Problem
Design of M25 grade concrete mix as per IS:10262-
2009, Concrete mix proportioning guidelines
1. Design Stipulations For Proportioning
i. Grade designation : M25
ii. Type of cement : OPC 43 grade confirming to IS 8112ii. Type of cement : OPC 43 grade confirming to IS 8112
iii. Maximum nominal size of C.A. : 20 mm
iv. Minimum cement content : 320 Kg/m3
v. Maximum water cement ratio : 0.55
vi. Workability : 75 mm (slump)
vii. Exposure condition : Mild
viii. Degree of supervision : Good
ix. Type of aggregate : Crushed angular aggregate
x. Maximum cement content : 450 kg/m3
xi. Chemical admixture : Not recommended
2. Test Data For Materials2. Test Data For Materials
p) Cement used : OPC 43 grade confirming to IS 8112
q) Specific gravity of cement : 3.15
r) Specific gravity of (SSD Condition):
i. Coarse aggregate : 2.68
ii. Fine aggregate : 2.65
s) Water absorption:
i. Coarse aggregate : 0.6 percent
ii. Fine aggregate : 1.0 percent
t) Free (surface) moisture:
i. Coarse aggregate : Nili. Coarse aggregate : Nil
ii. Fine aggregate : Nil
u) Sieve analysis result (Conforming IS: 383)
i. Coarse aggregate : Table 2 of IS: 383
ii. Fine aggregate : Zone I of IS: 383
3.Target Strength For Mix Proportioning
Fck = fck + 1.65 x S
Where,
Fck = Target average compressive strength at 28 days,
fck = Characteristic compressive strength at 28 days,fck = Characteristic compressive strength at 28 days,
S= Standard deviation
From Table 1 standard deviation, S = 4 N/mm2
Therefore, Target strength,
Fck = 25 + 1.65 x 4 = 31.60 N/mm2
4. Selection of Water Cement Ratio
From Table 5 of IS:456-2000, maximum water cement
ratio = 0.55 (Mild exposure),
adopt water cement ratio as 0.50.
So, 0.5 < 0.55, hence ok.
5. Selection of Water Content5. Selection of Water Content
From Table-2, IS:10262, maximum water content =
186 liters (for 25mm to 50mm slump range and for 20
mm aggregates)
Estimated water content for 75 mm slump = 186
+ 3/100 x186 = 191.6 liters
6. Calculation of Cement Content
Water cement ratio = 0.50
Cement content = W.C./w-c ratio=191.6/0.5=383 kg/m3 i.e.
> 320 kg/m3 also, mini. cement content as per Table 5 of
IS: 456 for mild exposure condition =300 kg/m3 and
also < 450 kg/m3 Hence, Ok.
7. Proportion of Volume of Coarse Aggregate and Fine7. Proportion of Volume of Coarse Aggregate and Fine
Aggregate Content:
From Table 3, of IS:10262 corresponding to 20 mm size
aggregate and fine aggregate (Zone I) for water-cement
ratio of 0.50
volume of coarse aggregate =0.60
8. Mix Calculations
The mix calculations per unit volume of concrete shall
be as:
a) Volume of concrete = 1 m3
b) Volume of cement =[383.16/3.15] x [1/1000]
3= 0.122 m3
c) Volume of water = [192/1] x [1/1000] = 0.192 m3
d) Volume of all in aggregates =(a) – (b) – (c)
= 1 – 0.122 – 0.192
= 0.686 m3
e) Mass of coarse
aggregates = (d) x Volume of CA x sp. gravity of CA
= 0.686 x 0.6 x 2.68 x 1000
= 1103 kg
f) Mass off) Mass of
fine aggregates = (d) x Vol. of FA x sp. gravity of FA
= 0.686 x 0.4 x 2.65 x 1000
= 727 kg
9. Estimated quantities for Trial Mix 1 (SSD Condition)
Cement = 383 kg/m3
Water = 191.6 kg/m3
Fine aggregate = 727 kg/m3
Coarse aggregates = 1103 kg/m3
Water cement ratio = 0.50Water cement ratio = 0.50
Yield =(383+191.6+727+1103)=2404.6 kg/m3
10.Mix Proportions For Trial Number 1 (SSD)
w/c=0.50; Cement :Fine Agg. :Coarse agg.
1 : 1.89 : 2.88
11. Correction for free surface moisture and water
absorption (Aggregates other than SSD):
 As per IS:10262 aggregates shall be used in SSD condition.
 If no, allowance shall be made for the free (surface)
moisture contributed by the fine and coarse aggregates.
 if the aggregates are dry, the amount of mixing water shall
be increased by an amount equal to the moisture likely tobe increased by an amount equal to the moisture likely to
be absorbed by the aggregates.
 Necessary adjustments are also required to be made in
mass of aggregates.
 Provided the surface water and percentage water
absorption of aggregates shall be determined according to
IS 2386 after that the will be check by trial mix / batches.
Correction for free surface moisture and water absorption
(Aggregates other than SSD):
(In our case the coarse and fine aggregates are in dry condition as
water absorption is given)
a) Fine Aggregate (Dry) = (Mass of SSD F.A.) / {1+((water absorp. by F.A.)/100)}
= 727 /{1+((1)/100)}
= 719.802 kg/m3
b) Coarse Aggregate (Dry) = (Mass of SSD C.A.) /{1+((water absorp. C.A.)/100)}b) Coarse Aggregate (Dry) = (Mass of SSD C.A.) /{1+((water absorp. C.A.)/100)}
= 1103 /{1+((0.6)/100)}
=1096.42 kg/m3
c) The extra water to be added for absorption:
Fine Aggregate = (Mass of FA in SSD condition – Mass of FA in dry condition)
= 727 – 719.802
= 7.2 kg
coarse Aggregate = (Mass of CA in SSD condition – Mass of CA in dry condition)
= 1103 – 1096.42
= 6.58 kg
c) The extra water to be added
for absorption = water absorbed by F.A. + water absorbed by C.A.
= 7.2 + 6.58
= 13.78 kg
Estimated water content will be = water content before correction + water
to be added for absorption
= 191.6+13.78
= 205.38 kg
12. Final Estimated quantities : For Trial mix Number 112. Final Estimated quantities : For Trial mix Number 1
Cement = 383 kg/m3
Water = 205.38 kg/m3
Fine aggregate = 719.802 kg/m3
Coarse aggregates = 1096.42 kg/m3
Water cement ratio = 0.536
Yield =(383+205.38+719.802+1096.42)= 2404.602kg/m3
13. Final Mix Proportions For Trial Number 1 (SSD)
w/c=0.536;
Cement :Fine Agg. :Coarse agg.
1 : 1.879 : 2.863
Trial Batches or Mixes:
 The calculated mix proportions shall be checked by The calculated mix proportions shall be checked by
means of trial batches.
 Quantity of concrete (materials) for each trial shall
be enough for casting at least three 150 mm size
cubes and to carry out workability test according to
IS: 1199.
 Trial Mix 1: should be checked for workability and
freedom from segregation and Bleeding and its
finishing property.
 Trial Mix 2: If the measured workability Trial mix 1
different from the stipulated value, the water and/or
admixture content shall be adjusted suitably. With thisadmixture content shall be adjusted suitably. With this
adjustment, the mix proportion shall be recalculated
keeping the free water-cement ratio at the pre-
selected value.
 Trial Mix 3: change water-cement ratio by + 10 % of
preselected or finally reached value and recalculate
mix proportions.
 Trial Mix 4: change water-cement ratio by - 10 % of
preselected or finally reached value and recalculate
mix proportions.
 Testing for trial mix numbers 2, 3, 4 are done
simultaneously.
 These tests normally provide sufficient information, These tests normally provide sufficient information,
including the relationship between compressive
strength and water-cement ratio, from which the
mix proportions for field trials may be arrived.
Trial mix No. 1 2 3 4
Final mix
proportions
Qty. per bag
of cement (kg)Ingredient Quantity per cu. meter
Water-cement ratio
Cement .
Water
C.A.-I ( %)
C.A.-II ( %)
F.A.
W
Mix Proportions Summary
W
O
R
K
ability
Slump(mm)
C.F.
Flow Table
Visual Observations
Comp.
Strength
(N/mm2)
7
Days
28
Days
Remark
17
Numerical problem on concrete mix design by is 10262(2009) method

More Related Content

What's hot

workability test of concrete
workability test of concreteworkability test of concrete
workability test of concreteKaran Patel
 
Marshall Mix Design
Marshall Mix Design Marshall Mix Design
Marshall Mix Design Akhil Ahuja
 
Creep and shrinkage
Creep and shrinkageCreep and shrinkage
Creep and shrinkageAsad Rehman
 
Overview of Soil Stabilization :Cement / Lime :PPT
Overview of Soil Stabilization :Cement / Lime :PPTOverview of Soil Stabilization :Cement / Lime :PPT
Overview of Soil Stabilization :Cement / Lime :PPTAniket Pateriya
 
Flexible and-rigid-pavements
Flexible and-rigid-pavementsFlexible and-rigid-pavements
Flexible and-rigid-pavementsHARITSEHRAWAT
 
Consolidation settlement
Consolidation settlementConsolidation settlement
Consolidation settlementParth Joshi
 
Problems on bearing capacity of soil
Problems on bearing capacity of soilProblems on bearing capacity of soil
Problems on bearing capacity of soilLatif Hyder Wadho
 
Concrete- types, testing & properties
Concrete- types, testing & propertiesConcrete- types, testing & properties
Concrete- types, testing & propertieslalitha moorthy
 
Individual lab report for bd rodded
Individual lab report for bd roddedIndividual lab report for bd rodded
Individual lab report for bd roddedAsaru Champ
 
Compressive strength in concrete test
Compressive strength in concrete testCompressive strength in concrete test
Compressive strength in concrete testSelva Prakash
 
Workability of Concrete
Workability  of ConcreteWorkability  of Concrete
Workability of ConcreteGulraizArshad1
 
California bearingratio test
California bearingratio testCalifornia bearingratio test
California bearingratio testAsok999
 
Problems on piles and deep footing
Problems on piles and deep footingProblems on piles and deep footing
Problems on piles and deep footingLatif Hyder Wadho
 
Geotechnical Engineering-II [Lec #4: Unconfined Compression Test]
Geotechnical Engineering-II [Lec #4: Unconfined Compression Test]Geotechnical Engineering-II [Lec #4: Unconfined Compression Test]
Geotechnical Engineering-II [Lec #4: Unconfined Compression Test]Muhammad Irfan
 

What's hot (20)

Compression member
Compression memberCompression member
Compression member
 
workability test of concrete
workability test of concreteworkability test of concrete
workability test of concrete
 
Marshall Mix Design
Marshall Mix Design Marshall Mix Design
Marshall Mix Design
 
Creep and shrinkage
Creep and shrinkageCreep and shrinkage
Creep and shrinkage
 
Overview of Soil Stabilization :Cement / Lime :PPT
Overview of Soil Stabilization :Cement / Lime :PPTOverview of Soil Stabilization :Cement / Lime :PPT
Overview of Soil Stabilization :Cement / Lime :PPT
 
Flexible and-rigid-pavements
Flexible and-rigid-pavementsFlexible and-rigid-pavements
Flexible and-rigid-pavements
 
Consolidation settlement
Consolidation settlementConsolidation settlement
Consolidation settlement
 
Problems on bearing capacity of soil
Problems on bearing capacity of soilProblems on bearing capacity of soil
Problems on bearing capacity of soil
 
Concrete- types, testing & properties
Concrete- types, testing & propertiesConcrete- types, testing & properties
Concrete- types, testing & properties
 
Individual lab report for bd rodded
Individual lab report for bd roddedIndividual lab report for bd rodded
Individual lab report for bd rodded
 
Design of rigid pavements
Design of rigid pavementsDesign of rigid pavements
Design of rigid pavements
 
Mix design-ppt
Mix design-pptMix design-ppt
Mix design-ppt
 
Compressive strength in concrete test
Compressive strength in concrete testCompressive strength in concrete test
Compressive strength in concrete test
 
Design of footing as per IS 456-2000
Design of footing as per IS 456-2000Design of footing as per IS 456-2000
Design of footing as per IS 456-2000
 
Workability of Concrete
Workability  of ConcreteWorkability  of Concrete
Workability of Concrete
 
California bearingratio test
California bearingratio testCalifornia bearingratio test
California bearingratio test
 
4 permeability and seepage
4  permeability and seepage4  permeability and seepage
4 permeability and seepage
 
Problems on piles and deep footing
Problems on piles and deep footingProblems on piles and deep footing
Problems on piles and deep footing
 
Stiffness Matrix
Stiffness MatrixStiffness Matrix
Stiffness Matrix
 
Geotechnical Engineering-II [Lec #4: Unconfined Compression Test]
Geotechnical Engineering-II [Lec #4: Unconfined Compression Test]Geotechnical Engineering-II [Lec #4: Unconfined Compression Test]
Geotechnical Engineering-II [Lec #4: Unconfined Compression Test]
 

Similar to Numerical problem on concrete mix design by is 10262(2009) method

Concrete Mix Proportioning.pdf
Concrete Mix Proportioning.pdfConcrete Mix Proportioning.pdf
Concrete Mix Proportioning.pdfReigerRoyal
 
CONCRETE Design mix
CONCRETE Design mixCONCRETE Design mix
CONCRETE Design mixMD AMANULLAH
 
a presentation on Concrete Mix Design1.ppt
a presentation on Concrete Mix Design1.ppta presentation on Concrete Mix Design1.ppt
a presentation on Concrete Mix Design1.pptRudraBasugade
 
CON 124 Session 3 - Examples of Concrete Proportioning
CON 124 Session 3 - Examples of Concrete ProportioningCON 124 Session 3 - Examples of Concrete Proportioning
CON 124 Session 3 - Examples of Concrete Proportioningalpenaccedu
 
Concrete design mix (ss)
Concrete design mix (ss)Concrete design mix (ss)
Concrete design mix (ss)Kezar Ali. Shah
 
CONCRETE MIX DESIGN AS PER IS 10262:2009
 CONCRETE MIX DESIGN AS PER IS 10262:2009  CONCRETE MIX DESIGN AS PER IS 10262:2009
CONCRETE MIX DESIGN AS PER IS 10262:2009 Avinash Kumar Gupta
 
Mix design by Indian standard method for M20
Mix design by Indian standard method for M20Mix design by Indian standard method for M20
Mix design by Indian standard method for M20patiltushar941
 
CON 124 - Session 5 - Examples of Concrete Proportioning
CON 124 - Session 5 - Examples of Concrete ProportioningCON 124 - Session 5 - Examples of Concrete Proportioning
CON 124 - Session 5 - Examples of Concrete Proportioningalpenaccedu
 
An Experimental Study on Partial Replacement of Cement with Sugarcane Bagasse...
An Experimental Study on Partial Replacement of Cement with Sugarcane Bagasse...An Experimental Study on Partial Replacement of Cement with Sugarcane Bagasse...
An Experimental Study on Partial Replacement of Cement with Sugarcane Bagasse...IRJET Journal
 
aci-mix-design-example-1.pdf
aci-mix-design-example-1.pdfaci-mix-design-example-1.pdf
aci-mix-design-example-1.pdfXamyto
 
Concrete Mix Design.pptx
Concrete Mix Design.pptxConcrete Mix Design.pptx
Concrete Mix Design.pptxBahzad5
 
Load reduction factor_ǿ
Load reduction factor_ǿLoad reduction factor_ǿ
Load reduction factor_ǿPrionath Roy
 
Load reduction factor_ǿ
Load reduction factor_ǿLoad reduction factor_ǿ
Load reduction factor_ǿPrionath Roy
 
Engineered cementatious composite, mix design of normal concrete, mix design ...
Engineered cementatious composite, mix design of normal concrete, mix design ...Engineered cementatious composite, mix design of normal concrete, mix design ...
Engineered cementatious composite, mix design of normal concrete, mix design ...Azaan Ahmad
 
WATER CEMENT RATIO
WATER CEMENT RATIOWATER CEMENT RATIO
WATER CEMENT RATIOHardik Joshi
 

Similar to Numerical problem on concrete mix design by is 10262(2009) method (20)

Concrete Mix Proportioning.pdf
Concrete Mix Proportioning.pdfConcrete Mix Proportioning.pdf
Concrete Mix Proportioning.pdf
 
CONCRETE Design mix
CONCRETE Design mixCONCRETE Design mix
CONCRETE Design mix
 
Concrete mix design
Concrete mix designConcrete mix design
Concrete mix design
 
a presentation on Concrete Mix Design1.ppt
a presentation on Concrete Mix Design1.ppta presentation on Concrete Mix Design1.ppt
a presentation on Concrete Mix Design1.ppt
 
CON 124 Session 3 - Examples of Concrete Proportioning
CON 124 Session 3 - Examples of Concrete ProportioningCON 124 Session 3 - Examples of Concrete Proportioning
CON 124 Session 3 - Examples of Concrete Proportioning
 
Concrete design mix (ss)
Concrete design mix (ss)Concrete design mix (ss)
Concrete design mix (ss)
 
CONCRETE MIX DESIGN AS PER IS 10262:2009
 CONCRETE MIX DESIGN AS PER IS 10262:2009  CONCRETE MIX DESIGN AS PER IS 10262:2009
CONCRETE MIX DESIGN AS PER IS 10262:2009
 
Mix design by Indian standard method for M20
Mix design by Indian standard method for M20Mix design by Indian standard method for M20
Mix design by Indian standard method for M20
 
CON 124 - Session 5 - Examples of Concrete Proportioning
CON 124 - Session 5 - Examples of Concrete ProportioningCON 124 - Session 5 - Examples of Concrete Proportioning
CON 124 - Session 5 - Examples of Concrete Proportioning
 
An Experimental Study on Partial Replacement of Cement with Sugarcane Bagasse...
An Experimental Study on Partial Replacement of Cement with Sugarcane Bagasse...An Experimental Study on Partial Replacement of Cement with Sugarcane Bagasse...
An Experimental Study on Partial Replacement of Cement with Sugarcane Bagasse...
 
Unit III – Mix Design_1.pptx
Unit III – Mix Design_1.pptxUnit III – Mix Design_1.pptx
Unit III – Mix Design_1.pptx
 
Strength analysis of concrete
Strength analysis of concreteStrength analysis of concrete
Strength analysis of concrete
 
Mix design
Mix designMix design
Mix design
 
aci-mix-design-example-1.pdf
aci-mix-design-example-1.pdfaci-mix-design-example-1.pdf
aci-mix-design-example-1.pdf
 
Concrete Mix Design.pptx
Concrete Mix Design.pptxConcrete Mix Design.pptx
Concrete Mix Design.pptx
 
Load reduction factor_ǿ
Load reduction factor_ǿLoad reduction factor_ǿ
Load reduction factor_ǿ
 
Load reduction factor_ǿ
Load reduction factor_ǿLoad reduction factor_ǿ
Load reduction factor_ǿ
 
Engineered cementatious composite, mix design of normal concrete, mix design ...
Engineered cementatious composite, mix design of normal concrete, mix design ...Engineered cementatious composite, mix design of normal concrete, mix design ...
Engineered cementatious composite, mix design of normal concrete, mix design ...
 
WATER CEMENT RATIO
WATER CEMENT RATIOWATER CEMENT RATIO
WATER CEMENT RATIO
 
Ce305c127&128
Ce305c127&128Ce305c127&128
Ce305c127&128
 

Recently uploaded

Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 

Recently uploaded (20)

★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 

Numerical problem on concrete mix design by is 10262(2009) method

  • 1. Subject: Concrete Technology Numerical Problem on Concrete Mix Design by IS:10262(2009) method by Dnyaneshwar. D. MoreDnyaneshwar. D. More (Assistant Professor) DEPARTMENT OF CIVIL ENGINEERING Sanjivani Rural Education Society’s SANJIVANI COLLEGE OF ENGINEERING, KOPARGAON – 423 603 SAVITRIBAI PHULE PUNE UNIVERSITY, PUNE
  • 2. Problem Design of M25 grade concrete mix as per IS:10262- 2009, Concrete mix proportioning guidelines 1. Design Stipulations For Proportioning i. Grade designation : M25 ii. Type of cement : OPC 43 grade confirming to IS 8112ii. Type of cement : OPC 43 grade confirming to IS 8112 iii. Maximum nominal size of C.A. : 20 mm iv. Minimum cement content : 320 Kg/m3 v. Maximum water cement ratio : 0.55 vi. Workability : 75 mm (slump)
  • 3. vii. Exposure condition : Mild viii. Degree of supervision : Good ix. Type of aggregate : Crushed angular aggregate x. Maximum cement content : 450 kg/m3 xi. Chemical admixture : Not recommended 2. Test Data For Materials2. Test Data For Materials p) Cement used : OPC 43 grade confirming to IS 8112 q) Specific gravity of cement : 3.15 r) Specific gravity of (SSD Condition): i. Coarse aggregate : 2.68 ii. Fine aggregate : 2.65
  • 4. s) Water absorption: i. Coarse aggregate : 0.6 percent ii. Fine aggregate : 1.0 percent t) Free (surface) moisture: i. Coarse aggregate : Nili. Coarse aggregate : Nil ii. Fine aggregate : Nil u) Sieve analysis result (Conforming IS: 383) i. Coarse aggregate : Table 2 of IS: 383 ii. Fine aggregate : Zone I of IS: 383
  • 5. 3.Target Strength For Mix Proportioning Fck = fck + 1.65 x S Where, Fck = Target average compressive strength at 28 days, fck = Characteristic compressive strength at 28 days,fck = Characteristic compressive strength at 28 days, S= Standard deviation From Table 1 standard deviation, S = 4 N/mm2 Therefore, Target strength, Fck = 25 + 1.65 x 4 = 31.60 N/mm2
  • 6. 4. Selection of Water Cement Ratio From Table 5 of IS:456-2000, maximum water cement ratio = 0.55 (Mild exposure), adopt water cement ratio as 0.50. So, 0.5 < 0.55, hence ok. 5. Selection of Water Content5. Selection of Water Content From Table-2, IS:10262, maximum water content = 186 liters (for 25mm to 50mm slump range and for 20 mm aggregates) Estimated water content for 75 mm slump = 186 + 3/100 x186 = 191.6 liters
  • 7. 6. Calculation of Cement Content Water cement ratio = 0.50 Cement content = W.C./w-c ratio=191.6/0.5=383 kg/m3 i.e. > 320 kg/m3 also, mini. cement content as per Table 5 of IS: 456 for mild exposure condition =300 kg/m3 and also < 450 kg/m3 Hence, Ok. 7. Proportion of Volume of Coarse Aggregate and Fine7. Proportion of Volume of Coarse Aggregate and Fine Aggregate Content: From Table 3, of IS:10262 corresponding to 20 mm size aggregate and fine aggregate (Zone I) for water-cement ratio of 0.50 volume of coarse aggregate =0.60
  • 8. 8. Mix Calculations The mix calculations per unit volume of concrete shall be as: a) Volume of concrete = 1 m3 b) Volume of cement =[383.16/3.15] x [1/1000] 3= 0.122 m3 c) Volume of water = [192/1] x [1/1000] = 0.192 m3 d) Volume of all in aggregates =(a) – (b) – (c) = 1 – 0.122 – 0.192 = 0.686 m3
  • 9. e) Mass of coarse aggregates = (d) x Volume of CA x sp. gravity of CA = 0.686 x 0.6 x 2.68 x 1000 = 1103 kg f) Mass off) Mass of fine aggregates = (d) x Vol. of FA x sp. gravity of FA = 0.686 x 0.4 x 2.65 x 1000 = 727 kg
  • 10. 9. Estimated quantities for Trial Mix 1 (SSD Condition) Cement = 383 kg/m3 Water = 191.6 kg/m3 Fine aggregate = 727 kg/m3 Coarse aggregates = 1103 kg/m3 Water cement ratio = 0.50Water cement ratio = 0.50 Yield =(383+191.6+727+1103)=2404.6 kg/m3 10.Mix Proportions For Trial Number 1 (SSD) w/c=0.50; Cement :Fine Agg. :Coarse agg. 1 : 1.89 : 2.88
  • 11. 11. Correction for free surface moisture and water absorption (Aggregates other than SSD):  As per IS:10262 aggregates shall be used in SSD condition.  If no, allowance shall be made for the free (surface) moisture contributed by the fine and coarse aggregates.  if the aggregates are dry, the amount of mixing water shall be increased by an amount equal to the moisture likely tobe increased by an amount equal to the moisture likely to be absorbed by the aggregates.  Necessary adjustments are also required to be made in mass of aggregates.  Provided the surface water and percentage water absorption of aggregates shall be determined according to IS 2386 after that the will be check by trial mix / batches.
  • 12. Correction for free surface moisture and water absorption (Aggregates other than SSD): (In our case the coarse and fine aggregates are in dry condition as water absorption is given) a) Fine Aggregate (Dry) = (Mass of SSD F.A.) / {1+((water absorp. by F.A.)/100)} = 727 /{1+((1)/100)} = 719.802 kg/m3 b) Coarse Aggregate (Dry) = (Mass of SSD C.A.) /{1+((water absorp. C.A.)/100)}b) Coarse Aggregate (Dry) = (Mass of SSD C.A.) /{1+((water absorp. C.A.)/100)} = 1103 /{1+((0.6)/100)} =1096.42 kg/m3 c) The extra water to be added for absorption: Fine Aggregate = (Mass of FA in SSD condition – Mass of FA in dry condition) = 727 – 719.802 = 7.2 kg coarse Aggregate = (Mass of CA in SSD condition – Mass of CA in dry condition) = 1103 – 1096.42 = 6.58 kg
  • 13. c) The extra water to be added for absorption = water absorbed by F.A. + water absorbed by C.A. = 7.2 + 6.58 = 13.78 kg Estimated water content will be = water content before correction + water to be added for absorption = 191.6+13.78 = 205.38 kg 12. Final Estimated quantities : For Trial mix Number 112. Final Estimated quantities : For Trial mix Number 1 Cement = 383 kg/m3 Water = 205.38 kg/m3 Fine aggregate = 719.802 kg/m3 Coarse aggregates = 1096.42 kg/m3 Water cement ratio = 0.536 Yield =(383+205.38+719.802+1096.42)= 2404.602kg/m3
  • 14. 13. Final Mix Proportions For Trial Number 1 (SSD) w/c=0.536; Cement :Fine Agg. :Coarse agg. 1 : 1.879 : 2.863 Trial Batches or Mixes:  The calculated mix proportions shall be checked by The calculated mix proportions shall be checked by means of trial batches.  Quantity of concrete (materials) for each trial shall be enough for casting at least three 150 mm size cubes and to carry out workability test according to IS: 1199.
  • 15.  Trial Mix 1: should be checked for workability and freedom from segregation and Bleeding and its finishing property.  Trial Mix 2: If the measured workability Trial mix 1 different from the stipulated value, the water and/or admixture content shall be adjusted suitably. With thisadmixture content shall be adjusted suitably. With this adjustment, the mix proportion shall be recalculated keeping the free water-cement ratio at the pre- selected value.  Trial Mix 3: change water-cement ratio by + 10 % of preselected or finally reached value and recalculate mix proportions.
  • 16.  Trial Mix 4: change water-cement ratio by - 10 % of preselected or finally reached value and recalculate mix proportions.  Testing for trial mix numbers 2, 3, 4 are done simultaneously.  These tests normally provide sufficient information, These tests normally provide sufficient information, including the relationship between compressive strength and water-cement ratio, from which the mix proportions for field trials may be arrived.
  • 17. Trial mix No. 1 2 3 4 Final mix proportions Qty. per bag of cement (kg)Ingredient Quantity per cu. meter Water-cement ratio Cement . Water C.A.-I ( %) C.A.-II ( %) F.A. W Mix Proportions Summary W O R K ability Slump(mm) C.F. Flow Table Visual Observations Comp. Strength (N/mm2) 7 Days 28 Days Remark 17