Course Outline
Day 1: Introduction + Project Integration Management.
Day 2: Project Scope Management.
Day 3: Project Schedule Management.
Day 4: Project Cost Management.
Day 5: Project Risk Management.
Day 6: Scrum.
Day 7: Final Presentation Day!
Dr Mohamed Elfarran 2
Principles of Project Management
Dr Mohamed Elfarran
3
Nov-2022
4
What is the Project management ?!!!
4
It’s a Life
Dr Mohamed Elfarran
5
What is the Project management ?!!!
5
1- Setting a Targets
2- Draw the Pathway 3- Achieve your Goals
Dr Mohamed Elfarran
What is a Project ?
6
● A project is a temporary endeavor undertaken to create
a unique product , service, or result
(This definition is taken from the Glossary of the Project Management Institute, A Guide to the Project Management Body of Knowledge, (PMBOK® Guide) – Sixth Edition, Project Management
Institute, Inc., 2017)
○ Projects are undertaken to fulfill objectives by producing
deliverables.
Dr Mohamed Elfarran
SEC 1
Nov-2022
Projects properties !!!!
7
● Unique
Different design, circumstances, contractors, material
○ A purpose to be achieved
○ A result to be obtained
○ A product to be produced
○ A service to be performed
● Temporary
○ Definite beginning and end, not a continuous and repetitive process.
○ Does not necessary mean short in duration.
Dr Mohamed Elfarran
SEC 1
Nov-2022
Start Point: Business Need
8
● Project are Typically initiated as a result of:
○ Market demand
○ Strategic opportunity/business need
○ Social need
○ Environmental consideration
○ Customer request
○ Technological advancement
○ Legal or regulatory requirement
○ Existing or forecast problem
Dr Mohamed Elfarran
SEC 1
Nov-2022
End Point: When to end a Project?
9
● Objectives achieved.
● Objectives can’t be achieved.
● No more fund.
● No longer need the project.
● No Human Resource.
● Legal concerns.
Dr Mohamed Elfarran
SEC 1
Nov-2022
10
What is the Project Management?
Project Management is the application of Knowledge,
skills, tools and techniques to project activities to meet
the project requirements.
10
(This definition is taken from the Glossary of the Project Management Institute, A Guide to the Project Management Body of
Knowledge, (PMBOK® Guide) – Sixth Edition, Project Management Institute, Inc., 2017)
SEC 1
Dr Mohamed Elfarran
Project Management
11
● Effective Project Management Helps To:
• Meet business objectives;
• Satisfy stakeholder expectations;
• Be more predictable;
• Increase chance to success;
• Deliver the right products at the right time;
• Resolve problems;
• Respond to risk in a timely manner; etc.,
Dr Mohamed Elfarran
SEC 1
Nov-2022
Project Management
12
● The Absence Of Project Management May Result In:
• Missed deadlines
• Cost overruns
• Poor quality
• Rework; etc.
Dr Mohamed Elfarran
SEC 1
Nov-2022
Project Management
13
 Effective And Efficient Project Management Enable Organizations
To:
 Tie project result to business goals,
 Compete more effectively in their markets,
 Sustain the organization,
 Respond to the impact of business environment changes on project.
Dr Mohamed Elfarran
SEC 1
Nov-2022
Project, Program, Portfolio & Operations
14
● Operation Management
Operation management is concerned with the ongoing production of
goods and /or services.
● Operation And Project Management
Ongoing operations are outside of the scope of the project; however,
there are an intersecting points where the two areas cross.
Dr Mohamed Elfarran
SEC 1
Nov-2022
Project Management Key Questions ?!!!
Understanding The Fundamentals of Project Management
PM is designed to answer:
1) What business case is being addressed by this project?
2) What will you do?
3) How will you do it?
4) When you will Finish ?
5) How WELL did you do?
Dr Mohamed Elfarran 15
SEC 1
Nov-2022
Project Management Overview
1) What business case is being addressed by this project?
The project business case is a documented economic feasibility study.
❑ Business needs
❑ Analysis of situation
❑ Recommendations
❑ evaluation
Dr Mohamed Elfarran 16
SEC 1
Nov-2022
Project Management Overview
2) What will you do?
✓ The answer to this question will be framed in your project goal and
objective statements.
✓ In any case, your goal and objective statements given as part of a
Project Management Plan will clearly state your intentions.
Dr Mohamed Elfarran 17
SEC 1
Nov-2022
Project Management Overview
3) How will you do it?
✓ This answer will document your approach to the project in
your Project Management Plan for meeting the goal and
objective of the project.
Dr Mohamed Elfarran 18
SEC 1
Nov-2022
Project Management Overview
4) How will you know you did it?
That success criterion may be expressed in the form of Provide management with
information about how effectively achieving the objectives.
 Status report – where the project stand
 Progress report – what has accomplished
 Trend report – examine project results overtime to see performance is
improving or deterioration
 Variance report – Comparing actual result to planned
 Earned value – PV, EV, AC
Dr Mohamed Elfarran 19
SEC 1
Nov-2022
Project Management Overview
5) How well did you do?
✓ Determined by answering the following questions:
1. How well did your deliverables meet the stated
success criteria?
2. How well did the project team perform?
3. How well did the project management approach
work for this project?
4. What lessons learned that can be
applied to future projects?
Dr Mohamed Elfarran 20
SEC 1
Nov-2022
21
The Project Constraints
“Managing a project typically includes, but is not limited to:
❑ Identifying requirements.
❑ Addressing the various needs, concerns & expectations of the stakeholders in
planning and executing the project.
❑ Setting up, maintaining and carrying out communications among stakeholders that
are active, effective, and collaborative in nature.
❑ Managing stakeholders towards meeting project requirements and creating project
deliverables.
❑ Balancing the competing project constrains which include, but not limited to:”
21
Scope Budget
Quality Resources
Schedule Risk
SEC 1
Dr Mohamed Elfarran
Project Management :Triple Constraints
“Scope, Time & Cost, All within Quality”
Dr Mohamed Elfarran 22
SEC 1
Nov-2022
Key Component
23
● Project and development life cycle
A project life cycle is the series of phases that a project passes through from its start to its
completion.
● Project phase
A project phase is a collection of logically related activities that culminates in the completion
of one or more deliverables.
● Phase gate (review)
A project gate is held at the end of a phase
Dr Mohamed Elfarran Nov-2022
Key Component
26
● Project Stakeholders
A Stakeholder is an individual, group, or organization that may affect, be affected by, or
perceive itself to be affected by a decision, activity, or outcome of the project.
○ Internal Stakeholders: Sponsor, Resource manager, (PMO), Portfolio steering
committee, etc.,
○ External Stakeholder: Customer, End user, suppliers, Shareholders, etc.,
Dr Mohamed Elfarran Nov-2022
27
PM Process
27
Dr Mohamed Elfarran
28
PM Knowledge Areas
28
Dr Mohamed
PM Areas & Process Interactions
Dr Mohamed Elfarran 29
Nov-2022
30
30
Dr Mohamed
Project Management Process Group
Dr Mohamed Elfarran
31
Nov-2022
Key Component
32
● Project management process
The project life cycle is managed by executing a series of project management activities
known as project management processes. (Coffee)
● Project Management Process Group
○ Initiating Process Group
○ Planning Process Group
○ Executing Process Group
○ Monitoring And Controlling Process Group
○ Closing Process Group
Dr Mohamed Elfarran Nov-2022
33
Project Management Process Group
Initiating
Processes
Initiating
Processes
Planning
Processes
Planning
Processes
Controlling
Processes
Controlling
Processes
Closing
Processes
Closing
Processes
Executing
Processes
Executing
Processes
Project Management Process Group
1. Initiating Process Group
Those processes performed to defines a new project or a new phase of an existing
project by obtaining authorization to start the project or a phase.
Dr Mohamed Elfarran 34
Nov-2022
Project Charter
The process of developing a document that formally authorizes
the existence of a project, and provide the project manager with
the authority to apply organizational resources to the project
activities. The key benefit of this process is that it provides a direct
link between the project and the strategic objectives of the
organization, creates a formal record of the project.
1. Initiating Process Group
Dr Mohamed Elfarran 35
Nov-2022
Project Charter
Is the document issued by the project initiator or sponsor that
formally authorizes the existence of the project
○ Project purpose
○ Measurable project objectives and related success criteria
○ High level requirements
○ Over all project risk
○ Summary milestone schedule
○ Preapproved financial resources
1. Initiating Process Group
Dr Mohamed Elfarran 36
Nov-2022
Project Charter
○ Key stakeholders list
○ Project approval requirements (i.e., what constitutes project success,
who decides the project is successful, and who sign off on the project)
○ Project exit criteria (i.e., what are the conditions to be met in order to
close or to cancel the project or phase)
○ Assigned project manager, responsibility, and authority level.
○ Name and authority of the sponsor or other person(s)authorizing the
project charter.
1. Initiating Process Group
Dr Mohamed Elfarran 37
Nov-2022
Project Charter
1. Initiating Process Group
Dr Mohamed Elfarran 38
Nov-2022
Project Management Process Group
2. Planning Process Group
Those processes required to establish the scope of the project, refine the
objectives, and define the course of action required to attain the objectives that
the project was undertaken to achieve.
Dr Mohamed Elfarran 39
Nov-2022
Principles of Project Management 40
Planning Process
2. Planning Process Group
Dr Mohamed Elfarran
Project Management Process Group
3. Executing Process Group
Those processes performed to complete the work defined in the project
management plan to satisfy the project requirements.
Dr Mohamed Elfarran 41
Nov-2022
Project Management Process Group
4. Monitoring and Controlling Process Group
Those processes required to track, review, and regulate the progress and
performance of the project, identify any areas in which changes to the plan are
required, and initiate the corresponding changes.
Dr Mohamed Elfarran 42
Nov-2022
Project Management Process Group
● Closing Process Group
Those processes performed to formally complete or close the project,
phase, or contract.
Dr Mohamed Elfarran 43
Nov-2022
Project Management Process Group
44
Dr Mohamed Elfarran Nov-2022
46
Process interaction
46
Dr Mohamed Elfarran
47
47
Dr Mohamed
Project Management Knowledge Areas
Dr Mohamed Elfarran
48
Nov-2022
49
49
Dr Mohamed
PM Areas & Process Interactions
Dr Mohamed Elfarran 50
Nov-2022
Integration Management
Integration
Project Integration Management includes the processes and activities to
identify, define, combine, unify, and coordinate the various processes and
project management activities within the Project Management Process
Groups. In the project management context, integration includes
characteristics
of unification, consolidation,
communication, and interrelationship.
Dr Mohamed Elfarran 52
Nov-2022
Scope Management
Scope
Project scope Management Includes the processes required to ensure that
the project includes all the work required, and only the work required, to
complete the project successfully. Managing the project scope is primarily
concerned with defining and controlling what is and is not included in the
project.
Dr Mohamed Elfarran 53
Nov-2022
Schedule Management
Schedule
Project Schedule Management includes the processes required to manage
the timely completion of the project.
Dr Mohamed Elfarran 54
Nov-2022
Cost Management
Cost
Project Cost Management includes the processes involved in planning,
estimating, budgeting, financing, funding, managing, and controlling costs
so that the project can be completed within the approved budget.
Dr Mohamed Elfarran 55
Nov-2022
Quality Management
Quality
Project Quality Management includes the processes for incorporating the
organization’s quality policy regarding planning, managing, and controlling
project and product quality requirements in order to meet stakeholder’s
objectives. Also supports continuous process improvement activities as
undertaken on behalf of the performing organization.
Dr Mohamed Elfarran 56
Nov-2022
Resources Management
Resources
Project Resource Management includes the processes to identify, acquire,
and manage the resources needed for the successful completion of the
project. These processes help ensure that the right resources will be
available to the project manager and project team at the right time and
place.
Dr Mohamed Elfarran 57
Nov-2022
Communication Management
Communication
Project Communication Management includes the processes necessary to
ensure that the information needs of the project and its stakeholders are
met through development of artifacts and implementation of activities
designed to achieve effective information exchange.
Dr Mohamed Elfarran 58
Nov-2022
Risk Management
Risk
Project Risk Management includes the process of conducting risk
management plan, identification, analysis, response planning, response
implementation, and monitoring risk on the project.
Dr Mohamed Elfarran 59
Nov-2022
Procurement Management
Procurement
Project Procurement Management include the processes necessary to
purchase or acquire products, services, or results needed from outside
the project team. Project Procurement Management includes the
management and control processes required to develop and administer .
Dr Mohamed Elfarran 60
Nov-2022
Stakeholders Management
Stakeholder
Processes required to identify the people, group, or organizations that
could impact or be impacted by the project, to analyze stakeholders
expectation and their impact on the project, and to develop appropriate
management strategies for
effectively engaging stakeholders
in project decisions and execution.
Dr Mohamed Elfarran 61
Nov-2022
Dr Mohamed Elfarran 62
Nov-2022
How to be a Good Project Manager (members) !!
Dr Mohamed Elfarran
64
Nov-2022
The Role of Project Manager
● Understanding Project Environment
The project team should consider the project in its cultural, social,
international, political, and physical environmental context.
○ Cultural and social environment
Economic, Demographic, Educational, Ethical, Ethnic, Religious.
○ Physical environment
Knowledge about the local ecology and physical geography.
Dr Mohamed Elfarran 65
Nov-2022
The Role of Project Manager
● International and political environment
○ International, National, regional, and local laws and customs
○ Political climate
○ Time zone difference
○ National and regional holidays
○ Travel requirements for face to face meeting
○ The logistics of teleconferencing
Dr Mohamed Elfarran 66
Nov-2022
The Role of Project Manager
● General Management knowledge and skills
○ Financial management and accounting
○ Purchasing and procurement
○ Sales and marketing
○ Contracts and commercial laws
○ Manufacturing and distribution
○ Logistics and supply Chain
○ Health and safety practices
○ Information technology
Dr Mohamed Elfarran 67
Nov-2022
The Role of Project Manager
● Interpersonal Skills
○ Effective Communicating:
The exchange of information between the sender and the receiver.
○ Influencing the Organization:
The “ability to get things done”.
○ Leadership:
Developing a vision and strategy, and motivating people to achieve that
vision and strategy.
Dr Mohamed Elfarran 68
Nov-2022
The Role of Project Manager
○ Motivation:
Energizing people to achieve high levels of performance and to
overcome barriers to change.
○ Negotiation and conflict management:
Conferring with others to come to terms with them or to reach an
agreement.
○ Problem solving:
The combination of problem definition, alternatives identification and
analysis, and decision-making.
Dr Mohamed Elfarran 69
Nov-2022
Dr Mohamed Elfarran 78
Dr Mohamed Elfarran 79

More Related Content

Similar to Day 1 Framework R03.pdf

ChapterPM_1.pptx for the course project management
ChapterPM_1.pptx for the course project managementChapterPM_1.pptx for the course project management
ChapterPM_1.pptx for the course project managementDerbewBirhanu2
 
01 02&03 introduction to pmp-mao
01 02&03 introduction to pmp-mao01 02&03 introduction to pmp-mao
01 02&03 introduction to pmp-maomao-osman73
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Managementmuhammadyasirsaeedqa
 
Lecture 1 23-01-2020 - Compatibility Mode.pdf
Lecture 1 23-01-2020  -  Compatibility Mode.pdfLecture 1 23-01-2020  -  Compatibility Mode.pdf
Lecture 1 23-01-2020 - Compatibility Mode.pdfTanzeelShahid5
 
Chapter 1 An Overview Of Project Management
Chapter 1  An Overview Of Project ManagementChapter 1  An Overview Of Project Management
Chapter 1 An Overview Of Project ManagementMahesh Bendigeri
 
Getting Really Good at Projects with Salesforce!.pptx
Getting Really Good at Projects with Salesforce!.pptxGetting Really Good at Projects with Salesforce!.pptx
Getting Really Good at Projects with Salesforce!.pptxRizwanQureshi64
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project ManagementKris Kimmerle
 
Project management
Project managementProject management
Project managementArsh Koul
 
Project Management- introduction
Project Management- introductionProject Management- introduction
Project Management- introductionAditi Garg
 
Undestand PMBok 5th, Section 1&2
Undestand PMBok 5th, Section 1&2Undestand PMBok 5th, Section 1&2
Undestand PMBok 5th, Section 1&2Amr Miqdadi
 
ACE-FUELS- 801- PROJECT MGT for real estate
ACE-FUELS- 801- PROJECT MGT for real estateACE-FUELS- 801- PROJECT MGT for real estate
ACE-FUELS- 801- PROJECT MGT for real estatehando2845
 
Project management for technologies MGT410
Project management for technologies   MGT410Project management for technologies   MGT410
Project management for technologies MGT410Saqib Imran
 
Project M&E (unit 1-4)
Project M&E (unit 1-4)Project M&E (unit 1-4)
Project M&E (unit 1-4)Regmi Milan
 
Project Management and Control Techniques
Project Management and Control TechniquesProject Management and Control Techniques
Project Management and Control Techniquesssuser8e973a
 

Similar to Day 1 Framework R03.pdf (20)

Pmi dec 13
Pmi dec 13Pmi dec 13
Pmi dec 13
 
ChapterPM_1.pptx for the course project management
ChapterPM_1.pptx for the course project managementChapterPM_1.pptx for the course project management
ChapterPM_1.pptx for the course project management
 
01 02&03 introduction to pmp-mao
01 02&03 introduction to pmp-mao01 02&03 introduction to pmp-mao
01 02&03 introduction to pmp-mao
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
Lecture 1 23-01-2020 - Compatibility Mode.pdf
Lecture 1 23-01-2020  -  Compatibility Mode.pdfLecture 1 23-01-2020  -  Compatibility Mode.pdf
Lecture 1 23-01-2020 - Compatibility Mode.pdf
 
PRINCE2 Basic Concepts
PRINCE2 Basic ConceptsPRINCE2 Basic Concepts
PRINCE2 Basic Concepts
 
Day 1 framework
Day 1 frameworkDay 1 framework
Day 1 framework
 
Chapter 1 An Overview Of Project Management
Chapter 1  An Overview Of Project ManagementChapter 1  An Overview Of Project Management
Chapter 1 An Overview Of Project Management
 
0. project management framework (fundamentals)
0. project management framework (fundamentals)0. project management framework (fundamentals)
0. project management framework (fundamentals)
 
Getting Really Good at Projects with Salesforce!.pptx
Getting Really Good at Projects with Salesforce!.pptxGetting Really Good at Projects with Salesforce!.pptx
Getting Really Good at Projects with Salesforce!.pptx
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
Project management
Project managementProject management
Project management
 
Project Management- introduction
Project Management- introductionProject Management- introduction
Project Management- introduction
 
Undestand PMBok 5th, Section 1&2
Undestand PMBok 5th, Section 1&2Undestand PMBok 5th, Section 1&2
Undestand PMBok 5th, Section 1&2
 
Project Management V1
Project Management V1Project Management V1
Project Management V1
 
UNIT-1.pptx
UNIT-1.pptxUNIT-1.pptx
UNIT-1.pptx
 
ACE-FUELS- 801- PROJECT MGT for real estate
ACE-FUELS- 801- PROJECT MGT for real estateACE-FUELS- 801- PROJECT MGT for real estate
ACE-FUELS- 801- PROJECT MGT for real estate
 
Project management for technologies MGT410
Project management for technologies   MGT410Project management for technologies   MGT410
Project management for technologies MGT410
 
Project M&E (unit 1-4)
Project M&E (unit 1-4)Project M&E (unit 1-4)
Project M&E (unit 1-4)
 
Project Management and Control Techniques
Project Management and Control TechniquesProject Management and Control Techniques
Project Management and Control Techniques
 

More from Dr Mohamed Elfarran

Project Management Day 5 Risk R02.pdf
Project Management Day 5 Risk  R02.pdfProject Management Day 5 Risk  R02.pdf
Project Management Day 5 Risk R02.pdfDr Mohamed Elfarran
 
Project Management Day 4 Cost ٌ R02.pdf
Project Management Day 4 Cost ٌ R02.pdfProject Management Day 4 Cost ٌ R02.pdf
Project Management Day 4 Cost ٌ R02.pdfDr Mohamed Elfarran
 
Industry 4.0 and Cyber physical systems Intro
Industry 4.0 and Cyber physical systems IntroIndustry 4.0 and Cyber physical systems Intro
Industry 4.0 and Cyber physical systems IntroDr Mohamed Elfarran
 
Ace 402 lec 12 fueslage shear flow
Ace 402 lec 12 fueslage shear flowAce 402 lec 12 fueslage shear flow
Ace 402 lec 12 fueslage shear flowDr Mohamed Elfarran
 
Ace 402 lec 12 fueslage shear flow2
Ace 402 lec 12 fueslage shear flow2Ace 402 lec 12 fueslage shear flow2
Ace 402 lec 12 fueslage shear flow2Dr Mohamed Elfarran
 
Ace 402 lec 13 max stress unsymetric
Ace 402 lec 13 max stress unsymetricAce 402 lec 13 max stress unsymetric
Ace 402 lec 13 max stress unsymetricDr Mohamed Elfarran
 
Mpe 209 lec 9 Pressized Vessels
Mpe 209 lec 9 Pressized Vessels Mpe 209 lec 9 Pressized Vessels
Mpe 209 lec 9 Pressized Vessels Dr Mohamed Elfarran
 

More from Dr Mohamed Elfarran (20)

SCRUM Day 1 Rev03.pdf
SCRUM Day 1 Rev03.pdfSCRUM Day 1 Rev03.pdf
SCRUM Day 1 Rev03.pdf
 
Project Management Day 5 Risk R02.pdf
Project Management Day 5 Risk  R02.pdfProject Management Day 5 Risk  R02.pdf
Project Management Day 5 Risk R02.pdf
 
Project Management Day 4 Cost ٌ R02.pdf
Project Management Day 4 Cost ٌ R02.pdfProject Management Day 4 Cost ٌ R02.pdf
Project Management Day 4 Cost ٌ R02.pdf
 
Day 3 Schedule R02.pdf
Day 3 Schedule R02.pdfDay 3 Schedule R02.pdf
Day 3 Schedule R02.pdf
 
how to write a business plan
how to write a business planhow to write a business plan
how to write a business plan
 
Industry 4.0 and Cyber physical systems Intro
Industry 4.0 and Cyber physical systems IntroIndustry 4.0 and Cyber physical systems Intro
Industry 4.0 and Cyber physical systems Intro
 
Ace 402 lec 12 fueslage shear flow
Ace 402 lec 12 fueslage shear flowAce 402 lec 12 fueslage shear flow
Ace 402 lec 12 fueslage shear flow
 
Ace 402 lec 7 unsymmetrical
Ace 402 lec 7 unsymmetrical Ace 402 lec 7 unsymmetrical
Ace 402 lec 7 unsymmetrical
 
Ace 402 lec 8 max stress
Ace 402 lec 8 max stressAce 402 lec 8 max stress
Ace 402 lec 8 max stress
 
Ace 402 lec 12 fueslage shear flow2
Ace 402 lec 12 fueslage shear flow2Ace 402 lec 12 fueslage shear flow2
Ace 402 lec 12 fueslage shear flow2
 
Ace 402 lec 13 max stress unsymetric
Ace 402 lec 13 max stress unsymetricAce 402 lec 13 max stress unsymetric
Ace 402 lec 13 max stress unsymetric
 
Ace 402 lec 3 bending
Ace 402 lec 3  bendingAce 402 lec 3  bending
Ace 402 lec 3 bending
 
Ace 402 lec 1&2
Ace 402 lec 1&2Ace 402 lec 1&2
Ace 402 lec 1&2
 
Ace 402 lec 5 effective
Ace 402 lec 5 effectiveAce 402 lec 5 effective
Ace 402 lec 5 effective
 
Ace 402 lec 6 ultimate bending
Ace 402 lec 6 ultimate bending Ace 402 lec 6 ultimate bending
Ace 402 lec 6 ultimate bending
 
Ace 402 lec 4 buckling
Ace 402 lec 4 buckling Ace 402 lec 4 buckling
Ace 402 lec 4 buckling
 
Mpe 209 lec 9 Pressized Vessels
Mpe 209 lec 9 Pressized Vessels Mpe 209 lec 9 Pressized Vessels
Mpe 209 lec 9 Pressized Vessels
 
Mpe 209 lec gear Design
Mpe 209 lec gear DesignMpe 209 lec gear Design
Mpe 209 lec gear Design
 
Mpe 209 lec 11 springs
Mpe 209 lec 11 springs Mpe 209 lec 11 springs
Mpe 209 lec 11 springs
 
Mpe 209 lec 10 screw fastners
Mpe 209 lec 10 screw fastnersMpe 209 lec 10 screw fastners
Mpe 209 lec 10 screw fastners
 

Recently uploaded

Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxNANDHAKUMARA10
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...vershagrag
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementDr. Deepak Mudgal
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptxrouholahahmadi9876
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesRashidFaridChishti
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptAfnanAhmad53
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...ronahami
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxpritamlangde
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 

Recently uploaded (20)

Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptx
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .ppt
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 

Day 1 Framework R03.pdf

  • 1. 1 Project Management Day (1) 1 Dr Mohamed Elfarran Nov-2022
  • 2. Course Outline Day 1: Introduction + Project Integration Management. Day 2: Project Scope Management. Day 3: Project Schedule Management. Day 4: Project Cost Management. Day 5: Project Risk Management. Day 6: Scrum. Day 7: Final Presentation Day! Dr Mohamed Elfarran 2
  • 3. Principles of Project Management Dr Mohamed Elfarran 3 Nov-2022
  • 4. 4 What is the Project management ?!!! 4 It’s a Life Dr Mohamed Elfarran
  • 5. 5 What is the Project management ?!!! 5 1- Setting a Targets 2- Draw the Pathway 3- Achieve your Goals Dr Mohamed Elfarran
  • 6. What is a Project ? 6 ● A project is a temporary endeavor undertaken to create a unique product , service, or result (This definition is taken from the Glossary of the Project Management Institute, A Guide to the Project Management Body of Knowledge, (PMBOK® Guide) – Sixth Edition, Project Management Institute, Inc., 2017) ○ Projects are undertaken to fulfill objectives by producing deliverables. Dr Mohamed Elfarran SEC 1 Nov-2022
  • 7. Projects properties !!!! 7 ● Unique Different design, circumstances, contractors, material ○ A purpose to be achieved ○ A result to be obtained ○ A product to be produced ○ A service to be performed ● Temporary ○ Definite beginning and end, not a continuous and repetitive process. ○ Does not necessary mean short in duration. Dr Mohamed Elfarran SEC 1 Nov-2022
  • 8. Start Point: Business Need 8 ● Project are Typically initiated as a result of: ○ Market demand ○ Strategic opportunity/business need ○ Social need ○ Environmental consideration ○ Customer request ○ Technological advancement ○ Legal or regulatory requirement ○ Existing or forecast problem Dr Mohamed Elfarran SEC 1 Nov-2022
  • 9. End Point: When to end a Project? 9 ● Objectives achieved. ● Objectives can’t be achieved. ● No more fund. ● No longer need the project. ● No Human Resource. ● Legal concerns. Dr Mohamed Elfarran SEC 1 Nov-2022
  • 10. 10 What is the Project Management? Project Management is the application of Knowledge, skills, tools and techniques to project activities to meet the project requirements. 10 (This definition is taken from the Glossary of the Project Management Institute, A Guide to the Project Management Body of Knowledge, (PMBOK® Guide) – Sixth Edition, Project Management Institute, Inc., 2017) SEC 1 Dr Mohamed Elfarran
  • 11. Project Management 11 ● Effective Project Management Helps To: • Meet business objectives; • Satisfy stakeholder expectations; • Be more predictable; • Increase chance to success; • Deliver the right products at the right time; • Resolve problems; • Respond to risk in a timely manner; etc., Dr Mohamed Elfarran SEC 1 Nov-2022
  • 12. Project Management 12 ● The Absence Of Project Management May Result In: • Missed deadlines • Cost overruns • Poor quality • Rework; etc. Dr Mohamed Elfarran SEC 1 Nov-2022
  • 13. Project Management 13  Effective And Efficient Project Management Enable Organizations To:  Tie project result to business goals,  Compete more effectively in their markets,  Sustain the organization,  Respond to the impact of business environment changes on project. Dr Mohamed Elfarran SEC 1 Nov-2022
  • 14. Project, Program, Portfolio & Operations 14 ● Operation Management Operation management is concerned with the ongoing production of goods and /or services. ● Operation And Project Management Ongoing operations are outside of the scope of the project; however, there are an intersecting points where the two areas cross. Dr Mohamed Elfarran SEC 1 Nov-2022
  • 15. Project Management Key Questions ?!!! Understanding The Fundamentals of Project Management PM is designed to answer: 1) What business case is being addressed by this project? 2) What will you do? 3) How will you do it? 4) When you will Finish ? 5) How WELL did you do? Dr Mohamed Elfarran 15 SEC 1 Nov-2022
  • 16. Project Management Overview 1) What business case is being addressed by this project? The project business case is a documented economic feasibility study. ❑ Business needs ❑ Analysis of situation ❑ Recommendations ❑ evaluation Dr Mohamed Elfarran 16 SEC 1 Nov-2022
  • 17. Project Management Overview 2) What will you do? ✓ The answer to this question will be framed in your project goal and objective statements. ✓ In any case, your goal and objective statements given as part of a Project Management Plan will clearly state your intentions. Dr Mohamed Elfarran 17 SEC 1 Nov-2022
  • 18. Project Management Overview 3) How will you do it? ✓ This answer will document your approach to the project in your Project Management Plan for meeting the goal and objective of the project. Dr Mohamed Elfarran 18 SEC 1 Nov-2022
  • 19. Project Management Overview 4) How will you know you did it? That success criterion may be expressed in the form of Provide management with information about how effectively achieving the objectives.  Status report – where the project stand  Progress report – what has accomplished  Trend report – examine project results overtime to see performance is improving or deterioration  Variance report – Comparing actual result to planned  Earned value – PV, EV, AC Dr Mohamed Elfarran 19 SEC 1 Nov-2022
  • 20. Project Management Overview 5) How well did you do? ✓ Determined by answering the following questions: 1. How well did your deliverables meet the stated success criteria? 2. How well did the project team perform? 3. How well did the project management approach work for this project? 4. What lessons learned that can be applied to future projects? Dr Mohamed Elfarran 20 SEC 1 Nov-2022
  • 21. 21 The Project Constraints “Managing a project typically includes, but is not limited to: ❑ Identifying requirements. ❑ Addressing the various needs, concerns & expectations of the stakeholders in planning and executing the project. ❑ Setting up, maintaining and carrying out communications among stakeholders that are active, effective, and collaborative in nature. ❑ Managing stakeholders towards meeting project requirements and creating project deliverables. ❑ Balancing the competing project constrains which include, but not limited to:” 21 Scope Budget Quality Resources Schedule Risk SEC 1 Dr Mohamed Elfarran
  • 22. Project Management :Triple Constraints “Scope, Time & Cost, All within Quality” Dr Mohamed Elfarran 22 SEC 1 Nov-2022
  • 23. Key Component 23 ● Project and development life cycle A project life cycle is the series of phases that a project passes through from its start to its completion. ● Project phase A project phase is a collection of logically related activities that culminates in the completion of one or more deliverables. ● Phase gate (review) A project gate is held at the end of a phase Dr Mohamed Elfarran Nov-2022
  • 24. Key Component 26 ● Project Stakeholders A Stakeholder is an individual, group, or organization that may affect, be affected by, or perceive itself to be affected by a decision, activity, or outcome of the project. ○ Internal Stakeholders: Sponsor, Resource manager, (PMO), Portfolio steering committee, etc., ○ External Stakeholder: Customer, End user, suppliers, Shareholders, etc., Dr Mohamed Elfarran Nov-2022
  • 27. PM Areas & Process Interactions Dr Mohamed Elfarran 29 Nov-2022
  • 29. Project Management Process Group Dr Mohamed Elfarran 31 Nov-2022
  • 30. Key Component 32 ● Project management process The project life cycle is managed by executing a series of project management activities known as project management processes. (Coffee) ● Project Management Process Group ○ Initiating Process Group ○ Planning Process Group ○ Executing Process Group ○ Monitoring And Controlling Process Group ○ Closing Process Group Dr Mohamed Elfarran Nov-2022
  • 31. 33 Project Management Process Group Initiating Processes Initiating Processes Planning Processes Planning Processes Controlling Processes Controlling Processes Closing Processes Closing Processes Executing Processes Executing Processes
  • 32. Project Management Process Group 1. Initiating Process Group Those processes performed to defines a new project or a new phase of an existing project by obtaining authorization to start the project or a phase. Dr Mohamed Elfarran 34 Nov-2022
  • 33. Project Charter The process of developing a document that formally authorizes the existence of a project, and provide the project manager with the authority to apply organizational resources to the project activities. The key benefit of this process is that it provides a direct link between the project and the strategic objectives of the organization, creates a formal record of the project. 1. Initiating Process Group Dr Mohamed Elfarran 35 Nov-2022
  • 34. Project Charter Is the document issued by the project initiator or sponsor that formally authorizes the existence of the project ○ Project purpose ○ Measurable project objectives and related success criteria ○ High level requirements ○ Over all project risk ○ Summary milestone schedule ○ Preapproved financial resources 1. Initiating Process Group Dr Mohamed Elfarran 36 Nov-2022
  • 35. Project Charter ○ Key stakeholders list ○ Project approval requirements (i.e., what constitutes project success, who decides the project is successful, and who sign off on the project) ○ Project exit criteria (i.e., what are the conditions to be met in order to close or to cancel the project or phase) ○ Assigned project manager, responsibility, and authority level. ○ Name and authority of the sponsor or other person(s)authorizing the project charter. 1. Initiating Process Group Dr Mohamed Elfarran 37 Nov-2022
  • 36. Project Charter 1. Initiating Process Group Dr Mohamed Elfarran 38 Nov-2022
  • 37. Project Management Process Group 2. Planning Process Group Those processes required to establish the scope of the project, refine the objectives, and define the course of action required to attain the objectives that the project was undertaken to achieve. Dr Mohamed Elfarran 39 Nov-2022
  • 38. Principles of Project Management 40 Planning Process 2. Planning Process Group Dr Mohamed Elfarran
  • 39. Project Management Process Group 3. Executing Process Group Those processes performed to complete the work defined in the project management plan to satisfy the project requirements. Dr Mohamed Elfarran 41 Nov-2022
  • 40. Project Management Process Group 4. Monitoring and Controlling Process Group Those processes required to track, review, and regulate the progress and performance of the project, identify any areas in which changes to the plan are required, and initiate the corresponding changes. Dr Mohamed Elfarran 42 Nov-2022
  • 41. Project Management Process Group ● Closing Process Group Those processes performed to formally complete or close the project, phase, or contract. Dr Mohamed Elfarran 43 Nov-2022
  • 42. Project Management Process Group 44 Dr Mohamed Elfarran Nov-2022
  • 45. Project Management Knowledge Areas Dr Mohamed Elfarran 48 Nov-2022
  • 47. PM Areas & Process Interactions Dr Mohamed Elfarran 50 Nov-2022
  • 48. Integration Management Integration Project Integration Management includes the processes and activities to identify, define, combine, unify, and coordinate the various processes and project management activities within the Project Management Process Groups. In the project management context, integration includes characteristics of unification, consolidation, communication, and interrelationship. Dr Mohamed Elfarran 52 Nov-2022
  • 49. Scope Management Scope Project scope Management Includes the processes required to ensure that the project includes all the work required, and only the work required, to complete the project successfully. Managing the project scope is primarily concerned with defining and controlling what is and is not included in the project. Dr Mohamed Elfarran 53 Nov-2022
  • 50. Schedule Management Schedule Project Schedule Management includes the processes required to manage the timely completion of the project. Dr Mohamed Elfarran 54 Nov-2022
  • 51. Cost Management Cost Project Cost Management includes the processes involved in planning, estimating, budgeting, financing, funding, managing, and controlling costs so that the project can be completed within the approved budget. Dr Mohamed Elfarran 55 Nov-2022
  • 52. Quality Management Quality Project Quality Management includes the processes for incorporating the organization’s quality policy regarding planning, managing, and controlling project and product quality requirements in order to meet stakeholder’s objectives. Also supports continuous process improvement activities as undertaken on behalf of the performing organization. Dr Mohamed Elfarran 56 Nov-2022
  • 53. Resources Management Resources Project Resource Management includes the processes to identify, acquire, and manage the resources needed for the successful completion of the project. These processes help ensure that the right resources will be available to the project manager and project team at the right time and place. Dr Mohamed Elfarran 57 Nov-2022
  • 54. Communication Management Communication Project Communication Management includes the processes necessary to ensure that the information needs of the project and its stakeholders are met through development of artifacts and implementation of activities designed to achieve effective information exchange. Dr Mohamed Elfarran 58 Nov-2022
  • 55. Risk Management Risk Project Risk Management includes the process of conducting risk management plan, identification, analysis, response planning, response implementation, and monitoring risk on the project. Dr Mohamed Elfarran 59 Nov-2022
  • 56. Procurement Management Procurement Project Procurement Management include the processes necessary to purchase or acquire products, services, or results needed from outside the project team. Project Procurement Management includes the management and control processes required to develop and administer . Dr Mohamed Elfarran 60 Nov-2022
  • 57. Stakeholders Management Stakeholder Processes required to identify the people, group, or organizations that could impact or be impacted by the project, to analyze stakeholders expectation and their impact on the project, and to develop appropriate management strategies for effectively engaging stakeholders in project decisions and execution. Dr Mohamed Elfarran 61 Nov-2022
  • 58. Dr Mohamed Elfarran 62 Nov-2022
  • 59. How to be a Good Project Manager (members) !! Dr Mohamed Elfarran 64 Nov-2022
  • 60. The Role of Project Manager ● Understanding Project Environment The project team should consider the project in its cultural, social, international, political, and physical environmental context. ○ Cultural and social environment Economic, Demographic, Educational, Ethical, Ethnic, Religious. ○ Physical environment Knowledge about the local ecology and physical geography. Dr Mohamed Elfarran 65 Nov-2022
  • 61. The Role of Project Manager ● International and political environment ○ International, National, regional, and local laws and customs ○ Political climate ○ Time zone difference ○ National and regional holidays ○ Travel requirements for face to face meeting ○ The logistics of teleconferencing Dr Mohamed Elfarran 66 Nov-2022
  • 62. The Role of Project Manager ● General Management knowledge and skills ○ Financial management and accounting ○ Purchasing and procurement ○ Sales and marketing ○ Contracts and commercial laws ○ Manufacturing and distribution ○ Logistics and supply Chain ○ Health and safety practices ○ Information technology Dr Mohamed Elfarran 67 Nov-2022
  • 63. The Role of Project Manager ● Interpersonal Skills ○ Effective Communicating: The exchange of information between the sender and the receiver. ○ Influencing the Organization: The “ability to get things done”. ○ Leadership: Developing a vision and strategy, and motivating people to achieve that vision and strategy. Dr Mohamed Elfarran 68 Nov-2022
  • 64. The Role of Project Manager ○ Motivation: Energizing people to achieve high levels of performance and to overcome barriers to change. ○ Negotiation and conflict management: Conferring with others to come to terms with them or to reach an agreement. ○ Problem solving: The combination of problem definition, alternatives identification and analysis, and decision-making. Dr Mohamed Elfarran 69 Nov-2022