• JIT philosophy means getting the right
quantity of goods at the right place and the
right time.
• JIT exceeds the concept of inventory reduction;
it is an all-encompassing philosophy geared to
eliminate waste, anything that does not add
value.
• A broad JIT view – or lean production/lean
systems - is one that encompasses the entire
organization.
 JIT originated in Japan at Toyota Motor Co,
fueled by a need to survive the devastation
post WWII.
 JIT gained worldwide prominence in the 1970s.
 Often termed “Lean Production” or “Lean
Systems.”
 Broad view that entire organization has the
same goal - to serve customers.
 JIT is built on simplicity - simpler is better.
 Continuous improvement – often using kaizen
blitz.
 Visibility – all waste must be visible to be
identified and eliminated.
 Flexibility - to adapt to changes in
environment.
 JIT manufacturing focuses on production system
to achieve value-added manufacturing.
 TQM is an integrated effort designed to
improve quality performance at every level.
 Respect for people rests on the philosophy that
human resources are an essential part of JIT
philosophy.
 JIT Manufacturing is a philosophy of value-
added manufacturing.
 Achieved by focusing on these elements:
 Inventory reduction - exposes problems.
 Small lots & quick setups.
 Uniform plant loading.
 Flexible resources.
 Efficient facility layouts.
 Moveable, general purpose equipment:
 Portable equipment with plug in power/air
 Drills, lathes, printer-fax-copiers, etc.
 Capable of being setup to do many different things
with minimal setup time.
 Multifunctional workers:
 Workers assume considerable responsibility.
 Cross-trained to perform several different duties.
 Trained to also be problem solvers.
 Integrate quality into all processes
 Focus on continuous improvement.
 Quality at the source - sequential inspection.
 Preventive maintenance – scheduled.
 Work environment - everything in its place, a
place for everything.
The Role of Employees:
 Genuine and meaningful respect for associates.
 Quality circles – small volunteer teams that solve
quality problems.
Lifetime Employment:
– Everyone feels secure/is empowered.
– Everyone is responsible for quality:
understand both internal and external
customer needs.
 Reduction in inventories.
 Improved quality.
 Reduced space requirements.
 Shorter lead times.
 Lower production costs.
 Increased productivity.
 Increased machine utilization.
 Greater flexibility.
Many JIT concepts also apply to Service
companies
 Improved quality such as timeliness, service
consistency, and courtesy
 Uniform facility loading to provide better service
responsiveness
 Use of multifunction workers
 Reduction in cycle time
 Minimizing setup times and parallel processing
 Workplace organization
K10880 deepaknagar jit ppt deepak

More Related Content

What's hot

What's hot (19)

KAIZEN COSTING NTES
KAIZEN COSTING NTESKAIZEN COSTING NTES
KAIZEN COSTING NTES
 
Benefits of Concurrent Engineering
Benefits of Concurrent EngineeringBenefits of Concurrent Engineering
Benefits of Concurrent Engineering
 
Decision making
Decision makingDecision making
Decision making
 
Lean vs agile manufacturing
Lean vs agile manufacturingLean vs agile manufacturing
Lean vs agile manufacturing
 
Chapter 3. CON CURRENT ENGINEERING
Chapter 3. CON CURRENT ENGINEERINGChapter 3. CON CURRENT ENGINEERING
Chapter 3. CON CURRENT ENGINEERING
 
Concurrent engineering
Concurrent engineering Concurrent engineering
Concurrent engineering
 
Continuous Process Improvement and Japanese Concepts
Continuous Process Improvement and Japanese ConceptsContinuous Process Improvement and Japanese Concepts
Continuous Process Improvement and Japanese Concepts
 
Lean production by Saiful Alam_050817
Lean production by Saiful Alam_050817Lean production by Saiful Alam_050817
Lean production by Saiful Alam_050817
 
Concurrent engineering
Concurrent engineeringConcurrent engineering
Concurrent engineering
 
Power point lean
Power point leanPower point lean
Power point lean
 
Dfma as the tool for concurrent engineering
Dfma as the tool for concurrent engineeringDfma as the tool for concurrent engineering
Dfma as the tool for concurrent engineering
 
Why Lean Initiative Fail-Is It Resistance...? Let’s Start VSM
Why Lean Initiative Fail-Is It Resistance...? Let’s Start VSMWhy Lean Initiative Fail-Is It Resistance...? Let’s Start VSM
Why Lean Initiative Fail-Is It Resistance...? Let’s Start VSM
 
Concurrent Engineering
Concurrent EngineeringConcurrent Engineering
Concurrent Engineering
 
lean & agile
lean & agilelean & agile
lean & agile
 
Advantages of Lean Production
Advantages of Lean ProductionAdvantages of Lean Production
Advantages of Lean Production
 
Project Manufacturing
Project ManufacturingProject Manufacturing
Project Manufacturing
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
5 Things to Know About Lean Manufacturing
5 Things to Know About Lean Manufacturing5 Things to Know About Lean Manufacturing
5 Things to Know About Lean Manufacturing
 
Tuning the planning and control system to product and process design: G3
Tuning the planning and control system to product and process design: G3Tuning the planning and control system to product and process design: G3
Tuning the planning and control system to product and process design: G3
 

Viewers also liked (14)

Tecnologías de punta
Tecnologías de puntaTecnologías de punta
Tecnologías de punta
 
Julius slide share
Julius slide shareJulius slide share
Julius slide share
 
2.4.awia huwisah-yos
2.4.awia huwisah-yos2.4.awia huwisah-yos
2.4.awia huwisah-yos
 
Mikeking2 CV ex 251115
Mikeking2 CV ex 251115Mikeking2 CV ex 251115
Mikeking2 CV ex 251115
 
Basic thermodynamics cycle
Basic thermodynamics cycleBasic thermodynamics cycle
Basic thermodynamics cycle
 
K10913 dhirendra gocher me 6th sem cpuk
K10913 dhirendra gocher me 6th sem cpukK10913 dhirendra gocher me 6th sem cpuk
K10913 dhirendra gocher me 6th sem cpuk
 
13. uiliin togsgoh nohtsol
13. uiliin togsgoh nohtsol13. uiliin togsgoh nohtsol
13. uiliin togsgoh nohtsol
 
Lecture 7
Lecture 7Lecture 7
Lecture 7
 
1.1.utga zohioliin-helnii-tuhai
1.1.utga zohioliin-helnii-tuhai1.1.utga zohioliin-helnii-tuhai
1.1.utga zohioliin-helnii-tuhai
 
Basic thermodynamics cycle
Basic thermodynamics cycleBasic thermodynamics cycle
Basic thermodynamics cycle
 
19.2. ugiin san bayajih
19.2. ugiin san bayajih19.2. ugiin san bayajih
19.2. ugiin san bayajih
 
Lecture 13
Lecture 13Lecture 13
Lecture 13
 
Tecnologías de punta
Tecnologías de puntaTecnologías de punta
Tecnologías de punta
 
K11038 Mayur pancholi
K11038 Mayur pancholiK11038 Mayur pancholi
K11038 Mayur pancholi
 

Similar to K10880 deepaknagar jit ppt deepak

Lean production and jit
Lean production and jitLean production and jit
Lean production and jit
Kusum Parmar
 

Similar to K10880 deepaknagar jit ppt deepak (20)

Just In Time
Just In TimeJust In Time
Just In Time
 
Lean.ppt
Lean.pptLean.ppt
Lean.ppt
 
ch07.ppt
ch07.pptch07.ppt
ch07.ppt
 
Lean production and jit
Lean production and jitLean production and jit
Lean production and jit
 
Just in time
Just in timeJust in time
Just in time
 
JIT- JUST IN TIME PPT
JIT- JUST IN TIME PPTJIT- JUST IN TIME PPT
JIT- JUST IN TIME PPT
 
15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)
 
Lean and agile manufacturing system
Lean and agile manufacturing systemLean and agile manufacturing system
Lean and agile manufacturing system
 
Just in time
Just in timeJust in time
Just in time
 
Just in time
Just in timeJust in time
Just in time
 
Just In Time(JIT)
Just In Time(JIT)Just In Time(JIT)
Just In Time(JIT)
 
LEAN MANUFACTURING USES
LEAN MANUFACTURING USESLEAN MANUFACTURING USES
LEAN MANUFACTURING USES
 
Just in Time (JIT)
Just in Time (JIT)Just in Time (JIT)
Just in Time (JIT)
 
Srj tpm
Srj tpmSrj tpm
Srj tpm
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
JUST IN TIME
JUST IN TIMEJUST IN TIME
JUST IN TIME
 
Lean Manufacturing - An Overview
Lean Manufacturing - An OverviewLean Manufacturing - An Overview
Lean Manufacturing - An Overview
 
just in time manufacturing
just in time manufacturingjust in time manufacturing
just in time manufacturing
 
Implementation of Lean Manufacturing System for Successful Production System ...
Implementation of Lean Manufacturing System for Successful Production System ...Implementation of Lean Manufacturing System for Successful Production System ...
Implementation of Lean Manufacturing System for Successful Production System ...
 
Productivity enhancement using lean
Productivity enhancement using leanProductivity enhancement using lean
Productivity enhancement using lean
 

More from Chetan Kumar (13)

K10846 chetan kumar compressed air production by suspension
K10846 chetan kumar compressed air production by suspensionK10846 chetan kumar compressed air production by suspension
K10846 chetan kumar compressed air production by suspension
 
K11019 SAMANT SINGH
K11019 SAMANT SINGHK11019 SAMANT SINGH
K11019 SAMANT SINGH
 
K11038 Mayur pancholi
K11038 Mayur pancholiK11038 Mayur pancholi
K11038 Mayur pancholi
 
K11038 Mayur pancholi
K11038 Mayur pancholiK11038 Mayur pancholi
K11038 Mayur pancholi
 
k10798 Ashok rac me 6th sem
k10798 Ashok rac me 6th semk10798 Ashok rac me 6th sem
k10798 Ashok rac me 6th sem
 
K11038 Mayur control ppt
K11038 Mayur control pptK11038 Mayur control ppt
K11038 Mayur control ppt
 
K10798 ashok opc me 6th sem
K10798 ashok opc me 6th semK10798 ashok opc me 6th sem
K10798 ashok opc me 6th sem
 
K11023 rohan patel me 6th sem. control
K11023 rohan patel me 6th sem. controlK11023 rohan patel me 6th sem. control
K11023 rohan patel me 6th sem. control
 
K10880 Deepak Nagar Control
K10880 Deepak Nagar ControlK10880 Deepak Nagar Control
K10880 Deepak Nagar Control
 
K10880 deepak nagar 6th sem me vehicle accident information deepak
K10880 deepak nagar 6th sem me vehicle accident information deepakK10880 deepak nagar 6th sem me vehicle accident information deepak
K10880 deepak nagar 6th sem me vehicle accident information deepak
 
K10913 dhirendra gocher me 6th sem cpu kota
K10913 dhirendra gocher me 6th sem cpu kotaK10913 dhirendra gocher me 6th sem cpu kota
K10913 dhirendra gocher me 6th sem cpu kota
 
K10913 Dhirendra Gocher OPC 6th sem cpu kota
K10913 Dhirendra Gocher OPC 6th sem cpu kotaK10913 Dhirendra Gocher OPC 6th sem cpu kota
K10913 Dhirendra Gocher OPC 6th sem cpu kota
 
K10913 dhirendra gocher me 6th sem
K10913 dhirendra gocher me 6th semK10913 dhirendra gocher me 6th sem
K10913 dhirendra gocher me 6th sem
 

Recently uploaded

Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Recently uploaded (20)

Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 

K10880 deepaknagar jit ppt deepak

  • 1. MAJAOR ASSIGNMENT ON JUST IN TIME SYSTEM SUBMITTED TO Mr. BHUPENDRA GEHLOT DEPT.OF (M.E.) SUBMITTED BY Deepak Nagar KID-K10880 B.Tech.(M.E.) 6th Semester
  • 2. • JIT philosophy means getting the right quantity of goods at the right place and the right time. • JIT exceeds the concept of inventory reduction; it is an all-encompassing philosophy geared to eliminate waste, anything that does not add value. • A broad JIT view – or lean production/lean systems - is one that encompasses the entire organization.
  • 3.  JIT originated in Japan at Toyota Motor Co, fueled by a need to survive the devastation post WWII.  JIT gained worldwide prominence in the 1970s.  Often termed “Lean Production” or “Lean Systems.”  Broad view that entire organization has the same goal - to serve customers.
  • 4.  JIT is built on simplicity - simpler is better.  Continuous improvement – often using kaizen blitz.  Visibility – all waste must be visible to be identified and eliminated.  Flexibility - to adapt to changes in environment.
  • 5.
  • 6.  JIT manufacturing focuses on production system to achieve value-added manufacturing.  TQM is an integrated effort designed to improve quality performance at every level.  Respect for people rests on the philosophy that human resources are an essential part of JIT philosophy.
  • 7.  JIT Manufacturing is a philosophy of value- added manufacturing.  Achieved by focusing on these elements:  Inventory reduction - exposes problems.  Small lots & quick setups.  Uniform plant loading.  Flexible resources.  Efficient facility layouts.
  • 8.  Moveable, general purpose equipment:  Portable equipment with plug in power/air  Drills, lathes, printer-fax-copiers, etc.  Capable of being setup to do many different things with minimal setup time.  Multifunctional workers:  Workers assume considerable responsibility.  Cross-trained to perform several different duties.  Trained to also be problem solvers.
  • 9.  Integrate quality into all processes  Focus on continuous improvement.  Quality at the source - sequential inspection.  Preventive maintenance – scheduled.  Work environment - everything in its place, a place for everything.
  • 10. The Role of Employees:  Genuine and meaningful respect for associates.  Quality circles – small volunteer teams that solve quality problems. Lifetime Employment: – Everyone feels secure/is empowered. – Everyone is responsible for quality: understand both internal and external customer needs.
  • 11.  Reduction in inventories.  Improved quality.  Reduced space requirements.  Shorter lead times.  Lower production costs.  Increased productivity.  Increased machine utilization.  Greater flexibility.
  • 12. Many JIT concepts also apply to Service companies  Improved quality such as timeliness, service consistency, and courtesy  Uniform facility loading to provide better service responsiveness  Use of multifunction workers  Reduction in cycle time  Minimizing setup times and parallel processing  Workplace organization