FTF Fusion Utilization


                                                    Team members


                                         •     Team Leader : C.S.Tu
                                         •     CSTD : Peace Lin.
                                         •     Equipment TESEC: J.T.Chiu.
                                         •     System Group :C.S.Tu




Division, Content owner, Date(in numbers), ISO No                           2
Fusion Utilization Status
                 Item  Month                Nov-02                         Dec-02
           Working Testers                     6.3                           8.3
           Non-Schedule Time
              Meal / Break time+Holiday        0.0                            0.0
              No Order                         4.8                           18.7
              Sub Total                        4.8                           18.7
           Planning Utilization (a)           95.2                           81.3
           Unschedule Downtime
             Maintenance Delay                 1.6                           1.0
             Tester repair time                4.5               2.9%        2.3
           Sub Total                           6.1                           3.3
           Schedule Downtime                             (2.8% Sub Total)
             PM / Calibration                  0.6                           0.3
             Change over time                  1.4                           1.3
           Sub Total                           2.1                           1.5
           Engineering time                    3.8               1.4%        5.2
           Standby Time
              Small stop                       3.8               1.2%         2.6
              Waiting for material             0.0                            0.0
              Type down related stop           2.8               1.5%         4.3
             Handler down related stop         1.9               0.5%         2.4
             Handle PM                         0.0                            0.0
             Others                            3.6               0.2%         3.4
           Sub Total                          12.0                           12.7
           Productive Time
              Production                      66.7                           51.0
              Maunal Test                      0.1                            0.3
              Tester unstable                  4.0               2.4%         6.4
              Handler unstable                 0.4                            0.8
           Sub Total                          71.2                           58.5


           Planning Utilization (a)         95.2                             81.3
           Operation Utilization (b)        74.8                             71.4
           Overall Tester Utilization (a)x(b)
                                            71.2                             58.5

             Overall Tester Utilization from Output
                                                  53.2                       30.3
Division, Content owner, Date(in numbers), ISO No                                    3
Standby Time Analysis ( Dec-02)
         * Standby time in Dec have 12.7% more than in Nov.
                                                                    Small stop
                                                    Wait for Type    21%
              Others                                     0%
             27%                                                            Waiting for
                                                                            material
                                                                             0%
        Handle PM
          0%

                                                                            Type down
        Handler down                                                      related stop
        related stop                                                          33%
            19%

      -Plan_list is here !

Division, Content owner, Date(in numbers), ISO No                                         4
System Down Root Causes analysis (Dec-02)

         Tester Repair Time have 4.5% in Nov and 2.7% in Dec :
         Root Cause:
                              In Nov Fusion FTF had two testers down because of its VME
                              power Supply and Lamda power pupply, the VME power
                              supply (no spare on hand).
         Action :
                              Investigate adding this part to LSI item.(Fixed at WK248)

         Engineering time 3.8% in Nov and 5.2% in Dec :
         Root cause :
                               Depend on users .



Division, Content owner, Date(in numbers), ISO No                                         5
Small Stop Causes analysis (Dec-02)

                 Small Stop have 3.8% in Nov and 2.6% in Dec
         Root causes :
                              * System problems, handler problems and types problems cause
                                 high small stop .
                              * In Dec >18% of No order , high idle rate .


         Improvement direction :
                              * Need supports form RM group record down the small down .
                              * Need Type/System/Eguip to improve their equipments down. .
                              * Need Operator’s Leader to monitor the small stop.




Division, Content owner, Date(in numbers), ISO No                                            6
Others Down Root Causes analysis (Dec-02)
         “Others “ have 3.5% n Dec lower than 3.6% in Nov and
         4.5% in Oct .
         Root Causes :
         Others Down Analysis in Nov
                                                                             等待生產 (Wait for
                                                    換 Type完成等待生              devices for prod)1%
                                                    產 (wait for prod after
                                                     change type )0%                             等待換 Type
                           高壓空氣不足                                                            (WaitforChangeType)
                         (Vaccum Problem)0%                                                           6%
                                                                                             機台待升降溫度
                                                                                             (handler Warm up)
                                                                                                    11%




                                      讀程式 (Load
                                       program)
                                         82%



       Action:
       Investigate histroy in ACS , prevent unnecessary action in reading test
       program when type /sysem/ equip problems happen.
Division, Content owner, Date(in numbers), ISO No                                                                  7
Type Down Root Causes analysis (Dec-02)
         •In Nov & Dec have different status of type down :
         (Compared with Type Down.)
         In Nov the Main Types Down % (Nov/2002)               In Dec the Main Types Down% (Dec/2002)
         PCD8012H/E27/4                             14.27%     PCF50601ET/N5/S30                   31.22%
         PCF50601ET/N5/S30                          14.40%     PCD8012H/E27/4                      12.64%
         VP40584B3                                  12.54%     VP40581H4                           11.81%
         OM6353E/271/2                               8.79%     VP40581H7                            9.19%
         PCF87750E/F2                                8.71%     OM6353E/2A3/2                        7.38%
         VP40554-2                                   8.59%     OM6353E/2A3/2/M1                     5.76%


                   120.00%


                   100.00%


                     80.00%


                     60.00%


                     40.00%


                     20.00%


                       0.00%

        Top Three Down Oc
                     In  t                        In Oct     I n No Nov
                                                                 Inv                   In Dec c
                                                                                           I n De

        QA un-pass                              56.75%         35.67%                  31.66%
        Low yi el d                             11.25%         19.16%                  17.09%
        Al l fai l                              11.25%         16.26%                  32.27%
        Change Type Fai l                        7.70%         16.14%                  18.98%


Division, Content owner, Date(in numbers), ISO No                                                           8
Handler Down Root Causes analysis ( Dec-02)
                                                                                                               Root Causes Analysis
                                                                                                 Top Three problems in Handler In Nov
                                                                                                                  In Oct                       In Dec
                                                                                                 機台區問題

    * TESEC’s Loader and Un-Loader still                                                         (Handler loader
                                                                                                 area )
                                                                                                                       31.84%   34.45%           41.91%


    are the main problems.                                                                       機台異常
                                                                                                 (Index problem)
                                                                                                                       23.79%   32.69%           19.88%


                                                                                                 機台區問題
                                                                                                 (Hnadler unloader     26.10%   16.25%           21.64%
                              Unstable Handler Analysis                                          area)
           In Oct                       In Nov                       In Dec
   Handler_idP                 Handler_idP                 Handler_idProble
                Percentage                   Percentage             m
                                                                               Down Percentage
     roblem                     roblem
       3940            14.96%           3952        30.38%         3955             12.84%                 *Also found some TESEC
       3955
       3958
                       16.11%
                       32.62%
                                        3955
                                        3959
                                                    20.80%
                                                    17.66%
                                                                   3959
                                                                   3976
                                                                                    11.13%
                                                                                    13.57%
                                                                                                           are unstable , especially
       3959            15.07%           4303        15.20%         4303             16.90%                 3955 & 3959 .
     90.00%

     80.00%
                                                                                                                          機台異常       (I ndex
     70.00%
                                                                                                                          problem)

     60.00%

     50.00%                                                                                                               機台區問題(Hnadler
                                                                                                                          unloader area)
     40.00%

     30.00%

     20.00%                                                                                                               機台區問題 (Handl er
                                                                                                                          loader area )
     10.00%

      0.00%
          In Oct                                          In Nov                                              In Dec


Division, Content owner, Date(in numbers), ISO No                                                                                                         9
Tester utilization fusion dec 2002_cs tu

More Related Content

More from Stone Striker

Hr file p_candidate_overview_template040127
Hr file p_candidate_overview_template040127Hr file p_candidate_overview_template040127
Hr file p_candidate_overview_template040127Stone Striker
 
Mse procedure synchro
Mse procedure synchroMse procedure synchro
Mse procedure synchroStone Striker
 
Pre screen double-check
Pre screen double-checkPre screen double-check
Pre screen double-checkStone Striker
 
Fusion material (psk meeting)
Fusion material (psk meeting)Fusion material (psk meeting)
Fusion material (psk meeting)Stone Striker
 
Data viewer improvement
Data viewer improvementData viewer improvement
Data viewer improvementStone Striker
 
Tsmm tester utilization ftf&wtf_sep 06 2004
Tsmm tester utilization ftf&wtf_sep 06 2004Tsmm tester utilization ftf&wtf_sep 06 2004
Tsmm tester utilization ftf&wtf_sep 06 2004Stone Striker
 
What Operation Utilization Done by C.S.Tu
What Operation Utilization Done by C.S.TuWhat Operation Utilization Done by C.S.Tu
What Operation Utilization Done by C.S.TuStone Striker
 
Tsmm tester utilization ftf_jun 2004
Tsmm tester utilization ftf_jun 2004Tsmm tester utilization ftf_jun 2004
Tsmm tester utilization ftf_jun 2004Stone Striker
 

More from Stone Striker (20)

Hang problem
Hang problemHang problem
Hang problem
 
Hr file p_candidate_overview_template040127
Hr file p_candidate_overview_template040127Hr file p_candidate_overview_template040127
Hr file p_candidate_overview_template040127
 
Mse procedure synchro
Mse procedure synchroMse procedure synchro
Mse procedure synchro
 
Mse procedure delta
Mse procedure deltaMse procedure delta
Mse procedure delta
 
Fusion repair
Fusion repairFusion repair
Fusion repair
 
Pre screen double-check
Pre screen double-checkPre screen double-check
Pre screen double-check
 
Fusion improvement
Fusion improvementFusion improvement
Fusion improvement
 
Fusion material (psk meeting)
Fusion material (psk meeting)Fusion material (psk meeting)
Fusion material (psk meeting)
 
Dow duw
Dow duwDow duw
Dow duw
 
Q4 qrm 2003
Q4 qrm 2003Q4 qrm 2003
Q4 qrm 2003
 
Q2 qrm 2005_ok
Q2 qrm 2005_okQ2 qrm 2005_ok
Q2 qrm 2005_ok
 
Qrm 2004 final
Qrm 2004 finalQrm 2004 final
Qrm 2004 final
 
Qit fusion 2003_apr
Qit fusion 2003_aprQit fusion 2003_apr
Qit fusion 2003_apr
 
Data viewer improvement
Data viewer improvementData viewer improvement
Data viewer improvement
 
Tsmm tester utilization ftf&wtf_sep 06 2004
Tsmm tester utilization ftf&wtf_sep 06 2004Tsmm tester utilization ftf&wtf_sep 06 2004
Tsmm tester utilization ftf&wtf_sep 06 2004
 
Tsmm fusion f_w
Tsmm fusion f_wTsmm fusion f_w
Tsmm fusion f_w
 
What Operation Utilization Done by C.S.Tu
What Operation Utilization Done by C.S.TuWhat Operation Utilization Done by C.S.Tu
What Operation Utilization Done by C.S.Tu
 
Ltx 2003 q1_kpi
Ltx 2003 q1_kpiLtx 2003 q1_kpi
Ltx 2003 q1_kpi
 
Fusion ut
Fusion utFusion ut
Fusion ut
 
Tsmm tester utilization ftf_jun 2004
Tsmm tester utilization ftf_jun 2004Tsmm tester utilization ftf_jun 2004
Tsmm tester utilization ftf_jun 2004
 

Recently uploaded

SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024The Digital Insurer
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDGMarianaLemus7
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024BookNet Canada
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr LapshynFwdays
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
Bluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfBluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfngoud9212
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions
 

Recently uploaded (20)

SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptxVulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDG
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
Bluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfBluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdf
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping Elbows
 

Tester utilization fusion dec 2002_cs tu

  • 1. Tester Utilization (Fusion, FTF) Date: Jan.02, 2003 By: CS Tu
  • 2. FTF Fusion Utilization Team members • Team Leader : C.S.Tu • CSTD : Peace Lin. • Equipment TESEC: J.T.Chiu. • System Group :C.S.Tu Division, Content owner, Date(in numbers), ISO No 2
  • 3. Fusion Utilization Status Item Month Nov-02 Dec-02 Working Testers 6.3 8.3 Non-Schedule Time Meal / Break time+Holiday 0.0 0.0 No Order 4.8 18.7 Sub Total 4.8 18.7 Planning Utilization (a) 95.2 81.3 Unschedule Downtime Maintenance Delay 1.6 1.0 Tester repair time 4.5 2.9% 2.3 Sub Total 6.1 3.3 Schedule Downtime (2.8% Sub Total) PM / Calibration 0.6 0.3 Change over time 1.4 1.3 Sub Total 2.1 1.5 Engineering time 3.8 1.4% 5.2 Standby Time Small stop 3.8 1.2% 2.6 Waiting for material 0.0 0.0 Type down related stop 2.8 1.5% 4.3 Handler down related stop 1.9 0.5% 2.4 Handle PM 0.0 0.0 Others 3.6 0.2% 3.4 Sub Total 12.0 12.7 Productive Time Production 66.7 51.0 Maunal Test 0.1 0.3 Tester unstable 4.0 2.4% 6.4 Handler unstable 0.4 0.8 Sub Total 71.2 58.5 Planning Utilization (a) 95.2 81.3 Operation Utilization (b) 74.8 71.4 Overall Tester Utilization (a)x(b) 71.2 58.5 Overall Tester Utilization from Output 53.2 30.3 Division, Content owner, Date(in numbers), ISO No 3
  • 4. Standby Time Analysis ( Dec-02) * Standby time in Dec have 12.7% more than in Nov. Small stop Wait for Type 21% Others 0% 27% Waiting for material 0% Handle PM 0% Type down Handler down related stop related stop 33% 19% -Plan_list is here ! Division, Content owner, Date(in numbers), ISO No 4
  • 5. System Down Root Causes analysis (Dec-02) Tester Repair Time have 4.5% in Nov and 2.7% in Dec : Root Cause: In Nov Fusion FTF had two testers down because of its VME power Supply and Lamda power pupply, the VME power supply (no spare on hand). Action : Investigate adding this part to LSI item.(Fixed at WK248) Engineering time 3.8% in Nov and 5.2% in Dec : Root cause : Depend on users . Division, Content owner, Date(in numbers), ISO No 5
  • 6. Small Stop Causes analysis (Dec-02) Small Stop have 3.8% in Nov and 2.6% in Dec Root causes : * System problems, handler problems and types problems cause high small stop . * In Dec >18% of No order , high idle rate . Improvement direction : * Need supports form RM group record down the small down . * Need Type/System/Eguip to improve their equipments down. . * Need Operator’s Leader to monitor the small stop. Division, Content owner, Date(in numbers), ISO No 6
  • 7. Others Down Root Causes analysis (Dec-02) “Others “ have 3.5% n Dec lower than 3.6% in Nov and 4.5% in Oct . Root Causes : Others Down Analysis in Nov 等待生產 (Wait for 換 Type完成等待生 devices for prod)1% 產 (wait for prod after change type )0% 等待換 Type 高壓空氣不足 (WaitforChangeType) (Vaccum Problem)0% 6% 機台待升降溫度 (handler Warm up) 11% 讀程式 (Load program) 82% Action: Investigate histroy in ACS , prevent unnecessary action in reading test program when type /sysem/ equip problems happen. Division, Content owner, Date(in numbers), ISO No 7
  • 8. Type Down Root Causes analysis (Dec-02) •In Nov & Dec have different status of type down : (Compared with Type Down.) In Nov the Main Types Down % (Nov/2002) In Dec the Main Types Down% (Dec/2002) PCD8012H/E27/4 14.27% PCF50601ET/N5/S30 31.22% PCF50601ET/N5/S30 14.40% PCD8012H/E27/4 12.64% VP40584B3 12.54% VP40581H4 11.81% OM6353E/271/2 8.79% VP40581H7 9.19% PCF87750E/F2 8.71% OM6353E/2A3/2 7.38% VP40554-2 8.59% OM6353E/2A3/2/M1 5.76% 120.00% 100.00% 80.00% 60.00% 40.00% 20.00% 0.00% Top Three Down Oc In t In Oct I n No Nov Inv In Dec c I n De QA un-pass 56.75% 35.67% 31.66% Low yi el d 11.25% 19.16% 17.09% Al l fai l 11.25% 16.26% 32.27% Change Type Fai l 7.70% 16.14% 18.98% Division, Content owner, Date(in numbers), ISO No 8
  • 9. Handler Down Root Causes analysis ( Dec-02) Root Causes Analysis Top Three problems in Handler In Nov In Oct In Dec 機台區問題 * TESEC’s Loader and Un-Loader still (Handler loader area ) 31.84% 34.45% 41.91% are the main problems. 機台異常 (Index problem) 23.79% 32.69% 19.88% 機台區問題 (Hnadler unloader 26.10% 16.25% 21.64% Unstable Handler Analysis area) In Oct In Nov In Dec Handler_idP Handler_idP Handler_idProble Percentage Percentage m Down Percentage roblem roblem 3940 14.96% 3952 30.38% 3955 12.84% *Also found some TESEC 3955 3958 16.11% 32.62% 3955 3959 20.80% 17.66% 3959 3976 11.13% 13.57% are unstable , especially 3959 15.07% 4303 15.20% 4303 16.90% 3955 & 3959 . 90.00% 80.00% 機台異常 (I ndex 70.00% problem) 60.00% 50.00% 機台區問題(Hnadler unloader area) 40.00% 30.00% 20.00% 機台區問題 (Handl er loader area ) 10.00% 0.00% In Oct In Nov In Dec Division, Content owner, Date(in numbers), ISO No 9