments and
introduction of innovative solutions.
The result is
optimization of operational expenditures
and increase of competitiveness.
17. Electric installation jobs, assembly of instrumentation
and automated process control systems
WALTER GC deals with
delivery and assembly
of lighting systems. Our
specialists estimate a
project in compliance with
requirements of standard
documents.
Installation of internal
and external high
voltage power supply
network lines, assembly,
commissioning jobs,
repair and technical
maintenance of electric
networks and electrical
and technical devices.
Fiber optic network
lines, structured
cabled systems are
installed at the highest
quality level (computer,
telephone), intercom
networks etc.
Installation of internal and
external power supply and
low voltage network lines,
assembly, commissioning,
repair and technical
maintenance of electric
networks and electrical and
technical devices.
18. - Management of investment project
- Development of strategy and main project stages
- Selection of product and technology
- Organization and management of Customer and General
Supervisor Services, design, construction and installation
- Execution of a set of construction and assembly jobs.
E. Walter has been awarded
with Certificate of Merit of the
RF Ministry of Regional
Development and Governor of
Tomsk region.
Functions of WALTER project team:
9billion rubles
amount of investment
264 th. m3 of MDF boards per annum
production capacity Tomsk city, Tomsk region
19. - Management of the full range of installation jobs
- Engineering of the project for construction of a resin shop
- Engineering of the project for short-cycle press lamination line
- Engineering of the project for profiling line
- Engineering of the project for waste treatment facilities construction
- Organization of tender procurement system
Functions of WALTER CONSTRUCTION:
10billion rubles
amount of investment
300 th. m3 of MDF boards per annum
operational capacity
Krasnodar locality,
Apsherpnsk city
20. - Project management related to General Contractor services
for mechanical installation jobs
- Implementation of electrical installation project;
- Implementation of the project for assembly of
laminating systems
- We are grateful for high level of
management of assembly, electric
installation and commissioning
operations.
V. Serov, Project Shareholder
Функции компании «ВАЛЬТЕР Констракшн»:
6amount of investment
billion rubles
operation capacity
300 th. m3 of PB per annum
Udmurt Republic,
Uva settlement
21. General Contractor for installation of operational equipment
and metal structures :
- Installation of operational equipment
- Installation of two laminating systems
- Installation of silos
- Installation of technological piping systems
- Installation of fire extinguishing systems
- Insulation work
- Commissioning
Functions of WALTER CONSTRUCTION:
6billion rubles
amount of investment
300 th. m3 of particle boards per annum
operation capacity
Tomsk region, Tomsk city
22. - Installation of the forming station
- Installation of continuous press system
- Installation of equipment after application of press system
- Manufacture and installation of surge bins
- Assembly of silos
- Insulation jobs
- Electric installation
Functions of WALTER CONSTRUCTION:
12billion rubles
amount of investment
500 th. m3 of OSB per annum
operational capacity
STOD project
Tver region, Torzhok city
23. - Providing staff by Contract for out-staffing for assembly and electric
installation jobs on the forming station and press
Functions of WALTER CONSTRUCTION:
17billion of rubles
amount of investment
500 th. m3 of MDF per annum
operation capacity
Gagarin project
Smolensk region,
Gagarin city
24. Construction and installation jobs on facilities by project for Siberian
Group of Chemical Plants
- Construction of fabrication module and commissioning complex for
re-fabrication of tight mixed uranium plutonium fuel for reactors on
fast neurons
- Assembly of storm water and household drainage systems
- Ventilation and air conditioning systems
- Internal heat supply systems, external water supply and disposal
systems.
Nuclear industry
This has never been invented in any region of the
world. It is a completely closed cycle of fast neuron
reactor of the fourth, most advanced generation.
Production of new-generation fuel for atomic power
stations.
Functions of WALTER CONSTRUCTION:
84 Complex for production of
nitride fuel
Tomsk region, Seversk city
billion rubles
amount of investment
Unique in the whole world, only one in
Russia: Breakthrough project.
25. - In-situ concrete jobs on facility 220 (PRK) of OJSC “GNC NIIAR” to +0.000.
- In-situ concrete jobs for bridging from -0.800 to -0,100 between axes 1-16, Е-Л
and axes11-16, А-Е and along wells to -0.100 to +5.000
between axes 1-11, А-Е.
Nuclear industry
Technological elements for processing nuclear
fuel of fast reactors and closing of nuclear fuel
cycle will be worked out together.
Functions of WALTER CONSTRUCTION:
6.5billion rubles
amount of investment
Building of radiochemical
complex, which does not have
analogs by its level of equipment
PRK project
Ulyanovsk region,
Dimitrovgrad city
26. 1
Highly qualified team of managers and
workers capable of settling the most
complicated matters
2
3
Readiness to work
in any region of
Russia and abroad
Wide range of rendered services in the field
of construction: from design to facility
commissioning
Reasons
to work
with us
27. Contact details:
WALTER GC
99 Uralskaya Street,