internship ppt on smartinternz platform as salesforce developer
Gc4 the product explanantion finish
1. GC4: The Product Explanation
The product I was specifically in charge of was the first flat on Stage Right. When creating this
product I had to do everything from start to finish making this flat correct and perfecting to my
design.
The Construction Process
Firstly after getting the flat by the size of 1.22m Wide
and 1.9m height.I had to draw my design of the
ladder and measure it to the correct scale to make
sure that it would fit perfectly and look like the
images I had sourced when researching the play. I had
to measure the correct spacing between each step of
the ladder and then also make that it fit across to the
flat next to me to make it seem more realistic as one
flat instead of two and also so that it didn’t look
cramped onto one flat. This is picture evidence of me
drawing the correct spacing of the escape ladder in
place.
This is picture evidence of me having to drill the steps of my flat in the
correct spacing that I had marked out to create 3D steps of the fire
escape and so that I could start painting them the colour I had
designed with ease.
This is picture evidence of me going over the back colour of my flat
in beige to create a general coating for me to go over with
different paint to create dirt and brick pattern to make it seem
much more realistic and the beige help that design stand out much
more when on stage.
2. GC4: The Product Explanation
This is picture evidence of me creating the detail of the dirty
onto my flat to create the more realism that it is a flat
building in Manhattan. I have dirtied it up because when
looking in the script it says when they sing “96,000” that they
are in financial difficulties there for I have made it seem like
a run-down area.
This is picture evidence of my
final product without the decoration
of props.