3. 2004 Actions Planning for System
1. Add one item in check list of PM, Use gauge to check & re-align docking.
(Done at WK412 WTFs.)
2. PECHF will have a trial on Fusion for PECHF high failures improvements.
(Ongoing)
3. OM6357 “Stuck-at ” problem caused by register during production.
(Ongoing)
4. SMS, Open “data_login” function for analysis SMS failure during SMS
calibration (Done WK412.)
5. SMS rev 02 & 03 ex-change because of higher failure rates
(Ongoing “exchange by fail)