SlideShare a Scribd company logo
1 of 27
Subject- Water Resources Engineering
By
Denish Jangid
Assistant Professor
Civil Engineering Department
WELLS,
TYPES OF WELLS
Overview of lecture
1. Introduction
2. Wells and Tube Wells Irrigation in
India : Merit & demerits
3. Open well and classification of
open well
4. Tube well and classification of tube
well
INTRODUCTION
Well: It is a vertical structure dug in ground for purpose
of bringing ground water to the earth’s surface
Basically wells are classified as follows :
 Open wells (Dug wells)
 Tube wells
There were about 5 million wells in 1950-51 and their
number has now increased to about 12 million.
Uttar Pradesh has the largest area of 93-84 lakh
hectares under well irrigation which accounts for
about 28-19 per cent of the well irrigated area of
India.
This is followed by Rajasthan (10-44%), Punjab (8-
65%), Madhya Pradesh (7-97%), and Gujarat (7-34%)
Bihar (6-29%), Andhra Pradesh (5-87%), Maharashtra
(5-75%), Haryana (4-41%), Tamil Nadu (4-35%), West
Bengal (4 19%) and Karnataka (3.06%).
Wells and Tube Wells Irrigation in India :
Merit
1. Well is simplest and cheapest source of irrigation
and the poor Indian farmer can easily afford it.
2 Well is an independent source of irrigation and can
be used as and when the necessity arises. Canal
irrigation, on the other hand, is controlled by other
agencies and cannot be used at will.
3. Excessive irrigation by canal leads to the problem of
reh which is not the case with well irrigation.
4. There is a limit to the extent of canal irrigation
beyond the tail end of the canal while a well can be
dug at any convenient place.
5 Several chemicals such as nitrate, chloride,
sulphate, etc. are generally found mixed in well
water. They add to the fertility of soil when they
reach the agricultural field along with well water.
6. The farmer has to pay regularly for canal irrigation
which is not the case with well irrigation.
Wells & Tube Wells Irrigation in India :Demerits
1.Only limited area can be irrigated. Normally, a well can
irrigate 1 to 8 hectares of land.
2. The well may dry up and may be rendered useless for
irrigation if excessive water is taken out
3. In the event of a drought, the ground water level falls and
enough water is not available in the well when it is needed
the most.
4. Tube wells can draw a lot of groundwater from its
neighbouring areas and make the ground dry and unfit for
agriculture.
5. Well and tube well irrigation is not possible in areas of
brackish groundwater.
OPEN WELL
These are the wells which have comparatively
large diameters and lower discharges
Usually they have discharge of 20 m³/hr but if
constructed by efficient planning it gives
discharge of 200-300 m³/hr
They are constructed of diameter of about 1-10 m
and have depth of about 2-20m
They are constructed by digging therefore they
are also known as dug wells
CLASSIFICATION OF OPEN WELL BASED ON DEPTH
1. Shallow open well : These are the wells resting
on the water bearing strata and gets their supplies
from the surrounding materials
2. Deep open well : These are the wells resting on
the impervious layer known as mota layer beneath
which lies water bearing pervious layer and gets
their supply from this layer
CLASSIFICATION OF OPEN WELL BASED ON DEPTH
CLASSIFICATION OF OPEN WELL BASED ON
TYPE OF Lining/Walls
Kachha wells : These type of wells are only
constructed when water table is high as these type
of wells sometimes collapses.
It has no lining. The well sides are unprotected. Also
called unlined well. It is limited depth well. Like 6
Meter
CLASSIFICATION OF OPEN WELL BASED ON TYPE
OF Lining
Wells with Impervious lining : These are most
suitable and stable type of open well. These are
constructed by first digging a pit then a curb which
is a circular ring with sharp bottom is inserted .
Then a masonry wall up to some distance above
ground is constructed , then as excavation proceeds
it sinks blow and then masonry is further extended
and well is constructed. As water enters from the
bottom type of flow is spherical.
CLASSIFICATION OF OPEN WELL BASED ON TYPE
OF Lining
Well with pervious lining : These type of wells are
suitable in coarse formations these are constructed
by masonry of dry bricks or stones without any
binding materials. So the water supply enters from
the wall of well therefore the flow is radial. Such
wells are provided with bottom plug so the flow is
not combination of radial and spherical.
TUBE WELLS
A tube well is a long pipe sunk in ground
intercepting one or more water bearing strata.
As compared to open well there diameter is less
about 80-600 mm. Tube well is a type of water well in which a
long 100–200 millimetres stainless steel tube or pipe is bored
into an underground aquifer. The lower end is fitted with a
strainer, and a pump at the top lifts water for irrigation.
A tube well is a deeper well from which water is lifted with
the help of a pumping set operated by an electric motor or a
diesel engine. Obviously, a tube well cannot be constructed
everywhere and requires some geographical conditions
favouring its installation.
The first tube well of India was sunk in Uttar Pradesh
in 1930. Till 1951 India had just 2,500 tube wells. The
central and the state governments are helping the
farmers by distributing pumping sets, granting loans
and giving subsidies.
The number of electrical pump sets/tube wells
increased from 2 lakh in 1960 to over 4 million in 1995-
96 while the dieselized pump sets increased from 2 3
lakh to about 3 million during the same period.
The main factors for installing the tube well:
(i) There should be sufficient quantity of ground water because a tube well
can generally irrigate 2 hectares per day against 0.2 hectares per day
irrigated by an ordinary well.
(ii) The water level should be nearly 15 metres. If the water table is more
than 50 metres deep the cost of pumping out water from the tube well
becomes uneconomic.
(iii) There should be regular supply of cheap electricity or diesel so that
water from the tube well can be taken out at the hour of need.
(iv) The soil in the immediate neighbourhood of the tube-well should be
fertile so that there is demand for irrigation and the cost involved in the
construction and operation of the tube well can be recovered by the
increased farm production.
CLASSIFICATION OF TUBE WELL BASED ON DEPTH
Shallow tube well : These are the tube which has
depth limited to 30 meters and maximum have
discharge of 20 m³/hr
Deep tube well : These are the tube wells which
have maximum depth of about 600 m and may give
discharge more then 800 m³/hr
CLASSIFICATION OF TUBE WELL BASED ON SUPPLY SYSTEM
Strainer type tube well : These is
most commonly used tube such that in
general a tube well means strainer
tube well. In this type of well a
strainer which a wire mesh with
small openings is wrapped around
the main pipe which also has large
openings such that area of opening
in strainer and main pipe remains
same. Annual space is left between
two strainer so that the open area of
pipe perforations is not reduced.
The type of flow is radial.
In tube wells the metal pipe driven in ground is perforated to
allow only clear water to enter the hole. It is obvious that if no
other means is adopted the perforations in the metal tube will
have to be made very fine. It is very costly process.
As an alternative wire net may be wrapped on the cylindrical
frame of small diameter but it is liable to break as it is very
delicate. So the best and most commonly adopted practice is to
provide a pipe with fairly big perforations and surrounding that
is a wire net or a strainer with smaller openings.
Normally the mesh size of the wire net or strainer is kept equal
to D to D of the surrounding soil. This type of well derives water
from one aquifer of unlimited extent or from a confined aquifer
or from number of aquifers.
CLASSIFICATION OF TUBE WELL BASED ON SUPPLY SYSTEM
Cavity tube well : A cavity type tube well
consists of a pipe sunk in ground up to the hard
clay layer . It draws water from the bottom of
well . In initial stages fine sand is also pumped
with water and in such manner a cavity is
formed at the bottom so the water enters from
the aquifer into the well through this cavity
. It is an empty space within a solid object.
A cavity type tube well draws water from
bottom of the well and not from the sides and is
drilled in alluvial formation.
The flow in a cavity well is spherical.
The area of flow is increased by enlarging the
size of cavity.
HOW IS THE CAVITY FORMED?
The tube well is taken down till it penetrates the
impervious or (mota) layer and reaches the water
bearing layer. In the initial stages when the water is
pumped out fine sand comes in the tube well with
the water and consequently a hollow or cavity is
formed at the bottom.
After the cavity formation only clear water enters the
tube well. Since the rate of pumping is more, the
velocity of water entering the coarse sand layer is
critical but when it comes in the hollow the velocity
is reduced. Finally the water enters the tube well at
the bottom with a velocity lower than the critical
velocity.
Developing a cavity:
1) A centrifugal pump is generally adopted for
developing a cavity well.
2) Generally the depth of cavity is small (in
centimetres).
3. Slotted Type Tube well:
CLASSIFICATION OF TUBE WELL BASED ON SUPPLY SYSTEM
Sometimes the nature of subsoil
formation is not anticipated correctly.
Obviously bore hole driven for
constructing strainer well will be a
failure. If a mota formation is present
cavity well may be resorted to.
But if neither of the conditions are
existing the slotted tube well can be
rightly constructed. There should be of
course an aquifer present at the bottom.
In the bore hole (say 36 cm diameter) a 15
cm diameter education pipe is lowered till
it reaches the bottom. The bottom of the
education pipe is slotted as shown in Fig.
The size of the slots may be 25 mm x 3
mm with 12 mm spacing

More Related Content

What's hot (20)

Spillways
SpillwaysSpillways
Spillways
 
Methods of Irrigation
Methods of IrrigationMethods of Irrigation
Methods of Irrigation
 
Canal of design
Canal of designCanal of design
Canal of design
 
Drainage system
Drainage systemDrainage system
Drainage system
 
Spillway
Spillway Spillway
Spillway
 
Aquifers
AquifersAquifers
Aquifers
 
energy dissipator in hydraulic structure
energy dissipator  in  hydraulic structure energy dissipator  in  hydraulic structure
energy dissipator in hydraulic structure
 
Canal Regulation & Cross Drainage Works
Canal Regulation & Cross Drainage WorksCanal Regulation & Cross Drainage Works
Canal Regulation & Cross Drainage Works
 
Stilling basin
Stilling basinStilling basin
Stilling basin
 
types of dam
types of damtypes of dam
types of dam
 
ARTIFICIAL RECHARGE OF GROUNDWATER
ARTIFICIAL RECHARGE OF GROUNDWATERARTIFICIAL RECHARGE OF GROUNDWATER
ARTIFICIAL RECHARGE OF GROUNDWATER
 
Reservior planning
Reservior    planningReservior    planning
Reservior planning
 
Unit 3 Diversion and Impounding Structures
Unit 3 Diversion and Impounding StructuresUnit 3 Diversion and Impounding Structures
Unit 3 Diversion and Impounding Structures
 
Earthen dam
Earthen damEarthen dam
Earthen dam
 
Dams and spillways
Dams and spillwaysDams and spillways
Dams and spillways
 
weir & barrage
weir & barrageweir & barrage
weir & barrage
 
Runoff
RunoffRunoff
Runoff
 
Diversion headwork
Diversion headwork Diversion headwork
Diversion headwork
 
Artificial ground water recharge ppt
Artificial ground water recharge pptArtificial ground water recharge ppt
Artificial ground water recharge ppt
 
River training works lecture
River training works lectureRiver training works lecture
River training works lecture
 

Similar to Water Resources Engineering types of wells with figures Denish Jangid Open wells (Dug wells) Tube wells Slotted Type Tube well

Tube wells and their design
Tube wells and their designTube wells and their design
Tube wells and their designMoudud Hasan
 
Hydrology (Ground water Hydrology)
Hydrology (Ground water Hydrology)Hydrology (Ground water Hydrology)
Hydrology (Ground water Hydrology)Latif Hyder Wadho
 
IRRIGATION_ENGINEERING.pptx
IRRIGATION_ENGINEERING.pptxIRRIGATION_ENGINEERING.pptx
IRRIGATION_ENGINEERING.pptxkhalidmustafa44
 
Irrigation systems of tamilnadu
Irrigation systems of tamilnaduIrrigation systems of tamilnadu
Irrigation systems of tamilnaduIIM Ahmedabad
 
Tube-Wells and their Designs
Tube-Wells and their DesignsTube-Wells and their Designs
Tube-Wells and their DesignsAnand Kumar
 
Techniques of rain water harvesting in urban and rural areas
Techniques of rain water harvesting in urban and rural areasTechniques of rain water harvesting in urban and rural areas
Techniques of rain water harvesting in urban and rural areasIEI GSC
 
Ground water recharge & water logging
Ground water recharge & water loggingGround water recharge & water logging
Ground water recharge & water loggingNIKHIL PAKWANNE
 
Ground water recharge & water logging by Nikhil Pakwanne
Ground water recharge & water logging by Nikhil PakwanneGround water recharge & water logging by Nikhil Pakwanne
Ground water recharge & water logging by Nikhil PakwanneNIKHIL PAKWANNE
 
Unit 3 ground water lect-3
Unit 3 ground water lect-3Unit 3 ground water lect-3
Unit 3 ground water lect-3DIPESH RAJPUT
 
Water supply slides (1).pptx
Water supply slides (1).pptxWater supply slides (1).pptx
Water supply slides (1).pptxtsheeringlama861
 
Canal Regulation & Canal Types
Canal Regulation & Canal TypesCanal Regulation & Canal Types
Canal Regulation & Canal TypesAbbasZafar3
 
GROUNDWATER.pptx
GROUNDWATER.pptxGROUNDWATER.pptx
GROUNDWATER.pptxnavo13
 
earth dam.pptx
earth dam.pptxearth dam.pptx
earth dam.pptxEboOQQ
 
L2 - Sources of water.ppt
L2 - Sources of water.pptL2 - Sources of water.ppt
L2 - Sources of water.pptPRACHI DESSAI
 

Similar to Water Resources Engineering types of wells with figures Denish Jangid Open wells (Dug wells) Tube wells Slotted Type Tube well (20)

Types of wells
Types of wellsTypes of wells
Types of wells
 
Tube wells and their design
Tube wells and their designTube wells and their design
Tube wells and their design
 
Hydrology (Ground water Hydrology)
Hydrology (Ground water Hydrology)Hydrology (Ground water Hydrology)
Hydrology (Ground water Hydrology)
 
IRRIGATION_ENGINEERING.pptx
IRRIGATION_ENGINEERING.pptxIRRIGATION_ENGINEERING.pptx
IRRIGATION_ENGINEERING.pptx
 
GWHMODULE5.pptx
GWHMODULE5.pptxGWHMODULE5.pptx
GWHMODULE5.pptx
 
Irrigation systems of tamilnadu
Irrigation systems of tamilnaduIrrigation systems of tamilnadu
Irrigation systems of tamilnadu
 
Tube-Wells and their Designs
Tube-Wells and their DesignsTube-Wells and their Designs
Tube-Wells and their Designs
 
Water.pptx
 Water.pptx Water.pptx
Water.pptx
 
Techniques of rain water harvesting in urban and rural areas
Techniques of rain water harvesting in urban and rural areasTechniques of rain water harvesting in urban and rural areas
Techniques of rain water harvesting in urban and rural areas
 
Ground water recharge & water logging
Ground water recharge & water loggingGround water recharge & water logging
Ground water recharge & water logging
 
Ground water recharge & water logging by Nikhil Pakwanne
Ground water recharge & water logging by Nikhil PakwanneGround water recharge & water logging by Nikhil Pakwanne
Ground water recharge & water logging by Nikhil Pakwanne
 
types of wells.pdf
types of wells.pdftypes of wells.pdf
types of wells.pdf
 
Unit 3 ground water lect-3
Unit 3 ground water lect-3Unit 3 ground water lect-3
Unit 3 ground water lect-3
 
10 Wells.pptx
10 Wells.pptx10 Wells.pptx
10 Wells.pptx
 
Water supply slides (1).pptx
Water supply slides (1).pptxWater supply slides (1).pptx
Water supply slides (1).pptx
 
Canal Regulation & Canal Types
Canal Regulation & Canal TypesCanal Regulation & Canal Types
Canal Regulation & Canal Types
 
GROUNDWATER.pptx
GROUNDWATER.pptxGROUNDWATER.pptx
GROUNDWATER.pptx
 
minor and micro irrigation
 minor and micro irrigation minor and micro irrigation
minor and micro irrigation
 
earth dam.pptx
earth dam.pptxearth dam.pptx
earth dam.pptx
 
L2 - Sources of water.ppt
L2 - Sources of water.pptL2 - Sources of water.ppt
L2 - Sources of water.ppt
 

More from Denish Jangid

Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
surveying_module-3-trigonometric-leveling by Denis Jangeed.pdf
surveying_module-3-trigonometric-leveling by Denis Jangeed.pdfsurveying_module-3-trigonometric-leveling by Denis Jangeed.pdf
surveying_module-3-trigonometric-leveling by Denis Jangeed.pdfDenish Jangid
 
Total Station by Denis Jangeed.pdf
Total Station by Denis Jangeed.pdfTotal Station by Denis Jangeed.pdf
Total Station by Denis Jangeed.pdfDenish Jangid
 
EDM-Electronic Distance Measurement by Denis Jangeed.pptx
EDM-Electronic Distance Measurement by Denis Jangeed.pptxEDM-Electronic Distance Measurement by Denis Jangeed.pptx
EDM-Electronic Distance Measurement by Denis Jangeed.pptxDenish Jangid
 
Curve Surveying by DJ Sir.pptx
Curve Surveying by DJ Sir.pptxCurve Surveying by DJ Sir.pptx
Curve Surveying by DJ Sir.pptxDenish Jangid
 
Surveying Levelling & Contouring Unit 2 Notes updating.pptx (1).pdf
Surveying Levelling & Contouring Unit 2 Notes updating.pptx (1).pdfSurveying Levelling & Contouring Unit 2 Notes updating.pptx (1).pdf
Surveying Levelling & Contouring Unit 2 Notes updating.pptx (1).pdfDenish Jangid
 
A Complete Guidance How to do Summer Industrial Training after 4th & 6th Seme...
A Complete Guidance How to do Summer Industrial Training after 4th & 6th Seme...A Complete Guidance How to do Summer Industrial Training after 4th & 6th Seme...
A Complete Guidance How to do Summer Industrial Training after 4th & 6th Seme...Denish Jangid
 
Wind and Seismic Analysis WASA or Building Design Notes.pdf
Wind and Seismic Analysis WASA or Building Design Notes.pdfWind and Seismic Analysis WASA or Building Design Notes.pdf
Wind and Seismic Analysis WASA or Building Design Notes.pdfDenish Jangid
 
Surveying Complete Notes of Unit 1.pptx
Surveying Complete Notes of Unit 1.pptxSurveying Complete Notes of Unit 1.pptx
Surveying Complete Notes of Unit 1.pptxDenish Jangid
 
WRED Water Resources Engineering Design lab Record work by Mr.Denish Jangid
WRED Water Resources Engineering Design lab Record work by Mr.Denish JangidWRED Water Resources Engineering Design lab Record work by Mr.Denish Jangid
WRED Water Resources Engineering Design lab Record work by Mr.Denish JangidDenish Jangid
 
WRE water resources engineering lab work by Mr. Denish Jangid
WRE water resources engineering lab work by Mr. Denish JangidWRE water resources engineering lab work by Mr. Denish Jangid
WRE water resources engineering lab work by Mr. Denish JangidDenish Jangid
 
All FLUID MECHANICS (FM) Notes by Mr. Denish Jangid
All FLUID MECHANICS (FM) Notes by Mr. Denish JangidAll FLUID MECHANICS (FM) Notes by Mr. Denish Jangid
All FLUID MECHANICS (FM) Notes by Mr. Denish JangidDenish Jangid
 
Complete all notes WATER RESOURCE ENGINEERING (WRE)
Complete all notes WATER RESOURCE ENGINEERING (WRE)Complete all notes WATER RESOURCE ENGINEERING (WRE)
Complete all notes WATER RESOURCE ENGINEERING (WRE)Denish Jangid
 
Introduction of WATER RESOURCE ENGINEERING Unit 1 Definitions functions and a...
Introduction of WATER RESOURCE ENGINEERING Unit 1 Definitions functions and a...Introduction of WATER RESOURCE ENGINEERING Unit 1 Definitions functions and a...
Introduction of WATER RESOURCE ENGINEERING Unit 1 Definitions functions and a...Denish Jangid
 
M sand difference between river sand and m sand & Manufactured sand- properti...
M sand difference between river sand and m sand & Manufactured sand- properti...M sand difference between river sand and m sand & Manufactured sand- properti...
M sand difference between river sand and m sand & Manufactured sand- properti...Denish Jangid
 
Spillways, Spillway capacity, flood routing through spillways, different type...
Spillways, Spillway capacity, flood routing through spillways, different type...Spillways, Spillway capacity, flood routing through spillways, different type...
Spillways, Spillway capacity, flood routing through spillways, different type...Denish Jangid
 
water distribution system & warabandi by Denish Jangid unit 2 Water Resources...
water distribution system & warabandi by Denish Jangid unit 2 Water Resources...water distribution system & warabandi by Denish Jangid unit 2 Water Resources...
water distribution system & warabandi by Denish Jangid unit 2 Water Resources...Denish Jangid
 
Waterlogging Types & Causes of Waterlogging Effects & its control Salinity Ef...
Waterlogging Types & Causes of Waterlogging Effects & its control Salinity Ef...Waterlogging Types & Causes of Waterlogging Effects & its control Salinity Ef...
Waterlogging Types & Causes of Waterlogging Effects & its control Salinity Ef...Denish Jangid
 
unit 4 vsem cross drainage works & srturcture water resource engineering Siph...
unit 4 vsem cross drainage works & srturcture water resource engineering Siph...unit 4 vsem cross drainage works & srturcture water resource engineering Siph...
unit 4 vsem cross drainage works & srturcture water resource engineering Siph...Denish Jangid
 
Hydrology by Denish Jangid sir
Hydrology by Denish Jangid sirHydrology by Denish Jangid sir
Hydrology by Denish Jangid sirDenish Jangid
 

More from Denish Jangid (20)

Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
surveying_module-3-trigonometric-leveling by Denis Jangeed.pdf
surveying_module-3-trigonometric-leveling by Denis Jangeed.pdfsurveying_module-3-trigonometric-leveling by Denis Jangeed.pdf
surveying_module-3-trigonometric-leveling by Denis Jangeed.pdf
 
Total Station by Denis Jangeed.pdf
Total Station by Denis Jangeed.pdfTotal Station by Denis Jangeed.pdf
Total Station by Denis Jangeed.pdf
 
EDM-Electronic Distance Measurement by Denis Jangeed.pptx
EDM-Electronic Distance Measurement by Denis Jangeed.pptxEDM-Electronic Distance Measurement by Denis Jangeed.pptx
EDM-Electronic Distance Measurement by Denis Jangeed.pptx
 
Curve Surveying by DJ Sir.pptx
Curve Surveying by DJ Sir.pptxCurve Surveying by DJ Sir.pptx
Curve Surveying by DJ Sir.pptx
 
Surveying Levelling & Contouring Unit 2 Notes updating.pptx (1).pdf
Surveying Levelling & Contouring Unit 2 Notes updating.pptx (1).pdfSurveying Levelling & Contouring Unit 2 Notes updating.pptx (1).pdf
Surveying Levelling & Contouring Unit 2 Notes updating.pptx (1).pdf
 
A Complete Guidance How to do Summer Industrial Training after 4th & 6th Seme...
A Complete Guidance How to do Summer Industrial Training after 4th & 6th Seme...A Complete Guidance How to do Summer Industrial Training after 4th & 6th Seme...
A Complete Guidance How to do Summer Industrial Training after 4th & 6th Seme...
 
Wind and Seismic Analysis WASA or Building Design Notes.pdf
Wind and Seismic Analysis WASA or Building Design Notes.pdfWind and Seismic Analysis WASA or Building Design Notes.pdf
Wind and Seismic Analysis WASA or Building Design Notes.pdf
 
Surveying Complete Notes of Unit 1.pptx
Surveying Complete Notes of Unit 1.pptxSurveying Complete Notes of Unit 1.pptx
Surveying Complete Notes of Unit 1.pptx
 
WRED Water Resources Engineering Design lab Record work by Mr.Denish Jangid
WRED Water Resources Engineering Design lab Record work by Mr.Denish JangidWRED Water Resources Engineering Design lab Record work by Mr.Denish Jangid
WRED Water Resources Engineering Design lab Record work by Mr.Denish Jangid
 
WRE water resources engineering lab work by Mr. Denish Jangid
WRE water resources engineering lab work by Mr. Denish JangidWRE water resources engineering lab work by Mr. Denish Jangid
WRE water resources engineering lab work by Mr. Denish Jangid
 
All FLUID MECHANICS (FM) Notes by Mr. Denish Jangid
All FLUID MECHANICS (FM) Notes by Mr. Denish JangidAll FLUID MECHANICS (FM) Notes by Mr. Denish Jangid
All FLUID MECHANICS (FM) Notes by Mr. Denish Jangid
 
Complete all notes WATER RESOURCE ENGINEERING (WRE)
Complete all notes WATER RESOURCE ENGINEERING (WRE)Complete all notes WATER RESOURCE ENGINEERING (WRE)
Complete all notes WATER RESOURCE ENGINEERING (WRE)
 
Introduction of WATER RESOURCE ENGINEERING Unit 1 Definitions functions and a...
Introduction of WATER RESOURCE ENGINEERING Unit 1 Definitions functions and a...Introduction of WATER RESOURCE ENGINEERING Unit 1 Definitions functions and a...
Introduction of WATER RESOURCE ENGINEERING Unit 1 Definitions functions and a...
 
M sand difference between river sand and m sand & Manufactured sand- properti...
M sand difference between river sand and m sand & Manufactured sand- properti...M sand difference between river sand and m sand & Manufactured sand- properti...
M sand difference between river sand and m sand & Manufactured sand- properti...
 
Spillways, Spillway capacity, flood routing through spillways, different type...
Spillways, Spillway capacity, flood routing through spillways, different type...Spillways, Spillway capacity, flood routing through spillways, different type...
Spillways, Spillway capacity, flood routing through spillways, different type...
 
water distribution system & warabandi by Denish Jangid unit 2 Water Resources...
water distribution system & warabandi by Denish Jangid unit 2 Water Resources...water distribution system & warabandi by Denish Jangid unit 2 Water Resources...
water distribution system & warabandi by Denish Jangid unit 2 Water Resources...
 
Waterlogging Types & Causes of Waterlogging Effects & its control Salinity Ef...
Waterlogging Types & Causes of Waterlogging Effects & its control Salinity Ef...Waterlogging Types & Causes of Waterlogging Effects & its control Salinity Ef...
Waterlogging Types & Causes of Waterlogging Effects & its control Salinity Ef...
 
unit 4 vsem cross drainage works & srturcture water resource engineering Siph...
unit 4 vsem cross drainage works & srturcture water resource engineering Siph...unit 4 vsem cross drainage works & srturcture water resource engineering Siph...
unit 4 vsem cross drainage works & srturcture water resource engineering Siph...
 
Hydrology by Denish Jangid sir
Hydrology by Denish Jangid sirHydrology by Denish Jangid sir
Hydrology by Denish Jangid sir
 

Recently uploaded

The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 

Recently uploaded (20)

The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 

Water Resources Engineering types of wells with figures Denish Jangid Open wells (Dug wells) Tube wells Slotted Type Tube well

  • 1. Subject- Water Resources Engineering By Denish Jangid Assistant Professor Civil Engineering Department WELLS, TYPES OF WELLS
  • 2. Overview of lecture 1. Introduction 2. Wells and Tube Wells Irrigation in India : Merit & demerits 3. Open well and classification of open well 4. Tube well and classification of tube well
  • 3. INTRODUCTION Well: It is a vertical structure dug in ground for purpose of bringing ground water to the earth’s surface Basically wells are classified as follows :  Open wells (Dug wells)  Tube wells
  • 4. There were about 5 million wells in 1950-51 and their number has now increased to about 12 million. Uttar Pradesh has the largest area of 93-84 lakh hectares under well irrigation which accounts for about 28-19 per cent of the well irrigated area of India. This is followed by Rajasthan (10-44%), Punjab (8- 65%), Madhya Pradesh (7-97%), and Gujarat (7-34%) Bihar (6-29%), Andhra Pradesh (5-87%), Maharashtra (5-75%), Haryana (4-41%), Tamil Nadu (4-35%), West Bengal (4 19%) and Karnataka (3.06%).
  • 5. Wells and Tube Wells Irrigation in India : Merit 1. Well is simplest and cheapest source of irrigation and the poor Indian farmer can easily afford it. 2 Well is an independent source of irrigation and can be used as and when the necessity arises. Canal irrigation, on the other hand, is controlled by other agencies and cannot be used at will. 3. Excessive irrigation by canal leads to the problem of reh which is not the case with well irrigation.
  • 6.
  • 7. 4. There is a limit to the extent of canal irrigation beyond the tail end of the canal while a well can be dug at any convenient place. 5 Several chemicals such as nitrate, chloride, sulphate, etc. are generally found mixed in well water. They add to the fertility of soil when they reach the agricultural field along with well water. 6. The farmer has to pay regularly for canal irrigation which is not the case with well irrigation.
  • 8. Wells & Tube Wells Irrigation in India :Demerits 1.Only limited area can be irrigated. Normally, a well can irrigate 1 to 8 hectares of land. 2. The well may dry up and may be rendered useless for irrigation if excessive water is taken out 3. In the event of a drought, the ground water level falls and enough water is not available in the well when it is needed the most. 4. Tube wells can draw a lot of groundwater from its neighbouring areas and make the ground dry and unfit for agriculture. 5. Well and tube well irrigation is not possible in areas of brackish groundwater.
  • 9. OPEN WELL These are the wells which have comparatively large diameters and lower discharges Usually they have discharge of 20 m³/hr but if constructed by efficient planning it gives discharge of 200-300 m³/hr They are constructed of diameter of about 1-10 m and have depth of about 2-20m They are constructed by digging therefore they are also known as dug wells
  • 10. CLASSIFICATION OF OPEN WELL BASED ON DEPTH 1. Shallow open well : These are the wells resting on the water bearing strata and gets their supplies from the surrounding materials 2. Deep open well : These are the wells resting on the impervious layer known as mota layer beneath which lies water bearing pervious layer and gets their supply from this layer
  • 11. CLASSIFICATION OF OPEN WELL BASED ON DEPTH
  • 12. CLASSIFICATION OF OPEN WELL BASED ON TYPE OF Lining/Walls Kachha wells : These type of wells are only constructed when water table is high as these type of wells sometimes collapses. It has no lining. The well sides are unprotected. Also called unlined well. It is limited depth well. Like 6 Meter
  • 13. CLASSIFICATION OF OPEN WELL BASED ON TYPE OF Lining Wells with Impervious lining : These are most suitable and stable type of open well. These are constructed by first digging a pit then a curb which is a circular ring with sharp bottom is inserted . Then a masonry wall up to some distance above ground is constructed , then as excavation proceeds it sinks blow and then masonry is further extended and well is constructed. As water enters from the bottom type of flow is spherical.
  • 14.
  • 15. CLASSIFICATION OF OPEN WELL BASED ON TYPE OF Lining Well with pervious lining : These type of wells are suitable in coarse formations these are constructed by masonry of dry bricks or stones without any binding materials. So the water supply enters from the wall of well therefore the flow is radial. Such wells are provided with bottom plug so the flow is not combination of radial and spherical.
  • 16.
  • 17. TUBE WELLS A tube well is a long pipe sunk in ground intercepting one or more water bearing strata. As compared to open well there diameter is less about 80-600 mm. Tube well is a type of water well in which a long 100–200 millimetres stainless steel tube or pipe is bored into an underground aquifer. The lower end is fitted with a strainer, and a pump at the top lifts water for irrigation. A tube well is a deeper well from which water is lifted with the help of a pumping set operated by an electric motor or a diesel engine. Obviously, a tube well cannot be constructed everywhere and requires some geographical conditions favouring its installation.
  • 18. The first tube well of India was sunk in Uttar Pradesh in 1930. Till 1951 India had just 2,500 tube wells. The central and the state governments are helping the farmers by distributing pumping sets, granting loans and giving subsidies. The number of electrical pump sets/tube wells increased from 2 lakh in 1960 to over 4 million in 1995- 96 while the dieselized pump sets increased from 2 3 lakh to about 3 million during the same period.
  • 19.
  • 20. The main factors for installing the tube well: (i) There should be sufficient quantity of ground water because a tube well can generally irrigate 2 hectares per day against 0.2 hectares per day irrigated by an ordinary well. (ii) The water level should be nearly 15 metres. If the water table is more than 50 metres deep the cost of pumping out water from the tube well becomes uneconomic. (iii) There should be regular supply of cheap electricity or diesel so that water from the tube well can be taken out at the hour of need. (iv) The soil in the immediate neighbourhood of the tube-well should be fertile so that there is demand for irrigation and the cost involved in the construction and operation of the tube well can be recovered by the increased farm production.
  • 21. CLASSIFICATION OF TUBE WELL BASED ON DEPTH Shallow tube well : These are the tube which has depth limited to 30 meters and maximum have discharge of 20 m³/hr Deep tube well : These are the tube wells which have maximum depth of about 600 m and may give discharge more then 800 m³/hr
  • 22. CLASSIFICATION OF TUBE WELL BASED ON SUPPLY SYSTEM Strainer type tube well : These is most commonly used tube such that in general a tube well means strainer tube well. In this type of well a strainer which a wire mesh with small openings is wrapped around the main pipe which also has large openings such that area of opening in strainer and main pipe remains same. Annual space is left between two strainer so that the open area of pipe perforations is not reduced. The type of flow is radial.
  • 23. In tube wells the metal pipe driven in ground is perforated to allow only clear water to enter the hole. It is obvious that if no other means is adopted the perforations in the metal tube will have to be made very fine. It is very costly process. As an alternative wire net may be wrapped on the cylindrical frame of small diameter but it is liable to break as it is very delicate. So the best and most commonly adopted practice is to provide a pipe with fairly big perforations and surrounding that is a wire net or a strainer with smaller openings. Normally the mesh size of the wire net or strainer is kept equal to D to D of the surrounding soil. This type of well derives water from one aquifer of unlimited extent or from a confined aquifer or from number of aquifers.
  • 24. CLASSIFICATION OF TUBE WELL BASED ON SUPPLY SYSTEM Cavity tube well : A cavity type tube well consists of a pipe sunk in ground up to the hard clay layer . It draws water from the bottom of well . In initial stages fine sand is also pumped with water and in such manner a cavity is formed at the bottom so the water enters from the aquifer into the well through this cavity . It is an empty space within a solid object. A cavity type tube well draws water from bottom of the well and not from the sides and is drilled in alluvial formation. The flow in a cavity well is spherical. The area of flow is increased by enlarging the size of cavity.
  • 25. HOW IS THE CAVITY FORMED? The tube well is taken down till it penetrates the impervious or (mota) layer and reaches the water bearing layer. In the initial stages when the water is pumped out fine sand comes in the tube well with the water and consequently a hollow or cavity is formed at the bottom.
  • 26. After the cavity formation only clear water enters the tube well. Since the rate of pumping is more, the velocity of water entering the coarse sand layer is critical but when it comes in the hollow the velocity is reduced. Finally the water enters the tube well at the bottom with a velocity lower than the critical velocity. Developing a cavity: 1) A centrifugal pump is generally adopted for developing a cavity well. 2) Generally the depth of cavity is small (in centimetres).
  • 27. 3. Slotted Type Tube well: CLASSIFICATION OF TUBE WELL BASED ON SUPPLY SYSTEM Sometimes the nature of subsoil formation is not anticipated correctly. Obviously bore hole driven for constructing strainer well will be a failure. If a mota formation is present cavity well may be resorted to. But if neither of the conditions are existing the slotted tube well can be rightly constructed. There should be of course an aquifer present at the bottom. In the bore hole (say 36 cm diameter) a 15 cm diameter education pipe is lowered till it reaches the bottom. The bottom of the education pipe is slotted as shown in Fig. The size of the slots may be 25 mm x 3 mm with 12 mm spacing