SlideShare a Scribd company logo
1 of 8
Download to read offline
IJRET: International Journal of Research in Engineering and Technology ISSN: 2319-1163
__________________________________________________________________________________________
Volume: 01 Issue: 03 | Nov-2012, Available @ http://www.ijret.org 389
FPGA IMPLEMENTATION OF RACE CONTROL ALGORITHM FOR
FULL BRIDGE PRCP CONVERTER
S.Kavitha1
, S.Joshibha Ponmalar2
, B.Chinthamani3
1, 2
Assistant Professor (SG)/Saveetha Engineering College
3
Assistant Professor (SG)/ SRM Eswari Engineering College
Abstract
In this paper, the unedited race-control algorithm (RCA) for the full-bridge passive resonant commutated poles (FB-PRCP) converter
is presented and implemented in cost effective field programmable gate-array. It compensates the drawbacks of that topology that are
related to the slow dynamics of the auxiliary poles which are necessary to obtain zero-voltage transitions both at turn-on and turn-off
conditions and makes possible its use in more general welding applications, such as manual metal arc welding, in which very fast
responses are required. The proposed RCA is a simple variation of the traditional phase-shift technique, which leads to significant
efficiency improvements. The guiding idea is to apply the phase-shift technique to both legs of the converter, contrarily to what has
been done to date. The limitation in dynamics of the converter is completely eliminated and it gains much more readiness. The
effectiveness of the RCA has been verified in simulation and it can be experimentally tested on a true converter..
----------------------------------------------------------------------***------------------------------------------------------------------------
1. INTRODUCTION:
Most resonant switching topologies are not optimal for welding
power supplies (WPS) due to the very wide variation of load
currents (typically 3 % to 100 %). A possible remade is to
employ additional resonant poles as done in Pseudo resonant
full bridge converter (PRFB), the passive resonant commutated
pole converter (PRCP) and the auxiliary resonant commutated
pole converter. The typical welding power supply is given in
Fig. 1.
Figure – 1: Typical Welding Power Supply
In the general scenario of the switching converters for welding
applications, many efforts have been done so far to convert
significant power while minimizing costs and overall
dimensions, hence, power dissipation. The degrees of freedom
to achieve these goals are the switches’ performance and the
converter topology. In fact, while the semiconductor technology
goes on in lowering the ON-state losses and the commutation
losses of the switches, the power-electronics technology
proposes newer and newer and more efficient topologies,
including refined-control strategies, aimed to achieve soft
switching for the devices of the circuit at input and load ranges
as wide as possible.
On the side of the power switch’s development, a state of-the-art
survey on the performances of the classical soft switching
phase-shift bridge topology has been presented in [1], where the
authors demonstrated that, depending on the switches used in
the circuit, some load conditions are more critical in terms of the
device’s reliability than other ones.
On the other side, in the field of research of new topologies for
welding converters, many circuits have been proposed in the
past based on hard-switching techniques [2]–[4] that allow a
simplified control strategy due to the intrinsic absence of
resonance transients, whose duration is affected by the load
conditions. The unavoidable drawback of these topologies is the
switching losses, which severely limit the frequency, hence, the
physical dimensions. Many innovative topologies belonging to
the soft-switching category have been developed. Series-
resonant topologies [5], [6] have been proposed and tested for
welding applications, in which one- or three-phase mains supply
a classical H-bridge isolated converter. Soft-switching
conditions are achieved owing to a resonance that involves a
series capacitor. These kinds of topologies, though, offer an
IJRET: International Journal of Research in Engineering and Technology ISSN: 2319-1163
__________________________________________________________________________________________
Volume: 01 Issue: 03 | Nov-2012, Available @ http://www.ijret.org 390
additional voltage drop across that capacitor that forces the
designer to reduce the transformer’s ratio and, in turn, to adopt
over dimensioned secondary rectifiers in terms of blocking
voltage. Another kind of soft-switching topology, presented in
2001, contemplates the presence of an auxiliary transformer
whose rule is to obtain zero-current-switching conditions for the
main leg of the inverter in a wide range of load conditions [7].
That auxiliary transformer, indeed, requires a powerful
controller to evaluate the optimal dead-times required to obtain
soft-switching conditions. A simpler topology has been
presented in 2006 that provides zero-voltage-switching (ZVS)
conditions for each switch of the circuit [8]. Its main drawback
is that a half-rail dc voltage is required, which is often very
difficult to obtain. Similarly, in the same year, a very efficient
topology has been developed and presented [9], whose primary
drawback is the half-bridge configuration, which provokes high
current stresses to the main capacitors causing reliability
problems.
A soft-switched topology, called pseudo resonant full-bridge
dc/dc converter, has been introduced in [10]. The basic principle
of that solution is to use a reactive circuit to obtain ZVS at each
load condition. The same principle was enhanced and adopted in
1997, when Frohleke et al. [11] presented an implementation of
a circuit called full-bridge passive resonant commutated poles
(FB-PRCP), which is fully zero-voltage transition (ZVT), and
demonstrated its application to a power converter rated at
12 kW, 350 A. An analogous topology was presented in 1999 by
the same authors [12]. The scheme of the converter presented in
[11] is shown in Fig. 2. The operation principle is as follows:
the two legs A and B are commutated with a classical phase-
shift technique, i.e., each of them has a duty cycle of 50%, and
the primary winding of the transformer receives increasing
power at increasing delays (―phase shifts‖) of leg B with respect
to leg A. The maximum power transfer is reached when leg B is
180◦ delayed from leg A, and a null transfer is obtained when
leg B is in phase with leg A.
The soft-switching operation is intrinsic at the turn-on for each
phase-shift topology, being the switches turned on when the
reverse diodes are conducting. Soft turn-offs are obtained in this
topology in a classical way: Four snubber capacitors are put in
parallel to the four switches, namely, CAp, CAn, CBp, and
CBn. As it is known from the literature [13], this solution is
generally good for heavy and medium loads, where the stray
inductance of the transformer’s primary winding is energized
enough to completely charge and discharge those snubber
capacitors, but it is dramatic at light loads, where the
magnetization is not sufficient to perform the whole leg
commutation, and the switches are fired on a still-charged
capacitor, in a manner very similar to a short-circuit turn-on.
Figure – 2: FB-PRCP converter
To solve this problem, many authors have recently adopted
several solutions [14]–[16]. The authors of [11] proposed an
interesting and cheap solution to ensure a minimum of the
switches’ current values, which includes an auxiliary reactive
network made up of the inductance LA(LB) and the capacitors
C1 and C2 (C3 and C4) for leg A (leg B). Referring to Fig. 2,
the principle of operation is as follows: due to the fixed duty
cycle of legs A and B to 50%, each inductance LA and LB is
subject to a square-wave voltage drop, whose amplitude and
frequency are constant. At steady state, the average currents into
LA and LB are zero, and the currents’ peak are symmetric with
respect to zero and correspond to the leg commutation.
For this reason, the current flowing into the switches at the
commutation instant has a minimum value, which ensures the
completion of the commutation from one rail to another and,
hence, ensuring a reasonable upper limitation to dead-times.
This profitable behavior allows one to use fixed-dead-times
generators, thus largely simplifying the design of the modulator.
Fig. 3 shows the typical waveforms of an FB-PRCP converter.
Switches belonging to the same leg are driven by opposite
signals, except for the dead-times, which are necessary to avoid
a leg short-circuit. The primary winding of the transformer is
subject to an effective voltage V (A)−V (B), which depends on
the phase shift, i.e., the delay of leg B from leg A. By varying
this quantity, it is possible to regulate the power transfer to the
secondary winding and, eventually, to the load. Fig. 3 also
shows the triangle-shaped current waveforms into the auxiliary
inductances.
Even if Frohleke et al. [11] demonstrated that it is possible to
design the auxiliary poles in such a way to obtain ZVT at each
load conditions at steady state, some malfunctions happen when
the phase shift is considerably varied. Such a condition is very
typical for manual metal arc-welding (MMA) applications,
where very frequently, a fusion droplet causes the collapse of
the load impedance and a drastic power-transfer reduction is
required in few switching periods.
IJRET: International Journal of Research in Engineering and Technology ISSN: 2319-1163
__________________________________________________________________________________________
Volume: 01 Issue: 03 | Nov-2012, Available @ http://www.ijret.org 391
Figure- 3: Typical waveforms of the FP-PRCP converter.
(Shadowed Dead-times)
To fix the ideas, Fig. 4 shows the scenario in which the phase
shift is reduced from 90% (about 160◦ delay) to 25% (45◦
delay). In that figure, the leg voltages, V (A) and V (B), and the
currents of the auxiliary inductances, I(LA) and I(LB), have
been reported. In this case, the commutation of leg B is
anticipated when the current into the inductor LB is still positive
(arrow in Fig. 4), thus not allowing the normal ZVT of the leg
voltage and, eventually, provoking a disastrous turn-on over a
capacitance, which is very similar to short-circuit conditions.
Figure – 4: Critical leg switch due to a phase-shift reduction
(90%–25%). The arrow shows the abnormal condition.
For these reasons, until now, the FB-PRCP topology has been
concretely employable only in welding applications with slowly
variable output currents, such as gas metal arc welding and
MIG/MAG processes, and, in any case, it adopts a large and
expensive output inductor that slows down the fast impedance
transients of the load, thus also limiting the system readiness.
Owing to the introduction of field-programmable gate arrays
(FPGAs) and, in particular, to the recent advances in FPGA
applications for power conversion [17], it is possible to
implement complicated control algorithms at affordable—if not
negligible—cost/performance ratios.
In this paper, an FPGA-based modified control algorithm called
race-control algorithm (RCA) is presented, that completely
eliminates the limitation in phase-shift transients, like the ones
shown in Fig. 4, and significantly improves the bandwidth of the
FB-PRCP topology. Some noticeable advantages are that the
converter is much more ready and becomes good also for MMA
welding, and the needed output inductance could be
significantly smaller, hence, cheaper.
Moreover, in perspective, owing to the more and more FPGA
cost reduction, the possibility of implementation of the whole
converter’s control algorithm in a single FPGA chip could be
considered.
2. PRINCIPLE OF OPERATION OF THE RCA
The RCA principle descends from the following observation: In
the classical approach, leg A is a fixed frequency and phase,
whereas leg B is shifted ahead and backward. In this way,
phase-shift reductions are achieved by anticipating that leg,
which might cause dramatic commutations, whereas phase shift
increases, achieved as a delaying of the same leg, result as
always safe. This observation suggests a modification of the
control algorithm as follows: Leg B is delayed when an increase
in phase shift is needed, whereas leg A is delayed when a
reduction is needed instead. In this way, each leg is never
anticipated, and the scenario of Fig. 4 is completely avoided.
To show the effectiveness of the principle stated earlier, the
worst case is shown in Fig. 5, where a sequence of three
switching periods at extreme phase-shift variations (0% →
100%(180◦) → 0%) has been depicted. In that figure, the same
signals of Fig. 4 have been reported, together with the primary
voltage of the transformer V (A)−V (B) and the magnetization
component of the primary current of the transformer. This latter
quantity is primary to study the transformer’s saturation.
From the point of view of the safeness of the commutations, the
problem shown in Fig. 4 is completely solved. Each
commutation happens at a safe status, in which the auxiliary
inductances are magnetized at a proper current.
Fig. 5 also shows that the RCA approach exhibits a drawback.
The current peak of the inductor belonging to the delayed leg is
increased. Its value can be evaluated as follows:
     2 %i A i A i APeak Peak Peak
T
L L PS L
T

     
-- (1)
IJRET: International Journal of Research in Engineering and Technology ISSN: 2319-1163
__________________________________________________________________________________________
Volume: 01 Issue: 03 | Nov-2012, Available @ http://www.ijret.org 392
where Δi(LA)peak is the inductance peak-current increase, T is
the switching period, ΔT is the period variation, and ΔPS% is
the phase-shift variation. In the extreme scenario of Fig. 5,
Δi(LA)peak reaches 2· i(LA)peak (100% increase).
Figure – 5: Safe leg commutations in correspondence of an
extreme phase-shift transition (0% → 100% → 0%)
However, this peak increase is not critical from the switch
losses’ point of view nor from the transformer’s saturation one.
In fact, according to the design consideration illustrated in [10],
the resonant commutating-pole currents i(LA) and i(LB) are
much lesser (few percents) than the primary currents at heavy
loads so that the switches can also easily tolerate a doubling in
those currents. In addition, it is reasonable to assume that the
events of heavy variations of phase shifts (0% → 100%
variations) are relatively rare in the switching-frequency time
scale. Finally, ZVTs are always performed in this topology, thus
hugely compensating those over currents from the point of view
of the switches’ stresses.
For what concerns the effects on the transformer’s saturation,
the lower trace of Fig. 5 has been obtained by time-integrating
the voltage across the primary winding V (A) − V (B). Its shape
easily demonstrates that the maximum of the magnetization
current, corresponding to the maximum magnetic flux of the
transformer, is not affected by the RCA technique at all.
The core of the RCA is a choice: it is delayed leg A or leg B
depending on the sign of the phase-shift variation. The chosen
leg is delayed by a factor equal to one half of the phase shift
variation. For example, a phase shift increase of 100%
corresponds to a delay of leg B equal to 50% of the period
(180◦). The flow chart of Fig. 6 describes this modus operandi.
It is worthwhile to note that, due to the algorithm structure,
simultaneous leg delays are intrinsically impossible.
3. PROPOSED FPGA IMPLEMENTATION
Having the RCA based on a difference, to avoid possible
communication errors between the external controller and the
modulating logic, that could result in a catastrophic
misalignment of the desired and the real phase-shift values, it
must be implemented in FPGA logic in such a way that the
required operations of the algorithm are made inside a unique
chip.
Figure – 6: Flowchart of the RCA algorithm
IJRET: International Journal of Research in Engineering and Technology ISSN: 2319-1163
__________________________________________________________________________________________
Volume: 01 Issue: 03 | Nov-2012, Available @ http://www.ijret.org 393
The second stage evaluates the phase-shift variation and its
opposite in such a way as to always obtain a positive result. Two
8-b subtractors simultaneously perform the two possible
subtractions between the present and the past phase-shift data.
Their outputs are
for leg A, , 1A K k kS PS PS 
--(2)
and
for leg B, , 1B K k kS PS PS  
--(3)
where k is the present time instant and k − 1 is the past one.
The third stage implements the core of the algorithm: It
determines which one of the two legs must be delayed,
depending on the sign of the phase-shift variation. In more
detail, its outputs are
, ,
,
,
, ,
,
,
0
(4)
0, 0
0
(5)
0, 0
A K A K
A K
A K
B K B K
B K
B K
S if S
S
if S
S if S
S
if S

   


   

for legs A and B, respectively. In other words, the function max
(Sk, 0) is implemented for each leg. To achieve this result, for
leg A, the borrow signal of the subtractor is used by a two way
8-b multiplexer to choose between zero (00h in Fig. 7) and the
phase-shift increase SA,k. An identical circuit is adopted for leg
B. For example, if the phase shift increases, PSk is greater than
PSk−1, then SA,k will be negative (borrow = 0) and SB,k will
be positive (borrow = 1). This result will provoke the
multiplexer of leg A to choose 00h and the corresponding one of
leg B to choose SB,k. Eventually, leg B will be delayed, and leg
A will be kept at constant phase, as expected from the algorithm
discussed in the previous section.
The fourth stage has a trivial role. It operates the divisions by
two, which are necessary to scale the phase-shift quantities, in
the range 0d–100d to the delay quantities which are in the range
of 0%–50% (it could be useful to remember here that the
maximum phase shift is obtained at delays of 50% of the
switching period, which correspond to a phase delay of 180◦).
These divisions are simply obtained by right-shifting the result
of the previous stage by one. Of course, the precision is
worsened from 1% to 2%. In general, this value is still
acceptable for this kind of application. If not, it is very simple to
operate the phase-shift data in the range of 0d–200d instead of
0d–100d to obtain back the 1% precision.
Figure - 7: Top-level schematic of the FPGA implementation
The fifth stage composes the period time of the switching
waveform for each leg. At steady state, the period is equal to
100d. When one leg must be delayed, its period must be
increased of the previously calculated quantities. In
,
,
100 (6)
2
100 (7)
2
A K
A
B K
B
S
T d
S
T d

   

   
where TA and TB are the durations of the next periods of legs A
and B, respectively. An unsigned 8-b adder is used for each leg
at this stage. No overflow conditions are possible, being the
maximum output period given by (6)
,max
100
100 150
2
A
d
T d d  
--(8)
which is representable with 8 b. Please explicitly note that, at
each switching period, the leg which is not being delayed is
forced to T(fixed leg) = 100d.
The sixth stage is the modulator. The two square-wave
generators of Fig. 7 produce a square-wave period with duty
cycle D = 50%, whose period is variable, and the new period
value is sampled at the end of each cycle.
IJRET: International Journal of Research in Engineering and Technology ISSN: 2319-1163
__________________________________________________________________________________________
Volume: 01 Issue: 03 | Nov-2012, Available @ http://www.ijret.org 394
Figure – 8: Schematic of the variable-period square-wave
generator
Fig. 8 shows the block diagram of one generator. A simple
finite-state machine (FSM) controls a buffer (D-register), which
contains the present period value, a multiplexer, and a loadable
down-counter. A frequency divider provides the necessary
clock frequency division to obtain the desired switching
frequency. In the experiment section, a switching frequency of
fS = 15 kHz has been used, and being the half-period at steady
state equal to a count value of 100d, it is easy to calculate the
countdown frequency as
2 100 3COUNT Sf f d M Hz  
--(9)
The main clock of the FPGA oscillates at 48 MHz, so the
frequency divider’s ratio in Fig. 8 is 48 MHz/3 MHz = 16.
The FSM operates between two statuses, s0 and s1,
corresponding to the output statuses of 0 and 1, respectively,
whose mode of operation is described as follows. Please note
that the circuit operates at main clock frequency, including the
syncr_load signal of the counter. Due to the input count_enable,
the countdown, instead, takes place at reduced frequency [(9)].
To fix the ideas, suppose that the FSM was in the s1 status and
that the counter asserted the count_end signal in the last clock
period, thus making the FSM to switch to the status s0. In this
condition, the multiplexer is set to the input TA, and the FSM
asserts both the half-period and the full-period signals, thus
loading the counter with the new period value TA and latching it
also into the D register. The countdown starts. Having the FSM
in the status s0, the Out signal is kept to zero, and nothing
happens until the count_end signal is asserted. After TA counts,
corresponding to half-output period, the countdown ends, and
the signal count_end is asserted again. In this case, though, the
FSM asserts only the half-period signal, thus making the counter
to be reloaded at the same value TA, which is stored into the D
register. The full-period signal, instead, is not asserted in this
case; in such a way, the ―one‖ time is forced to be of the same
duration of the ―zero‖ time. The FSM switches to its s1 status,
and a new countdown starts. During the second countdown, the
signal Out is kept to one. At the period end, the full_period
signal is asserted, thus provoking the acquisition of the new
period data.
The behavior of the modulator circuit in Fig. 7 is as follows: At
a new period start (rising edge) of the signal OutA, the D
registers shift, and a new phase-shift PSk data is acquired. At
this point, two cases must be considered: PSk = PSk−1 and PSk
_= PSk−1. If PSk = PSk−1, then both the subtractors of stage
two produce zero, both the multiplexers of stage three produce
zero, and the same for the dividers of stage four, so that the
adders of stage five produce both TA = TB = 100d, which is
exactly the switching period, and the square-wave generators of
stage six go on to produce two square waves at locked phase.
If PSk _= PSk−1, the signal SA,k and SB,k are opposite in sign
[(2) and (3)]. To fix the ideas, suppose that PSk < PSk−1
(hence, SA,k > 0 and SB,k < 0). In this case, the upper
multiplexer at stage three sees a borrow signal equal to one and
outputs ΔSA,k = SA,k [(4)], whereas the lower one sees a
borrow equal to zero and zeroes its output ΔSB,k [(5)]. After the
division by two of stage four, the adders of stage five produce
TA = ΔSA,k/2 + 100d [(6)], y and TB = 100d [(7)]. In this way,
leg A is driven by a slower oscillation period and delays with
respect to leg B, according to the behavior described in Fig. 6.
Of course, if PSk > PSk−1, leg B is delayed instead. It is
worthwhile to explicitly note that, if the new phase shift value is
kept constant at the following period, everything behaves like
the earlier case PSk = PSk−1, and the oscillation period of leg A
intrinsically returns back to TA = TB = 100d, thus keeping leg
A indefinitely delayed until a new phase-shift variation occurs.
As a final consideration about the behavior of the proposed
circuit in Fig. 7, it can be useful to note that, due to the shift of
leg A, the sync signal which governs the phase-shift acquisition
is not strictly periodic. In fact, it is delayed each time a phase-
shift reduction occurs (in that leg A is delayed), up to a 50% of
the switching period. Even if this behavior could cause some
additional troubles in the design of the external controller,
particularly if this one implements a constant time step
algorithm, it is useful to consider that this delay is typically very
small, due to the slow phase-shift variations required in normal
operations, and, anyway, in the worst case, it is limited to a
maximum of half a period, thus keeping locked the external
controller frequency with the modulator’s one.
IJRET: International Journal of Research in Engineering and Technology ISSN: 2319-1163
__________________________________________________________________________________________
Volume: 01 Issue: 03 | Nov-2012, Available @ http://www.ijret.org 395
4. SIMULATION RESULTS:
The Quartus II developing environment by ALTERA
Corporation [18] has been adopted to simulate and to implement
the presented system, and the two devices used for the
experimental part have been summarized in Table I. There, the
total resource usage, in absolute and percent units, has been
reported together with the estimated commercial cost of each
device.
Figure – 9: Quartus II logic simulation of the RCA algorithm
Following the approach bottom-up, the single parts of the design
have been implemented into the Quartus II environment and
have been tested by means of the timing simulator.
The simulation of the overall system has been shown in Fig. 9,
in which the output signals are included together with the PS-
data and the intermediate signals ΔSA and ΔSB in Fig. 7. The
clock signal is too dense in this time scale to be displayed. At
the simulation start, a Reset signal of the duration of one to two
clock periods is given to the system and is not visible. Initially,
PS-data is kept to zero. At 200 μs, the PSdata is changed to 75d.
At the rising edge of OutA, the new data are sampled, and the
stages one to three in Fig. 7 correctly compute the values of the
signal ΔSA and ΔSB. In fact, in the transition 0d → 75d, being
the variation positive, leg B has to be delayed (ΔSB = 75d) and
leg A does not have to change (ΔSA = 0). These values are
immediately supplied to the square-wave generators that
adequate their periods. Specifically, the output OutB performs a
longer period at about 300 μs and, at steady state, it keeps its
delay until the new transition. It is worthwhile to explicitly note
that signals ΔSA and ΔSA differ from zero for one period only.
This is correct, because the data at the last time PSk−1 have
become equal to that at the present time PSk (see Fig. 7).
Nothing changes until the next transition at about 850 μs. In this
case, a phase-shift reduction is required, and ΔSA differs from
zero. The signal OutA is slightly delayed, and the phase shift
reduces to the appropriate quantity.
Further transitions are stimulated at 1500 and 2100 μs, and the
phase shift is finally returned back to zero. The system always
produces the correct response at each condition.
The RCA has been tested on true prototype inverter equipment,
of a scaled size in terms of voltage and currents, whose main
parameters are summarized in Table II. In addition, a large
simplification has been done by substituting the secondary stage
of Fig. 2 with a fixed-value resistor to better evaluate the
behavior of the primary stage independently of the second order
effects introduced by the secondary freewheeling currents and
diode reverse recovery.
CONCLUSIONS
Due to the rising demand for portable volume, weight and cost
reduced welding power supplies in the mid and high power
range the passive resonant commutated pole converter is
inspected for wide load range applications. The availability of
cost effective digital solutions such as FPGA and power supply
modules facilitates the application of Passive resonant
commutated pole converter to ever lower power levels.
An unedited control technique called RCA for FB-PRCP
converters has been implemented on an FPGA platform and
successfully experimented thro simulation.
The technique promises to strongly improve the dynamic
responses of high-power FB-PRCP converters used in welding
applications, thus allowing reduction of the heavy and expensive
output inductances and/or to perform an advanced control of the
welding current shape which is typical for MMA applications.
The adoption of the presented technique is of course strictly
related to the possibility of using digital control circuits, like
FPGAs, although whose supplementary cost is largely
compensated by the economies of passive components.
Verification of above proposed algorithms are given by
simulations and measurements are resenting a basis for further
development.
REFERENCES
[1] P. G. Cancelliere, V. Delli Colli, R. Di Stefano, and G.
Tomassi, ―A comparative analysis of 4 KW PSBs for welding
machine,‖ in Proc. 5th
Int. Conf. PEDS, Nov. 17–20, 2003, vol.
2, pp. 1471–1475.
[2] P. Verdelho, M. Pio Silva, E. Margato, and J. Esteves, ―An
electronic welder control circuit,‖ in Proc. 24th Annu. Conf.
IEEE IECON, Aug. 31–Sep. 4, 1998, vol. 2, pp. 612–617.
[3] H.-R. Choi, H.-S. Mok, G.-H. Choe, C. Y.Won, and K. S.
Kim, ―Enhanced characteristics of DCM boost converter for
inverter arc welding system,‖ in Proc. IEEE Int. Conf. PEDS,
1999, vol. 1, pp. 456–461.
[4] M. Salo, H. Tuusa, and J. Nyqvist, ―A high-performance
three-phase DCvoltage source—An application to a welding
machine,‖ in Proc. 16th
Annu. IEEE APEC, 2001, vol. 2, pp.
793–799.
[5] T.-F. Wu, H.-P. Yang, and C.-M. Pan, ―Analysis and design
of variable frequency and phase-shift controlled series resonant
converter applied for electric arc welding machines,‖ in Proc.
21st Int. Conf. IEEE IECON, Nov. 6–10, 1995, vol. 1, pp. 656–
661.
[6] N. Huang, D. Zhang, T. Song, M. Fan, Y. Liu, and Y. Zhao,
―A 10 kW single-stage converter for welding with inherent
IJRET: International Journal of Research in Engineering and Technology ISSN: 2319-1163
__________________________________________________________________________________________
Volume: 01 Issue: 03 | Nov-2012, Available @ http://www.ijret.org 396
power factor correction,‖ in Proc. 20th Annu. IEEE APEC, Mar.
6–10, 2005, vol. 1, pp. 254–259.
[7] S.-J. Jeon and G.-H. Cho, ―A zero-voltage and zero-current
switching full bridge DC–DC converter with transformer
isolation,‖ IEEE Trans. Power Electron., vol. 16, no. 5, pp. 573–
580, Sep. 2001.
[8] K. Fathy, K. Morimoto, D. Toshimitsu, K.-H. Koh, H.-W.
Lee, and M. Nakaoka, ―A new soft-switching PWM half-bridge
DC–DC converter with high and low side DC rail active edge
resonant snubbers,‖ in Proc. 37th IEEE PESC, Jun. 18–22,
2006, pp. 1–7.
[9] M. Borage, S. Tiwari, and S. Kotaiah, ―LCL-T resonant
converter with clamp diodes: A novel constant-current power
supply with inherent constant-voltage limit,‖ IEEE Trans. Ind.
Electron., vol. 54, no. 2, pp. 741–746, Apr. 2007.
[10] O. D. Patterson and D. M. Divan, ―Pseudo-resonant full
bridge DC/DC converter,‖ IEEE Trans. Power Electron., vol. 6,
no. 4, pp. 671–678, Oct. 1991.
[11] N. Frohleke, H. Mundinger, S. Beineke, P.Wallmeier, and
H. Grotstollen, ―Resonant transition switching welding power
supply,‖ in Proc. 23rd Int. Conf. IECON, Nov. 9–14, 1997, vol.
2, pp. 615–620.
[12] N. Frohleke, R. Pieper, H. Mundinger, and H. Grotstollen,
―Computer aided investigation of the auxiliary resonant
commutated pole converter for wide range applications such as
welding power supplies,‖ in Proc.25th Int. Conf. IECON, 1999,
vol. 2, pp. 891–896.
[13] N. Mohan, T. M. Undeland, and W. P. Robbins, Power
Electronics.New York: Wiley, 1995, pp. 280–286.
[14] M. Brunoro and J. L. F. Vieira, ―A high-performance ZVS
full-bridge DC/DC 0–50 V/0–10 A power supply with phase-
shift control,‖ IEEE Trans. Power Electron., vol. 14, no. 3, pp.
495–505, May 1999.
[15] J. Zhang, F. Zhang, X. Xie, D. Jiao, and Z. Qian, ―A novel
ZVS DC/DC converter for high power applications,‖ IEEE
Trans. Power Electron., vol. 19, no. 2, pp. 420–429, Mar. 2004.
[16] Y. Jang and M. M. Jovanovic, ―A new family of full-bridge
ZVS converters,‖ IEEE Trans. Power Electron., vol. 19, no. 3,
pp. 701–708, May 2004.
[17] J. Rodriguez-Andina, M. J. Moure, and M. D. Valdes,
―Features, design tools, and application domains of FPGAs,‖
IEEE Trans. Ind. Electron., vol. 54, no. 4, pp. 1810–1823, Aug.
2007.
[18] ALTERA Quartus II Version 6.1 Reference Manual, Altera
Corp., San Jose, CA, 2006.

More Related Content

What's hot

MLI Power Topologies and Voltage Eminence: An Exploratory Review
MLI Power Topologies and Voltage Eminence: An Exploratory ReviewMLI Power Topologies and Voltage Eminence: An Exploratory Review
MLI Power Topologies and Voltage Eminence: An Exploratory Reviewijeei-iaes
 
An automotive onboard 3.3kw battery charger for phev applications
An automotive onboard 3.3kw battery charger for phev applicationsAn automotive onboard 3.3kw battery charger for phev applications
An automotive onboard 3.3kw battery charger for phev applicationsMurray Edington
 
INVERTER CC FOR CA Vaishnav
INVERTER CC FOR CA VaishnavINVERTER CC FOR CA Vaishnav
INVERTER CC FOR CA VaishnavJAMES ARREDONDO
 
The Performance of an Integrated Transformer in a DC/DC Converter
The Performance of an Integrated Transformer in a DC/DC ConverterThe Performance of an Integrated Transformer in a DC/DC Converter
The Performance of an Integrated Transformer in a DC/DC ConverterTELKOMNIKA JOURNAL
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)IJERD Editor
 
Bi directional dc to dc converters for fuel cell systems
Bi directional dc to dc converters for fuel cell systemsBi directional dc to dc converters for fuel cell systems
Bi directional dc to dc converters for fuel cell systemsLi (Eric) Sun
 
Analysis of multiport dc dc converter in renewable energy sources
Analysis of multiport dc dc converter in renewable energy sourcesAnalysis of multiport dc dc converter in renewable energy sources
Analysis of multiport dc dc converter in renewable energy sourceseSAT Publishing House
 
Meet sarayni
Meet sarayniMeet sarayni
Meet saraynithavasik
 
IRJET- Designing and Simulation of Multilevel STATCOM on Cascaded Topology
IRJET- Designing and Simulation of Multilevel STATCOM on Cascaded TopologyIRJET- Designing and Simulation of Multilevel STATCOM on Cascaded Topology
IRJET- Designing and Simulation of Multilevel STATCOM on Cascaded TopologyIRJET Journal
 
A Novel Three-Phase Three-Leg AC/AC Converter Using Nine IGBTS
A Novel Three-Phase Three-Leg AC/AC Converter Using Nine IGBTSA Novel Three-Phase Three-Leg AC/AC Converter Using Nine IGBTS
A Novel Three-Phase Three-Leg AC/AC Converter Using Nine IGBTSIJMER
 
COMPREHENSIVE ANALYSIS AND SIMULATION OF MULTILEVEL POWER CONVERTERS TO CURTA...
COMPREHENSIVE ANALYSIS AND SIMULATION OF MULTILEVEL POWER CONVERTERS TO CURTA...COMPREHENSIVE ANALYSIS AND SIMULATION OF MULTILEVEL POWER CONVERTERS TO CURTA...
COMPREHENSIVE ANALYSIS AND SIMULATION OF MULTILEVEL POWER CONVERTERS TO CURTA...ecij
 
Design of High-Speed Dynamic Double-Tail Comparator
Design of High-Speed Dynamic Double-Tail ComparatorDesign of High-Speed Dynamic Double-Tail Comparator
Design of High-Speed Dynamic Double-Tail ComparatorIJERDJOURNAL
 

What's hot (16)

MLI Power Topologies and Voltage Eminence: An Exploratory Review
MLI Power Topologies and Voltage Eminence: An Exploratory ReviewMLI Power Topologies and Voltage Eminence: An Exploratory Review
MLI Power Topologies and Voltage Eminence: An Exploratory Review
 
An automotive onboard 3.3kw battery charger for phev applications
An automotive onboard 3.3kw battery charger for phev applicationsAn automotive onboard 3.3kw battery charger for phev applications
An automotive onboard 3.3kw battery charger for phev applications
 
INVERTER CC FOR CA Vaishnav
INVERTER CC FOR CA VaishnavINVERTER CC FOR CA Vaishnav
INVERTER CC FOR CA Vaishnav
 
The Performance of an Integrated Transformer in a DC/DC Converter
The Performance of an Integrated Transformer in a DC/DC ConverterThe Performance of an Integrated Transformer in a DC/DC Converter
The Performance of an Integrated Transformer in a DC/DC Converter
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)
 
Bi directional dc to dc converters for fuel cell systems
Bi directional dc to dc converters for fuel cell systemsBi directional dc to dc converters for fuel cell systems
Bi directional dc to dc converters for fuel cell systems
 
Analysis of multiport dc dc converter in renewable energy sources
Analysis of multiport dc dc converter in renewable energy sourcesAnalysis of multiport dc dc converter in renewable energy sources
Analysis of multiport dc dc converter in renewable energy sources
 
Meet sarayni
Meet sarayniMeet sarayni
Meet sarayni
 
IRJET- Designing and Simulation of Multilevel STATCOM on Cascaded Topology
IRJET- Designing and Simulation of Multilevel STATCOM on Cascaded TopologyIRJET- Designing and Simulation of Multilevel STATCOM on Cascaded Topology
IRJET- Designing and Simulation of Multilevel STATCOM on Cascaded Topology
 
A1040106
A1040106A1040106
A1040106
 
A Novel Three-Phase Three-Leg AC/AC Converter Using Nine IGBTS
A Novel Three-Phase Three-Leg AC/AC Converter Using Nine IGBTSA Novel Three-Phase Three-Leg AC/AC Converter Using Nine IGBTS
A Novel Three-Phase Three-Leg AC/AC Converter Using Nine IGBTS
 
Systematic Design of Hybrid Cascaded Multilevel Inverters with Simplified DC...
Systematic Design of Hybrid Cascaded Multilevel Inverters with  Simplified DC...Systematic Design of Hybrid Cascaded Multilevel Inverters with  Simplified DC...
Systematic Design of Hybrid Cascaded Multilevel Inverters with Simplified DC...
 
COMPREHENSIVE ANALYSIS AND SIMULATION OF MULTILEVEL POWER CONVERTERS TO CURTA...
COMPREHENSIVE ANALYSIS AND SIMULATION OF MULTILEVEL POWER CONVERTERS TO CURTA...COMPREHENSIVE ANALYSIS AND SIMULATION OF MULTILEVEL POWER CONVERTERS TO CURTA...
COMPREHENSIVE ANALYSIS AND SIMULATION OF MULTILEVEL POWER CONVERTERS TO CURTA...
 
Design of High-Speed Dynamic Double-Tail Comparator
Design of High-Speed Dynamic Double-Tail ComparatorDesign of High-Speed Dynamic Double-Tail Comparator
Design of High-Speed Dynamic Double-Tail Comparator
 
Single phase 21 level hybrid multilevel inverter with reduced power component...
Single phase 21 level hybrid multilevel inverter with reduced power component...Single phase 21 level hybrid multilevel inverter with reduced power component...
Single phase 21 level hybrid multilevel inverter with reduced power component...
 
J026055062
J026055062J026055062
J026055062
 

Viewers also liked

New approach for wolfe’s modified simplex method to solve quadratic programmi...
New approach for wolfe’s modified simplex method to solve quadratic programmi...New approach for wolfe’s modified simplex method to solve quadratic programmi...
New approach for wolfe’s modified simplex method to solve quadratic programmi...eSAT Journals
 
Ijret20120103031 head line mismatch
Ijret20120103031 head line mismatchIjret20120103031 head line mismatch
Ijret20120103031 head line mismatcheSAT Journals
 
A survey on temporal cyclic patterns
A survey on temporal cyclic patternsA survey on temporal cyclic patterns
A survey on temporal cyclic patternseSAT Journals
 
Available transfer capability computations in the indian southern e.h.v power...
Available transfer capability computations in the indian southern e.h.v power...Available transfer capability computations in the indian southern e.h.v power...
Available transfer capability computations in the indian southern e.h.v power...eSAT Journals
 
The implementation of terrorist web miner for the terrorist networks
The implementation of terrorist web miner for the terrorist networksThe implementation of terrorist web miner for the terrorist networks
The implementation of terrorist web miner for the terrorist networkseSAT Journals
 
Harmonic analysis of composite propeller for marine applications
Harmonic analysis of composite propeller for marine applicationsHarmonic analysis of composite propeller for marine applications
Harmonic analysis of composite propeller for marine applicationseSAT Journals
 
An overview of wireless based subsea tunnel monitoring system
An overview of wireless based subsea tunnel monitoring systemAn overview of wireless based subsea tunnel monitoring system
An overview of wireless based subsea tunnel monitoring systemeSAT Journals
 
Implementation of ‘5 s’ technique in a manufacturing organization a case s...
Implementation of ‘5 s’ technique in a manufacturing organization    a case s...Implementation of ‘5 s’ technique in a manufacturing organization    a case s...
Implementation of ‘5 s’ technique in a manufacturing organization a case s...eSAT Journals
 
Special pairs of pythagorean triangles and dhuruva numbers of orders 4, 5 and 6
Special pairs of pythagorean triangles and dhuruva numbers of orders 4, 5 and 6Special pairs of pythagorean triangles and dhuruva numbers of orders 4, 5 and 6
Special pairs of pythagorean triangles and dhuruva numbers of orders 4, 5 and 6eSAT Journals
 
Mechanical properties and reliability of glass aluminium composite as insert ...
Mechanical properties and reliability of glass aluminium composite as insert ...Mechanical properties and reliability of glass aluminium composite as insert ...
Mechanical properties and reliability of glass aluminium composite as insert ...eSAT Journals
 
Circumferential lug for super critical boiler analytical design and computati...
Circumferential lug for super critical boiler analytical design and computati...Circumferential lug for super critical boiler analytical design and computati...
Circumferential lug for super critical boiler analytical design and computati...eSAT Journals
 
An experimental investigation of annular fins under forced convection
An experimental investigation of annular fins under forced convectionAn experimental investigation of annular fins under forced convection
An experimental investigation of annular fins under forced convectioneSAT Journals
 
Contrast enhancement of color images using improved retinex method
Contrast enhancement of color images using improved retinex methodContrast enhancement of color images using improved retinex method
Contrast enhancement of color images using improved retinex methodeSAT Journals
 
Comparative analysis of authentication and authorization security in distribu...
Comparative analysis of authentication and authorization security in distribu...Comparative analysis of authentication and authorization security in distribu...
Comparative analysis of authentication and authorization security in distribu...eSAT Journals
 
View classification of medical x ray images using pnn classifier, decision tr...
View classification of medical x ray images using pnn classifier, decision tr...View classification of medical x ray images using pnn classifier, decision tr...
View classification of medical x ray images using pnn classifier, decision tr...eSAT Journals
 
Optical character recognition an encompassing review
Optical character recognition   an encompassing reviewOptical character recognition   an encompassing review
Optical character recognition an encompassing revieweSAT Journals
 

Viewers also liked (16)

New approach for wolfe’s modified simplex method to solve quadratic programmi...
New approach for wolfe’s modified simplex method to solve quadratic programmi...New approach for wolfe’s modified simplex method to solve quadratic programmi...
New approach for wolfe’s modified simplex method to solve quadratic programmi...
 
Ijret20120103031 head line mismatch
Ijret20120103031 head line mismatchIjret20120103031 head line mismatch
Ijret20120103031 head line mismatch
 
A survey on temporal cyclic patterns
A survey on temporal cyclic patternsA survey on temporal cyclic patterns
A survey on temporal cyclic patterns
 
Available transfer capability computations in the indian southern e.h.v power...
Available transfer capability computations in the indian southern e.h.v power...Available transfer capability computations in the indian southern e.h.v power...
Available transfer capability computations in the indian southern e.h.v power...
 
The implementation of terrorist web miner for the terrorist networks
The implementation of terrorist web miner for the terrorist networksThe implementation of terrorist web miner for the terrorist networks
The implementation of terrorist web miner for the terrorist networks
 
Harmonic analysis of composite propeller for marine applications
Harmonic analysis of composite propeller for marine applicationsHarmonic analysis of composite propeller for marine applications
Harmonic analysis of composite propeller for marine applications
 
An overview of wireless based subsea tunnel monitoring system
An overview of wireless based subsea tunnel monitoring systemAn overview of wireless based subsea tunnel monitoring system
An overview of wireless based subsea tunnel monitoring system
 
Implementation of ‘5 s’ technique in a manufacturing organization a case s...
Implementation of ‘5 s’ technique in a manufacturing organization    a case s...Implementation of ‘5 s’ technique in a manufacturing organization    a case s...
Implementation of ‘5 s’ technique in a manufacturing organization a case s...
 
Special pairs of pythagorean triangles and dhuruva numbers of orders 4, 5 and 6
Special pairs of pythagorean triangles and dhuruva numbers of orders 4, 5 and 6Special pairs of pythagorean triangles and dhuruva numbers of orders 4, 5 and 6
Special pairs of pythagorean triangles and dhuruva numbers of orders 4, 5 and 6
 
Mechanical properties and reliability of glass aluminium composite as insert ...
Mechanical properties and reliability of glass aluminium composite as insert ...Mechanical properties and reliability of glass aluminium composite as insert ...
Mechanical properties and reliability of glass aluminium composite as insert ...
 
Circumferential lug for super critical boiler analytical design and computati...
Circumferential lug for super critical boiler analytical design and computati...Circumferential lug for super critical boiler analytical design and computati...
Circumferential lug for super critical boiler analytical design and computati...
 
An experimental investigation of annular fins under forced convection
An experimental investigation of annular fins under forced convectionAn experimental investigation of annular fins under forced convection
An experimental investigation of annular fins under forced convection
 
Contrast enhancement of color images using improved retinex method
Contrast enhancement of color images using improved retinex methodContrast enhancement of color images using improved retinex method
Contrast enhancement of color images using improved retinex method
 
Comparative analysis of authentication and authorization security in distribu...
Comparative analysis of authentication and authorization security in distribu...Comparative analysis of authentication and authorization security in distribu...
Comparative analysis of authentication and authorization security in distribu...
 
View classification of medical x ray images using pnn classifier, decision tr...
View classification of medical x ray images using pnn classifier, decision tr...View classification of medical x ray images using pnn classifier, decision tr...
View classification of medical x ray images using pnn classifier, decision tr...
 
Optical character recognition an encompassing review
Optical character recognition   an encompassing reviewOptical character recognition   an encompassing review
Optical character recognition an encompassing review
 

Similar to Fpga implementation of race control algorithm for full bridge prcp converter

Multi_objective_Design_and_Benchmark_of_Wide_Voltage_Range_Phase_Shift_Full_B...
Multi_objective_Design_and_Benchmark_of_Wide_Voltage_Range_Phase_Shift_Full_B...Multi_objective_Design_and_Benchmark_of_Wide_Voltage_Range_Phase_Shift_Full_B...
Multi_objective_Design_and_Benchmark_of_Wide_Voltage_Range_Phase_Shift_Full_B...PranavpPillai2
 
Analysis And Design Of LLC Resonant Converter With Integrated Transformer
Analysis And Design Of LLC Resonant Converter With Integrated TransformerAnalysis And Design Of LLC Resonant Converter With Integrated Transformer
Analysis And Design Of LLC Resonant Converter With Integrated TransformerGina Brown
 
Design and implementation of Closed Loop Control of Three Phase Interleaved P...
Design and implementation of Closed Loop Control of Three Phase Interleaved P...Design and implementation of Closed Loop Control of Three Phase Interleaved P...
Design and implementation of Closed Loop Control of Three Phase Interleaved P...IJMTST Journal
 
2 twofold mode series echoing dc dc converter for ample load
2 twofold mode series echoing dc dc converter for ample load2 twofold mode series echoing dc dc converter for ample load
2 twofold mode series echoing dc dc converter for ample loadchelliah paramasivan
 
Half bridge converter with wide range zvs
Half bridge converter with wide range zvsHalf bridge converter with wide range zvs
Half bridge converter with wide range zvsIAEME Publication
 
A Resonant Converter with LLC for DC-to-DC Converter Based Applications
A Resonant Converter with LLC for DC-to-DC Converter Based ApplicationsA Resonant Converter with LLC for DC-to-DC Converter Based Applications
A Resonant Converter with LLC for DC-to-DC Converter Based ApplicationsIJMTST Journal
 
SIMULATION ANALYSIS OF CLOSED LOOP DUAL INDUCTOR CURRENT-FED PUSH-PULL CONVER...
SIMULATION ANALYSIS OF CLOSED LOOP DUAL INDUCTOR CURRENT-FED PUSH-PULL CONVER...SIMULATION ANALYSIS OF CLOSED LOOP DUAL INDUCTOR CURRENT-FED PUSH-PULL CONVER...
SIMULATION ANALYSIS OF CLOSED LOOP DUAL INDUCTOR CURRENT-FED PUSH-PULL CONVER...Journal For Research
 
Analysis of multiport dc dc converter in renewable energy sources
Analysis of multiport dc dc converter in renewable energy sourcesAnalysis of multiport dc dc converter in renewable energy sources
Analysis of multiport dc dc converter in renewable energy sourceseSAT Journals
 
DESIGNING AND IMPLEMENTATION OF BI - DIRECTIONAL ISOLATED FULL BRIDGE CONVERTER
DESIGNING AND IMPLEMENTATION OF BI - DIRECTIONAL ISOLATED FULL BRIDGE CONVERTERDESIGNING AND IMPLEMENTATION OF BI - DIRECTIONAL ISOLATED FULL BRIDGE CONVERTER
DESIGNING AND IMPLEMENTATION OF BI - DIRECTIONAL ISOLATED FULL BRIDGE CONVERTEREditor IJMTER
 
Application of Distribution Power Electronic Transformer for Medium Voltage
Application of Distribution Power Electronic Transformer for Medium VoltageApplication of Distribution Power Electronic Transformer for Medium Voltage
Application of Distribution Power Electronic Transformer for Medium VoltageIAES-IJPEDS
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)IJERD Editor
 
Review of Integrated Power Factor Correction (PFC) Boost converter topologies...
Review of Integrated Power Factor Correction (PFC) Boost converter topologies...Review of Integrated Power Factor Correction (PFC) Boost converter topologies...
Review of Integrated Power Factor Correction (PFC) Boost converter topologies...IJARBEST JOURNAL
 
Representing Tap-changer Transformers in Conic Relaxation Optimal Power Flows
Representing Tap-changer Transformers in Conic Relaxation Optimal Power FlowsRepresenting Tap-changer Transformers in Conic Relaxation Optimal Power Flows
Representing Tap-changer Transformers in Conic Relaxation Optimal Power Flowsinventionjournals
 

Similar to Fpga implementation of race control algorithm for full bridge prcp converter (20)

Journal article
Journal articleJournal article
Journal article
 
Input switched closed-loop single phase ĈUK AC to DC converter with improved ...
Input switched closed-loop single phase ĈUK AC to DC converter with improved ...Input switched closed-loop single phase ĈUK AC to DC converter with improved ...
Input switched closed-loop single phase ĈUK AC to DC converter with improved ...
 
Multi_objective_Design_and_Benchmark_of_Wide_Voltage_Range_Phase_Shift_Full_B...
Multi_objective_Design_and_Benchmark_of_Wide_Voltage_Range_Phase_Shift_Full_B...Multi_objective_Design_and_Benchmark_of_Wide_Voltage_Range_Phase_Shift_Full_B...
Multi_objective_Design_and_Benchmark_of_Wide_Voltage_Range_Phase_Shift_Full_B...
 
Analysis And Design Of LLC Resonant Converter With Integrated Transformer
Analysis And Design Of LLC Resonant Converter With Integrated TransformerAnalysis And Design Of LLC Resonant Converter With Integrated Transformer
Analysis And Design Of LLC Resonant Converter With Integrated Transformer
 
Design and implementation of Closed Loop Control of Three Phase Interleaved P...
Design and implementation of Closed Loop Control of Three Phase Interleaved P...Design and implementation of Closed Loop Control of Three Phase Interleaved P...
Design and implementation of Closed Loop Control of Three Phase Interleaved P...
 
2 twofold mode series echoing dc dc converter for ample load
2 twofold mode series echoing dc dc converter for ample load2 twofold mode series echoing dc dc converter for ample load
2 twofold mode series echoing dc dc converter for ample load
 
Half bridge converter with wide range zvs
Half bridge converter with wide range zvsHalf bridge converter with wide range zvs
Half bridge converter with wide range zvs
 
A Resonant Converter with LLC for DC-to-DC Converter Based Applications
A Resonant Converter with LLC for DC-to-DC Converter Based ApplicationsA Resonant Converter with LLC for DC-to-DC Converter Based Applications
A Resonant Converter with LLC for DC-to-DC Converter Based Applications
 
SIMULATION ANALYSIS OF CLOSED LOOP DUAL INDUCTOR CURRENT-FED PUSH-PULL CONVER...
SIMULATION ANALYSIS OF CLOSED LOOP DUAL INDUCTOR CURRENT-FED PUSH-PULL CONVER...SIMULATION ANALYSIS OF CLOSED LOOP DUAL INDUCTOR CURRENT-FED PUSH-PULL CONVER...
SIMULATION ANALYSIS OF CLOSED LOOP DUAL INDUCTOR CURRENT-FED PUSH-PULL CONVER...
 
Analysis of multiport dc dc converter in renewable energy sources
Analysis of multiport dc dc converter in renewable energy sourcesAnalysis of multiport dc dc converter in renewable energy sources
Analysis of multiport dc dc converter in renewable energy sources
 
DESIGNING AND IMPLEMENTATION OF BI - DIRECTIONAL ISOLATED FULL BRIDGE CONVERTER
DESIGNING AND IMPLEMENTATION OF BI - DIRECTIONAL ISOLATED FULL BRIDGE CONVERTERDESIGNING AND IMPLEMENTATION OF BI - DIRECTIONAL ISOLATED FULL BRIDGE CONVERTER
DESIGNING AND IMPLEMENTATION OF BI - DIRECTIONAL ISOLATED FULL BRIDGE CONVERTER
 
F42033342
F42033342F42033342
F42033342
 
Application of Distribution Power Electronic Transformer for Medium Voltage
Application of Distribution Power Electronic Transformer for Medium VoltageApplication of Distribution Power Electronic Transformer for Medium Voltage
Application of Distribution Power Electronic Transformer for Medium Voltage
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)
 
R01043105113
R01043105113R01043105113
R01043105113
 
A Novel DC-AC Inverter Topology to Eliminate Leakage Current
A Novel DC-AC Inverter Topology to Eliminate Leakage CurrentA Novel DC-AC Inverter Topology to Eliminate Leakage Current
A Novel DC-AC Inverter Topology to Eliminate Leakage Current
 
Kf2417451751
Kf2417451751Kf2417451751
Kf2417451751
 
Review of Integrated Power Factor Correction (PFC) Boost converter topologies...
Review of Integrated Power Factor Correction (PFC) Boost converter topologies...Review of Integrated Power Factor Correction (PFC) Boost converter topologies...
Review of Integrated Power Factor Correction (PFC) Boost converter topologies...
 
Ba4101300306
Ba4101300306Ba4101300306
Ba4101300306
 
Representing Tap-changer Transformers in Conic Relaxation Optimal Power Flows
Representing Tap-changer Transformers in Conic Relaxation Optimal Power FlowsRepresenting Tap-changer Transformers in Conic Relaxation Optimal Power Flows
Representing Tap-changer Transformers in Conic Relaxation Optimal Power Flows
 

More from eSAT Journals

Mechanical properties of hybrid fiber reinforced concrete for pavements
Mechanical properties of hybrid fiber reinforced concrete for pavementsMechanical properties of hybrid fiber reinforced concrete for pavements
Mechanical properties of hybrid fiber reinforced concrete for pavementseSAT Journals
 
Material management in construction – a case study
Material management in construction – a case studyMaterial management in construction – a case study
Material management in construction – a case studyeSAT Journals
 
Managing drought short term strategies in semi arid regions a case study
Managing drought    short term strategies in semi arid regions  a case studyManaging drought    short term strategies in semi arid regions  a case study
Managing drought short term strategies in semi arid regions a case studyeSAT Journals
 
Life cycle cost analysis of overlay for an urban road in bangalore
Life cycle cost analysis of overlay for an urban road in bangaloreLife cycle cost analysis of overlay for an urban road in bangalore
Life cycle cost analysis of overlay for an urban road in bangaloreeSAT Journals
 
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materialsLaboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materialseSAT Journals
 
Laboratory investigation of expansive soil stabilized with natural inorganic ...
Laboratory investigation of expansive soil stabilized with natural inorganic ...Laboratory investigation of expansive soil stabilized with natural inorganic ...
Laboratory investigation of expansive soil stabilized with natural inorganic ...eSAT Journals
 
Influence of reinforcement on the behavior of hollow concrete block masonry p...
Influence of reinforcement on the behavior of hollow concrete block masonry p...Influence of reinforcement on the behavior of hollow concrete block masonry p...
Influence of reinforcement on the behavior of hollow concrete block masonry p...eSAT Journals
 
Influence of compaction energy on soil stabilized with chemical stabilizer
Influence of compaction energy on soil stabilized with chemical stabilizerInfluence of compaction energy on soil stabilized with chemical stabilizer
Influence of compaction energy on soil stabilized with chemical stabilizereSAT Journals
 
Geographical information system (gis) for water resources management
Geographical information system (gis) for water resources managementGeographical information system (gis) for water resources management
Geographical information system (gis) for water resources managementeSAT Journals
 
Forest type mapping of bidar forest division, karnataka using geoinformatics ...
Forest type mapping of bidar forest division, karnataka using geoinformatics ...Forest type mapping of bidar forest division, karnataka using geoinformatics ...
Forest type mapping of bidar forest division, karnataka using geoinformatics ...eSAT Journals
 
Factors influencing compressive strength of geopolymer concrete
Factors influencing compressive strength of geopolymer concreteFactors influencing compressive strength of geopolymer concrete
Factors influencing compressive strength of geopolymer concreteeSAT Journals
 
Experimental investigation on circular hollow steel columns in filled with li...
Experimental investigation on circular hollow steel columns in filled with li...Experimental investigation on circular hollow steel columns in filled with li...
Experimental investigation on circular hollow steel columns in filled with li...eSAT Journals
 
Experimental behavior of circular hsscfrc filled steel tubular columns under ...
Experimental behavior of circular hsscfrc filled steel tubular columns under ...Experimental behavior of circular hsscfrc filled steel tubular columns under ...
Experimental behavior of circular hsscfrc filled steel tubular columns under ...eSAT Journals
 
Evaluation of punching shear in flat slabs
Evaluation of punching shear in flat slabsEvaluation of punching shear in flat slabs
Evaluation of punching shear in flat slabseSAT Journals
 
Evaluation of performance of intake tower dam for recent earthquake in india
Evaluation of performance of intake tower dam for recent earthquake in indiaEvaluation of performance of intake tower dam for recent earthquake in india
Evaluation of performance of intake tower dam for recent earthquake in indiaeSAT Journals
 
Evaluation of operational efficiency of urban road network using travel time ...
Evaluation of operational efficiency of urban road network using travel time ...Evaluation of operational efficiency of urban road network using travel time ...
Evaluation of operational efficiency of urban road network using travel time ...eSAT Journals
 
Estimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn methodEstimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn methodeSAT Journals
 
Estimation of morphometric parameters and runoff using rs &amp; gis techniques
Estimation of morphometric parameters and runoff using rs &amp; gis techniquesEstimation of morphometric parameters and runoff using rs &amp; gis techniques
Estimation of morphometric parameters and runoff using rs &amp; gis techniqueseSAT Journals
 
Effect of variation of plastic hinge length on the results of non linear anal...
Effect of variation of plastic hinge length on the results of non linear anal...Effect of variation of plastic hinge length on the results of non linear anal...
Effect of variation of plastic hinge length on the results of non linear anal...eSAT Journals
 
Effect of use of recycled materials on indirect tensile strength of asphalt c...
Effect of use of recycled materials on indirect tensile strength of asphalt c...Effect of use of recycled materials on indirect tensile strength of asphalt c...
Effect of use of recycled materials on indirect tensile strength of asphalt c...eSAT Journals
 

More from eSAT Journals (20)

Mechanical properties of hybrid fiber reinforced concrete for pavements
Mechanical properties of hybrid fiber reinforced concrete for pavementsMechanical properties of hybrid fiber reinforced concrete for pavements
Mechanical properties of hybrid fiber reinforced concrete for pavements
 
Material management in construction – a case study
Material management in construction – a case studyMaterial management in construction – a case study
Material management in construction – a case study
 
Managing drought short term strategies in semi arid regions a case study
Managing drought    short term strategies in semi arid regions  a case studyManaging drought    short term strategies in semi arid regions  a case study
Managing drought short term strategies in semi arid regions a case study
 
Life cycle cost analysis of overlay for an urban road in bangalore
Life cycle cost analysis of overlay for an urban road in bangaloreLife cycle cost analysis of overlay for an urban road in bangalore
Life cycle cost analysis of overlay for an urban road in bangalore
 
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materialsLaboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
 
Laboratory investigation of expansive soil stabilized with natural inorganic ...
Laboratory investigation of expansive soil stabilized with natural inorganic ...Laboratory investigation of expansive soil stabilized with natural inorganic ...
Laboratory investigation of expansive soil stabilized with natural inorganic ...
 
Influence of reinforcement on the behavior of hollow concrete block masonry p...
Influence of reinforcement on the behavior of hollow concrete block masonry p...Influence of reinforcement on the behavior of hollow concrete block masonry p...
Influence of reinforcement on the behavior of hollow concrete block masonry p...
 
Influence of compaction energy on soil stabilized with chemical stabilizer
Influence of compaction energy on soil stabilized with chemical stabilizerInfluence of compaction energy on soil stabilized with chemical stabilizer
Influence of compaction energy on soil stabilized with chemical stabilizer
 
Geographical information system (gis) for water resources management
Geographical information system (gis) for water resources managementGeographical information system (gis) for water resources management
Geographical information system (gis) for water resources management
 
Forest type mapping of bidar forest division, karnataka using geoinformatics ...
Forest type mapping of bidar forest division, karnataka using geoinformatics ...Forest type mapping of bidar forest division, karnataka using geoinformatics ...
Forest type mapping of bidar forest division, karnataka using geoinformatics ...
 
Factors influencing compressive strength of geopolymer concrete
Factors influencing compressive strength of geopolymer concreteFactors influencing compressive strength of geopolymer concrete
Factors influencing compressive strength of geopolymer concrete
 
Experimental investigation on circular hollow steel columns in filled with li...
Experimental investigation on circular hollow steel columns in filled with li...Experimental investigation on circular hollow steel columns in filled with li...
Experimental investigation on circular hollow steel columns in filled with li...
 
Experimental behavior of circular hsscfrc filled steel tubular columns under ...
Experimental behavior of circular hsscfrc filled steel tubular columns under ...Experimental behavior of circular hsscfrc filled steel tubular columns under ...
Experimental behavior of circular hsscfrc filled steel tubular columns under ...
 
Evaluation of punching shear in flat slabs
Evaluation of punching shear in flat slabsEvaluation of punching shear in flat slabs
Evaluation of punching shear in flat slabs
 
Evaluation of performance of intake tower dam for recent earthquake in india
Evaluation of performance of intake tower dam for recent earthquake in indiaEvaluation of performance of intake tower dam for recent earthquake in india
Evaluation of performance of intake tower dam for recent earthquake in india
 
Evaluation of operational efficiency of urban road network using travel time ...
Evaluation of operational efficiency of urban road network using travel time ...Evaluation of operational efficiency of urban road network using travel time ...
Evaluation of operational efficiency of urban road network using travel time ...
 
Estimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn methodEstimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn method
 
Estimation of morphometric parameters and runoff using rs &amp; gis techniques
Estimation of morphometric parameters and runoff using rs &amp; gis techniquesEstimation of morphometric parameters and runoff using rs &amp; gis techniques
Estimation of morphometric parameters and runoff using rs &amp; gis techniques
 
Effect of variation of plastic hinge length on the results of non linear anal...
Effect of variation of plastic hinge length on the results of non linear anal...Effect of variation of plastic hinge length on the results of non linear anal...
Effect of variation of plastic hinge length on the results of non linear anal...
 
Effect of use of recycled materials on indirect tensile strength of asphalt c...
Effect of use of recycled materials on indirect tensile strength of asphalt c...Effect of use of recycled materials on indirect tensile strength of asphalt c...
Effect of use of recycled materials on indirect tensile strength of asphalt c...
 

Recently uploaded

Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEselvakumar948
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxmaisarahman1
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 

Recently uploaded (20)

Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 

Fpga implementation of race control algorithm for full bridge prcp converter

  • 1. IJRET: International Journal of Research in Engineering and Technology ISSN: 2319-1163 __________________________________________________________________________________________ Volume: 01 Issue: 03 | Nov-2012, Available @ http://www.ijret.org 389 FPGA IMPLEMENTATION OF RACE CONTROL ALGORITHM FOR FULL BRIDGE PRCP CONVERTER S.Kavitha1 , S.Joshibha Ponmalar2 , B.Chinthamani3 1, 2 Assistant Professor (SG)/Saveetha Engineering College 3 Assistant Professor (SG)/ SRM Eswari Engineering College Abstract In this paper, the unedited race-control algorithm (RCA) for the full-bridge passive resonant commutated poles (FB-PRCP) converter is presented and implemented in cost effective field programmable gate-array. It compensates the drawbacks of that topology that are related to the slow dynamics of the auxiliary poles which are necessary to obtain zero-voltage transitions both at turn-on and turn-off conditions and makes possible its use in more general welding applications, such as manual metal arc welding, in which very fast responses are required. The proposed RCA is a simple variation of the traditional phase-shift technique, which leads to significant efficiency improvements. The guiding idea is to apply the phase-shift technique to both legs of the converter, contrarily to what has been done to date. The limitation in dynamics of the converter is completely eliminated and it gains much more readiness. The effectiveness of the RCA has been verified in simulation and it can be experimentally tested on a true converter.. ----------------------------------------------------------------------***------------------------------------------------------------------------ 1. INTRODUCTION: Most resonant switching topologies are not optimal for welding power supplies (WPS) due to the very wide variation of load currents (typically 3 % to 100 %). A possible remade is to employ additional resonant poles as done in Pseudo resonant full bridge converter (PRFB), the passive resonant commutated pole converter (PRCP) and the auxiliary resonant commutated pole converter. The typical welding power supply is given in Fig. 1. Figure – 1: Typical Welding Power Supply In the general scenario of the switching converters for welding applications, many efforts have been done so far to convert significant power while minimizing costs and overall dimensions, hence, power dissipation. The degrees of freedom to achieve these goals are the switches’ performance and the converter topology. In fact, while the semiconductor technology goes on in lowering the ON-state losses and the commutation losses of the switches, the power-electronics technology proposes newer and newer and more efficient topologies, including refined-control strategies, aimed to achieve soft switching for the devices of the circuit at input and load ranges as wide as possible. On the side of the power switch’s development, a state of-the-art survey on the performances of the classical soft switching phase-shift bridge topology has been presented in [1], where the authors demonstrated that, depending on the switches used in the circuit, some load conditions are more critical in terms of the device’s reliability than other ones. On the other side, in the field of research of new topologies for welding converters, many circuits have been proposed in the past based on hard-switching techniques [2]–[4] that allow a simplified control strategy due to the intrinsic absence of resonance transients, whose duration is affected by the load conditions. The unavoidable drawback of these topologies is the switching losses, which severely limit the frequency, hence, the physical dimensions. Many innovative topologies belonging to the soft-switching category have been developed. Series- resonant topologies [5], [6] have been proposed and tested for welding applications, in which one- or three-phase mains supply a classical H-bridge isolated converter. Soft-switching conditions are achieved owing to a resonance that involves a series capacitor. These kinds of topologies, though, offer an
  • 2. IJRET: International Journal of Research in Engineering and Technology ISSN: 2319-1163 __________________________________________________________________________________________ Volume: 01 Issue: 03 | Nov-2012, Available @ http://www.ijret.org 390 additional voltage drop across that capacitor that forces the designer to reduce the transformer’s ratio and, in turn, to adopt over dimensioned secondary rectifiers in terms of blocking voltage. Another kind of soft-switching topology, presented in 2001, contemplates the presence of an auxiliary transformer whose rule is to obtain zero-current-switching conditions for the main leg of the inverter in a wide range of load conditions [7]. That auxiliary transformer, indeed, requires a powerful controller to evaluate the optimal dead-times required to obtain soft-switching conditions. A simpler topology has been presented in 2006 that provides zero-voltage-switching (ZVS) conditions for each switch of the circuit [8]. Its main drawback is that a half-rail dc voltage is required, which is often very difficult to obtain. Similarly, in the same year, a very efficient topology has been developed and presented [9], whose primary drawback is the half-bridge configuration, which provokes high current stresses to the main capacitors causing reliability problems. A soft-switched topology, called pseudo resonant full-bridge dc/dc converter, has been introduced in [10]. The basic principle of that solution is to use a reactive circuit to obtain ZVS at each load condition. The same principle was enhanced and adopted in 1997, when Frohleke et al. [11] presented an implementation of a circuit called full-bridge passive resonant commutated poles (FB-PRCP), which is fully zero-voltage transition (ZVT), and demonstrated its application to a power converter rated at 12 kW, 350 A. An analogous topology was presented in 1999 by the same authors [12]. The scheme of the converter presented in [11] is shown in Fig. 2. The operation principle is as follows: the two legs A and B are commutated with a classical phase- shift technique, i.e., each of them has a duty cycle of 50%, and the primary winding of the transformer receives increasing power at increasing delays (―phase shifts‖) of leg B with respect to leg A. The maximum power transfer is reached when leg B is 180◦ delayed from leg A, and a null transfer is obtained when leg B is in phase with leg A. The soft-switching operation is intrinsic at the turn-on for each phase-shift topology, being the switches turned on when the reverse diodes are conducting. Soft turn-offs are obtained in this topology in a classical way: Four snubber capacitors are put in parallel to the four switches, namely, CAp, CAn, CBp, and CBn. As it is known from the literature [13], this solution is generally good for heavy and medium loads, where the stray inductance of the transformer’s primary winding is energized enough to completely charge and discharge those snubber capacitors, but it is dramatic at light loads, where the magnetization is not sufficient to perform the whole leg commutation, and the switches are fired on a still-charged capacitor, in a manner very similar to a short-circuit turn-on. Figure – 2: FB-PRCP converter To solve this problem, many authors have recently adopted several solutions [14]–[16]. The authors of [11] proposed an interesting and cheap solution to ensure a minimum of the switches’ current values, which includes an auxiliary reactive network made up of the inductance LA(LB) and the capacitors C1 and C2 (C3 and C4) for leg A (leg B). Referring to Fig. 2, the principle of operation is as follows: due to the fixed duty cycle of legs A and B to 50%, each inductance LA and LB is subject to a square-wave voltage drop, whose amplitude and frequency are constant. At steady state, the average currents into LA and LB are zero, and the currents’ peak are symmetric with respect to zero and correspond to the leg commutation. For this reason, the current flowing into the switches at the commutation instant has a minimum value, which ensures the completion of the commutation from one rail to another and, hence, ensuring a reasonable upper limitation to dead-times. This profitable behavior allows one to use fixed-dead-times generators, thus largely simplifying the design of the modulator. Fig. 3 shows the typical waveforms of an FB-PRCP converter. Switches belonging to the same leg are driven by opposite signals, except for the dead-times, which are necessary to avoid a leg short-circuit. The primary winding of the transformer is subject to an effective voltage V (A)−V (B), which depends on the phase shift, i.e., the delay of leg B from leg A. By varying this quantity, it is possible to regulate the power transfer to the secondary winding and, eventually, to the load. Fig. 3 also shows the triangle-shaped current waveforms into the auxiliary inductances. Even if Frohleke et al. [11] demonstrated that it is possible to design the auxiliary poles in such a way to obtain ZVT at each load conditions at steady state, some malfunctions happen when the phase shift is considerably varied. Such a condition is very typical for manual metal arc-welding (MMA) applications, where very frequently, a fusion droplet causes the collapse of the load impedance and a drastic power-transfer reduction is required in few switching periods.
  • 3. IJRET: International Journal of Research in Engineering and Technology ISSN: 2319-1163 __________________________________________________________________________________________ Volume: 01 Issue: 03 | Nov-2012, Available @ http://www.ijret.org 391 Figure- 3: Typical waveforms of the FP-PRCP converter. (Shadowed Dead-times) To fix the ideas, Fig. 4 shows the scenario in which the phase shift is reduced from 90% (about 160◦ delay) to 25% (45◦ delay). In that figure, the leg voltages, V (A) and V (B), and the currents of the auxiliary inductances, I(LA) and I(LB), have been reported. In this case, the commutation of leg B is anticipated when the current into the inductor LB is still positive (arrow in Fig. 4), thus not allowing the normal ZVT of the leg voltage and, eventually, provoking a disastrous turn-on over a capacitance, which is very similar to short-circuit conditions. Figure – 4: Critical leg switch due to a phase-shift reduction (90%–25%). The arrow shows the abnormal condition. For these reasons, until now, the FB-PRCP topology has been concretely employable only in welding applications with slowly variable output currents, such as gas metal arc welding and MIG/MAG processes, and, in any case, it adopts a large and expensive output inductor that slows down the fast impedance transients of the load, thus also limiting the system readiness. Owing to the introduction of field-programmable gate arrays (FPGAs) and, in particular, to the recent advances in FPGA applications for power conversion [17], it is possible to implement complicated control algorithms at affordable—if not negligible—cost/performance ratios. In this paper, an FPGA-based modified control algorithm called race-control algorithm (RCA) is presented, that completely eliminates the limitation in phase-shift transients, like the ones shown in Fig. 4, and significantly improves the bandwidth of the FB-PRCP topology. Some noticeable advantages are that the converter is much more ready and becomes good also for MMA welding, and the needed output inductance could be significantly smaller, hence, cheaper. Moreover, in perspective, owing to the more and more FPGA cost reduction, the possibility of implementation of the whole converter’s control algorithm in a single FPGA chip could be considered. 2. PRINCIPLE OF OPERATION OF THE RCA The RCA principle descends from the following observation: In the classical approach, leg A is a fixed frequency and phase, whereas leg B is shifted ahead and backward. In this way, phase-shift reductions are achieved by anticipating that leg, which might cause dramatic commutations, whereas phase shift increases, achieved as a delaying of the same leg, result as always safe. This observation suggests a modification of the control algorithm as follows: Leg B is delayed when an increase in phase shift is needed, whereas leg A is delayed when a reduction is needed instead. In this way, each leg is never anticipated, and the scenario of Fig. 4 is completely avoided. To show the effectiveness of the principle stated earlier, the worst case is shown in Fig. 5, where a sequence of three switching periods at extreme phase-shift variations (0% → 100%(180◦) → 0%) has been depicted. In that figure, the same signals of Fig. 4 have been reported, together with the primary voltage of the transformer V (A)−V (B) and the magnetization component of the primary current of the transformer. This latter quantity is primary to study the transformer’s saturation. From the point of view of the safeness of the commutations, the problem shown in Fig. 4 is completely solved. Each commutation happens at a safe status, in which the auxiliary inductances are magnetized at a proper current. Fig. 5 also shows that the RCA approach exhibits a drawback. The current peak of the inductor belonging to the delayed leg is increased. Its value can be evaluated as follows:      2 %i A i A i APeak Peak Peak T L L PS L T        -- (1)
  • 4. IJRET: International Journal of Research in Engineering and Technology ISSN: 2319-1163 __________________________________________________________________________________________ Volume: 01 Issue: 03 | Nov-2012, Available @ http://www.ijret.org 392 where Δi(LA)peak is the inductance peak-current increase, T is the switching period, ΔT is the period variation, and ΔPS% is the phase-shift variation. In the extreme scenario of Fig. 5, Δi(LA)peak reaches 2· i(LA)peak (100% increase). Figure – 5: Safe leg commutations in correspondence of an extreme phase-shift transition (0% → 100% → 0%) However, this peak increase is not critical from the switch losses’ point of view nor from the transformer’s saturation one. In fact, according to the design consideration illustrated in [10], the resonant commutating-pole currents i(LA) and i(LB) are much lesser (few percents) than the primary currents at heavy loads so that the switches can also easily tolerate a doubling in those currents. In addition, it is reasonable to assume that the events of heavy variations of phase shifts (0% → 100% variations) are relatively rare in the switching-frequency time scale. Finally, ZVTs are always performed in this topology, thus hugely compensating those over currents from the point of view of the switches’ stresses. For what concerns the effects on the transformer’s saturation, the lower trace of Fig. 5 has been obtained by time-integrating the voltage across the primary winding V (A) − V (B). Its shape easily demonstrates that the maximum of the magnetization current, corresponding to the maximum magnetic flux of the transformer, is not affected by the RCA technique at all. The core of the RCA is a choice: it is delayed leg A or leg B depending on the sign of the phase-shift variation. The chosen leg is delayed by a factor equal to one half of the phase shift variation. For example, a phase shift increase of 100% corresponds to a delay of leg B equal to 50% of the period (180◦). The flow chart of Fig. 6 describes this modus operandi. It is worthwhile to note that, due to the algorithm structure, simultaneous leg delays are intrinsically impossible. 3. PROPOSED FPGA IMPLEMENTATION Having the RCA based on a difference, to avoid possible communication errors between the external controller and the modulating logic, that could result in a catastrophic misalignment of the desired and the real phase-shift values, it must be implemented in FPGA logic in such a way that the required operations of the algorithm are made inside a unique chip. Figure – 6: Flowchart of the RCA algorithm
  • 5. IJRET: International Journal of Research in Engineering and Technology ISSN: 2319-1163 __________________________________________________________________________________________ Volume: 01 Issue: 03 | Nov-2012, Available @ http://www.ijret.org 393 The second stage evaluates the phase-shift variation and its opposite in such a way as to always obtain a positive result. Two 8-b subtractors simultaneously perform the two possible subtractions between the present and the past phase-shift data. Their outputs are for leg A, , 1A K k kS PS PS  --(2) and for leg B, , 1B K k kS PS PS   --(3) where k is the present time instant and k − 1 is the past one. The third stage implements the core of the algorithm: It determines which one of the two legs must be delayed, depending on the sign of the phase-shift variation. In more detail, its outputs are , , , , , , , , 0 (4) 0, 0 0 (5) 0, 0 A K A K A K A K B K B K B K B K S if S S if S S if S S if S             for legs A and B, respectively. In other words, the function max (Sk, 0) is implemented for each leg. To achieve this result, for leg A, the borrow signal of the subtractor is used by a two way 8-b multiplexer to choose between zero (00h in Fig. 7) and the phase-shift increase SA,k. An identical circuit is adopted for leg B. For example, if the phase shift increases, PSk is greater than PSk−1, then SA,k will be negative (borrow = 0) and SB,k will be positive (borrow = 1). This result will provoke the multiplexer of leg A to choose 00h and the corresponding one of leg B to choose SB,k. Eventually, leg B will be delayed, and leg A will be kept at constant phase, as expected from the algorithm discussed in the previous section. The fourth stage has a trivial role. It operates the divisions by two, which are necessary to scale the phase-shift quantities, in the range 0d–100d to the delay quantities which are in the range of 0%–50% (it could be useful to remember here that the maximum phase shift is obtained at delays of 50% of the switching period, which correspond to a phase delay of 180◦). These divisions are simply obtained by right-shifting the result of the previous stage by one. Of course, the precision is worsened from 1% to 2%. In general, this value is still acceptable for this kind of application. If not, it is very simple to operate the phase-shift data in the range of 0d–200d instead of 0d–100d to obtain back the 1% precision. Figure - 7: Top-level schematic of the FPGA implementation The fifth stage composes the period time of the switching waveform for each leg. At steady state, the period is equal to 100d. When one leg must be delayed, its period must be increased of the previously calculated quantities. In , , 100 (6) 2 100 (7) 2 A K A B K B S T d S T d           where TA and TB are the durations of the next periods of legs A and B, respectively. An unsigned 8-b adder is used for each leg at this stage. No overflow conditions are possible, being the maximum output period given by (6) ,max 100 100 150 2 A d T d d   --(8) which is representable with 8 b. Please explicitly note that, at each switching period, the leg which is not being delayed is forced to T(fixed leg) = 100d. The sixth stage is the modulator. The two square-wave generators of Fig. 7 produce a square-wave period with duty cycle D = 50%, whose period is variable, and the new period value is sampled at the end of each cycle.
  • 6. IJRET: International Journal of Research in Engineering and Technology ISSN: 2319-1163 __________________________________________________________________________________________ Volume: 01 Issue: 03 | Nov-2012, Available @ http://www.ijret.org 394 Figure – 8: Schematic of the variable-period square-wave generator Fig. 8 shows the block diagram of one generator. A simple finite-state machine (FSM) controls a buffer (D-register), which contains the present period value, a multiplexer, and a loadable down-counter. A frequency divider provides the necessary clock frequency division to obtain the desired switching frequency. In the experiment section, a switching frequency of fS = 15 kHz has been used, and being the half-period at steady state equal to a count value of 100d, it is easy to calculate the countdown frequency as 2 100 3COUNT Sf f d M Hz   --(9) The main clock of the FPGA oscillates at 48 MHz, so the frequency divider’s ratio in Fig. 8 is 48 MHz/3 MHz = 16. The FSM operates between two statuses, s0 and s1, corresponding to the output statuses of 0 and 1, respectively, whose mode of operation is described as follows. Please note that the circuit operates at main clock frequency, including the syncr_load signal of the counter. Due to the input count_enable, the countdown, instead, takes place at reduced frequency [(9)]. To fix the ideas, suppose that the FSM was in the s1 status and that the counter asserted the count_end signal in the last clock period, thus making the FSM to switch to the status s0. In this condition, the multiplexer is set to the input TA, and the FSM asserts both the half-period and the full-period signals, thus loading the counter with the new period value TA and latching it also into the D register. The countdown starts. Having the FSM in the status s0, the Out signal is kept to zero, and nothing happens until the count_end signal is asserted. After TA counts, corresponding to half-output period, the countdown ends, and the signal count_end is asserted again. In this case, though, the FSM asserts only the half-period signal, thus making the counter to be reloaded at the same value TA, which is stored into the D register. The full-period signal, instead, is not asserted in this case; in such a way, the ―one‖ time is forced to be of the same duration of the ―zero‖ time. The FSM switches to its s1 status, and a new countdown starts. During the second countdown, the signal Out is kept to one. At the period end, the full_period signal is asserted, thus provoking the acquisition of the new period data. The behavior of the modulator circuit in Fig. 7 is as follows: At a new period start (rising edge) of the signal OutA, the D registers shift, and a new phase-shift PSk data is acquired. At this point, two cases must be considered: PSk = PSk−1 and PSk _= PSk−1. If PSk = PSk−1, then both the subtractors of stage two produce zero, both the multiplexers of stage three produce zero, and the same for the dividers of stage four, so that the adders of stage five produce both TA = TB = 100d, which is exactly the switching period, and the square-wave generators of stage six go on to produce two square waves at locked phase. If PSk _= PSk−1, the signal SA,k and SB,k are opposite in sign [(2) and (3)]. To fix the ideas, suppose that PSk < PSk−1 (hence, SA,k > 0 and SB,k < 0). In this case, the upper multiplexer at stage three sees a borrow signal equal to one and outputs ΔSA,k = SA,k [(4)], whereas the lower one sees a borrow equal to zero and zeroes its output ΔSB,k [(5)]. After the division by two of stage four, the adders of stage five produce TA = ΔSA,k/2 + 100d [(6)], y and TB = 100d [(7)]. In this way, leg A is driven by a slower oscillation period and delays with respect to leg B, according to the behavior described in Fig. 6. Of course, if PSk > PSk−1, leg B is delayed instead. It is worthwhile to explicitly note that, if the new phase shift value is kept constant at the following period, everything behaves like the earlier case PSk = PSk−1, and the oscillation period of leg A intrinsically returns back to TA = TB = 100d, thus keeping leg A indefinitely delayed until a new phase-shift variation occurs. As a final consideration about the behavior of the proposed circuit in Fig. 7, it can be useful to note that, due to the shift of leg A, the sync signal which governs the phase-shift acquisition is not strictly periodic. In fact, it is delayed each time a phase- shift reduction occurs (in that leg A is delayed), up to a 50% of the switching period. Even if this behavior could cause some additional troubles in the design of the external controller, particularly if this one implements a constant time step algorithm, it is useful to consider that this delay is typically very small, due to the slow phase-shift variations required in normal operations, and, anyway, in the worst case, it is limited to a maximum of half a period, thus keeping locked the external controller frequency with the modulator’s one.
  • 7. IJRET: International Journal of Research in Engineering and Technology ISSN: 2319-1163 __________________________________________________________________________________________ Volume: 01 Issue: 03 | Nov-2012, Available @ http://www.ijret.org 395 4. SIMULATION RESULTS: The Quartus II developing environment by ALTERA Corporation [18] has been adopted to simulate and to implement the presented system, and the two devices used for the experimental part have been summarized in Table I. There, the total resource usage, in absolute and percent units, has been reported together with the estimated commercial cost of each device. Figure – 9: Quartus II logic simulation of the RCA algorithm Following the approach bottom-up, the single parts of the design have been implemented into the Quartus II environment and have been tested by means of the timing simulator. The simulation of the overall system has been shown in Fig. 9, in which the output signals are included together with the PS- data and the intermediate signals ΔSA and ΔSB in Fig. 7. The clock signal is too dense in this time scale to be displayed. At the simulation start, a Reset signal of the duration of one to two clock periods is given to the system and is not visible. Initially, PS-data is kept to zero. At 200 μs, the PSdata is changed to 75d. At the rising edge of OutA, the new data are sampled, and the stages one to three in Fig. 7 correctly compute the values of the signal ΔSA and ΔSB. In fact, in the transition 0d → 75d, being the variation positive, leg B has to be delayed (ΔSB = 75d) and leg A does not have to change (ΔSA = 0). These values are immediately supplied to the square-wave generators that adequate their periods. Specifically, the output OutB performs a longer period at about 300 μs and, at steady state, it keeps its delay until the new transition. It is worthwhile to explicitly note that signals ΔSA and ΔSA differ from zero for one period only. This is correct, because the data at the last time PSk−1 have become equal to that at the present time PSk (see Fig. 7). Nothing changes until the next transition at about 850 μs. In this case, a phase-shift reduction is required, and ΔSA differs from zero. The signal OutA is slightly delayed, and the phase shift reduces to the appropriate quantity. Further transitions are stimulated at 1500 and 2100 μs, and the phase shift is finally returned back to zero. The system always produces the correct response at each condition. The RCA has been tested on true prototype inverter equipment, of a scaled size in terms of voltage and currents, whose main parameters are summarized in Table II. In addition, a large simplification has been done by substituting the secondary stage of Fig. 2 with a fixed-value resistor to better evaluate the behavior of the primary stage independently of the second order effects introduced by the secondary freewheeling currents and diode reverse recovery. CONCLUSIONS Due to the rising demand for portable volume, weight and cost reduced welding power supplies in the mid and high power range the passive resonant commutated pole converter is inspected for wide load range applications. The availability of cost effective digital solutions such as FPGA and power supply modules facilitates the application of Passive resonant commutated pole converter to ever lower power levels. An unedited control technique called RCA for FB-PRCP converters has been implemented on an FPGA platform and successfully experimented thro simulation. The technique promises to strongly improve the dynamic responses of high-power FB-PRCP converters used in welding applications, thus allowing reduction of the heavy and expensive output inductances and/or to perform an advanced control of the welding current shape which is typical for MMA applications. The adoption of the presented technique is of course strictly related to the possibility of using digital control circuits, like FPGAs, although whose supplementary cost is largely compensated by the economies of passive components. Verification of above proposed algorithms are given by simulations and measurements are resenting a basis for further development. REFERENCES [1] P. G. Cancelliere, V. Delli Colli, R. Di Stefano, and G. Tomassi, ―A comparative analysis of 4 KW PSBs for welding machine,‖ in Proc. 5th Int. Conf. PEDS, Nov. 17–20, 2003, vol. 2, pp. 1471–1475. [2] P. Verdelho, M. Pio Silva, E. Margato, and J. Esteves, ―An electronic welder control circuit,‖ in Proc. 24th Annu. Conf. IEEE IECON, Aug. 31–Sep. 4, 1998, vol. 2, pp. 612–617. [3] H.-R. Choi, H.-S. Mok, G.-H. Choe, C. Y.Won, and K. S. Kim, ―Enhanced characteristics of DCM boost converter for inverter arc welding system,‖ in Proc. IEEE Int. Conf. PEDS, 1999, vol. 1, pp. 456–461. [4] M. Salo, H. Tuusa, and J. Nyqvist, ―A high-performance three-phase DCvoltage source—An application to a welding machine,‖ in Proc. 16th Annu. IEEE APEC, 2001, vol. 2, pp. 793–799. [5] T.-F. Wu, H.-P. Yang, and C.-M. Pan, ―Analysis and design of variable frequency and phase-shift controlled series resonant converter applied for electric arc welding machines,‖ in Proc. 21st Int. Conf. IEEE IECON, Nov. 6–10, 1995, vol. 1, pp. 656– 661. [6] N. Huang, D. Zhang, T. Song, M. Fan, Y. Liu, and Y. Zhao, ―A 10 kW single-stage converter for welding with inherent
  • 8. IJRET: International Journal of Research in Engineering and Technology ISSN: 2319-1163 __________________________________________________________________________________________ Volume: 01 Issue: 03 | Nov-2012, Available @ http://www.ijret.org 396 power factor correction,‖ in Proc. 20th Annu. IEEE APEC, Mar. 6–10, 2005, vol. 1, pp. 254–259. [7] S.-J. Jeon and G.-H. Cho, ―A zero-voltage and zero-current switching full bridge DC–DC converter with transformer isolation,‖ IEEE Trans. Power Electron., vol. 16, no. 5, pp. 573– 580, Sep. 2001. [8] K. Fathy, K. Morimoto, D. Toshimitsu, K.-H. Koh, H.-W. Lee, and M. Nakaoka, ―A new soft-switching PWM half-bridge DC–DC converter with high and low side DC rail active edge resonant snubbers,‖ in Proc. 37th IEEE PESC, Jun. 18–22, 2006, pp. 1–7. [9] M. Borage, S. Tiwari, and S. Kotaiah, ―LCL-T resonant converter with clamp diodes: A novel constant-current power supply with inherent constant-voltage limit,‖ IEEE Trans. Ind. Electron., vol. 54, no. 2, pp. 741–746, Apr. 2007. [10] O. D. Patterson and D. M. Divan, ―Pseudo-resonant full bridge DC/DC converter,‖ IEEE Trans. Power Electron., vol. 6, no. 4, pp. 671–678, Oct. 1991. [11] N. Frohleke, H. Mundinger, S. Beineke, P.Wallmeier, and H. Grotstollen, ―Resonant transition switching welding power supply,‖ in Proc. 23rd Int. Conf. IECON, Nov. 9–14, 1997, vol. 2, pp. 615–620. [12] N. Frohleke, R. Pieper, H. Mundinger, and H. Grotstollen, ―Computer aided investigation of the auxiliary resonant commutated pole converter for wide range applications such as welding power supplies,‖ in Proc.25th Int. Conf. IECON, 1999, vol. 2, pp. 891–896. [13] N. Mohan, T. M. Undeland, and W. P. Robbins, Power Electronics.New York: Wiley, 1995, pp. 280–286. [14] M. Brunoro and J. L. F. Vieira, ―A high-performance ZVS full-bridge DC/DC 0–50 V/0–10 A power supply with phase- shift control,‖ IEEE Trans. Power Electron., vol. 14, no. 3, pp. 495–505, May 1999. [15] J. Zhang, F. Zhang, X. Xie, D. Jiao, and Z. Qian, ―A novel ZVS DC/DC converter for high power applications,‖ IEEE Trans. Power Electron., vol. 19, no. 2, pp. 420–429, Mar. 2004. [16] Y. Jang and M. M. Jovanovic, ―A new family of full-bridge ZVS converters,‖ IEEE Trans. Power Electron., vol. 19, no. 3, pp. 701–708, May 2004. [17] J. Rodriguez-Andina, M. J. Moure, and M. D. Valdes, ―Features, design tools, and application domains of FPGAs,‖ IEEE Trans. Ind. Electron., vol. 54, no. 4, pp. 1810–1823, Aug. 2007. [18] ALTERA Quartus II Version 6.1 Reference Manual, Altera Corp., San Jose, CA, 2006.