SlideShare a Scribd company logo
1 of 3
EDWARD D COCKMAN JR
2603 Lilac St., Pasadena, TX 77503 | H: 832-677-4270 | Civiced77@gmail.com
Summary
Highly accomplished management professionalwith 18 years of experience in operations,
team management,safety and regulatorycompliance,and strategicplanning.Results-
oriented, decisive leader with proven success in implementing effective process
improvements. Pragmatic and focused in dynamicfluid environments.
Highlights
Strategic planning Production scheduling familiarity
Procedure development Process improvement strategies
Systems implementation Inventory control
Production scheduling familiarity Quality inspection professional
Productivity improvement specialist Troubleshooting and problem solving
Mathematicalreasoningaptitude Expert metalworking ability
Accomplishments
Strategically increasing productivity through the implementation ofvarious process
improvements.
Consistently meeting project schedule and workload goals by managingand allocating
proper staff levels.
Using operationalknowledge of systems, parts and components to solve problems that
arise duringproduction.
Ongoing development processes enablingproduction that was previously impervious.
Youngest Shift supervisor in the 20 year historyof JSW.
Experience
Shift supervisor/4Hi Operator Jan 2010 to Current
JSW Steel - Baytown, Texas
Planning,organizing,and directingproduction operations to ensure optimalreturn on
investment for the company.
Maximizingproductivityby leading on-the-job training focusing on safety practices
and procedures and managing both human and materialresources to meet production
targets.
Overseeingqualityassurance initiatives to design and implement products and
processes for ongoing projects.
Directing alloperations in the milldepartment including but not limited to charging,
heating, extraction, roughing,finishing, gauging and leveling.
Identifying inefficiencies and made recommendations for process improvements.
Implementingroot cause and corrective actions to remove production constraints and
improve product quality.
Defining manufacturingperformance standards and reviewed the performance
outcomes to set future targets.
Improvingefficiencyand productivity byeliminatingwaste and production
constraints.
Reviewingproduction orders,schedules,delivery dates and inventorylevels to
determine product availability.
Completingkey projects on time, on budget and with a high levelof accuracy.
Finishing the hot rollingprocess bymanufacturing plate to ordered gauge and length.
2Hi Operator Jan 2001 to Jan 2010
JSW Steel - Baytown, Texas
Mediated information transfer between slab dept. and milldept.
Provided initialhot slab roughingand produced product width as ordered bycustomer.
Leveler Operator Jan 2000 to Jan 2001
JSW Steel - Baytown, Texas
Addressed any finalflatness concerns ofplates through use ofa hydraulicpress and
provided a serialnumber for proper identification.
Cooling Bed Operator Jan 1999 to Jan 2000
JSW Steel - Baytown, Texas
Accepted plates from the hot milland transferred them in sequence around a
processingbed for cooling.
Layer Out Jan 1999 to Jan 2000
JSW Steel - Baytown, Texas
Coordinated and expedited operations between Cooling Bed,MarkingMachine,
Painter/Stamper and Shear department for efficient transition and finalprocessing of
customers product.
Provided Quality Controlsupport to hot milloperators for gauge, width,and surface
conditions
Marking Machine Operator Jan 1998 to Jan 1999
JSW Steel - Baytown, Texas
Measured and marked plates for cutting based on dimensions provided bythe
customer.
Painter/Stamper Jan 1998 to Jan 1999
JSW Steel - Baytown, Texas
Identified and labeled products with customer information and materialspecifications
accordingly.
Certifications
ANSI
API
ISO
ASTM
Heavy Equipment
Edward D Cockman Jr Resume

More Related Content

What's hot

What's hot (20)

Stacy Quasebarth Resume
Stacy Quasebarth ResumeStacy Quasebarth Resume
Stacy Quasebarth Resume
 
Magdalena
MagdalenaMagdalena
Magdalena
 
Harjeet Gill 110516
Harjeet Gill  110516Harjeet Gill  110516
Harjeet Gill 110516
 
Mac navid
Mac navidMac navid
Mac navid
 
Resume
ResumeResume
Resume
 
Quality harjeet gill 11 19_16
Quality harjeet gill 11 19_16Quality harjeet gill 11 19_16
Quality harjeet gill 11 19_16
 
resume_Beatriz_Barba
resume_Beatriz_Barbaresume_Beatriz_Barba
resume_Beatriz_Barba
 
Resume2
Resume2Resume2
Resume2
 
PRUKS RESUME PROJ 2016C
PRUKS RESUME PROJ 2016CPRUKS RESUME PROJ 2016C
PRUKS RESUME PROJ 2016C
 
S Perkins 8 22-2021
S Perkins 8 22-2021S Perkins 8 22-2021
S Perkins 8 22-2021
 
Steves Resume Upgrade 2
Steves Resume Upgrade 2Steves Resume Upgrade 2
Steves Resume Upgrade 2
 
Steve Majors resume
Steve Majors resumeSteve Majors resume
Steve Majors resume
 
Jessica_Cabral_Resume1i
Jessica_Cabral_Resume1iJessica_Cabral_Resume1i
Jessica_Cabral_Resume1i
 
William Baxter Professional Resume
William Baxter Professional ResumeWilliam Baxter Professional Resume
William Baxter Professional Resume
 
ROBERT RICHARDSON6
ROBERT RICHARDSON6ROBERT RICHARDSON6
ROBERT RICHARDSON6
 
kevin-salerno-resume
kevin-salerno-resumekevin-salerno-resume
kevin-salerno-resume
 
Resume - Zonal Manager
Resume - Zonal ManagerResume - Zonal Manager
Resume - Zonal Manager
 
Brian Aldridge resume 2016
Brian Aldridge resume 2016 Brian Aldridge resume 2016
Brian Aldridge resume 2016
 
Ron's Resume
Ron's ResumeRon's Resume
Ron's Resume
 
Costa Resume (2015-10)
Costa Resume (2015-10)Costa Resume (2015-10)
Costa Resume (2015-10)
 

Viewers also liked

Viewers also liked (15)

7-myths-of-startup-financing-141103140829-conversion-gate01
7-myths-of-startup-financing-141103140829-conversion-gate017-myths-of-startup-financing-141103140829-conversion-gate01
7-myths-of-startup-financing-141103140829-conversion-gate01
 
(Amostra) Modelo de Relatorio do MISSU para escolas
(Amostra) Modelo de Relatorio do MISSU para escolas(Amostra) Modelo de Relatorio do MISSU para escolas
(Amostra) Modelo de Relatorio do MISSU para escolas
 
15146_S16_A1-Asrar_Mustafa
15146_S16_A1-Asrar_Mustafa15146_S16_A1-Asrar_Mustafa
15146_S16_A1-Asrar_Mustafa
 
Elkarkariak
ElkarkariakElkarkariak
Elkarkariak
 
MADISON SHAMBAUGH 033115
MADISON SHAMBAUGH 033115MADISON SHAMBAUGH 033115
MADISON SHAMBAUGH 033115
 
Teta
TetaTeta
Teta
 
Libro 3
Libro 3Libro 3
Libro 3
 
Pakistan's iqbal
Pakistan's iqbalPakistan's iqbal
Pakistan's iqbal
 
Normas inversa en Panamá
Normas inversa en Panamá Normas inversa en Panamá
Normas inversa en Panamá
 
Mémoire charafa olahanmi Licence Professionnelle en Hydraulique
Mémoire charafa olahanmi Licence Professionnelle en HydrauliqueMémoire charafa olahanmi Licence Professionnelle en Hydraulique
Mémoire charafa olahanmi Licence Professionnelle en Hydraulique
 
Media Landscape Analysis of Snapchat Discover - NHBuzzFeed
Media Landscape Analysis of Snapchat Discover - NHBuzzFeedMedia Landscape Analysis of Snapchat Discover - NHBuzzFeed
Media Landscape Analysis of Snapchat Discover - NHBuzzFeed
 
Sertifikat pkl 2015
Sertifikat pkl 2015Sertifikat pkl 2015
Sertifikat pkl 2015
 
Bedah kasus etika valdez
Bedah kasus etika valdezBedah kasus etika valdez
Bedah kasus etika valdez
 
Recent COSO Internal Control and Risk Management Developments
Recent COSO Internal Control and Risk Management DevelopmentsRecent COSO Internal Control and Risk Management Developments
Recent COSO Internal Control and Risk Management Developments
 
Rmk bab 7 scott aplikasi perspektif pengukuran
Rmk bab 7 scott aplikasi perspektif pengukuranRmk bab 7 scott aplikasi perspektif pengukuran
Rmk bab 7 scott aplikasi perspektif pengukuran
 

Similar to Edward D Cockman Jr Resume

Green Jason C Resume
Green Jason C ResumeGreen Jason C Resume
Green Jason C ResumeJason Green
 
Planning Engineer CV Faizan
Planning Engineer CV FaizanPlanning Engineer CV Faizan
Planning Engineer CV FaizanFaizan Ahmed
 
Sonny james daigrepont_resume' (6)
Sonny james daigrepont_resume' (6)Sonny james daigrepont_resume' (6)
Sonny james daigrepont_resume' (6)Sonny Daigrepont
 
Gary giblock resume 2 21-17
Gary giblock resume 2 21-17Gary giblock resume 2 21-17
Gary giblock resume 2 21-17Gary Giblock
 
Presentation_Resume.p164007.f1586933
Presentation_Resume.p164007.f1586933Presentation_Resume.p164007.f1586933
Presentation_Resume.p164007.f1586933Dane Wise
 
Gary Armstrong Resume-2
Gary Armstrong Resume-2Gary Armstrong Resume-2
Gary Armstrong Resume-2Gary Armstrong
 
Gary giblock resume 1 31-17
Gary giblock resume 1 31-17Gary giblock resume 1 31-17
Gary giblock resume 1 31-17Gary Giblock
 
Matthew J Rockey Resume
Matthew J Rockey ResumeMatthew J Rockey Resume
Matthew J Rockey ResumeMatthew Rockey
 
shane-michael-elcoate-CV
shane-michael-elcoate-CVshane-michael-elcoate-CV
shane-michael-elcoate-CVShane Elcoate
 
shane-michael-elcoate-CV
shane-michael-elcoate-CVshane-michael-elcoate-CV
shane-michael-elcoate-CVShane Elcoate
 
Manufacturing engineer CV template
Manufacturing engineer CV templateManufacturing engineer CV template
Manufacturing engineer CV templateMina Gergis
 
James Beam resume1
James Beam resume1James Beam resume1
James Beam resume1James Beam
 

Similar to Edward D Cockman Jr Resume (20)

Green Jason C Resume
Green Jason C ResumeGreen Jason C Resume
Green Jason C Resume
 
Todd's Resume
Todd's ResumeTodd's Resume
Todd's Resume
 
Planning Engineer CV Faizan
Planning Engineer CV FaizanPlanning Engineer CV Faizan
Planning Engineer CV Faizan
 
Sonny james daigrepont_resume' (6)
Sonny james daigrepont_resume' (6)Sonny james daigrepont_resume' (6)
Sonny james daigrepont_resume' (6)
 
JWBRESUME
JWBRESUMEJWBRESUME
JWBRESUME
 
Gary giblock resume 2 21-17
Gary giblock resume 2 21-17Gary giblock resume 2 21-17
Gary giblock resume 2 21-17
 
Presentation_Resume.p164007.f1586933
Presentation_Resume.p164007.f1586933Presentation_Resume.p164007.f1586933
Presentation_Resume.p164007.f1586933
 
Kevin Wells
Kevin WellsKevin Wells
Kevin Wells
 
Gary Armstrong Resume-2
Gary Armstrong Resume-2Gary Armstrong Resume-2
Gary Armstrong Resume-2
 
Gary giblock resume 1 31-17
Gary giblock resume 1 31-17Gary giblock resume 1 31-17
Gary giblock resume 1 31-17
 
Matthew J Rockey Resume
Matthew J Rockey ResumeMatthew J Rockey Resume
Matthew J Rockey Resume
 
shane-michael-elcoate-CV
shane-michael-elcoate-CVshane-michael-elcoate-CV
shane-michael-elcoate-CV
 
shane-michael-elcoate-CV
shane-michael-elcoate-CVshane-michael-elcoate-CV
shane-michael-elcoate-CV
 
Resume1
Resume1Resume1
Resume1
 
keith doc rev1
keith doc rev1keith doc rev1
keith doc rev1
 
Manufacturing engineer CV template
Manufacturing engineer CV templateManufacturing engineer CV template
Manufacturing engineer CV template
 
Dulan_Resume_QE
Dulan_Resume_QEDulan_Resume_QE
Dulan_Resume_QE
 
James Beam resume1
James Beam resume1James Beam resume1
James Beam resume1
 
Sureshkumar. s resume latest new
Sureshkumar. s resume latest newSureshkumar. s resume latest new
Sureshkumar. s resume latest new
 
SURESHKUMAR. S RESUME LATEST new
SURESHKUMAR. S RESUME LATEST newSURESHKUMAR. S RESUME LATEST new
SURESHKUMAR. S RESUME LATEST new
 

Edward D Cockman Jr Resume

  • 1. EDWARD D COCKMAN JR 2603 Lilac St., Pasadena, TX 77503 | H: 832-677-4270 | Civiced77@gmail.com Summary Highly accomplished management professionalwith 18 years of experience in operations, team management,safety and regulatorycompliance,and strategicplanning.Results- oriented, decisive leader with proven success in implementing effective process improvements. Pragmatic and focused in dynamicfluid environments. Highlights Strategic planning Production scheduling familiarity Procedure development Process improvement strategies Systems implementation Inventory control Production scheduling familiarity Quality inspection professional Productivity improvement specialist Troubleshooting and problem solving Mathematicalreasoningaptitude Expert metalworking ability Accomplishments Strategically increasing productivity through the implementation ofvarious process improvements. Consistently meeting project schedule and workload goals by managingand allocating proper staff levels. Using operationalknowledge of systems, parts and components to solve problems that arise duringproduction. Ongoing development processes enablingproduction that was previously impervious. Youngest Shift supervisor in the 20 year historyof JSW. Experience Shift supervisor/4Hi Operator Jan 2010 to Current JSW Steel - Baytown, Texas Planning,organizing,and directingproduction operations to ensure optimalreturn on investment for the company. Maximizingproductivityby leading on-the-job training focusing on safety practices and procedures and managing both human and materialresources to meet production targets. Overseeingqualityassurance initiatives to design and implement products and processes for ongoing projects. Directing alloperations in the milldepartment including but not limited to charging, heating, extraction, roughing,finishing, gauging and leveling. Identifying inefficiencies and made recommendations for process improvements. Implementingroot cause and corrective actions to remove production constraints and improve product quality. Defining manufacturingperformance standards and reviewed the performance outcomes to set future targets. Improvingefficiencyand productivity byeliminatingwaste and production constraints. Reviewingproduction orders,schedules,delivery dates and inventorylevels to determine product availability. Completingkey projects on time, on budget and with a high levelof accuracy. Finishing the hot rollingprocess bymanufacturing plate to ordered gauge and length.
  • 2. 2Hi Operator Jan 2001 to Jan 2010 JSW Steel - Baytown, Texas Mediated information transfer between slab dept. and milldept. Provided initialhot slab roughingand produced product width as ordered bycustomer. Leveler Operator Jan 2000 to Jan 2001 JSW Steel - Baytown, Texas Addressed any finalflatness concerns ofplates through use ofa hydraulicpress and provided a serialnumber for proper identification. Cooling Bed Operator Jan 1999 to Jan 2000 JSW Steel - Baytown, Texas Accepted plates from the hot milland transferred them in sequence around a processingbed for cooling. Layer Out Jan 1999 to Jan 2000 JSW Steel - Baytown, Texas Coordinated and expedited operations between Cooling Bed,MarkingMachine, Painter/Stamper and Shear department for efficient transition and finalprocessing of customers product. Provided Quality Controlsupport to hot milloperators for gauge, width,and surface conditions Marking Machine Operator Jan 1998 to Jan 1999 JSW Steel - Baytown, Texas Measured and marked plates for cutting based on dimensions provided bythe customer. Painter/Stamper Jan 1998 to Jan 1999 JSW Steel - Baytown, Texas Identified and labeled products with customer information and materialspecifications accordingly. Certifications ANSI API ISO ASTM Heavy Equipment