SlideShare a Scribd company logo
1 of 11
Download to read offline
With the battery switch off
and no GPU hooked up,
these buses are powered.
When any of the following
doors are opened, the Ground
Handling Bus is energized
through the Battery Transfer
Relay.
GND HDLG
BUS
HOT EMER
BAT BUS
+ -
HOT MAIN
BAT BUS
+ -
Hot Main
Battery
Hot Emergency
Battery
1. Cargo Door Access Panel
2. Refueling Panel
3. Main Cabin Door
4. Auxiliary Hydraulic Pump
Push Button is depressed.
BTR
If you walk into the cockpit
and observe a GREEN AVAIL
light on the main electrical
panel, these buses are now
powered.
AVAIL
SHED
SHED
EXT PWR DC GEN 2DC GEN 1
AC BUS 2
INV 1 INV 2
0
1
2
1
2
DC
CHDCH
ESS BUS
DC SVCE/UTLY BUS
BAT SEL
MAINEMERG BTC
STBY BUS
EMER BUS
DC BUS 2
OFF
ON
OVRD
BAT
MAIN BAT
CHG
EMER BAT
CHG
DC BUS 1
AC BUS 1
EXTERNAL
POWER
EGHR
When the GPU is plugged in, the
External Ground Handling Relay
closes taking priority over the Bus
Transfer Relay. The BTR then opens.
GND HDLG
BUS
HOT EMER
BAT BUS
+ -
HOT MAIN
BAT BUS
+ -
Hot Main
Battery
Hot Emergency
Battery
BTR
DC SVCE
BUS
If the DC SERVICE BUS push
button is depressed on the
flight attendant panel, then
the DC SERVICE BUS is
powered through the
Service Bus Transfer Relay.
ON
GND SVCE BUS
PASS LAV CAPT LAV CARGO
EMER
LT
CALLS SMOKE
GALLEY LAV
LAT
PASS DIM
UPR
PASS ENTR
AFT
CARGO
READ
LT VENT
ACDC
The GPU is now powering
the Ground Handling Bus
and the DC Service Bus.
EXTERNAL
POWER
EGHR
GND HDLG
BUS
HOT EMER
BAT BUS
+ -
HOT MAIN
BAT BUS
+ -
Hot Main
Battery
Hot Emergency
Battery
BTR
SBTR
Now we turn on the
Main Battery Toggle Switch.
AVAIL
SHED
SHED
EXT PWR DC GEN 2DC GEN 1
AC BUS 2
INV 1 INV 2
0
1
2
1
2
DC
CHDCH
ESS BUS
DC SVCE/UTLY BUS
BAT SEL
MAINEMERG BTC
STBY BUS
EMER BUS
DC BUS 2
OFF
ON
OVRD
BAT
MAIN BAT
CHG
EMER BAT
CHG
DC BUS 1
AC BUS 1
DC SVCE
BUS
EXTERNAL
POWER
EGHR
GND HDLG
BUS
HOT EMER
BAT BUS
+ -
HOT MAIN
BAT BUS
+ -
Hot Main
Battery
Hot Emergency
Battery
BTR
SBTR
Now we turn on the
Main Battery Toggle Switch.
AVAIL
SHED
SHED
EXT PWR DC GEN 2DC GEN 1
AC BUS 2
INV 1 INV 2
0
1
2
1
2
DC
CHDCH
ESS BUS
DC SVCE/UTLY BUS
BAT SEL
MAINEMERG BTC
STBY BUS
EMER BUS
DC BUS 2
OFF
ON
OVRD
BAT
MAIN BAT
CHG
EMER BAT
CHG
DC BUS 1
AC BUS 1
DC SVCE
BUS
EXTERNAL
POWER
EGHR
GND HDLG
BUS
HOT EMER
BAT BUS
+ -
HOT MAIN
BAT BUS
+ -
Hot Main
Battery
Hot Emergency
Battery
BTR
SBTR
Now we turn on the
Main Battery Toggle Switch.
AVAIL
SHED
SHED
EXT PWR DC GEN 2DC GEN 1
AC BUS 2
INV 1 INV 2
0
1
2
1
2
DC
CHDCH
ESS BUS
DC SVCE/UTLY BUS
BAT SEL
MAINEMERG BTC
STBY BUS
EMER BUS
DC BUS 2
OFF
ON
OVRD
BAT
MAIN BAT
CHG
EMER BAT
CHG
DC BUS 1
AC BUS 1
DC SVCE
BUS
EXTERNAL
POWER
EGHR
GND HDLG
BUS
HOT EMER
BAT BUS
+ -
HOT MAIN
BAT BUS
+ -
Hot Main
Battery
Hot Emergency
Battery
BTR
SBTR
Now with the main battery
on, these buses are
powered.
FAULTFAULT AVAIL
SHED
SHED
DC GEN 2DC GEN 1
0
1
2
1
2
DC
CHDCH
DC SVCE/UTLY BUS
BAT SEL
MAINEMERG BTC
DC BUS
OFF
DC BUS
OFF
BUS
OFF
INV
FAULT
BUS
OFF
EXT PWR
EMER BAT
CHG
EMER BUS ESS BUS
STBY BUS
AC BUS 2AC BUS 1
INV 1
DC BUS 1
OFF
ON
OVRD
BAT
MAIN BAT
CHG
INV 2
DC BUS 2
DC EMER
BUS
DC STBY BUS
DC ESS
BUS
HMBTCHEBTC
SBTC
HBTC
INV
1
DC SVCE
BUS
EXTERNAL
POWER
EGHR
GND HDLG
BUS
HOT EMER
BAT BUS
+ -
HOT MAIN
BAT BUS
+ -
Hot Main
Battery
Hot Emergency
Battery
BTR
SBTR
HEBTC = Hot Emergency Bus Transfer Contactor
HMBTC = Hot Main Bus Transfer Contactor
SBTC = Standby Bus Transfer Contactor
HBTC = Hot Battery Transfer Contactor
115 VAC SBY
26 VAC SBY
When the external power
pushbutton is depressed,
these buses are powered.
FAULTFAULT AVAIL
SHED
SHED
DC GEN 2DC GEN 1
0
1
2
1
2
DC
CHDCH
DC SVCE/UTLY BUS
BAT SEL
MAINEMERG BTC
DC BUS
OFF
DC BUS
OFF
BUS
OFF
INV
FAULT
BUS
OFF
EXT PWR
EMER BAT
CHG
EMER BUS ESS BUS
STBY BUS
AC BUS 2AC BUS 1
INV 1
DC BUS 1
OFF
ON
OVRD
BAT
MAIN BAT
CHG
INV 2
DC BUS 2
DC EMER
BUS
DC STBY BUS
DC ESS
BUS
HMBTCHEBTC
SBTC
HBTC
INV
1
DC SVCE
BUS
EXTERNAL
POWER
EGHR
GND HDLG
BUS
HOT EMER
BAT BUS
+ -
HOT MAIN
BAT BUS
+ -
Hot Main
Battery
Hot Emergency
Battery
BTR
SBTR
115 VAC SBY
26 VAC SBY
SDTC
When the external power
pushbutton is depressed,
these buses are powered.
FAULTFAULT AVAIL
SHED
SHED
DC GEN 2DC GEN 1
0
1
2
1
2
DC
CHDCH
DC SVCE/UTLY BUS
BAT SEL
MAINEMERG BTC
DC BUS
OFF
DC BUS
OFF
BUS
OFF
INV
FAULT
BUS
OFF
EXT PWR
EMER BAT
CHG
EMER BUS ESS BUS
STBY BUS
AC BUS 2AC BUS 1
INV 1
DC BUS 1
OFF
ON
OVRD
BAT
MAIN BAT
CHG
INV 2
DC BUS 2
ON
UTILITY
BUS 2
UTILITY
BUS 1
DC BUS 1 DC BUS 2
DC EMER
BUS
DC STBY BUS
DC ESS
BUS
HMBTCHEBTC
SBTC
HBTC
INV
1
DC SVCE
BUS
EXTERNAL
POWER
EGHR
GND HDLG
BUS
HOT EMER
BAT BUS
+ -
HOT MAIN
BAT BUS
+ -
BTR
SBTR
115 VAC SBY
26 VAC SBY
115 VAC BUS 2
26 VAC BUS 2
115 VAC BUS 1
26 VAC BUS 1
INV
2
ACBTR
ASTR
#1 INVERTER FAIL
SIGNAL
INVERTER FAIL
SIGNAL
SDTC
When DC Bus 1 is powered the Static
Inverter Override Transfer Contactor
(SDTC) closes and the HBTC (Hot
Bat Transfer Contactor opens).
FAULTFAULT AVAIL
SHED
SHED
DC GEN 2DC GEN 1
0
1
2
1
2
DC
CHDCH
DC SVCE/UTLY BUS
BAT SEL
MAINEMERG BTC
EXT PWR
EMER BAT
CHG
EMER BUS ESS BUS
STBY BUS
AC BUS 2AC BUS 1
INV 1
DC BUS 1
OFF
ON
OVRD
BAT
MAIN BAT
CHG
INV 2
DC BUS 2
ON
UTILITY
BUS 2
UTILITY
BUS 1
DC BUS 1 DC BUS 2
DC EMER
BUS
DC STBY BUS
DC ESS
BUS
HMBTCHEBTC
SBTC
HBTC
INV
1
DC SVCE
BUS
EXTERNAL
POWER
EGHR
GND HDLG
BUS
HOT EMER
BAT BUS
+ -
HOT MAIN
BAT BUS
+ -
BTR
SBTR
115 VAC SBY
26 VAC SBY
115 VAC BUS 2
26 VAC BUS 2
115 VAC BUS 1
26 VAC BUS 1
INV
2
ACBTR
ASTR
#1 INVERTER FAIL
SIGNAL
INVERTER FAIL
SIGNAL
Once the DC Buses are powered,
the associated lights are
extinguished on the main electrical
panel.
Electrical system sample

More Related Content

What's hot

Lead-acid standby Battery charger.
Lead-acid standby Battery charger.Lead-acid standby Battery charger.
Lead-acid standby Battery charger.Ahmed Sakr
 
737 electrics quiz
737 electrics quiz737 electrics quiz
737 electrics quizYasin çetin
 
ESI Electro Service India - Float Cum Battery Charger
ESI Electro Service India - Float Cum Battery ChargerESI Electro Service India - Float Cum Battery Charger
ESI Electro Service India - Float Cum Battery ChargerRadhika Goyal
 
Generator Voltage control
Generator Voltage controlGenerator Voltage control
Generator Voltage controljamaju56
 
Battery Charger Manufacturer - RS Power Systems
Battery Charger Manufacturer - RS Power SystemsBattery Charger Manufacturer - RS Power Systems
Battery Charger Manufacturer - RS Power Systemsrspowersystems
 
ISL6257: Highly Integrated Battery Charger Controller for Li-Ion/Li-Ion Polym...
ISL6257: Highly Integrated Battery Charger Controller for Li-Ion/Li-Ion Polym...ISL6257: Highly Integrated Battery Charger Controller for Li-Ion/Li-Ion Polym...
ISL6257: Highly Integrated Battery Charger Controller for Li-Ion/Li-Ion Polym...Premier Farnell
 
Multiple well cathodic protection
Multiple well cathodic protectionMultiple well cathodic protection
Multiple well cathodic protectionAsif Sheriff
 
Introduction to IGBT & its losses with videos demonstration
Introduction  to IGBT & its losses with videos demonstration Introduction  to IGBT & its losses with videos demonstration
Introduction to IGBT & its losses with videos demonstration Zeeshan Akhtar
 
Product: UPS: UniStar SCLI924
Product: UPS: UniStar SCLI924Product: UPS: UniStar SCLI924
Product: UPS: UniStar SCLI924Staco Energy
 
industrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCLindustrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCLsurendra rawat
 
Unit-1 Power Semiconductor devices
Unit-1 Power Semiconductor devicesUnit-1 Power Semiconductor devices
Unit-1 Power Semiconductor devicesjohny renoald
 
INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG
INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG  INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG
INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG Muneeb Amin Khan
 

What's hot (20)

Igbt reliability
Igbt reliabilityIgbt reliability
Igbt reliability
 
Lead-acid standby Battery charger.
Lead-acid standby Battery charger.Lead-acid standby Battery charger.
Lead-acid standby Battery charger.
 
737 electrics quiz
737 electrics quiz737 electrics quiz
737 electrics quiz
 
ESI Electro Service India - Float Cum Battery Charger
ESI Electro Service India - Float Cum Battery ChargerESI Electro Service India - Float Cum Battery Charger
ESI Electro Service India - Float Cum Battery Charger
 
Generator Voltage control
Generator Voltage controlGenerator Voltage control
Generator Voltage control
 
Battery Charger Manufacturer - RS Power Systems
Battery Charger Manufacturer - RS Power SystemsBattery Charger Manufacturer - RS Power Systems
Battery Charger Manufacturer - RS Power Systems
 
ISL6257: Highly Integrated Battery Charger Controller for Li-Ion/Li-Ion Polym...
ISL6257: Highly Integrated Battery Charger Controller for Li-Ion/Li-Ion Polym...ISL6257: Highly Integrated Battery Charger Controller for Li-Ion/Li-Ion Polym...
ISL6257: Highly Integrated Battery Charger Controller for Li-Ion/Li-Ion Polym...
 
switching & control devices
switching & control devicesswitching & control devices
switching & control devices
 
Multiple well cathodic protection
Multiple well cathodic protectionMultiple well cathodic protection
Multiple well cathodic protection
 
Introduction to IGBT & its losses with videos demonstration
Introduction  to IGBT & its losses with videos demonstration Introduction  to IGBT & its losses with videos demonstration
Introduction to IGBT & its losses with videos demonstration
 
Igbt
IgbtIgbt
Igbt
 
Product: UPS: UniStar SCLI924
Product: UPS: UniStar SCLI924Product: UPS: UniStar SCLI924
Product: UPS: UniStar SCLI924
 
Vs510 s
Vs510 sVs510 s
Vs510 s
 
industrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCLindustrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCL
 
Gto basics
Gto   basicsGto   basics
Gto basics
 
Unit-1 Power Semiconductor devices
Unit-1 Power Semiconductor devicesUnit-1 Power Semiconductor devices
Unit-1 Power Semiconductor devices
 
Igbt Working
Igbt WorkingIgbt Working
Igbt Working
 
INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG
INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG  INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG
INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG
 
Multivibrators
MultivibratorsMultivibrators
Multivibrators
 
Battery Charging
Battery ChargingBattery Charging
Battery Charging
 

Similar to Electrical system sample

B747 Electrical Power
B747 Electrical PowerB747 Electrical Power
B747 Electrical Powertheoryce
 
Original Power Supply IC LNK616PG LNK616P LNK616 DIP-7 New
Original Power Supply IC LNK616PG LNK616P LNK616 DIP-7 NewOriginal Power Supply IC LNK616PG LNK616P LNK616 DIP-7 New
Original Power Supply IC LNK616PG LNK616P LNK616 DIP-7 NewAUTHELECTRONIC
 
Datasheet-bmss05
Datasheet-bmss05Datasheet-bmss05
Datasheet-bmss05Martin Pec
 
EC/Bios Interaction Laptop Repair Course
EC/Bios Interaction Laptop Repair CourseEC/Bios Interaction Laptop Repair Course
EC/Bios Interaction Laptop Repair CourseVikas Deoarshi
 
1 100 transistorcircuits
1 100 transistorcircuits1 100 transistorcircuits
1 100 transistorcircuitsAlejandro Perez
 
Original Power Supply IC LNK632DG LNK632 632 SOP-7 New
Original Power Supply IC LNK632DG LNK632 632 SOP-7 NewOriginal Power Supply IC LNK632DG LNK632 632 SOP-7 New
Original Power Supply IC LNK632DG LNK632 632 SOP-7 NewAUTHELECTRONIC
 
Power semiconductor devices ppt new converted
Power semiconductor devices ppt new convertedPower semiconductor devices ppt new converted
Power semiconductor devices ppt new convertedPallavi Choudekar
 
New Generation Switching Power Manager with USB On-the-Go
New Generation Switching Power Manager with USB On-the-GoNew Generation Switching Power Manager with USB On-the-Go
New Generation Switching Power Manager with USB On-the-GoPremier Farnell
 
Drv8833 motor driver datasheet
Drv8833 motor driver datasheetDrv8833 motor driver datasheet
Drv8833 motor driver datasheetMahmut Yildiz
 
Original IC LNK6778 LNK6778K 6778 SOP-11 New Power Integrations
Original IC LNK6778 LNK6778K 6778 SOP-11 New Power IntegrationsOriginal IC LNK6778 LNK6778K 6778 SOP-11 New Power Integrations
Original IC LNK6778 LNK6778K 6778 SOP-11 New Power IntegrationsAUTHELECTRONIC
 
Control ICs for Energy-efficient Fluorescent Ballast Applications
Control ICs for Energy-efficient Fluorescent Ballast Applications Control ICs for Energy-efficient Fluorescent Ballast Applications
Control ICs for Energy-efficient Fluorescent Ballast Applications Premier Farnell
 
Udn2916 lb performance characteristics and application circuit analysis
Udn2916 lb performance characteristics and application circuit analysisUdn2916 lb performance characteristics and application circuit analysis
Udn2916 lb performance characteristics and application circuit analysisVinsion Chan
 
PLANO ELECTRICO CAT GENSET 3500B Renr98450001
PLANO ELECTRICO CAT GENSET 3500B Renr98450001PLANO ELECTRICO CAT GENSET 3500B Renr98450001
PLANO ELECTRICO CAT GENSET 3500B Renr98450001juanManuel1001
 
What Is Magnetic Contactor
What Is Magnetic ContactorWhat Is Magnetic Contactor
What Is Magnetic ContactorEmran Hosain
 
Original Power Supply IC LNK302PN LNK302P LNK302 DIP-7 New
Original Power Supply IC LNK302PN LNK302P LNK302 DIP-7 NewOriginal Power Supply IC LNK302PN LNK302P LNK302 DIP-7 New
Original Power Supply IC LNK302PN LNK302P LNK302 DIP-7 NewAUTHELECTRONIC
 

Similar to Electrical system sample (20)

B747 Electrical Power
B747 Electrical PowerB747 Electrical Power
B747 Electrical Power
 
400 Kv Soja
400 Kv Soja400 Kv Soja
400 Kv Soja
 
Original Power Supply IC LNK616PG LNK616P LNK616 DIP-7 New
Original Power Supply IC LNK616PG LNK616P LNK616 DIP-7 NewOriginal Power Supply IC LNK616PG LNK616P LNK616 DIP-7 New
Original Power Supply IC LNK616PG LNK616P LNK616 DIP-7 New
 
Datasheet-bmss05
Datasheet-bmss05Datasheet-bmss05
Datasheet-bmss05
 
EC/Bios Interaction Laptop Repair Course
EC/Bios Interaction Laptop Repair CourseEC/Bios Interaction Laptop Repair Course
EC/Bios Interaction Laptop Repair Course
 
1 100 transistorcircuits
1 100 transistorcircuits1 100 transistorcircuits
1 100 transistorcircuits
 
Original Power Supply IC LNK632DG LNK632 632 SOP-7 New
Original Power Supply IC LNK632DG LNK632 632 SOP-7 NewOriginal Power Supply IC LNK632DG LNK632 632 SOP-7 New
Original Power Supply IC LNK632DG LNK632 632 SOP-7 New
 
Power semiconductor devices ppt new converted
Power semiconductor devices ppt new convertedPower semiconductor devices ppt new converted
Power semiconductor devices ppt new converted
 
Boost converter
Boost converterBoost converter
Boost converter
 
New Generation Switching Power Manager with USB On-the-Go
New Generation Switching Power Manager with USB On-the-GoNew Generation Switching Power Manager with USB On-the-Go
New Generation Switching Power Manager with USB On-the-Go
 
Drv8833 motor driver datasheet
Drv8833 motor driver datasheetDrv8833 motor driver datasheet
Drv8833 motor driver datasheet
 
Original IC LNK6778 LNK6778K 6778 SOP-11 New Power Integrations
Original IC LNK6778 LNK6778K 6778 SOP-11 New Power IntegrationsOriginal IC LNK6778 LNK6778K 6778 SOP-11 New Power Integrations
Original IC LNK6778 LNK6778K 6778 SOP-11 New Power Integrations
 
Control ICs for Energy-efficient Fluorescent Ballast Applications
Control ICs for Energy-efficient Fluorescent Ballast Applications Control ICs for Energy-efficient Fluorescent Ballast Applications
Control ICs for Energy-efficient Fluorescent Ballast Applications
 
330cl
 330cl 330cl
330cl
 
Udn2916 lb performance characteristics and application circuit analysis
Udn2916 lb performance characteristics and application circuit analysisUdn2916 lb performance characteristics and application circuit analysis
Udn2916 lb performance characteristics and application circuit analysis
 
PLANO ELECTRICO CAT GENSET 3500B Renr98450001
PLANO ELECTRICO CAT GENSET 3500B Renr98450001PLANO ELECTRICO CAT GENSET 3500B Renr98450001
PLANO ELECTRICO CAT GENSET 3500B Renr98450001
 
What Is Magnetic Contactor
What Is Magnetic ContactorWhat Is Magnetic Contactor
What Is Magnetic Contactor
 
Inn3278C.pdf
Inn3278C.pdfInn3278C.pdf
Inn3278C.pdf
 
Why Dc Power
Why Dc PowerWhy Dc Power
Why Dc Power
 
Original Power Supply IC LNK302PN LNK302P LNK302 DIP-7 New
Original Power Supply IC LNK302PN LNK302P LNK302 DIP-7 NewOriginal Power Supply IC LNK302PN LNK302P LNK302 DIP-7 New
Original Power Supply IC LNK302PN LNK302P LNK302 DIP-7 New
 

Recently uploaded

Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptxPoojaSen20
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfUmakantAnnand
 

Recently uploaded (20)

Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptx
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.Compdf
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 

Electrical system sample

  • 1. With the battery switch off and no GPU hooked up, these buses are powered. When any of the following doors are opened, the Ground Handling Bus is energized through the Battery Transfer Relay. GND HDLG BUS HOT EMER BAT BUS + - HOT MAIN BAT BUS + - Hot Main Battery Hot Emergency Battery 1. Cargo Door Access Panel 2. Refueling Panel 3. Main Cabin Door 4. Auxiliary Hydraulic Pump Push Button is depressed. BTR
  • 2. If you walk into the cockpit and observe a GREEN AVAIL light on the main electrical panel, these buses are now powered. AVAIL SHED SHED EXT PWR DC GEN 2DC GEN 1 AC BUS 2 INV 1 INV 2 0 1 2 1 2 DC CHDCH ESS BUS DC SVCE/UTLY BUS BAT SEL MAINEMERG BTC STBY BUS EMER BUS DC BUS 2 OFF ON OVRD BAT MAIN BAT CHG EMER BAT CHG DC BUS 1 AC BUS 1 EXTERNAL POWER EGHR When the GPU is plugged in, the External Ground Handling Relay closes taking priority over the Bus Transfer Relay. The BTR then opens. GND HDLG BUS HOT EMER BAT BUS + - HOT MAIN BAT BUS + - Hot Main Battery Hot Emergency Battery BTR
  • 3. DC SVCE BUS If the DC SERVICE BUS push button is depressed on the flight attendant panel, then the DC SERVICE BUS is powered through the Service Bus Transfer Relay. ON GND SVCE BUS PASS LAV CAPT LAV CARGO EMER LT CALLS SMOKE GALLEY LAV LAT PASS DIM UPR PASS ENTR AFT CARGO READ LT VENT ACDC The GPU is now powering the Ground Handling Bus and the DC Service Bus. EXTERNAL POWER EGHR GND HDLG BUS HOT EMER BAT BUS + - HOT MAIN BAT BUS + - Hot Main Battery Hot Emergency Battery BTR SBTR
  • 4. Now we turn on the Main Battery Toggle Switch. AVAIL SHED SHED EXT PWR DC GEN 2DC GEN 1 AC BUS 2 INV 1 INV 2 0 1 2 1 2 DC CHDCH ESS BUS DC SVCE/UTLY BUS BAT SEL MAINEMERG BTC STBY BUS EMER BUS DC BUS 2 OFF ON OVRD BAT MAIN BAT CHG EMER BAT CHG DC BUS 1 AC BUS 1 DC SVCE BUS EXTERNAL POWER EGHR GND HDLG BUS HOT EMER BAT BUS + - HOT MAIN BAT BUS + - Hot Main Battery Hot Emergency Battery BTR SBTR
  • 5. Now we turn on the Main Battery Toggle Switch. AVAIL SHED SHED EXT PWR DC GEN 2DC GEN 1 AC BUS 2 INV 1 INV 2 0 1 2 1 2 DC CHDCH ESS BUS DC SVCE/UTLY BUS BAT SEL MAINEMERG BTC STBY BUS EMER BUS DC BUS 2 OFF ON OVRD BAT MAIN BAT CHG EMER BAT CHG DC BUS 1 AC BUS 1 DC SVCE BUS EXTERNAL POWER EGHR GND HDLG BUS HOT EMER BAT BUS + - HOT MAIN BAT BUS + - Hot Main Battery Hot Emergency Battery BTR SBTR
  • 6. Now we turn on the Main Battery Toggle Switch. AVAIL SHED SHED EXT PWR DC GEN 2DC GEN 1 AC BUS 2 INV 1 INV 2 0 1 2 1 2 DC CHDCH ESS BUS DC SVCE/UTLY BUS BAT SEL MAINEMERG BTC STBY BUS EMER BUS DC BUS 2 OFF ON OVRD BAT MAIN BAT CHG EMER BAT CHG DC BUS 1 AC BUS 1 DC SVCE BUS EXTERNAL POWER EGHR GND HDLG BUS HOT EMER BAT BUS + - HOT MAIN BAT BUS + - Hot Main Battery Hot Emergency Battery BTR SBTR
  • 7. Now with the main battery on, these buses are powered. FAULTFAULT AVAIL SHED SHED DC GEN 2DC GEN 1 0 1 2 1 2 DC CHDCH DC SVCE/UTLY BUS BAT SEL MAINEMERG BTC DC BUS OFF DC BUS OFF BUS OFF INV FAULT BUS OFF EXT PWR EMER BAT CHG EMER BUS ESS BUS STBY BUS AC BUS 2AC BUS 1 INV 1 DC BUS 1 OFF ON OVRD BAT MAIN BAT CHG INV 2 DC BUS 2 DC EMER BUS DC STBY BUS DC ESS BUS HMBTCHEBTC SBTC HBTC INV 1 DC SVCE BUS EXTERNAL POWER EGHR GND HDLG BUS HOT EMER BAT BUS + - HOT MAIN BAT BUS + - Hot Main Battery Hot Emergency Battery BTR SBTR HEBTC = Hot Emergency Bus Transfer Contactor HMBTC = Hot Main Bus Transfer Contactor SBTC = Standby Bus Transfer Contactor HBTC = Hot Battery Transfer Contactor 115 VAC SBY 26 VAC SBY
  • 8. When the external power pushbutton is depressed, these buses are powered. FAULTFAULT AVAIL SHED SHED DC GEN 2DC GEN 1 0 1 2 1 2 DC CHDCH DC SVCE/UTLY BUS BAT SEL MAINEMERG BTC DC BUS OFF DC BUS OFF BUS OFF INV FAULT BUS OFF EXT PWR EMER BAT CHG EMER BUS ESS BUS STBY BUS AC BUS 2AC BUS 1 INV 1 DC BUS 1 OFF ON OVRD BAT MAIN BAT CHG INV 2 DC BUS 2 DC EMER BUS DC STBY BUS DC ESS BUS HMBTCHEBTC SBTC HBTC INV 1 DC SVCE BUS EXTERNAL POWER EGHR GND HDLG BUS HOT EMER BAT BUS + - HOT MAIN BAT BUS + - Hot Main Battery Hot Emergency Battery BTR SBTR 115 VAC SBY 26 VAC SBY
  • 9. SDTC When the external power pushbutton is depressed, these buses are powered. FAULTFAULT AVAIL SHED SHED DC GEN 2DC GEN 1 0 1 2 1 2 DC CHDCH DC SVCE/UTLY BUS BAT SEL MAINEMERG BTC DC BUS OFF DC BUS OFF BUS OFF INV FAULT BUS OFF EXT PWR EMER BAT CHG EMER BUS ESS BUS STBY BUS AC BUS 2AC BUS 1 INV 1 DC BUS 1 OFF ON OVRD BAT MAIN BAT CHG INV 2 DC BUS 2 ON UTILITY BUS 2 UTILITY BUS 1 DC BUS 1 DC BUS 2 DC EMER BUS DC STBY BUS DC ESS BUS HMBTCHEBTC SBTC HBTC INV 1 DC SVCE BUS EXTERNAL POWER EGHR GND HDLG BUS HOT EMER BAT BUS + - HOT MAIN BAT BUS + - BTR SBTR 115 VAC SBY 26 VAC SBY 115 VAC BUS 2 26 VAC BUS 2 115 VAC BUS 1 26 VAC BUS 1 INV 2 ACBTR ASTR #1 INVERTER FAIL SIGNAL INVERTER FAIL SIGNAL
  • 10. SDTC When DC Bus 1 is powered the Static Inverter Override Transfer Contactor (SDTC) closes and the HBTC (Hot Bat Transfer Contactor opens). FAULTFAULT AVAIL SHED SHED DC GEN 2DC GEN 1 0 1 2 1 2 DC CHDCH DC SVCE/UTLY BUS BAT SEL MAINEMERG BTC EXT PWR EMER BAT CHG EMER BUS ESS BUS STBY BUS AC BUS 2AC BUS 1 INV 1 DC BUS 1 OFF ON OVRD BAT MAIN BAT CHG INV 2 DC BUS 2 ON UTILITY BUS 2 UTILITY BUS 1 DC BUS 1 DC BUS 2 DC EMER BUS DC STBY BUS DC ESS BUS HMBTCHEBTC SBTC HBTC INV 1 DC SVCE BUS EXTERNAL POWER EGHR GND HDLG BUS HOT EMER BAT BUS + - HOT MAIN BAT BUS + - BTR SBTR 115 VAC SBY 26 VAC SBY 115 VAC BUS 2 26 VAC BUS 2 115 VAC BUS 1 26 VAC BUS 1 INV 2 ACBTR ASTR #1 INVERTER FAIL SIGNAL INVERTER FAIL SIGNAL Once the DC Buses are powered, the associated lights are extinguished on the main electrical panel.