SCHOOL OF ARCHITECTURE, BUILDING & DESIGN Research Unit for Modern Architecture 
Studies in Southeast Asia Bachelor of Science (Honours) (Architecture) 
Building Structures (ARC 2523) Prerequisite: Building Construction 2 (ARC2213) 
____________________________________________________________________ 
Project 1 
Fettuccine Truss Bridge 
Loo Giap Sheng 0310390 Gan Chin Bong 0313738 Teo Kean Hui 0310165 
Ng You Sheng 0309997 Kong Chee Seng 0308360
Table of Content 
1.0 Introduction 
1.1 Aims & Objectives 
1.2 Project Scope 
2.0 Precedent Study 
2.1 Overview 
2.2 History 
2.3Structure Details 
3.0 Materials Study 
3.1 Fettuccine 
3.2Materials & Equipment 
4.0 Design & Structure Analysis 
4.1 Design 1 
4.2 Design 2 
4.3 Design 3 & 4 
4.4Design 5 & Final Design 
5.0 Conclusion 
6.0 Appendix 
7.0 References
1.0 Introduction 
1.1 Aim & Objectives 
The objectives of this project are as follows: 
 To develop student’s understanding of tension and compressive strength of 
construction materials 
 To develop student’s understanding of force distribution in a truss 
 To design a perfect truss bridge which fulfils the following criteria: 
 High level of aesthetic value 
 Minimal construction material 
1.2 Project Scope 
As a group, we are required to carry out precedent study of a truss bridge. Then, we have to 
design and construct a truss bridge using fettuccine and adhesive materials such as glue. The 
bridge must be at least 750 millimetres of clear span and weight not more than 200 grams. 
The structure is then tested to carry load until it breaks. 
Efficiency of the bridge can be calculated as follow: 
Efficiency, E = (Maximum Load)² / Weight of Bridge 
In order to achieve higher efficiency, structure analysis have to be carried out to study and 
determine members of tension and compression. Several times of load testing have to be 
carried out to identify structure failure point and weaker truss members. 
2.0 Precedent Study
To have better understanding of truss bridges, appropriate precedent study should be 
carried out. The following is our study of truss bridge: 
Image 2.1: Perspective view of the bridge. Source: Sun Current 
Name: Long Meadow Lake Bridge 
Location: Old Cedar Avenue at Minnesota River, Bloomington, Hennepin. 
Largest spam: 170.0 feet 
Total length: 864.5 feet 
Deck width: 21.0 feet (2 lanes) 
Materials: Steel and Iron 
Type of truss: Camelback truss 
Diagram 2.1 above shows camelback truss. Source: Wikipedia 
2.1 History
The Long Meadow Lake Bridge is a five-span through truss camelback bridge that was built 
in 1920. Before the highway 77 overpass opened in 1981, it was one of the few bridges that 
connects traffic from Old Cedar Avenue to Dokata County. This bridge was given to the City 
of Bloomington by the State of Minnesota in 1981, and was still open to automobile traffic 
as late as 1993. It remained open to pedestrian and bicycle traffic after it was closed to 
vehicle traffic. In the early 2000s, the bridge deck was declared to be unsafe. The bridge was 
deemed unsafe again in 2002, and had to be barricaded at each end. It was scheduled to be 
rehabilitated beginning in 2014. The builder of this bridge was Illinois Steel Bridge Co. Of 
Jacksonville. The bridge today called Old Cedar Avenue Bridge and had average daily traffic 
of 400 vehicles. 
Image 2.2 showing the bridge was closed down in 2002. Source: Johnweeks 
Image 2.3 showing the spring flood in 2010. The water level is just under the bridge deck. 
Source: Johnweeks 
2.2 Structural Details
Image 2.4 showing the beams and decking of the bridge. Part of the decking had already 
teared off. Source: Johnweeks 
Image 2.5 shows the connection between girders and a stringer at the abutment. Note that 
you can see daylight through holes at several spots on this beam, and that the stringer is 
rotted through on the right side of the image. Source: Johnweeks
Image 2.6 showing the bridge bearing at the end of the structure. The bridge structure is 
pushed fully back up against the concrete abutment. This is most likely caused by the bridge 
sagging due to a weakened structure. The pressure is causing the concrete to crack. Source: 
Johnweeks 
Diagram 2.2 showing the joints at the corner end of the bridge. Source: Past-inc. 
org
3.0 Material Study 
3.1 Fettuccine 
Fettuccine is used as the main material for the bridge construction. Before use, fettuccine 
need to be check and filter out those that are twisted; it is to ensure that the load is able to 
distribute evenly and effectively through the flat surface of the fettuccine. 
Dimension: 250mm x 5mm (average) 
Tensile strength: ~2000psi 
Stiffness (E=stress/strain): ~10,000,000psi 
We have tried 2 types of fettuccine to test its strength and weakness: 
San Remo Spinach fettuccine 
San Remo fettuccine 
Strength of material is analyzed: 
 Greenish yellow 
 Slightly harder than normal fettuccine 
 Surface a bit round 
 Gold Yellow 
 Softer than the spinach fettuccine 
 Flat surface 
 Ratio of usable fettuccine is higher 
Shear force Shear force
When the fettuccine is laid flat and the force is only applied on the middle, bending will 
occurs due to tension and compression. 
Shear force Shear force 
When the fettuccine is put upright, the thickness of the fettuccine provide more tensile 
strength then laying it flat. However the narrow surface’s load distribution is much lesser 
than flat surface, this increases pressure on the structure. 
Solution: 
Image 3.1 shows force acting on ‘I’ beam structure. 
‘I’ beam structure is use; both advantages of horizontal and vertical position are able to be 
put in use. When the vertical member is placed in between two horizontal members, the 
horizontal members will enhance the load distributions and the load will transfer to the 
vertical member which can withstand more loads. 
Image 3.2 shows force acting on one side of solid structure 
By adding more vertical members, it enhances the load transfer from horizontal member to 
the vertical members.
3.2 Materials & Equipment: 
PVA UHU Super Glue (Selleys) 
 Water based glue 
causes fettuccine to 
soften 
 Take long time to dry 
 Weak joints 
 Take long time to dry 
 Joint not rigid 
 Shifting occurs when 
load apply on it 
 Dry within 10-20 
seconds 
 Produce strong and 
rigid joints 
 Surface that was 
applied once can’t 
be apply on again 
There are other equipment to aid this project: 
 Luggage scale (max. 5kg) 
- Act as a hook between bridge model and water pail, at the same time determine 
the weight of the load. 
 Water pail 
-Act as a container to carry loads. 
 Camera 
-Record down the procedure of load testing, to determine which part of the structure 
causes failure. 
 Mineral bottles (500ml) 
-Use as the standard addition of weight during load testing.
4.0 Design & Structure Analysis 
We did six bridges in total, in five different designs, to test out whether different designs will 
have different outcome. 
4.1 Design 1 
Image 4.1.1 shows the first design of our truss bridge 
For the 1st design, we decided to start off with a Truss bridge with curved top chord. So, we 
searched of type of truss which is bowstring arch truss where the top chord is a true arc and 
has diagonal load-bearing members. Then, we decided to add in hinged arch which is 
located at the bottom sides of the truss bridge that is supposed to transfer load to the edge 
of tables. At the middle of the bridge where force is being act on is like a 'H' letter where 1 
beam is laid perpendicularly on top of 2 other beam to transfer load more equally rather 
than just acting in the middle. The distances between the trusses are the same throughout 
the bridge design.
Structure Analysis 
Diagram 4.1.1 shows the force analysis of our first design 
Bridge Details: 
Weight of the bridge: 246 g 
Clear Span: 750mm 
Width of the base: 120mm 
Height: 130mm 
Maximum Load Capacity 3.3 kg 
Efficiency: 44.3 
The load is from the middle part of the bridge, we place the truss in this arrangement so that 
the load can be transferred to other parts of the bridge. The top part we design it to be 
curved because curve is a pre-bend structure, and when it receive load from the bottom, it 
will be pulled down and trying to get back to its original form, so it will be more flexible 
when compared to straight structure.
Model Test 
Image 4.1.2 shows the fettuccine bridge has been set up for testing and use water as load. 
Image 4.1.3 shows the water has been pour into the bucket, the fettuccine bridge started 
bending downwards slowly as the load is getting more.
Image 4.1.4 shows the bridge’s members started to fall apart when it reached 2.5 kg. 
Image 4.1.5 shows the bridge broke at 3.3kg.
Cause of failure 
Image 4.1.6 shows the weak and breaking members of our bridge 
As this the first fettuccine bridge that we have ever built, we still unable to understand the 
properties of fettuccine and how it work. Besides lack of understanding, we also lack of 
workmanship that cause the bridge came up with unbalance structure from both sides and 
some members are not attached to the structure properly.
4.2 Design 2 
Image 4.2.1 shows the second design of our truss bridge 
From the 1st process, we understand that the hinged arch at the bottom does not provide as 
much load-transfer but only stabilize the bridge. Therefore, for the 2nd design approach we 
reduced the size of it. Not only that, we tried to curve the horizontal member of the bridge 
hoping it achieves the potential to pre-bend to sustain more load before it breaks. Also, we 
changed the design of the truss where instead of a truss design, we connect vertical load-bearing 
member tangent to the top chord. The reason we did this is because we were trying 
to predict the direction of the force so that it is parallel to the vertical members. By doing so, 
the whole bridge actually serve more as a cable bridge than a truss bridge where most of the 
forces are tension beside top chord and the horizontal members. The distances between 
trusses are also modified where it slowly expands exponentially from the middle to both 
sides. This is to support the heavy force acting to the middle of the bridge and reducing the 
members at the sides because they usually receive the least force. 
Structure Analysis
Diagram 4.2.1 shows the force analysis of our second design 
Bridge Details: 
Weight of the bridge: 186 g 
Clear Span: 850mm 
Width of the base: 80mm 
Height: 130mm 
Maximum Load Capacity 3.9 kg 
Efficiency: 81.8 
For this design, we place the truss in this way is to predict the direction of magnitude of 
tensile force in different position of the total bridge span. Using the same theory from the 
previous bridge, now we made both top and bottom part of the bridge structure to be 
curved. After testing, the problem is the curve is not strong enough and fails to transfer the 
load to two sides of the structure. 
Model Analysis
Image 4.2.2 shows the fettuccine bridge has been set up for testing and water as load. 
Image 4.2.3 shows the bridge is tested with 2 kg initial weight.
Image 4.2.4 shows when the load is getting more, the pre-bend fettuccine bridge started to 
bend downwards. The base of the bridge started to turn into an ‘M’ shape. 
Image 4.2.5 shows the bridge failed at 3.9 kg.
Cause of failure: 
Image 4.2.6 shows the weak and breaking members of our bridge 
In this structure, we’ve used pre-bend structure method to build it. Due to it’s a pre-bend 
structure, during the constructing process the pre-bend component keep breaking as the 
fettuccine fragile properties. Although it’s hard but we’re still able to complete with the 
bending and came out with a pre-bend fettuccine bridge. Along the testing session, the 
bridge’s base that bended upward has been pulled by the load from the middle and cause 
the bridge to form ‘M’ shape. 
4.3 Design 3 & 4 
Image 4.3.1 shows the third and fourth design of our truss bridge 
In our 3rd design and 4th design, we decided to repeat using bowstring truss bridge design 
where only the top chords are different. For 3rd design, the top chords are a series a shorter 
members connected by vertical members to form a curve shape whereas the 4th design is a 
triangular top chord to experiment different possibilities with fettuccine as well as the 
difference between the effectiveness of the different length of fettuccine when it is used as 
top chord. The distances between trusses are as the 2nd design where they increase steadily 
by each truss from the middle.
Structure Analysis 
Diagram 4.3.1 shows the force analysis of our third design 
Bridge Details: 
Weight of the bridge: 192 g 
Clear Span: 850mm 
Width of the base: 80mm 
Height: 130mm 
Maximum Load Capacity 3.6 kg 
Efficiency: 67.5 
In design 3, we remove the bottom part of two sides, to try out whether the structure will 
help out supporting the bridge, and the truss is following our first design. For the bottom 
chord of the bridge, we are using straight structure for this design as we found out that using 
curve structure for the bottom chord is not effective. Unfortunately, the bridge failure is 
again caused by the bottom chord.
Model Test 
Image 4.3.2 shows the fettuccine bridge has been set up for testing and bottle with water as 
load. 
Image 4.3.3 shows the bridge seems rigid after load has been added.
Image 4.3.4 shows the bridge started to bend to one side when the load reach 3.3kg. 
Image 4.3.5 shows the bridge had collapsed at 3.6kg due to twisting and breaking apart. 
Cause of failure:
Image 4.3.6 shows the weak and breaking members of our bridge 
This bridge goes well along the constructing process, the structure only have bending on the 
top beam and flat base. In the process of testing, the bridge doesn’t show any sign of 
bending and due to the load has been placed unevenly and cause the hock to move towards 
one side and cause twisting then broke. After identify and verification, we’ve found out that 
the problem is with the base we’ve made was not strong enough. 
Structure Analysis 
Diagram 4.3.2 shows the force analysis of our fourth design 
Bridge Details: 
Weight of the bridge: 200 g 
Clear Span: 850mm 
Width of the base: 80mm
Height: 200mm 
Maximum Load Capacity 3.6 kg 
Efficiency: 64.8 
In design 4, we changed the bridge design into triangular structure; the truss arrangement is 
still the same as previous bridges. We used the triangular top chord to test if the structure 
will help supporting the load more efficiently than curved top chord structure. We are 
unable to get the result we want as the same problem still occurs, the midpoint of the 
bottom chord broke faster than other members. 
Image 4.3.7 shows the bridge has been set up for testing and water as load.
Image 4.3.8 shows the bridge seems rigid and doesn’t show any sign of bending after load 
has been added. 
Image 4.3.9 shows the bridge broke at the middle suddenly when the load reached 3.6kg. 
Cause of failure:
Image 4.3.10 shows the weak and breaking members of our bridge 
We’ve building this bridge without using any pre-bend structure, the overall form of the 
bridge was a triangle. In the testing process, bridge is slightly similar to the previous one 
which doesn’t show any sign of bending and due to the load has been placed unevenly and 
cause the hock to move towards one side and cause twisting then broke. The problem also 
with the base of the bridge was still not strong enough. 
4.4 Design 5 & 6 
Image 4.4.1 shows the fifth and final design of our truss bridge 
For our last design approach, using all the data and analysis that we have gathered, we 
understand that the height of the whole bridge should be reduced to increase effectiveness. 
The whole bridge is designed to be more flat-out than all the previous ones. Also the middle 
part where load is being hung must serve the function to distribute force as equally 
throughout the entire bridge span rather than just depending on the trusses. 
Structure Analysis
Diagram 4.4.1 shows the force analysis of our fifth and final design 
Bridge Details: 
Weight of the bridge: 155g / 165 g 
Clear Span: 850mm 
Width of the base: 80mm 
Height: 200mm 
Maximum Load Capacity: 5.9kg / 5.0 kg 
Efficiency: 224.6 / 151.5 
In this design, we reduced the height of the bridge, reducing the weight to increase the 
efficiency. Due to the same failures from our previous experience, we found out that the top 
chords did not actually help much in carrying the loads, as the bottom chords are the main 
load carries, so we enhance the bottom chord by using I-beam structure, three layers of 
fettuccine in the middle and one layer in both ends. 
Model Test
Image 4.4.2 shows the fettuccine bridge has been set up for testing. Water poured into 
bucket. 
Image 4.4.3 shows the bridge is stable during the test.
Image 4.4.4 shows the bridge doesn’t affect by the load but the part that supporting the 
load started to bend. 
Image 4.4.5 shows the part that hold the load broke but the whole structure remain 
unharmed. The load is 4.9 kg. Second test after replacing the supporting part and it reach 
5.5kg.
Cause of failure: 
Image 4.4.6 shows the weak and breaking members of our bridge 
This bridge has been constructed without using any pre-bend just, an evolve product of 
mock-up 4. At first we lack of confident toward this bridge which is supposed to be the final, 
so we came out with an idea of testing it as mock-up no.5. Everything goes well in the whole 
process of testing, the structure is very rigid but only the part that act to hold the load 
broke. After replace with a better one we went for 2nd test, we’re all satisfied with the 
outcome.
Model Test (Final Design) 
Image 4.4.6 shows the bridge was evolve of design 5 has been set up for the final load test. 
Image 4.4.7 shows the bridge remain stable throughout the test.
Image 4.4.8 shows the bridge fail due to twist at the end of bridge. The load is 5kg. 
Cause of failure: 
This bridge was actually a rebuild of the mock-up no.5, we spent then whole night construct 
it. Due to all the classes and work in the afternoon we’re all tired. The bridge is slightly 
bended due to lack of workmanship. During the final load testing, the table surface were 
slightly unbalance. The testing process go well and the bridge end up fail by twisting, but 
we’re still contented with the outcome.
The following table concludes each design efficiency: 
WEIGHT LOAD EFFECIENCY 
Design 1 246 g 3.3 kg 44.3 
Design 2 186 g 3.9 kg 81.8 
Design 3 192 g 3.6 kg 67.5 
Design 4 200 g 3.6 kg 64.8 
Design 5 155 g 5.9 kg 224.6 
Design 6 165 g 5.0 kg 151.5 
Table 4.4.1 shows the efficiency of each bridge.
5.0 Conclusion 
In this project, we managed to understand tension and compressive strength that is highly 
depending on the materials. On the other hand, we are also able to understand how loads 
are distributed through trusses. Through trials and errors, we were able to test out new 
structure by playing around with different design of trusses. Unfortunately, load distributions 
of the model were not performing well due to random errors from workmanship issues and 
etc. In our opinion, the usage of fettuccine as material is not a good choice because every 
pack of fettuccine contain random amount of fettuccine that are suitable for use and the 
quality of it varies from each other. After this project, we also felt that a lot food is wasted 
especially when there are 100 over students doing this project. We believe there are model 
making materials that are more suitable for this project especially when fettuccine is 
manufactured as food not as modelling material. 
Source: Chatelaine
7.0 Appendix
7.0 References 
Hanks, M. (2013, September 19). SunThisweek | Bike-pedestrian bridge to be rehabilitated 
to link Bloomington to Dakota County. Retrieved from 
http://sunthisweek.com/2013/09/19/bike-pedestrian-bridge-rehabilitated-link 
bloomington-dakota-county/ 
James, B. (n.d.). Bridgehunter.com | Long Meadow Bridge. Retrieved from 
http://bridgehunter.com/mn/hennepin/3145/ 
John A. (2011). Long Meadow Bridge, Eagan, MN. Retrieved from 
http://www.johnweeks.com/bridges/pages/b09.html 
Mike H. (2014, July 3). Sun Current | A glimpse into the future of the Old Cedar 
Avenue Bridge. Retrieved from http://current.mnsun.com/2014/07/a-glimpse-into 
the-future-of-the-old-cedar-avenue-bridge/ 
Long Meadow Bridge. (n.d.). Retrieved from 
http://www.nps.gov/nr/feature/places/13000324.htm

More Related Content

What's hot

Building Structure Project 1
Building Structure Project 1Building Structure Project 1
Building Structure Project 1Gertrude Lee
 
BUILDING STRUCTURE FETTUCINE BRIDGE
BUILDING STRUCTURE FETTUCINE BRIDGEBUILDING STRUCTURE FETTUCINE BRIDGE
BUILDING STRUCTURE FETTUCINE BRIDGEChuah Say Yin
 
Building Structure Analysis Report
Building Structure Analysis ReportBuilding Structure Analysis Report
Building Structure Analysis ReportEsther Lau
 
Fettucine Truss Bridge Report
Fettucine Truss Bridge ReportFettucine Truss Bridge Report
Fettucine Truss Bridge Reportkimberlywjs
 
Building Structures - Fettucine Bridge
Building Structures - Fettucine BridgeBuilding Structures - Fettucine Bridge
Building Structures - Fettucine Bridgenadiacbass
 
Building Structure Project 1
Building Structure Project 1Building Structure Project 1
Building Structure Project 1Pinkie95
 
Building structure project 1 report
Building structure project 1 reportBuilding structure project 1 report
Building structure project 1 reportAdelinetingg
 
Building Structure Project 1 Analysis Report
Building Structure Project 1 Analysis ReportBuilding Structure Project 1 Analysis Report
Building Structure Project 1 Analysis ReportJoyeeLee0131
 
Building structure report xoxoxo
Building structure report xoxoxoBuilding structure report xoxoxo
Building structure report xoxoxoJason Juen
 
Truss Bridge Report
Truss Bridge ReportTruss Bridge Report
Truss Bridge ReportYvonne Chin
 
BUILDING STRUCTURE BRIDGE TRUSS
BUILDING STRUCTURE BRIDGE TRUSSBUILDING STRUCTURE BRIDGE TRUSS
BUILDING STRUCTURE BRIDGE TRUSSmiranazrin
 
BUILDING STRUCTURE ASSIGNMENT 1
BUILDING STRUCTURE ASSIGNMENT 1BUILDING STRUCTURE ASSIGNMENT 1
BUILDING STRUCTURE ASSIGNMENT 1Nur Zaas
 
Design and analysis of stress ribbon bridges
Design and analysis of stress ribbon bridgesDesign and analysis of stress ribbon bridges
Design and analysis of stress ribbon bridgeseSAT Journals
 
Building Structure Project 1 Report
Building Structure Project 1 ReportBuilding Structure Project 1 Report
Building Structure Project 1 Reportkimberleyee95
 

What's hot (18)

Building Structure Project 1
Building Structure Project 1Building Structure Project 1
Building Structure Project 1
 
Fettucine truss bridge
Fettucine truss bridgeFettucine truss bridge
Fettucine truss bridge
 
BUILDING STRUCTURE FETTUCINE BRIDGE
BUILDING STRUCTURE FETTUCINE BRIDGEBUILDING STRUCTURE FETTUCINE BRIDGE
BUILDING STRUCTURE FETTUCINE BRIDGE
 
Building Structure Analysis Report
Building Structure Analysis ReportBuilding Structure Analysis Report
Building Structure Analysis Report
 
Fettucine recipe
Fettucine recipeFettucine recipe
Fettucine recipe
 
Fettucine Truss Bridge Report
Fettucine Truss Bridge ReportFettucine Truss Bridge Report
Fettucine Truss Bridge Report
 
Fettucine Bridge Report
Fettucine Bridge ReportFettucine Bridge Report
Fettucine Bridge Report
 
Building Structures - Fettucine Bridge
Building Structures - Fettucine BridgeBuilding Structures - Fettucine Bridge
Building Structures - Fettucine Bridge
 
Building Structure Project 1
Building Structure Project 1Building Structure Project 1
Building Structure Project 1
 
Building structure project 1 report
Building structure project 1 reportBuilding structure project 1 report
Building structure project 1 report
 
Building Structure Project 1 Analysis Report
Building Structure Project 1 Analysis ReportBuilding Structure Project 1 Analysis Report
Building Structure Project 1 Analysis Report
 
Building structure report xoxoxo
Building structure report xoxoxoBuilding structure report xoxoxo
Building structure report xoxoxo
 
Truss Bridge Report
Truss Bridge ReportTruss Bridge Report
Truss Bridge Report
 
BUILDING STRUCTURE BRIDGE TRUSS
BUILDING STRUCTURE BRIDGE TRUSSBUILDING STRUCTURE BRIDGE TRUSS
BUILDING STRUCTURE BRIDGE TRUSS
 
BUILDING STRUCTURE ASSIGNMENT 1
BUILDING STRUCTURE ASSIGNMENT 1BUILDING STRUCTURE ASSIGNMENT 1
BUILDING STRUCTURE ASSIGNMENT 1
 
Design and analysis of stress ribbon bridges
Design and analysis of stress ribbon bridgesDesign and analysis of stress ribbon bridges
Design and analysis of stress ribbon bridges
 
Bstructure report
Bstructure reportBstructure report
Bstructure report
 
Building Structure Project 1 Report
Building Structure Project 1 ReportBuilding Structure Project 1 Report
Building Structure Project 1 Report
 

Similar to Fettuccine bridge Full report

Building structure report xoxoxo
Building structure report xoxoxoBuilding structure report xoxoxo
Building structure report xoxoxoJason Juen
 
Building structure report xoxoxo
Building structure report xoxoxoBuilding structure report xoxoxo
Building structure report xoxoxoAnthony Chew
 
Building structure report
Building structure reportBuilding structure report
Building structure reportChenyi Teo
 
Building structuresproject1 fettuccinnefinalm
Building structuresproject1 fettuccinnefinalmBuilding structuresproject1 fettuccinnefinalm
Building structuresproject1 fettuccinnefinalmJ.j. Hayashi
 
building Structure
building Structurebuilding Structure
building Structureamee16
 
Bcon project 1 pdf report
Bcon project 1 pdf reportBcon project 1 pdf report
Bcon project 1 pdf reportAnderson Wong
 
Bstructure report
Bstructure reportBstructure report
Bstructure reportMegan Chung
 
building structures 1 fettuccine report
building structures 1 fettuccine reportbuilding structures 1 fettuccine report
building structures 1 fettuccine reportYaseen Syed
 
Project 1 fettucine truss bridge
Project 1 fettucine truss bridgeProject 1 fettucine truss bridge
Project 1 fettucine truss bridgeAh Jun
 
[ARC2513] Building construction2 project 2
[ARC2513] Building construction2 project 2[ARC2513] Building construction2 project 2
[ARC2513] Building construction2 project 2Baddy Peigun
 
bridge report
bridge reportbridge report
bridge reportabc def
 

Similar to Fettuccine bridge Full report (18)

Building structure report xoxoxo
Building structure report xoxoxoBuilding structure report xoxoxo
Building structure report xoxoxo
 
Building structure report xoxoxo
Building structure report xoxoxoBuilding structure report xoxoxo
Building structure report xoxoxo
 
Building structure report
Building structure reportBuilding structure report
Building structure report
 
FETTICCINE BRIDGE
FETTICCINE BRIDGEFETTICCINE BRIDGE
FETTICCINE BRIDGE
 
Fettucine
FettucineFettucine
Fettucine
 
Building structuresproject1 fettuccinnefinalm
Building structuresproject1 fettuccinnefinalmBuilding structuresproject1 fettuccinnefinalm
Building structuresproject1 fettuccinnefinalm
 
building Structure
building Structurebuilding Structure
building Structure
 
Finalest final report
Finalest final reportFinalest final report
Finalest final report
 
bus shelter
bus shelterbus shelter
bus shelter
 
Bcon project 1 pdf report
Bcon project 1 pdf reportBcon project 1 pdf report
Bcon project 1 pdf report
 
BCON II PROJECT 1
BCON II PROJECT 1BCON II PROJECT 1
BCON II PROJECT 1
 
Bstructure report
Bstructure reportBstructure report
Bstructure report
 
B.structure report
B.structure reportB.structure report
B.structure report
 
building structures 1 fettuccine report
building structures 1 fettuccine reportbuilding structures 1 fettuccine report
building structures 1 fettuccine report
 
Project 1 fettucine truss bridge
Project 1 fettucine truss bridgeProject 1 fettucine truss bridge
Project 1 fettucine truss bridge
 
[ARC2513] Building construction2 project 2
[ARC2513] Building construction2 project 2[ARC2513] Building construction2 project 2
[ARC2513] Building construction2 project 2
 
bridge report
bridge reportbridge report
bridge report
 
KUY Limeng,e20190482(I4GCI-B)_4.pdf
KUY Limeng,e20190482(I4GCI-B)_4.pdfKUY Limeng,e20190482(I4GCI-B)_4.pdf
KUY Limeng,e20190482(I4GCI-B)_4.pdf
 

More from Teo Kean Hui

PP1 Project 3 Gantt chart
PP1 Project 3 Gantt chartPP1 Project 3 Gantt chart
PP1 Project 3 Gantt chartTeo Kean Hui
 
PP1 Project 3 Feasibility study
PP1 Project 3 Feasibility studyPP1 Project 3 Feasibility study
PP1 Project 3 Feasibility studyTeo Kean Hui
 
PP1 Project 3 Cover letter
PP1 Project 3 Cover letterPP1 Project 3 Cover letter
PP1 Project 3 Cover letterTeo Kean Hui
 
PP1 Project 3 Memoradum
PP1 Project 3 Memoradum PP1 Project 3 Memoradum
PP1 Project 3 Memoradum Teo Kean Hui
 
PP1 Project 2 Project Report
PP1 Project 2 Project ReportPP1 Project 2 Project Report
PP1 Project 2 Project ReportTeo Kean Hui
 
PP1 Project 1 Presentation
PP1 Project 1 Presentation PP1 Project 1 Presentation
PP1 Project 1 Presentation Teo Kean Hui
 
PP1 Project 1 Company Brochure
PP1 Project 1 Company BrochurePP1 Project 1 Company Brochure
PP1 Project 1 Company BrochureTeo Kean Hui
 
PP1 Project 1 Project implementation
PP1 Project 1 Project implementationPP1 Project 1 Project implementation
PP1 Project 1 Project implementationTeo Kean Hui
 
PP1 Project 1 Cover letter
PP1 Project 1 Cover letterPP1 Project 1 Cover letter
PP1 Project 1 Cover letterTeo Kean Hui
 
A STRATEGY STUDY ON SUSTAINABLE RURAL GHOST TOWN REVITALIZATION VIA NEW ARCHI...
A STRATEGY STUDY ON SUSTAINABLE RURAL GHOST TOWN REVITALIZATION VIA NEW ARCHI...A STRATEGY STUDY ON SUSTAINABLE RURAL GHOST TOWN REVITALIZATION VIA NEW ARCHI...
A STRATEGY STUDY ON SUSTAINABLE RURAL GHOST TOWN REVITALIZATION VIA NEW ARCHI...Teo Kean Hui
 
A Strategy Study on Sustainable Rural Ghost Town Revitalization vis New Archi...
A Strategy Study on Sustainable Rural Ghost Town Revitalization vis New Archi...A Strategy Study on Sustainable Rural Ghost Town Revitalization vis New Archi...
A Strategy Study on Sustainable Rural Ghost Town Revitalization vis New Archi...Teo Kean Hui
 
Biomimicry, giant redwood prototype
Biomimicry, giant redwood prototypeBiomimicry, giant redwood prototype
Biomimicry, giant redwood prototypeTeo Kean Hui
 
E&T Project 1 Site Analysis
E&T Project 1 Site AnalysisE&T Project 1 Site Analysis
E&T Project 1 Site AnalysisTeo Kean Hui
 
E&t slides (latest)
E&t   slides (latest)E&t   slides (latest)
E&t slides (latest)Teo Kean Hui
 

More from Teo Kean Hui (20)

PP1 Project 3 Gantt chart
PP1 Project 3 Gantt chartPP1 Project 3 Gantt chart
PP1 Project 3 Gantt chart
 
PP1 Project 3 Feasibility study
PP1 Project 3 Feasibility studyPP1 Project 3 Feasibility study
PP1 Project 3 Feasibility study
 
PP1 Project 3 Cover letter
PP1 Project 3 Cover letterPP1 Project 3 Cover letter
PP1 Project 3 Cover letter
 
PP1 Project 3 Memoradum
PP1 Project 3 Memoradum PP1 Project 3 Memoradum
PP1 Project 3 Memoradum
 
PP1 Project 2 Project Report
PP1 Project 2 Project ReportPP1 Project 2 Project Report
PP1 Project 2 Project Report
 
PP1 Project 1 Presentation
PP1 Project 1 Presentation PP1 Project 1 Presentation
PP1 Project 1 Presentation
 
PP1 Project 1 Company Brochure
PP1 Project 1 Company BrochurePP1 Project 1 Company Brochure
PP1 Project 1 Company Brochure
 
PP1 Project 1 Project implementation
PP1 Project 1 Project implementationPP1 Project 1 Project implementation
PP1 Project 1 Project implementation
 
PP1 Project 1 Cover letter
PP1 Project 1 Cover letterPP1 Project 1 Cover letter
PP1 Project 1 Cover letter
 
A STRATEGY STUDY ON SUSTAINABLE RURAL GHOST TOWN REVITALIZATION VIA NEW ARCHI...
A STRATEGY STUDY ON SUSTAINABLE RURAL GHOST TOWN REVITALIZATION VIA NEW ARCHI...A STRATEGY STUDY ON SUSTAINABLE RURAL GHOST TOWN REVITALIZATION VIA NEW ARCHI...
A STRATEGY STUDY ON SUSTAINABLE RURAL GHOST TOWN REVITALIZATION VIA NEW ARCHI...
 
A Strategy Study on Sustainable Rural Ghost Town Revitalization vis New Archi...
A Strategy Study on Sustainable Rural Ghost Town Revitalization vis New Archi...A Strategy Study on Sustainable Rural Ghost Town Revitalization vis New Archi...
A Strategy Study on Sustainable Rural Ghost Town Revitalization vis New Archi...
 
Biomimicry, giant redwood prototype
Biomimicry, giant redwood prototypeBiomimicry, giant redwood prototype
Biomimicry, giant redwood prototype
 
E&T Project 1 Site Analysis
E&T Project 1 Site AnalysisE&T Project 1 Site Analysis
E&T Project 1 Site Analysis
 
Project 2 gizmo
Project 2 gizmoProject 2 gizmo
Project 2 gizmo
 
UDS design report
UDS design reportUDS design report
UDS design report
 
E&t2
E&t2E&t2
E&t2
 
E&t slides (latest)
E&t   slides (latest)E&t   slides (latest)
E&t slides (latest)
 
Rm3
Rm3Rm3
Rm3
 
Rm 2
Rm 2Rm 2
Rm 2
 
Rm1 kenyeang
Rm1 kenyeangRm1 kenyeang
Rm1 kenyeang
 

Recently uploaded

FULL ENJOY - 9953040155 Call Girls in Noida | Delhi
FULL ENJOY - 9953040155 Call Girls in Noida | DelhiFULL ENJOY - 9953040155 Call Girls in Noida | Delhi
FULL ENJOY - 9953040155 Call Girls in Noida | DelhiMalviyaNagarCallGirl
 
Bur Dubai Call Girls O58993O4O2 Call Girls in Bur Dubai
Bur Dubai Call Girls O58993O4O2 Call Girls in Bur DubaiBur Dubai Call Girls O58993O4O2 Call Girls in Bur Dubai
Bur Dubai Call Girls O58993O4O2 Call Girls in Bur Dubaidajasot375
 
Lucknow 💋 Virgin Call Girls Lucknow | Book 8923113531 Extreme Naughty Call Gi...
Lucknow 💋 Virgin Call Girls Lucknow | Book 8923113531 Extreme Naughty Call Gi...Lucknow 💋 Virgin Call Girls Lucknow | Book 8923113531 Extreme Naughty Call Gi...
Lucknow 💋 Virgin Call Girls Lucknow | Book 8923113531 Extreme Naughty Call Gi...anilsa9823
 
FULL ENJOY - 9953040155 Call Girls in Gtb Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in Gtb Nagar | DelhiFULL ENJOY - 9953040155 Call Girls in Gtb Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in Gtb Nagar | DelhiMalviyaNagarCallGirl
 
Downtown Call Girls O5O91O128O Pakistani Call Girls in Downtown
Downtown Call Girls O5O91O128O Pakistani Call Girls in DowntownDowntown Call Girls O5O91O128O Pakistani Call Girls in Downtown
Downtown Call Girls O5O91O128O Pakistani Call Girls in Downtowndajasot375
 
Roadrunner Lodge, Motel/Residence, Tucumcari NM
Roadrunner Lodge, Motel/Residence, Tucumcari NMRoadrunner Lodge, Motel/Residence, Tucumcari NM
Roadrunner Lodge, Motel/Residence, Tucumcari NMroute66connected
 
The First Date by Daniel Johnson (Inspired By True Events)
The First Date by Daniel Johnson (Inspired By True Events)The First Date by Daniel Johnson (Inspired By True Events)
The First Date by Daniel Johnson (Inspired By True Events)thephillipta
 
Call Girl Service In Dubai #$# O56521286O #$# Dubai Call Girls
Call Girl Service In Dubai #$# O56521286O #$# Dubai Call GirlsCall Girl Service In Dubai #$# O56521286O #$# Dubai Call Girls
Call Girl Service In Dubai #$# O56521286O #$# Dubai Call Girlsparisharma5056
 
FULL ENJOY - 9953040155 Call Girls in Shaheen Bagh | Delhi
FULL ENJOY - 9953040155 Call Girls in Shaheen Bagh | DelhiFULL ENJOY - 9953040155 Call Girls in Shaheen Bagh | Delhi
FULL ENJOY - 9953040155 Call Girls in Shaheen Bagh | DelhiMalviyaNagarCallGirl
 
Vip Hisar Call Girls #9907093804 Contact Number Escorts Service Hisar
Vip Hisar Call Girls #9907093804 Contact Number Escorts Service HisarVip Hisar Call Girls #9907093804 Contact Number Escorts Service Hisar
Vip Hisar Call Girls #9907093804 Contact Number Escorts Service Hisarsrsj9000
 
Aminabad @ Book Call Girls in Lucknow - 450+ Call Girl Cash Payment 🍵 8923113...
Aminabad @ Book Call Girls in Lucknow - 450+ Call Girl Cash Payment 🍵 8923113...Aminabad @ Book Call Girls in Lucknow - 450+ Call Girl Cash Payment 🍵 8923113...
Aminabad @ Book Call Girls in Lucknow - 450+ Call Girl Cash Payment 🍵 8923113...akbard9823
 
exhuma plot and synopsis from the exhuma movie.pptx
exhuma plot and synopsis from the exhuma movie.pptxexhuma plot and synopsis from the exhuma movie.pptx
exhuma plot and synopsis from the exhuma movie.pptxKurikulumPenilaian
 
Hazratganj ] (Call Girls) in Lucknow - 450+ Call Girl Cash Payment 🧄 89231135...
Hazratganj ] (Call Girls) in Lucknow - 450+ Call Girl Cash Payment 🧄 89231135...Hazratganj ] (Call Girls) in Lucknow - 450+ Call Girl Cash Payment 🧄 89231135...
Hazratganj ] (Call Girls) in Lucknow - 450+ Call Girl Cash Payment 🧄 89231135...akbard9823
 
FULL ENJOY - 9953040155 Call Girls in New Ashok Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in New Ashok Nagar | DelhiFULL ENJOY - 9953040155 Call Girls in New Ashok Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in New Ashok Nagar | DelhiMalviyaNagarCallGirl
 
Deconstructing Gendered Language; Feminist World-Making 2024
Deconstructing Gendered Language; Feminist World-Making 2024Deconstructing Gendered Language; Feminist World-Making 2024
Deconstructing Gendered Language; Feminist World-Making 2024samlnance
 
Jeremy Casson - An Architectural and Historical Journey Around Europe
Jeremy Casson - An Architectural and Historical Journey Around EuropeJeremy Casson - An Architectural and Historical Journey Around Europe
Jeremy Casson - An Architectural and Historical Journey Around EuropeJeremy Casson
 
FULL ENJOY - 9953040155 Call Girls in Burari | Delhi
FULL ENJOY - 9953040155 Call Girls in Burari | DelhiFULL ENJOY - 9953040155 Call Girls in Burari | Delhi
FULL ENJOY - 9953040155 Call Girls in Burari | DelhiMalviyaNagarCallGirl
 
Hazratganj / Call Girl in Lucknow - Phone 🫗 8923113531 ☛ Escorts Service at 6...
Hazratganj / Call Girl in Lucknow - Phone 🫗 8923113531 ☛ Escorts Service at 6...Hazratganj / Call Girl in Lucknow - Phone 🫗 8923113531 ☛ Escorts Service at 6...
Hazratganj / Call Girl in Lucknow - Phone 🫗 8923113531 ☛ Escorts Service at 6...akbard9823
 

Recently uploaded (20)

FULL ENJOY - 9953040155 Call Girls in Noida | Delhi
FULL ENJOY - 9953040155 Call Girls in Noida | DelhiFULL ENJOY - 9953040155 Call Girls in Noida | Delhi
FULL ENJOY - 9953040155 Call Girls in Noida | Delhi
 
Bur Dubai Call Girls O58993O4O2 Call Girls in Bur Dubai
Bur Dubai Call Girls O58993O4O2 Call Girls in Bur DubaiBur Dubai Call Girls O58993O4O2 Call Girls in Bur Dubai
Bur Dubai Call Girls O58993O4O2 Call Girls in Bur Dubai
 
Lucknow 💋 Virgin Call Girls Lucknow | Book 8923113531 Extreme Naughty Call Gi...
Lucknow 💋 Virgin Call Girls Lucknow | Book 8923113531 Extreme Naughty Call Gi...Lucknow 💋 Virgin Call Girls Lucknow | Book 8923113531 Extreme Naughty Call Gi...
Lucknow 💋 Virgin Call Girls Lucknow | Book 8923113531 Extreme Naughty Call Gi...
 
Bur Dubai Call Girls # 971504361175 # Call Girls In Bur Dubai || (UAE)
Bur Dubai Call Girls # 971504361175 # Call Girls In Bur Dubai || (UAE)Bur Dubai Call Girls # 971504361175 # Call Girls In Bur Dubai || (UAE)
Bur Dubai Call Girls # 971504361175 # Call Girls In Bur Dubai || (UAE)
 
Dxb Call Girls # +971529501107 # Call Girls In Dxb Dubai || (UAE)
Dxb Call Girls # +971529501107 # Call Girls In Dxb Dubai || (UAE)Dxb Call Girls # +971529501107 # Call Girls In Dxb Dubai || (UAE)
Dxb Call Girls # +971529501107 # Call Girls In Dxb Dubai || (UAE)
 
FULL ENJOY - 9953040155 Call Girls in Gtb Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in Gtb Nagar | DelhiFULL ENJOY - 9953040155 Call Girls in Gtb Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in Gtb Nagar | Delhi
 
Downtown Call Girls O5O91O128O Pakistani Call Girls in Downtown
Downtown Call Girls O5O91O128O Pakistani Call Girls in DowntownDowntown Call Girls O5O91O128O Pakistani Call Girls in Downtown
Downtown Call Girls O5O91O128O Pakistani Call Girls in Downtown
 
Roadrunner Lodge, Motel/Residence, Tucumcari NM
Roadrunner Lodge, Motel/Residence, Tucumcari NMRoadrunner Lodge, Motel/Residence, Tucumcari NM
Roadrunner Lodge, Motel/Residence, Tucumcari NM
 
The First Date by Daniel Johnson (Inspired By True Events)
The First Date by Daniel Johnson (Inspired By True Events)The First Date by Daniel Johnson (Inspired By True Events)
The First Date by Daniel Johnson (Inspired By True Events)
 
Call Girl Service In Dubai #$# O56521286O #$# Dubai Call Girls
Call Girl Service In Dubai #$# O56521286O #$# Dubai Call GirlsCall Girl Service In Dubai #$# O56521286O #$# Dubai Call Girls
Call Girl Service In Dubai #$# O56521286O #$# Dubai Call Girls
 
FULL ENJOY - 9953040155 Call Girls in Shaheen Bagh | Delhi
FULL ENJOY - 9953040155 Call Girls in Shaheen Bagh | DelhiFULL ENJOY - 9953040155 Call Girls in Shaheen Bagh | Delhi
FULL ENJOY - 9953040155 Call Girls in Shaheen Bagh | Delhi
 
Vip Hisar Call Girls #9907093804 Contact Number Escorts Service Hisar
Vip Hisar Call Girls #9907093804 Contact Number Escorts Service HisarVip Hisar Call Girls #9907093804 Contact Number Escorts Service Hisar
Vip Hisar Call Girls #9907093804 Contact Number Escorts Service Hisar
 
Aminabad @ Book Call Girls in Lucknow - 450+ Call Girl Cash Payment 🍵 8923113...
Aminabad @ Book Call Girls in Lucknow - 450+ Call Girl Cash Payment 🍵 8923113...Aminabad @ Book Call Girls in Lucknow - 450+ Call Girl Cash Payment 🍵 8923113...
Aminabad @ Book Call Girls in Lucknow - 450+ Call Girl Cash Payment 🍵 8923113...
 
exhuma plot and synopsis from the exhuma movie.pptx
exhuma plot and synopsis from the exhuma movie.pptxexhuma plot and synopsis from the exhuma movie.pptx
exhuma plot and synopsis from the exhuma movie.pptx
 
Hazratganj ] (Call Girls) in Lucknow - 450+ Call Girl Cash Payment 🧄 89231135...
Hazratganj ] (Call Girls) in Lucknow - 450+ Call Girl Cash Payment 🧄 89231135...Hazratganj ] (Call Girls) in Lucknow - 450+ Call Girl Cash Payment 🧄 89231135...
Hazratganj ] (Call Girls) in Lucknow - 450+ Call Girl Cash Payment 🧄 89231135...
 
FULL ENJOY - 9953040155 Call Girls in New Ashok Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in New Ashok Nagar | DelhiFULL ENJOY - 9953040155 Call Girls in New Ashok Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in New Ashok Nagar | Delhi
 
Deconstructing Gendered Language; Feminist World-Making 2024
Deconstructing Gendered Language; Feminist World-Making 2024Deconstructing Gendered Language; Feminist World-Making 2024
Deconstructing Gendered Language; Feminist World-Making 2024
 
Jeremy Casson - An Architectural and Historical Journey Around Europe
Jeremy Casson - An Architectural and Historical Journey Around EuropeJeremy Casson - An Architectural and Historical Journey Around Europe
Jeremy Casson - An Architectural and Historical Journey Around Europe
 
FULL ENJOY - 9953040155 Call Girls in Burari | Delhi
FULL ENJOY - 9953040155 Call Girls in Burari | DelhiFULL ENJOY - 9953040155 Call Girls in Burari | Delhi
FULL ENJOY - 9953040155 Call Girls in Burari | Delhi
 
Hazratganj / Call Girl in Lucknow - Phone 🫗 8923113531 ☛ Escorts Service at 6...
Hazratganj / Call Girl in Lucknow - Phone 🫗 8923113531 ☛ Escorts Service at 6...Hazratganj / Call Girl in Lucknow - Phone 🫗 8923113531 ☛ Escorts Service at 6...
Hazratganj / Call Girl in Lucknow - Phone 🫗 8923113531 ☛ Escorts Service at 6...
 

Fettuccine bridge Full report

  • 1. SCHOOL OF ARCHITECTURE, BUILDING & DESIGN Research Unit for Modern Architecture Studies in Southeast Asia Bachelor of Science (Honours) (Architecture) Building Structures (ARC 2523) Prerequisite: Building Construction 2 (ARC2213) ____________________________________________________________________ Project 1 Fettuccine Truss Bridge Loo Giap Sheng 0310390 Gan Chin Bong 0313738 Teo Kean Hui 0310165 Ng You Sheng 0309997 Kong Chee Seng 0308360
  • 2. Table of Content 1.0 Introduction 1.1 Aims & Objectives 1.2 Project Scope 2.0 Precedent Study 2.1 Overview 2.2 History 2.3Structure Details 3.0 Materials Study 3.1 Fettuccine 3.2Materials & Equipment 4.0 Design & Structure Analysis 4.1 Design 1 4.2 Design 2 4.3 Design 3 & 4 4.4Design 5 & Final Design 5.0 Conclusion 6.0 Appendix 7.0 References
  • 3. 1.0 Introduction 1.1 Aim & Objectives The objectives of this project are as follows:  To develop student’s understanding of tension and compressive strength of construction materials  To develop student’s understanding of force distribution in a truss  To design a perfect truss bridge which fulfils the following criteria:  High level of aesthetic value  Minimal construction material 1.2 Project Scope As a group, we are required to carry out precedent study of a truss bridge. Then, we have to design and construct a truss bridge using fettuccine and adhesive materials such as glue. The bridge must be at least 750 millimetres of clear span and weight not more than 200 grams. The structure is then tested to carry load until it breaks. Efficiency of the bridge can be calculated as follow: Efficiency, E = (Maximum Load)² / Weight of Bridge In order to achieve higher efficiency, structure analysis have to be carried out to study and determine members of tension and compression. Several times of load testing have to be carried out to identify structure failure point and weaker truss members. 2.0 Precedent Study
  • 4. To have better understanding of truss bridges, appropriate precedent study should be carried out. The following is our study of truss bridge: Image 2.1: Perspective view of the bridge. Source: Sun Current Name: Long Meadow Lake Bridge Location: Old Cedar Avenue at Minnesota River, Bloomington, Hennepin. Largest spam: 170.0 feet Total length: 864.5 feet Deck width: 21.0 feet (2 lanes) Materials: Steel and Iron Type of truss: Camelback truss Diagram 2.1 above shows camelback truss. Source: Wikipedia 2.1 History
  • 5. The Long Meadow Lake Bridge is a five-span through truss camelback bridge that was built in 1920. Before the highway 77 overpass opened in 1981, it was one of the few bridges that connects traffic from Old Cedar Avenue to Dokata County. This bridge was given to the City of Bloomington by the State of Minnesota in 1981, and was still open to automobile traffic as late as 1993. It remained open to pedestrian and bicycle traffic after it was closed to vehicle traffic. In the early 2000s, the bridge deck was declared to be unsafe. The bridge was deemed unsafe again in 2002, and had to be barricaded at each end. It was scheduled to be rehabilitated beginning in 2014. The builder of this bridge was Illinois Steel Bridge Co. Of Jacksonville. The bridge today called Old Cedar Avenue Bridge and had average daily traffic of 400 vehicles. Image 2.2 showing the bridge was closed down in 2002. Source: Johnweeks Image 2.3 showing the spring flood in 2010. The water level is just under the bridge deck. Source: Johnweeks 2.2 Structural Details
  • 6. Image 2.4 showing the beams and decking of the bridge. Part of the decking had already teared off. Source: Johnweeks Image 2.5 shows the connection between girders and a stringer at the abutment. Note that you can see daylight through holes at several spots on this beam, and that the stringer is rotted through on the right side of the image. Source: Johnweeks
  • 7. Image 2.6 showing the bridge bearing at the end of the structure. The bridge structure is pushed fully back up against the concrete abutment. This is most likely caused by the bridge sagging due to a weakened structure. The pressure is causing the concrete to crack. Source: Johnweeks Diagram 2.2 showing the joints at the corner end of the bridge. Source: Past-inc. org
  • 8. 3.0 Material Study 3.1 Fettuccine Fettuccine is used as the main material for the bridge construction. Before use, fettuccine need to be check and filter out those that are twisted; it is to ensure that the load is able to distribute evenly and effectively through the flat surface of the fettuccine. Dimension: 250mm x 5mm (average) Tensile strength: ~2000psi Stiffness (E=stress/strain): ~10,000,000psi We have tried 2 types of fettuccine to test its strength and weakness: San Remo Spinach fettuccine San Remo fettuccine Strength of material is analyzed:  Greenish yellow  Slightly harder than normal fettuccine  Surface a bit round  Gold Yellow  Softer than the spinach fettuccine  Flat surface  Ratio of usable fettuccine is higher Shear force Shear force
  • 9. When the fettuccine is laid flat and the force is only applied on the middle, bending will occurs due to tension and compression. Shear force Shear force When the fettuccine is put upright, the thickness of the fettuccine provide more tensile strength then laying it flat. However the narrow surface’s load distribution is much lesser than flat surface, this increases pressure on the structure. Solution: Image 3.1 shows force acting on ‘I’ beam structure. ‘I’ beam structure is use; both advantages of horizontal and vertical position are able to be put in use. When the vertical member is placed in between two horizontal members, the horizontal members will enhance the load distributions and the load will transfer to the vertical member which can withstand more loads. Image 3.2 shows force acting on one side of solid structure By adding more vertical members, it enhances the load transfer from horizontal member to the vertical members.
  • 10. 3.2 Materials & Equipment: PVA UHU Super Glue (Selleys)  Water based glue causes fettuccine to soften  Take long time to dry  Weak joints  Take long time to dry  Joint not rigid  Shifting occurs when load apply on it  Dry within 10-20 seconds  Produce strong and rigid joints  Surface that was applied once can’t be apply on again There are other equipment to aid this project:  Luggage scale (max. 5kg) - Act as a hook between bridge model and water pail, at the same time determine the weight of the load.  Water pail -Act as a container to carry loads.  Camera -Record down the procedure of load testing, to determine which part of the structure causes failure.  Mineral bottles (500ml) -Use as the standard addition of weight during load testing.
  • 11. 4.0 Design & Structure Analysis We did six bridges in total, in five different designs, to test out whether different designs will have different outcome. 4.1 Design 1 Image 4.1.1 shows the first design of our truss bridge For the 1st design, we decided to start off with a Truss bridge with curved top chord. So, we searched of type of truss which is bowstring arch truss where the top chord is a true arc and has diagonal load-bearing members. Then, we decided to add in hinged arch which is located at the bottom sides of the truss bridge that is supposed to transfer load to the edge of tables. At the middle of the bridge where force is being act on is like a 'H' letter where 1 beam is laid perpendicularly on top of 2 other beam to transfer load more equally rather than just acting in the middle. The distances between the trusses are the same throughout the bridge design.
  • 12. Structure Analysis Diagram 4.1.1 shows the force analysis of our first design Bridge Details: Weight of the bridge: 246 g Clear Span: 750mm Width of the base: 120mm Height: 130mm Maximum Load Capacity 3.3 kg Efficiency: 44.3 The load is from the middle part of the bridge, we place the truss in this arrangement so that the load can be transferred to other parts of the bridge. The top part we design it to be curved because curve is a pre-bend structure, and when it receive load from the bottom, it will be pulled down and trying to get back to its original form, so it will be more flexible when compared to straight structure.
  • 13. Model Test Image 4.1.2 shows the fettuccine bridge has been set up for testing and use water as load. Image 4.1.3 shows the water has been pour into the bucket, the fettuccine bridge started bending downwards slowly as the load is getting more.
  • 14. Image 4.1.4 shows the bridge’s members started to fall apart when it reached 2.5 kg. Image 4.1.5 shows the bridge broke at 3.3kg.
  • 15. Cause of failure Image 4.1.6 shows the weak and breaking members of our bridge As this the first fettuccine bridge that we have ever built, we still unable to understand the properties of fettuccine and how it work. Besides lack of understanding, we also lack of workmanship that cause the bridge came up with unbalance structure from both sides and some members are not attached to the structure properly.
  • 16. 4.2 Design 2 Image 4.2.1 shows the second design of our truss bridge From the 1st process, we understand that the hinged arch at the bottom does not provide as much load-transfer but only stabilize the bridge. Therefore, for the 2nd design approach we reduced the size of it. Not only that, we tried to curve the horizontal member of the bridge hoping it achieves the potential to pre-bend to sustain more load before it breaks. Also, we changed the design of the truss where instead of a truss design, we connect vertical load-bearing member tangent to the top chord. The reason we did this is because we were trying to predict the direction of the force so that it is parallel to the vertical members. By doing so, the whole bridge actually serve more as a cable bridge than a truss bridge where most of the forces are tension beside top chord and the horizontal members. The distances between trusses are also modified where it slowly expands exponentially from the middle to both sides. This is to support the heavy force acting to the middle of the bridge and reducing the members at the sides because they usually receive the least force. Structure Analysis
  • 17. Diagram 4.2.1 shows the force analysis of our second design Bridge Details: Weight of the bridge: 186 g Clear Span: 850mm Width of the base: 80mm Height: 130mm Maximum Load Capacity 3.9 kg Efficiency: 81.8 For this design, we place the truss in this way is to predict the direction of magnitude of tensile force in different position of the total bridge span. Using the same theory from the previous bridge, now we made both top and bottom part of the bridge structure to be curved. After testing, the problem is the curve is not strong enough and fails to transfer the load to two sides of the structure. Model Analysis
  • 18. Image 4.2.2 shows the fettuccine bridge has been set up for testing and water as load. Image 4.2.3 shows the bridge is tested with 2 kg initial weight.
  • 19. Image 4.2.4 shows when the load is getting more, the pre-bend fettuccine bridge started to bend downwards. The base of the bridge started to turn into an ‘M’ shape. Image 4.2.5 shows the bridge failed at 3.9 kg.
  • 20. Cause of failure: Image 4.2.6 shows the weak and breaking members of our bridge In this structure, we’ve used pre-bend structure method to build it. Due to it’s a pre-bend structure, during the constructing process the pre-bend component keep breaking as the fettuccine fragile properties. Although it’s hard but we’re still able to complete with the bending and came out with a pre-bend fettuccine bridge. Along the testing session, the bridge’s base that bended upward has been pulled by the load from the middle and cause the bridge to form ‘M’ shape. 4.3 Design 3 & 4 Image 4.3.1 shows the third and fourth design of our truss bridge In our 3rd design and 4th design, we decided to repeat using bowstring truss bridge design where only the top chords are different. For 3rd design, the top chords are a series a shorter members connected by vertical members to form a curve shape whereas the 4th design is a triangular top chord to experiment different possibilities with fettuccine as well as the difference between the effectiveness of the different length of fettuccine when it is used as top chord. The distances between trusses are as the 2nd design where they increase steadily by each truss from the middle.
  • 21. Structure Analysis Diagram 4.3.1 shows the force analysis of our third design Bridge Details: Weight of the bridge: 192 g Clear Span: 850mm Width of the base: 80mm Height: 130mm Maximum Load Capacity 3.6 kg Efficiency: 67.5 In design 3, we remove the bottom part of two sides, to try out whether the structure will help out supporting the bridge, and the truss is following our first design. For the bottom chord of the bridge, we are using straight structure for this design as we found out that using curve structure for the bottom chord is not effective. Unfortunately, the bridge failure is again caused by the bottom chord.
  • 22. Model Test Image 4.3.2 shows the fettuccine bridge has been set up for testing and bottle with water as load. Image 4.3.3 shows the bridge seems rigid after load has been added.
  • 23. Image 4.3.4 shows the bridge started to bend to one side when the load reach 3.3kg. Image 4.3.5 shows the bridge had collapsed at 3.6kg due to twisting and breaking apart. Cause of failure:
  • 24. Image 4.3.6 shows the weak and breaking members of our bridge This bridge goes well along the constructing process, the structure only have bending on the top beam and flat base. In the process of testing, the bridge doesn’t show any sign of bending and due to the load has been placed unevenly and cause the hock to move towards one side and cause twisting then broke. After identify and verification, we’ve found out that the problem is with the base we’ve made was not strong enough. Structure Analysis Diagram 4.3.2 shows the force analysis of our fourth design Bridge Details: Weight of the bridge: 200 g Clear Span: 850mm Width of the base: 80mm
  • 25. Height: 200mm Maximum Load Capacity 3.6 kg Efficiency: 64.8 In design 4, we changed the bridge design into triangular structure; the truss arrangement is still the same as previous bridges. We used the triangular top chord to test if the structure will help supporting the load more efficiently than curved top chord structure. We are unable to get the result we want as the same problem still occurs, the midpoint of the bottom chord broke faster than other members. Image 4.3.7 shows the bridge has been set up for testing and water as load.
  • 26. Image 4.3.8 shows the bridge seems rigid and doesn’t show any sign of bending after load has been added. Image 4.3.9 shows the bridge broke at the middle suddenly when the load reached 3.6kg. Cause of failure:
  • 27. Image 4.3.10 shows the weak and breaking members of our bridge We’ve building this bridge without using any pre-bend structure, the overall form of the bridge was a triangle. In the testing process, bridge is slightly similar to the previous one which doesn’t show any sign of bending and due to the load has been placed unevenly and cause the hock to move towards one side and cause twisting then broke. The problem also with the base of the bridge was still not strong enough. 4.4 Design 5 & 6 Image 4.4.1 shows the fifth and final design of our truss bridge For our last design approach, using all the data and analysis that we have gathered, we understand that the height of the whole bridge should be reduced to increase effectiveness. The whole bridge is designed to be more flat-out than all the previous ones. Also the middle part where load is being hung must serve the function to distribute force as equally throughout the entire bridge span rather than just depending on the trusses. Structure Analysis
  • 28. Diagram 4.4.1 shows the force analysis of our fifth and final design Bridge Details: Weight of the bridge: 155g / 165 g Clear Span: 850mm Width of the base: 80mm Height: 200mm Maximum Load Capacity: 5.9kg / 5.0 kg Efficiency: 224.6 / 151.5 In this design, we reduced the height of the bridge, reducing the weight to increase the efficiency. Due to the same failures from our previous experience, we found out that the top chords did not actually help much in carrying the loads, as the bottom chords are the main load carries, so we enhance the bottom chord by using I-beam structure, three layers of fettuccine in the middle and one layer in both ends. Model Test
  • 29. Image 4.4.2 shows the fettuccine bridge has been set up for testing. Water poured into bucket. Image 4.4.3 shows the bridge is stable during the test.
  • 30. Image 4.4.4 shows the bridge doesn’t affect by the load but the part that supporting the load started to bend. Image 4.4.5 shows the part that hold the load broke but the whole structure remain unharmed. The load is 4.9 kg. Second test after replacing the supporting part and it reach 5.5kg.
  • 31. Cause of failure: Image 4.4.6 shows the weak and breaking members of our bridge This bridge has been constructed without using any pre-bend just, an evolve product of mock-up 4. At first we lack of confident toward this bridge which is supposed to be the final, so we came out with an idea of testing it as mock-up no.5. Everything goes well in the whole process of testing, the structure is very rigid but only the part that act to hold the load broke. After replace with a better one we went for 2nd test, we’re all satisfied with the outcome.
  • 32. Model Test (Final Design) Image 4.4.6 shows the bridge was evolve of design 5 has been set up for the final load test. Image 4.4.7 shows the bridge remain stable throughout the test.
  • 33. Image 4.4.8 shows the bridge fail due to twist at the end of bridge. The load is 5kg. Cause of failure: This bridge was actually a rebuild of the mock-up no.5, we spent then whole night construct it. Due to all the classes and work in the afternoon we’re all tired. The bridge is slightly bended due to lack of workmanship. During the final load testing, the table surface were slightly unbalance. The testing process go well and the bridge end up fail by twisting, but we’re still contented with the outcome.
  • 34. The following table concludes each design efficiency: WEIGHT LOAD EFFECIENCY Design 1 246 g 3.3 kg 44.3 Design 2 186 g 3.9 kg 81.8 Design 3 192 g 3.6 kg 67.5 Design 4 200 g 3.6 kg 64.8 Design 5 155 g 5.9 kg 224.6 Design 6 165 g 5.0 kg 151.5 Table 4.4.1 shows the efficiency of each bridge.
  • 35. 5.0 Conclusion In this project, we managed to understand tension and compressive strength that is highly depending on the materials. On the other hand, we are also able to understand how loads are distributed through trusses. Through trials and errors, we were able to test out new structure by playing around with different design of trusses. Unfortunately, load distributions of the model were not performing well due to random errors from workmanship issues and etc. In our opinion, the usage of fettuccine as material is not a good choice because every pack of fettuccine contain random amount of fettuccine that are suitable for use and the quality of it varies from each other. After this project, we also felt that a lot food is wasted especially when there are 100 over students doing this project. We believe there are model making materials that are more suitable for this project especially when fettuccine is manufactured as food not as modelling material. Source: Chatelaine
  • 37.
  • 38.
  • 39. 7.0 References Hanks, M. (2013, September 19). SunThisweek | Bike-pedestrian bridge to be rehabilitated to link Bloomington to Dakota County. Retrieved from http://sunthisweek.com/2013/09/19/bike-pedestrian-bridge-rehabilitated-link bloomington-dakota-county/ James, B. (n.d.). Bridgehunter.com | Long Meadow Bridge. Retrieved from http://bridgehunter.com/mn/hennepin/3145/ John A. (2011). Long Meadow Bridge, Eagan, MN. Retrieved from http://www.johnweeks.com/bridges/pages/b09.html Mike H. (2014, July 3). Sun Current | A glimpse into the future of the Old Cedar Avenue Bridge. Retrieved from http://current.mnsun.com/2014/07/a-glimpse-into the-future-of-the-old-cedar-avenue-bridge/ Long Meadow Bridge. (n.d.). Retrieved from http://www.nps.gov/nr/feature/places/13000324.htm